Sunteți pe pagina 1din 10

WEEKLY PERFORMANCE CALCULATION REPORT

WORK PACKAGE : FIRE PROTECTION


PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
MONTH : APRIL, WEEK : 4TH
UPDATE : 4/20/2019

REALIZATION

WEIGHT UNTIL LAST WEEK THIS WEEK UNTIL THIS WEEK


NO TYPE OF WORK EXPLANATION
ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT

(%) (%) (%) (%) (%) (%) (%)


A. RISER PIPE FIRE PROTECTION INSTALLATION
1. RISER PIPE SPRINKLER TYPE LOW ZONE 2.849%

2. RISER PIPE SPRINKLER TYPE HIGH ZONE 2.849%

3. RISER PIPE HYDRANT TYPE LOW ZONE 2.849%

4. RISER PIPE HYDRANT TYPE HIGH ZONE 2.849%

5. RISER PIPE DRAIN SPRINKLER 0.906%

B. INSTALLATION PIPE FIRE PROTECTION


1. INSTALLLATION SPRINKLER 5.748%

2. INSTALLATION HYDRANT 0.872%

3. INSTALLATION DRAIN SPRINKLER 0.254%

C. PARTIAL TEST PIPE FIRE PROTECTION


1. INSTALLTION SPRINKLER 0.014%

2. INSTALLATION HYDRANT 0.014%

3. INSTALLATION DRAIN SPRINKLER 0.014%

D. ACCESORISE FIRE PROTECTION


1. HEAD SPRINKLER ACCESORISE 0.037%

2. INDOOR & OUTDOOR HYDRANT BOX SET ACCESORISE 8.961%

3. BRANCH CONTROL VALVE SET & TEST DRAIN VALVE SET ACCESORISE 9.807%

4. MAIN CONTROL VALVE SET & PRESSURE REDUCING VALVE SET ACCESORISE 61.977%

E. TEST COMMISIONING FIRE PROTECTION


1. INSTALLATION SPRINKLER
2. INSTALLATION HYDRANT
3. INSTALLATION DRAIN SPRINKLER

Page 1 of 10
TOTAL 100.000%

Page 2 of 10
BILL OF QUANTITY
WORK PACKAGE : FIRE PROTECTION
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE

NO MATERIAL TYPE UNIT PRICE


A. RISER SPRINKLER (DIAMETER 150)
1. PIPE BLACK STEEL BS SCH-40 ROD Rp 3,250,000
2. T CONNECTION FITTING SCH-40 PCS Rp 330,000
3. ELBOW CONNECTION FITTING SCH-40 PCS Rp 1,300,000
4. REDUCER CONNECTING FITTING SCH-40 PCS Rp 175,000
TOTAL Rp 5,055,000 5.698%

B. RISER HYDRANT (DIAMETER 150)


1. PIPE BLACK STEEL BS SCH-40 ROD Rp 3,250,000
2. T CONNECTION FITTING SCH-40 PCS Rp 330,000
3. ELBOW CONNECTION FITTING SCH-40 PCS Rp 1,300,000
4. REDUCER CONNECTING FITTING SCH-40 PCS Rp 175,000
TOTAL Rp 5,055,000 5.698%

C. RISER DRAIN SPRINKLER (DIAMETER 50)


1. PIPE BLACK STEEL BS SCH-40 ROD Rp 620,400
2. T CONNECTION FITTING SCH-40 PCS Rp 38,000
3. ELBOW CONNECTION FITTING SCH-40 PCS Rp 110,000
4. REDUCER CONNECTING FITTING SCH-40 PCS Rp 35,000
TOTAL Rp 803,400 0.906%

D. SPRINKLER INSTALLATION
1. T CONNECTING FITTING SCH-40 PCS Rp 115,000
2. ELBOW CONNECTING FITTING SCH-40 PCS Rp 100,000
3. PIPES BLACK STEEL SCH-40 PCS Rp 4,885,000
TOTAL Rp 5,100,000 5.748%
E. HYDRANT INSTALLATION
1. T CONNECTING FITTING SCH-40 PCS Rp 43,000
2. ELBOW CONNECTING FITTING SCH-40 PCS Rp 110,000
3. PIPES BLACK STEEL SCH-40 PCS Rp 620,400
TOTAL Rp 773,400 0.872%

F. DRAIN SPRINKLER INSTALLATION


1. ELBOW CONNECTING FITTING SCH-40 PCS Rp 25,000
2. PIPES BLACK STEEL SCH-40 PCS Rp 200,000
TOTAL Rp 225,000 0.254%

G. PARTIAL TEST
1. HYDROSTATIC TEST WATER M3 Rp 25,000
TOTAL Rp 25,000 0.028%

F. ACCSESORISE
1. HEAD SPRINKLER PCS Rp 33,000 0.037%
2. BCV SET SET Rp 7,500,000 8.454%
3. TDV SET SET Rp 1,200,000 1.353%
4. PRV SET SET Rp 55,000,000 61.993%
5. IHB SET SET Rp 7,500,000 8.454%
6. LANDING VALVE SET SET Rp 450,000 0.507%
TOTAL Rp 71,683,000 80.797%

TOTAL Rp 88,719,800 100.000%


0.807971
WEEKLY PERFORMANCE CALCULATION REPORT
WORK PACKAGE : AIR CONDITIONING
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
MONTH : APRIL, WEEK : 4TH
REALIZATION

WEIGHT UNTIL LAST WEEK THIS WEEK UNTIL THIS WEEK


NO TYPE OF WORK EXPLANATION
ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT

(%) (%) (%) (%) (%) (%) (%)


A. INSTALLATIONS
1. UNITS MACHINE
a. FCU UNITS INSTALLATIONS
b. EXHAUST FAN UNITS INSTALLATION
c. SMOKE FAN UNITS INSTALLATION
d. FRESH AIR FAN UNITS INSTALLATION

2. DUCTING
a. SUPPLY AIR DUCT INSTALLATION
b. EXHAUST DUCT INSTALLATION
c. SMOKE DUCT INSTALLATION
d. FRESH AIR DUCT INSTALLATION

3. REFRIGERANT
a. REFRIGERANT PIPE INSTALLATION

4. DRAIN
a. RISER DRAIN INSTALLATION
b. DRAIN INSTALLATION

5. POWER CABLE & CONTROL CABLE


a. POWER CABLE INSTALLATION
b. CONTROL CABLE INSTALLATION

Page 6 of 10
WEEKLY PERFORMANCE CALCULATION REPORT
WORK PACKAGE : AIR CONDITIONING
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
MONTH : APRIL, WEEK : 4TH
REALIZATION

WEIGHT UNTIL LAST WEEK THIS WEEK UNTIL THIS WEEK


NO TYPE OF WORK EXPLANATION
ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT

(%) (%) (%) (%) (%) (%) (%)


B. PARTIAL TESTING
1. FUNGTION TEST (MACHINE UNITS)
2. FOGGING TEST
a. SUPPLY AIR DUCT INSTALLATION
b. EXHAUST AIR DUCT INSTALLATION
c. SMOKE AIR DUCT INSTALLATION
d. FRESH AIR DUCT INSTALLATION
3. LEAK TEST (REFRIGERANT)
4. SURGE TEST (DRAIN)
5. MEGGER TEST (POWER CABLE AND CONTROL CABLE)

C. ACCESORISES
1. SUPPLY AIR GRILLE
2. EXHAUST AIR GRILLE
3. RETURN AIR GRILLE
4. SMOKE GRILLE
5. MANUAL FIRE DAMPER
6. THERMOSTAT

D. TEST COMMISIONING
1. SUPPLY AIR
2. EXHAUST AIR
3. SMOKE FREE LOBBY

Page 7 of 10
WEEKLY PERFORMANCE CALCULATION REPORT
WORK PACKAGE : AIR CONDITIONING
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
MONTH : APRIL, WEEK : 4TH
REALIZATION

WEIGHT UNTIL LAST WEEK THIS WEEK UNTIL THIS WEEK


NO TYPE OF WORK EXPLANATION
ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT

(%) (%) (%) (%) (%) (%) (%)


TOTAL

Page 8 of 10
WEEKLY PERFORMANCE CALCULATION REPORT
WORK PACKAGE : PLUMBING
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
MONTH : APRIL, WEEK : 4TH
UPDATE : 4/20/2019

REALIZATION

WEIGHT UNTIL LAST WEEK THIS WEEK UNTIL THIS WEEK


NO TYPE OF WORK EXPLANATION
ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT ACHIEVEMENT WEIGHT

(%) (%) (%) (%) (%) (%) (%)


A. RISER PIPE PLUMBING
1. RISER PIPE CLEAN WATER
2. RISER PIPE WASTE AND SEWAGE WATER
3. RISER PIPE KITCHEN DRAIN
4. RISER PIPE VENTING

B. INSTALLATION PIPE PLUMBING


1. INSTALLATION CLEAN WATER
2. INSTALLATION WASTER WATER
3. INSTALLATION SEWAGE WATER
4. INSTALLATION KITCHEN DRAIN
5. INSTALLATION VENTING

C. PARTIAL TEST PIPE PLUMBING


1. HYDROSTATIC TEST
2. INSTALLATION HYDRANT
3. SURGE TEST

D. ACCESORISE FIRE PROTECTION


1. HEAD SPRINKLER ACCESORISE
2. INDOOR & OUTDOOR HYDRANT BOX SET ACCESORISE
3. BRANCH CONTROL VALVE SET & TEST DRAIN VALVE SET ACCESORISE
4. MAIN CONTROL VALVE SET & PRESSURE REDUCING VALVE SET ACCESORISE

E. TEST COMMISIONING FIRE PROTECTION


1. INSTALLATION SPRINKLER
2. INSTALLATION HYDRANT
3. INSTALLATION DRAIN SPRINKLER
TOTAL

S-ar putea să vă placă și