Date: 20-11-2013
Date: 20-11-2013
No: DWP001
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Excavation & Concrete grade 15 - Screed Culvert 2/2 8.30 13.00
2 Excavation & Concrete grade 15 - Screed Culvert 3/1 9.00 14.00
3 Excavation & Concrete grade 15 - Screed Culvert 3/2 10.00 16.00
4 Excavation & Concrete grade 15 - Screed Culvert 3/5 11.00 17.00
Time
CONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 20-11-2013
20-11-2013
DWP001
Remarks
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 21-11-2013
Date: 21-11-2013
No: DWP002
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Reinforcement & Form work preperation - Bace Culvert 2/2 8.00 10.00
2 Reinforcement & Form work preperation - Bace Culvert 3/1 8.00 10.00
3 Reinforcement & Form work preperation - Bace Culvert 3/2 8.00 10.00
4 Reinforcement & Form work preperation - Bace Culvert 3/5 8.00 10.00
5 Concrete grade 30 - Base Culvert 2/2 10.00 14.00
6 Concrete grade 30 - Base Culvert 3/1 10.30 15.00
7 Concrete grade 30 - Base Culvert 3/2 10.00 14.30
8 Concrete grade 30 - Base Culvert 3/5 10.30 16.00
Time
CONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 21-11-2013
21-11-2013
DWP002
Remarks
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 22-11-2013
Date: 22-11-2013
No: DWP003
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Form work preperation - Wall 1 Culvert 2/2 8.00 14.00
2 Form work preperation - Wall 1 Culvert 3/1 8.00 15.00
3 Form work preperation - Wall 1 Culvert 3/2 8.00 15.00
4 Form work preperation - Wall 1 Culvert 3/5 8.00 14.30
Time
CONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 22-11-2013
22-11-2013
DWP003
Remarks
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 23-11-2013
Date: 23-11-2013
No: DWP004
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 15 - Wall 1 Culvert 2/2 8.00 12.00
2 Concrete grade 15 - Wall 1 Culvert 3/1 8.00 12.00
3 Concrete grade 15 - Wall 1 Culvert 3/2 8.00 12.00
4 Concrete grade 15 - Wall 1 Culvert 3/5 8.00 12.00
5 Form work preperation - Wall 2 Culvert 2/2 13.00 17.00
6 Form work preperation - Wall 2 Culvert 3/1 13.00 17.00
7 Form work preperation - Wall 2 Culvert 3/2 13.00 17.00
8 Form work preperation - Wall 2 Culvert 3/5 13.00 17.00
Date: 23-11-2013
23-11-2013
DWP004
Remarks
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 24-11-2013
Date: 24-11-2013
No: DWP005
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 15 - Wall 2 Culvert 2/2 8.00 12.00
2 Concrete grade 15 - Wall 2 Culvert 3/1 10.00 11.00
3 Concrete grade 15 - Wall 2 Culvert 3/2 8.00 12.00
4 Concrete grade 15 - Wall 2 Culvert 3/5 11.00 11.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 24-11-2013
24-11-2013
DWP005
Remarks
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 25-11-2013
Date: 25-11-2013
No: DWP006
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Reinforcement & Form work preperation - Capping Culvert 2/2 8.00 10.00
2 Reinforcement & Form work preperation - Capping Culvert 3/1 8.00 10.00
3 Reinforcement & Form work preperation - Capping Culvert 3/2 8.00 10.00
4 Reinforcement & Form work preperation - Capping Culvert 3/5 8.00 10.00
5 Concrete grade 30 - Capping beam Culvert 2/2 10.00 13.00
6 Concrete grade 30 - Capping beam Culvert 3/1 10.30 14.00
7 Concrete grade 30 - Capping beam Culvert 3/2 10.00 15.00
8 Concrete grade 30 - Capping beam Culvert 3/5 10.00 14.30
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 25-11-2013
25-11-2013
DWP006
Remarks
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 26-11-2013
Date: 26-11-2013
No: DWP007
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Reinforcement & Form work preperation - Deck Culvert 2/2 8.00 17.00
2 Reinforcement & Form work preperation - Deck Culvert 3/1 8.00 17.00
3 Reinforcement & Form work preperation - Deck Culvert 3/2 8.00 17.00
4 Reinforcement & Form work preperation - Deck Culvert 3/5 8.00 17.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 26-11-2013
26-11-2013
DWP007
Remarks
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 27-11-2013
Date: 27-11-2013
No: DWP008
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Deck Culvert 2/2 8.00 13.00
2 Concrete grade 30 - Deck Culvert 3/1 8.00 14.00
3 Concrete grade 30 - Deck Culvert 3/2 8.00 13.00
4 Concrete grade 30 - Deck Culvert 3/5 8.00 14.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 27-11-2013
27-11-2013
DWP008
Remarks
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 28-11-2013
Date: 28-11-2013
No: DWP009
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Excavation & Concrete grade 15 - Screed Culvert 3/3 8.30 13.00
2 Excavation & Concrete grade 15 - Screed Culvert 3/6 9.00 14.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 28-11-2013
28-11-2013
DWP009
Remarks
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 29-11-2013
Date: 29-11-2013
No: DWP010
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Reinforcement & Form work preperation - Bace Culvert 3/3 8.00 14.00
2 Reinforcement & Form work preperation - Bace Culvert 3/6 8.00 15.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 29-11-2013
29-11-2013
DWP010
Remarks
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 30-11-2013
Date: 30-11-2013
No: DWP011
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Base Culvert 3/3 8.00 12.00
2 Concrete grade 30 - Base Culvert 3/6 8.00 13.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 30-11-2013
30-11-2013
DWP011
Remarks
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 01-12-2013
Date: 1/12/2013
No: DWP012
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Form work preperation - Wall 1 Culvert 3/3 8.00 14.00
2 Form work preperation - Wall 1 Culvert 3/6 8.00 15.00
LY WORK PROGRAMME
Date: 01-12-2013
1/12/2013
DWP012
Remarks
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 02-12-2013
Date: 2/12/2013
No: DWP013
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 15 - Wall 1 Culvert 3/3 8.00 11.00
2 Concrete grade 15 - Wall 1 Culvert 3/6 8.00 11.30
3 Form work preperation - Wall 2 Culvert 3/3 13.00 16.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 02-12-2013
2/12/2013
DWP013
Remarks
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 03-12-2013
Date: 3/12/2013
No: DWP014
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 15 - Wall 2 Culvert 3/3 8.00 11.00
2 Reinforcement & Form work preperation - Capping Culvert 3/3 13.00 17.00
3 Excavation & Concrete grade 15 - Screed Culvert 4/1 9.00 14.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 03-12-2013
3/12/2013
DWP014
Remarks
RHS
RHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 04-12-2013
Date: 4/12/2013
No: DWP015
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Capping beam Culvert 3/3 8.00 11.00
2 Reinforcement & Form work preperation - Base Culvert 4/1 8.00 16.00
3 Excavation & Concrete grade 15 - Screed Culvert 4/6 9.00 14.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 04-12-2013
4/12/2013
DWP015
Remarks
RHS
LHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 05-12-2013
Date: 5/12/2013
No: DWP016
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Base Culvert 4/1 8.00 11.00
2 Reinforcement & Form work preperation - Deck Culvert 3/3 8.00 17.00
3 Reinforcement & Form work preperation - Base Culvert 4/6 8.00 12.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 05-12-2013
5/12/2013
DWP016
Remarks
LHS
RHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 06-12-2013
Date: 6/12/2013
No: DWP017
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Deck Culvert 3/3 8.00 11.00
2 Concrete grade 30 - Base Culvert 4/6 8.00 12.00
3 Form work preperation - Wall 2 Culvert 3/6 8.00 15.00
4 Excavation & Concrete grade 15 - Screed Culvert 1/5 8.00 15.00
5 Excavation & Concrete grade 15 - Screed Culvert 5/1 9.00 14.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
LY WORK PROGRAMME
Date: 06-12-2013
6/12/2013
DWP017
Remarks
LHS
RHS
RHS
RHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 07-12-2013
Date: 07-12-2013
No: DWP018
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 15 - Screed Culvert 1/5 8.30 11.30
2 Concrete grade 15 - wall 2 Culvert 3/6 8.30 13.30
3 Concrete grade 15 - screed Culvert 5/1 8.30 10.00
4 Reinforcement & Form work preperation - Base Culvert 5/1 11.00 15.00
5 Form work preperation - Wall 1 Culvert 4/1 8.00 12.00
6 Reinforcement & Form work preperation - Base Culvert 1/5 13.00 16.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 07-12-2013
07-12-2013
DWP018
Remarks
RHS
RHS
LHS
LHS
LHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 08-12-2013
Date: 08-12-2013
No: DWP019
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Temporary by pass roads for culverts Culvert 1/3 8.30 11.00
2 Concrete grade 15 - wall 1 Culvert 4/1 8.30 13.00
3 Concrete grade 30 - base Culvert 5/1 9.00 12.00
4 Concrete grade 30 - base Culvert 1/5 9.00 12.00
5 Form work preperation - Wall 1 Culvert 1/5 13.00 15.00
6 Reinforcement & Form work preperation - Capping Culvert 3/6 8.00 15.00
7 Excavation & Concrete grade 15 - Screed Culvert 1/3 8.00 15.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 08-12-2013
08-12-2013
DWP019
Remarks
RHS
LHS
LHS
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 09-12-2013
Date: 09-12-2013
No: DWP020
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 15 - screed Culvert 1/3 8.30 10.00
2 Concrete grade 15 - Wall 1 Culvert 1/5 8.30 13.00
3 Concrete grade 30 - Capping Culvert 3/6 8.00 12.00
4 Reinforcement & Form work preperation - Base Culvert 1/3 11.00 15.00
5 Form work preperation - Wall 2 Culvert 4/6 8.00 12.00
LY WORK PROGRAMME
Date: 09-12-2013
09-12-2013
DWP020
Remarks
RHS
LHS
RHS
RHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 10-12-2013
Date: 10-12-2013
No: DWP021
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Base Culvert 1/3 8.30 11.30
2 Form work preparation - Wall 2 Culvert 1/5 8.00 13.00
3 Concrete grade 15 - Wall 2 Culvert 4/6 8.00 12.00
4 Reinforcement & formwork preparation - capping beam Culvert 4/6 13.00 17.00
5 Reinforcement & formwork preparation - Deck Culvert 3/6 8.00 15.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 10-12-2013
10-12-2013
DWP021
Remarks
RHS
RHS
LHS
LHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 11-12-2013
Date: 11-12-2013
No: DWP022
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 15 - Wall 2 Culvert 1/5 8.00 11.00
2 Concrete grade 30 - Deck Culvert 3/6 8.00 13.00
3 Concrete grade 30 - Capping Beam Culvert 4/6 8.30 13.00
4 formwork preparation - Wall 1 Culvert 5/1 8.00 11.00
5 formwork preparation - Wall 2 Culvert 4/1 8.00 11.00
6 Reinforcement & Form work preperation - Capping Culvert 1/5 13.00 17.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 11-12-2013
11-12-2013
DWP022
Remarks
RHS
RHS
LHS
LHS
LHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 12-12-2013
Date: 12-12-2013
No: DWP023
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Capping Culvert 1/5 8.00 10.00
2 Concrete grade 15 - Wall 2 Culvert 4/1 9.00 14.00
3 Concrete grade 15 - Wall 1 Culvert 5/1 8.00 13.00
4 Reinforcement & formwork preparation - Capping Beam Culvert 4/1 8.00 17.00
5 Form work preparation - Wall 2 Culvert 5/1 14.00 16.00
6 Reinforcement & formwork preparation - Deck Culvert 1/5 11.00 17.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 12-12-2013
12-12-2013
DWP023
Remarks
RHS
LHS
LHS
LHS
LHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 13-12-2013
Date: 13-12-2013
No: DWP024
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Capping Beam Culvert 4/1 8.00 12.00
2 Concrete grade 15 - Wall 2 Culvert 5/1 9.00 14.00
3 Concrete grade 30 - Deck Culvert 1/5 14.00 17.00
Time
ONSTRUCTION (PVT) LTD
vements to Kalugamuwa-Wilakatupotha Road
Date: 13-12-2013
13-12-2013
DWP024
Remarks
LHS
LHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 18-12-2013
Date: 18-12-2013
No: DWP025
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Reinorcement &Formwork preparation - Deck Culvert 4/6 8.30 12.30
2 Aggregate backfill Culvert 2/2 9.30 14.30
3 Reinforcement &Formwork preparation - Deck Culvert 4/1 9.00 13.00
4 Reinforcement &Formwork preparation - Capping Culvert 5/1 8.00 13.00
5 Excavation & Concrete grade 15 - Screed Culvert 6/4 9.00 14.00
LY WORK PROGRAMME
Date: 18-12-2013
18-12-2013
DWP025
Remarks
RHS
RHS
LHS
LHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 19-12-2013
Date: 19-12-2013
No: DWP026
Expected Expected
No. Activity Location Commencin Finishing
g Time Time
1 Concrete grade 30 - Deck Culvert 4/1 8.00 12.00
2 Concrete grade 30 - Capping Culvert 5/1 9.00 13.00
3 Form work Preperation - Wall 1 Culvert 1/3 9.00 13.00
4 Form work Preperation - Base Culvert 6/4 9.00 13.00
5 Reinorcement &Formwork preparation - Deck Culvert 5/1 13.00 17.00
6 Backfilling Culvert 2/2 8.00 9.30
7 Backfilling Culvert 3/1 9.30 11.00
8 Backfilling Culvert 3/2 11.00 12.30
9 Backfilling Culvert 3/3 12.30 14.00
10 Backfilling Culvert 3/5 14.00 15.30
Date: 19-12-2013
19-12-2013
DWP026
Remarks
LHS
LHS
RHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 20-12-2013
Date: 20-12-2013
No: DWP027
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 15 - Wall 1 Culvert 1/3 8.00 12.00
2 Concrete grade 30 - Base Culvert 6/4 8.00 12.00
3 Form work Preperation - Wall 2 Culvert 1/3 13.00 17.00
4 Form work Preperation - Wall 1 Culvert 6/4 13.00 17.00
5 Reinorcement &Formwork preparation - Deck Culvert 5/1 8.00 17.00
6 Reinorcement &Formwork preparation - Deck Culvert 4/6 8.00 17.00
LY WORK PROGRAMME
Date: 20-12-2013
20-12-2013
DWP027
Remarks
RHS
LHS
RHS
LHS
LHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 21-12-2013
Date: 21-12-2013
No: DWP028
Expected
No. Activity Location Commencing
Time
1 Concrete grade 15 - Wall 2 Culvert 1/3 9.00
2 Concrete grade 30 - Deck Culvert 5/1 13.00
3 Concrete grade 30 - Deck Culvert 4/6 9.00
4 Concrete grade 15 - Screed Culvert 7/4 9.00
5 Reinorcement & Formwork preparation - Capping Culvert 1/3 13.00
6 Reinorcement & Formwork preparation - Base Culvert 7/4 13.00
7 Ariggate Backfilling Culvert 3/3 8.00
8 Ariggate Backfilling Culvert 3/2 8.00
9 Backfilling Culvert 3/6 8.00
10 Excavation Culvert 5/2 11.00
11 Excavation Culvert 6/1 13.00
12 Excavation Culvert 10/1 10.00
ME
Expected
Finishing Remarks
Time
12.00 RHS
17.00 LHS
13.00 LHS
11.00 LHS
17.00 RHS
11.00 LHS
13.00 RHS
11.00 RHS
17.00 RHS
13.00 LHS
15.00 LHS
15.00 RHS
ied by:
e: …………………………………….
nation: ……………………………..
ture: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 22-12-2013
Date: 22-12-2013
No: DWP029
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Capping Culvert 1/3 8.00 11.00
2 Concrete grade 15 - Screed Culvert 5/3 13.00 15.00
3 Concrete grade 15 - Screed Culvert 5/2 13.00 15.00
4 Concrete grade 15 - Wall 1 Culvert 6/4 9.00 12.00
5 Excavation & Concrete grade 15 - Screed Culvert 6/4 9.00 14.00
6 Excavation Culvert 5/2 9.00 11.00
7 Backfilling Culvert 3/2 8.00 17.00
8 Form work & Reinorcement work - Deck Culvert 1/3 11.00 17.00
9 Reinorcement & Formwork preparation - Base Culvert 7/4 8.00 17.00
10 Formwork preparation - Wall 2 Culvert 6/4 12.00 15.00
Date: 22-12-2013
22-12-2013
DWP029
Remarks
RHS
LHS
LHS
LHS
LHS
LHS
RHS
RHS
LHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 23-12-2013
Date: 23-12-2013
No: DWP030
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Deck Culvert 1/3 14.00 17.00
2 Concrete grade 30 - Base Culvert 7/4 8.00 11.00
3 Concrete grade 15 - Wall 2 Culvert 6/4 8.00 11.00
4 Backfilling Culvert 3/2 8.00 17.00
5 Reinorcement &Formwork preparation - Base Culvert 5/2 8.00 17.00
5 Reinorcement &Formwork preparation - Capping Culvert 6/4 11.00 17.00
6 Form work preparation - Wall 1 Culvert 7/4 11.00 17.00
Date: 23-12-2013
23-12-2013
DWP030
Remarks
RHS
LHS
LHS
RHS
LHS
LHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 24-12-2013
Date: 24-12-2013
No: DWP031
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Identyfication of House Access 0+000 - 5+000 9.00 12.00
2 Concrete grade 30 - Base Culvert 5/2 9.00 11.00
4 Concrete grade 30 - Capping beam Culvert 6/4 9.00 12.00
5 Concrete grade 15 - Wall 1 Culvert 7/4 9.00 11.00
6 Concrete grade 15 - Screed Culvert 10/1 9.00 10.00
7 Excavation Culvert 7/2 10.00 12.00
8 Excavation Culvert 9/2 10.00 15.00
9 Back filling Culvert 2/2 8.00 17.00
10 Back filling Culvert 3/1 8.00 17.00
11 Back filling Culvert 3/2 8.00 17.00
12 Form work preperation - Wall 1 Culvert 5/2 11.00 15.00
13 Form work preperation - Wall 1 Culvert 6/4 11.00 15.00
14 Reinforcement & Form work preperation - Base Culvert 10/1 11.00 15.00
LY WORK PROGRAMME
Date: 24-12-2013
24-12-2013
DWP031
Remarks
Both Side
LHS
LHS
LHS
RHS
LHS
RHS
RHS
RHS
RHS
LHS
LHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 25-12-2013
Date: 25-12-2013
No: DWP032
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Identyfication of House Access 0+000 - 5+000 9.00 12.00
2 Concrete grade 30 - Capping beam Culvert 6/4 11.00 14.00
3 Concrete grade 30 - Base Culvert 10/1 15.00 18.00
4 Concrete grade 15 - Wall 1 Culvert 6/1 9.00 12.00
5 Concrete grade 15 - Wall 1 (Wariyapola end) Culvert 7/4 15.00 17.00
6 Concrete grade 15 - Wall 2 (Kalugamuwa end) Culvert 7/4 15.00 17.00
7 Excavation (for Culvert Widning) Culvert 8/3 10.00 12.00
8 Back filling Culvert 2/2 8.00 17.00
9 Back filling Culvert 3/1 8.00 17.00
10 Back filling Culvert 3/2 8.00 17.00
11 Back filling Culvert 3/3 8.00 17.00
12 Form work Preperation - Wall 2 Culvert 6/2 13.00 17.00
LY WORK PROGRAMME
Date: 25-12-2013
25-12-2013
DWP032
Remarks
Both Side
LHS
RHS
LHS
LHS
LHS
Both Side
RHS
RHS
RHS
RHS
LHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 26-12-2013
Date: 26-12-2013
No: DWP033
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Reinforcement & Form work preperation - Deck Culvert 6/4 8.00 17.00
2 Form work preperation - Wall 1 Culvert 10/1 8.00 13.00
3 Form work preperation - Wall 2 (Wariyapola end) Culvert 7/4 8.00 11.00
4 Reinorcement & Form work preparation - Capping Culvert 7/4 8.00 15.00
5 Concrete grade 15 - Wall 1 Culvert 10/1 14.00 17.00
6 Concrete grade 15 - Wall 2 Culvert 6/2 9.00 12.00
7 Concrete grade 15 - Wall 2 (Wariyapola end) Culvert 7/4 11.00 13.00
8 Concrete grade 30 - Capping Culvert 7/4 15.00 17.00
9 Concrete grade 15 - Screed Culvert 8/3 10.00 14.00
10 Back filling Culvert 2/2 8.00 17.00
11 Back filling Culvert 3/1 8.00 17.00
13 Back filling Culvert 3/3 8.00 17.00
14 Reinorcement & Form work preparation - Capping Culvert 6/1 13.00 17.00
15 Reinforcement & Form work preperation - Base Culvert 8/3 10.00 14.00
16 Roadway excavation for edge widning 2+500 - 3+000 8.00 17.00
17 Sub grade compaction & Com.Testing 2+500 - 3+000 9.00 18.00
18 Emankment & Sub base laying for edge widning 2+500 - 3+000 10.00 18.00
19 Emankment & Sub base Compaction testing 2+500 - 3+000 11.00 18.00
LY WORK PROGRAMME
Date: 26-12-2013
26-12-2013
DWP033
Remarks
LHS
RHS
LHS
LHS
RHS
LHS
LHS
LHS
Both Side
RHS
RHS
RHS
LHS
Both Side
RHS
RHS
RHS
RHS
Certified by:
Name: …………………………………….
Designation: ……………………………..
Signature: ………………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 27-12-2013
Date: 27-12-2013
No: DWP034
Expected Expected
No. Activity Location Commencing Finishing
Time Time
1 Concrete grade 30 - Capping Culvert 6/1 9.00 12.00
2 Concrete grade 30 - Deck Culvert 6/4 13.00 17.00
3 Concrete grade 15 - Wall 2 Culvert 7/4 10.00 14.00
4 Concrete grade 15 - Screed Culvert 9/2 8.00 10.00
5 Reinforcement & Form work preperation - Base Culvert 9/2 10.00 15.00
6 Concrete grade 30 - Base Culvert 9/2 14.00 16.00
7 Concrete grade 30 - Base Culvert 10/1 11.00 14.00
8 Excavation Culvert 6/3 11.00 13.00
9 Excavation Culvert 7/2 8.00 11.00
10 Concrete grade 15 - Screed Culvert 7/2 14.00 17.00
11 Excavation Culvert 8/3 10.00 15.00
12 Back filling Culvert 2/2 8.00 17.00
13 Back filling Culvert 3/1 8.00 17.00
14 Back filling Culvert 3/3 8.00 17.00
15 Reinorcement & Form work preparation - Deck Culvert 6/1 13.00 17.00
16 Reinforcement & Form work preperation -Capping Culvert 7/4 14.00 17.00
17 Form work Preperation - Wall 1 Culvert 10/1 15.00 18.00
18 Roadway excavation for edge widning 2+600 - 2+700 8.00 17.00
19 Sub grade compaction & Com.Testing 2+600 - 2+700 13.00 17.00
20 Joint Survey of Sub grade 2+600 - 2+700 14.00 17.00
21 Emankment Filling of edge widning 2+600 - 2+700 15.00 18.00
22 Emankment Compaction testing 2+600 - 2+700 17.00 18.00
23 Soil test for materials (MDD,UMC,CBR,LL,PL,PI) 0+000 Stock pile 10.00 12.00
Submited by: Certified by:
Name: ……………………………………. Name: …………………………………….
3/10
Remarks
LHS
LHS
LHS
RHS
RHS
RHS
RHS
LHS
LHS
LHS
LHS
RHS
RHS
RHS
LHS
LHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
…………….
……………..
……………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 28-12-2013
Date: 28-12-2013
No: DWP035
Expected
No. Activity Location Commencing
Time
1 Concrete grade 15 - Screed Culvert 4/2 8.00
2 Reinforcement & Form work preperation - Base Culvert 4/2 11.00
3 Concrete grade 30 - Base Culvert 4/2 15.00
4 Excavation Culvert 4/3 8.00
5 Concrete grade 15 - Screed Culvert 4/3 13.00
6 Excavation Culvert 6/3 10.00
7 Concrete grade 30 - Deck Culvert 6/1 10.00
8 Concrete grade 30 - Base Culvert 7/2 (K/end) 10.00
9 Concrete grade 15 - Screed Culvert 7/2 (W/end) 14.00
10 Concrete grade 30 - Capping Culvert 7/4 11.00
11 Concrete grade 15 - Wall 1 Culvert 9/2 11.00
12 Concrete grade 30 - Base Culvert 10/1 14.00
13 Excavation Culvert 8/3 10.00
14 Back filling Culvert 4/1 8.00
15 Back filling Culvert 3/1 8.00
16 Back filling Culvert 3/3 8.00
17 Reinforcement & Form work preparation - Base Culvert 4/2 11.00
18 Reinforcement & Form work preparation - Base Culvert 4/3 16.00
19 Form work Preperation - Wall 1 Culvert 7/2 (K/end) 15.00
20 Reinforcement & Form work preparation - Deck Culvert 7/4 15.00
21 Roadway excavation for edge widning 2+700 - 2+800 8.00
22 Sub grade compaction & Com.Testing 2+700 - 2+800 11.00
23 Joint Survey of Sub grade 2+700 - 2+800 12.00
24 Embankment Filling of edge widning 2+600 - 2+800 13.00
25 Embankment Filling Compaction testing 2+600 - 2+800 17.00
Submited by: Certified by:
Name: ……………………………………. Name: …………………………………….
TAGE – 2/2013/10
thority
) Ltd
Expected
Finishing Remarks
Time
10.00 LHS
14.30 LHS
17.00 LHS
10.00 LHS
15.00 LHS
13.00 LHS
15.00 LHS
14.00 LHS
17.00 LHS
15.00 LHS
15.00 RHS
17.00 RHS
13.00 B/Side
17.00 RHS
17.00 RHS
17.00 RHS
17.00 LHS
18.00 LHS
17.00 LHS
18.00 LHS
17.00 RHS
17.00 RHS
17.00 RHS
18.00 RHS
18.00 RHS
…………………………….
……………………………..
……………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 29-12-2013
Date: 29-12-2013
No: DWP036
Expected
No. Activity Location Commencing
Time
1 Concrete grade 15 - Wall 1 Culvert 4/2 9.00
2 Concrete grade 15 - Screed Culvert 4/3 9.00
3 Concrete grade 30 - Base Culvert 4/3 15.00
4 Concrete grade 15 - Wall 2 Culvert 5/2 9.00
5 Concrete grade 15 - Screed Culvert 6/3 9.00
6 Concrete grade 30 - Base Culvert 6/3 15.00
7 Concrete grade 30 - Base Culvert 7/2 9.00
8 Concrete grade 30 - Capping Culvert 7/4 10.00
9 Concrete grade 15 - Wall 2 Culvert 9/2 14.00
10 Concrete grade 30 - Base Culvert 10/1 14.00
11 Excavation Culvert 8/3 10.00
12 Back filling Culvert 4/1 8.00
13 Reinforcement & Form work preparation - Base Culvert 4/3 10.00
14 Reinforcement & Form work preparation - Base Culvert 6/3 10.00
15 Form work Preperation - Wall 2 Culvert 4/2 9.00
16 Reinforcement & Form work preparation - Capping Culvert 9/2 16.00
17 Roadway excavation for edge widning 2+700 - 3+000 8.00
18 Sub grade compaction & Com.Testing 2+700 - 3+000 11.00
19 Joint Survey of Sub grade 2+700 - 3+000 12.00
20 Embankment Filling of edge widning 2+600 - 2+800 13.00
21 Embankment Compation test 2+600 - 2+700 15.00
22 Joint Survey of Emankment top 2+600 - 2+700 16.00
TAGE – 2/2013/10
thority
) Ltd
Expected
Finishing Remarks
Time
12.00 LHS
10.00 LHS
18.00 LHS
10.00 LHS
10.00 RHS
18.00 RHS
12.00 LHS
15.00 LHS
16.00 RHS
17.00 RHS
13.00 B/Side
17.00 RHS
15.00 LHS
15.00 RHS
12.00 LHS
18.00 RHS
17.00 RHS
17.00 RHS
17.00 RHS
18.00 RHS
16.00 RHS
17.00 RHS
…………………………….
……………………………..
……………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 30-12-2013
Date: 30-12-2013
No: DWP037
Expected
No. Activity Location Commencing
Time
1 Concrete grade 15 - Wall 2 Culvert 4/2 9.00
2 Concrete grade 15 - Wall 1 Culvert 4/3 11.00
3 Concrete grade 30 - Capping Culvert 5/2 9.00
4 Concrete grade 15 - Wall 1 Culvert 6/3 11.00
5 Concrete grade 15 - Wall 1 Culvert 7/2 10.00
6 Concrete grade 15 - Screed Culvert 8/3 10.00
7 Concrete grade 30 - Capping Culvert 9/2 11.00
8 Concrete grade 15 - Wall 1 Culvert 10/1 14.00
9 Back filling Culvert 4/1 8.00
10 Reinforcement & Form work preparation - Deck Culvert 7/4 8.00
11 Reinforcement & Form work preparation - Capping Culvert 4/2 13.00
12 Form work Preperation - Wall 2 Culvert 4/3 16.00
13 Reinforcement & Form work preparation - Deck Culvert 5/2 14.00
14 Form work Preperation - Wall 2 Culvert 6/3 15.00
15 Form work Preperation - Wall 2 Culvert 7/2 13.00
16 Roadway excavation for edge widning 2+700 - 3+000 8.00
17 Sub grade compaction & Com.Testing 2+700 - 3+000 11.00
18 Joint Survey of Sub grade 2+700 - 3+000 11.30
19 Embankment Laying & Compaction 2+700 - 2+900 12.00
20 Embankment Compation test 2+600 - 2+700 15.00
21 Joint Survey of Emankment top 2+700 - 2+800 16.00
22 Sub Base Laying & Compaction 2+600 - 2+700 13.00
TAGE – 2/2013/10
thority
) Ltd
Expected
Finishing Remarks
Time
12.00 LHS
15.00 LHS
13.00 LHS
14.00 RHS
12.00 LHS
13.00 B/Side
15.00 RHS
17.00 RHS
17.00 RHS
17.00 LHS
17.00 LHS
18.00 LHS
18.00 LHS
18.00 RHS
17.00 LHS
17.00 RHS
17.00 RHS
13.00 RHS
15.00 RHS
16.00 RHS
17.00 RHS
18.00 RHS
…………………………….
……………………………..
……………………………..