2017
Surveyor's
MAN Dieselday Gard/Norwegian
& TurboHull Club
Bergen
October 2017
Peter M. Christensen
Superintendent Engineer
MAN Diesel & Turbo 2017 < 1 >
MAN | PrimeServ
CBM - Condition based maintenance
• Exhaust valves
• Fuel equipment
• Engine performance
• Air supply system
• Cylinder condition
• Crank train bearings
• Annual Service Package
• Annual Extended SP
• Pre-docking inspections
Spindle remain closed after 30 Non return valve / drop down Exhaust spindle #8 dropped
minutes check after 5 minutes
Unit 1 2 3 4 5 6 7 8 9 10
Test ok ok ok ok x ok x x ok ok
Running hours 3617 3617 12473 3617 3529 2999 2502 7067 2312 3266
MC engine:
Cam driven Fuel Oil
Injection Pump:
ME engine
Fuel Oil Pressure Booster:
No problem
Pressure transducer
PMI controller
Power
Engine supply
control
room
LED
indicator
Intermediate
Or frequency
divider box
Crankshaft pickup
mounted at free end
of crankshaft
Two-stroke diesel engine
1 bar increase in average Pmax => 0.20 - 0.25 g/kWh decrease in fuel oil consumption
Reference Pmax
Potential
Potential
MAN Diesel & Turbo 3331353.2004.03.10 (2610/BGJ) 2017 < 17 >
MAN | PrimeServ
CBM – Engine Performance
Water
Air
Temperature
~80 % ~15 % ~5 %
Evaporated Water
• Black liner deposts
• Higher corrosion
3 mm
4.8 mm
Zero measuring
position
MAN Diesel & Turbo Korea, Autumn 2012, by Henrik Rolsted, LEO 2017 < 31 >
MAN | PrimeServ
CBM – Cylinder Condition – coating thickness of Cermet
2.5
• Shaft line earthing devices must be kept working and be equipped with monitoring
connected to the alarm system.
• Bearing inspection schedule
Due to the higher safety against major failure, MAN Diesel considers it feasible to
completely omit regular open-up inspections of any of the three crank-train bearings
featuring an approved BWM system connected to the alarm and slow-down
system.
For engines comprising an approved MBTM system, regular open-up main bearing
inspections can be omitted.
If the BWM, the MBTM system or other alarm indications for an abnormal bearing
condition are triggered, investigations must follow and, eventually, extraordinary
open-up inspections should be carried out according to the findings.
Know your A, B, C:
A. Shaft line earthing devices must be kept working and be equipped with monitoring
connected to the alarm system.
In addition it is possible to alter the bearing inspection schedule when installing:
B. An approved BWM system connected to the alarm and slow-down system will
completely omit regular open-up inspections of any of the 3 crank-train bearings.
C. An approved MBTM system, omits only regular open-up inspections of main bearings.
In case of an alarm or indication:
• If the BWM, the MBTM system or other alarm indications for an abnormal bearing
condition are triggered, investigations must follow and, eventually, extraordinary open-
up inspections should be carried out according to the findings.
Overlay corrosion
Over layer
(88% Pb 10% Sn 2% Cu)
AlSn40
Steel
MAN Diesel & Turbo 2017 < 44 >
MAN | PrimeServ
CBM – Crank train bearings – XH Bearings - Corrosion
1. Ni layer exposed
2. Scuffing between Ni and pin
3. Scuffing between AlSn40 and pin
4. Steel-to-Steel contact
5. XH-pin & conrod bore damaged
6. Debris through to crankpin bearing
7. Crankpin bearing wiping / scuffing
8. Crankpin / bearing Steel-to-Steel
9. Crankpin severely damaged
10. Possible overheating and oilmist
11. 14 – 30 days repair
Corrosion:
• Monitor Pb content in the LO.
• Monitor the water content in the LO.
Accelerated wear:
• Savings in fuel due to slow steaming has a cost of shorter XH bearing TBO.
• Monitor oil wedges for bearing metal.
But…..!
The
human
factor
The process for the survey arrangement condition monitoring itself consists of
three parts and is explained in the following using the example of crank-train
bearings of crosshead diesel engines:
Fuel equipment
Cylinder condition
VAK Measurements
Upcoming dry-dock
(7-9 months)
PO for pre-inspection
PrimeServ Copenhagen
Co-ordination with local
Service Centers
Inspection report
Pre-Inspection
Recommended spare parts
DD ÷ 6 months
Shipping instructions
PrimeServ Copenhagen
DD ÷ 3-4 weeks
Delivery
DD ÷ 2 weeks
MAN Diesel & Turbo 2017 < 60 >
MAN | PrimeServ
CBM – Pre-docking inspections
2017