Sunteți pe pagina 1din 23

gzikp ;N/N NoK;fw;aB ekog'o/;aB

fbwfNv tXhe fBrokB fJzihBhno $ gh s/ n?w wzvb,


o'gV Eowb gkto ekb"Bh ezgb?e; BzL1,;kjwD/ 132
e/th ;p;N/;aB, o'gV c'BL 01881^220109 w'pkfJb :- 96461-
18212, fJw/b :- srxen-pm-ropar@pstcl.org
v`l: au`p mu`K
ieMjInIAr
pI Aqy AYm hlkw,
pI.AYs.tI.sI.AYl, pitAWlw

mImo nM:_1541
imqI:__18.10.19__

ivSw: imqI 18.10.2019 nUM r`KI geI mIitMg dy Agenda sbMDI[


auprokq ivSy dy sbMD iv`c pI qy AYm mMfl ropV ADIn mMgI geI jwxkwrI hyT ilKy
AnUswr hY jI:

1. Maintenance status of Transmission Line/ Sub-Station Equipment:


Maintenance Status of Sub-Station Equipment
132 kV Sub-Station Sri Anandpur Sahib
Maintenance
Sr. No. Name of Equipment P.T.W. No.
Date
1. Discharging of 220V 200 Ah Battery Set 05.08.2019 -
132 kV SF-6 Breaker B-1 Loop-In Ckt. (Ganguwal ASHP-1 -
2. 13.08.2019 95
Anandpur Line)
132 kV SF-6 Breaker B-2 Loop-Out Ckt. (Anandpur-Nakkian
3. 14.08.2019 96
ASHP-2 Line)
4. 132/11 kV 12.5 MVA Power T/F T#2 19.08.2019 100
5. 132/66 kV 40/50 MVA Power T/F T#3 26.08.2019 04
6. 11 kV Bus-Bar 3 including VCBs 14.09.2019 13
7. 11 kV Bus-Bar 2 including VCBs & 11kV/415V Station T/F 14.09.2019 15
8. 11 kV Bus-Bar 1 including VCBs 21.09.2019 20
9. 33/11 kV 5 MVA Power T/F T#5 07.10.2019 33
66 kV Bus-Bar, 66 kV SF-6 Breaker C-2 (Khalsa Heritage Line)
10. 14.10.2019 36
& 66 kV SF-6 Breaker C-3 (Nurpur Bedi Line)
132 kV Bus Bar , 132 kV Railway Bus-Bar,132 kV SF-6 Railway
11. 14.10.2019 37
Breaker B-5)
132/11 kV 10/12.5 MVA Power T/F T#1 & 132 kV SF-6 Breaker
12. 15.10.2019 42
B-3

132 kV Sub-Station Nakkian


Sr. No. Name of Equipment Maintenance Date P.T.W. No.
1. 132 kV Bus-Bar 17.09.2019 52
132 kV SF-6 Breaker B-2 Loop-Out
2. 23.09.2019 61
Ckt. (132 kV Nakkian S/S-Ropar Line)
3. 11 kV Bus-Bar including VCBs 24.09.2019 62
132 kV SF-6 Breaker B-1 Loop-In Ckt.
4. 25.09.2019 69
(Nakkian P/H-Nakkian S/S Line)
132/11 kV 10/12.5 MVA Power T/F
5. 04.10.2019 74
T#1 & 132 kV SF-6 Breaker B-3
Maintenance Schedule of Sub-Station Equipment (Nov & Dec, 2019)
132 kV Sub-Station Sri Anandpur Sahib
Sr. No. Name of Equipment Scheduled Maintenance Date
132/66 kV 50 MVA Power T/F T#4 & 132 kV SF-6
1. 23.10.2019
Breaker B-7
2. 11 kV Capacitor Bank 1 & 2 including VCBs 05.11.2019
3. 66 kV Incomer-1 SF-6 Breaker C-1 06.11.2019
132/11 kV 12.5 MVA Power T/F T#2 & 132 kV
4. 13.11.2019
SF-6 Breaker B-4
5. 66 kV Incomer-2 SF-6 Breaker C-4 20.11.2019
132/66 kV 40/50 MVA Power T/F T#3 & 132 kV
6. 25.11.2019
SF-6 Breaker B-6
132 kV Sub-Station Nakkian
Sr. No. Name of Equipment Scheduled Maintenance Date
1. Discharging of 220V 200 Ah Battery Set 04.11.2019
2. 132/11 kV 10/12.5 MVA Power T/F T#1 03.12.2019

Maintenance Status of Sub-Station Equipment


132KV S/S Ropar
Name of Transmission Line/Sub-
PTW No.& date
Name Of Station Equipment
Sr.No.
Sub-Station

1 132KV NIL Jul-19


S/S NIL Aug-19
2
Ropar
132/11KV,20MVA,PTF T-1 & 11KV
3
86 02/09/2019
INCOMER-1

4
11KV BUS BAR NO. 1 91 02/09/2019
132/11KV,20MVA,PTF T-5 & 11KV
5
94 03/09/2019
INCOMER-2

6
11KV BUS BAR NO. 2 96 03/09/2019

POWER T/F 132/66KV,50MVA T-2 & 66KV


7
15 07/09/2019
INCOMER-2

66/11KV,10/12.5MVA,PTF T-4 & 11KV


8
21 11/09/2019
INCOMER 3

9
11KV BUS BAR NO. 3 24 11/09/2019

10
11KV CAPACITOR BANK NO. 2 (T-5) 28 16/09/2019

11
11KV GOVT. COLLEGE FEEDER 29 16/09/2019

12
11KV HOSPITAL FEEDER 30 16/09/2019

13
66KV PURKHALI BAY 33 17/09/2019

14
11KV G. ZAIL SINGH NAGAR FEEDER 45 21/09/2019

15
11KV ROPAR TOWN FEEDER 46 21/09/2019

16
11KV RTP FEEDER 48 21/09/2019

17
11KV COLD STORE FEEDER 49 21/09/2019

18
11KV MAJRI JATTAN FEEDER 52 24/09/2019

20
66KV BHARATGARH BAY 60 26/09/2019

21
11KV SUBSTATION T/F FEEDER 67 28/09/2019
22
11KV UPS-2 FEEDER 75 01/10/2019

23
11KV RANGILPUR FEEDER 76 01/10/2019

24
11KV MEGA STAR FEEDER 77 01/10/2019

25
132 KV KOTLA CIRCUIT NO. 1 BAY 78 01/10/2019

11KV CAPACITOR BANK NO. 2 (T-5)


26
81
& 11KV BUS-COUPLER-1 03/10/2019

27
11KV SANGATPURA FEEDER 82 03/10/2019

28
132 KV KOTLA CIRCUIT NO. 2 BAY 85 05/10/2019

29
132 KV KOTLA CIRCUIT NO. 3 BAY 86 07/10/2019

30
66KV BEHLOLPUR BAY 87 07/10/2019

31
11KV JHALLIAN & PSTC FEEDERS 90 09/10/2019

32
11KV BIRLA FEEDER 91 09/10/2019

33
11KV BEHRAMPUR FEEDER 95 11/10/2019

34
11KV MIANPUR FEEDER 97 11/10/2019

35
132KV PINJORE CIRCUIT NO. 1 BAY 5 17/10/2019
MAINTENANCE SCHEDULE OF SUB-STATION EQUIPMENT FOR FOR THE MONTH OF NOVEMBER AND DECEMBER 2019

S.No. NAME OF S/S Name of Transmission Line/Sub-Station Equipment DATE OF MTC. (Quarterly)

132KV S/S
1 ROPAR 132/11kv,20MVA,PTF T-1 & INCOMER 04/12/2019

2 132/11kv,20MVA,PTF T-5 & INCOMER 06/12/2019

3 132/66kv,50MVA,PTF T-2 & INCOMER 11/12/2019

4 132/66kv,50MVA,PTF T-3 & INCOMER 13/12/2019

5 66/11kv, 10/12.5MVA, PTF T-4 & INCOMER 18/12/2019

6 DC Battery
Date 15th of every month
Maintenance of Equipments and Maintenance schedule of 132 kv S/S Asron
Whether
Mode of Mtc. Mtc. If not
S. Name of Monthly/ Work PTW then Next planned
Date
No. Equipment Quertly/ done No. remarks/ date
Half yearly yes or reason
not
1 11 KV INDUSTRIAL Half Yearly yes 57 28/09/2019 Mar-20
2 11 KV CAPSUGEL Half Yearly yes 64 10/04/2019 Apr-20
11 KV
3 Half Yearly yes 54 21/09/2019 Mar-20
HARGOBINDNAGAR
4 11 KV NIELIT Half Yearly yes 58 28/09/2019 Mar-20
5 11 KV INCOMER-I Half Yearly yes 73 10/10/2019 Apr-20
6 11 KV ZEINTH-II Half Yearly yes 71 10/06/2019 Apr-20
7 11 KV ASRON Half Yearly yes 79 16/10/2019 Apr-20
8 11 KV TONSA Half Yearly yes 53 20/09/2019 Mar-20
9 11 KV SUB-STATION Half Yearly yes 52 20/09/2019 Mar-20
11 KV CAPACITOR
10 Half Yearly yes 68 10/05/2019 Apr-20
BANK
11 11 KV BUS COUPLER Half Yearly yes 72 10/07/2019 Apr-20
12 11 KV INCOMER-II Half Yearly yes 79 16/10/2019 Apr-20
13 11 KV BUS BAR 1 Half Yearly yes 73 10/10/2019 Apr-20
14 11 KV BUS BAR 2 Half Yearly yes 79 16/10/2019 Apr-20
132/11 KV P/T/F/T-1
15 quarterly yes 51 16/09/2019 Nov-19
(20 MVA)
132/11 KV P/T/F/T-2
16 quarterly yes 49 16/09/2019 Nov-19
(12.5 MVA)
220 V/200 AH DC
17 monthly yes 17/10/2019 Nov-19
BATTERY
18 132 KV AIR monthly yes 21/09/2019 Oct-19
COMPRESSOR
132 KV BREAKER (B-
1)
19 Half Yearly yes 51 16/09/2019 Mar-20
CONTROLLING P/T/F
T-1
132 KV BREAKER (B-
2)
20 Half Yearly yes 49 16/09/2019 Mar-20
CONTROLLING P/T/F
T-2
132 KV
21 RANBAXY+DSM+SML Half Yearly yes 20 08/07/2019 Feb-20
(B-3)
132 KV ASRON-
22 Half Yearly no Mtc. Due 21/10/2019
ROPAR (B-4)
23 132 KV DCM (B-5) Half Yearly yes 55 23/09/2019 Mar-20
132 KV ASRON-RTP
24 Half Yearly yes 65 10/05/2019 Apr-20
(B-6)
Consent
132 KV MAX INDIA due on not
25 Half Yearly no 19/09/2019 Mar-20
(B-7) 19/9/19 given by
factory
26 132 KV BUS BAR Yearly Mtc. Due Nov-20
Maintenance of Equipments and Maintenance schedule of 220 kv S/S Majra
Mtc.
Sr No mode of Date on Done/ if not, Next planned
Name of Eqp. mtc. which it falls Not PTW. No. Date reason date

220KV GANGUWAL
1 MAJRA LINE Quarterly 15.9.2019 Y 71 18/09/2019 15.12.19
220KV MAJRA
2 MOHALI1 LINE " 13.9.19 y 70 16/09/2019 13.12.19
3 220KV CB CONT T/F T1 " 13.9.19 Y 73 20/09/2019 13.12.19
220/66KV 160MVA T/F
4 T1 " 13.09.19 Y 73 20/09/2019 13.12.19
5 220KV BUS COUPLER " 29.07.19 Y 74 24/09/2019 29.01.20
6 220 kv Busbar 1 half yrly. 13.09.19 y 70 16/09/2019
7 220 kv Busbar2 " 13.09.19 y 71 18/09/2019
8 66KV INCOMER NO 1 Quarterly 13.09.19 Y 65 06/08/2019 13.12.19
9 66KV MAJRA LINE " 11.10.19 Y 72 20/09/2019 11.01.20
10 66KV BUS COUPLER " 11.07.19 Y 72 20/09/2019 11.01.20
11 66 kv Busbar 1 half yrly. 13.09.19 Y 72 20/09/2019 13.12.19
12 66 kv Busbar 2 " 13.09.19 Y 72 20/09/2019 13.12.19
13 Station T/F,200 KVA Quarterly 14.10.19 y 75 01/10/2019 14.01.20
132KV Maintenance of Equipments and Maintenance schedule of 132KV S/S, SRI CHAMKAUR SAHIB.
DATE OF MTC.
DATE OF MTC. MTC. DONE PTW DATE OF MTC. MTC. DONE PTW
S.No. Name of Equipment PTW NO. MTC. DONE ON
(Half Yearly) ON DATE NO. (Half Yearly) ON DATE NO.
(Quarterly) DATE
1 132/11kv,20MVA,PTF T-1 14-04-2019 09-05-2019 80 09-08-2019 25-09-2019 108 04-11-2019
2 132/11kv,16/20MVA,PTF T-2 18-04-2019 10-05-2019 84 10-08-2019 09-09-2019 77 05-11-2019
3 132KV Breaker B-3 of T/F T-1 14-04-2019 09-05-2019 80 04-11-2019
4 132KV Breaker B-4 of T/F T-5 18-04-2019 10-05-2019 84 05-11-2019
5 132kv Ropar (B-1) 21-04-2019 14-10-2019
6 132kv Ghulal (B-2) 25-04-2019 16-05-2019 95 21-10-2019
7 132kv Bus Bar-1 (YEARLY) 07-12-2019
8 DC Battery Date 18th of every month
ALL POWER T/F'S OIL SAMPLE
9 (YEARLY) 10-12-2019
SENT TO ODTL FOR TESTING
11KV Maintenance of Equipments and Maintenance schedule of 132KV S/S, SRI CHAMKAUR
SAHIB.
DATE OF DATE OF
MTC. MTC. DONE PTW MTC. MTC. DONE PTW
S.No. Name of Equipment
(HALF ON DATE NO. (HALF ON DATE NO.
YEARLY) YEARLY)
1 11kv Incomer-1 (T-1) 01-04-2019 10-04-2019 83 10-10-2019 15-10-2019 71
2 11kv Bus Bar-1 01-04-2019 17-04-2019 9 17/10/2019 15-10-2019 71
3 11kv Anaj Mandi 02/11/2019
4 11kv Navodhya 02/11/2019
5 11kv Hawara Kalan 14-03-2019 14-03-2019 27 14/09/2019 28/08/2019 49
6 11kv Lutheri 16-03-2019 16-03-2019 31 16/09/2019 28/08/2019 52
7 11kv Bassi 18-03-2019 18-03-2019 33 18/09/2019 04/09/2019 65
8 11kv City Pattern 21-03-2019 10-04-2019 84 10-10-2019
9 11kv Bela 22-03-2019 27-03-2019 50 27/09/2019 23/09/2019 95
10 11kv Salempur 22-03-2019 28-03-2019 52 28/09/2019 24/09/2019 100
11 11kv Kheri 23-03-2019 04/02/2019 61 04/08/2019 13/08/2019 18
12 11kv Kandhola 23-03-2019 10/04/2019 87 10/10/2019
13 11kv Bus Coupler 23-03-2019 26-03-2019 48 26/09/2019
14 11kv Incomer-2 (T-2) 05-04-2019 24/04/2019 28 24/10/2019 16-10-2019 81
15 11kv Bus Bar-2 05-04-2019 24/04/2019 28 24/10/2019 16-10-2019 81
16 11kv Majri 25-03-2019 15-04-2019 4 15/10/2019
17 11kv Sub Station T/F 19-03-2019 19-03-2019 35 19/09/2019 25/09/2019 106
11kv Sri Chamkaur
18 25-03-2019 24/05/2019 11 24/11/2019
Sahib
19 11kv PSTC 26-03-2019 23/04/2019 25 23/10/2019
20 11kv Jatana 26-03-2019 04/06/2019 29 04/12/2019
21 11kv Spare VCB 27-03-2019 06/05/2019 70 06/11/2019
22 11kv Manjit Pura 27-03-2019 30/07/2019 100 01-01-2020
23 11kv Amrali 28-03-2019 27/06/2019 5 27/12/2019
24 11kv Kotli 19-03-2019 19-03-2019 39 19/09/2019 23/09/2019 96
25 11kv Maneli 28-03-2019 06/05/2019 71 06/11/2019
26 11kv Balrampur 29-03-2019 06/05/2019 72 06/11/2019
27 11kv Ramgarh 18-03-2019 18-03-2019 34 18/09/2019 09/10/2019 50
28 11kv Dhaulran 29-03-2019 30-03-2019 56 30/09/2019 09/10/2019 53
29 11kv Capacitor Bank-2 29-03-2019 11/04/2019 91 11/10/2019
Meeting agenda point no. 2 :- Discussion regarding Cause of Trippings/ Remedial measures for Trippings/ Breakdowns during Foggy season FY 2018-19
:-
TRIPPING/BREAKDOWNS OF 220/132 KV LINES UNDER P&M DIV.ROPAR IN FY 2018-2019 DUE TO FOG
Leng Tripping/Breakdown RELAY INDICATION
Name NAME Cause of
Sr. th of DUR.
of OF Tripping/breakd Remedial Measures
No. Line 00.00
S/Stn. LINE own
K.M. date From date to 1st End 2nd End

At Tower no.
Zone-
220 KV Zone-1 66/11 Disc
220 KV s/s 41.1 05.0 05.0 1,R,Y,B New polymer Insulator String fitted in
1 Lalru 3.04 13.08 10.04 ,R,y,B- Insulator string
Mohali 85 2.19 2.19 Phase,2 place of Damaged Insulator string
Line Phase damaged due to
4.40 KM
heavy Fog
Meeting agenda point no. 3 :- Maintenance Schedule of Transmission Line for the month of November and December 2019 :-

NOVEMBER 2019 :-

Format I(A): Request for Transmission Element outage by Indenting agency to RPC
Indenting Agency PSTCL For The Nov- Date 01-11-2019 to 30.11.2019
month 19

Sr. Name of the Voltage From To Owner Ckt Inter Daily/ Reason From From To date To Remarks
No. requesting Level Substation substation ID Regional/ continous date time time
Agency (KV) intra
Regional
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Kotla Ropar Regional jumpers, dampers ,
circuit-1 suspension clamps and 01.11.19 10.00 01.11.19 17.00
cleaning of Disc insulators of
Tower No 104 to 113 with
gantry at Ropar End
2. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Nalagarh Mohali Regional jumpers, dampers ,
circuit-1 suspension clamps and 02.11.19 10.00 02.11.19 17.00
cleaning of Disc insulators of
Tower No 01 to 10 and S/s
Gantry at Nalagarh end.
3. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Kotla Ropar Regional jumpers, dampers ,
circuit-2 suspension clamps and 04.11.19 10.00 04.11.19 17.00
cleaning of Disc insulators of
Tower No 98 to 111
4. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Mohali Lalru Regional jumpers, dampers ,
suspension clamps and 05.11.19 10.00 05.11.19 17.00
cleaning of Disc insulators of
s/s gantry Lalru End and
Tower No 66/46 to 66/57

5. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Nakkian Ropar Regional jumpers, dampers ,
suspension clamps and 06.11.19 10.00 06.11.19 17.00
cleaning of Disc insulators of
Tower No 104 to 113 and
gantry at Ropar end
6. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Nalagarh Mohali Regional jumpers, dampers ,
circuit-2 suspension clamps and 07.11.19 10.00 07.11.19 17.00
cleaning of Disc insulators of
Tower No 01 to 10 and S/s
Gantry at Nalagarh end.
7. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Ganguwal Mohali Regional jumpers, dampers ,
suspension clamps and 08.11.19 10.00 08.11.19 17.00
cleaning of Disc insulators of
Tower No 196 to 214 .
8. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Kotla Ropar Regional jumpers, dampers ,
circuit-3 suspension clamps and 09.11.19 10.00 09.11.19 17.00
cleaning of Disc insulators of
s/s gantry and Tower No 98 to
111
9. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Ropar Kurali Regional jumpers, dampers ,
Railway suspension clamps and 11.11.19 10.00 11.11.19 17.00
cleaning of Disc insulators of
s/s gantry kurali end and
Tower No 48 to 60
10. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Mohali 80 Derabassi Regional jumpers, dampers ,
sector suspension clamps and 13.11.19 10.00 13.11.19 17.00
cleaning of Disc insulators of
Tower No 76 to 85
11. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Derabassi Lalru Regional jumpers, dampers ,
suspension clamps and 14.11.19 10.00 14.11.19 17.00
cleaning of Disc insulators of
s/s gantry Lalru End and
Tower No 66/46 to 66/57
12. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Derabassi Ghaggar Regional jumpers, dampers ,
Railway suspension clamps and 15.11.19 10.00 15.11.19 17.00
cleaning of Disc insulators of
s/s gantry Railway End and
Tower No 12 to 21
13. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Anandpur Anandpur Regional jumpers, dampers ,
Sahib Sahib suspension clamps and 16.11.19 10.00 16.11.19 17.00
Railway cleaning of Disc insulators of
Tower No 1 to 16 and gantries
of both ends.
14. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Mohali Majra Regional jumpers, dampers ,
suspension clamps and 18.11.19 10.00 18.11.19 17.00
cleaning of Disc insulators of
Tower No 196 to 214 .
PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
15. Asron Ranbaxy/ Regional jumpers, dampers ,
DSM /SML suspension clamps and 19.11.19 10.00 19.11.19 17.00
cleaning of Disc insulators of
Tower No 1 to 16
16. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
RTP Mohali Regional jumpers, dampers ,
suspension clamps and 20.11.19 10.00 20.11.19 17.00
cleaning of Disc insulators of
Tower No 125 to 135
17. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
RTP Kharar Regional jumpers, dampers ,
suspension clamps and 21.11.19 10.00 21.11.19 17.00
cleaning of Disc insulators of
Tower No 120/1 to120/15
18. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
RTP GACL Regional jumpers, dampers ,
suspension clamps and 22.11.19 10.00 22.11.19 17.00
cleaning of Disc insulators of
Tower No 1 to 16
19. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Nalagarh Mohali Regional jumpers, dampers ,
circuit-1 suspension clamps and 23.11.19 10.00 23.11.19 17.00
cleaning of Disc insulators of
Tower No 11 to 20.
20. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Kotla Ropar Regional jumpers, dampers ,
circuit-2 suspension clamps and 25.11.19 10.00 25.11.19 17.00
cleaning of Disc insulators of
Tower No 98 to 111
21. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Nalagarh Mohali Regional jumpers, dampers ,
circuit-2 suspension clamps and 26.11.19 10.00 26.11.19 17.00
cleaning of Disc insulators of
Tower No 11to 20
PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Asron Max India Regional jumpers, dampers ,
suspension clamps and 27.11.19 10.00 27.11.19 17.00
cleaning of Disc insulators of
Tower No 1 to 16 and 16/1-
16/4
PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
RTP Ropar Regional jumpers, dampers ,
suspension clamps and 28.11.19 10.00 28.11.19 17.00
cleaning of Disc insulators of
Tower No 1 to 15
PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Mohali Kharar Regional jumpers, dampers ,
suspension clamps and 29.11.19 10.00 29.11.19 17.00
cleaning of Disc insulators of
Tower No 125 to 135
PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
RTP Asron Regional jumpers, dampers ,
suspension clamps and 30.11.19 10.00 30.11.19 17.00
cleaning of Disc insulators of
Tower No 1 to 15

DECEMBER 2019 :-

Format I(A): Request for Transmission Element outage by Indenting agency to RPC
Indenting Agency PSTCL For The Dec- Date 01-12-2019 to 31.12.2019
month 19

Sr. Name of the Voltage From To Owner Ckt Inter Daily/ Reason From From To date To Remarks
No. requesting Level Substation substation ID Regional/ continous date time time
Agency (KV) intra
Regional
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Kotla Ropar Regional jumpers, dampers ,
circuit-1 suspension clamps and 02.12.19 10.00 02.12.19 17.00
cleaning of Disc insulators of
Tower No 4 to 13.
2. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Nalagarh Mohali Regional jumpers, dampers ,
circuit-1 suspension clamps and 03.12.19 10.00 03.12.19 17.00
cleaning of Disc insulators of
Tower No 21 to 30
3. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Kotla Ropar Regional jumpers, dampers ,
circuit-2 suspension clamps and 04.12.19 10.00 04.12.19 17.00
cleaning of Disc insulators of
Tower No 111A to 124
4. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Mohali Lalru Regional jumpers, dampers ,
suspension clamps and 05.12.19 10.00 05.12.19 17.00
cleaning of Disc insulators of
s/s gantry Lalru End and
Tower No 14 to 25
5. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Nakkian Ropar Regional jumpers, dampers ,
suspension clamps and 06.12.19 10.00 06.12.19 17.00
cleaning of Disc insulators of
Tower No 4 to 13.
6. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Nalagarh Mohali Regional jumpers, dampers ,
circuit-2 suspension clamps and 07.12.19 10.00 07.12.19 17.00
cleaning of Disc insulators of
Tower No 21 to 30
7. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Ganguwal Mohali Regional jumpers, dampers ,
suspension clamps and 09.12.19 10.00 09.12.19 17.00
cleaning of Disc insulators of
Tower No 1 to 10 .
8. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Kotla Ropar Regional jumpers, dampers ,
circuit-3 suspension clamps and 10.12.19 10.00 10.12.19 17.00
cleaning of Disc insulators of
Tower No 111A to 124
9. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Ropar Kharar Regional jumpers, dampers ,
suspension clamps and 11.12.19 10.00 11.12.19 17.00
cleaning of Disc insulators of
Tower No 1 to 7 and 47 to 50.
10. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Mohali 80 Derabassi Regional jumpers, dampers ,
sector suspension clamps and 13.12.19 10.00 13.12.19 17.00
cleaning of Disc insulators of
Tower No 26 to 38
11. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Derabassi Lalru Regional jumpers, dampers ,
suspension clamps and 14.12.19 10.00 14.12.19 17.00
cleaning of Disc insulators of
s/s gantry DBS End and Tower
No 74 to 85
12. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Kotla Ropar Regional jumpers, dampers ,
circuit-2 suspension clamps and 16.12.19 10.00 16.12.19 17.00
cleaning of Disc insulators of
Tower No 149 to 163
13. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Ropar Chamkour Regional jumpers, dampers ,
Sahib suspension clamps and 17.12.19 10.00 17.12.19 17.00
cleaning of Disc insulators of
Tower No 159 to 171 and 200
to 207.
14. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Mohali Majra Regional jumpers, dampers ,
suspension clamps and 18.12.19 10.00 18.12.19 17.00
cleaning of Disc insulators of
Tower No 188/30 to 188/40 .
PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
15. Kotla Ropar Regional jumpers, dampers ,
circuit-3 suspension clamps and 19.12.19 10.00 19.12.19 17.00
cleaning of Disc insulators of
Tower No 149 to 163

16. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
RTP Mohali Regional jumpers, dampers ,
suspension clamps and 20.12.19 10.00 20.12.19 17.00
cleaning of Disc insulators of
Tower No 136 to 144
17. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Nakkian Ropar Regional jumpers, dampers ,
suspension clamps and 21.12.19 10.00 21.12.19 17.00
cleaning of Disc insulators of
Tower No 89 to 103.
18. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Ropar Kharar Regional jumpers, dampers ,
suspension clamps and 23.12.19 10.00 23.12.19 17.00
cleaning of Disc insulators of
Tower No 51 to 56 and 79 to
83.
19. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Nalagarh Mohali Regional jumpers, dampers ,
circuit-1 suspension clamps and 24.12.19 10.00 24.12.19 17.00
cleaning of Disc insulators of
Tower No 31 to 40.
20. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Ropar Kurali Regional jumpers, dampers ,
Railway suspension clamps and 26.12.19 10.00 26.12.19 17.00
cleaning of Disc insulators of
Tower No 12 to 30
21. PSTCL 220KV 220 KV S/s 220 KV S/s PSTCL Inter Daily Tightening of nut bolts of
Nalagarh Mohali Regional jumpers, dampers ,
circuit-2 suspension clamps and 27.12.19 10.00 27.12.19 17.00
cleaning of Disc insulators of
Tower No 31 to 40
22. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Asron Ropar Regional jumpers, dampers ,
suspension clamps and 28.12.19 10.00 28.12.19 17.00
cleaning of Disc insulators of
Tower No 44 to 57.
23. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
RTP Ropar Regional jumpers, dampers ,
suspension clamps and 29.12.19 10.00 29.12.19 17.00
cleaning of Disc insulators of
Tower No 44 to 57
24. PSTCL 220 KV 220 KV S/s 220 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Mohali Kharar Regional jumpers, dampers ,
suspension clamps and 30.12.19 10.00 30.12.19 17.00
cleaning of Disc insulators of
Tower No 120/3 to 120/15
25. PSTCL 132KV 132 KV S/s 132 KV S/s PSTCL Intra Daily Tightening of nut bolts of
Ropar Chamkour Regional jumpers, dampers ,
Sahib suspension clamps and 31.12.19 10.00 31.12.19 17.00
cleaning of Disc insulators of
Tower No 159 to 171 and 200
to 207.
Meeting agenda point no. 4 :- Information regarding status of Fixed Asset Register maintained at each accounting unit :- …………..

Meeting agenda point no. 5 :- Any other Agenda:


(A ) 132 KV S/S Nakkian: -Requirement of drainage facility for rainwater/ sump pit
-Whitewash and renovation of control room building & boundary walls is required
-Pits along boundary wall are required to be filled
-There is a pit under the 132 KV tower in the switchyard premises which needs to be filled
-There are no Approaching stairs for 132 kV SF-6 Loop-Out Breaker (B-2) controlling 132 kV Nakkian-Ropar Line.
They are required to be constructed.
-Gravel level in the switchyard is inadequate. It is required to be maintained as per standards.
(B)

DETAIL OF FAULTY EQUIPMENTS AT 132KV S/S, SRI CHAMKAUR SAHIB.


Sr.
No. Name of equipment Fault detail
1 132/11KV (16/20MVA) There is heavy oil leakage from the body of transformer. Due
power transformer T-2 to this leakage, more than 3Ltr. Oil wasting daily.
2 11KV outgoing VCB, This VCB is more than 13 years old and due to this VCB, IR
Make-ABB, DOC-11- value of 11KV Bus bar is decreased.
10-2006

Addl.SE/P&M,
Division, PSTCL, Ropar.