Sunteți pe pagina 1din 12

INCIDENCIA DE RECURSOS

CONSOLIDADO

OBRA : CERCO PERIMETRICO


HECHO POR : ING° SULCA PEÑA, MARIA ::: INGENIERO CIVIL
REVISADO POR : ING° SULCA PEÑA, MARIA ::: INGENIERO CIVIL
FECHA : miércoles, 30 de octubre de 2019

MANO DE OBRA
Item Descripción UM IU Cantidad
2 OFICIAL H-H 47 227.9434
3 OPERADOR H-H 47 4.8040
4 OPERADOR DE EQUIPO PESADO H-H 47 7.3241
5 OPERARIO H-H 47 1,577.4962
6 PEON H-H 47 1,160.6864
CPOC 2016

MATERIALES
Item Descripción UM IU Cantidad
1 ACEITE M. 30° GLN 30 0.0583
2 ACERO F'Y=4,200 KG/CM² KG 3 974.0441
3 AGUA M3 39 10.5550
4 ALAMBRE NEGRO # 8 KG 2 44.1000
5 ALAMBRE NEGRO # 16 KG 2 46.3821
6 ALAMBRE NEGRO # 8 KG 30 28.5541
7 ALAMBRON 1/4 KG 2 151.7750
8 ANDAMIO DE MADERA P² 30 35.9333
9 ANDAMIOS DE MADERA H-M 43 0.0000
10 ANGULO 2"x2"x1/4" x6m. PZA 2 4.9552
11 ARENA FINA M3 4 10.8127
12 ARENA GRUESA M3 4 32.1490
13 CEMENTO PORTLAND TIPO I BLS 21 557.4174
14 CIZALLA P/FIERRO CONST. HASTA 1" UND 37 4.2700
15 CLAVOS C/C 2" KG 1 17.6000
16 CLAVOS C/C 3" KG 2 36.7500
17 CLAVOS DE 2 A 4 KG 30 14.2771
18 FLETE TRANSPORTE LOCAL KG 32 3,858.2000
19 GASOLINA 84 OCTANOS GLN 34 1.8000
20 GRASA POTE 200 GR UND 53 0.1190
21 HORMIGON M3 38 19.2748
22 LADR.ARC.KK.18HCOS.(TIPO IV)9X13X24CM UND 17 24,185.0344
23 MADERA TORNILLO P² 43 698.2500
24 MADERA TORNILLO EN BRUTO P² 43 220.3224
25 MADERA TORNILLO LARGA P² 43 530.9884
26 MALLA METALICA DE 5" x 1/4" x 0.5 mts M² 3 13.6640
27 PIEDRA CHANCADA 3/4 M3 30 11.2851
28 PIEDRA CHANCADA Ø 1/2" M3 5 20.0848
29 PIEDRA GRANDE M3 5 16.7331
30 PLANCHA ACERO 1.6mm x 1.22m x 2.40m PLN 2 1.0956
31 PLATINA DE FIERRO 1/8" x 1 1/2" x 6m PZA 2 0.8540
32 REGLA DE MADERA P² 37 42.8274
33 SOLDADURA CELLOCORD KG 30 5.1211
34 TEE 1 1/2" x 1 1/2" x 1/8" x6m. PZA 2 1.7121
35 VARILLA CORRUGADA Ø=4.7 MM ML 3 27.8265

EQUIPO/MAQUINARIA
Item Descripción UM IU Cantidad
1 CIZALLA FE CONSTRUCCION MANUAL HASTA 1" H-M 37 8.8903
2 CIZALLA P/FIERRO DE CONSTRUCCION H-M 37 19.0283
3 MEZCLADORA CONCRETO 9 A 11 P3- 20 HP H-M 48 9.7432
4 MEZCLADORA CONCRETO TAMBOR 16P3 20-35HP H-M 48 6.9540
5 MEZCLADORA CONCRETO TAMBOR11P3-18 HP H-M 48 7.3280
6 MOTOSOLDADORA DE 250 AMP. H-M 49 6.8319
7 VIBRADOR DE CONCRETO 4 HP. 2.4" H-M 49 9.7416
8 VOLQUETE 4x2 10 M3 H-M 48 5.7440

COMODINES
Item Descripción UM IU Cantidad
1 HERRAMIENTAS MANUALES % 37

RESUMEN
MANO DE OBRA 43,540.65
MATERIALES 43,454.01
EQUIPO/HERRAMIENTA 1,675.04
COMODINES 1,732.06
OTROS RECURSOS 0.00
TOTAL RECURSO S/ 90,401.76
S/ 41,143.31
Precio Parcial
15.39 3,508.05
13.52 64.95
18.36 134.47
18.36 28,962.83
7.30 8,473.01

S/ 43,454.01
Precio Parcial
41.17 2.40
3.40 3,311.75
2.00 21.11
2.80 123.48
2.80 129.87
4.62 131.92
2.80 424.97
0.75 26.95
1.00 0.00
9.60 47.57
30.00 324.38
38.00 1,221.66
23.50 13,099.31
6.00 25.62
4.20 73.92
4.20 154.35
4.62 65.96
0.05 192.91
7.50 13.50
3.78 0.45
75.00 1,445.61
0.58 14,027.32
3.00 2,094.75
2.42 533.18
4.30 2,283.25
34.20 467.31
45.00 507.83
90.00 1,807.63
35.00 585.66
25.10 27.50
12.60 10.76
3.30 141.33
6.77 34.67
7.78 13.32
2.94 81.81

S/ 1,675.04
Precio Parcial
1.55 13.78
6.00 114.17
27.30 265.99
31.50 219.05
20.00 146.56
16.00 109.31
12.00 116.90
120.00 689.28

S/ 1,732.06
Precio Parcial
0.00 1,732.06

48.16%
48.07%
1.85%
1.92%
0.00%
INCIDENCIA DE RECURSOS
CONSOLIDADO

OBRA : CERCO PERIMETRICO


HECHO POR : ING° SULCA PEÑA, MARIA ::: INGENIERO CIVIL
REVISADO POR : ING° SULCA PEÑA, MARIA ::: INGENIERO CIVIL
FECHA : miércoles, 30 de octubre de 2019

MANO DE OBRA S/ 41,143.31 0.455 IU


Item CODIGO Descripción UM Cantidad Precio Parcial COEFICIENTES JULIO AGOSTO
1 47 OFICIAL H-H 227.9434 15.39 3,508.05 0.039 600.4 619.76
2 47 OPERADOR H-H 4.8040 13.52 64.95 0.001 600.4 619.76
3 47 OPERADOR DE EQUIP H-H 7.3241 18.36 134.47 0.001 600.4 619.76
4 47 OPERARIO H-H 1,577.4962 18.36 28,962.83 0.320 600.4 619.76
5 47 PEON H-H 1,160.6864 7.30 8,473.01 0.094 600.4 619.76

MATERIALES S/ 43,454.01 0.481 IU


Item CODIGO Descripción UM Cantidad Precio Parcial JULIO AGOSTO
1 1 ACEITE M. 30° GLN 0.0583 41.17 2.40 0.000 960.43 981.15
2 3 ACERO F'Y=4,200 KG/ KG 974.0441 3.40 3,311.75 0.037 548.06 541.62
3 39 AGUA M3 10.5550 2.00 21.11 0.000 458.29 458.56
4 2 ALAMBRE NEGRO # 8 KG 44.1000 2.80 123.48 0.001 548.06 562.55
5 2 ALAMBRE NEGRO # 16KG 46.3821 2.80 129.87 0.001 548.07 562.56
6 2 ALAMBRE NEGRO # 8 KG 28.5541 4.62 131.92 0.001 548.08 562.57
7 2 ALAMBRON 1/4 KG 151.7750 2.80 424.97 0.005 548.09 562.58
8 48 ANDAMIO DE MADER P² 35.9333 0.75 26.95 0.000 369.59 374.19
9 48 ANDAMIOS DE MADERH-M 0.0000 1.00 0.00 0.000 369.60 374.20
10 48 ANGULO 2"x2"x1/4" xPZA 4.9552 9.60 47.57 0.001 369.61 374.21
11 4 ARENA FINA M3 10.8127 30.00 324.38 0.004 1051.54 1058.82
12 5 ARENA GRUESA M3 32.1490 38.00 1,221.66 0.014 429.12 434.38
13 21 CEMENTO PORTLAND BTLS 557.4174 23.50 13,099.31 0.145 449.56 449.56
14 37 CIZALLA P/FIERRO CONUND 4.2700 6.00 25.62 0.000 314.62 312.66
15 2 CLAVOS C/C 2" KG 17.6000 4.20 73.92 0.001 548.06 562.56
16 2 CLAVOS C/C 3" KG 36.7500 4.20 154.35 0.002 548.06 562.57
17 2 CLAVOS DE 2 A 4 KG 14.2771 4.62 65.96 0.001 548.06 562.58
18 32 FLETE TRANSPORTE L KG 3,858.2000 0.05 192.91 0.002 472.50 472.50
19 34 GASOLINA 84 OCTANOGLN 1.8000 7.50 13.50 0.000 521.63 523.79
20 53 GRASA POTE 200 GR UND 0.1190 3.78 0.45 0.000 833.17 830.52
21 38 HORMIGON M3 19.2748 75.00 1,445.61 0.016 874.24 878.58
22 17 LADR.ARC.KK.18HCOS.UND 24,185.0344 0.58 14,027.32 0.155 700.21 705.20
23 43 MADERA TORNILLO P² 698.2500 3.00 2,094.75 0.023 932.99 936.28
24 43 MADERA TORNILLO ENP² 220.3224 2.42 533.18 0.006 932.100 936.29
25 43 MADERA TORNILLO L P² 530.9884 4.30 2,283.25 0.025 932.101 936.30
26 46 MALLA METALICA DE 5"
M² 13.6640 34.20 467.31 0.005 444.52 449.86
27 5 PIEDRA CHANCADA 3/M3 11.2851 45.00 507.83 0.006 429.12 434.38
28 5 PIEDRA CHANCADA Ø M3 20.0848 90.00 1,807.63 0.020 429.13 434.39
29 5 PIEDRA GRANDE M3 16.7331 35.00 585.66 0.006 429.14 434.40
30 56 PLANCHA ACERO 1.6mm
PLN 1.0956 25.10 27.50 0.000 527.11 541.04
31 48 PLATINA DE FIERRO 1/8
PZA 0.8540 12.60 10.76 0.000 369.59 374.19
32 37 REGLA DE MADERA P² 42.8274 3.30 141.33 0.002 314.62 312.66
33 30 SOLDADURA CELLOCOKG 5.1211 6.77 34.67 0.000 491.24 505.07
34 72 TEE 1 1/2" x 1 1/2" x PZA 1.7121 7.78 13.32 0.000 434.08 438.75
35 3 VARILLA CORRUGADA ML 27.8265 2.94 81.81 0.001 527.67 541.62

EQUIPO/MAQUINARIA S/ 1,675.04 0.019 IU


Item Descripción UM Cantidad Precio Parcial JULIO AGOSTO
1 37 CIZALLA FE CONSTRU H-M 8.8903 1.55 13.78 0.000 314.62 312.66
2 37 CIZALLA P/FIERRO DE H-M 19.0283 6.00 114.17 0.001 314.63 312.67
3 48 MEZCLADORA CONCRETO
H-M 9.7432 27.30 265.99 0.003 369.59 374.19
4 48 MEZCLADORA CONCREH-M 6.9540 31.50 219.05 0.002 369.60 374.20
5 48 MEZCLADORA CONCREH-M 7.3280 20.00 146.56 0.002 369.61 374.21
6 48 MOTOSOLDADORA DEH-M 6.8319 16.00 109.31 0.001 369.62 374.22
7 49 VIBRADOR DE CONCRET
H-M 9.7416 12.00 116.90 0.001 308.84 317.45
8 48 VOLQUETE 4x2 10 M3H-M 5.7440 120.00 689.28 0.008 369.62 374.19

COMODINES S/ 1,732.06 0.019 IU


Item Descripción UM Cantidad Precio Parcial JULIO AGOSTO
1 37 HERRAMIENTAS MANU% 0.00 1,732.06 0.019 314.62 312.66

RESUMEN
MANO DE OBRA 41,143.31 48.16%
MATERIALES 43,454.01 48.07%
EQUIPO/HERRAMIENTA 1,675.04 1.85%
COMODINES 1,732.06 1.92%
OTROS RECURSOS 0.00 0.00%
TOTAL RECURSO 90,401.76
IU
SETIEMBRE
619.76
619.76
619.76
619.76
619.76

IU
SETIEMBRE
973.52
538.41
458.59
559.22
559.23
559.24
559.25
373.24
373.25
373.26
1048.12
434.86
449.56
312.40
559.22
559.23
559.24
474.11
520.34
829.86
875.75
709.42
932.30
932.31
932.32
449.45
434.86
434.87
434.88
537.84
373.24
312.40
502.06
437.75
538.41

IU
SETIEMBRE
312.40
312.41
373.24
373.25
373.26
373.27
315.57
373.27

IU
SETIEMBRE
312.40
AGRUPACION PRE LIMINAR

PRE LIMINAR COEFICIENTE COEFICIENTE IU

1 0.455 37
3 0.168 80

0.07 49

4 0.318
0.02

0.24
5 0.43
PRE LIMINAR

Descripción

MANO DE OBRA
CONCRETO PRE MEZCLADO

MAQUINARIA

COMODINES

OTROS
MATERIALES
FORMULA

FORMULA POLINOMICA

CONSTRUCCION DE UNA VIVIENDA FAMILIAR


OBRA :

UBICACIÓN :
PROPIETARIO :
FECHA :

K= 0.309 * ( Jr/Jo )+ 0.168 * (CRr/CRo)+ 0.374 * ( MMr/MMo )+ 0.049 * ( MTr/MTo )

MONOMIO COEFICIENTE Símbolo IU

1 0.309 J 47
2 0.168 CR 39
49
4 0.374 MM

5 0.049 MT 3
ULA POLINOMICA

NDA FAMILIAR

o)+ 0.374 * ( MMr/MMo )+ 0.049 * ( MTr/MTo )

Descripción

MANO DE OBRA
CONCRETO PRE MEZCLADO
MAQUINARIA
COMODINES
OTROS
MATERIALES

S-ar putea să vă placă și