ENGINEERING APPRECIATION FOR BOUNDRY WALL

RESIDENTIAL,AT DISTT:-PRATAPGARH (U.P.)

RATE AS PER RATE AS PER


S.N. DESCRIPTION OF ITEM CONSUMPTION UNIT DIFFERENCE
S.O.R. 2018 MARKET

1. 1st. CLASS BRICK 0.17 1000 NOS 0.00


2. COARSE SAND 0.32 CUM 2917.00 3800.00 883.00
3. 20 MM.THICK GRIT 0.25 CUM 0.00
4. 40MM THICK STONE BALLAST 0.10 CUM 0.00
TOTAL

ENGINEERING  APPRECIATION AS PER RM 
ENGG. APPRECIATION

0.00
284.66
0.00
0.00
284.66

284.66
CONSUMPTION OF MATERIALS PROPOSED BOUNDRY WALL
SCHOOL FOR DIFFERENTLY ABLED, AT - DISTT:-PRATAPGARH (U.P.)
CEMENT C.SAND F.SAND IBRICKS GRIT S.BALL B.BALL W. CEMENT B.BATS G. TILE KOTA
S.N. ITEM QTY. UNIT
BAGS CUM CUM NOS. CUM CUM CUM KG CUM SQM SQM

1 Cement concrete 1:4:8 0.10 CUM 0.33 0.05 - - 0.10 - - -

2 R.C.C. 1:1.5:3 (For grit) 0.29 CUM 2.51 0.12 - 0.25 - - - - -

3 Brick work in 1:6 cement


and coarse sand 0.24 CUM 0.30 0.06 111 - - - - - -

4 Brick work in 1:4 cement


and coarse sand 0.13 CUM 0.31 0.03 59 - - - - - -

5 Plaster 1:6 cement & coarse sand


12 mm thick 3.53 SQM 0.27 0.05 - - - -

6. Brick coba Treatment SQM 0.00 0.00 - - - - - 0.00

7 Fixing of Glazed tiles SQM 0.00 0.00 - - - - 0.00 0.00

8 Vitrified flooring SQM 0.00 0.00 - - - - - - -

9 M.S. Work in R.C.C. 0.53 QTL.


TOTAL 4 0.32 0.00 170 0.25 0.10 0.00 0.00 0.00 0.00 0.00
F MATERIALS PROPOSED BOUNDRY WALL
ENTLY ABLED, AT - DISTT:-PRATAPGARH (U.P.)
MANSON VITRIFIED
POLISH
KG SQM

- 0.00

0.00 0.00
BILL OF QUANTITY OF PROPOSED BOUNDARY WALL (24.00 M. )

S.N. DESCRIPTION OF ITEM SOR No. QUANTITY UNIT RATES

1. Earth work in excavation in trenches for foundations and


pipes cables etc in ordinary soil (loan clay or sand) including
lift upto 1.5 m, lead upto 50 m and dressing of sides and
ramming of bottom and disposal of surplus excavated
earth as directed by the Engineer- in- charge with in a lead
of 50m .(Including royalty).
PWD-251 13.30 CUM 140.00

2. Filling of available excavated earth in trenches, plinth,sides


of foundation, etc.in layers not exceeding 20 cms in depth
in layers not exceeding 20 cms in depth consolidating
each deposited layer by ramming and watering including
lead upto 50m and lift upto 1.5m
PWD-253 9.31 CUM 122.00

3. Providing and laying in cement concrete 1:4:8 (1 cement :4


coarse sand :8 stone grit 40 mm nominal size) and curing
complete,including cost of form- work,in foundation and
floors. (PWD-281) 2.29 CUM 4750.00

4 R.C.C. work with cement approved coarse sand and 20


mm. guage approved stone ballast in the proportion of
1:1.5:3 (M-20) in raft foundation and footing excluding
supply of reinforcement and its fixing and binding the same
with 24 B.W.G.G.I. binding wire and including necessary
centering and shuttering etc.and also including supply of all
materials, labour and tools and plants etc, required for
proper completion of the works. Binding wire cost being
inluded in the item.
(PWD-287) 2.204 CUM 7180.00

5 R.C.C. work with cement approved coarse sand and 20


mm. guage approved stone ballast in the proportion of
1:1.5:3 (M-20) in lintels of Plinth band excluding supply of
reinforcement and its fixing and binding the same with 24
B.W.G.G.I. binding wire and including necessary centering
and shuttering etc.and also including supply of all materials,
labour and tools and plants etc, required for proper
completion of the works. Binding wire cost being inluded in
the item.
PWD-283(a) 2.926 CUM 8100.00

6 R.C.C. work with cement approved coarse sand and 20


mm. guage approved stone ballast in the proportion of
1:1.5:3 (M-20) in columns excluding supply of
reinforcement and its fixing and binding the same with 24
B.W.G.G.I. binding wire and including necessary centering
and shuttering etc.and also including supply of all materials,
labour and tools and plants etc, required for proper
completion of the works. Binding wire cost being inluded in
the item.
(PWD-289) 1.881 CUM 9300.00

7 First Class brick work in 1:6 cement and coarse sand of


1.25 F.M. mortar in foundation and plinth including supply of
all materials, labour, tools and plants etc. required for proper
completion of the work. (1:6 cement & coarse sand)
(PWD-303) 4.802 CUM 5500.00

8 Brick work in super-structure above plinth level up to floor


two level (up to two storeys) including necessary cutting
and moulding of bricks as required and also including
honey comb brick work thickness of wall not to be less than
1.5 brick thick. (1:6 cement & coarse sand).
(PWD-303+309+310) 0.856 CUM 6010.00
9 Same as in item No. 8 but in 1:4 cement and coarse sand
mortar in superstructure for wall thickness 12 cms & below
brick work. (PWD-305a+309+ 310a) 3.008 CUM 6224.00

10 P/F Mild steel or iron in plain work such as reinforced


concrete or reinforced, brick work (when not included in
over all rates ) wrought to required shape as necessary
including bending for proper completion of the work and
including supply of all steel and and over lapping & hooks.
(PWD- 504) 12.766 QTL. 5800.00

11 12mm cement plaster in single coat on fair side of single or


half brick wall for exterior plastering up to floor two level
including internal rounded angles chamfers, and/or rounded
angles not exceeding 80mm in girth and finished even and
smooth no extra for mixing any additive. (1)1 cement : 6 fine
coarse sand
(PWD- 586+(583-582) 84.720 SQM 128.00

12 Mild steel or iron work of small sizes and sections such as


holding down bolts, hold fast tierods,gratings etc. ( when not
included in an over all rates) wrought to required from
including supply of steel and its wastage including cost of
bolts, nuts if required for and welding, grinding and making
holes as required completion of work fabrication of holes
doors, chaukhats nosing.

Door / windows & Staircase grill. (PWD 502) 4.320 KG 57.00

13 Painting two coat over priming coat (but including cost of


priming coat) on steel and other metal surfaces up to 10 cm.
width or girth or small articles not exceeding 0.10sqm in
area white superior synthetic enamel such as LUXOL3,Hi-
gloss apcolite superlac, DULUX specified brushing to give
an even shade and including cleaning the surface of all
dirt,dust and other foreign matter sand papering and stoping
including cost of all materials, labour tools and plants etc.
required for proper completion of the work.
(PWD-641+642) 43.200 SQM 95.50

14 Finishing walls with water-proofing on cement paint of


approved make such as super m,robiacem,guttucem
supercem quality and of required shade on decorated wall
surfaces (two coat) overone and including one coat white
cement primer to give an even shade after thoroughly
brushing the surface to powdered materials including
curing and cost of all materials.

(PWD-660 +661) 84.72 SQM 67.000


TOTAL
ADD 2% CONTINGIENCES

G.TOTAL

Cost of Boundary wall/ Rm Rs.


COST OF ENGINEERING APPRECIATION
COST PER RM SAY RS.
OF PROPOSED BOUNDARY WALL (24.00 M. )

AMOUNT

1861.47

1135.50

10895.55

15827.88

23697.36

17489.53

26413.20

5142.16
18724.28

74042.91

10844.16

0.00
246.24

4125.60

5676.24
216122.08
4322.44

220444.53

9185.19
284.66
9469.85
DETAILED ESTIMATE OF PROPOSED BOUNDARY WALL (24.00M. )

S.N. DESCRIPTION OF ITEM NO. L B H QTY

1. Earth work in excavation


F1 8 1.05 1.35 1.00 11.34
TB1 8 1.95 0.38 0.33 1.96
TOTAL 13.30

2. Filling of Earth.
AVAILABLE EARTH 70% OF ITEM NO. 1 9.31

3. Base concrete (1:4:8)


F1 8 1.05 1.35 0.150 1.70
TB1 8 1.95 0.38 0.100 0.59
TOTAL 2.29

4 R.C.C. Work in Footing


F1 8 0.900 1.200 0.150 1.30
8*.150/6(.900*1.200+.430*.430+4*.665*.815) 0.69
8 0.430 0.430 0.150 0.22
TOTAL 2.204

5 R.C. C. in Beam.
Top band 8 3.00 0.230 0.100 0.55
Middle band 8 3.00 0.230 0.200 1.10
Plinth Beam 8 3.00 0.230 0.230 1.27
TOTAL 2.926

6 R.C.C.work in column
C1 9 0.230 0.230 3.95 1.88
TOTAL 1.881
7 B/W in foundation
TB-1 G.L. TO P.L. 8 3.00 0.230 0.870 4.80
TOTAL 4.80

8 B/W in super-structure
8 3.00 0.230 0.155 0.86
TOTAL 0.856
9 B/W in super-structure(115 thick)
8 3.00 0.115 1.090 3.01
TOTAL 3.008

10 M. S. work in R.C.C.
qty same as item no (4)*1.5 *0.785 2.60
qty same as item no (5)*2.50*0.785 5.74
qty same as item no (6)*3.0 *0.785 4.43
TOTAL 12.77
11 12mm thick Cement Plaster
16 3.00 1.650 79.20
16 3.00 0.115 5.52
TOTAL 84.72
12 M.S . Grill
8 3.00 0.600 0.30 4.32
TOTAL 4.32
13 Steel painting
8 3.00 0.600 3.00 43.20
TOTAL 43.20

14 Snowcem.
as item no.11 TOTAL 84.72
F PROPOSED BOUNDARY WALL (24.00M. )

UNIT

CUM

CUM

CUM

CUM

CUM

CUM

CUM

CUM

CUM

QTL

SQM

KG
SQM

SQM