ENGINEERING APPRECIATION AS PER RM
ENGG. APPRECIATION
0.00
284.66
0.00
0.00
284.66
284.66
CONSUMPTION OF MATERIALS PROPOSED BOUNDRY WALL
SCHOOL FOR DIFFERENTLY ABLED, AT - DISTT:-PRATAPGARH (U.P.)
CEMENT C.SAND F.SAND IBRICKS GRIT S.BALL B.BALL W. CEMENT B.BATS G. TILE KOTA
S.N. ITEM QTY. UNIT
BAGS CUM CUM NOS. CUM CUM CUM KG CUM SQM SQM
- 0.00
0.00 0.00
BILL OF QUANTITY OF PROPOSED BOUNDARY WALL (24.00 M. )
G.TOTAL
AMOUNT
1861.47
1135.50
10895.55
15827.88
23697.36
17489.53
26413.20
5142.16
18724.28
74042.91
10844.16
0.00
246.24
4125.60
5676.24
216122.08
4322.44
220444.53
9185.19
284.66
9469.85
DETAILED ESTIMATE OF PROPOSED BOUNDARY WALL (24.00M. )
2. Filling of Earth.
AVAILABLE EARTH 70% OF ITEM NO. 1 9.31
5 R.C. C. in Beam.
Top band 8 3.00 0.230 0.100 0.55
Middle band 8 3.00 0.230 0.200 1.10
Plinth Beam 8 3.00 0.230 0.230 1.27
TOTAL 2.926
6 R.C.C.work in column
C1 9 0.230 0.230 3.95 1.88
TOTAL 1.881
7 B/W in foundation
TB-1 G.L. TO P.L. 8 3.00 0.230 0.870 4.80
TOTAL 4.80
8 B/W in super-structure
8 3.00 0.230 0.155 0.86
TOTAL 0.856
9 B/W in super-structure(115 thick)
8 3.00 0.115 1.090 3.01
TOTAL 3.008
10 M. S. work in R.C.C.
qty same as item no (4)*1.5 *0.785 2.60
qty same as item no (5)*2.50*0.785 5.74
qty same as item no (6)*3.0 *0.785 4.43
TOTAL 12.77
11 12mm thick Cement Plaster
16 3.00 1.650 79.20
16 3.00 0.115 5.52
TOTAL 84.72
12 M.S . Grill
8 3.00 0.600 0.30 4.32
TOTAL 4.32
13 Steel painting
8 3.00 0.600 3.00 43.20
TOTAL 43.20
14 Snowcem.
as item no.11 TOTAL 84.72
F PROPOSED BOUNDARY WALL (24.00M. )
UNIT
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
QTL
SQM
KG
SQM
SQM