Notes:

1. This drawing is protected under copyright act and cannot be used


or reproduced in part or whole without authors consent.

2. All dimensions to be checked on site. Written dimensions to be


preffered to
scaled dimensions.

3. All construction work is to comply with the latest B.S. starndard


codes of practice.
WATER Local authority By-Laws and fire regulations.

15.2 M TANK
STAND
4. P.V. denotes permanent ventilation and must be provided above
all doors
JOMAYI ESTATES and windows where indicated or shown.

NABUSUGWE

150
5. All walls less than 200mm thick to be reinforced with hoop iron

1,200 150 1,000


at every alternative course.

SEPTIC SOAK 6. Water meter to be 300mm above ground level.


IC IC
PIT LATRINE 150 150 TANK PIT

5,200

5,200
5,412
1,500

5,411
7. D.p.c. denotes one layer of bituminous felt to be provided under
POSITION all walls at least 150mm above ground level.

8. All reinfirced concrete works to structural egineer's details and

150
specifications.
TO

MH MH MH
PLOT 91 1,500
NS

1,500
AS

9. Provide one row of 600 x 600 x 50mm thick pre -cast or insitu.
A

concrete paving
slabs around the buildign as splash apron unless otherwise stated.

2,800
10. Contractors must verify all dimensions and levels on site before
Bedroom 1 commecment of works
Porceline Tiles
FF
Any discrepancies must be reported to the Architect before work
is put in hand.
MH

1,800 200
Kitchen 11. All levels shown are finished levels unless otherwise stated.
Porceline Tiles
F FF
Wardrobe
12. All surface beds to be cast on well compacted murram or sand
infill where
NSA aplicably stated.
SA -
NAB
USU
GW 13. Depth of foundation trenches to be at a min. of 750mm below
E RO
AD reduced
Dinning

30.5 M

30.5 M
Porceline Tiles
FF ground level
Lounge
Porceline Tiles
FF 14. All pipes and services to be at a min. of 450mm below reduced
ground level.

2,520 LEGEND:

2,800

4,100
NAMUGONGO SECONDARY/
VOCATIONAL SCHOOL 2,500 2,500

01 02

5,000
15,144

14,936
Project:

11,250

11,9
PAVED

2,500
PROPOSED RESIDENTIAL DEVELOPMENT AND

74
PARKING
BOUNDARY WALL

3,900
PLOT 540, BLOCK 91
NABUSUGWE.
1,500 MUKONO DISTRICT.
MAMRE INTERNATIONAL 4,000
PRAYER CENTRE
Client: Client's Sign:

2,000
ROAD RESERVE

IBRA IVULABE.
KBM HOME

15.2 M Drawing title: Drawing scales:

ACCESS ROAD SITE LOCATION PLAN, 1:100


SITE LAYOUT PLAN,

SD- 02 Site Layout/Roof Plan Drawing status:


Scale 1:100 Designed by:
O.L BOSWELL
Drawn by:
O.L BOSWELL
Checked by:
+256782878584 +256782878584
+256756039869 +256756039869
UGANDA MARTYRS
ANGLICAN CHURCH Consulting Architect:

NAMUGONGO - SSONDE ROAD

SD [01] SITE LOCATION PLAN


NOT TO SCALE Sheet No: P. C. No.:

01 Signature:

Date: AUG. 2019

GSPublisherVersion 0.0.100.100
Notes:
1. This drawing is protected under copyright act and cannot be used
or reproduced in part or whole without authors consent.

2. All dimensions to be checked on site. Written dimensions to be


preffered to
scaled dimensions.

SEC [01]

SEC [01]
ELE [03] ELE [03] 3. All construction work is to comply with the latest B.S. starndard
codes of practice.
A B C D A B C D Local authority By-Laws and fire regulations.
3,200 2,300 5,500 3,200 2,300 5,500
4. P.V. denotes permanent ventilation and must be provided above
12,200 12,200 all doors
200 4,000 200 2,100 200 1,600 200 3,500 200
200 and windows where indicated or shown.
200 2,600 200 1,200 200 2,100 1,400 200 3,700 200
350 600 150
150 600 600 600 4,550 600
600 600
650 800 1,150 2,400 850
5. All walls less than 200mm thick to be reinforced with hoop iron
3,150 900 800 1,250 2,400 650
W1 pv
at every alternative course.
W6 pv

200

550
W6 pv W1 pv
1 1 1 1 6. Water meter to be 300mm above ground level.

1,200

1,200
200

200
1,700

1,700
1,700

1,700

1,500

800

Wardrobe
W1 pv

Bedroom 3
7. D.p.c. denotes one layer of bituminous felt to be provided under

Porceline Tiles
W3 pv

3,000

3,000
W3 pv
all walls at least 150mm above ground level.
2 2

1,200

1,200
FF
1,100
2,800

Wardrobe
750
D2 pv
200

200
8. All reinfirced concrete works to structural egineer's details and

5,500

5,400
1,000

200
5,200
specifications.

W1 pv
Bedroom 1
W2 pv
3,700

2,400

3,700

2,400
3,200
D2 pv

200
Porceline Tiles
3,500

3,500

W3 pv

1,200
1,800 200
FF
9. Provide one row of 600 x 600 x 50mm thick pre -cast or insitu.

2,000
Reading Room
Kitchen concrete paving

2,000
Bedroom 2 Porceline Tiles
Porceline Tiles D2 pv D2 pv FF
D2 pv slabs around the buildign as splash apron unless otherwise stated.

1,000
Porceline Tiles

200
FF
D2 pv
750

750
F
Wardrobe

500
FF
3 3 3 3

11,650

11,650
150
10. Contractors must verify all dimensions and levels on site before
200

200

1,700 200

200
Shoe Rack
900

1,200
900
D2 pv
commecment of works

W3 pv

1,200

2,500
W.I.C
14,050

14,050
Master Any discrepancies must be reported to the Architect before work

150
Bedroom is put in hand.
W1 pv
2,400
ELE [02]

ELE [02]
ELE [04]

ELE [04]
Porceline Tiles
4,700

4,500

4,700

200
FF

2,000
11. All levels shown are finished levels unless otherwise stated.

3,550
Porceline Tiles

5,850

6,050
6,150
FF

5,850
2,600

1,600
Master
W5 pv
Bath
Dinning 12. All surface beds to be cast on well compacted murram or sand

4,500
Lounge
1,400

Porceline Tiles
infill where

W3 pv
FF Porceline Tiles
200

200
1,200
FF
4 4 W4 pv
aplicably stated.

600

1,200
W3 pv
1,150

1,150
W1 pv 500 2,400 300 900 3,600 900

1,150
13. Depth of foundation trenches to be at a min. of 750mm below

200
D1 pv
2,650

2,650
6 D1 pv
6
200

200
reduced

200

250

200
ground level
1,100

1,100

1,100
1,200
500 2,400 300 1,150 3,600 1,950 Master
Balcony
5 5

2,400

2,400
2,400
Porceline Tiles 14. All pipes and services to be at a min. of 450mm below reduced
200

200

200
FF
ground level.
1,100

1,100

1,100
200 800 200 3,000 200 5,000 200 2,400 200
200 3,000 200 6,300 200 1,100 200 LEGEND:
SEC [01]

SEC [01]
3,200 5,200

A 3,200
B
5,200
E A B E

ELE [01] ELE [01]


SD- 04 First Floor Plan
SD- 03 Ground Floor Plan Scale 1:100
Scale 1:100

Project:
PROPOSED RESIDENTIAL DEVELOPMENT AND
BOUNDARY WALL
PLOT 540, BLOCK 91
NABUSUGWE.
DOOR SCHEDULE. MUKONO DISTRICT.
Label D1pv D2pv D3
ROOF CONSTRUCTION
Elevation.
Roof pitch 30 degrees 3,600 900
Client: Client's Sign:
Approved mangalore tiles and ridges on 800
100x150mm timber principle rafters on
50x150mm timber ties and struts on

2,100 300
75x100mm timber wall plate. IBRA IVULABE.

2,400

2,400

2,100
Roof truss details to specialist's details

1 2 3 4 5 Drawing title: Drawing scales:


1,700 3,700 4,700 2,650

Wall Plate Level


WALLS Description. Alluminium Sliding door Timber panelled door. Timber flush door.
EXTERNAL WALLS
-200mm thick bricks wall,
Quantity.
400

on wall damp proof coarse 02 pcs 07 pcs 03 pcs


2,800

(50 guage polythene,


150mm laps on butimen hezzaine base)
2,400

WINDOW SCHEDULE Drawing status:


4,300

First Floor Level INTERNAL WALLS


-200mm /150mm thick bricks wall, Label W1 PV W2 PV W3 PV W4 PV W5 PV W6 PV
-Apply 9mm first coat of cement & sand(1:6),
300
-3mm second coat of cement and Elevation 2,400 2,400 Designed by: Drawn by: Checked by:
400

1,200
lime putty (1:10) finished with steel trowel, 1,200 800 800 800 800 800 800 O.L BOSWELL O.L BOSWELL
3,000

-1 coat universal under coat paint,


-2 coats of silk vinyl emulsion paint +256782878584 +256782878584

800

800

800
1,200
2,600

+256756039869 +256756039869
150

1,950

1,950
1,500

Ground Floor Level


Consulting Architect:

SEC [01]
SUBSTRUCTURE
Foundations to structural engineer's details
Depth of foundation to be determined on site. Description Aluminium sliding window Aluminium sliding window Aluminium top hung window Aluminium top hung window Aluminium top hung window Aluminium top hung window

Scale 1:100 Quantity 05 02 05 01 01 02

Sheet No: P. C. No.:

Signature:

Date: AUG. 2019

GSPublisherVersion 0.0.100.100
10mm DIA. OUTLET PIPE TO DRAINAGE SOAK PIT/ PERCOLATION TRENCHES
Y12 02-150 C/C both ways (BOT)
Notes:
1. This drawing is protected under copyright act and cannot be used
INLET PIPE
or reproduced in part or whole without authors consent.
0TH
A B 15
F SL 2. All dimensions to be checked on site. Written dimensions to be
ROO
RC preffered to
scaled dimensions.
A B E D 4 6 2 1 3. All construction work is to comply with the latest B.S. starndard
3,200 5,200 2,800 CONCRETE BENCHING RETURNED AT SOFFIT HEIGHT OF PIPE AT 1:12 SLOPE
1,300 6,150 5,400 codes of practice.
ROOF SLAB PLAN Y12 10 - 200 C/C Local authority By-Laws and fire regulations.
Wall Plate Level Wall Plate Level Scale 1:50
4. P.V. denotes permanent ventilation and must be provided above
Y12 06 - 200 C/C 50mm blinding all doors
and windows where indicated or shown.
350 400 L1 400 L2 400 175 SECTION B - B

2,800

2,800

350
B Scale 1:50 5. All walls less than 200mm thick to be reinforced with hoop iron
First Floor Level First Floor Level
at every alternative course.

200

400
6. Water meter to be 300mm above ground level.
A A WATER PROOF RENDERING IN
TWO 100mm LAYERS EACH
LAYER BRASHED WITH VANDEX
7. D.p.c. denotes one layer of bituminous felt to be provided under
20

3,000

3,000
0TH 175

B
LAB 20 all walls at least 150mm above ground level.

20

50
E S
BAS Y12 10 - 200 C/C
RC

400
Ground Floor Level Ground Floor Level 8. All reinfirced concrete works to structural egineer's details and
Y12 06 - 200 C/C specifications.
B

350
ELE [01] ELE [04] INTERNAL WATER PROOF TO 9. Provide one row of 600 x 600 x 50mm thick pre -cast or insitu.
Scale 1:100 Scale 1:100 BASE SLAB PLAN Scale 1:50 WALLS AND SLABS Scale 1:25 concrete paving
slabs around the buildign as splash apron unless otherwise stated.

10. Contractors must verify all dimensions and levels on site before
CAST IRON MEDIUM DUTY COVER AND FRAME FOR CAST IRON MEDIUM DUTY COVER AND FRAME FOR commecment of works
CLEAR 600x450mm OPENING AND BEDDED INTO CLEAR 600x450mm OPENNING AND BEDDED INTO
CAST IRON MEDIUM DUTY COVER AND FRAME FOR CEMENT MORTAR CEMENT MORTAR
Any discrepancies must be reported to the Architect before work
CLEAR 750x600mm OPENNING AND BEDDED INTO
Y12 02 - 150 C/C both ways (BOT)
is put in hand.
CEMENT MORTAR GROUND LEVEL

11. All levels shown are finished levels unless otherwise stated.

200
INLET PIPE
150mm dia. C.I dip pipe 100mm RC SCUM BOARD 100mm DIA. OUTLET PIPE

450
CONC. CLASS 25/12 TO DRAINAGE SOAK PIT/PERCOLATION
150 150 TRENCHES

200 50

150
12. All surface beds to be cast on well compacted murram or sand

375 150
TOP WATER LEVEL
12Y12 01-175 C/C
infill where

500

500

60
4Y12 03-175 C/C
aplicably stated.
1:3 CEMENT/SAND 1:3 CEMENT/SAND

1 2 2 3 4
45 DEG. FILLET 45 DEG. FILLET

D C B A 75 75

H1
1,700 3,700 4,700 2,650 13. Depth of foundation trenches to be at a min. of 750mm below

150
3Y12 05-175C/C

175 50
H2
5,500 2,300 3,200 12Y12 04-175C/C
RC BEAM 150x400mm
3Y12 05-175C/C
reduced
200 200
12Y12 04-175C/C
ground level

800
10Y12 07 - 200 C/C
Y12 10 - 200 C/C
Wall Plate Level Wall Plate Level
CONC. WEIR 14. All pipes and services to be at a min. of 450mm below reduced
ground level.
Y12 06 - 200 C/C
10Y12 08 - 200 C/C 50mm BLINDING BLOCK DETAIL
10Y12 09 - 200 C/C
Scale 1:25
2,800

2,800
SECTION A - A Scale 1:50 LEGEND:
WHERE GOOD SOAKAGE MAY BE OBTAINED ,
First Floor Level First Floor Level MAY BE POSSIBLE TO REDUCE THIS FIGURE.

PERCOLATION TRENCHES
INTERNAL DIMENSIONS CAPACITY NO. OF USERS atleast one foot of percolation trench should be provided for every 2 gallons of effluent to be disposed
off in 24 hrs when sediment is seen in effluent, the tank should be desludged without delay.
L1 L2 H1 H2 B Cu. M one trench should be at rest while the other is in use. No trench should be used continuously for
3,000

3,000
760mm 1600mm 1750mm 760mm 3.2 10 more than a month
1540mm

900mm 1800mm 2000mm 900mm 4.5 20


1900mm
1800mm 2100mm 1100mm 5.9 30 INSPECTION CHEMBERS' SIZE
Ground Floor Level Ground Floor Level 2000mm 1000mm
DEPTH TO INVERT (mm) INTERNAL DIMENSIONS (mm) WALL THICKNES(mm)
2400mm 1100mm 1800mm 2100mm 1150mm 7.24 40
up to 450
2500mm 1200mm 1800mm 2100mm 1300mm 8.6 50 482 - 900
ELE [03] ELE [02] 1300mm 1800mm 2100mm 1400mm 10 60
930 - 1500
2700mm
Scale 1:100 Scale 1:100 1400mm 1800mm 2100mm 1450mm 11.3 70
over 1500
brick work to built in 1:6 cem : sand mortar and
29000mm
1800mm 2100mm 1560mm 12.7 80 rendered internally in cem: sand plaster 12mm. thick
3000mm 1500mm
foundations to be 1:3:6 concrete
3200mm 1600mm 1800mm 2100mm 1600mm 14 90

3300mm 1700mm 1800mm 2100mm 1700mm 15.4 100 Project:


4000mm 2200mm 1800mm 2100mm 2190mm 24 150

4500mm 2700mm 1800mm 2100mm 2650mm 34.3 200 PROPOSED RESIDENTIAL DEVELOPMENT AND
BOUNDARY WALL
PLOT 540, BLOCK 91
NABUSUGWE.
Selected filling well compacted and MUKONO DISTRICT.
consolidated.

900
GROUND LEVEL

Client: Client's Sign:


hollow section
holder fixed on the
balustrades IBRA IVULABE.
A

300
ground & wall/column Invert level
precast concrete
335
50

5000 min
at intervals by specialist
25 225 25

150x50mm RHS stile to column head


50

Selected stone
100

Line of Inlet pipe

750
50

wall 600x600x75mm p.c.c.


/column Concrete tile to
coping to columns
Drawing title: Drawing scales:
302

schedules
100
50

3 ms cladding both sides light fixture to


1,900

Side wheels
302

600
50x25mm RHS bars at approx. 200mm centres LA & Arch detail 25mm dia vertical bars at
ELEVATIONS, SECTION,
1,800

Selected stone profile.


DETAIL A 1:100
1,525

DETAIL D 150mm c/c on alternate sides


50 50

1:5
ROOF PLAN.
300

1:5 150x50
Concrete tile to of horizontal rails
mm RHS CROSS SECTION THRU DRAIN PIPE TRENCH
top rail schedules
600

Concrete tile to
350 100 W 100 350
schedules DRAINAGE AND 1:20
3,500(varies) Plaster painted
to masonary wall
PERIMETER WALL
Concrete tile to
A light fitting to specification SECTION THRU SOAK PIT
DETAILS 1:50
400

3 ms cladding
schedules both sides ELEVATION
1,000

scale 1:50
600 600 50x25mm m.s. R.H.S. Drawing status:
1,900

A horizontal rails fixed


to columns Selected filling in six layers well rammed and
Designed by: Drawn by: Checked by:
600

600

consolidated into place.


50x50mm
DETAIL B RHS middle O.L BOSWELL O.L BOSWELL
1:5 rail 3,500(varies)
+256782878584 +256782878584
50

D 400x400mm blockwork/R.C.
COPING PLAN column +256756039869 +256756039869
scale 1:50
H

Concrete tile to Second hand G.C.I sheet or


schedules
roofing felt Consulting Architect:
600

400x400mm blockwork/R.C.
column with wall plaster and 200mm thick block wall
concrete tile finish to schedules 100mm dia agricultural
pipes laid with open joints,
Boundary wall
400 400 400 200mm thick block walling minimum fall 1:10.
to detail A[91]01
C A with wall plaster and
SELECTED STONE 150 DOWN TO 20mm
concrete tile finish to schedules
200
400

150x50mm
pressed steel
400

200

MS SLIDING GATE ELEVATION bottom rail


1:20
sliding track in floor R.C. foundation
C[31]17 to s.e. details
400

200

1. DETAILS SHOWN HERE ARE PURELY ILLUSTRATIVE


DETAIL C
2. THE CONTRACTOR IS REQUIRED TO PREPARE SHOP
1:5
outline of foundation
LONGITUDINAL SECTION THRU PERCOLATION TRENCH Sheet No: P. C. No.:
DRAWINGS AND PROVIDE SECTIONS FOR APPROVAL
3. ALL IN ACCORDANCE WITH SPECIFICATIONS AND TO
Bottom wheels by
3,500(varies)
SECTION A-A
MEET PERFORMANCE REQUIREMENTS
PLAN scale 1:20

02
4.IRONMONGERY BY SPECIALIST specialist
scale 1:50
Signature:

Date: AUG. 2019

GSPublisherVersion 0.0.100.100

S-ar putea să vă placă și