Sunteți pe pagina 1din 1

Hydrographic Education

Professional Hydrographic Surveyor Education Program


Matriculation Course
Undergraduate Program
Hydrography I
ASSIGNMENT C: BATHYMETRIC MAPPING PLAN

 
Indonesian Nautical Chart Number 79 

Description of Problem Instructions

Bathymetric survey for early study of container terminal Your group shall select and use one site (cropped
construction will be conducted. The primary intention of portion of NC 79) within the requested range of location
the survey is to obtain early information on generic from the map. Minimize overlap among group. Go after
geometrical shape of seabed between Tg Bungin on the the following work sequence:
West and Tg Indramayu on the East. Single-beam echo- 1. Delineate the survey area, i.e. Port Section,
sounding and differential positioning systems are used. Navigation Channel, and identify their boundaries so
that the edges of the enclosing polyline can be listed.
As group of five members, you are requested to prepare 2. Plot the sounding tracks (i.e. main sounding line,
sounding plan based on the following specifications: cross sounding line) and fix sounding points. Put
1. Reference to Nautical Chart Number 79 (NC79). systematic numbering on them. Make sure that the
2. The survey covers the following location, anywhere interval of all sounding lines and points satisfies
between Tg Bungin and Tg Indramayu: IHO standard.
a. Port Section is corridor; 1 km seaward from 3. Choose two appropriate locations for your tidal
coastline, along 3 km length of shoreline. station and benchmark.
b. Navigation Channel; 3 km seaward from Port 4. Collect list of all coordinates as per requested, i.e.
Section with 1 km width. survey area, sounding lines’ start-end points (with
3. Compliance to IHO standards. azimuth), tidal station, benchmark.
5. Calculate the total length of your sounding tracks.
Superior who is authorized in verifying your submission 6. Make sure that all technical mapping terms (e.g.
has limited knowledge on hydrography. You must unit, coordinate system, map projection, geodetic
ensure success of delivery of your plan. The plan you reference, vertical datum, etc.) as guided by IHO
prepare should contain presentation of the following standards are properly described.
elements on selected crop of NC79:
1. Survey boundaries; 3km1km Port Section and You may use paper based method (manual drawing) or
1km4km Navigation Channel. dedicated mapping software for your planned sounding
2. Sounding tracks (main and cross), with numbering tracks. Decide the best lay out, visualization, and
of sounding lines and sounding fix points. presentation of your results. Your submission will be a
3. Proposed locations for tidal observation and report on one page of A4 paper (follow essay writing
establishment of benchmark. standard), attached with one page A3 paper (half folded)
4. Tabulation of all coordinates, i.e. survey area, for the map and one page of A4 paper for tabulation of
sounding lines’ start-end points (with azimuth), tidal coordinates. The report must clearly describe what you
station, benchmark. do, how you do it, and what are resulted there from.
Group name and identity of group members (i.e. name,
Elements 1 to 3 must be presented on A3 paper and student number, email, barcode) must appear in the first
element 4 must be presented on separated A4 paper. sheet, i.e. A4 paper report. Readability of the entire
Submit them along with report on one page of A4 paper. submission must be ensured.

S-ar putea să vă placă și