REALIZATION
3. BRANCH CONTROL VALVE SET & TEST DRAIN VALVE SET ACCESORISE 9.807%
4. MAIN CONTROL VALVE SET & PRESSURE REDUCING VALVE SET ACCESORISE 61.977%
Page 1 of 10
TOTAL 100.000%
Page 2 of 10
BILL OF QUANTITY
WORK PACKAGE : FIRE PROTECTION
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
D. SPRINKLER INSTALLATION
1. T CONNECTING FITTING SCH-40 PCS Rp 115,000
2. ELBOW CONNECTING FITTING SCH-40 PCS Rp 100,000
3. PIPES BLACK STEEL SCH-40 PCS Rp 4,885,000
TOTAL Rp 5,100,000 5.748%
E. HYDRANT INSTALLATION
1. T CONNECTING FITTING SCH-40 PCS Rp 43,000
2. ELBOW CONNECTING FITTING SCH-40 PCS Rp 110,000
3. PIPES BLACK STEEL SCH-40 PCS Rp 620,400
TOTAL Rp 773,400 0.872%
G. PARTIAL TEST
1. HYDROSTATIC TEST WATER M3 Rp 25,000
TOTAL Rp 25,000 0.028%
F. ACCSESORISE
1. HEAD SPRINKLER PCS Rp 33,000 0.037%
2. BCV SET SET Rp 7,500,000 8.454%
3. TDV SET SET Rp 1,200,000 1.353%
4. PRV SET SET Rp 55,000,000 61.993%
5. IHB SET SET Rp 7,500,000 8.454%
6. LANDING VALVE SET SET Rp 450,000 0.507%
TOTAL Rp 71,683,000 80.797%
2. DUCTING
a. SUPPLY AIR DUCT INSTALLATION
b. EXHAUST DUCT INSTALLATION
c. SMOKE DUCT INSTALLATION
d. FRESH AIR DUCT INSTALLATION
3. REFRIGERANT
a. REFRIGERANT PIPE INSTALLATION
4. DRAIN
a. RISER DRAIN INSTALLATION
b. DRAIN INSTALLATION
Page 6 of 10
WEEKLY PERFORMANCE CALCULATION REPORT
WORK PACKAGE : AIR CONDITIONING
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
MONTH : APRIL, WEEK : 4TH
REALIZATION
C. ACCESORISES
1. SUPPLY AIR GRILLE
2. EXHAUST AIR GRILLE
3. RETURN AIR GRILLE
4. SMOKE GRILLE
5. MANUAL FIRE DAMPER
6. THERMOSTAT
D. TEST COMMISIONING
1. SUPPLY AIR
2. EXHAUST AIR
3. SMOKE FREE LOBBY
Page 7 of 10
WEEKLY PERFORMANCE CALCULATION REPORT
WORK PACKAGE : AIR CONDITIONING
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
MONTH : APRIL, WEEK : 4TH
REALIZATION
Page 8 of 10
WEEKLY PERFORMANCE CALCULATION REPORT
WORK PACKAGE : PLUMBING
PROJECT : THAMRIN NINE, AREA : TOWN HOUSE
MONTH : APRIL, WEEK : 4TH
UPDATE : 4/20/2019
REALIZATION