Q C & I Sub Division No. 1, LMD Colony of Q C & I Division No. 7, Karimnagar.

Pro forma For the Month of September- 2017


No. of
Quantity/ No. of
Site Inspections tests
Lab Tests Units tests to be Description of Defects/ Compliance
by QC Staff Name of the actually
S. No. Description of Work Conducted Executed conducted Suggestions notified with Reports with Remarks
SE/EE/DEE/ Test conducted
Details during the by QC date Date/ Reference
AEE by QC
month Staff
Staff
1 2 3 4 5 6 7 8 9 10 11
12/09/2017
1) It is suggested to
maintain optimum
compaction only.
2) It is instructed to follow
mix design uniformly as
EWE & FE and Construction the slump measured are 45
of CD & CM works of Main Sieve Analysis mm, 100 mm and 60 mm
for Coarse respectively.
Canal & Distributory system
Aggregate and 15/09/2017
upto water course level and Fine aggregate,
Concrete 1) As the side walls have
C. C. lining to Main Canal Slump Test, been constructed earlier, it
Work
Aggregate is suggested that the
and other allied works using M 15
Impact Value, exposed concrete has to be
1 DEE/ AEE - and M 20 23 25
including Investigation, Flakiness and cleaned thoroughly to
Grade- 200
Elongation remove deleterious
Designing and Estimation of cubic
Indices and material and to pre wet the
metres
Gouravelly Right Side Canal Compressive surface before laying of
Strength of c o n c r e t e .
Km. 0.00 to 47.725 and Left Concrete 2) The backfilling of the
Side Canal from Km. 0.00 to Cubes structure is very poor
14.325 in Karimnagar District clearly showing the cracks
on the surface and is
suggested that the
compacted fill shall be
placed in horizontal layers
not exceeding 15 cm.
19/09/2017
1) It is seen that oversized
40 mm metal is not
screened, it is instructed to
screen the oversize
m a t e r i a l .
2) The batching of input
materials is carried out
using self loading machine
on the basis of volumetric
EWE & FE and Construction batching and the self
loading machine is not yet
of CD & CM works of Main Sieve Analysis
calibrated. It is instructed
for Coarse
Canal & Distributory system to calibrate and ensure that
Aggregate and
upto water course level and it displays weights of input
Fine aggregate,
Concrete material including
C. C. lining to Main Canal Slump Test,
Work waterrmeters and also
Aggregate
and other allied works using M 15 necessary approval from
Impact Value,
1 DEE/ AEE - and M 20 23 25 the Competent Authority
including Investigation, Flakiness and
Grade- 200 has to be taken in writing.
Elongation
Designing and Estimation of cubic 3) It is instructed to follow
Indices and
metres the mix design strictly as
Gouravelly Right Side Canal Compressive
slump values are collapsed
Strength of
Km. 0.00 to 47.725 and Left Concrete
Side Canal from Km. 0.00 to Cubes

14.325 in Karimnagar District


29/09/2017
1) The size of cover blocks
are oversized, it is
suggested to provide cover
blocks of 40 mm thick as
per drawing only.
2) Necessary moisture
corrections are to be
conducted to get a
EWE & FE and Construction uniform mix.
3) It is seen that backfilling
of CD & CM works of Main Sieve Analysis is in progress, it is
Canal & Distributory system for Coarse instructed that the backfill
Aggregate and shall commence only after
upto water course level and Fine aggregate,
Concrete the concrete is completely
C. C. lining to Main Canal Slump Test, set and the honey combed
Work
Aggregate portions of the structure
and other allied works using M 15
Impact Value, should be corrected and the
1 DEE/ AEE - and M 20 23 25
including Investigation, Flakiness and surface finish should be
Grade- 200
Elongation smooth enough.
Designing and Estimation of cubic
Indices and 4) Curing has to be
metres
Gouravelly Right Side Canal Compressive improved and necessary
Strength of arrangements are to be
Km. 0.00 to 47.725 and Left
Concrete made.
Side Canal from Km. 0.00 to Cubes
14.325 in Karimnagar District