Hormigón H-22.5
Condiciones Muy Buenas
Cemento Viacha IP-30
Incremento del agua por la puzolana = 15%
Vigas y muros de hormigón armado
Módulo de Finura (arena) = 2.61
P.U.c
%H % Abs Pe
kg/m3
AGUA - - 1 -
CEMENTO - - 3,1 -
GRAVA 2,78 2,078 2,330 1571,617
ARENA 3,65 2,946 2,725 1738,944
𝑓𝑐𝑚 = 28 [𝑀𝑃𝑎]
ASENTAMIENTO
10 + 2
= 6 𝑐𝑚
2
3"
𝑇𝑀𝑁 =
4
15
𝐴𝑔𝑢𝑎 = 165 (1 + )
100
% 𝐴𝑖𝑟𝑒 = 6.0
RELACION AGUA CEMENTO (a/c)
28 a/c
𝑎
25 0.53 = 0.488
𝑐
DOSIS DE CEMENTO
189.75
𝐶=
0.488
𝐶 = 388.83 𝐾𝑔𝑟.
3"
𝑇𝑀𝑁 =
4
2.61 X
𝑠𝑒𝑐𝑜
𝑃 𝑔𝑟𝑎𝑣𝑎 = 0.633 ∗ 1571.617
𝑠𝑒𝑐𝑜
𝑃 𝑔𝑟𝑎𝑣𝑎 = 994.83 𝐾𝑔𝑟.
𝑉𝑎𝑟𝑒𝑛𝑎 = 0.194 𝑚3
𝑠𝑒𝑐𝑜
𝑃 𝑎𝑟𝑒𝑛𝑎 = 0.194 ∗ 2.725 ∗ 1000
𝑠𝑒𝑐𝑜
𝑃 𝑎𝑟𝑒𝑛𝑎 = 528.65 𝐾𝑔𝑟.
DOSIFICACION OPERATIVA
ℎ𝑢𝑚𝑒𝑑𝑜
2.78
𝑃 𝑔𝑟𝑎𝑣𝑎 = 994.83 (1 + )
100
ℎ𝑢𝑚𝑒𝑑𝑜
𝑃 𝑔𝑟𝑎𝑣𝑎 = 1022.49 𝐾𝑔𝑟.
3.65
𝑃 ℎ𝑢𝑚𝑒𝑑𝑜
𝑎𝑟𝑒𝑛𝑎 = 528.65 (1 + )
100
𝑃 ℎ𝑢𝑚𝑒𝑑𝑜
𝑎𝑟𝑒𝑛𝑎 = 547.95 𝐾𝑔𝑟.
𝑃 𝑟𝑒𝑎𝑙
𝑎𝑔𝑢𝑎 = 179.04 𝐾𝑔𝑟.
CUADRO RESUMEN
BASE
OPERATIVA POR PESO
MATERIAL
PESO (Kgr) VOLUMEN (m3) (Kgr)
CEMENTO
ARENA
GRAVA
PARA 15 PROBETAS
MATERIAL VOLUMEN (cm3) PESO (Kg)
PESO (Kg)
CEMENTO 570,99 1,71 25,65
AIRE 263,53 -