Schedule B
Name Of Work : Additional Ambernath Industrial Area...Strengthening and repairs to Infrastructure provid
by MIDC in Additional Ambernath Industrial Area
Name Of Sub Estimate : Strengthening of damaged road portion & providing DBM & AC treatment to road
unt And Rate In (Rs)
Total Amount Rs
: 0.00
Name
Of Sub
Estima
Sr.No Quantity Item Description Rate
te :
Strengt
1 104100 Providing and cast-in-situ Cement 3600
hening Concrete Pavement in M-40 grade of
and
2 22500 300mm pavement
Flexible thickness including onedge/side sub-base treatment 2160
of Concrete
Upgrad as excavation,
Pavement:- dewatering,
Providing preparing surface
and constructing
ation
3 of 6930 by consolidation,
flexible
Providing Central GSB-250mm
pavement Verge by 1.00m thick, wide: Wet Mix- 3200
existing 100mm
385mm
- thick
thk
Providing and
GSB,250 constructing Dry
100mm mm thick
Wet mix,75
road Leanmm DBM
roads
4 1 Concrete(DLC)
and 40 mm
divider/centralthe
Maintaining AC in
mm
vergegradethick M-15.
of 1.00
existing treatment
7.22 Item
m wide includes
etc.
as per
km roads inall 3000000
by expansion
including all
detailed
motorable joints at 45mt
material,during
drawing
condition labour,
and c/c, MS bars
transportation,
specification
execution at
of 7.22
concret
5 26025 expansion
taxes,
km CC royalty,
including
Earthwork road joints,runner
in(From octrai
required
excavation etc. RCC
excavation
commensement beams,
&complete.
filling providing
in upto
all
including types of 100
ization. cuts
(Rateat
road 4mt
Excluding
crust
completion c/cwork)
WBM
of etc.
GST)
layer including
including
including all material,
fillingproviding
potholes
providing murum, laying in layers, watering
Total Amount Rs labour,
with rolling
and transportation,
fixing precast
etc complete kerb taxes,stones royalty,
for camber in concrete octrai M-20
: 0.00 etc.
grade
75 complete.
mm
correction as per
thick
& (Rate
drawing
semi
badly Excluding
and
grout/LBM
damaged as GST)
directed
portionand in
of line
Amount and level,
20mm
proposed thick
CCearth and good quality
PSS.(Rate
road. Excluding soil filling
And between
GST)
(Rate kerb stones
Excluding GST) for 50% area &
Rate In
Sr.No
(Rs) Quantity coloured
Item Descriptionchequered tiles for 50% area painting Rate
with two coats of synthetic enamel paint over
1 35830 primer of approved
Open excavation formakeroad works,on all exposed side gutters faces 85
and sides of kerb stone as directed by
water retaining structures and large excavated
engineer not in charge manual and as per thematerials
cross
2 4480 areas
Open excavation involving for road works, lift of side gutters 300
section drawing enclosed herewith with std.
suchlarge
and as water reservoir,
excavated areas foundation,
not involving dammanual seats
practice
andofallied including
works in all of manpower,
3 2240 lift
Open material
excavation such forsoils
as
roadwater allreservoir,
work, sorts,sidesand
gutters 800
machinery,
gravel, soft taxes,
and hard dutiesmurum royalty and etc. complete.
boulders
foundations,
and large dam
excavated seatsareas andnot allied works manual
involving innotsoft
(Rate
exceeding excluding GST) in size, to required
0.03stacking
Cu.M.
4 rock
lift ofand
Supplying boulders
materialsand such beyond
as atwaterwork 0.03 siteto 0.3
reservoir,
grade,
Cu.M.
foundation,
225 mm camber
rubble
sizedam and and
trap seatssideand
conveying
stone slopes
rubble and
allied and
for conveying
stacking
works,
soling inhard
inup to
4 2580 the
regular
rock
10 kmexcavated
and stacks
lead
Quarry rubble boulders material
with
including all
above all with
lifts 0.3
taxesand all
Cu.M.
andlifts
leads and
up
size
royalty.)upto
to
by 100a 450
lead
m from
wedging,
(Rates of excluding
100
outsidem from edge
chiselling GST) outside
of the
and / the
excavated
or line edgedrilling
ofarea.etc.
5 (excavated
or Rates
excavation
Supplying area,
excluding
50 inmm spreading
GST)
lateriate
to 75rock the
mm same
including on
trap stone
embankment
dressing section or stacking
to the
oversize metal at the road side including, as
required directed.grade ( Rates
camber,
5 650 excluding
slopes
conveying
Quarry and GST)
metal. breaking to 225 mm.
and stacking etc. complete including 650 size rubble
and conveying
all taxes and royalty the same, and lead stacking up toin10 regular
km.)
6 2580 stacks with
(Rates excluding
Laying all
in compactGST)lift and leads upto
layer rubble duly hand 100 m. from 100
outside
packed for edges solingof excavated
in 225 mmarea. layer( to Rates
required
7 excluding
camber and
Providing GST)
and gradient
laying in including
positionfilling plain in the
cement
intersticesusing
concrete with stone granite chips, spalls trap
or black and oversize
graded
7 With (quantity
metalNatural
including Sand excluding
mixing in a oversized
mechanically metal).)
(Rates excluding
operated mixer, GST) dewatering, compacting,
1931 curing
b) as required
In 1:3:6 proportion. complete for all lifts up to 3600
a +/- 5 m. above or below the ground level
8 where
Providing concrete
& layingisinproposed, position Ready mix
including
cement concrete centering/shuttering
for C.C. work for using Roads ordinary
8 12380 Portland
using
M - 15granitecement. ( Rates
Gradeor black trap graded metal excluding GST) 6400
including mixing in plant transporting in
9 transit mixer,
Providing & laying placing & compacting
in position Ready Mix by
mechanical
Cement meansforincluding
Concrete RCC work required
for beam steel or
9 3088 plywood
column,
M - 20 Grade centering,
slabs, pardis, form road work for
pavement, all elements,
etc. 7000
including
using granite all/ black
lifts trap & stationery
graded metal pump for
10 lifting
including
Providing concrete,
mixing
and fixing all
in leads
plant, of
in position concrete
transporting from
reinforcement in RMCof
plant
transit
all to
dia for site
mixer, of work
RCC placing etc
piles, pile caps, complete.
and footings, Notes
compacting :
10 757 1. The
by mechanical
foundations,
TMT Bars prices
slabs, shall
means include
including
columns, the
beams, activities
or plyof: 60000
steelcanopies,
a. Study
wood centering,
staircase, / recommendation
newels, form worklintels
chajjas, of the elements,mix
concrete
for all pardis,
design.
copings, b.
including fins, Preparation
all arches
lifts & and
etc. testing
stationery
as per detailed of thefor
pump
concrete as
lifting concrete,
designs, per
drawings the
all and approved
leads design
of concrete
schedules mix. RMC
from
including c.
Transportation
plant to bending,
cutting, site of work of the concrete
etc complete.
hooking upto
the bars,Notes site.
binding d.
: with
Placement
1.
wires orThetack of concrete
prices
welding shalland in the
include formwork. as e. of:
the activities
supporting
Compaction, texturing and curing
a. Study / recommendation of the of concrete.
concrete mix(
11 Providing at the site of work and lowering,
laying and jointing RCC NP3 class pipes
11 3520 conforming
300 mm dia. to IS458-1998 in prepared 1050
trenches in grade and level, including
11 110 hoisting,
900 mm dia.making rubber ring / collar joints in 4500
cement mortar 1:1, including cost of collar /
12 rubber
Conveying ring, material
jointing material
obtained like from
cement, roadsand
etc. and hydraulic testing of the
cutting including all lifts, and beyond initialpipes at
12 25080 factory
For as well
lead,alllaying
Leads. as on ofsite per the stipulation 115
in layers
in
20cms to 30cms,code
relevant IS in case etc. complete.
of power roller(Rates
and
13 excluding
45cms to 60cms
Providing, GST)
erecting in pre-cast
case of vibratory
elements such as
compactor,
cover slabs forbreaking
drains,clods,
grills,dressing
kerbs, kerb to thestone,
13 required
dividers, lines, curves,
manholes,
Elements weighing upto 50 kg. grade
frames, and section
manholes for
covers,
formationfence
gutters, of roads,postsincluding leveling,
grills, rails lintels, sills,
868 disposing
bed blocks,
i) Using offsteps
natural surplus
or any
sand material in desired
other member or 8700
manner as directed
element as per drawings & specifications using by Engineer-
14 in-charge
RCC gradeetc.
Providing M-20 complete
& fixing includingincluding
plain / colourtaxes
shuttering as may
cement , be
Royalty
required,
tiles if any
compacting
conforming beyond 100
to byIS: m initial lead.
plate vibrator, curing
14 5950 (Rates
1237-1990
Coloured excluding
and finishing forthe
chequered GST)
element
flooring where required
in required
tiles locationwith on 525
1:3
bed cement
of mortar,
1:4
(Rate excluding GST) cementtransporting
mortar, 20to site
mm, and
thick
erecting inneat
Total Amount Rs including position
cement grouting with cement
float, filling joints with
: 0.00 mortar
neat 1:3
cement as
slurry, may be
curing, required
machine and
polishing,
curing etc.
waxing all labour
conforming and material
to IS:1443-1972
complete. (Including cost of Steel
reinforcement)(
Grand Total Rates excluding GST)
Tander Amt.
nd repairs to Infrastructure provided
Unit Amount
Cubic 554200
Meter
Cubic 2228000
Meter
Cubic 5220000
Meter
0
Cubic 2616000
Meter
Cubic 261200
Meter
Cubic 95200
Meter
Square 173920
Meter
0
Square 260880
Meter
0
Square 260880
Meter
0
Cubic 3522000
Meter
Cubic 1174800
Meter
Cubic 783600
Meter
Cubic 365360
Meter
0
Square 347760
Meter
Cubic 60900
Meter
Metric 11920000
Tonne
0
Metric Tonne 298000
Per Kilo Meter
0
Metric 89400
Tonne
Square 434700
Meter
Cubic 2689500
Meter
Square 260790
Meter
0
Square 43465000
Meter
0
0
Square 33033400
Meter
110115490
16926810 0.1816402
Unit Amount
Square 374760000
Meter
Square 48600000
Meter
Meter 22176000
Job 3000000
Square 2602500
Meter
451138500
46207785 0.1141128
Unit Amount
Cubic 3045550
Meter
Cubic 1344000
Meter
Cubic 1792000
Meter
Cubic 1161000
Meter
Cubic 422500
Meter
Cubic 258000
Meter
Cubic 6951600
Meter
Cubic 79232000
Meter
Cubic 21616000
Meter
Metric 45420000
Tonne
Running 3696000
Meter
Running 495000
Meter
Cubic 2884200
Meter
Cubic 7551600
Meter
Square 3123750
Meter
178993200
15100916 0.0921393
740247190