WORLD VISION ETHIOPIA OMO NADA AP

General Summary

BILL SUMMARIES
Description of item Currency Price
S/N

Distribution network for education facility Eth. Birr


1

construction of three school water points Eth. Birr


2

Construction of six roto support


3 Eth. Birr

Construction of five water points


4 Eth. Birr
construction of two Hand washing facility pinned
to toilet and HWF(6) sinks for laboratory and
5 Eth. Birr
delivery room
Sub total
Eth. Birr

Rebate(-------%)
Eth. Birr

Total after Rebate


Eth. Birr

15 % VAT
Eth. Birr

Grand Total With VAT


Eth. Birr
Project: Construction of HWF for Health Centers pinned to Toilet
Location: Omo Nada Woreda. Ale and boneya Health center
Client: World Vision Ethiopa, Omo Nada AP.
Bill of Quantities and specification HC Hand Washing Facility

S.N Description of Work Unit Qty Rate Total Amount

1 Earth work
1.1 Site clearing & grubbing up to a average depth of 20cm M2 2.00
to remove top vegetated soil

1.2 Foundation excavation to a depth of 50cm below ground M3 0.80


level

1.3 Filling and compacting foundation base with selected M3 0.60


materials for20cm

1.4 Cart away surplus excavated materials from the site to a M3 0.40
distance not less 100m

2 Masonry Work
2.1 Placing 25cm thick basaltic or equivalent hardcore well M2 1.40
rolled, consolidated and blinded with crushed stone

2.2 Construction of stone masonry wall joined with a 1:3 M3 0.50


cement-sand mix mortar as per the drawing

3 Concrete work
3.1 Pouring 50mm thick lean concrete (1:2:6 mix) over the M2 1.40
hardcore

4 Wall work
4.1 15cm HCB OR BRICKS M3 3.00
4.2 Supply, cut, bend and fix in position reinforcement bars Kg 21.00
Of Ф10mm

4.3 Fixing of good quality wooden or metal form work firmly M2 7.00
with strong strutting & tight to avoid bleeding & bulking
out
5 Pipe work
5.1 Pipe line extension from existing pipe line with HDPE of 1 m 200.00
1/4" for all sites

5.2 Faucet 3/4 " No 4.00


6 Finishing and miscellaneous works
6.1 Supply & Install all necessary pipes & fittings with all Ls 1.00
necessary accessories as per the Design Drawings

6.2 Apply 25mm thick cement screed mix 1:3 for floor base of M2 2.20
Hand washing with 1% sloping towards the drainage.

6.3 Plastering the HCB with three coats of cement sand m2 2.20
mortar of mix 1:3

6.4 Pointing the whole external face of the masonry wall with m2 4.00
cement mortar mix 1:4

6.5 Construction of gravel packed soak away pit to No 1.00


downstream of the hand washing having 700mm dia. and
600mm depth with proper drainage canal connection
work
sub Total for one Hand Washing facility
sub Total for Two(2)Hand Washing facilities
7 HWF for delivery, laboratory and others
7.1 supply and install single leaf sink with all its accessaries No 6
7.2 maintain the existing pipe line and make it functional for Ls 1
all room for both health center

7.2 install one taps (one faucet)in compound for both health No 2
centers

Sub total for 6 sinks


Grand total for HWF and sinks
BOQ for distribution network for education facilities
No Discription Unit Qty Rate Amount
1 Earth Work
1.1 Trench excavation for pipe m3 360 0
1.2 back fill m3 360 0
2 HDPE Pipes with necessary fittings
HDPE 1 1/4" m 800 0

Total 0
BOQ FOR WATER POINT

No Description of Work Unit Qty Rate Amounts


1. Earth Work

Site clearing & striping of top soil to a minimum m2 24.2 0


1.1 depth 200mm
Bulk excavation to a depth of 50cm below site
1.2 clearing for foundation m2 7.2 0
Excavation for foundation, soak away pit and valve
1.3 chamber m 3
5.4 0
Provide and Compact selected materials in layers of
1.4 150mm for foundation m3 6.85 0
Provide & fill hard core with hard basaltic or
equivalent stone, well compacted and blinded with m3 0.54 0
1.5 crushed
Cart awaystone
and dispose all excavated material to
1.6 appropriate distance m3 11.8 0
2. Concrete Work 0
2.1 C-15 lean concrete m3 0.3 0
2.2 C-20 concrete mass concrete m 3
2.2 0
2.3 Concrete cylindre(Diametr 1m and Height 1m) No 1 0
2.4 Concrete cylindre(Diametr 30cm and Height 1m) No 1 0
3. Masonary Work 0
Provide and Construct 400mm thick trychytic
masonry wall grouted and filled with 1:3 cement m3 1 0
3.1 mortar for foundation and super structure
Plastering to smooth finish for water point wall and
3.2 surface m2 4.5 0
Masonry pavement around the water point as per
the drawing (20mm thick with 1:3 mix ratio cement m2 7.6 0
3.3 mortar)
4. Pipe Work 0
4.1 Supplying & Installing GS Pipes 0
4.1.1 DN 40 GS m 6 0
4.1.2 DN 20GS m 6 0
4.2 Supplying & Installing fittings 0
4.2.1 Cross Tee DN 40 No 1 0
4.2.2 Reducer 40 X 20 No 4 0
4.2.3 Tee DN 40 No 1 0
4.2.4 DN 40 Bend (elbow) 90degree No 5 0
4.2.5 Faucet DN 20 No 4 0
4.2.6 Socket DN 20 No 4 0
4.2.7 Gate valve DN 40 No 1 0
4.2.8 Union DN 40 No 1 0
4.2.9 Nipples DN 40 No 6 0
Construct
4.2.10Water two
Meter DN valve
40 chamber for Water Meter & No 1 0
Gate Valve, covered with 700x700x6mm sheet
4.2.11metal with latch lock as per the drawing. No 2 0
 5 Reinforced
Drainage Concrete drainage Ditch from water point 0
to soak away pit as per the drawing, price including
5.1 excavation and any other incidental works m 2 0

Supply & place boulders, crashed aggregate and m3 0.32 0


5.2 sand to form the soak away as per the drawing
Barbed wires fencing consist of 2.5m barbed wire
 6 horizontal
Fence and diagonally member spaced at 0
200mm fixed to 2700mm long and diameter 80mm
seasoned eucalyptus poles spaced @ every
1500mm, including all necessary materials as per m 19.8 0
6.1 the drawing.
Supply and fix a corrugated iron sheet of Gage-32
double leaf gate each 2.1mx0.8m with lock and No 2 0
6.2 latch
Total for one WP 0
Bill Total of five Water Points -
10M3 ROTO TANKER & STAND ( 2.5m height)

S/N Description Unit Qty Rate


1 Excavation & Earth Work
Site clearing to remove vegetable soil to
1.1 M2 26.30
a depth of 20 cm

Excavation for footing depth not


1.2 M3 31.20
exceeding 1500cm

Supply and install HDPE of 1 1/4" with


1.3 M 30.00
necccessary fittings

1.4 Cart a way excavated material from site M3 36.50


1.5 Back fill selected Borrowed material M3 18.60
2 Concrete work
10 cm thick lean concrete under footing
2.1 M3 1.10
pad
2.2 25 cm think C20 R.C.C pad to middle part M3 1.10
2.3 Ditto but corner part M3 1.03
C20 R.c concrete to 35x35cm middle
2.4 M3 1.10
columns
2.5 Ditto but 25x25cm corner columns M3 1.10
16cm thick R.c concrete to inter me diet
2.6 M3 2.60
slabe
2.7 ditto but 16cm thick to top slab M3 2.60
2.8 R.c steel bar ø 20 Kg 520.00
2.9 R.c steel bar ø 16 Kg 275.00
2.10 R.c steel bar ø12 Kg 133
2.11 R.c Steel bar ø10 Kg 400
2.12 R.c Steel bar ø 6 kg 50
Sawen Zigba wooden formwork for
2.13 M2 4
footing pad corner part
2.14 Ditto but middle part M2 4
2.15 Ditto but column & slabs M2 5
3 Finishing work
3.1 10m3 horizontal roto tanker Pcs 1
5cm thick cement sand mortar plastering
3.2 M2 33
to slabs
Three coast of cement sand plastering to
3.3 M2 30
columns
1" Gib for Shelter of roto tank post hight
3.4 M2 57
3.50 & truss lengh 2.90
3.5 2.5mm thick sheet metal roof cover M2 16
Welding truss & post at G2 pipe rs sheet
3.6 Ls 1
metal
Supply and install Machine engraved
marble sign post of size 60*60cm
3.7 including typing words.( "Constructed No 1
by World Vision Omo Nada AP 2020"
)

3.8 Painting to Sheet metal roof cover m2 16

Total for one Roto Tank and Stand


Total for six Roto Tank and Stand
Amount
BOQ FOR SCHOOL WATER POINTS
No Description of Work Unit Qty Rate
1 1. Earth Work

1.1 Site clearing & striping of top soil to a minimum


depth 200mm m2 48

1.2 Bulk excavation to a depth of 50cm below site


clearing for foundation m2 16.12

1.3 Excavation for foundation, soak away pit and


valve chamber m3 6.28

1.4 Provide and Compact selected materials in layers


of 150mm for foundation m3 5.54
Provide & fill hard core with hard basaltic or
1.5 equivalent stone, well compacted and blinded
with crushed stone m3 2.53

1.6 Cart away and dispose all excavated material to


appropriate distance m3 4.98
2. Concrete Work
2.1 C-5 lean concrete m3 0.46
C-15 lean concrete m3 0.46
2.2 C-20 concrete mass concrete m3 2.69
2.3 Concrete cylindre(Diametr 1m and Height 1m) No
2.4 Concrete cylindre(Diametr 30cm and Height 1m) No
3. Masonary Work
Provide and Construct 400mm thick trychytic
masonry wall grouted and filled with 1:3 cement
3.1
mortar for foundation and super structure
m3 13.76

3.2 Plastering to smooth finish for water point wall


and surface m2 84.56
Masonry pavement around the water point as per
3.3 the drawing (20mm thick with 1:3 mix ratio
cement mortar) m2 8.4
4. Pipe Work
4.1 Supplying & Installing GS Pipes
4.1.1 DN 40 GS m 6
4.1.2 DN 20GS m 18
4.2 Supplying & Installing fittings
4.2.1 Cross Tee DN 40 No 4
4.2.2 Reducer 40 X 20 No 8
4.2.3 Tee DN 40 No 1
4.2.4 DN 40 Bend (elbow) 90degree No 5
4.2.5 Faucet DN 20 No 8
4.2.6 Socket DN 20 No 8
4.2.7 Gate valve DN 40 No 1
4.2.8 Union DN 40 No 1
4.2.9 Nipples DN 40 No 6
4.2.10Water Meter DN 40 approved quality No 1
Construct valve chamber for Water Meter & Gate
4.2.11
Valve, covered with 700x700x6mm sheet metal
with latch lock as per the drawing. No 2
 5 Drainage
Reinforced Concrete drainage Ditch from water
point to soak away pit as per the drawing, price
5.1
including excavation and any other incidental
works m 11.3

5.2 Supply & place boulders, crashed aggregate and


sand to form the soak away as per the drawing m3 0.72
total for one school WP
Bill Total for three schoool Water Point
Amounts

0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
-