Construction Basic Price


BASIC PRICE 2019

COMPARISON OF RATES (MAIN BUILDING)

1 2 3
SEC DESCRIPTION Unit AMOUNT AMOUNT AMOUNT

PILING WORKS
1 Provide and dismantle item 2,000.00 27,000.00 26,000.00

2 Maintain Piling item 1,000.00 7,000.00 6,500.00

3 Allow For moving Piling equipment item 2,000.00 7,000.00 6,500.00

4 Piling record item 5,000.00 1,300.00 1,300.00

5 Supply, Deliver and unload 250mm x 250mm Initial Pile m 80.00 60.00 91.00

6 Supply, Deliver and unload 250mm x 250mm extension Pile m 90.00 79.00 106.60

7 Handle Transport and Pitch 250mm x 250mm Initial Pile no 10.00 14.00 26.00

8 Handle Transport and Pitch 250mm x 250mm extension Pile no 5.00 14.00 26.00

9 Drive only precast reinforced 250mm x 250mm initial pile m 10.00 27.00 13.00

10 Drive only precast reinforced 250mm x 250mm extension pile m 10.00 27.00 13.00

11 Prebored vertical hole minimum 250mm m 50.00 60.00 97.50

12 Fillet weld connection no 30.00 20.00 32.50

13 Cut Off 250mm x 250mm no 30.00 20.00 52.00

14 Pile Test no 1,500.00 20,000.00 10,920.00 Pages


Provide all necessary plant equipment labour 250mm x 250mm Basic Construction Knowle
15 no 1,200.00 1,300.00 1,170.00
precast RC piles
Construction Basic Price
STRUCTURE
Built-Up Rates
16 Excavate oversite to reduce level m3 20.00 20.00 281.00
Conditions of Contract
17 150mm Thick Hardcore m2 18.00 22.00 20.00

18 concrete grade 10 m3 225.00 250.00 230.00

19 Reinforced Concrete Grade 30 m3 300.00 330.00 310.00 Blog Archive


20 Mild Steel Reinforcements to BS 4449 kg 4.00 3.80 4.20 ▼ 2019 (1)

21 High Tensile Reinforcements to BS 4449 kg 4.00 3.80 4.20 ▼ July (1)


WIRE MESH
22 BRC A8 m2 22.00 22.00 22.50
► 2017 (1)
23 BRC B8 m2 28.00 25.90 38.70
► 2016 (3)
24 Formwork Class F1 Exceeding 500mm high m2 48.00 42.00 45.00
► 2014 (2)
25 Formwork Class F1 not Exceeding 500mm high m2 26.70 37.90 ► 2013 (1)

26 Layer approve waterproofing m2 50.00 53.30 8.20 ► 2012 (3)

27 Anti termite m2 10.50 4.20 5.00

28 Provide Mackintosh probe (MP) item 500.00 5,000.00


Ape ni???

malaysiaconstructionindustry.blogspot.com/p/construction-basic-price.html 1/4
11/20/2019 My Construction Industry: Construction Basic Price
ARCHITECHTURE
29 200mm Thick common clay brickwall m2 76.00 80.00 94.00 Labels
30 200mm wide approved bituminious felt damp proof m 10.00 1.20 1.60 Basement (1)

31 6mm x 450mm long mild steel bar no 3.00 0.50 0.60 Beam (1)

32 100mm thick common clay brickwall m2 38.00 40.00 47.00 Beams (1)

Bore Pile (1)


33 100mm wide approved bituminious felt damp proof m2 5.00 0.60 0.80
BRC (1)
34 Precast concrete Grade 25 lintol m 60.00 352.70 102.50
Bumbung (1)
35 Supply and fix aluminium lourved window 2400mm x 600mm no 500.00 510.00 572.00
Bumbung Kerangka (1)
36 Supply and fix aluminium lourved window 3000mm x 600mm no 630.00 640.00 715.00
Cofferdam (1)
37 Supply and fix aluminium lourved window 1200mm x 600mm no 250.00 250.00 293.00
Column (1)
38 Supply and fix aluminium lourved window 2400mm x 2400mm no 2,000.00 2,040.00 3,418.00
Footings (1)
39 Supply and fix aluminium lourved window 1000mm x 600mm no 210.00 210.00 437.00
FOUNDATION (1)
40 Supply and fix aluminium lourved window 3000mm x 600mm no 630.00 640.00 715.00
GFA (1)
41 Supply and fix aluminium lourved window 1800mm x 600mm no 400.00 380.00 572.00 Gross Floor Area (1)

42 Supply and install mild steel louvres size 2400mm x 2400mm no 1,500.00 3,840.00 2,405.00 High Tensile (1)

43 Plywood flush door size 900mm x 2100mm no 500.00 280.00 1,440.00 Keluasan Lantai Bersih (1)

44 Fire rated door size 1000mm x 2100mm no 600.00 1,600.00 2,340.00 kg/m3 (1)

45 Fire rated door size 2000mm x 2400mm no 3,500.00 2,030.00 5,221.00 Kumbahan (1)

46 Fire rated door size 1200mm x 2100mm no 2,500.00 1,600.00 2,587.00 Luas Lantai Kasar (1)

MESH (1)
Guocera Porcelain Tiles
47 300mm x 300mm Guocero KV 945 m2 70.00 85.00 100.00 Mild Steel (1)

Ceiling Finish Net Floor Area (1)


48 5mm thick approved skim coat m2 20.00 13.00 12.50
NFA (1)
49 Mineral Acoustic Moisture resistance ceiling board m2 100.00 50.00 66.00
Pad Footing (1)
50 Prepare and apply one coat and two coats of approved emulsion
PE (1)
paint m2 6.20 7.50 7.00
Pile Cap (1)
51 Mineral fibre ceiling board m2 100.00 46.70 66.00
Pile Caps (1)
Internal Wall Finish
PILING (1)
52 Cement and sand mixed with and approved plasticer 20mm thick m2 50.00 20.00 58.40
Pondage (1)

Poundage (1)

Prestressed Concrete Pile


INFRASTRUCTURE WORKS
53 Site clearence acre 3,000.00 6,700.00 5,500.00 Raft Footing (1)

54 Cut and Fill (>10,000m3) m3 7.00 13.30 4.70 Rafts (1)

55 Imported Fill M3 30.00 33.30 28.00 Rasuk (1)

56 Excavate Earth Drain M 30.00 13.30 47.40 RC Pile (1)

57 Silt Trap No 10,000.00 10,700.00 22,600.00 Reinforcement (1)

Retaining Walls (1)


58 Wash Through No 3,500.00 9,300.00 166,100.00

Roadworks and Hardstanding Roof Design (1)


59 Excavate Oversite to reduce level M3 10.00 10.70 14.20 Sewage Treatment Plant (1
60 Trim level M2 5.00 4.00 2.90 sheet pile (1)

61 50mm Thick bed M2 6.00 6.00 9.40 Shell Roof (1)

62 300mm Thick crusher run M2 27.00 31.50 35.00 Spun Pile (1)

63 Prime coat for Binder coarse 60mm Thick M2 3.00 1.30 3.20 Steel Pile (1)

64 Binder coarse M2 46.00 41.90 60.40 STP Population Equivalent

65 Prime coat for wearing coarse 40mm Thick M2 3.00 1.30 3.20 Strip Footing (1)

Swimming Pool (1)


66 Wearing Coarse M2 35.00 32.20 47.10
Temporary Construction (1
67 Road Kerb M 100.00 53.30 126.30
Timber Pile (1)
Surface Water Drainage
68 Supply 300mm Spun Concrete M 70.00 200.00 285.60 Waterproofing (1)

69 Supply 375mm Spun Concrete M 80.00 270.00 333.30

malaysiaconstructionindustry.blogspot.com/p/construction-basic-price.html 2/4
11/20/2019 My Construction Industry: Construction Basic Price
70 600mm x 450mm Box Culvert M 600.00 330.00 1,197.00
Popular Posts
71 1320mm x 1320mm Brick Sum No 1,500.00 1,330.00 4,348.00
PILING (CERUCUK)
72 1320mm x 1295mm Brick Sum No 1,500.00 1,330.00 4,308.00
FOUNDATION (ASAS)
Water Reticulation
BEAM (RASUK)
73 150mm MS Pipe M 250.00 120.00 163.00
Bumbung (Roof)
Sewerage
74 225mm VCP pipe M 250.00 160.00 200.60 Keluasan Lantai Kasar (Gr
Area - GFA)
Turfing & Walkway
75 Top Soil M2 2.50 2.20 3.00 Reinforcement Bar

WALLS BELOW GROUND


76 Closed Turfing M2 4.70 4.00 5.80
BASEMENT
Fencing and Gate COFFERDAM
77 Standard Anti Climb Fencing M 300.00 470.00 472.00
SEWAGE TREATMENT PL

Keluasan Lantai Bersih (Ne


Nota: Harga Sentiasa berubah - berubah mengikut keadaan semasa. Harga yang terdapat di sini adalah berdasarkan Projek - projek
Area - NFA)
kami di Johor. Mungkin di tempat lain harganya berbeza.

Total Pageviews

8 comments:
1 4 5 9 0

Naga lingam July 9, 2014 at 8:09 PM


User online
Blog yang sangat Berguna.. Terbaik sekali.. Terima kasih... Blog ini sangat beruguna kepada orang seperti saya yang langsung tidak tahu
mengenai proses pembinaan. Saya baru sahaja memberi kerja extension kepada seorang Tukang dari tempat saya. Jadi saya ingin tahu apa
yang dibuatnya dan saya jumpalah blog encik ni. Memang terlalu baik blog ini dan mudah difahami.. Terima Kasih sekali lagi dan teruskan
usaha anda ini.. Sharing is Caring...
Reply
Followers
Followers (7)

afif July 9, 2014 at 10:30 PM


Terima kasih... Tetapi encik perlu berhati2 kerana harga yang di atas boleh berubah - ubah mengikut keadaan semasa. Harga ini adalah
daripada senarai beberapa petender kepada beberapa projek saya.
Reply Follow

Unknown October 24, 2015 at 9:05 PM

harga bagi spun pile berapa ye?


Reply

Insan Biasa January 8, 2017 at 8:18 PM


amount 1, 2 dan 3 tu maksudnye rate dr beberape supplier atau subcont ker?..sb sy x pasti mana price nye..sb skrang sy tengah prepare form
utk calculation rate bagi road kerb..sy perlu tahu harga dlm per nos..utk dptkan harga dlm 1 meter.
Reply

Replies

Yasmin Min February 14, 2018 at 6:29 AM


harga supply ke?

Afif Shapiai March 11, 2018 at 11:40 PM


Harga-harga tersebut merupakan harga average bidder dari setiap Main Contractor yang masuk tender projek saya. Untuk
penghujung tahun 2017 ni saya masih lagi tidak cukup info untuk update harga

Reply

John Alvin March 30, 2018 at 1:28 AM


Blog yang sangat berguna TQ. Cuma nak tanya perbezaan diantara amount 1 2 dan 3. TQ

Reply

Unknown February 17, 2019 at 9:21 AM

Bolh tak send qoutation harga untuk sewa mesin rc pile..tolong email qoutation kat sya

malaysiaconstructionindustry.blogspot.com/p/construction-basic-price.html 3/4
11/20/2019 My Construction Industry: Construction Basic Price
Reply

Enter your comment...

Comment as: Google Accoun

Publish Preview

Home

Subscribe to: Posts (Atom)

Awesome Inc. theme. Powered by Blogger.

malaysiaconstructionindustry.blogspot.com/p/construction-basic-price.html 4/4

S-ar putea să vă placă și