CONSOLIDADO
MANO DE OBRA
Item Descripción UM IU Cantidad
2 OFICIAL H-H 47 227.9434
3 OPERADOR H-H 47 4.8040
4 OPERADOR DE EQUIPO PESADO H-H 47 7.3241
5 OPERARIO H-H 47 1,577.4962
6 PEON H-H 47 1,160.6864
CPOC 2016
MATERIALES
Item Descripción UM IU Cantidad
1 ACEITE M. 30° GLN 30 0.0583
2 ACERO F'Y=4,200 KG/CM² KG 3 974.0441
3 AGUA M3 39 10.5550
4 ALAMBRE NEGRO # 8 KG 2 44.1000
5 ALAMBRE NEGRO # 16 KG 2 46.3821
6 ALAMBRE NEGRO # 8 KG 30 28.5541
7 ALAMBRON 1/4 KG 2 151.7750
8 ANDAMIO DE MADERA P² 30 35.9333
9 ANDAMIOS DE MADERA H-M 43 0.0000
10 ANGULO 2"x2"x1/4" x6m. PZA 2 4.9552
11 ARENA FINA M3 4 10.8127
12 ARENA GRUESA M3 4 32.1490
13 CEMENTO PORTLAND TIPO I BLS 21 557.4174
14 CIZALLA P/FIERRO CONST. HASTA 1" UND 37 4.2700
15 CLAVOS C/C 2" KG 1 17.6000
16 CLAVOS C/C 3" KG 2 36.7500
17 CLAVOS DE 2 A 4 KG 30 14.2771
18 FLETE TRANSPORTE LOCAL KG 32 3,858.2000
19 GASOLINA 84 OCTANOS GLN 34 1.8000
20 GRASA POTE 200 GR UND 53 0.1190
21 HORMIGON M3 38 19.2748
22 LADR.ARC.KK.18HCOS.(TIPO IV)9X13X24CM UND 17 24,185.0344
23 MADERA TORNILLO P² 43 698.2500
24 MADERA TORNILLO EN BRUTO P² 43 220.3224
25 MADERA TORNILLO LARGA P² 43 530.9884
26 MALLA METALICA DE 5" x 1/4" x 0.5 mts M² 3 13.6640
27 PIEDRA CHANCADA 3/4 M3 30 11.2851
28 PIEDRA CHANCADA Ø 1/2" M3 5 20.0848
29 PIEDRA GRANDE M3 5 16.7331
30 PLANCHA ACERO 1.6mm x 1.22m x 2.40m PLN 2 1.0956
31 PLATINA DE FIERRO 1/8" x 1 1/2" x 6m PZA 2 0.8540
32 REGLA DE MADERA P² 37 42.8274
33 SOLDADURA CELLOCORD KG 30 5.1211
34 TEE 1 1/2" x 1 1/2" x 1/8" x6m. PZA 2 1.7121
35 VARILLA CORRUGADA Ø=4.7 MM ML 3 27.8265
EQUIPO/MAQUINARIA
Item Descripción UM IU Cantidad
1 CIZALLA FE CONSTRUCCION MANUAL HASTA 1" H-M 37 8.8903
2 CIZALLA P/FIERRO DE CONSTRUCCION H-M 37 19.0283
3 MEZCLADORA CONCRETO 9 A 11 P3- 20 HP H-M 48 9.7432
4 MEZCLADORA CONCRETO TAMBOR 16P3 20-35HP H-M 48 6.9540
5 MEZCLADORA CONCRETO TAMBOR11P3-18 HP H-M 48 7.3280
6 MOTOSOLDADORA DE 250 AMP. H-M 49 6.8319
7 VIBRADOR DE CONCRETO 4 HP. 2.4" H-M 49 9.7416
8 VOLQUETE 4x2 10 M3 H-M 48 5.7440
COMODINES
Item Descripción UM IU Cantidad
1 HERRAMIENTAS MANUALES % 37
RESUMEN
MANO DE OBRA 43,540.65
MATERIALES 43,454.01
EQUIPO/HERRAMIENTA 1,675.04
COMODINES 1,732.06
OTROS RECURSOS 0.00
TOTAL RECURSO S/ 90,401.76
S/ 41,143.31
Precio Parcial
15.39 3,508.05
13.52 64.95
18.36 134.47
18.36 28,962.83
7.30 8,473.01
S/ 43,454.01
Precio Parcial
41.17 2.40
3.40 3,311.75
2.00 21.11
2.80 123.48
2.80 129.87
4.62 131.92
2.80 424.97
0.75 26.95
1.00 0.00
9.60 47.57
30.00 324.38
38.00 1,221.66
23.50 13,099.31
6.00 25.62
4.20 73.92
4.20 154.35
4.62 65.96
0.05 192.91
7.50 13.50
3.78 0.45
75.00 1,445.61
0.58 14,027.32
3.00 2,094.75
2.42 533.18
4.30 2,283.25
34.20 467.31
45.00 507.83
90.00 1,807.63
35.00 585.66
25.10 27.50
12.60 10.76
3.30 141.33
6.77 34.67
7.78 13.32
2.94 81.81
S/ 1,675.04
Precio Parcial
1.55 13.78
6.00 114.17
27.30 265.99
31.50 219.05
20.00 146.56
16.00 109.31
12.00 116.90
120.00 689.28
S/ 1,732.06
Precio Parcial
0.00 1,732.06
48.16%
48.07%
1.85%
1.92%
0.00%
INCIDENCIA DE RECURSOS
CONSOLIDADO
RESUMEN
MANO DE OBRA 41,143.31 48.16%
MATERIALES 43,454.01 48.07%
EQUIPO/HERRAMIENTA 1,675.04 1.85%
COMODINES 1,732.06 1.92%
OTROS RECURSOS 0.00 0.00%
TOTAL RECURSO 90,401.76
IU
SETIEMBRE
619.76
619.76
619.76
619.76
619.76
IU
SETIEMBRE
973.52
538.41
458.59
559.22
559.23
559.24
559.25
373.24
373.25
373.26
1048.12
434.86
449.56
312.40
559.22
559.23
559.24
474.11
520.34
829.86
875.75
709.42
932.30
932.31
932.32
449.45
434.86
434.87
434.88
537.84
373.24
312.40
502.06
437.75
538.41
IU
SETIEMBRE
312.40
312.41
373.24
373.25
373.26
373.27
315.57
373.27
IU
SETIEMBRE
312.40
AGRUPACION PRE LIMINAR
1 0.455 37
3 0.168 80
0.07 49
4 0.318
0.02
0.24
5 0.43
PRE LIMINAR
Descripción
MANO DE OBRA
CONCRETO PRE MEZCLADO
MAQUINARIA
COMODINES
OTROS
MATERIALES
FORMULA
FORMULA POLINOMICA
UBICACIÓN :
PROPIETARIO :
FECHA :
1 0.309 J 47
2 0.168 CR 39
49
4 0.374 MM
5 0.049 MT 3
ULA POLINOMICA
NDA FAMILIAR
Descripción
MANO DE OBRA
CONCRETO PRE MEZCLADO
MAQUINARIA
COMODINES
OTROS
MATERIALES