S. Duratio Total Achive Balance
NO
DISCRIPTION n (Days)
From To Unit
Qty. d Qty. Qty.
1 DIVERSION WEIR
3 APPROACH CHANNEL
4 FORE BAY
ii RCC Concretting including raft, side wall 120 9.05.2019 8.09.2019 m3 1440 269 1171
5 PENSTOCK
Anchor blocks 1-7 and saddle support STRI STRI STRI STRI
ii 50 11.03.2019 30.08.2019 m3 900 567 333 5 Puja 5 R 5 0 5 R 5 R 5 R 30 0 5 0 5 R 5
KE
5
KE
5
KE
5
KE
30 0
first stage RCC
STRI STRI STRI STRI
iii Errection of steel linear (Penstock) 169 1.03.2019 17.08.2019 m 630 122.5 507.5 2.5 Puja 2.5 R 2.5 0 2.5 R 2.5 R 2.5 R 15 0 5 0 5 R 5
KE
5
KE
5
KE
5
KE
30 0
2nd Stage RCC Concerting and Saddle STRI STRI STRI STRI
iv 184 31.03.2019 30.09.2019 m3 1250 592 658 5 Puja 5 R 5 0 5 R 5 R 5 R 30 0 5 0 5 R 5
KE
5
KE
5
KE
5
KE
30 0
Support Manually)
6 POWER HOUSE
iva Soil Filling (cantilever slab-2, & DT,s) 110 Completed 3000 3000 0
7 TRC.
8 MISCELLANEOUS WORK
11 SWITCHYARD
12 33 KV TRANSMISSION LINE
13 H&M WORKS
iii Stoplog Gate Installation ( 02 Nos. Set ) 15 23.05 2019 07.09 2019
B FOREBAY
iii Trash Rack at Fore bay( 01 No. Set ) 10 06.07.2019 15.09. 2019
C DRAFT TUBE
14 E&M WORKS
A UNIT# 1
B UNIT# 2
C UNIT # 3
Note: Reasons for shortfall highlighted by developer are below Excavation(Cum) Excavation(Cum)
R - stand for work hampered due to Rainfall, Puja- Stand for Festivel,Strike-Stand for 135 3 180 10
1
Worked Hampered by Local Worker Concreting(Cum) Concreting(Cum)
15 0 30 0
2 Excavation Work Not Targeted Due to Monsoon Penstock Erection (m) Penstock Erection (m)
3 Concreting shortfall is due to Rainfall and Local Worker Strike
4 Penstock Erection shortfall is due to Rainfal and Local Worker Strike