Sunteți pe pagina 1din 3

5-Star Safety and Health Management System

Risk Assesment (Baseline and full RA)


Risk Assessment (Baseline and full RA) Access Ladder,Cable Rack and Painting (Confined space)
TASK/ACTIVITY / PROCESS NAME: DEPARTMENT/AREA: Electrical / Al Hassa
RA Number: DATE:
RA TEAM(Names) 1.Sathish kumar(GL)2.Zain Fazal(Engineer)3.Salman Farees(Engineer)4.Raheem,Noufal,habib,shoby APPROVED BY MANAGER:
NEXT REVIEW DATE:

HAZARD IDENTIFICATION CONTROL RISK ASSESSMENT ACTION PLAN


Severty Probability

C R C R
P P
o i o i
r r
Risks Issue n
o
s n
o
s
(Possible incident) s k s k
b Additional Control b
[What can go wrong] e e Follow up by Controls
a a
q R measures to to mitigate q R
Item # Work Activity/Process Hazards Existing Controls u
b
a or to control the risk u
b
a (name) & Implemented
(Accident/till health to i i date Yes/No
e n issue e n
persons، fire or property l l
n k n k
i i
loss) c
t
i c
t
i
e n e n
y y
g g

1.Never attempt to lift a load that exceeds the


1.Physical injury due to limits of the jack
1.Pay attention & take
sharp edges, trapping 2.Never attempt to use a pallet jack on a steep
your time
under heavy object,back slope
1.Untrained can cause 2.Keep load balanced
injury,spinal dislocation. 3.Pre-plan your route and inspect & remove for 6 months/
1 Manual handling injuries 6 3.Ensure that all 2 yes
2.Muscle strain and/or obstacles which could get struck under rollers and Zain Fazal
2.Manual material handling employees aware of the
sprain from pushing and cause a trip/slip
manual lifting
pulling. 4.Keep hands & feet away from rollers and other
technique.
pinch points
5.Check equipment for any damage

1.Electric shock
2.Flying object may cause
eye injuries
1.Ensure the inspection of electrical equipment
3.Dropping material or
before taking into use. The personnel in the
Tools
2.Ensure the power tools are double insulated activity should be
Cable Ladder and Cable Rack Crushing injuries to the feet 4.Sharp edges on Tray or 6 months/
2 3.use proper PPE 4 competent and trained 2 yes
Installation and toes hardware Zain Fazal
4.Barricade area for ground man or passers in manual handling
5.Climbing on Tray/Fall
5.Wear gloves when working with smooth off technique
from heights
rough edges after cutting.
6.Lifting tray manually
may cause back injury

1
HAZARD IDENTIFICATION CONTROL RISK ASSESSMENT ACTION PLAN
Severty Probability

C R C R
P P
o i o i
r r
Risks Issue n
o
s n
o
s
(Possible incident) s k s k
b Additional Control b
[What can go wrong] e e Follow up by Controls
a a
q R measures to to mitigate q R
Item # Work Activity/Process Hazards Existing Controls u
b
a or to control the risk u
b
a (name) & Implemented
(Accident/till health to i i date Yes/No
e n issue e n
persons، fire or property l l
n k n k
i i
loss) c
t
i c
t
i
e n e n
y y
g g

1.TBT shall be conducted before starting the


work.
1.Induce inflammation of 2.When skin contact does occur, wash thoroughly
the mucous membranes with lukewarm water and soap
and nose 3.Ventilation helps to reduce the riskd from
1.Resins
2.Loss os vapours&aerosols created
2.Pigments 1.Supervision should be 6 months/
3 Painting appetite,irritation, pain in 4.PPE must be provided&worn. 6 3 yes
3.Solvents maintained Zain Fazal
the muscles,joins& 5.All workers engaged in the activity must have
4.Additives
abdomen,mental proper instruction,training and supervise all the
retardation, time.
anaemia,sterility. 6.Stand by man should maintain communication
with entrant

1.TBT shall be conducted before starting the


work.
2.Ensure sufficient air circulation during confined
space entry
3.Proper access
1.Supervision should be
1.Slip,trip,fall of person 4.Stand by man shall be deployed on both
1.Personal injury maintained
2.Possible lack of Oxygen manhole entry point 6 months/
4 Work in Confined Space (Manhole) 2.Suffocation due to lack of 4 2.Relevant safety 2 yes
3.Improper access 5.Stand by man should maintain communication Zain Fazal
oxygen signage shall be
4.Lack of commuication with entrant and engineer
displayed
6.Emergency vehicle should be available at all
time
7.maintain PPE
8.Maximum manpower inside manhole is 2 and 1
fire watch must be provided.

Approved by: