Sunteți pe pagina 1din 6
one DAELIM Petrofac 6 BBO SOHAR REFINERY IMPROVEMENT PROJECT SRIP Welding Procedure Specification(W.P.S) Document No: OFD0137-WPS-GTSM-P4-002-Rev.1 Wonk oreiuncts NOeATED BEC Project Number - OFD0137 S.awronaion ont DPUV Contract Number — 120476 / JI-02022 Package Number — 2 & 6 4 | 17-03-2015 Issued For Approval Ms SuN GVA 0 | 14-03-2018 Issued For Approval Ms SIN eva Rev.| Date Description Originator | Reviewed | Approver | DPV Bahwan Engineering Co LLC, PO Box 703, PC 112, Sullanate of Oman “Tel #968 24007510, Fax: +068 24507511 wu. Dahwanengineeting com Orpic Document No: OFD0137-WPS-GTSM-P4.002-Rev.1 DAELIM Petrofac 6 St Contractors comments ‘Sub-contractor_ BEC Signature | Remarks NO response See Comments in attached WPS, Sooo ai Incorporated. Page 1of 1 eon oso as vorwascersae, uc aan | me mommmemcrenl | ose = [ocmemeieeners| oom wwoeee wowsoamsa | wersten | aman | mmo | seu = ~ |Smmermeaa| = = = es a = eo | emer lemeuraawerense| a - wom wes veonnsoresan — | wucrraa em eeenennee | ane sean [| com | mms | emaconin fevonret| sees [mrnmemntone| mec ror rs a se [remerraevce! 987: equa aBeped ‘pafeia Wournosduy Mouyoy TeI0S SNIaid~ eYACIM ze one DABUM etdac) WELDING PROCEDURE SPECIFICATION (WPS) BeO SOWAR REFINERY IMPROVEMENT PROVEGT (SRI) hea ATO CREE? oon Bangg TOE fetrg Pees TASHA Tne WAR ergo Toner oes REREDITERE Ts (= ¥2) Lon oesin As erste bosina NO frRel un YES tr Sabet Passes fos cn AsPer Stes fone: NA BASE METALS (QW- 403) been Type 8 rato 095 GRADE PI, MO. MC. CL2OASTMLABDE CLAMSTI AZSH GPCL P.No 4 GroupNo 1 TO Plo 4 Gopi 1 | Patual | Base Metal Thickness (T) mm — : a osateaton Rego Gr Fat [Base Metal Thickness 5.00 - 54.00 mm Al Th. usd (vith pec Test) mu __ + Pass bick(< 13mm) fea - _ FEE rLLeR WeALS(qW- a4) enw sun posrions w= pectesonNa (9A) a8 56 Joson of coe : ALL av cs) mies eosin of ist: ALL erantNane esaworen lig Presson ; Up Vel wals ert, 16 ‘ Wet tana Na 2 3 FREREAT ew -a5 ou tert 224mm ——82,400m teat Tongeatue in: 1206 owns voit! om nn laps Terpeaio ti; S15 rte ” Jere vatennce + Outng Weng comodo nset an loner; Rela & nto Ring ‘method 10 be used for Prehealing, ttt poatom fee i Poa aig 8 PAT ri mA rm tein; Rtrhales csteatn rn a ex >on 1A Mm POST WELD HEAT TREATMENT (QW-407) GAS (QW 408) herpactae Rago conto cm titue Fon Rte hein Tee Rago 1H 2 Mina ening figon Seo 10-180inin ato Hig toe wore hata wom ™ ate coring woe twor esa gon Shh 8-18 Un Page 1 of2 Qa! DAELIM Petrofac § WELDING PROCEDURE SPECIFICATION (WPS) 880 Orpic SOHAR REFINERY MMPROVEWENT PROJEGT SRP) [Wes No Lwpseecorsupeana) REV) ‘Company : Bahwan Engineering CoLLC ng Pe) ran Tet va suppersngPaR No (oacumeaen code Gea ge IcTReaL eurAcTENsTCS awa) TEoAaUE (aH-40) eatacerce + het are(00) sr Nene Set: tng nd ong say EN GTAP orsnaw a, We Bent Sn GTA Xt JAmpere ( Range ) 90-180 Amp JOniice oF Gas Cup Size 6to10mm Voltage ( Range ) 10-90V inital & Interpess Cleaning By wire brushing, chipping & Grinding peat 24K ets ot aconry = NA fiesin pe dsce—: 162nmda (2 Theta 12) Mana Man! base sro paso pss fie syxd(Roys) + 020m snaetomsteeroes NA lctin rm cesar: NA emtoesonig HA lection: NA ea = Ne Iwo bata wiley | poss FEM eaey | Aer | et | Te S| Hee 7 [aw [ace [| |e] en @ 2 [aw | eee [a2 [| wor | 8s | ae te | eww | ewe [ae [er | wots | wm] eae ‘8 Tow | swan [eres [aoe | rior | aman | — ato a 4) | Method oftackingfiamping by bridge tacking with 4 equidistant tacks 7. fsa stats ns ig pan sed WPS Ths WP a ae We pan 2) ThePe tes Terps Heed tn 7 nett albt Wl pl nd to wal eos baa 4) [The inter pass Temperature tits ehall be maintained at least 30 mm or 4X T(whichever is inmum) on either side of weld 5) |erwsy compen esha be ena pt hese tol oe wn en ci 6) Pl Phin Css DN ERT, ADL ET Ter Da Deseo Rena 1 Ta Pole ened 0 ‘ina Frets orp euneeetou | on | ae hime wd a [Signature Date v Page 2 of 2 QU, Qi WELDING PROCEDURE SPECIFICATION Sree OAELUMUac O (WPS) ‘SOHAR REFINERY IMPROVEMENT PROJECT (SRIP) Wes Wo (MIPSBEC-GTSM-PH002 REV. Conpary:Behwan Engineering CoLLC |Welding Process (es) GTAW+SMAW ‘Type (s) 1 MANUAL |Supporting POR No = (/DABLIN-P4-001 Code , Section IX(Edd. 2013) & * ASME B31 3(Edd. 2012) ‘Sketch for Jolnt configuration LM, Butt fillet ~__ Branch een dr em Boe cp | |, rer i wack gs, - i Nozzle with RF Pad NontewlthoutRFPad | a ee Rev Date Description Remarks: 1 ‘arz015 Point aorported ° ‘az016 Fistnsu for approval Reviewed & Approved by Prepared by Alon Name Signature Page 1 of 1

S-ar putea să vă placă și