Successive calculation - Basics


Project Basics Instructions
Project RQ501 Fill out ”Project Basics” and then use the sheet ”Estimates” to estimate the individual
tasks of the project.
Project manager Ib H Skaaning
For versioning you are suggested to use the “Change log” sheet. Only white cells are
Michael Buch Hansen to be edited. The rest contain either text or formulas and should not be changed. The
sheet “Statistics” is mostly to be used to get an overview when you want to perform
Department MARS follow up during the project implementation.
Department number 19523
You can delete rows and columns in the Estimation sheet (not the top row). It is also
an option to hide columns depending on your needs – use the hide function on the
Project category IBM AS right mouse button after selecting a column.

If the estimation sheet is to be used for follow up as well, the sheet “Follow up” can
Covers the period n/a be used to enter usage time and rest estimates. Then the follow up summary on the
statistics sheet will be updated automatically. If you insert new rows in the
Iteration: #REF! “Estimation” sheet and want to use the “Follow up” sheet, remember to synchronize
Date: #REF! the two (i.e. make sure all tasks are displayed in the follow up sheet). This can i.e. be
done by copying row 2 in “Follow up” to all the subsequent rows
Latest version by #REF! in the same sheet.

Measurement units Hours Remember that estimimation is the same regardless whether it is a fixed price
project or a time and material project.

In IBM T&L we use the value providing 97% probability to complete the activity within
the given estimate.

Note that estimation has nothing to do with pricing - you only work with hours
at this stage. Pricing the tasks comes later.

file:///conversion/tmp/scratch/449727549.xls Page 1 of 12
Printed 11/30/2019 07:19:31

Date Version Who What

3/11/2009 1.0 Snehashis Mazumder First version made. Initial estimation prepared.
11/11/2009 2.0 Snehashis Mazumder Revised version prepared based upon current SO

file:///conversion/tmp/scratch/449727549.xls Page 2 of 12
Printed 11/30/2019 07:19:31

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)

Analysis 0 0 0.0 0.0 Alert (zero est.)


(Solution outline) 0 0 0.0 0.0 Alert (zero est.)
Solution outline finalization 0 0 0.0 0.0 Alert (zero est.)
IBM QA & Estimation 0 0 0.0 0.0 Alert (zero est.)
IBM QA & Estimation 0 0 0.0 0.0 Alert (zero est.)
Clarifications/incorporate QA 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
Detailed design 0 0 0.0 0.0 Alert (zero est.)
(High level design) 0 0 0.0 0.0 Alert (zero est.)
... 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
Technical design 0 0 0.0 0.0 Alert (zero est.)
(Low level design) 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
Coding 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
Unit Testing 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
Integression Testing and Regression Test 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
Implementation 0 0 0.0 0.0 Alert (zero est.)
Promotion to Demo 0 0 0.0 0.0 Alert (zero est.)
Promotion to Production 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
Cross-phases 0 0 0.0 0.0 Alert (zero est.)
Project management 0 0 0.0 0.0 Alert (zero est.)
Project Management 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
Note: 0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)

0 0 0.0 0.0 Alert (zero est.)

0 0 0.0 0.0 Alert (zero est.)


0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 3 of 12
Printed 11/30/2019 07:19:31

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 4 of 12
Printed 11/30/2019 07:19:32

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 5 of 12
Printed 11/30/2019 07:19:32

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 6 of 12
Printed 11/30/2019 07:19:32

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 7 of 12
Printed 11/30/2019 07:19:32

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.0 0.0 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 8 of 12
Printed 11/30/2019 07:19:32

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 9 of 12
Printed 11/30/2019 07:19:32

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 10 of 12
Printed 11/30/2019 07:19:32

Minimum Likely Maximum Middle Std.


Phase/ Application 97% Estimation
Responsibility Task / Activity estimate estimate Hours estimate Value Hours Deviation Variance (Vi) Estimation Comments
WBS Area Probability status
Hours (Ai) (Ci) Hours (Bi) (Mi) (Si)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)
0 0 0.00 0.00 Alert (zero est.)

file:///conversion/tmp/scratch/449727549.xls Page 11 of 12
Printed 11/30/2019 07:19:32

Successive calculation - Statistics


Estimates Statistics overview
Minimum estimate (Ai) - Hours Number of tasks 8
Likely estimate (Ci) - Hours
Maximum estimate (Bi) - Hours Tasks with min estimate - tasks
Standard Deviation (Si) - Tasks with likely estimate - tasks
Variance (Vi) - Tasks with max estimate - tasks
Middle Value (Mi) - Hours
85% Probability - Hours Average task size (min value) - Hours
97% Probability - Hours Average task size (likely value) - Hours
99% Probability - Hours Average task size (max value) - Hours
Average task size (middle value) - Hours

###

Page 12 of 12