Documente Academic
Documente Profesional
Documente Cultură
18 CD 31 CD 31 CD 30 CD 31 CD 30 CD 31 CD 31 CD 28 CD 31 CD 30 CD 31 CD 30 CD 31 CD 31 CD 30 CD 5 CD
ITEM 414(1)
30 CD
ITEM 400(26)a
4 CD
ITEM 400(27) ITEM 404(1)a ITEM 406(1)d8 ITEM 407(2)
ITEM A.1.1(11) ITEM 404(1)a ITEM 405(1)a3
ITEM B.9 ITEM B.18(1) ITEM 101(6) ITEM 103(2)a ITEM 416(1)e ITEM 400(23)c2 ITEM 400(17)c ITEM 400(23)e2 ITEM 400(17)e ITEM 405(1)a3 L ITEM 400(17)e ITEM 404(1)b ITEM 406(10h8 ITEM 407(6) ITEM 401(2)a ITEM 411(2)
A B C D E F G G H I J ITEM 404(1)b K N O P Q R S T
0 0 10 10 35 35 80 80 110 110 61 CD 202 202 233 233 261 261 292 292 322 322 337 337 31 CD 368 368 30 CD 5 CD 403 403 11 CD 436 436 9 CD 445 445 14 CD 459 459 16 CD 475 475 5 CD 480 480
10 CD 25 CD 45 CD 30 CD 31 CD 141 141 31 CD 28 CD 31 CD 30 CD 15 CD 414 414 22 CD
ITEM 413(1)
ITEM 104(2)a ITEM 407(8) ITEM 412(1) ITEM 412(1)
ITEM B.4(5) ITEM B.18(1) ITEM 400(27) ITEM 400(26)a ITEM 413(7)a2 ITEM 204(1)a ITEM B.9
ITEM 104(2)a H-1 I-1 J-1 ITEM 406(1)h8 K-1 L-1 M-1 ITEM 413(1) N-1 ITEM 517(1)a ITEM 311(2)f1
25 CD 31 CD 292 292 15 CD 307 307 15 CD 322 322 16 CD 338 338 353 353 368 368 12 CD 383 383 12 CD 12 CD 18 CD
43 CD 15 CD 5 CD
480 CD
407(2) CONCRETE POST (BALLUSTER RAILINGS) EACH 60.00 3,034.63 182,077.80 0.209% P 0.209%
A SEPTEMBER 15-30, 2019
P 0.252%
407(6) SIDEWALK CONCRETE CUM 27.12 8,108.56 219,904.15 0.252%
A SEPTEMBER 1 -14, 2019
P 0.001%
407(8) LEAN CONCRETE CUM 0.16 7,045.99 1,127.36 0.001% 25%
A APRIL 16-30, 2019
SCHEDULED (Php) 259,883.64 2,002,976.31 3,815,630.55 85,765.30 64,846.94 7,427,361.58 7,673,044.49 8,158,697.38 8,893,514.46 12,291,827.45 6,578,121.52 3,079,003.16 3,541,010.47 8,200,763.64 13,727,842.29 1,128,077.59 300,054.17
COMMULATIVE (Php) 259,883.64 2,262,859.94 6,078,490.50 6,164,255.80 6,229,102.74 13,656,464.32 21,329,508.81 29,488,206.19 38,381,720.65 50,673,548.10 57,251,669.62 60,330,672.78 63,871,683.24 72,072,446.88 85,800,289.16 86,928,366.75 87,228,420.92
PERCENT ACCOMPLISHMENT & CASH FLOW
SCHEDULED (%) 0.298% 2.30% 4.37% 0.10% 0.07% 8.51% 8.80% 9.35% 10.20% 14.09% 7.54% 3.53% 4.0595% 9.4015% 15.7378% 1.2932% 0.344%
COMMULATIVE (%) 0.298% 2.59% 6.97% 7.07% 7.14% 15.66% 24.45% 33.81% 44.00% 58.09% 65.63% 69.16% 73.22% 82.62% 98.36% 99.66% 100.000%
PREPARED BY: NAME & LOCATION OF PROJECT: SHEET CONTENTS CHECKED BY: REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
-PERT-CPM DIAGRAM DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
WIDENING OF PERMANENT BRIDGES TO MORE THAN -BAR CHART & S-CURVE REGION - XIII
TWO(2) LANES -CASH FLOW PROJECTION
OFFICE OF THE DISTRICT ENGINEER 1
KINABUTAN BRIDGE 2 ALONG DAANG MAHARLIKA (LIPATA - SURIGAO SURIGAO DEL NORTE 1ST ENGINEERING DISTRICT
A.T. DUMLAO CONSTRUCTION, INC.
PABLO YVES L. DUMLAO II
AUTHORIZED MANAGING OFFICER
SECTION) BRGY RIZAL SURIGAO CITY K1121 + 826 - K1121 + 918 SURIGAO CITY
DOHJIE B. MORALES RELIETA N. BONITE EMMANNUEL J. CABANOS HENRY CRUZ J. MARAPAO
1
A.T. DUMLAO CONSTRUCTION INC. PROJECT ENGINEER CHIEF, CONSTRUCTION SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER