Prestress Losses
Example-4
For the beam of cross section shown in Figure, analyze the flexural
stresses at midspan at transfer and in service. The beam is prestressed
with Grade-250 steel with 1/2 in strands providing a total area Aps=1.25
in2, use f c = 6000 psi, and assume that the concrete has attained a
strength of 5000 psi at the time of transfer. The initial prestress at jacking
is 0.8 fpu. Compute the losses and find the stresses at service. The
service dead load = 0.25 kip/ft, which does not include the weight of the
beam. The service live load = 1.0 kip/ft. Use n = 7. Assume that the
entire cross section is effective and use the transformed area (neglecting
displaced concrete) for the moment of inertia.
Example-4
Example-4
Prestressing steel Grade 250 fpu =250 ksi
fcir Concrete stress @ level of tendon Elastic Shortening ES = 7.2 x 1.52 = 6.384 ksi
due to prestressing effect @ transfer
and self-weight of member
Example-4 Prestress Losses PCI
Stress Loss due to Creep
Creep Loss (CR) Ep Kcr = 2.0 for pretensioned members
CR K cr f cir f cds
Ec Eps/Ec = n = 6.568
250 250×4.722 28.1×12×4.72
From the previous slide 𝑓𝑐𝑖𝑟 = − 240 − 8331 + =-1.519 ksi
8331
M e fcds : concrete stress at center of gravity of the tendons due to all dead
f cds sd loads except the dead load present at transfer
Ig
28.1×12×4.72
M sd 𝑓𝑐𝑑𝑠 = + = 0.191 ksi
8331