Sunteți pe pagina 1din 3

Ref.

No: COR-001

TTJV's COST PROPOSAL for ADDITIONAL 6 CONTAINERS


JV

Direct
Item No Item Description Quantity Unit Unit Price Amount USD Equipment Direct Labor Direct Material TOTAL
Cost Cost Cost

1 Additional 6 Container 1,00 LS $ 33.000,00 $ 33.000,00 $ 33.000,00 $ 33.000,00

2 Mobil Crane 1,00 day $ 600,00 $ 600,00 $ 600,00 $ 600,00

3 Rebar Placement 2,23 ton $ 795,45 $ 1.773,86 $ 1.773,86 $ 1.773,86

4 Concrete Pouring 25,40 m3 $ 95,00 $ 2.413,00 $ 2.413,00 $ 2.413,00

5 Formwork Installation 9,50 m2 $ 29,00 $ 275,50 $ 275,50 $ 275,50

6 Increase in the amount of Data Cable 1,00 LS $ 250,00 $ 250,00 $ 250,00 $ 250,00

7 Furniture Installation 1,00 LS $ 230,00 $ 230,00 $ 230,00 $ 230,00

8 Increase in the size of power feed cable 1,00 LS $ 950,00 $ 950,00 $ 950,00 $ 950,00

9 Increase in the size of panelboard 1,00 LS $ 500,00 $ 500,00 $ 500,00 $ 500,00

10 Increase in the amount of AC Units 9,00 EA $ 350,00 $ 3.150,00 $ 3.150,00 $ 3.150,00

TOTAL $ 43.142,36

Overhead & Profit 15% $ 6.471,35


SUB TOTAL $ 49.613,72
KDV 18% $ 8.930,47

GRAND TOTAL $ 58.544,19

Date : 02-Feb-2012
REV. NO: O8
TEPE ĐNŞAAT SANAYĐ A.Ş.
TARĐH: 01.02.2012

KONTEYNER FĐYAT LĐSTESĐ


Outer Dimensions
Unit Building
Nu Proposal No Material Description Qty Unit Building Price Grand Total
Area m² Height Width Length
m.
(mm) (mm) (mm)

1 P11-474.A OFĐS BĐNASI (ilave 6 konteyner) 20,59 5.280 2.962 6.952 6 6.142,-USD 36.849,-USD

GRAND TOTAL (VAT IS NOT INCLUDED) 123,55 36.849,-USD

YER DÖŞEMESĐ FĐYATI dahildir

MONTAJ ĐŞÇĐLĐĞĐ FĐYATI (montaj ekibinin iaşe-ibade-yol masrafları dahil, montaj için vinç temini hariçtir) 3.608,-USD

NAKLĐYE VE NAKLĐYE SĐGORTASI 205,-USD

TOPLAM FĐYAT (KDV DAHĐL DEĞĐLDĐR) 40.662,-USD

FĐRMANIZA ÖZEL ĐSKONTO 7.662,-USD

ĐSKONTOLU TOPLAM FĐYAT 33.000,-USD