Sr no Improvement Projects Activities New plan date Last plan date First plan date Status / remarks
ohmmeter modification from Vendor 10-10-2018 5.10.2018 unit under develoment
testing of ohmemeter unit with the help of NM automation 11-10-2018 6.10.2018 unit under develoment
integration with PLC, with help of NM automation 11-10-2018
alarm limits programming from John sir 12-10-2018
mounting of resistance head, by kotian 10-10-2018 follow up with bhrama
encoder mounting on the head, from bhraman sign 10.10.2018
trials and testing 12-10-2018
Resistance
1 parameter weld defect detection
Voltage, current,
2 wirfeed parameter based weld defect detection
mechanical reuirement finalization with prasad sir. 03-10-2018 need meeting with prasad sir.
mechanical deisgn with prasad sir 20-10-2018
arrangement for valves and sensors, stand 20-10-2018
plc and controller finalization, with reddy sir 02-10-2018 done
wiring diagram by waman 10-10-2018
panel drawing by waman 10-10-2018
panel preparation by wmana 20-10-2018
temperature sensors 20-10-2018
plc logic 21-10-2018
HMI programming 22-10-2018 9820186987
integration of valve, hmi and plc over panel 25-10-2018
trials and testing 25-10-2018
7 preheat controller
trials
8 Shell Marking
10
10
11
12
13
14
15
16
15