Documente Academic
Documente Profesional
Documente Cultură
Portion control: 20
Total Total
Ingredient Recipe(s) required for Ingredient Recipe(s) required for
quantity quantity
Dry Goods / Other Frozen Goods
Salt Mr. President fries with 2 Salt & Pepper Calamari Salad 1 kg
ketchup teaspoon
Black pepper. Mr. President fries with Bean shoots Vietnamese Beef salad 3 kg
ketchup
Tomato Vietnamese Beef salad 2 kg
Knives All 4
Plates All 25
Dusters All 2
Brooms All 2
Saucepan All 1
Dish 1: Mr. President Granola (Didasko, 2016)
Work Flow Plan/ End of Service Procedures / De-Brief
Step TIME Task (Description) and Priority Equipment & WHS Communication (Who, About what?)
Person
allocated
1. 6:30 - Collect ingredients and equipment Ingredients: Oats, low-fat Kitchen staff Staff 1: To get the ingredients from the
6:40 milk, fresh fruits, and store.
roasted seeds. Staff 2: To set the stovetop and the
Equipment: saucepan, saucepan.
stovetop. Staff 3 and 4: To arrange the dining
room.
2. 6:40 – Take 10 litres yogurt and warm it Saucepan (largest) Kitchen staff Staff 3: To warm.
6:45 gently for 5 minutes.
3. 6:45-6:50 Into the yogurt, stir 5 cups oats and Stovetop and cup(s). Kitchen staff Staff 1 and 2: Maintain the heating,
reduce the amount of heat to cook and remove it from the stove.
medium.
4. 6:50 - Cook the content for 2 minutes Stovetop Kitchen staff
6:52
5. 6:52- Take it off the stove and allow it to Nil Kitchen staff
6:55 stand for 3 minutes.
6. 6:55 - Prepare the fruits and roasted seeds Washing sinks with clean Kitchen staff Staff 3 and 4: Staff 3 to wash the fruits
7:00 for serving. water as staff 4 is preparing the roasted seeds.
7. 7:00 - Prepare for serving Cups, plates, and forks. Kitchen staff Staff 1 and 2 to serve yogurt and
7:20 oatmeal.
Staff 2 and 3 to serve roasted seeds and
fruits.
End of Service Procedures/ Equipment/Systems Communication (Who, About what?)
Reporting Requirements
8. 7:20 – Clean the equipment and the Kitchen sinks Staff 1 and 2 to clean the cups and any equipment.
7:40 benches used with clean water Kitchen towels Staff 3 to dry and arrange the cups on cup shelves.
Staff 4 to clean the Kitchen table.
9. 7:40-7:50 Sweep and wipe the floor Dusters, brooms, and water. Staff 1 and 2 to wipe the floor.
Empty the bins for waste food Staff 4 to empty the bins.
Post Service Debrief Equipment/Systems Communication (Who, About what?)
10. 7:50 – Discuss the comments and any Nil All of us
7:55 suggestion from the customers.
Discuss the cooking of the next
menu.
11. 7:55-8:00 Identify the next menu and list down Nil All of us
the ingredients
Dish 2: Vietnamese Beef Salad (Grilled)
Step TIME Task (Description) and Priority Equipment & WHS Communication (Who, About what?)
Person
allocated
1. 8:00- Collect ingredients Beef, lettuce, julienne Cook With the help of the cook, the kitchen
8:15 carrots, bean shoots, Kitchen staff staff should assemble all the ingredients
cucumber, tomato, and and in good quantities. There should be
ginger. good coordination between the two.
Clean the fruits and 2 staffs to assemble while 2 to wash.
vegetables with clean water.
2. 8:15 – 8: Collect utensils/ Equipment The grill pan, 4 tongs, 4 Kitchen staff Kitchen staff should make these items
30 mixing bowls, and 4 available and accessible.
wooden spoons. All items 2 staff to collect and assemble the items.
should be clean and in good Staff 1 to bring the grill.
condition.
Use gloves to prevent
kitchen accidents (WHS,
2018).
3. 8:30 – Take the tender beef and marinate it 4 mixing bowls Staff 1 Staff 1 to bring the cook the meat and
9:30 in the ground ginger lime. Cook the ginger lime.
4. 9:30 - Grill the beef on high heat for Grill pan and tongs Cook The cook should grill the meat with
9:45 around 15 minutes on each side uniform heat and on all side.
(depending on how thick it is), until Cook 1 to grill the beef.
the meat is medium-rare or medium.
5. 9:45 – Slice the carrots and cucumber. Chopping board and knife Kitchen staff The kitchen staff 1 washes the carrots.
9.55 Staff 2 washes the cucumber. Staff 3
cuts the ingredients.
6. 9: 55 – The meat is then sliced into strips. 4 chopping boards and 4 Chicken Staff 1, 2, 3 and 4 to assist in slicing.
10: 05 This should be done against the knives staffs
grains.
7. 10.05 – In separate mixing bowls, add 1kg Mixing bowls, wooden Assistant Assistant cooks to bring the mixing
10: 30 of the grilled sliced beef to each spoon Cook bowls and assist in mixing with the
bowl, and add the clean shoots, And cook cook.
carrots, and cucumber. Toss
everything together.
8. 10:30 – Prepare the lettuce and set ready for Plates Kitchen All the 4 kitchen staffs to arrange the
11:00 serving staffs dining hall.
Assistant cooks to serve.
Assistant
cooks
End of Service Procedures/ Equipment/Systems Communication (Who, About what?)
Reporting Requirements
9. 11:00 - Clean the equipment and the Kitchen sinks Staff 1 and 2 to clean the plates and any equipment.
11:15 benches used with clean water Kitchen towels Staff 3 to dry and arrange the plates on plate holders.
Staff 4 to clean the Kitchen table.
10. 11:15 - Sweep and wipe the floor Dusters, brooms, and water. Staff 1 and 2 to wipe the floor.
11:30 Empty the bins for waste food Staff 4 to empty the bins.
Post Service Debrief Equipment/Systems Communication (Who, About what?)
11. 11:30 – Discuss the comments and any Nil All of us
11:35 suggestion from the customers.
Discuss the cooking of the next
menu.
12. 11:30 – Identify the next menu and list down Nil All of us
11:45 the ingredients
Dish 3: Salt & Pepper Calamari Salad
Step TIME Task (Description) and Priority Equipment & WHS Communication (Who, About what?)
Person
allocated
1. 11:45 - Collect ingredients Knives and chopping board Cook Kitchen staff 1 to assist in preparing the
12:00 Prepare ingredients Prepare the gloves and tongs Kitchen staff ingredients.
to prevent any cuts. Kitchen staff to help in preparing the
Ingredients: Tomato, onion, equipment.
mixed lettuce, carrots, bean
shoots, samosa, cucumber,
and feta cheese
2. 12:00- Cut the ingredients and prepare the Knives, chopping board, Kitchen staff Staff 1: Cut the tomatoes
12:30 sauce and dressing for the dishes Mixing bowl and spoons. Staff 2: Cut the cucumber
Rinse and drain the mix salad leaves Staff 3: Cut the onion
Staff 4: Prepare the bean shoots
3. 12:30 – Start the actual cooking Pot, pan and mixing bowl, Staff 1 Cook
1.30 Cook
4. 1:30 - Prepare to serve the dishes Grill pan and tongs Staffs Staff 1, 2, 3 and 4 to do the serving.
3.00
End of Service Procedures/ Equipment/Systems Communication (Who, About what?)
Reporting Requirements
5. 3:00 - Clean the equipment and the Kitchen sinks Staff 1 and 2 to clean the plates and any equipment.
3:15 benches used with clean water Kitchen towels Staff 3 to dry and arrange the plates on plate holders.
Staff 4 to clean the Kitchen table.
6. 3:15 - Sweep and wipe the floor Dusters, brooms, and water. Staff 1 and 2 to wipe the floor.
3:30 Empty the bins for waste food Staff 4 to empty the bins.
Post Service Debrief Equipment/Systems Communication (Who, About what?)
7. 3:30 – Discuss the comments and any Nil All of us
3:35 suggestion from the customers.
Discuss the cooking of the next
menu (Chu, 2016).
8. 3:35 – Identify the next menu and list down Nil All of us
3:45 the ingredients
3.45- Organize the kitchen and leave it
4.00 ready for another shift.
Set 4: The classic
Work Flow Plan/ End of Service Procedures / De-Brief
Step TIME Task (Description) and Priority Equipment & WHS Communication (Who, About what?)
Person
allocated
1. 11:00 - Collect ingredients and equipment Ingredients: Smoked ham Kitchen staff Staff 1: To get the ingredients from the
11:15 and cheese store.
Equipment: saucepan, oven, Staff 2: To set the equipment ready.
kitchen gloves, plates
2. 11:15 - Heat the skillet with cheese and add Oven Kitchen staff Staff 3: To heat the ingredients.
11:20 the smoked ham. Heat one side for 5
minutes and the other for 3 minutes.
3. 11:20 - Serve with peas and dressed carrots. Plates Kitchen staff Staff 1 to serve the classic.
11:25 Staff 2 to serve the peas and carrot
salad.
End of Service Procedures/ Equipment/Systems Communication (Who, About what?)
Reporting Requirements
4. 12:20 - Clean the equipment and the Kitchen sinks Staff 1 and 2 to clean the equipment.
12:30 benches used with clean water Kitchen towels Staff 3 to dry and arrange the used utensils.
5. 12:30 - Sweep and wipe the floor Dusters, brooms and water. Staff 1 and 2 to wipe the floor.
12:45 Empty the bins for waste food Staff 4 to empty the bins.
Post Service Debrief Equipment/Systems Communication (Who, About what?)
6. 12:45- Discuss the comments and any Nil All of us
1.00 suggestion from the customers.
Discuss the cooking of the next
menu.
7. 1:00 - Identify the next menu and list down Nil All of us
1:15 the ingredients
Set 5: Mr. President fries with ketchup (Bittman, 2017)
Work Flow Plan/ End of Service Procedures / De-Brief
Step TIME Task (Description) and Priority Equipment & WHS Communication (Who, About what?)
Person
allocated
1. 11:00 - Collect ingredients and equipment Ingredients: Peeled sweet Kitchen staff Staff 1: To get the ingredients from the
11:15 potatoes, ketchup olive oil, store.
garlic powder, paprika, salt Staff 2: To set the equipment ready.
and black pepper. Staff 3: To pre-heat oven to 200 oC.
Equipment: saucepan, oven,
kitchen gloves, plates
2. 11:15 - Cut the sweet potatoes into sticks Knife and bowl. Kitchen staff Staff 3: To assist in cutting the sweet
11:20 long and coat them with oil. potatoes.
Staff 4 to toss with oil.
3. 11:20 - Then mix salt and pepper in a small Bowl and baking sheets. Kitchen staff Staff 1 to mix salt and pepper.
11:25 bowl. Then mix with the sweet Staff 2 to toss sweet potatoes.
potatoes. Staff 3 to bake.
Spread them out on baking sheets.
4. 11:25 - Bake for 15 minutes. Oven Kitchen staff
11:45
5. 11:45 - Turn the other side and bake for 10 Oven and kitchen gloves Kitchen staff
11:50 minutes until it’s brown and crisp.
6. 12:10 - Prepare for serving with ketchup Plates and forks. Kitchen staff Staff 4 to prepare and serve the fries
12.20 Staff 3 to 1 to serve the ketchup.
End of Service Procedures/ Equipment/Systems Communication (Who, About what?)
Reporting Requirements
7. 12:20 - Clean the equipment and the Kitchen sinks Staff 1 and 2 to clean the equipment.
12:30 benches used with clean water Kitchen towels Staff 3 to dry and arrange the used utensils.
8. 12:30 - Sweep and wipe the floor Dusters, brooms and water. Staff 1 and 2 to wipe the floor.
12:45 Empty the bins for waste food Staff 4 to empty the bins.
Post Service Debrief Equipment/Systems Communication (Who, About what?)
9. 12:45- Discuss the comments and any Nil All of us
1.00 suggestion from the customers.
Discuss the cooking of the next
menu.
10. 12:45- Identify the next menu and list down Nil All of us
1.00 the ingredients