Sunteți pe pagina 1din 14

i

TITLE: INPUT YOUR TITLE IN INFORMATION MANAGEMENT COURSE


PROJECT HERE; IF CONTAINS MORE THAN TWO LINES, THE
FORMAT SHOULD BE IN A PYRAMID FORM, FROM LONGEST
TO SHORTEST AND SHOULD NOT OVERLAP
THE PRECEDING LINE.

//NOTE: PROJECT LEADER MUST BE FIRST, THEN THE NEXT MEMBERS, IF


APPLICABLE, SHOULD BE IN ALPHABETICAL ORDER
MEMBER 1_LAST NAME, FIRST NAME
MEMBER 2_LAST NAME, FIRST NAME
MEMBER 3_LAST NAME, FIRST NAME

OCTOBER 2019
ii

ASBTRACT (NOT INCLUDED YET)


iii

TABLE OF CONTENTS (USES A LITERAL TABLE, NO BORDER FORMAT; IF


ROWS ARE INSUFFICIENT, JUST USE “INSERT BELOW” IN THE ‘DESIGN TAB’)
//TABLE IS DOWN HERE
TITLE PAGE i
ABSTRACT (NOT APPLICABLE FOR CURRENT TERM, DELETE) ii
TABLE OF CONTENTS iii

1.0 INTRODUCTION 1
1.1 System Type
1.2 Statement of the Problem
1.3 Statement of Objectives
1.3.1 General Objectives
1.3.2 Specific Objectives YOUR
1.4 Significance of the Study PAGE
1.5 Scope and Limitations of the Study NUMBER

2.0 METHODOLOGY OF THE STUDY

3.0 DATA GATHERING ACTIVITIES AND RESULTS SHOULD


3.1 Data Gathering Methodologies BE
3.2 Result Summary of Data Gathering HERE

4.0 THE EXISTING BUSINESS SYSTEM (MIDTERM PAPER ONLY


UP TO THIS POINT, I WILL INCLUDE THE LATER SECTIONS FOR
FUTURE REFERENCING IF NEEDED)
4.1 Business System Background THIS
4.2 Description of the Business Process IS
4.3 Problem Areas A

5.0 PROPOSED INFORMATION SYSTEM DIFFERE.


5.1 System Overview COLUMN
5.2 Features of the proposed solution
5.3 Process Specification
5.3.1 Data Flow Diagram
5.3.2 Data Dictionary
5.3.3 Data Specifications
5.3.3.1 Entity Relationship Diagram
5.3.3.2 Database Design Schema
5.4 Technical Specification
5.4.1 Software Platform
5.4.2 Programming Language
5.4.3 Programming Support Tools
5.4.4 Graphical User Interface and Specifications
5.4.5 Report and Form Specifications

6.0 PROPOSED INFORMATION SYSTEM TESTING PLAN


6.1 Proposed Testing Stages
6.2 Proposed Testing Schedules
iv

7.0 PROPOSED INFORMATION SYSTEM DEPLOYMENT PLAN


7.1 Proposed Deployment Requirements
7.1.1 Hardware Requirements
7.1.2 Software Requirements
7.1.3 Human Resource Requirements
7.2 Proposed Deployment Plan
7.2.1 Site Preparation
7.2.2 Personnel Training
7.2.3 System and Data Conversion
7.2.4 Deployment Schedule

8.0 PROPOSED INFORMATION SYSTEM MAINTENANCE PLAN

9.0 REFERENCES

10.0 APPENDICES
v

LIST OF TABLES (COPY TABLE ABOVE, INSERT A NEW COLUMN ON THE


LEFT SIDE WITH A SMALL WIDTH; SEE PICTURE BELOW FOR REFERENCE)
vi

LIST OF FIGURES (COPY TABLE ABOVE; SEE FIGURE BELOW FOR


REFERENCE)
vii

LIST OF APPENDICES (COPY TABLE ABOVE)


1

Chapter 1
Introduction

1.1 System Type

//TPS/MIS/OAS/KWS/etc. whatever system your study will be focusing into

1.2 Statement of the problem


2

Assuming this is a continuation of your chapter 1, note that there is a ‘2’ in the upper

right corner of this page. The page numbering for this document (different page

numbering for Title Page to Appendices which uses ‘lower-case roman’ and another

page numbering starting from chapter 1 up to the last chapter) is already pre-

formatted in-case if it’s needed.

Please note that for every page that starts with a “Chapter X” where X is a number,

the page number should be hidden. To do this, insert a “rectangle shape” big enough

to cover the upper right page number, and then set its shape fill and border outline to

white.
3

Chapter 2
Methodology of the Study
(Identify methodology and/or model used and explain the activities per

development stage. You may include the WBS Diagram)

//Gantt Chart is inserted in this chapter

WBS Diagram Reference:

https://www.edrawsoft.com/what-is-work-breakdown-structure-diagram.php
4

See the page number above right?


5

Chapter 3

Data Gathering Activities and Results

3.1 Data Gathering Methodologies

3.2
6

And another one.


7

Chapter 4

The Existing Business System

NOTE: MUST include diagrams to show the current business flow and

problems, (Activity Diagram)

S-ar putea să vă placă și