BAJADA TUBERIA 1 S.U.M, ACOPIO Y DESPENSA CONCRETO 61.93 283.29 0.95 4.63
BAJADA TUBERIA 2 S.U.M. Y COCINA CONCRETO 65.22 283.29 0.95 4.88
BAJADA TUBERIA 3 HALL Y S.S.H.H CONCRETO 43.42 283.29 0.95 3.25
BAJADA TUBERIA 4 AULA 101, DEPOSITO Y ALMACEN CONCRETO 65.22 283.29 0.95 4.88
BAJADA TUBERIA 5 AULA 101 Y ADMINISTRACION CONCRETO 45.53 283.29 0.95 3.40
BAJADA TUBERIA 6 PATIO PRINCIPAL CONCRETO 19.62 283.29 0.95 1.47
BAJADA TUBERIA 7 PATIO PRINCIPAL CONCRETO 19.62 283.29 0.95 1.47
BAJADA TUBERIA 8 PATIO PRINCIPAL CONCRETO 19.62 283.29 0.95 1.47
BAJADA TUBERIA 9 PATIO PRINCIPAL CONCRETO 19.62 283.29 0.95 1.47
BAJADA TUBERIA 10 COCINETA CONCRETO 24.48 283.29 0.95 1.83
BAJADA TUBERIA 11 HABITACION Y SS.HH CONCRETO 24.48 283.29 0.95 1.83
ACCESO VEHICULAR ACCESO VEHICULAR CONCRETO 20.15 283.29 0.95 1.51
CORREDOR CORREDOR CONCRETO 109.37 283.29 0.95 8.18
PLAZOLETA PLAZOLETA CONCRETO 12.77 283.29 0.95 0.95
EXTENSION EDUCATIVA EXTENSION EDUCATIVA CONCRETO 25.28 283.29 0.95 1.89
CIRCULACION CIRCULACION CONCRETO 85.75 283.29 0.95 6.41