one DAELIM Petrofac 6 BBO
SOHAR REFINERY IMPROVEMENT PROJECT
SRIP
Welding Procedure Specification(W.P.S)
Document No: OFD0137-WPS-GTSM-P4-002-Rev.1
Wonk
oreiuncts NOeATED BEC Project Number - OFD0137
S.awronaion ont
DPUV Contract Number — 120476 / JI-02022
Package Number — 2 & 6
4 | 17-03-2015 Issued For Approval Ms SuN GVA
0 | 14-03-2018 Issued For Approval Ms SIN eva
Rev.| Date Description Originator | Reviewed | Approver | DPV
Bahwan Engineering Co LLC, PO Box 703, PC 112, Sullanate of Oman
“Tel #968 24007510, Fax: +068 24507511 wu. Dahwanengineeting comOrpic Document No: OFD0137-WPS-GTSM-P4.002-Rev.1
DAELIM Petrofac 6
St Contractors comments ‘Sub-contractor_ BEC Signature | Remarks
NO response
See Comments in attached WPS, Sooo
ai Incorporated.
Page 1of 1eon oso as vorwascersae, uc aan | me mommmemcrenl | ose =
[ocmemeieeners| oom wwoeee wowsoamsa | wersten | aman | mmo | seu = ~
|Smmermeaa| = = = es a = eo | emer
lemeuraawerense| a - wom wes veonnsoresan — | wucrraa em eeenennee | ane sean
[| com | mms | emaconin fevonret| sees [mrnmemntone| mec ror
rs a se [remerraevce!
987: equa aBeped
‘pafeia Wournosduy Mouyoy TeI0S
SNIaid~ eYACIM
zeone DABUM etdac) WELDING PROCEDURE SPECIFICATION (WPS) BeO
SOWAR REFINERY IMPROVEMENT PROVEGT (SRI)
hea ATO CREE? oon Bangg TOE
fetrg Pees TASHA Tne WAR
ergo Toner oes REREDITERE
Ts (= ¥2)
Lon oesin As erste
bosina NO frRel un YES tr Sabet Passes
fos cn AsPer Stes fone: NA
BASE METALS (QW- 403)
been Type 8 rato 095 GRADE PI, MO. MC. CL2OASTMLABDE CLAMSTI AZSH GPCL
P.No 4 GroupNo 1 TO Plo 4 Gopi 1 |
Patual | Base Metal Thickness (T) mm — : a
osateaton Rego Gr Fat
[Base Metal Thickness 5.00 - 54.00 mm Al
Th. usd (vith pec Test) mu __ +
Pass bick(< 13mm) fea - _ FEE
rLLeR WeALS(qW- a4) enw sun posrions w=
pectesonNa (9A) a8 56 Joson of coe : ALL
av cs) mies eosin of ist: ALL
erantNane esaworen lig Presson ; Up Vel wals
ert, 16 ‘
Wet tana Na 2 3 FREREAT ew -a5
ou tert 224mm ——82,400m teat Tongeatue in: 1206
owns voit! om nn laps Terpeaio ti; S15
rte ” Jere vatennce + Outng Weng
comodo nset an loner; Rela & nto Ring
‘method 10 be used for Prehealing,
ttt poatom fee i Poa aig 8 PAT
ri mA rm tein; Rtrhales
csteatn rn a
ex >on 1A Mm
POST WELD HEAT TREATMENT (QW-407) GAS (QW 408)
herpactae Rago conto cm titue Fon Rte
hein Tee Rago 1H 2 Mina ening figon Seo 10-180inin
ato Hig toe wore hata wom ™
ate coring woe twor esa gon Shh 8-18 Un
Page 1 of2Qa!
DAELIM Petrofac § WELDING PROCEDURE SPECIFICATION (WPS) 880
Orpic
SOHAR REFINERY MMPROVEWENT PROJEGT SRP)
[Wes No Lwpseecorsupeana) REV) ‘Company : Bahwan Engineering CoLLC
ng Pe) ran Tet va
suppersngPaR No (oacumeaen code Gea ge
IcTReaL eurAcTENsTCS awa) TEoAaUE (aH-40)
eatacerce + het are(00) sr Nene Set: tng nd ong
say EN GTAP orsnaw a, We Bent Sn GTA Xt
JAmpere ( Range ) 90-180 Amp JOniice oF Gas Cup Size 6to10mm
Voltage ( Range ) 10-90V inital & Interpess Cleaning By wire brushing, chipping & Grinding
peat 24K ets ot aconry = NA
fiesin pe dsce—: 162nmda (2 Theta 12) Mana Man!
base sro paso pss
fie syxd(Roys) + 020m
snaetomsteeroes NA
lctin rm
cesar: NA
emtoesonig HA
lection: NA
ea = Ne
Iwo bata
wiley | poss FEM eaey | Aer | et | Te S| Hee
7 [aw [ace [| |e] en @
2 [aw | eee [a2 [| wor | 8s | ae te
| eww | ewe [ae [er | wots | wm] eae ‘8
Tow | swan [eres [aoe | rior | aman | — ato a
4) | Method oftackingfiamping by bridge tacking with 4 equidistant tacks
7. fsa stats ns ig pan sed WPS Ths WP a ae We pan
2) ThePe tes Terps Heed tn 7 nett albt Wl pl nd to wal eos
baa 4) [The inter pass Temperature tits ehall be maintained at least 30 mm or 4X T(whichever is inmum) on either side of weld
5) |erwsy compen esha be ena pt hese tol oe wn en ci
6) Pl Phin Css DN ERT, ADL ET
Ter Da Deseo Rena
1 Ta Pole ened
0 ‘ina Frets orp
euneeetou | on | ae
hime wd a
[Signature
Date v
Page 2 of 2QU, Qi WELDING PROCEDURE SPECIFICATION
Sree OAELUMUac O (WPS)
‘SOHAR REFINERY IMPROVEMENT PROJECT (SRIP)
Wes Wo (MIPSBEC-GTSM-PH002 REV. Conpary:Behwan Engineering CoLLC
|Welding Process (es) GTAW+SMAW ‘Type (s) 1 MANUAL
|Supporting POR No = (/DABLIN-P4-001 Code , Section IX(Edd. 2013) &
* ASME B31 3(Edd. 2012)
‘Sketch for Jolnt configuration
LM,
Butt fillet ~__ Branch
een dr em
Boe cp | |, rer
i wack
gs, - i
Nozzle with RF Pad NontewlthoutRFPad | a ee
Rev Date Description Remarks:
1 ‘arz015 Point aorported
° ‘az016 Fistnsu for approval
Reviewed & Approved by
Prepared by
Alon
Name
Signature
Page 1 of 1