DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH SEMESTER 2

DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014

NO URAIAN BAHAN/MATERIAL SAT. HARGA KET


KESEPAKATAN
A. BAHAN :
I. BATU
1 Abu Batu m3 172,500.00
2 Atras ( tanah urug ) m3 125,000.00
3 Base course A m3 175,000.00
4 Base course B m3 165,800.00
5 Batu apung kg 4,300.00
6 Batu belah 10/15 cm m3 135,000.00
7 Batu belah 15/20 cm m3 135,000.00
8 Batu pecah mesin 0.5-1 cm m3 180,000.00
9 Batu pecah mesin 1-2 cm m3 180,000.00
10 Batu pecah mesin 2-3 cm m3 180,000.00
11 Batu tempel Palimanan 10 X 20 bh 1,500.00
12 Batu tempel kapur tekstur tidak rata bh 2,000.00
13 Kapur bakar m3 70,000.00
14 Kapur Sirih kg 2,000.00
15 Kerikil m3 65,000.00

II. PASIR
1 Pasir beton m3 150,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 143,000.00
4 Pasir urug m3 110,000.00
5 Sirtu m3 110,000.00
6 Sirtu tersaring m3 115,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 11,250.00
2 Besi strip kg 11,250.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 20,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 600,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 50,600.00
29 Pipa PVC / paralon 3 inch btg 75,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 5,800.00
31 Pipa Knee/bend PVC Ø 3" bh 5,800.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,200.00
34 Socket besi O 3 " bh 45,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00
2 Alumunium pelapis pintu KM lbr 130,000.00
3 Asbes gelombang 1500 x 1050 x 4 mm lbr 35,000.00
4 Asbes gelombang 1800 x 920 x 4 mm lbr 42,500.00
5 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00
6 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00
7 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00
8 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00
9 Bak mandi keramik volume 0,3 m3 bh 185,000.00
10 Bak mandi fiber 120 L bh 220,000.00
11 Batu apung kg 4,300.00
12 Baut 3/4 " bh 3,000.00
13 Baut 5/8 " bh 3,800.00
14 Baut 1/2 " bh 6,000.00
15 Baut 1/2 " panjang 30 cm bh 8,550.00
16 Baut lawa-lawa bh 9,900.00
17 Beading penurunan ( PC ) gypsum m' 10,000.00
18 Beading horison gypsum m' 10,000.00
19 Cat Menie kg 20,000.00
20 Cat genteng kg 48,000.00
21 Cat penutup kayu kg 49,000.00
22 Cat penutup tembok kg 23,000.00
23 Cat penutup besi kg 45,000.00
24 Cat Sinkromat kg 80,000.00
25 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00
26 Closet duduk ( siram ) porselen merk INA bh 545,000.00
27 Closet jongkok porselen merk INA/KIA bh 140,000.00
28 Dempul kayu kg 18,000.00
29 Dinding keramik uk. 10 x 20 cm bh 950.00
30 Dinding keramik uk. 20 x 20 cm bh 1,850.00
31 Dinding keramik uk. 20 x 25 cm bh 2,200.00
32 Dinding keramik uk. 30 x 30 cm bh 3,300.00
33 Door closer bh 158,125.00
34 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00
35 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00
36 Daun jendela alumunium lengkap warna natural/coklat dop bh 350,000.00
37 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00
38 Elastomer 30x30x5 bh 550,000.00
39 Engsel jendela set 12,000.00
40 Engsel pintu set 15,000.00
41 Engsel meubeler bh 3,800.00
42 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,800.00
43 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,400.00
44 Flincote ltr 22,000.00
45 Glass beat kg 20,000.00
46 Glass Block bh 17,500.00
47 Gas elpiji kg 8,800.00
48 Grendel pintu / jendela bh 5,500.00
49 Gypsum board lbr 50,000.00
50 GRC tebal 4 mm lbr 53,000.00
51 Hampelas lbr 4,000.00
52 Kaca nako tebal 5 mm berikut teralis bh 11,400.00
53 Kaca polos tebal 3 mm m2 63,250.00
54 Kaca polos tebal 5 mm m2 75,000.00
55 Kait angin bh 9,500.00
56 Kunci gembok bh 17,000.00
57 Kunci pintu ukuran besar bh 125,000.00
58 Kunci pintu ukuran sedang bh 85,000.00
59 Kunci dan daun pintu dari fiber bh 350,000.00
60 Kusen Alumunium 3" warna natural m' 55,000.00
61 Kusen Alumunium 3" warna coklat dop m' 60,000.00
62 Kusen Alumunium 3" warna coklat kilap m' 75,000.00
63 Kusen Alumunium 4" warna natural m' 60,000.00
64 Kusen Alumunium 4" warna coklat dop m' 65,000.00
65 Kusen Alumunium 4" warna coklat kilap m' 85,000.00
66 Langko - langko kuda - kuda bh 18,000.00
67 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00
68 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00
69 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00
70 Lantai keramik uk. 10 x 20 cm bh 950.00
71 Lantai keramik uk. 20 x 20 cm bh 1,650.00
72 Lantai keramik uk. 30 x 30 cm bh 3,650.00
73 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 6,900.00
74 Lantai terakota 20 x 5 cm bh 4,400.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
75 Lem kayu ltr 30,000.00
76 Lemkra/zat addictive kg 15,000.00
77 Lemkra Just Do It kg 4,500.00
78 Lemkra FS Nat kg 15,850.00
79 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00
80 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00
81 List keliling gypsum lebar 7 cm m' 6,250.00
82 List keliling gypsum lebar 10 cm m' 7,250.00
83 List keliling gypsum lebar 12 cm m' 8,750.00
84 List drop m' 8,900.00
85 Melamin / folywood lbr 88,500.00
86 Mozaik uk. 20 x 20 cm bh 1,900.00
87 Multiplex tebal 15 mm m2 272,000.00
88 Paku biasa 1/2" - 1" kg 15,000.00
89 Paku biasa 2" - 5" kg 12,500.00
90 Paku pancing 60 x 230 bh 825.00
91 Paku sekrup 3" - 5 " bh 400.00
92 Paku ulir bh 150.00
93 Plamir kayu / kualitas 1 kg 17,500.00
94 Plamir tembok kg 25,000.00
95 Plester Mutiara kg 8,700.00
96 Polycarbonate m2 115,000.00
97 Plywood lbr 92,250.00
98 Portland Cement ( PC ) zak 61,000.00
99 Rubber joint 25x10x5 bh 175,000.00
100 Roster / batu kerawang bh 2,600.00
101 Semen portland kg 1,220.00
102 Semen warna kg 11,000.00
103 Seng BJLS 30 L. 90 cm m2 32,500.00
104 Seng gelombang 3' - 6 " BJLS 30 lbr 42,000.00
105 Sirlak kg 19,500.00
106 Spirtus ltr 11,000.00
107 Skim Coat kg 4,400.00
108 Taekwood 4 mm 1200 x 2400 mm lbr 90,000.00
109 Taekwood 4 mm 900 x 2400 mm lbr 75,000.00
110 Ter kayu kg 14,500.00
111 Thermoplastic Glass beat kg 23,000.00
112 Tiner / minyak cat ltr 9,200.00
113 Triplek 3 mm lbr 45,000.00
114 Triplek 4 mm lbr 55,000.00
115 Triplek 6 mm lbr 75,000.00
116 Triplek 9 mm lbr 95,000.00
117 Triplek 12 mm lbr 200,000.00
118 TG 302 kg 46,500.00
119 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00
120 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00
121 Ubin wafel ukuran 20 x 20 cm bh 2,000.00
122 Ubin warna 20 x 20 cm bh 2,300.00
123 Ubin warna 30 x 30 cm bh 2,900.00
124 Washtafel bh 686,000.00
125 Woodplank bh 59,500.00
126 Zincalume m2 70,000.00
127 Rangka plafon memakai Hollow dengan penutup GRC tebal 4 mm + pengecatan m2 88,200.00
128 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 165,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 210,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 155,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 162,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 160,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 180,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
129 Pintu Air Sorong
- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa roda gigi ) Unit 8,497,000.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa roda gigi ) Unit 9,639,000.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa roda gigi ) Unit 13,500,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda gigi ) Unit 11,414,000.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda gigi ) Unit 25,366,000.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda gigi ) Unit 38,049,000.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda gigi ) Unit 50,732,000.00
130 Gigi Payung / Jantung Besar bh 1,250,000.00
131 Gigi Payung / Jantung Sedang bh 1,100,000.00
132 Gigi Piring Besar bh 2,930,000.00
133 Gigi Piring Sedang bh 1,903,000.00
134 Blok Laher bh 1,750,000.00
135 Bron mur drat 5 " bh 3,250,000.00
136 Bron mur drat 3 " bh 2,150,000.00
137 Drat stang 2" x 100 bh 2,500,000.00
138 Drat stang 3/4" x 100 bh 1,750,000.00
139 Drat stang 1,5" x 100 bh 1,550,000.00
140 Dudukan as horisontal bh 1,850,000.00
141 As Horisontal bh 1,850,000.00
142 Karet sel 8 x 3 cm bh 1,500,000.00
143 As Pemutar bh 750,000.00
144 Laher/Bearing bh 350,000.00
145 Engkel Kemudi Sedang bh 450,000.00
146 Daun Pintu B.50, H.50 bh 1,000,000.00
147 Pintu Klep B=0,5 m unit 1,750,000.00
148 Pintu Klep B=1,0 m unit 3,000,000.00
149 Pintu Klep B=1,5 m unit 4,500,000.00

V. ASPAL
1 Aspal kemasan kg 10,785.00
2 Aspal curah kg 9,930.00

VI. MINYAK
1 Premium liter 4,500.00
2 Premium (non subsidi) liter 9,950.00
3 Solar liter 4,500.00
4 Solar (non subsidi) liter 8,500.00
5 Minyak tanah liter 9,000.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00

VII.CETAKAN
1 Bata merah bh 600.00
2 Bata berongga bh 2,250.00
3 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
4 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
5 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
6 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
7 Genteng nok/bubung morando diglazuur bh 4,500.00
8 Genteng nok/bubung morando bh 4,000.00
9 Genteng press diglazuur ex Jatiwangi bh 2,000.00
10 Genteng press mesin ex Jatiwangi bh 1,900.00
11 Genteng press tangan ex Jatiwangi bh 1,400.00
12 Genteng Type Viktoria bh 9,000.00
13 Genteng nok/bubung Type Viktoria bh 12,500.00
14 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
15 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
16 Genteng beton bh 5,000.00
17 Genteng metal m2 75,000.00
18 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
19 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
20 Gorong-gorong buis beton dia. 60 cm bh/m' 70,000.00
21 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
22 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
23 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
24 Gravel dia. 60 cm bh 38,000.00
25 Gravel dia. 40 cm bh 35,000.00
26 Gravel dia. 20 cm bh 20,000.00
27 Nok steel gelombang 1050 x 5 mm m' 23,000.00
28 Nok steel gelombang 920 x 5 mm m' 22,500.00
29 Nok / bubung genteng beton bh 6,000.00
30 Paving Block K.175 Segi Enam bh 1,500.00
31 Paving Block K.175 Persegi bh 2,000.00
32 Paving Block K.125 Segi Enam bh 1,250.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
33 Paving Block K.125 Persegi bh 1,600.00
34 Digital printing m2 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 14,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 7,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 4,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 57,000.00
6 Kayu dolken O 12 - 15 /4 m btg 60,000.00
7 Kayu dolken O 5 /3 m btg 35,000.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 5,000,000.00
15 Kayu jati Jabar m3 7,500,000.00
16 Kayu Balau m3 7,500,000.00
17 Kayu Borneo m3 4,500,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00

B. UPAH
1 Mandor /hari 70,000.00
2 Kepala tukang /hari 65,000.00
3 Tukang kayu / besi /hari 60,000.00
4 Tukang batu /hari 60,000.00
5 Pembantu tukang /hari 50,000.00
6 Operator terlatih /hari 60,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Buruh lapangan terlatih /hari 55,000.00
12 Buruh lapangan kurang terlatih /hari 50,000.00
13 Buruh lapangan tak terlatih / pekerja /hari 50,000.00

DINAS BINA MARGA DINAS PENGELOLAAN SUMBER DAYA AIR


KABUPATEN CIREBON DINAS CIPTA KARYA DAN TATA RUANG DAN PERTAMBANGAN KAB.CIREBON
KABUPATEN CIREBON Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik
Jalan dan Jembatan Kepala Seksi Bangunan Gedung

SUPARMAN,S.Sos, ST Ir. DAWUD


NIP. 19721230 199901 1 001 NIP. 19640525 199303 1 007
YEDI ADHI PRIATNA, BAE, S.Sos
NIP. 19660815 199803 1 004
Kepala Bidang Bina Teknik Kepala Bidang Bina Teknik
Kepala Bidang Bangunan Gedung, Perumahan dan
Permukiman

RACHMAT S, BE AGUNG GUMILANG, SS., M.si


NIP. 19571008 198709 1 001 Ir. FELLYANTO TAMZIL, MM NIP. 19711224 199803 1 004
NIP. 19620428 199003 1 006
Kepala Dinas Bina Marga Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon dan Pertambangan Kabupaten Cirebon
Kepala Dinas Cipta Karya dan Tata Ruang
Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT DEDI NURUL SUDJUDI A


NIP. 19640827 199303 1 006 NIP. 19590721 198303 1 009
Ir. H. ARIEF BUDI PRAYITNO
NIP. 19620428 199003 1 006
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014

NO URAIAN BAHAN/MATERIAL SAT. HARGA KET


KESEPAKATAN
A. BAHAN :
I. BATU
1 Abu Batu m3 172,500.00
2 Agregat kasar m3 203,000.00
3 Agregat halus m3 203,000.00
4 Atras ( tanah urug ) m3 125,000.00
5 Base course A m3 175,000.00
6 Base course B m3 165,800.00
7 Batu apung kg 4,300.00
8 Batu belah 10/15 cm m3 153,000.00
9 Batu belah 15/20 cm m3 153,000.00
10 Batu pecah mesin 0.5-1 cm m3 180,000.00
11 Batu pecah mesin 1-2 cm m3 180,000.00
12 Batu pecah mesin 2-3 cm m3 190,000.00
13 Batu tempel Palimanan 10 X 20 bh 1,500.00
14 Batu tempel kapur tekstur tidak rata bh 2,000.00
15 Chipping m3 203,000.00
16 Filler kg 90.00
17 Kapur bakar m3 70,000.00
18 Kapur Sirih kg 2,000.00
19 Kerikil m3 65,000.00

II. PASIR
1 Pasir beton m3 178,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 145,000.00
4 Pasir urug m3 140,000.00
5 Sirtu m3 140,000.00
6 Sirtu tersaring m3 145,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 12,500.00
2 Besi strip kg 12,500.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 14,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 500,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 65,000.00
29 Pipa PVC / paralon 3 inch btg 90,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 6,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
31 Pipa Knee/bend PVC Ø 3" bh 6,000.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,000.00
34 Socket besi O 3 " bh 45,000.00
35 Toren Penguin 250 lt bh 525,000.00
36 Toren 500 lt bh 860,000.00
37 Toren 1000 lt bh 1,450,000.00

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00
2 Alumunium pelapis pintu KM Tebal 0.2 lbr 35,000.00
3 Alumunium pelapis pintu KM Tebal 0.3 lbr 50,000.00
4 Alumunium pelapis pintu KM Tebal 0.4 lbr 70,000.00
5 Asbes gelombang 1500 x 1050 x 4 mm lbr 42,500.00
6 Asbes gelombang 1800 x 920 x 4 mm lbr 32,000.00
7 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00
8 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00
9 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00
10 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00
11 Ampelas lbr 3,000.00
12 Bak mandi keramik volume 0,3 m3 bh 185,000.00
13 Bak mandi fiber 120 L bh 220,000.00
14 Batu apung kg 4,300.00
15 Baut 3/4 " bh 8,500.00
16 Baut 5/8 " bh 3,800.00
17 Baut 1/2 " bh 6,000.00
18 Baut 1/2 " panjang 30 cm bh 8,550.00
19 Beading penurunan ( PC ) gypsum m' 10,000.00
20 Beading horison gypsum m' 10,000.00
21 Cat Menie kg 20,000.00
22 Cat genteng Matex kg 48,000.00
23 Cat genteng maxilite kg 50,000.00
24 Cat penutup kayu Bee brand kg 49,000.00
25 Cat penutup kayu Vim kg 25,000.00
26 Cat penutup kayu Ftalit kg 46,000.00
27 Cat penutup kayu Avian kg 48,000.00
28 Cat penutup tembok Vinilex kg 23,000.00
29 Cat penutup tembok Metrolit kg 23,000.00
30 Cat penutup tembok catylac kg 18,600.00
31 Cat penutup tembok Q Luc kg 10,000.00
32 Cat penutup tembok Property kg 9,500.00
33 Cat penutup besi kg 45,000.00
34 Cat Sinkromat kg 80,000.00
35 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00
36 Closet duduk ( siram ) porselen merk INA bh 545,000.00
37 Closet jongkok porselen merk INA/KIA bh 140,000.00
38 Closet jongkok porselen merk Avena bh 100,000.00
39 Dempul kayu kg 18,500.00
40 Dinding keramik uk. 10 x 20 cm bh 1,000.00
41 Dinding keramik uk. 20 x 20 cm bh 2,000.00
42 Dinding keramik uk. 20 x 25 cm bh 2,200.00
43 Dinding keramik uk. 30 x 30 cm bh 4,500.00
44 Door closer bh 160,000.00
45 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00
46 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00
47 Daun jendela alumunium lengkap warna natural/coklat dop bh 350,000.00
48 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00
49 Elastomer 30x30x5 bh 550,000.00
50 Engsel jendela set 12,000.00
51 Engsel pintu set 19,000.00
52 Engsel meubeler bh 3,800.00
53 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,900.00
54 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,450.00
55 Flincote ltr 22,000.00
56 Loster Jati bh 25,000.00
57 Glass beat kg 20,000.00
58 Glass Block bh 17,500.00
59 Gas elpiji kg 8,800.00
60 Grendel pintu / jendela bh 5,500.00
61 Gypsum board lbr 52,500.00
62 GRC tebal 4 mm lbr 52,500.00
63 Fiber Gelombang 180 x80 lbr 40,000.00
64 Kaca nako tebal 5 mm berikut teralis bh 11,400.00
65 Kaca polos tebal 3 mm m2 63,250.00
66 Kaca polos tebal 5 mm m2 75,000.00
67 Kaca polos tebal 5 mm ryben m2 80,000.00
68 Kait angin bh 7,500.00
69 Kran air Onda bh 12,000.00
70 Kunci gembok bh 20,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
71 Kunci pintu ukuran besar bh 125,000.00
72 Kunci pintu ukuran sedang bh 85,000.00
73 Kunci dan daun pintu dari fiber bh 350,000.00
74 Kusen Alumunium 3" warna natural m' 60,000.00
75 Kusen Alumunium 3" warna coklat dop m' 65,000.00
76 Kusen Alumunium 3" warna coklat kilap m' 70,000.00
77 Kusen Alumunium 4" warna natural m' 65,000.00
78 Kusen Alumunium 4" warna coklat dop m' 70,000.00
79 Kusen Alumunium 4" warna coklat kilap m' 75,000.00
80 Kusen Alumunium 3" YKK m' 100,000.00
81 Kusen Alumunium 4" YKK m' 1,300,000.00
82 Langko - langko kuda - kuda bh 18,000.00
83 Lantai granit 60 x 60 cm ex. Granito corak bh 57,600.00
84 Lantai granit 60 x 60 cm ex. Granito polos bh 84,600.00
85 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00
86 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00
87 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00
88 Lantai keramik uk. 10 x 20 cm bh 1,000.00
89 Lantai keramik uk. 20 x 20 cm bh 2,000.00
90 Lantai keramik uk. 30 x 30 cm bh 2,200.00
91 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 4,500.00
92 Lantai terakota 20 x 5 cm bh 4,400.00
93 Lem kayu ltr 30,000.00
94 Lemkra/zat addictive kg 15,000.00
95 Lemkra Just Do It kg 4,500.00
96 Lemkra FS Nat kg 15,850.00
97 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00
98 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00
99 List keliling gypsum lebar 7 cm m' 14,000.00
100 List keliling gypsum lebar 10 cm m' 16,000.00
101 List keliling gypsum lebar 12 cm m' 18,000.00
102 List drop m' 8,900.00
103 Melamin / folywood lbr 88,500.00
104 Mozaik uk. 20 x 20 cm bh 1,900.00
105 Multiplex tebal 12 mm lbr 175,000.00
106 Multiplex tebal 15 mm lbr 275,000.00
107 Paku biasa 1/2" - 1" kg 16,000.00
108 Paku biasa 2" - 5" kg 13,000.00
109 Paku pancing 60 x 230 bh 825.00
110 Paku sekrup 3" - 5 " bh 400.00
111 Paku ulir bh 150.00
112 Plamir kayu / kualitas 1 kg 18,500.00
113 Plamir tembok kg 20,000.00
114 Plester Mutiara kg 8,000.00
115 Pintu kamer mandi fiber polos Daimaru bh 175,000.00
116 Pintu kamer mandi fiber Kaca Daimaru bh 245,000.00
117 Pintu kamer mandi Almunium Kettler bh 700,000.00
118 Polycarbonate m2 115,000.00
119 Plywood lbr 92,250.00
120 Portland Cement ( PC ) tiga roda zak 63,000.00
121 Portland Cement ( PC ) holcim zak 62,500.00
122 Portland Cement ( PC ) gresik zak 61,000.00
123 Rubber joint 25x10x5 bh 175,000.00
124 Roster / batu kerawang bh 4,000.00
125 Semen portland kg 1,260.00
126 Semen warna kg 6,000.00
127 Seng BJLS 30 L. 90 cm m2 38,000.00
128 Seng gelombang 3' - 6 " BJLS 30 lbr 42,000.00
129 Sirlak kg 19,500.00
130 Spirtus ltr 9,000.00
131 Skim Coat kg 4,400.00
132 Taekwood 4 mm 1200 x 2400 mm lbr 80,000.00
133 Taekwood 4 mm 900 x 2400 mm lbr 65,000.00
134 Ter kayu kg 14,500.00
135 Thermoplastic Glass beat kg 23,000.00
136 Tiner / minyak cat ltr 6,000.00
137 Triplek 3 mm lbr 45,000.00
138 Triplek 4 mm lbr 55,000.00
139 Triplek 6 mm lbr 75,000.00
140 Triplek 9 mm lbr 102,500.00
141 Triplek 12 mm lbr 200,000.00
142 Tempat cuci piring Beleza bh 400,000.00
143 Tempat cuci piring Benoti bh 175,000.00
144 Tempat cuci piring Royal bh 160,000.00
145 TG 302 kg 43,600.00
146 Washtafel bh 686,000.00
147 Woodplank corak 4 m lbr 60,000.00
148 Woodplank polos 2 m lbr 32,500.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
149 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00
150 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00
151 Ubin wafel ukuran 20 x 20 cm bh 2,000.00
152 Ubin warna 20 x 20 cm bh 2,300.00
153 Ubin warna 30 x 30 cm bh 2,900.00
154 Washtafel bh 686,000.00
155 Woodplank corak 4 m lbr 60,000.00
156 Woodplank polos 2 m lbr 32,500.00
157 Zincalume m2 75,000.00
158 Rangka plafon memakai Hollow dengan penutup GRC tebal 4 mm + pengec m2 88,200.00
159 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 165,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 210,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 155,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 162,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 160,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 180,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00

160 Pintu Air Sorong


- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa roda gigi ) Unit 8,497,000.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa roda gigi ) Unit 9,639,000.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa roda gigi ) Unit 13,500,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda gigi ) Unit 11,414,000.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda gigi ) Unit 25,366,000.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda gigi ) Unit 38,049,000.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda gigi ) Unit 50,732,000.00
161 Gigi Payung / Jantung Besar bh 1,250,000.00
162 Gigi Payung / Jantung Sedang bh 1,100,000.00
163 Gigi Piring Besar bh 2,930,000.00
164 Gigi Piring Sedang bh 1,903,000.00
165 Blok Laher bh 1,750,000.00
166 Bron mur drat 5 " bh 3,250,000.00
167 Bron mur drat 3 " bh 2,150,000.00
168 Drat stang 2" x 100 bh 2,500,000.00
169 Drat stang 3/4" x 100 bh 1,750,000.00
170 Drat stang 1,5" x 100 bh 1,550,000.00
171 Dudukan as horisontal bh 1,850,000.00
172 As Horisontal bh 1,850,000.00
173 Karet sel 8 x 3 cm bh 1,500,000.00
174 As Pemutar bh 750,000.00
175 Laher/Bearing bh 350,000.00
176 Engkel Kemudi Sedang bh 450,000.00
177 Daun Pintu B.50, H.50 bh 1,000,000.00
178 Pintu Klep B=0,5 m unit 1,750,000.00
179 Pintu Klep B=1,0 m unit 3,000,000.00
180 Pintu Klep B=1,5 m unit 4,500,000.00

V. ASPAL
1 Aspal kemasan kg 11,300.00
2 Aspal curah kg 11,100.00

VI. MINYAK
1 Premium liter 6,500.00
2 Premium (non subsidi) liter 9,600.00
3 Solar liter 6,500.00
4 Solar (non subsidi) liter 10,400.00
5 Minyak tanah liter 10,300.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VII.CETAKAN
1 Bata merah bh 650.00
2 Bata berongga bh 2,400.00
3 Batako bh 3,200.00
4 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00
9 Genteng morando bh 3,500.00
10 Genteng nok/bubung morando bh 4,000.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00
14 Genteng Type Viktoria bh 9,000.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
18 Genteng beton bh 5,000.00
19 Genteng metal 70 x 80 cm lbr 48,000.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 80,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
26 Gravel dia. 60 cm bh 40,000.00
27 Gravel dia. 40 cm bh 35,000.00
28 Gravel dia. 20 cm bh 25,000.00
29 Nok steel gelombang 1050 x 5 mm m' 29,000.00
30 Nok steel gelombang 920 x 5 mm m' 22,500.00
31 Nok / bubung genteng beton bh 6,000.00
32 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00
33 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00
34 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00
35 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00
36 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00
37 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00
38 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00
39 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00
40 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00
41 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00
42 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00
43 Digital printing m2 25,000.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00
7 Kayu dolken O 5 /3 m btg 12,500.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 6,000,000.00
15 Kayu jati Jabar m3 8,200,000.00
16 Kayu Balau m3 9,500,000.00
17 Kayu Borneo m3 5,000,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
B. UPAH
1 Mandor /hari 85,000.00
2 Kepala tukang /hari 75,000.00
3 Tukang kayu / besi /hari 70,000.00
4 Tukang batu /hari 70,000.00
5 Pembantu tukang /hari 55,000.00
6 Operator terlatih /hari 100,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Mekanik /hari 55,000.00
12 Pembantu mekanik /hari 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00

DINAS BINA MARGA DINAS CIPTA KARYA DAN TATA RUANG DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik Kepala Seksi Bangunan Gedung
Jalan dan Jembatan

SUPARMAN,S.Sos, ST YEDI ADHI PRIATNA, BAE, S.Sos Ir. DAWUD


NIP. 19721230 199901 1 001 NIP. 19660815 199803 1 004 NIP. 19640525 199303 1 007

Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Perumahan dan Kepala Bidang Bina Teknik
Permukiman

RACHMAT S, BE Ir. FELLYANTO TAMZIL, MM AGUNG GUMILANG, SS., M.si


NIP. 19571008 198709 1 001 NIP. 19620428 199003 1 006 NIP. 19711224 199803 1 004

Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Ruang Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Kabupaten Cirebon dan Pertambangan Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT Ir. H. ARIEF BUDI PRAYITNO DEDI NURUL SUDJUDI A
NIP. 19640827 199303 1 006 NIP. 19620428 199003 1 006 NIP. 19590721 198303 1 009
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
HARGA TERTINGGI TAHUN ANGGARAN 2015

kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
A. BAHAN :
I. BATU
1 Abu Batu m3 185,850.00 204,400.00
2 Atras ( tanah urug ) m3 125,000.00 137,500.00
3 Base course A m3
4 Base course B m3
5 Batu apung kg 4,300.00 4,700.00
6 Batu belah 10/15 cm m3 175,000.00 192,500.00
7 Batu belah 15/20 cm (Krakal) m3 175,000.00 192,500.00
8 Batu pecah mesin 0.5-1 cm m3 200,000.00 220,000.00
9 Batu pecah mesin 1-2 cm m3 200,000.00 220,000.00
10 Batu pecah mesin 2-3 cm m3 200,000.00 220,000.00
11 Batu pecah mesin 3-5 cm 182,000.00 200,200.00
12 Batu tempel Palimanan 10 X 20 bh 1,500.00 1,650.00
13 Batu tempel kapur tekstur tidak rata bh 2,000.00 2,200.00
14 Chipping m3 245,300.00 269,800.00
15 Filler kg 100.00 100.00
16 Kapur bakar m3 70,000.00 77,000.00
17 Kapur Sirih kg 2,000.00 2,200.00
18 Kerikil m3 65,000.00 71,500.00

II. PASIR
1 Pasir beton m3 179,000.00 196,900.00
2 Pasir aspal m3 175,000.00 192,500.00
3 Pasir pasang m3 162,000.00 178,200.00
4 Pasir urug m3 150,000.00 165,000.00
5 Sirtu m3 145,000.00 159,500.00
6 Sirtu tersaring m3 147,000.00 161,700.00
7 Tanah urug pilhan m3 125,000.00 137,500.00
8 Tanah urug biasa m3 100,000.00 110,000.00
Tanah merah m3 112,500.00 123,750.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 13,750.00 15,125.00
2 Besi strip kg 13,750.00 15,125.00
3 Besi beton kg 13,000.00 14,300.00
4 Besi stainless dia. 0,5" m' 38,000.00 41,800.00
5 Besi stainless dia. 1" m' 60,000.00 66,000.00
6 Besi stainless dia. 1,5" m' 75,000.00 82,500.00
7 Besi stainless dia. 2" m' 80,000.00 88,000.00
8 Besi stainless dia. 2,5" m' 125,000.00 137,500.00
9 Besi stainless dia. 3" m' 152,000.00 167,200.00
10 Besi galvanis dia. 0.5" m' 25,000.00 27,500.00
11 Besi galvanis dia. 1" m' 27,000.00 29,700.00
12 Besi galvanis dia. 1.5" m' 45,000.00 49,500.00
13 Besi galvanis dia. 2" m' 57,000.00 62,700.00
14 Besi galvanis dia. 2.5" m' 80,500.00 88,550.00
15 Besi galvanis dia. 3" m' 84,000.00 92,400.00
16 Besi biasa dia. 2" btg 250,000.00 275,000.00
17 Besi biasa dia. 3" btg 310,000.00 341,000.00
18 Dop besi Ø 3 " bh 60,000.00 66,000.00
19 Kawat beton / Kawat tali kg 18,000.00 19,800.00
20 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 388,080.00 426,888.00
21 Kawat bronjong dia. 4 mm kg 20,000.00 22,000.00
22 Kawat galvanis dia. 4 mm kg 20,000.00 22,000.00
23 Kawat galvanis dia. 6 mm kg 24,000.00 26,400.00
24 Kawat duri m' 14,000.00 15,400.00
25 Pipa besi galvanis 2" btg/6m' 324,000.00 356,400.00
26 Pipa besi galvanis 3" btg/6m' 500,000.00 550,000.00
27 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00 28,900.00
28 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00 58,900.00
29 Pipa PVC / paralon 2 inch btg 69,000.00 75,900.00
30 Pipa PVC / paralon 3 inch btg 90,000.00 99,000.00
31 Pipa Reducer PVC Ø 3"-4" bh 6,000.00 6,600.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
32 Pipa Knee/bend PVC Ø 3" bh 6,000.00 6,600.00
33 Plat baja tebal 5 mm - 20 mm kg 13,000.00 14,300.00
34 Ram kawat harmonika m2 25,000.00 27,500.00
35 Socket besi O 3 " bh 45,000.00 49,500.00
36 Toren Penguin 250 lt bh 525,000.00 577,500.00
37 Toren 500 lt bh 860,000.00 946,000.00
38 Toren 1000 lt bh 1,450,000.00 1,595,000.00
39 Sling Ø 32 mm m 300,000.00 330,000.00
40 Sling Ø 16 mm m 175,000.00 192,500.00
41 Klem sling Ø 32 mm set 250,000.00 275,000.00
42 Warfel / jarum keras Ø 32 mm bh 200,000.00 220,000.00
43 Causen sling Ø 32 mm bh 85,000.00 93,500.00
44 Klem kokat sling Ø 32 mm bh 210,000.00 231,000.00
45 Segel sling Ø 32 mm bh 250,000.00 275,000.00
46 Warfel sling Ø 16 mm bh 135,000.00 148,500.00
47 Segel sling Ø 16 mm bh 140,000.00 154,000.00
48 Klem kokat sling Ø 16 mm bh 35,000.00 38,500.00
49 Causen sling Ø 16 mm bh 50,000.00 55,000.00
50 Jarum keras Ø 16 mm bh 75,000.00 82,500.00

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00 9,900.00
2 Alumunium pelapis pintu KM Tebal 0.2 lbr 35,000.00 38,500.00
3 Alumunium pelapis pintu KM Tebal 0.3 lbr 50,000.00 55,000.00
4 Alumunium pelapis pintu KM Tebal 0.4 lbr 70,000.00 77,000.00
5 Asbes gelombang 1500 x 1050 x 4 mm lbr 42,500.00 46,750.00
6 Asbes gelombang 1800 x 920 x 4 mm lbr 32,000.00 35,200.00
7 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00 62,700.00
8 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00 71,500.00
9 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00 82,500.00
10 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00 93,500.00
11 Ampelas lbr 3,000.00 3,300.00
12 Bak mandi keramik volume 0,3 m3 bh 185,000.00 203,500.00
13 Bak mandi fiber 120 L bh 220,000.00 242,000.00
14 Batu apung kg 4,300.00 4,700.00
15 Baut 3/4 " bh 6,700.00 7,300.00
16 Baut 5/8 " bh 6,700.00 7,300.00
17 Baut 1/2 " bh 6,000.00 6,600.00
18 Baut 1/2 " panjang 30 cm bh 8,550.00 9,400.00
19 Baut lawa-lawa 12 cm 13,000.00 14,300.00
20 Beading penurunan ( PC ) gypsum m' 10,000.00 11,000.00
21 Beading horison gypsum m' 10,000.00 11,000.00
22 Cat Menie kg 25,000.00 27,500.00
23 Cat genteng Matex kg 48,000.00 52,800.00
24 Cat genteng maxilite kg 50,000.00 55,000.00
25 Cat penutup kayu Bee brand kg 49,000.00 53,900.00
26 Cat penutup kayu Vim kg 25,000.00 27,500.00
27 Cat penutup kayu Ftalit kg 46,000.00 50,600.00
28 Cat penutup kayu Avian kg 48,000.00 52,800.00
29 Cat penutup tembok Vinilex kg 25,000.00 27,500.00
30 Cat penutup tembok Metrolit kg 23,000.00 25,300.00
31 Cat penutup tembok catylac kg 18,600.00 20,400.00
32 Cat penutup tembok Q Luc kg 10,000.00 11,000.00
33 Cat penutup tembok Property kg 9,500.00 10,450.00
34 Cat penutup besi kg 52,000.00 57,200.00
35 Cat Sinkromat kg 90,000.00 99,000.00
36 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00 1,360,700.00
37 Closet duduk ( siram ) porselen merk INA bh 545,000.00 599,500.00
38 Closet jongkok porselen merk INA/KIA bh 140,000.00 154,000.00
39 Closet jongkok porselen merk Avena bh 100,000.00 110,000.00
40 Dempul kayu kg 18,500.00 20,350.00
41 Dinding keramik uk. 10 x 20 cm bh 1,000.00 1,100.00
42 Dinding keramik uk. 20 x 20 cm bh 2,000.00 2,200.00
43 Dinding keramik uk. 20 x 25 cm bh 2,200.00 2,400.00
44 Dinding keramik uk. 30 x 30 cm bh 4,500.00 4,950.00
45 Door closer bh 160,000.00 176,000.00
46 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00 990,000.00
47 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00 1,430,000.00
48 Daun jendela alumunium lengkap warna natural/coklat do bh 350,000.00 385,000.00
49 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00 440,000.00
50 Elastomer 30x30x5 bh 632,500.00 695,750.00
51 Engsel jendela set 12,000.00 13,200.00
52 Engsel pintu set 19,000.00 20,900.00
53 Engsel meubeler bh 3,800.00 4,200.00
54 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,900.00 7,600.00
55 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,450.00 3,800.00
56 Flincote ltr 22,000.00 24,200.00
57 Loster Jati bh 25,000.00 27,500.00
58 Glass beat kg 25,000.00 27,500.00
59 Glass Block bh 17,500.00 19,250.00
60 Gas elpiji kg 8,800.00 9,700.00
61 Grendel pintu / jendela bh 5,500.00 6,000.00
62 Gypsum board lbr 52,500.00 57,750.00
63 GRC tebal 4 mm lbr 52,500.00 57,750.00
64 Fiber Gelombang 180 x80 lbr 40,000.00 44,000.00
65 Kaca nako tebal 5 mm berikut teralis bh 11,400.00 12,500.00
66 Kaca polos tebal 3 mm m2 63,250.00 69,575.00
67 Kaca polos tebal 5 mm m2 75,000.00 82,500.00
68 Kaca polos tebal 5 mm ryben m2 80,000.00 88,000.00
69 Kait angin bh 7,500.00 8,250.00
70 Kran air Onda bh 12,000.00 13,200.00
71 Kunci gembok bh 20,000.00 22,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
72 Kunci pintu ukuran besar bh 125,000.00 137,500.00
73 Kunci pintu ukuran sedang bh 85,000.00 93,500.00
74 Kunci dan daun pintu dari fiber bh 350,000.00 385,000.00
75 Kusen Alumunium 3" warna natural m' 60,000.00 66,000.00
76 Kusen Alumunium 3" warna coklat dop m' 65,000.00 71,500.00
77 Kusen Alumunium 3" warna coklat kilap m' 70,000.00 77,000.00
78 Kusen Alumunium 4" warna natural m' 65,000.00 71,500.00
79 Kusen Alumunium 4" warna coklat dop m' 70,000.00 77,000.00
80 Kusen Alumunium 4" warna coklat kilap m' 75,000.00 82,500.00
81 Kusen Alumunium 3" YKK m' 100,000.00 110,000.00
82 Kusen Alumunium 4" YKK m' 1,300,000.00 1,430,000.00
83 Langko - langko kuda - kuda bh 18,000.00 19,800.00
84 Lantai granit 60 x 60 cm ex. Granito corak bh 57,600.00 63,400.00
85 Lantai granit 60 x 60 cm ex. Granito polos bh 84,600.00 93,000.00
86 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00 47,850.00
87 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00 46,200.00
88 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00 51,500.00
89 Lantai keramik uk. 10 x 20 cm bh 1,000.00 1,100.00
90 Lantai keramik uk. 20 x 20 cm bh 2,000.00 2,200.00
91 Lantai keramik uk. 30 x 30 cm bh 2,200.00 2,400.00
92 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 4,500.00 4,950.00
93 Lantai terakota 20 x 5 cm bh 4,400.00 4,800.00
94 Lem kayu ltr 30,000.00 33,000.00
95 Lemkra/zat addictive kg 15,000.00 16,500.00
96 Lemkra Just Do It kg 4,500.00 4,950.00
97 Lemkra FS Nat kg 15,850.00 17,400.00
98 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00 4,800.00
99 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00 5,300.00
100 List keliling gypsum lebar 7 cm m' 14,000.00 15,400.00
101 List keliling gypsum lebar 10 cm m' 16,000.00 17,600.00
102 List keliling gypsum lebar 12 cm m' 18,000.00 19,800.00
103 List drop m' 8,900.00 9,800.00
104 Melamin / folywood lbr 88,500.00 97,350.00
105 Mozaik uk. 20 x 20 cm bh 1,900.00 2,100.00
106 Multiplex tebal 12 mm lbr 175,000.00 192,500.00
107 Multiplex tebal 15 mm lbr 275,000.00 302,500.00
108 Paku biasa 1/2" - 1" kg 18,500.00 20,350.00
109 Paku biasa 2" - 5" kg 20,000.00 22,000.00
110 Paku pancing 60 x 230 bh 825.00 900.00
111 Paku sekrup 3" - 5 " bh 400.00 450.00
112 Paku ulir bh 150.00 200.00
113 Plamir kayu / kualitas 1 kg 20,000.00 22,000.00
114 Plamir tembok kg 23,000.00 25,300.00
115 Plester Mutiara kg 8,000.00 8,800.00
116 Pintu kamer mandi fiber polos Daimaru bh 175,000.00 192,500.00
117 Pintu kamer mandi fiber Kaca Daimaru bh 245,000.00 269,500.00
118 Pintu kamer mandi Almunium Kettler bh 700,000.00 770,000.00
119 Polycarbonate m2 115,000.00 126,500.00
120 Plywood lbr 92,250.00 101,475.00
121 Portland Cement ( PC ) tiga roda zak 68,000.00 68,000.00
122 Portland Cement ( PC ) holcim zak 67,000.00 67,000.00
123 Portland Cement ( PC ) gresik zak 66,000.00 66,000.00
124 Rubber joint 25x10x5 bh 192,500.00 211,750.00
125 Joint Sealent kg 42,900.00 47,200.00
126 Expansion Cap m2 7,600.00 8,400.00
127 Polytene 125 mikron kg 27,500.00 30,250.00
128 Curing Compound Ltr 4,400.00 4,850.00
129 Roster / batu kerawang bh 4,000.00 4,400.00
130 Semen portland kg 1,360.00 1,360.00
131 Semen warna kg 6,000.00 6,000.00
132 Seng BJLS 30 L. 90 cm m2 38,000.00 41,800.00
133 Seng gelombang 3' - 6 " BJLS 30 lbr 51,000.00 56,100.00
134 Sirlak kg 19,500.00 21,450.00
135 Spirtus ltr 9,000.00 9,900.00
136 Skim Coat kg 4,400.00 4,850.00
137 Taekwood 4 mm 1200 x 2400 mm lbr 80,000.00 88,000.00
138 Taekwood 4 mm 900 x 2400 mm lbr 65,000.00 71,500.00
139 Ter kayu kg 14,500.00 15,950.00
140 Thermoplastic Glass beat kg 25,000.00 27,500.00
141 Tiner / minyak cat ltr 11,500.00 12,650.00
142 Triplek 3 mm lbr 52,000.00 57,200.00
143 Triplek 4 mm lbr 55,000.00 60,500.00
144 Triplek 6 mm lbr 83,000.00 91,300.00
145 Triplek 9 mm lbr 102,500.00 112,750.00
146 Triplek 12 mm lbr 200,000.00 220,000.00
147 Tempat cuci piring Beleza bh 400,000.00 440,000.00
148 Tempat cuci piring Benoti bh 175,000.00 192,500.00
149 Tempat cuci piring Royal bh 160,000.00 176,000.00
150 TG 302 kg 43,600.00 47,950.00
151 Washtafel bh 686,000.00 754,600.00
152 Woodplank corak 4 m lbr 60,000.00 66,000.00
153 Woodplank polos 2 m lbr 32,500.00 35,750.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
154 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00 2,200.00
155 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00 2,750.00
156 Ubin wafel ukuran 20 x 20 cm bh 2,000.00 2,200.00
157 Ubin warna 20 x 20 cm bh 2,300.00 2,550.00
158 Ubin warna 30 x 30 cm bh 2,900.00 3,200.00
159 Washtafel bh 686,000.00 754,600.00
160 Woodplank corak 4 m lbr 60,000.00 66,000.00
161 Woodplank polos 2 m lbr 32,500.00 35,750.00
162 Zincalume m2 75,000.00 82,500.00
163 Rangka plafon memakai Hollow dengan penutup GRC teb m2 88,200.00 97,000.00
164 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumuni m2 165,000.00 181,500.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumuni m2 175,000.00 192,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumuniu m2 185,000.00 203,500.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumu m2 175,000.00 192,500.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alum m2 190,000.00 209,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumun m2 200,000.00 220,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumun m2 190,000.00 209,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumun m2 200,000.00 220,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumuni m2 210,000.00 231,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumuni m2 155,000.00 170,500.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumuni m2 162,500.00 178,750.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumuniu m2 170,000.00 187,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumu m2 160,000.00 176,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alum m2 175,000.00 192,500.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumun m2 185,000.00 203,500.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumun m2 170,000.00 187,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumun m2 180,000.00 198,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumuni m2 190,000.00 209,000.00

165 Pintu Air Sorong


- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa Unit 8,497,000.00 9,346,700.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa Unit 9,639,000.00 10,602,900.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa Unit 13,500,000.00 14,850,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda Unit 11,414,000.00 12,555,400.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda Unit 25,366,000.00 27,902,600.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda Unit 38,049,000.00 41,853,900.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda Unit 50,732,000.00 55,805,200.00
166 Gigi Payung / Jantung Besar bh 1,250,000.00 1,375,000.00
167 Gigi Payung / Jantung Sedang bh 1,100,000.00 1,210,000.00
168 Gigi Piring Besar bh 2,930,000.00 3,223,000.00
169 Gigi Piring Sedang bh 1,903,000.00 2,093,300.00
170 Blok Laher bh 1,750,000.00 1,925,000.00
171 Bron mur drat 5 " bh 3,250,000.00 3,575,000.00
172 Bron mur drat 3 " bh 2,150,000.00 2,365,000.00
173 Drat stang 2" x 100 bh 2,500,000.00 2,750,000.00
174 Drat stang 3/4" x 100 bh 1,750,000.00 1,925,000.00
175 Drat stang 1,5" x 100 bh 1,550,000.00 1,705,000.00
176 Dudukan as horisontal bh 1,850,000.00 2,035,000.00
177 As Horisontal bh 1,850,000.00 2,035,000.00
178 Karet sel 8 x 3 cm bh 1,500,000.00 1,650,000.00
179 As Pemutar bh 750,000.00 825,000.00
180 Laher/Bearing bh 350,000.00 385,000.00
181 Engkel Kemudi Sedang bh 450,000.00 495,000.00
182 Daun Pintu B.50, H.50 bh 1,000,000.00 1,100,000.00
183 Pintu Klep B=0,5 m unit 1,750,000.00 1,925,000.00
184 Pintu Klep B=1,0 m unit 3,000,000.00 3,300,000.00
185 Pintu Klep B=1,5 m unit 4,500,000.00 4,950,000.00

V. ASPAL
1 Aspal kemasan kg 12,100.00 12,100.00
2 Aspal curah kg 11,600.00 11,600.00
3 Aspal Emulsi ltr 10,500.00 10,500.00

VI. MINYAK
1 Premium liter 6,500.00 6,500.00
2 Premium (non subsidi) liter 11,400.00 11,400.00
3 Solar liter 5,500.00 5,500.00
4 Solar (non subsidi) liter 11,900.00 11,900.00
5 Minyak tanah liter 12,500.00 12,500.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 42,000.00 42,000.00
7 Pelumas bekisting liter 10,000.00 10,000.00
8 Stempet kg 25,000.00 25,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
VII.CETAKAN
1 Bata merah bh 800.00 900.00
2 Bata berongga bh 2,400.00 2,650.00
3 Batako bh 3,200.00 3,500.00
4 Genteng glazuur turbo ex Jatiwangi bh 3,500.00 3,850.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,000.00 4,400.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,500.00 2,750.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00 2,200.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00 4,950.00
9 Genteng morando bh 3,500.00 3,850.00
10 Genteng nok/bubung morando bh 4,000.00 4,400.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00 2,750.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00 2,100.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00 1,550.00
14 Genteng Type Viktoria bh 9,000.00 9,900.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00 13,750.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00 22,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00 27,500.00
18 Genteng beton bh 5,000.00 5,500.00
19 Genteng metal 70 x 80 cm lbr 48,000.00 52,800.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 150,000.00 165,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 130,000.00 143,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 140,000.00 154,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 100,000.00 110,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 80,000.00 88,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 60,000.00 66,000.00
26 Kansten Cetak 82,500.00 90,750.00
27 Gravel dia. 60 cm bh 75,000.00 82,500.00
28 Gravel dia. 40 cm bh 45,000.00 49,500.00
29 Gravel dia. 20 cm bh 35,000.00 38,500.00
30 Nok steel gelombang 1050 x 5 mm m' 29,000.00 31,900.00
31 Nok steel gelombang 920 x 5 mm m' 22,500.00 24,750.00
32 Nok / bubung genteng beton bh 6,000.00 6,600.00
33 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00 68,200.00
34 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00 70,400.00
35 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00 75,900.00
36 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00 60,500.00
37 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00 63,800.00
38 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00 70,400.00
39 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00 55,000.00
40 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00 58,300.00
41 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00 62,700.00
42 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00 47,300.00
43 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00 51,700.00
44 Tiang pancang beton Pratekan m3 4,600,000.00 5,060,000.00
45 Digital printing m2 25,000.00 27,500.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00 18,700.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 9,800,000.00 10,780,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00 10,450,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00 5,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00 66,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00 74,800.00
7 Kayu dolken O 5 /3 m btg 12,500.00 13,750.00
8 Kayu hutan/kayu perancah acuan m3 4,700,000.00 5,170,000.00
9 Kayu kamper m3 8,200,000.00 9,020,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00 6,600,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00 86,900.00
12 Kayu kruing m3 7,274,000.00 8,001,400.00
13 Kayu lanan m3 6,546,000.00 7,200,600.00
14 Kayu meranti m3 6,000,000.00 6,600,000.00
15 Kayu jati Jabar m3 8,200,000.00 9,020,000.00
16 Kayu Balau m3 9,500,000.00 10,450,000.00
17 Kayu Borneo m3 5,000,000.00 5,500,000.00
18 Kayu bakar m3 90,000.00 99,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00 59,400.00
20 Tali Ijuk kg 9,000.00 9,900.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
B. UPAH
1 Mandor /hari 85,000.00 85,000.00
2 Kepala tukang /hari 75,000.00 75,000.00
3 Tukang kayu / besi /hari 70,000.00 70,000.00
4 Tukang batu /hari 70,000.00 70,000.00
5 Pembantu tukang /hari 55,000.00 55,000.00
6 Operator terlatih /hari 100,000.00 100,000.00
7 Operator kurang terlatih /hari 55,000.00 55,000.00
8 Pembantu operator /hari 50,000.00 50,000.00
9 Supir truk /hari 55,000.00 55,000.00
10 Pembantu supir /hari 50,000.00 50,000.00
11 Mekanik /hari 55,000.00 55,000.00
12 Pembantu mekanik /hari 50,000.00 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00 55,000.00

DINAS CIPTA KARYA DAN TATA


RUANG
DINAS BINA MARGA DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON
KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Bangunan Gedung Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik
Jalan dan Jembatan

YEDI ADHI PRIATNA, BAE,


SUPARMAN,S.Sos, ST Ir. DAWUD
S.Sos
NIP. 19721230 199901 1 001 NIP. 19640525 199303 1 007
NIP. 19660815 199803 1 004
Kepala Bidang Bina Teknik Kepala Bidang Bina Teknik
Kepala Bidang Bangunan Gedung,
Perumahan dan Permukiman

Ir. TETI MEIRAWATI AGUNG GUMILANG, SS., M.si


Ir. FELLYANTO TAMZIL, MM
NIP. 19670502 199703 2 004 NIP. 19711224 199803 1 004
NIP. 19620428 199003 1 006
Kepala Dinas Bina Marga Kepala Dinas Pengelolaan Sumber Daya Air
Kepala Dinas Cipta Karya dan Tata
Kabupaten Cirebon dan Pertambangan Kabupaten Cirebon
Ruang
Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT DEDI NURUL SUDJUDI A


NIP. 19640827 199303 1 006 NIP. 19590721 198303 1 009
Ir. H. ARIEF BUDI PRAYITNO
NIP. 19620428 199003 1 006
HARGA PERKIRAAN SENDIRI (HPS)
RENCANA BIAYA : PEMBANGUNAN / REHABILITASI
TAHUN : 2017
DESA :
KECAMATAN :
KABUPATEN : C I R E B O N

HARGA
JUMLAH
NO JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp Rp
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 (K3) Pembuatan 1 m2 gudang semen dan peralatan A. 2.2.1.7. m2 -
2 Pengukuran dan pemasangan 1 m’ Bouwplank A. 2.2.1.4. m' -
3 (K3) Pembuatan 1 m2 steger/perancah dari bambu A. 2.2.1.10. m2 -
4 Papan nama proyek abk.100.03 bh -
-

II PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang A. 2.2.1.13. m3 -
2 Pembongkaran 1 m3 dinding tembok bata A. 2.2.1.14. m3 -
-

III PEKERJAAN GALIAN/URUGAN


1 Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1. m3 -
2 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9. m3 -
3 (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) A.2.3.1.10. m3 -
4 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
-

IV PEKERJAAN PONDASI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
2 (K3) Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9. m3 -
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP A.3.2.1.3 m3 -
-

V PEKERJAAN BETON/PEMBESIAN
1 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17 kg -
2 (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 m2 -
3 (K3) Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21 m2 -
4 (K3) Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22 m2 -
5 (K3) Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 m2 -
6 (K3) Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24 m2 -
7 (K3) Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25 m2 -
8 (K3) Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26 m2 -
Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K
9 A.4.1.1.1 m3
100), setara dengan beton rabat -
Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-
10 A.4.1.1.2 m3
125) -
Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K
11 A.4.1.1.3 m3
150) -
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump
12 A.4.1.1.4 m3
(3-6) cm, w/c = 0,87 -
Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20)
13 A.4.1.1.5. m3
mm (sama dengan K 175) -
Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K
14 A.4.1.1.6 m3
220) -
Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K
15 A.4.1.1.7. m3
225) -
Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K
16 A.4.1.1.8. m3
250) -
Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K
17 A.4.1.1.9. m3
325) -
Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K
18 A.4.1.1.10. m3
350) -
Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K
19 A.4.1.1.11. m3
375) -
Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20)
20 A.4.1.1.12. m3
mm (sama dengan K 425) -
21 Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13 m3 -
22 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35 m' -
23 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36 m' -
-

VI PEKERJAAN PASANGAN DINDING BATA


Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1
1 A. 4.4.1.4. m2
batu campuran 1SP : 5PP -
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½
2 A. 4.4.1.10 m2
batu campuran 1SP :5PP -
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½
3 A. 4.4.1.15 m2
batu campuran 1SM : 1KP :2PP -
4 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm A.4.4.2.5. m2 -
5 Pemasangan 1 m2 acian A.4.4.2.27. m2 -

6 Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm A.4.4.2.21. m2


-
7 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP A.4.4.2.23. m2 -

8 Pemasangan 1 m2 finishing siar pasangan conblock ekspose A.4.4.2.25. m2


-
Pemasangan 1 m2 finishing siar pasangan batu kali,
9 A.4.4.2.26. m2
campuran 1SP : 2PP -
10 Pemasangan 1 m2 dinding keramik 25 cm x 40 cm A.4.4.3.54. m2 -
-
-
VII PEKERJAAN KUSEN,PINTU DAN JENDELA
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen
1 A.4.6.1.1. m3
jendela, kayu kelas I -
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen
2 A.4.6.1.2. m3
jendela, kayu kelas II atau III -
Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca,
3 A.4.6.1.6. m2
kayu kelas I atau II -
Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi
4 A.4.6.1.7. m2
kayu kelas I atau II -
Pemasangan 1 m2 teakwood rangkap, rangka expose kayu
5 A.4.6.1.11. m2
kelas I -
Pemasangan 1 m2 teakwood rangkap lapis formika, rangka
6 A.4.6.1.12. m2
expose kayu kelas II -
7 Pemasangan 1 m kusen pintu alluminium A.4.2.1.11. m' -
8 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm A.4.2.1.12. m2 -
Pemasangan 1 m2 langit-langit gypsum board ukuran
9 A.4.5.1.7. m2
(120x240x9) mm, tebal 9 mm -
10 Pemasangan 1 m’ list langit-langit kayu profil A.4.5.1.9. m' -
11 Pemasangan 1 m2 kaca tebal 3 mm A.4.6.2.16. m2 -
12 Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17. m2 -
13 Pemasangan 1 m2 kaca tebal 8 mm A.4.6.2.18. m2 -
14 Pemasangan 1 m2 kaca buram tebal 12 mm A.4.6.2.19. m2 -
15 Pemasangan 1 m2 kaca cermin tebal 5 mm A.4.6.2.20. m2 -
-

VIII PEKERJAAN KUDA-KUDA / ATAP


- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium
1 - m2
G.550 -
Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas
2 A.4.6.1.16. m2
II -

3 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A.4.6.1.17. m2


-
4 Pemasangan 1 m2 rangka atap sirap, kayu kelas II A.4.6.1.18. m2 -
Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu
5 A.4.6.1.19. m2
kelas II atau III -
Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu
6 A.4.6.1.20. m2
kelas II atau III -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I
7 A.4.6.1.21. m'
atau kelas II -
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I
8 A.4.6.1.22. m'
atau kelas II -
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm
9 A.4.6.1.23. m2
kayu kelas II atau III -
Pemasangan 1 m2 dinding lambrisering dari papan kayu
10 A.4.6.1.26. m2
kelas I -
11 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 -
12 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3. m2 -
13 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m' -
14 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m' -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I
15 A.4.6.1.21. m'
atau kelas II -
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I
16 A.4.6.1.22. m'
atau kelas II -
Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x
17 A.4.5.2.8. m2
5 mm -
18 Pemasangan 1 m’ bubung stel gelombang 0,92 m A.4.5.2.22. m' -
19 Pemasangan 1 m’ nok paten 0,92 m A.4.5.2.22. m' -
-

IX PEKERJAAN LANTAI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -

Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x


2 A.4.4.3.1. m2
40 cm
-

3 Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm A.4.4.3.4. m2


-

4 Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm A.4.4.3.9. m2


-
Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40
5 A.4.4.3.14. m2
cm x 40 cm -

6 Pemasangan 1 m2 lantai keramik ukuran 33 cm x 33 cm A.4.4.3.34. m2


-

7 Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm A.4.4.3.35. m2


-

8 Pemasangan 1m2 lantai keramik ukuran 25 cm x 25 cm A.4.4.3.36. m2


-
9 Pemasangan 1 m2 dinding keramik 25 cm x 40 cm A.4.4.3.54. m2 -
Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x
10 A.4.4.3.18. m'
40cm -

11 Pemasangan 1 m’ plint ubin warna ukuran 10 cm x 40 cm A.4.4.3.21. m'


-

12 Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 40 cm A.4.4.3.24. m'


-
13 Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm A.4.4.3.39. m' -
14 Pemasangan 1 m2 paving block natural tebal 6 cm A.4.4.3.64. m2 -
15 Pemasangan 1 m2 paving block berwarna tebal 6 cm A.4.4.3.66. m2 -
-

X PEKERJAAN BESI / LAIN-LAIN


1 Pemasangan 1 buah kunci tanam biasa A.4.6.2.2. bh -
2 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh -
3 Pemasangan 1 buah kait angin A.4.6.2.9. bh -
4 Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6. bh -
5 Pemasangan 1 buah door closer A.4.6.2.10. bh -
6 Pemasangan 1 buah kunci slot (grendel) A.4.6.2.11. bh -
7 (K3) Pemasangan 1 buah closet duduk/monoblock A.5.1.1.1. bh -
8 Pemasangan 1 buah closet jongkok porselen A.5.1.1 2. bh -
9 (K3) Pemasangan 1 buah urinoir A.5.1.1 4. bh -
10 (K3) Pemasangan 1 buah wastafel A.5.1.1 5. bh -
11 Pemasangan 1 buah bak cuci piring stainlessteel A.5.1.1 12. bh -
12 Pemasangan 1 buah floor drain A.5.1.1 14. bh -
Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi
13 A.5.1.1 15. bh
35 cm -
14 Pemasangan 1 m’ pipa galvanis diameter ½” A.5.1.1 18. m' -
15 Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” A.5.1.1 25. m' -
16 (K3) Pemasangan 1 buah titik lampu (Instalasi) A.8.4.6.1 bh -

17 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) A.8.4.6.1 bh


-
-

XI PEKERJAAN MENGECAT
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis
1 A.4.7.1.4. m2
cat dasar, 2 lapis cat penutup) -
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat
2 A.4.7.1.10. m2
dasar, 2 lapis cat penutup) -
3 Pengecatan 1 m2 permukaan baja dengan menie besi A.4.7.1.16. m2 -
Pengecatan 1 m2 permukaan baja galvanis secara manual 4
4 A.4.7.1.18. m2
lapis -
5 Plituran 10 m2 dengan plitur melamic A.4.7.1.22. m2 -
6 Pemasangan 1 m2 wallpaper A.4.7.1.15. m2 -
7 1 m2 Pengikisan/pengerokan permukaan cat lama A.4.7.1.1. m2 -
-
REKAPITULASI
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN BONGKARAN Rp -
III PEKERJAAN GALIAN/URUGAN Rp -
IV PEKERJAAN PONDASI Rp -
V PEKERJAAN BETON/PEMBESIAN Rp -
VI PEKERJAAN PASANGAN DINDING BATA Rp -
VII PEKERJAAN KUSEN,PINTU DAN JENDELA Rp -
VIII PEKERJAAN KUDA-KUDA / ATAP Rp -
IX PEKERJAAN LANTAI Rp -
X PEKERJAAN BESI / LAIN-LAIN Rp -
XI PEKERJAAN MENGECAT Rp -
JUMLAH -

PPN 10 % Rp -
JUMLAH TOTAL Rp -

DIBULATKAN Rp -

TERBILANG : ( ………………………………………….. )

Sumber, 2017

Kepala Dinas Perumahan, Kawasan Permukiman Dan


Pertanahan Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012
DAFTAR HARGA SATUAN BAHAN, UPAH DAN ALAT
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017

HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
A. BAHAN :

I. BATU
1 Abu Batu m3 195,000.00
2 Atras ( tanah urug ) m3 125,000.00
3 Batu apung kg 4,300.00
4 Batu belah 10/15 cm m3 175,000.00
5 Batu belah 15/20 cm (Krakal) m3 175,000.00
6 Batu pecah mesin 0.5-1 cm m3 250,000.00
7 Batu pecah mesin 1-2 cm m3 250,000.00
8 Batu pecah mesin 2-3 cm m3 250,000.00
9 Batu pecah mesin 3-5 cm m3 225,000.00
10 Batu tempel Palimanan 10 X 20 bh 1,550.00
11 Batu tempel kapur tekstur tidak rata bh 2,050.00
12 Chipping m3 245,300.00
13 Filler kg 400.00
14 Kapur bakar (padam) m3 70,000.00
15 Kapur Sirih kg 2,000.00
16 Kerikil Ø 1-3 cm m3 200,000.00

II. PASIR
1 Pasir beton m3 200,000.00
2 Pasir aspal m3 200,000.00
3 Pasir urug m3 150,000.00
4 Sirtu m3 150,000.00
5 Sirtu tersaring m3 160,000.00
6 Tanah urug pilhan m3 125,000.00
7 Tanah urug biasa m3 100,000.00
8 Tanah merah m3 112,500.00

III. PABRIKAN / TOKO


1 Portland Cement ( PC ) tiga roda zak 70,000.00
2 Portland Cement ( PC ) holcim zak 68,000.00
3 Portland Cement ( PC ) gresik zak 68,000.00
4 Rubber joint 25x10x5 bh 250,000.00
5 Joint Sealent kg 42,000.00

IV. ASPAL
1 Aspal kemasan kg 12,200.00
2 Aspal curah kg 12,000.00
3 Aspal Emulsi ltr 11,400.00

VI. MINYAK
1 Premium liter 6,550.00
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
2 Premium (non subsidi) liter 6,550.00
3 Solar liter 5,150.00
4 Solar (non subsidi) liter 6,150.00
5 Minyak tanah liter 10,225.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 42,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
BAHAN JALAN LINGKUNGAN
1 Pasir Beton (Kasar) M01a M3 200,000.00
2 Pasir Halus (untuk HRS) M01c M3 180,000.00
3 Agregat Kasar (5-40 mm) M03 M3 250,892.68
4 Agregat Halus (0-5 mm) M04 M3 250,892.68
5 Agregat Kasar (tertahan pada ayakan 4,75 mm) M3 250,892.68
6 Agregat Halus (lolos saringan 4,75 mm) M3 250,892.68
7 Filler M05 Kg 400.00
8 Bahan Tanah Timbunan M08 M3 125,000.00
9 Bahan Pilihan M09 M3 150,000.00
10 Aspal M10 KG 12,200.00
11 Kerosen / Minyak Tanah M11 LITER 10,225.00
12 Chipping M41 M3 245,000.00
13 Chipping (kg) M41kg Kg 129.99

B. UPAH
1 Mandor /hari 100,000.00 14,285.71
2 Kepala tukang /hari 95,000.00 13,571.43
3 Tukang kayu / besi /hari 90,000.00 12,857.14
4 Tukang batu /hari 90,000.00 12,857.14
5 Tukang Las /hari 100,000.00 14,285.71
6 Pembantu tukang/Pekerja /hari 70,000.00 10,000.00
7 Operator terlatih /hari 130,000.00 18,571.43
8 Operator kurang terlatih /hari 75,000.00 10,714.29
9 Pembantu operator /hari 70,000.00 10,000.00
10 Supir truk /hari 75,000.00 10,714.29
11 Pembantu supir /hari 70,000.00 10,000.00
12 Mekanik /hari 80,000.00 11,428.57
13 Pembantu mekanik /hari 70,000.00 10,000.00
14 Buruh lapangan terlatih /hari 90,000.00 12,857.14
15 Buruh lapangan kurang terlatih /hari 70,000.00 10,000.00
16 Buruh lapangan tak terlatih / pekerja /hari 70,000.00 10,000.00

C. ALAT
1 Sewa crane (10 Ton) unit/hari 3,900,000.00
2 Sewa pipe support buah/hari 297,000.00
3 Sewa scaffolding unit/hari 297,000.00
4 Sewa Tripot/Tackel & handle crane 2 T unit/hari 3,500,000.00
5 Sewa excavator type 225 kapasitas 0,5 - 1,0 m3 unit/hari 1,596,000.00
6 Peralatan potong pipa T1/manual (gergaji) /saw unit/hari 50,000.00
7 Peralatan potong pipa T2/manual (gergaji) /saw unit/hari 50,000.00
8 Mobile crane £ 3 ton unit/hari 1,450,000.00
9 Sewa Genset 1500 watt unit/hari 1,234,800.00
10 Sewa Pompa Submersible 3 m3/h unit/hari 330,000.00
11 Sewa crane (3 Ton) Jam 115,000.00
12 Compressor Jam 68,310.00

ALAT JALAN
1 EXCAVATOR 80-140 HP E10 Jam 482,600.60
2 DUMP TRUCK 3.5 TON E08 Jam 272,784.44
HARGA
SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
3 WHEEL LOADER 1.0-1.6 M3 E15 Jam 226,139.45
4 MOTOR GRADER >100 HP E13 Jam 466,154.35
5 VIBRATORY ROLLER 5-8 T. E19 Jam 344,765.59
6 WATER TANKER 3000-4500 L. E23 Jam 258,774.99
7 TANDEM ROLLER 6-8 T. E17 Jam 286,807.14
8 ASPHALT DISTRIBUTOR E41 Jam 374,495.18
9 COMPRESSOR 4000-6500 L\M E05 Jam 179,166.49
10 TIRE ROLLER 8-10 T. E18 Jam 438,763.41
11 ASPHALT MIXING PLANT E01 Jam 6,233,983.42
12 GENERATOR SET E12 Jam 449,852.17
13 ASPHALT FINISHER E02 Jam 609,364.64
14 DUMP TRUCK 10 TON E09 Jam 458,230.39
15 THREE WHEEL ROLLER 6-8 T E16 Jam 193,957.93
16 ASPHALT SPRAYER E03 Jam 111,731.09
DAFTAR ANALISA HARGA SATUAN
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.750 70,000.00 52,500.00
Mandor L.04 OH 0.025 100,000.00 2,500.00
JUMLAH TENAGA KERJA 55,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 55,000.00
E Overhead & Profit 15.00% 8,250.00
F Harga Satuan Pekerjaan (D+E) 63,250.00

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 40,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,000.00
E Overhead & Profit 15.00% 6,000.00
F Harga Satuan Pekerjaan (D+E) 46,000.00

A.2.3.1.14. Pengurugan 1 m3 sirtu padat

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Mandor L.04 OH 0.025 100,000.00 2,500.00
JUMLAH TENAGA KERJA 20,000.00
B BAHAN
Sirtu m3 1.200 150,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 200,000.00


E Overhead & Profit 15.00% 30,000.00
F Harga Satuan Pekerjaan (D+E) 230,000.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang batu L.02 OH 0.750 90,000.00 67,500.00
Kepala tukang L.03 OH 0.075 95,000.00 7,125.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 187,125.00
B BAHAN
Batu belah m3 1.200 175,000.00 210,000.00
Semen Portland Kg 136.000 1,400.00 190,400.00
Pasir pasang m3 0.544 180,000.00 97,920.00
JUMLAH HARGA BAHAN 498,320.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 685,445.00
E Overhead & Profit 15.00% 102,816.75
F Harga Satuan Pekerjaan (D+E) 788,261.75

A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.780 70,000.00 54,600.00
Tukang batu L.02 OH 0.390 90,000.00 35,100.00
Kepala tukang L.03 OH 0.039 95,000.00 3,705.00
Mandor L.04 OH 0.039 100,000.00 3,900.00
JUMLAH TENAGA KERJA 97,305.00
B BAHAN
Batu belah m3 1.200 175,000.00 210,000.00
Pasir urug m3 0.432 150,000.00 64,800.00
JUMLAH HARGA BAHAN 274,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 372,105.00


E Overhead & Profit 15.00% 55,815.75
F Harga Satuan Pekerjaan (D+E) 427,920.75

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala tukang L.03 OH 0.028 95,000.00 2,660.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 151,210.00
B BAHAN
Semen Portland kg 326.000 1,400.00 456,400.00
Pasir beton kg 760.000 142.86 108,571.43
Kerikil (Maks kg 1,029.000 185.19 190,555.56
30mm)/menggunakan bt.pecah 2-
3
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 766,276.98
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 917,486.98


E Overhead & Profit 15.00% 137,623.05
F Harga Satuan Pekerjaan (D+E) 1,055,110.03

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang besi L.02 OH 0.070 90,000.00 6,300.00
Kepala tukang L.03 OH 0.007 95,000.00 665.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 12,265.00
B BAHAN
Besi beton kg 10.500 13,000.00 136,500.00
(polos/ulir)
Kawat beton kg 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 139,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 151,765.00


E Overhead & Profit 15.00% 22,764.75
F Harga Satuan Pekerjaan (D+E) 174,529.75

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 70,000.00 36,400.00
Tukang kayu L.02 OH 0.260 90,000.00 23,400.00
Kepala tukang L.03 OH 0.026 95,000.00 2,470.00
Mandor L.04 OH 0.026 100,000.00 2,600.00
JUMLAH TENAGA KERJA 64,870.00
B BAHAN
Kayu kelas III m3 0.045 3,500,000.00 157,500.00
Paku 5 cm – 10 cm kg 0.300 16,000.00 4,800.00
Minyak bekisting Liter 0.100 10,000.00 1,000.00
JUMLAH HARGA BAHAN 163,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 228,170.00


E Overhead & Profit 15.00% 34,225.50
F Harga Satuan Pekerjaan (D+E) 262,395.50

A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala tukang L.03 OH 0.033 95,000.00 3,135.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 82,335.00
B BAHAN
Kayu kelas III m3 0.040 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.400 16,000.00 6,400.00
Minyak bekisting Liter 0.200 10,000.00 2,000.00
Balok kayu kelas II m3 0.015 5,000,000.00 75,000.00
Plywood tebal 9 Lbr 0.350 92,250.00 32,287.50
mm
Dolken kayu f 8- Batang 2.000 60,000.00 120,000.00
Batang 2.000 60,000.00 120,000.00
10cm –panj 4 m
JUMLAH HARGA BAHAN 375,687.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 458,022.50


E Overhead & Profit 15.00% 68,703.38
F Harga Satuan Pekerjaan (D+E) 526,725.88

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala tukang L.03 OH 0.033 95,000.00 3,135.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 82,335.00
B BAHAN
Kayu kelas III m3 0.040 3,500,000.00 140,000.00
Paku 5 cm – 12 cm kg 0.400 16,000.00 6,400.00
Minyak bekisting Liter 0.200 10,000.00 2,000.00
Balok kayu kelas II m3 0.018 5,000,000.00 90,000.00
Plywood tebal 9 mm Lbr 0.350 92,250.00 32,287.50
Dolken kayu 60,000.00 120,000.00
f (8–10) cm Batang 2.000
panjang 4 m
JUMLAH HARGA BAHAN 390,687.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 473,022.50
E Overhead & Profit 15.00% 70,953.38
F Harga Satuan Pekerjaan (D+E) 543,975.88

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.52. Pemasangan 1 m2 dinding keramik 30 cm x 30 cm corak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.00
Tukang batu L.02 OH 0.450 90,000.00 40,500.00
Kepala tukang L.03 OH 0.045 95,000.00 4,275.00
Mandor L.04 OH 0.045 100,000.00 4,500.00
JUMLAH TENAGA KERJA 112,275.00
B BAHAN
Keramik artistik buah 11.000 4,500.00 49,500.00
Semen Portland Kg 9.300 1,400.00 13,020.00
Pasir pasang M3 0.018 180,000.00 3,240.00
Semen warna Kg 2.900 6,000.00 17,400.00
JUMLAH HARGA BAHAN 83,160.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 195,435.00


E Overhead & Profit 15.00% 29,315.25
F Harga Satuan Pekerjaan (D+E) 224,750.25

A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang batu L.02 OH 0.350 90,000.00 31,500.00
Kepala tukang L.03 OH 0.035 95,000.00 3,325.00
Mandor L.04 OH 0.035 100,000.00 3,500.00
JUMLAH TENAGA KERJA 87,325.00
B BAHAN
Batu tempel hitam Buah 1.100 1,550.00 1,705.00
Semen Portland Kg 11.750 1,400.00 16,450.00
Pasir pasang M3 0.035 180,000.00 6,300.00
JUMLAH HARGA BAHAN 24,455.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 111,780.00


E Overhead & Profit 15.00% 16,767.00
F Harga Satuan Pekerjaan (D+E) 128,547.00

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang cat L.02 OH 0.063 90,000.00 5,670.00
Kepala tukang L.03 OH 0.006 95,000.00 598.50
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 7,968.50
B BAHAN
Plamuur Kg 0.100 27,000.00 2,700.00
Cat dasar Kg 0.100 25,000.00 2,500.00
Cat penutup Kg 0.260 25,000.00 6,500.00
JUMLAH HARGA BAHAN 11,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 19,668.50


E Overhead & Profit 15.00% 2,950.28
F Harga Satuan Pekerjaan (D+E) 22,618.78

A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 70,000.00 1,960.00
Tukang cat L.02 OH 0.042 90,000.00 3,780.00
Kepala tukang L.03 OH 0.004 95,000.00 399.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 6,439.00
B BAHAN
Cat dasar Kg 0.120 25,000.00 3,000.00
Cat penutup Kg 0.180 25,000.00 4,500.00
JUMLAH HARGA BAHAN 7,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,939.00


E Overhead & Profit 15.00% 2,090.85
F Harga Satuan Pekerjaan (D+E) 16,029.85

A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 70,000.00 1,960.00
Tukang cat L.02 OH 0.042 90,000.00 3,780.00
Kepala tukang L.03 OH 0.004 95,000.00 399.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 6,439.00
B BAHAN
Kalkarium Kg 0.100 18,500.00 1,850.00
JUMLAH HARGA BAHAN 1,850.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,289.00


E Overhead & Profit 15.00% 1,243.35
F Harga Satuan Pekerjaan (D+E) 9,532.35

A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang cat L.02 OH 0.001 90,000.00 90.00
Kepala tukang L.03 OH 0.000 95,000.00 9.50
Mandor L.04 OH 0.003 100,000.00 250.00
JUMLAH TENAGA KERJA 10,849.50
B BAHAN
Kapur sirih Kg 0.150 2,000.00 300.00
Ampelas Lbr 0.100 3,000.00 300.00
Alang-alang Ikat 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 3,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,949.50


E Overhead & Profit 15.00% 2,092.43
F Harga Satuan Pekerjaan (D+E) 16,041.93

A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 70,000.00 2,800.00
Tukang cat L.02 OH 0.005 90,000.00 450.00
Kepala tukang L.03 OH 0.001 95,000.00 47.50
Mandor L.04 OH 0.003 100,000.00 250.00
JUMLAH TENAGA KERJA 3,547.50
B BAHAN
Kapur sirih Kg 0.300 2,000.00 600.00
Ampelas Lbr 0.200 3,000.00 600.00
Alang-alang Ikat 0.250 10,000.00 2,500.00
JUMLAH HARGA BAHAN 3,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,247.50


E Overhead & Profit 15.00% 1,087.13
F Harga Satuan Pekerjaan (D+E) 8,334.63

A.4.7.1.15. Pemasangan 1 m2 wallpaper


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang cat L.02 OH 0.200 90,000.00 18,000.00
Kepala tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.003 100,000.00 250.00
JUMLAH TENAGA KERJA 21,550.00
B BAHAN
Wall paper m2 1.200 70,000.00 84,000.00
Lem Kg 0.200 22,000.00 4,400.00
JUMLAH HARGA BAHAN 88,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,950.00


E Overhead & Profit 15.00% 16,492.50
F Harga Satuan Pekerjaan (D+E) 126,442.50

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang cat L.02 OH 0.200 90,000.00 18,000.00
Kepala tukang L.03 OH 0.020 95,000.00 1,900.00
Mandor L.04 OH 0.003 100,000.00 250.00
JUMLAH TENAGA KERJA 21,550.00
B BAHAN
Menie besi Kg 0.100 25,000.00 2,500.00
Kwas buah 0.010 12,000.00 120.00
JUMLAH HARGA BAHAN 2,620.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 24,170.00


E Overhead & Profit 15.00% 3,625.50
F Harga Satuan Pekerjaan (D+E) 27,795.50

A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang cat L.02 OH 0.225 90,000.00 20,250.00
Kepala tukang L.02 OH 0.023 95,000.00 2,137.50
Mandor L.04 OH 0.008 100,000.00 750.00
JUMLAH TENAGA KERJA 40,637.50
B BAHAN
Menie besi Kg 0.100 25,000.00 2,500.00
Pengencer L 0.010 24,000.00 240.00
Kwas buah 0.010 12,000.00 120.00
Perancah kayu m3 0.002 3,500,000.00 7,000.00
JUMLAH HARGA BAHAN 9,860.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,497.50


E Overhead & Profit 15.00% 7,574.63
F Harga Satuan Pekerjaan (D+E) 58,072.13
A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang cat L.02 OH 0.250 90,000.00 22,500.00
Kepala tukang L.03 OH 0.025 95,000.00 2,375.00
Mandor L.04 OH 0.001 100,000.00 130.00
JUMLAH TENAGA KERJA 42,505.00
B BAHAN
Menie A Kg 0.100 25,000.00 2,500.00
Menie B Kg 0.100 25,000.00 2,500.00
Cat Kg 0.080 52,000.00 4,160.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 24,000.00 240.00
JUMLAH HARGA BAHAN 9,520.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 52,025.00


E Overhead & Profit 15.00% 7,803.75
F Harga Satuan Pekerjaan (D+E) 59,828.75

A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang cat L.02 OH 0.060 90,000.00 5,400.00
Kepala tukang L.03 OH 0.012 95,000.00 1,140.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 11,040.00
B BAHAN
Cat Kg 0.300 52,000.00 15,600.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 24,000.00 240.00
JUMLAH HARGA BAHAN 15,960.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 27,000.00


E Overhead & Profit 15.00% 4,050.00
F Harga Satuan Pekerjaan (D+E) 31,050.00

A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang cat L.02 OH 0.800 90,000.00 72,000.00
Kepala tukang L.03 OH 0.080 95,000.00 7,600.00
Mandor L.04 OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 109,600.00
B BAHAN
Cat dasar Kg 0.110 25,000.00 2,750.00
Cat antara Kg 0.170 35,000.00 5,950.00
Cat penutup Kg 0.080 52,000.00 4,160.00
Kwas buah 0.010 12,000.00 120.00
Pengencer L 0.010 24,000.00 240.00
JUMLAH HARGA BAHAN 13,220.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 122,820.00


E Overhead & Profit 15.00% 18,423.00
F Harga Satuan Pekerjaan (D+E) 141,243.00

A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang cat L.02 OH 0.700 90,000.00 63,000.00
Kepala tukang L.03 OH 0.070 95,000.00 6,650.00
Mandor L.04 OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 99,650.00
B BAHAN
Cat dasar Kg 0.300 25,000.00 7,500.00
Pengencer L 0.010 24,000.00 240.00
JUMLAH HARGA BAHAN 7,740.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,390.00


E Overhead & Profit 15.00% 16,108.50
F Harga Satuan Pekerjaan (D+E) 123,498.50

A.4.7.1.22. Plituran 10 m2 dengan plitur melamic

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.000 70,000.00 140,000.00
Tukang cat L.02 OH 12.000 90,000.00 1,080,000.00
Kepala tukang L.03 OH 1.200 95,000.00 114,000.00
Mandor L.04 OH 0.100 100,000.00 10,000.00
JUMLAH TENAGA KERJA 1,344,000.00
B BAHAN
Wood filler kg 1.500 26,000.00 39,000.00
Woodstain kg 1.500 47,000.00 70,500.00
Sanding kg 1.500 48,000.00 72,000.00
Melamic kg 2.400 43,500.00 104,400.00
Thinner L 2.000 11,500.00 23,000.00
Ampelas Lbr 6.000 3,000.00 18,000.00
Lbr JUMLAH HARGA BAHAN 326,900.00
C PERALATAN
Compressor jam 68,310.00 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,670,900.00


E Overhead & Profit 15.00% 250,635.00
F Harga Satuan Pekerjaan (D+E) 1,921,535.00

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 70,000.00 231,000.00
Tukang batu L.02 OH 1.100 90,000.00 99,000.00
Kepala tukang L.03 OH 0.010 95,000.00 950.00
Mandor L.04 OH 0.160 100,000.00 16,000.00
JUMLAH TENAGA KERJA 346,950.00
B BAHAN
Closet duduk Unit 1.000 1,237,000.00 1,237,000.00
Perlengkapan Ls 6% x closet 74,220.00 74,220.00
JUMLAH HARGA BAHAN 1,311,220.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,658,170.00


E Overhead & Profit 15.00% 248,725.50
F Harga Satuan Pekerjaan (D+E) 1,906,895.50

A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang batu L.02 OH 1.500 90,000.00 135,000.00
Kepala tukang L.03 OH 0.150 95,000.00 14,250.00
Mandor L.04 OH 0.160 100,000.00 16,000.00
JUMLAH TENAGA KERJA 235,250.00
B BAHAN
Closet jongkok Unit 1.000 140,000.00 140,000.00
Semen Portland Kg 6.000 1,400.00 8,400.00
Pasir pasang M3 0.010 180,000.00 1,800.00
JUMLAH HARGA BAHAN 150,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 385,450.00


E Overhead & Profit 15.00% 57,817.50
F Harga Satuan Pekerjaan (D+E) 443,267.50

A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang batu L.02 OH 1.500 90,000.00 135,000.00
Kepala tukang L.03 OH 0.150 95,000.00 14,250.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 224,250.00
B BAHAN
Closet jongkok Unit 1.000 100,000.00 100,000.00
Semen Portland Kg 6.000 1,400.00 8,400.00
Pasir pasang M3 0.010 180,000.00 1,800.00
Bata merah buah 7.000 800.00 5,600.00
JUMLAH HARGA BAHAN 115,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 340,050.00


E Overhead & Profit 15.00% 51,007.50
F Harga Satuan Pekerjaan (D+E) 391,057.50

A.5.1.1 4. (K3) Pemasangan 1 buah urinoir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang batu L.02 OH 1.000 90,000.00 90,000.00
Kepala tukang L.03 OH 0.100 95,000.00 9,500.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 174,500.00
B BAHAN
Urinoir Unit 1.000 649,000.00 649,000.00
Semen Portland Kg 6.000 1,400.00 8,400.00
Pasir pasang M3 0.010 180,000.00 1,800.00
Perlengkapan % 0.300 194,700.00 194,700.00
JUMLAH HARGA BAHAN 853,900.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,028,400.00


E Overhead & Profit 15.00% 154,260.00
F Harga Satuan Pekerjaan (D+E) 1,182,660.00

A.5.1.1 5. (K3) Pemasangan 1 buah wastafel

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.00
Tukang batu L.02 OH 1.450 90,000.00 130,500.00
Kepala tukang L.03 OH 0.150 95,000.00 14,250.00
Mandor L.04 OH 0.060 100,000.00 6,000.00
JUMLAH TENAGA KERJA 234,750.00
B BAHAN
Wastafel Unit 1.200 686,000.00 823,200.00
Semen Portland Kg 6.000 1,400.00 8,400.00
Pasir pasang M3 0.010 180,000.00 1,800.00
Perlengkapan % 0.120 98,784.00 98,784.00
JUMLAH HARGA BAHAN 932,184.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,166,934.00


E Overhead & Profit 15.00% 175,040.10
F Harga Satuan Pekerjaan (D+E) 1,341,974.10

A.5.1.1 6. (K3) Pemasangan 1 buah bathcuip porselen

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.075 70,000.00 5,250.00
Tukang batu L.02 OH 0.750 90,000.00 67,500.00
Kepala tukang L.03 OH 0.075 95,000.00 7,125.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 80,175.00
B BAHAN
Bathcuip Unit 1.000 - -
Perlengkapan % 0.200 - -
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 80,175.00


E Overhead & Profit 15.00% 12,026.25
F Harga Satuan Pekerjaan (D+E) 92,201.25

A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 70,000.00 210,000.00
Tukang batu L.02 OH 4.500 90,000.00 405,000.00
Kepala tukang L.03 OH 0.050 95,000.00 4,750.00
Mandor L.04 OH 0.900 100,000.00 90,000.00
JUMLAH TENAGA KERJA 709,750.00
B BAHAN
Bak fiberglass Unit 1.000 220,000.00 220,000.00
Perlengkapan Ls 0.120 26,400.00 26,400.00
JUMLAH HARGA BAHAN 246,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 956,150.00


E Overhead & Profit 15.00% 143,422.50
F Harga Satuan Pekerjaan (D+E) 1,099,572.50

A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 70,000.00 420,000.00
Tukang batu L.02 OH 3.000 90,000.00 270,000.00
Kepala tukang L.03 OH 0.300 95,000.00 28,500.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 721,500.00
B BAHAN
Bata merah M3 150.000 800.00 120,000.00
Semen portlan Kg 120.000 1,400.00 168,000.00
Pasir pasang M3 0.300 180,000.00 54,000.00
Porselen 11x11 bh 360.000 - -
Semen warna Kg 6.000 6,000.00 36,000.00
JUMLAH HARGA BAHAN 378,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,099,500.00


E Overhead & Profit 15.00% 164,925.00
F Harga Satuan Pekerjaan (D+E) 1,264,425.00

A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 70,000.00 210,000.00
Tukang batu L.02 OH 4.500 90,000.00 405,000.00
Kepala tukang L.03 OH 0.050 95,000.00 4,750.00
Mandor L.04 OH 0.900 100,000.00 90,000.00
JUMLAH TENAGA KERJA 709,750.00
B BAHAN
Bak fiberglass Unit 1.000 220,000.00 220,000.00
Perlengkapan Ls 0.120 26,400.00 26,400.00
JUMLAH HARGA BAHAN 246,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 956,150.00


E Overhead & Profit 15.00% 143,422.50
F Harga Satuan Pekerjaan (D+E) 1,099,572.50

A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang batu L.02 OH 0.450 90,000.00 40,500.00
Kepala tukang L.03 OH 0.045 95,000.00 4,275.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 67,275.00
B BAHAN
Bak air fiberglass Unit 1.000 220,000.00 220,000.00
Perlengkapan % 0.120 26,400.00 26,400.00
JUMLAH HARGA BAHAN 246,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 313,675.00


E Overhead & Profit 15.00% 47,051.25
F Harga Satuan Pekerjaan (D+E) 360,726.25

A.5.1.1 11. (K3) Pemasangan 1 buah bak beton volume 1 m3

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 3.500 70,000.00 245,000.00
Tukang batu L.02 OH 4.500 90,000.00 405,000.00
Kepala tukang L.03 OH 0.050 95,000.00 4,750.00
Mandor L.04 OH 0.018 100,000.00 1,800.00
JUMLAH TENAGA KERJA 656,550.00
B BAHAN
Beton 1:2:3 M3 0.900 829,862.51 746,876.26
Baja tulangan Kg 180.000 18,150.00 3,267,000.00
Kayu bekisting M2 8.000 35,000.00 280,000.00
Ubin porselen buah 500.000 - -
Perlengkapan % 0.100 883,012.51 88,301.25
JUMLAH HARGA BAHAN 4,382,177.51
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 5,038,727.51


E Overhead & Profit 15.00% 755,809.13
F Harga Satuan Pekerjaan (D+E) 5,794,536.64

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 70,000.00 2,100.00
Tukang batu L.02 OH 0.300 90,000.00 27,000.00
Kepala tukang L.03 OH 0.030 95,000.00 2,850.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 33,450.00
B BAHAN
Bak cuci piring Unit 1.000 400,000.00 400,000.00
Waterdrain buah 1.000 385,000.00 385,000.00
JUMLAH HARGA BAHAN 785,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 818,450.00
E Overhead & Profit 15.00% 122,767.50
F Harga Satuan Pekerjaan (D+E) 941,217.50

A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Tukang batu L.02 OH 0.500 90,000.00 45,000.00
Kepala tukang L.03 OH 0.050 95,000.00 4,750.00
Mandor L.04 OH 0.025 100,000.00 2,500.00
JUMLAH TENAGA KERJA 55,750.00
B BAHAN
Bak cuci piring Unit 1.000 175,000.00 175,000.00
Waterdrain buah 1.000 385,000.00 385,000.00
Semen portland Kg 20.000 1,400.00 28,000.00
Pasir pasang M3 0.050 180,000.00 9,000.00
JUMLAH HARGA BAHAN 597,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 652,750.00


E Overhead & Profit 15.00% 97,912.50
F Harga Satuan Pekerjaan (D+E) 750,662.50

A.5.1.1 14. Pemasangan 1 buah floor drain

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.00
Tukang batu L.02 OH 0.100 90,000.00 9,000.00
Kepala tukang L.03 OH 0.010 95,000.00 950.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 11,150.00
B BAHAN
Floor drain Unit 1.000 82,500.00 82,500.00
JUMLAH HARGA BAHAN 82,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 93,650.00


E Overhead & Profit 15.00% 14,047.50
F Harga Satuan Pekerjaan (D+E) 107,697.50

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.160 70,000.00 151,200.00
Tukang batu L.02 OH 0.720 90,000.00 64,800.00
Kepala tukang L.03 OH 0.072 95,000.00 6,840.00
Mandor L.04 OH 0.011 100,000.00 1,100.00
JUMLAH TENAGA KERJA 223,940.00
B BAHAN
Bata merah buah 40.000 800.00 32,000.00
Semen portland Kg 44.000 1,400.00 61,600.00
Pasir pasang M3 0.070 180,000.00 12,600.00
Pasir beton M3 0.060 200,000.00 12,000.00
Kerikil M3 0.070 200,000.00 14,000.00
Baja tulangan Kg 1.600 18,150.00 29,040.00
JUMLAH HARGA BAHAN 161,240.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 385,180.00


E Overhead & Profit 15.00% 57,777.00
F Harga Satuan Pekerjaan (D+E) 442,957.00

A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 70,000.00 224,000.00
Tukang cat L.02 OH 1.500 90,000.00 135,000.00
Kepala tukang L.03 OH 0.011 95,000.00 1,045.00
Mandor L.04 OH 0.016 100,000.00 1,600.00
JUMLAH TENAGA KERJA 361,645.00
B BAHAN
Bata merah buah 70.000 800.00 56,000.00
Semen portland Kg 77.000 1,400.00 107,800.00
Pasir pasang M3 0.130 180,000.00 23,400.00
Pasir beton M3 0.090 200,000.00 18,000.00
Kerikil M3 0.020 200,000.00 4,000.00
Baja tulangan Kg 2.600 18,150.00 47,190.00
JUMLAH HARGA BAHAN 256,390.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 618,035.00


E Overhead & Profit 15.00% 92,705.25
F Harga Satuan Pekerjaan (D+E) 710,740.25

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 70,000.00 224,000.00
Tukang batu L.02 OH 1.150 90,000.00 103,500.00
Kepala tukang L.03 OH 0.011 95,000.00 1,045.00
Mandor L.04 OH 0.016 100,000.00 1,600.00
JUMLAH TENAGA KERJA 330,145.00
B BAHAN
Bata merah buah 123.000 800.00 98,400.00
Semen portland Kg 114.000 1,400.00 159,600.00
Pasir pasang M3 0.184 180,000.00 33,120.00
Pasir beton M3 0.120 200,000.00 24,000.00
Kerikil M3 0.033 200,000.00 6,600.00
Baja tulangan Kg 4.850 18,150.00 88,027.50
JUMLAH HARGA BAHAN 409,747.50
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 739,892.50
E Overhead & Profit 15.00% 110,983.88
F Harga Satuan Pekerjaan (D+E) 850,876.38

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang batu L.02 OH 0.090 90,000.00 8,100.00
Kepala tukang L.03 OH 0.009 95,000.00 855.00
Mandor L.04 OH 0.027 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,435.00
B BAHAN
Pipa galvanis ½” M 1.200 25,833.33 31,000.00
Perlengkapan Ls 0.350 25,833.33 9,041.67
JUMLAH HARGA BAHAN 40,041.67
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,476.67


E Overhead & Profit 15.00% 8,321.50
F Harga Satuan Pekerjaan (D+E) 63,798.17

A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ”

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0.010 70,000.00 700.00
Tukang batu L.02 OH 0.400 90,000.00 36,000.00
Kepala tukang L.03 OH 0.040 95,000.00 3,800.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 41,000.00
B BAHAN
Kran air M 1.000 12,000.00 12,000.00
Sealtape Buah 0.025 4,000.00 100.00
JUMLAH HARGA BAHAN 12,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,100.00


E Overhead & Profit 15.00% 7,965.00
F Harga Satuan Pekerjaan (D+E) 61,065.00

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang batu L.02 OH 0.090 90,000.00 8,100.00
Kepala tukang L.03 OH 0.009 95,000.00 855.00
Mandor L.04 OH 0.027 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,435.00
B BAHAN
Pipa galvanis 3/4” M 1.200 33,333.33 40,000.00
Perlengkapan % 0.350 14,000.00 14,000.00
JUMLAH HARGA BAHAN 54,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 69,435.00


E Overhead & Profit 15.00% 10,415.25
F Harga Satuan Pekerjaan (D+E) 79,850.25

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang batu L.02 OH 0.090 90,000.00 8,100.00
Kepala tukang L.03 OH 0.009 95,000.00 855.00
Mandor L.04 OH 0.027 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,435.00
B BAHAN
Pipa galvanis 1” M 1.200 50,000.00 60,000.00
Perlengkapan % 0.350 60,000.00 60,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 135,435.00


E Overhead & Profit 15.00% 20,315.25
F Harga Satuan Pekerjaan (D+E) 155,750.25

A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.108 70,000.00 7,560.00
Tukang batu L.02 OH 0.180 90,000.00 16,200.00
Kepala tukang L.03 OH 0.018 95,000.00 1,710.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 25,970.00
B BAHAN
Pipa galvanis 11/2” M 1.200 75,833.33 91,000.00
Perlengkapan % 0.350 91,000.00 91,000.00
JUMLAH HARGA BAHAN 182,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 207,970.00


E Overhead & Profit 15.00% 31,195.50
F Harga Satuan Pekerjaan (D+E) 239,165.50

A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 70,000.00 9,450.00
Tukang batu L.02 OH 0.225 90,000.00 20,250.00
Kepala tukang L.03 OH 0.023 95,000.00 2,185.00
Mandor L.04 OH 0.007 100,000.00 700.00
JUMLAH TENAGA KERJA 32,585.00
B BAHAN
Pipa galvanis 3” M 1.200 84,000.00 100,800.00
Perlengkapan % 0.350 35,280.00 35,280.00
JUMLAH HARGA BAHAN 136,080.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 168,665.00


E Overhead & Profit 15.00% 25,299.75
F Harga Satuan Pekerjaan (D+E) 193,964.75

A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 70,000.00 9,450.00
Tukang batu L.02 OH 0.225 90,000.00 20,250.00
Kepala tukang L.03 OH 0.023 95,000.00 2,185.00
Mandor L.04 OH 0.007 100,000.00 700.00
JUMLAH TENAGA KERJA 32,585.00
B BAHAN
Pipa galvanis 4” M 1.200 245,000.00 294,000.00
Perlengkapan % 0.350 102,900.00 102,900.00
JUMLAH HARGA BAHAN 396,900.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 429,485.00


E Overhead & Profit 15.00% 64,422.75
F Harga Satuan Pekerjaan (D+E) 493,907.75

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 70,000.00 2,520.00
Tukang batu L.02 OH 0.060 90,000.00 5,400.00
Kepala tukang L.03 OH 0.006 95,000.00 570.00
Mandor L.04 OH 0.002 100,000.00 200.00
JUMLAH TENAGA KERJA 8,690.00
B BAHAN
Pipa PVC 1/2” M 1.200 4,500.00 5,400.00
Perlengkapan % 0.350 1,890.00 1,890.00
JUMLAH HARGA BAHAN 7,290.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,980.00


E Overhead & Profit 15.00% 2,397.00
F Harga Satuan Pekerjaan (D+E) 18,377.00

A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 70,000.00 2,100.00
Tukang batu L.02 OH 0.060 90,000.00 5,400.00
Kepala tukang L.03 OH 0.006 95,000.00 570.00
Mandor L.04 OH 0.002 100,000.00 200.00
JUMLAH TENAGA KERJA 8,270.00
B BAHAN
Pipa PVC 3/4” M 1.200 6,300.00 7,560.00
Perlengkapan % 0.350 2,646.00 2,646.00
JUMLAH HARGA BAHAN 10,206.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 18,476.00


E Overhead & Profit 15.00% 2,771.40
F Harga Satuan Pekerjaan (D+E) 21,247.40

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 70,000.00 2,520.00
Tukang batu L.02 OH 0.060 90,000.00 5,400.00
Kepala tukang L.03 OH 0.006 95,000.00 570.00
Mandor L.04 OH 0.002 100,000.00 200.00
JUMLAH TENAGA KERJA 8,690.00
B BAHAN
Pipa PVC 1” M 1.200 8,887.50 10,665.00
Perlengkapan % 0.350 3,732.75 3,732.75
JUMLAH HARGA BAHAN 14,397.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 23,087.75


E Overhead & Profit 15.00% 3,463.16
F Harga Satuan Pekerjaan (D+E) 26,550.91

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang batu L.02 OH 0.090 90,000.00 8,100.00
Kepala tukang L.03 OH 0.009 95,000.00 855.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 13,035.00
B BAHAN
Pipa PVC 11/2” M 1.200 15,000.00 18,000.00
Perlengkapan % 0.350 6,300.00 6,300.00
JUMLAH HARGA BAHAN 24,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,335.00


E Overhead & Profit 15.00% 5,600.25
F Harga Satuan Pekerjaan (D+E) 42,935.25

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang batu L.02 OH 0.090 90,000.00 8,100.00
Kepala tukang L.03 OH 0.009 95,000.00 855.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 13,035.00
B BAHAN
Pipa PVC 2” M 1.200 19,350.00 23,220.00
Perlengkapan % 0.350 8,127.00 8,127.00
JUMLAH HARGA BAHAN 31,347.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,382.00


E Overhead & Profit 15.00% 6,657.30
F Harga Satuan Pekerjaan (D+E) 51,039.30

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang batu L.02 OH 0.135 90,000.00 12,150.00
Kepala tukang L.03 OH 0.014 95,000.00 1,282.50
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 19,502.50
B BAHAN
Pipa PVC 21/2” M 1.200 28,037.50 33,645.00
Perlengkapan % 0.350 11,775.75 11,775.75
JUMLAH HARGA BAHAN 45,420.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 64,923.25


E Overhead & Profit 15.00% 9,738.49
F Harga Satuan Pekerjaan (D+E) 74,661.74

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang batu L.02 OH 0.135 90,000.00 12,150.00
Kepala tukang L.03 OH 0.014 95,000.00 1,282.50
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 19,502.50
B BAHAN
Pipa PVC 3” M 1.200 53,600.00 64,320.00
Perlengkapan % 0.350 22,512.00 22,512.00
JUMLAH HARGA BAHAN 86,832.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 106,334.50


E Overhead & Profit 15.00% 15,950.18
F Harga Satuan Pekerjaan (D+E) 122,284.68

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang batu L.02 OH 0.135 90,000.00 12,150.00
Kepala tukang L.03 OH 0.014 95,000.00 1,282.50
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 19,502.50
B BAHAN
Pipa PVC 4” M 1.200 63,562.50 76,275.00
Perlengkapan % 0.350 26,696.25 26,696.25
JUMLAH HARGA BAHAN 102,971.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 122,473.75


E Overhead & Profit 15.00% 18,371.06
F Harga Satuan Pekerjaan (D+E) 140,844.81

A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 70,000.00 5,600.00
Tukang batu L.02 OH 0.040 90,000.00 3,600.00
Kepala tukang L.03 OH 0.004 95,000.00 380.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 9,980.00
B BAHAN
Pipa tanah buah 1.600 173,200.00 277,120.00
Semen portlan Kg 35.000 1,400.00 49,000.00
Pasir pasang M3 0.014 180,000.00 2,520.00
Pasir urug M3 0.014 150,000.00 2,100.00
JUMLAH HARGA BAHAN 330,740.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 340,720.00


E Overhead & Profit 15.00% 51,108.00
F Harga Satuan Pekerjaan (D+E) 391,828.00

A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang batu L.02 OH 0.030 90,000.00 2,700.00
Kepala tukang L.03 OH 0.003 95,000.00 285.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 7,485.00
B BAHAN
Pipa tanah dia 15 buah 1.600 113,200.00 181,120.00
Semen portlan Kg 0.680 1,400.00 952.00
Pasir pasang M3 0.013 180,000.00 2,340.00
Pasir urug M3 0.011 150,000.00 1,650.00
JUMLAH HARGA BAHAN 186,062.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 193,547.00


E Overhead & Profit 15.00% 29,032.05
F Harga Satuan Pekerjaan (D+E) 222,579.05

A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang batu L.02 OH 0.070 90,000.00 6,300.00
Kepala tukang L.03 OH 0.007 95,000.00 665.00
Mandor L.04 OH 7.000 100,000.00 700,000.00
JUMLAH TENAGA KERJA 716,765.00
B BAHAN
Pipa beton dia. 15-20 buah 1.100 44,275.00 48,702.50
Bata merah M3 0.027 800.00 21.60
Semen portlan Kg 3.920 1,400.00 5,488.00
Pasir pasang M3 0.056 180,000.00 10,080.00
Pasir urug M3 0.024 150,000.00 3,600.00
JUMLAH HARGA BAHAN 67,892.10
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 784,657.10


E Overhead & Profit 15.00% 117,698.57
F Harga Satuan Pekerjaan (D+E) 902,355.67
A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.380 70,000.00 26,600.00
Tukang batu L.02 OH 0.190 90,000.00 17,100.00
Kepala tukang L.03 OH 0.019 95,000.00 1,805.00
Mandor L.04 OH 0.019 100,000.00 1,900.00
JUMLAH TENAGA KERJA 47,405.00
B BAHAN
Pipa beton dia. 30-100 buah 1.100 66,000.00 72,600.00
Bata merah M3 0.550 800.00 440.00
Semen portlan Kg 10.300 1,400.00 14,420.00
Pasir pasang M3 0.061 180,000.00 10,980.00
Pasir urug M3 0.069 150,000.00 10,350.00
JUMLAH HARGA BAHAN 108,790.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 156,195.00
E Overhead & Profit 15.00% 23,429.25
F Harga Satuan Pekerjaan (D+E) 179,624.25

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG


A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC Ø 63 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang pipa L.02 OH 0.041 90,000.00 3,690.00
Mandor L.04 OH 0.008 100,000.00 800.00
10,160.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm m 1.000 30,600.00 30,600.00
JUMLAH HARGA BAHAN 30,600.00
C PERALATAN
Sewa Tripot/Tackel hari 0.006 3,500,000.00 21,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 21,000.00
D Jumlah (A+B+C) 61,760.00
E Overhead & Profit 15.00% 9,264.00
F Harga Satuan Pekerjaan (D+E) 71,024.00
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel. Apabila ada tambahan
peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan gambar kerja.

A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC Ø 90 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.094 70,000.00 6,580.00
Tukang pipa L.02 OH 0.047 90,000.00 4,230.00
Mandor L.04 OH 0.009 100,000.00 900.00
JUMLAH TENAGA KERJA 11,710.00
B BAHAN
Pipa PVC Ø 90 mm m 1.000 64,000.00 64,000.00
JUMLAH HARGA BAHAN 64,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.008 3,500,000.00 28,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 28,000.00
D Jumlah (A+B+C) 103,710.00
E Overhead & Profit 15.00% 15,556.50
F Harga Satuan Pekerjaan (D+E) 119,266.50

A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC Ø 110 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.105 70,000.00 7,350.00
Tukang pipa L.02 OH 0.053 90,000.00 4,770.00
Mandor L.04 OH 0.011 100,000.00 1,100.00
JUMLAH TENAGA KERJA 13,220.00
B BAHAN
Pipa PVC Ø 110 mm m 1.000 92,980.00 92,980.00
JUMLAH HARGA BAHAN 92,980.00
C PERALATAN
Sewa Tripot/Tackel hari 0.010 3,500,000.00 35,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 35,000.00

D Jumlah (A+B+C) 141,200.00


E Overhead & Profit 15.00% 21,180.00
F Harga Satuan Pekerjaan (D+E) 162,380.00

A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC Ø 150 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.118 70,000.00 8,260.00
Tukang pipa L.02 OH 0.059 90,000.00 5,310.00
Mandor L.04 OH 0.012 100,000.00 1,200.00
JUMLAH TENAGA 14,770.00
KERJA
B BAHAN
Pipa PVC Ø 150 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hari 0.012 3,500,000.00 42,000.00
handle crane 2 T
JUMLAH HARGA ALAT 42,000.00

D Jumlah (A+B+C) 56,770.00


E Overhead & Profit 15.00% 8,515.50
F Harga Satuan Pekerjaan (D+E) 65,285.50

A.8.4.1.5 (K3) Pemasngan 1 m pipa PVC Ø 200 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.189 70,000.00 13,230.00
Tukang pipa L.02 OH 0.095 90,000.00 8,550.00
Mandor L.04 OH 0.019 100,000.00 1,900.00
JUMLAH TENAGA KERJA 23,680.00
B BAHAN
Pipa PVC Ø 200 mm m 1.000 308,700.00 308,700.00
JUMLAH HARGA BAHAN 308,700.00
C PERALATAN
Sewa Tripot/Tackel hari 0.024 3,500,000.00 84,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 84,000.00

D Jumlah (A+B+C) 416,380.00


E Overhead & Profit 15.00% 62,457.00
F Harga Satuan Pekerjaan (D+E) 478,837.00
A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.256 70,000.00 17,920.00
Tukang pipa L.02 OH 0.128 90,000.00 11,520.00
Mandor L.04 OH 0.026 100,000.00 2,600.00
JUMLAH TENAGA KERJA 32,040.00
B BAHAN
Pipa PVC Ø 250 mm m 1.000 483,750.00 483,750.00
JUMLAH HARGA BAHAN 483,750.00
C PERALATAN
Sewa Tripot/Tackel hari 0.034 3,500,000.00 119,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 119,000.00

D Jumlah (A+B+C) 634,790.00


E Overhead & Profit 15.00% 95,218.50
F Harga Satuan Pekerjaan (D+E) 730,008.50

A.8.4.1.7 (K3) Pemasangan 1 m pipa PVC Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.294 70,000.00 20,580.00
Tukang pipa L.02 OH 0.147 90,000.00 13,230.00
Mandor L.04 OH 0.029 100,000.00 2,900.00
JUMLAH TENAGA KERJA 36,710.00
B BAHAN
Pipa PVC Ø 300 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.040 3,500,000.00 140,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 140,000.00

D Jumlah (A+B+C) 176,710.00


E Overhead & Profit 15.00% 26,506.50
F Harga Satuan Pekerjaan (D+E) 203,216.50

A.8.4.1.8 (K3) Pemasangan 1 m pipa PVC Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.544 70,000.00 38,080.00
Tukang pipa L.02 OH 0.272 90,000.00 24,480.00
Mandor L.04 OH 0.054 100,000.00 5,400.00
JUMLAH TENAGA KERJA 67,960.00
B BAHAN
Pipa PVC Ø 400 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.080 3,500,000.00 280,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 280,000.00

D Jumlah (A+B+C) 347,960.00


E Overhead & Profit 15.00% 52,194.00
F Harga Satuan Pekerjaan (D+E) 400,154.00

A.8.4.1.9 (K3) Pemasangan 1 m pipa PVC Ø 450 mm


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.669 70,000.00 46,830.00
Tukang pipa L.02 OH 0.335 90,000.00 30,150.00
Mandor L.04 OH 0.067 100,000.00 6,700.00
JUMLAH TENAGA KERJA 83,680.00
B BAHAN
Pipa PVC Ø 450 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.100 3,500,000.00 350,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 350,000.00

D Jumlah (A+B+C) 433,680.00


E Overhead & Profit 15.00% 65,052.00
F Harga Satuan Pekerjaan (D+E) 498,732.00

A.8.4.1.10 (K3) Pemasangan 1 m pipa PVC Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.809 70,000.00 56,630.00
Tukang pipa L.02 OH 0.405 90,000.00 36,450.00
Mandor L.04 OH 0.081 100,000.00 8,100.00
JUMLAH TENAGA KERJA 101,180.00
B BAHAN
Pipa PVC Ø 500 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.122 3,500,000.00 427,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 427,000.00

D Jumlah (A+B+C) 528,180.00


E Overhead & Profit 15.00% 79,227.00
F Harga Satuan Pekerjaan (D+E) 607,407.00

A.8.4.1.11 (K3) Pemasangan 1 m pipa PVC Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.957 70,000.00 66,990.00
Tukang pipa L.02 OH 0.479 90,000.00 43,110.00
Mandor L.04 OH 0.096 100,000.00 9,600.00
JUMLAH TENAGA KERJA 119,700.00
B BAHAN
Pipa PVC Ø 600 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.145 3,500,000.00 507,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 507,500.00

D Jumlah (A+B+C) 627,200.00


E Overhead & Profit 15.00% 94,080.00
F Harga Satuan Pekerjaan (D+E) 721,280.00

A.8.4.1.12 (K3) Pemasangan 1 m pipa PVC Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.618 70,000.00 113,260.00
Tukang pipa L.02 OH 0.809 90,000.00 72,810.00
Mandor L.04 OH 0.162 100,000.00 16,200.00
JUMLAH TENAGA KERJA 202,270.00
B BAHAN
Pipa PVC Ø 800 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.250 3,500,000.00 875,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 875,000.00

D Jumlah (A+B+C) 1,077,270.00


E Overhead & Profit 15.00% 161,590.50
F Harga Satuan Pekerjaan (D+E) 1,238,860.50

A.8.4.1.13 (K3) Pemasangan 1 m pipa PVC Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.691 70,000.00 118,370.00
Tukang pipa L.02 OH 0.846 90,000.00 76,140.00
Mandor L.04 OH 0.169 100,000.00 16,900.00
JUMLAH TENAGA KERJA 211,410.00
B BAHAN
Pipa PVC Ø 900 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.262 3,500,000.00 917,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 917,000.00

D Jumlah (A+B+C) 1,128,410.00


E Overhead & Profit 15.00% 169,261.50
F Harga Satuan Pekerjaan (D+E) 1,297,671.50

A.8.4.1.14 (K3) Pemasangan 1 m pipa PVC Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.895 70,000.00 132,650.00
Tukang pipa L.02 OH 0.948 90,000.00 85,320.00
Mandor L.04 OH 0.190 100,000.00 19,000.00
JUMLAH TENAGA KERJA 236,970.00
B BAHAN
Pipa PVC Ø 1000 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.294 3,500,000.00 1,029,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,029,000.00

D Jumlah (A+B+C) 1,265,970.00


E Overhead & Profit 15.00% 189,895.50
F Harga Satuan Pekerjaan (D+E) 1,455,865.50

A.8.4.1.15 (K3) Pemasangan 1 m pipa PVC Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.099 70,000.00 146,930.00
Tukang pipa L.02 OH 1.050 90,000.00 94,500.00
Mandor L.04 OH 0.210 100,000.00 21,000.00
JUMLAH TENAGA KERJA 262,430.00
B BAHAN
Pipa PVC Ø 1100 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.327 3,500,000.00 1,144,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,144,500.00

D Jumlah (A+B+C) 1,406,930.00


E Overhead & Profit 15.00% 211,039.50
F Harga Satuan Pekerjaan (D+E) 1,617,969.50

A.8.4.1.16 (K3) Pemasangan 1 m pipa PVC Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.303 70,000.00 161,210.00
Tukang pipa L.02 OH 1.152 90,000.00 103,680.00
Mandor L.04 OH 0.230 100,000.00 23,000.00
JUMLAH TENAGA KERJA 287,890.00
B BAHAN
Pipa PVC Ø 1200 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 1,256,500.00
hari 0.359 3,500,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,256,500.00

D Jumlah (A+B+C) 1,544,390.00


E Overhead & Profit 15.00% 231,658.50
F Harga Satuan Pekerjaan (D+E) 1,776,048.50

A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.035 70,000.00 2,450.00
Tukang pipa L.02 OH 0.017 90,000.00 1,530.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 4,280.00
B BAHAN
Pipa HDPE Ø 63 mm m 1.000 25,900.00 25,900.00
JUMLAH HARGA BAHAN 25,900.00
C PERALATAN
Sewa Tripot/Tackel hari 0.019 3,500,000.00 66,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 66,500.00

D Jumlah (A+B+C) 96,680.00


E Overhead & Profit 15.00% 14,502.00
F Harga Satuan Pekerjaan (D+E) 111,182.00

A.8.4.1.18 (K3) Pemasangan 1 m pipa HDPE Ø 100 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.040 70,000.00 2,800.00
Tukang pipa L.02 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 5,000.00
B BAHAN
Pipa HDPE Ø 100 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.019 3,500,000.00 66,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 66,500.00

D Jumlah (A+B+C) 71,500.00


E Overhead & Profit 15.00% 10,725.00
F Harga Satuan Pekerjaan (D+E) 82,225.00

A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.045 70,000.00 3,150.00
Tukang pipa L.02 OH 0.023 90,000.00 2,070.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 5,720.00
B BAHAN
Pipa HDPE Ø 125 mm m 1.000 101,800.00 101,800.00
JUMLAH HARGA BAHAN 101,800.00
C PERALATAN
Sewa Tripot/Tackel hari 0.019 3,500,000.00 66,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 66,500.00

D Jumlah (A+B+C) 174,020.00


E Overhead & Profit 15.00% 26,103.00
F Harga Satuan Pekerjaan (D+E) 200,123.00

A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.062 70,000.00 4,340.00
Tukang pipa L.02 OH 0.031 90,000.00 2,790.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 7,730.00
B BAHAN
Pipa HDPE Ø 150 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.019 3,500,000.00 66,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 66,500.00

D Jumlah (A+B+C) 74,230.00


E Overhead & Profit 15.00% 11,134.50
F Harga Satuan Pekerjaan (D+E) 85,364.50

A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.102 70,000.00 7,140.00
Tukang pipa L.02 OH 0.051 90,000.00 4,590.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 12,730.00
B BAHAN
Pipa HDPE Ø 200 mm m 1.000 259,600.00 259,600.00
JUMLAH HARGA BAHAN 259,600.00
C PERALATAN
Sewa Tripot/Tackel hari 0.019 3,500,000.00 66,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 66,500.00

D Jumlah (A+B+C) 338,830.00


E Overhead & Profit 15.00% 50,824.50
F Harga Satuan Pekerjaan (D+E) 389,654.50

A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.133 70,000.00 9,310.00
Tukang pipa L.02 OH 0.067 90,000.00 6,030.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 16,640.00
B BAHAN
Pipa HDPE Ø 250 mm m 1.000 404,300.00 404,300.00
JUMLAH HARGA BAHAN 404,300.00
C PERALATAN
Sewa Tripot/Tackel hari 0.042 3,500,000.00 147,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 147,000.00

D Jumlah (A+B+C) 567,940.00


E Overhead & Profit 15.00% 85,191.00
F Harga Satuan Pekerjaan (D+E) 653,131.00

A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.170 70,000.00 11,900.00
Tukang pipa L.02 OH 0.085 90,000.00 7,650.00
Mandor L.04 OH 0.017 100,000.00 1,700.00
JUMLAH TENAGA KERJA 21,250.00
B BAHAN
Pipa HDPE Ø 300 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.065 3,500,000.00 227,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 227,500.00

D Jumlah (A+B+C) 248,750.00


E Overhead & Profit 15.00% 37,312.50
F Harga Satuan Pekerjaan (D+E) 286,062.50

A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.290 70,000.00 20,300.00
Tukang pipa L.02 OH 0.145 90,000.00 13,050.00
Mandor L.04 OH 0.029 100,000.00 2,900.00
JUMLAH TENAGA KERJA 36,250.00
B BAHAN
Pipa HDPE Ø 400 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.152 3,500,000.00 532,000.00
hari 0.152 3,500,000.00 532,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 532,000.00

D Jumlah (A+B+C) 568,250.00


E Overhead & Profit 15.00% 85,237.50
F Harga Satuan Pekerjaan (D+E) 653,487.50

A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.359 70,000.00 25,130.00
Tukang pipa L.02 OH 0.180 90,000.00 16,200.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 44,330.00
B BAHAN
Pipa HDPE Ø 450 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.200 3,500,000.00 700,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 700,000.00

D Jumlah (A+B+C) 744,330.00


E Overhead & Profit 15.00% 111,649.50
F Harga Satuan Pekerjaan (D+E) 855,979.50

A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.433 70,000.00 30,310.00
Tukang pipa L.02 OH 0.216 90,000.00 19,440.00
Mandor L.04 OH 0.043 100,000.00 4,300.00
JUMLAH TENAGA KERJA 54,050.00
B BAHAN
Pipa HDPE Ø 500 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.251 3,500,000.00 878,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 878,500.00

D Jumlah (A+B+C) 932,550.00


E Overhead & Profit 15.00% 139,882.50
F Harga Satuan Pekerjaan (D+E) 1,072,432.50

A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.512 70,000.00 35,840.00
Tukang pipa L.02 OH 0.256 90,000.00 23,040.00
Mandor L.04 OH 0.051 100,000.00 5,100.00
JUMLAH TENAGA KERJA 63,980.00
B BAHAN
Pipa HDPE Ø 600 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.307 3,500,000.00 1,074,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,074,500.00
D Jumlah (A+B+C) 1,138,480.00
E Overhead & Profit 15.00% 170,772.00
F Harga Satuan Pekerjaan (D+E) 1,309,252.00

A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.893 70,000.00 62,510.00
Tukang pipa L.02 OH 0.446 90,000.00 40,140.00
Mandor L.04 OH 0.089 100,000.00 8,900.00
JUMLAH TENAGA KERJA 111,550.00
B BAHAN
Pipa HDPE Ø 800 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.573 3,500,000.00 2,005,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 2,005,500.00

D Jumlah (A+B+C) 2,117,050.00


E Overhead & Profit 15.00% 317,557.50
F Harga Satuan Pekerjaan (D+E) 2,434,607.50

A.8.4.1.29 (K3) Pemasangan 1 m pipa HDPE Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.353 70,000.00 94,710.00
Tukang pipa L.02 OH 0.677 90,000.00 60,930.00
Mandor L.04 OH 0.135 100,000.00 13,500.00
JUMLAH TENAGA KERJA 169,140.00
B BAHAN
Pipa HDPE Ø 900 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.883 3,500,000.00 3,090,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,090,500.00

D Jumlah (A+B+C) 3,259,640.00


E Overhead & Profit 15.00% 488,946.00
F Harga Satuan Pekerjaan (D+E) 3,748,586.00

A.8.4.1.30 (K3) Pemasangan 1 m pipa HDPE Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.659 70,000.00 116,130.00
Tukang pipa L.02 OH 0.830 90,000.00 74,700.00
Mandor L.04 OH 0.166 100,000.00 16,600.00
JUMLAH TENAGA KERJA 207,430.00
B BAHAN
Pipa HDPE Ø 1000 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.093 3,500,000.00 3,825,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,825,500.00

D Jumlah (A+B+C) 4,032,930.00


E Overhead & Profit 15.00% 604,939.50
F Harga Satuan Pekerjaan (D+E) 4,637,869.50

A.8.4.1.31 (K3) Pemasangan 1 m pipa HDPE Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.818 70,000.00 127,260.00
Tukang pipa L.02 OH 0.909 90,000.00 81,810.00
Mandor L.04 OH 0.182 100,000.00 18,200.00
JUMLAH TENAGA KERJA 227,270.00
B BAHAN
Pipa HDPE Ø 1100 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.205 3,500,000.00 4,217,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 4,217,500.00

D Jumlah (A+B+C) 4,444,770.00


E Overhead & Profit 15.00% 666,715.50
F Harga Satuan Pekerjaan (D+E) 5,111,485.50

A.8.4.1.32 (K3) Pemasangan 1 m pipa HDPE Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.370 70,000.00 165,900.00
Tukang pipa L.02 OH 1.185 90,000.00 106,650.00
Mandor L.04 OH 0.237 100,000.00 23,700.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Pipa HDPE Ø 1200 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.584 3,500,000.00 5,544,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 5,544,000.00

D Jumlah (A+B+C) 5,840,250.00


E Overhead & Profit 15.00% 876,037.50
F Harga Satuan Pekerjaan (D+E) 6,716,287.50

A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.345 70,000.00 24,150.00
Tukang pipa L.02 OH 0.172 90,000.00 15,480.00
Mandor L.04 OH 0.034 100,000.00 3,400.00
JUMLAH TENAGA KERJA 43,030.00
B BAHAN
Pipa GIP Ø 63 mm m 1.000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 85,000.00
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 128,030.00


E Overhead & Profit 15.00% 19,204.50
F Harga Satuan Pekerjaan (D+E) 147,234.50
A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang pipa L.02 OH 0.200 90,000.00 18,000.00
Mandor L.04 OH 0.040 100,000.00 4,000.00
JUMLAH TENAGA KERJA 50,000.00
B BAHAN
Pipa GIP Ø 100 mm m 1.000 245,000.00 245,000.00
JUMLAH HARGA BAHAN 245,000.00
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 295,000.00


E Overhead & Profit 15.00% 44,250.00
F Harga Satuan Pekerjaan (D+E) 339,250.00

A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 125 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.448 70,000.00 31,360.00
Tukang pipa L.02 OH 0.224 90,000.00 20,160.00
Mandor L.04 OH 0.045 100,000.00 4,500.00
JUMLAH TENAGA KERJA 56,020.00
B BAHAN
Pipa GIP Ø 125 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,020.00


E Overhead & Profit 15.00% 8,403.00
F Harga Satuan Pekerjaan (D+E) 64,423.00

A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.506 70,000.00 35,420.00
Tukang pipa L.02 OH 0.253 90,000.00 22,770.00
Mandor L.04 OH 0.051 100,000.00 5,100.00
JUMLAH TENAGA KERJA 63,290.00
B BAHAN
Pipa GIP Ø 150 mm m 1.000 355,000.00 355,000.00
JUMLAH HARGA BAHAN 355,000.00
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 418,290.00


E Overhead & Profit 15.00% 62,743.50
F Harga Satuan Pekerjaan (D+E) 481,033.50

A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.796 70,000.00 55,720.00
Tukang pipa L.02 OH 0.398 90,000.00 35,820.00
Mandor L.04 OH 0.080 100,000.00 8,000.00
JUMLAH TENAGA KERJA 99,540.00
B BAHAN
Pipa GIP Ø 200 mm m 1.000 680,000.00 680,000.00
JUMLAH HARGA BAHAN 680,000.00
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 779,540.00


E Overhead & Profit 15.00% 116,931.00
F Harga Satuan Pekerjaan (D+E) 896,471.00

A.8.4.1.38 (K3) Pemasangan 1 m pipa GIP Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.949 70,000.00 66,430.00
Tukang pipa L.02 OH 0.475 90,000.00 42,750.00
Mandor L.04 OH 0.095 100,000.00 9,500.00
JUMLAH TENAGA KERJA 118,680.00
B BAHAN
Pipa GIP Ø 250 mm m 1.000 875,000.00 875,000.00
JUMLAH HARGA BAHAN 875,000.00
C PERALATAN
Sewa Tripot/Tackel hari - 3,500,000.00 -
& handle crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 993,680.00


E Overhead & Profit 15.00% 149,052.00
F Harga Satuan Pekerjaan (D+E) 1,142,732.00

A.8.4.1.39 (K3) Pemasangan 1 m pipa GIP Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.958 70,000.00 67,060.00
Tukang pipa L.02 OH 0.479 90,000.00 43,110.00
Mandor L.04 OH 0.096 100,000.00 9,600.00
JUMLAH TENAGA KERJA 119,770.00
B BAHAN
Pipa GIP Ø 300 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 119,770.00


E Overhead & Profit 15.00% 17,965.50
F Harga Satuan Pekerjaan (D+E) 137,735.50

A.8.4.1.40 (K3) Pemasangan 1 m pipa GIP Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.212 70,000.00 84,840.00
Tukang pipa L.02 OH 0.606 90,000.00 54,540.00
Mandor L.04 OH 0.121 100,000.00 12,100.00
JUMLAH TENAGA KERJA 151,480.00
B BAHAN
Pipa GIP Ø 400 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 151,480.00


E Overhead & Profit 15.00% 22,722.00
F Harga Satuan Pekerjaan (D+E) 174,202.00

A.8.4.1.41 (K3) Pemasangan 1 m pipa GIP Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.353 70,000.00 94,710.00
Tukang pipa L.02 OH 0.676 90,000.00 60,840.00
Mandor L.04 OH 0.135 100,000.00 13,500.00
JUMLAH TENAGA KERJA 169,050.00
B BAHAN
Pipa GIP Ø 450 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 169,050.00


E Overhead & Profit 15.00% 25,357.50
F Harga Satuan Pekerjaan (D+E) 194,407.50

A.8.4.1.42 (K3) Pemasangan 1 m pipa GIP Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.469 70,000.00 102,830.00
Tukang pipa L.02 OH 0.735 90,000.00 66,150.00
Mandor L.04 OH 0.140 100,000.00 14,000.00
JUMLAH TENAGA KERJA 182,980.00
B BAHAN
Pipa GIP Ø 500 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 182,980.00


E Overhead & Profit 15.00% 27,447.00
F Harga Satuan Pekerjaan (D+E) 210,427.00

A.8.4.1.43 (K3) Pemasangan 1 m pipa GIP Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.327 70,000.00 92,890.00
Tukang pipa L.02 OH 0.664 90,000.00 59,760.00
Mandor L.04 OH 0.133 100,000.00 13,300.00
JUMLAH TENAGA KERJA 165,950.00
B BAHAN
Pipa GIP Ø 600 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 165,950.00


E Overhead & Profit 15.00% 24,892.50
F Harga Satuan Pekerjaan (D+E) 190,842.50

A.8.4.1.44 (K3) Pemasangan 1 m pipa GIP Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.327 70,000.00 162,890.00
Tukang pipa L.02 OH 1.163 90,000.00 104,670.00
Mandor L.04 OH 0.233 100,000.00 23,300.00
JUMLAH TENAGA KERJA 290,860.00
B BAHAN
Pipa GIP Ø 800 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 290,860.00


E Overhead & Profit 15.00% 43,629.00
F Harga Satuan Pekerjaan (D+E) 334,489.00

A.8.4.1.45 (K3) Pemasangan 1 m pipa GIP Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.623 70,000.00 183,610.00
Tukang pipa L.02 OH 1.312 90,000.00 118,080.00
Mandor L.04 OH 0.262 100,000.00 26,200.00
JUMLAH TENAGA KERJA 327,890.00
B BAHAN
Pipa GIP Ø 900 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 327,890.00


E Overhead & Profit 15.00% 49,183.50
F 377,073.50

A.8.4.1.46 (K3) Pemasangan 1 m pipa GIP Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.911 70,000.00 203,770.00
Tukang pipa L.02 OH 1.456 90,000.00 131,040.00
Mandor L.04 OH 0.291 100,000.00 29,100.00
JUMLAH TENAGA KERJA 363,910.00
B BAHAN
Pipa GIP Ø 1000 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 363,910.00


E Overhead & Profit 15.00% 54,586.50
F Harga Satuan Pekerjaan (D+E) 418,496.50

A.8.4.1.47 (K3) Pemasangan 1 m pipa GIP Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 70,000.00 224,000.00
Tukang pipa L.02 OH 1.600 90,000.00 144,000.00
Mandor L.04 OH 0.320 100,000.00 32,000.00
JUMLAH TENAGA KERJA 400,000.00
B BAHAN
Pipa GIP Ø 1100 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 400,000.00


E Overhead & Profit 15.00% 60,000.00
F Harga Satuan Pekerjaan (D+E) 460,000.00

A.8.4.1.48 (K3) Pemasangan 1 m pipa GIP Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.488 70,000.00 244,160.00
Tukang pipa L.02 OH 1.744 90,000.00 156,960.00
Mandor L.04 OH 0.349 100,000.00 34,900.00
JUMLAH TENAGA KERJA 436,020.00
B BAHAN
Pipa GIP Ø 1200 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel 3,500,000.00 -
& handle crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 436,020.00


E Overhead & Profit 15.00% 65,403.00
F Harga Satuan Pekerjaan (D+E) 501,423.00

A.8.4.1.49 (K3) Pemasangan 1 m pipa DCI Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.489 70,000.00 34,230.00
Tukang pipa L.02 OH 0.098 90,000.00 8,820.00
Mandor L.04 OH 0.040 100,000.00 4,000.00
JUMLAH TENAGA KERJA 47,050.00
B BAHAN
Pipa DCI Ø 100 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.380 3,500,000.00 1,330,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,330,000.00

D Jumlah (A+B+C) 1,377,050.00


E Overhead & Profit 15.00% 206,557.50
F Harga Satuan Pekerjaan (D+E) 1,583,607.50

A.8.4.1.50 (K3) Pemasangan 1 m pipa DCI Ø 125 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.547 70,000.00 38,290.00
Tukang pipa L.02 OH 0.109 90,000.00 9,810.00
Mandor L.04 OH 0.055 100,000.00 5,500.00
JUMLAH TENAGA KERJA 53,600.00
B BAHAN
Pipa DCI Ø 125 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.380 3,500,000.00 1,330,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,330,000.00

D Jumlah (A+B+C) 1,383,600.00


E Overhead & Profit 15.00% 207,540.00
F Harga Satuan Pekerjaan (D+E) 1,591,140.00

A.8.4.1.51 (K3) Pemasangan 1 m pipa DCI Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.613 70,000.00 42,910.00
Tukang pipa L.02 OH 0.123 90,000.00 11,070.00
Mandor L.04 OH 0.061 100,000.00 6,100.00
JUMLAH TENAGA KERJA 60,080.00
B BAHAN
Pipa DCI Ø 150 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.380 3,500,000.00 1,330,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,330,000.00

D Jumlah (A+B+C) 1,390,080.00


E Overhead & Profit 15.00% 208,512.00
F Harga Satuan Pekerjaan (D+E) 1,598,592.00

A.8.4.1.52 (K3) Pemasangan 1 m pipa DCI Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.855 70,000.00 59,850.00
Tukang pipa L.02 OH 0.171 90,000.00 15,390.00
Mandor L.04 OH 0.085 100,000.00 8,500.00
JUMLAH TENAGA KERJA 83,740.00
B BAHAN
Pipa DCI Ø 200 mm M 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.380 3,500,000.00 1,330,000.00
hari 0.380 3,500,000.00 1,330,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,330,000.00

D Jumlah (A+B+C) 1,413,740.00


E Overhead & Profit 15.00% 212,061.00
F Harga Satuan Pekerjaan (D+E) 1,625,801.00

A.8.4.1.53 (K3) Pemasangan 1 m pipa DCI Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.951 70,000.00 66,570.00
Tukang pipa L.02 OH 0.190 90,000.00 17,100.00
Mandor L.04 OH 0.095 100,000.00 9,500.00
JUMLAH TENAGA KERJA 93,170.00
B BAHAN
Pipa DCI Ø 250 mm M 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.050 3,500,000.00 175,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 175,000.00

D Jumlah (A+B+C) 268,170.00


E Overhead & Profit 15.00% 40,225.50
F Harga Satuan Pekerjaan (D+E) 308,395.50

A.8.4.1.54 (K3) Pemasangan 1 m pipa DCI Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.973 70,000.00 68,110.00
Tukang pipa L.02 OH 0.195 90,000.00 17,550.00
Mandor L.04 OH 0.097 100,000.00 9,700.00
JUMLAH TENAGA KERJA 95,360.00
B BAHAN
Pipa DCI Ø 300 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.071 3,500,000.00 248,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 248,500.00

D Jumlah (A+B+C) 343,860.00


E Overhead & Profit 15.00% 51,579.00
F Harga Satuan Pekerjaan (D+E) 395,439.00

A.8.4.1.55 (K3) Pemasangan 1 m pipa DCI Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.545 70,000.00 108,150.00
Tukang pipa L.02 OH 0.309 90,000.00 27,810.00
Operator alat berat L.08 OH 0.093 130,000.00 12,090.00
Mandor L.04 OH 0.154 100,000.00 15,400.00
JUMLAH TENAGA KERJA 163,450.00
B BAHAN
Pipa DCI Ø 400 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.023 1,596,000.00 36,708.00
225 kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel hari 0.031 3,500,000.00 108,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 145,208.00
D Jumlah (A+B+C) 308,658.00
E Overhead & Profit 15.00% 46,298.70
F Harga Satuan Pekerjaan (D+E) 354,956.70

A.8.4.1.56 (K3) Pemasangan 1 m pipa DCI Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.813 70,000.00 126,910.00
Tukang pipa L.02 OH 0.363 90,000.00 32,670.00
Operator alat berat L.08 OH 0.143 130,000.00 18,590.00
Mandor L.04 OH 0.181 100,000.00 18,100.00
JUMLAH TENAGA KERJA 196,270.00
B BAHAN
Pipa DCI Ø 450 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.029 1,596,000.00 46,284.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.039 3,500,000.00 136,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 182,784.00
D Jumlah (A+B+C) 379,054.00
E Overhead & Profit 15.00% 56,858.10
F Harga Satuan Pekerjaan (D+E) 435,912.10

A.8.4.1.57 (K3) Pemasangan 1 m pipa DCI Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.047 70,000.00 143,290.00
Tukang pipa L.02 OH 0.409 90,000.00 36,810.00
Operator alat berat L.08 OH 0.193 130,000.00 25,090.00
Mandor L.04 OH 0.205 100,000.00 20,500.00
JUMLAH TENAGA KERJA 225,690.00
B BAHAN
Pipa DCI Ø 500 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.034 1,596,000.00 54,264.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.045 3,500,000.00 157,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 211,764.00

D Jumlah (A+B+C) 437,454.00


E Overhead & Profit 15.00% 65,618.10
F Harga Satuan Pekerjaan (D+E) 503,072.10

A.8.4.1.58 (K3) Pemasangan pipa 1 m DCI Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.011 70,000.00 140,770.00
Tukang pipa L.02 OH 0.402 90,000.00 36,180.00
Operator alat berat L.08 OH 0.293 130,000.00 38,090.00
Mandor L.04 OH 0.201 100,000.00 20,100.00
JUMLAH TENAGA KERJA 235,140.00
B BAHAN
Pipa DCI Ø 600 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type 92,568.00
hari 0.058 1,596,000.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel 269,500.00
hari 0.077 3,500,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 362,068.00
D Jumlah (A+B+C) 597,208.00
E Overhead & Profit 15.00% 89,581.20
F Harga Satuan Pekerjaan (D+E) 686,789.20

A.8.4.1.59 (K3) Pemasangan 1 m pipa DCI Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.859 70,000.00 270,130.00
Tukang pipa L.02 OH 0.772 90,000.00 69,480.00
Operator alat berat L.08 OH 0.493 130,000.00 64,090.00
Mandor L.04 OH 0.386 100,000.00 38,600.00
JUMLAH TENAGA KERJA 442,300.00
B BAHAN
Pipa DCI Ø 800 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.084 1,596,000.00 134,064.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.225 3,500,000.00 787,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 921,564.00
D Jumlah (A+B+C) 1,363,864.00
E Overhead & Profit 15.00% 204,579.60
F Harga Satuan Pekerjaan (D+E) 1,568,443.60

A.8.4.1.60 (K3) Pemasangan 1 m pipa DCI Ø900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.995 70,000.00 349,650.00
Tukang pipa L.02 OH 0.999 90,000.00 89,910.00
Operator alat berat L.08 OH 0.593 130,000.00 77,090.00
Mandor L.04 OH 0.499 100,000.00 49,900.00
JUMLAH TENAGA KERJA 566,550.00
B BAHAN
Pipa DCI Ø 900 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.093 1,596,000.00 148,428.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.248 3,500,000.00 868,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,016,428.00
D Jumlah (A+B+C) 1,582,978.00
E Overhead & Profit 15.00% 237,446.70
F Harga Satuan Pekerjaan (D+E) 1,820,424.70

A.8.4.1.61 (K3) Pemasangan 1 m pipa DCI Ø1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.931 70,000.00 415,170.00
Tukang pipa L.02 OH 1.186 90,000.00 106,740.00
Operator alat berat L.08 OH 0.793 130,000.00 103,090.00
Mandor L.04 OH 0.693 100,000.00 69,300.00
JUMLAH TENAGA KERJA 694,300.00
B BAHAN
Pipa DCI Ø 1000 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.112 1,596,000.00 178,752.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.298 3,500,000.00 1,043,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,221,752.00
D Jumlah (A+B+C) 1,916,052.00
E Overhead & Profit 15.00% 287,407.80
F Harga Satuan Pekerjaan (D+E) 2,203,459.80

A.8.4.1.62 (K3) Pemasangan 1 m pipa DCI Ø1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.949 70,000.00 486,430.00
Tukang pipa L.02 OH 1.390 90,000.00 125,100.00
Operator alat berat L.08 OH 0.793 130,000.00 103,090.00
Mandor L.04 OH 0.695 100,000.00 69,500.00
JUMLAH TENAGA KERJA 784,120.00
B BAHAN
Pipa DCI Ø 1100 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.152 1,596,000.00 242,592.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.304 3,500,000.00 1,064,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,306,592.00
D Jumlah (A+B+C) 2,090,712.00
E Overhead & Profit 15.00% 313,606.80
F Harga Satuan Pekerjaan (D+E) 2,404,318.80

A.8.4.1.63 (K3) Pemasangan 1 m pipa DCI Ø1200 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 8.056 70,000.00 563,920.00
Tukang pipa L.02 OH 1.611 90,000.00 144,990.00
Operator alat berat L.08 OH 0.893 130,000.00 116,090.00
Mandor L.04 OH 0.806 100,000.00 80,600.00
JUMLAH TENAGA KERJA 905,600.00
B BAHAN
Pipa DCI Ø 1200 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.180 1,596,000.00 287,280.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.300 3,500,000.00 1,050,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,337,280.00
D Jumlah (A+B+C) 2,242,880.00
E Overhead & Profit 15.00% 336,432.00
F Harga Satuan Pekerjaan (D+E) 2,579,312.00

A.8.4.1.64 (K3) Pemasangan 1 m Pipa baja Ø 63 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.499 70,000.00 34,930.00
Tukang pipa L.02 OH 0.100 90,000.00 9,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 48,930.00
B BAHAN
Pipa baja Ø 63 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 62,930.00
E Overhead & Profit 15.00% 9,439.50
F Harga Satuan Pekerjaan (D+E) 72,369.50

A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.579 70,000.00 40,530.00
Tukang pipa L.02 OH 0.116 90,000.00 10,440.00
Mandor L.04 OH 0.058 100,000.00 5,800.00
JUMLAH TENAGA KERJA 56,770.00
B BAHAN
Pipa baja Ø 100 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 70,770.00
E Overhead & Profit 15.00% 10,615.50
F Harga Satuan Pekerjaan (D+E) 81,385.50

A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.648 70,000.00 45,360.00
Tukang pipa L.02 OH 0.130 90,000.00 11,700.00
Mandor L.04 OH 0.065 100,000.00 6,500.00
JUMLAH TENAGA KERJA 63,560.00
B BAHAN
Pipa baja Ø 125 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 77,560.00
E Overhead & Profit 15.00% 11,634.00
F Harga Satuan Pekerjaan (D+E) 89,194.00

A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.708 70,000.00 49,560.00
Tukang pipa L.02 OH 0.142 90,000.00 12,780.00
Mandor L.04 OH 0.071 100,000.00 7,100.00
JUMLAH TENAGA KERJA 69,440.00
B BAHAN
Pipa baja Ø 150 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 83,440.00
E Overhead & Profit 15.00% 12,516.00
F Harga Satuan Pekerjaan (D+E) 95,956.00

A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.113 70,000.00 77,910.00
Tukang pipa L.02 OH 0.223 90,000.00 20,070.00
Mandor L.04 OH 0.111 100,000.00 11,100.00
JUMLAH TENAGA KERJA 109,080.00
B BAHAN
Pipa baja Ø 200 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 123,080.00
E Overhead & Profit 15.00% 18,462.00
F Harga Satuan Pekerjaan (D+E) 141,542.00

A.8.4.1.69 (K3) Pemasangan pipa baja Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.325 70,000.00 92,750.00
Tukang pipa L.02 OH 0.265 90,000.00 23,850.00
Mandor L.04 OH 0.133 100,000.00 13,300.00
JUMLAH TENAGA KERJA 129,900.00
B BAHAN
Pipa baja Ø 250 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 143,900.00
E Overhead & Profit 15.00% 21,585.00
F Harga Satuan Pekerjaan (D+E) 165,485.00

A.8.4.1.70 (K3) Pemasangan 1 m pipa baja Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.415 70,000.00 99,050.00
Tukang pipa L.02 OH 0.283 90,000.00 25,470.00
Mandor L.04 OH 0.141 100,000.00 14,100.00
JUMLAH TENAGA KERJA 138,620.00
B BAHAN
Pipa baja Ø 300 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.004 3,500,000.00 14,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,000.00
D Jumlah (A+B+C) 152,620.00
E Overhead & Profit 15.00% 22,893.00
F Harga Satuan Pekerjaan (D+E) 175,513.00

A.8.4.1.71 (K3) Pemasangan 1 m pipa baja Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.366 70,000.00 165,620.00
Tukang pipa L.02 OH 0.473 90,000.00 42,570.00
Mandor L.04 OH 0.237 100,000.00 23,700.00
JUMLAH TENAGA KERJA 231,890.00
B BAHAN
Pipa baja Ø 400 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.027 1,596,000.00 43,092.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.039 3,500,000.00 136,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 179,592.00
D Jumlah (A+B+C) 411,482.00
E Overhead & Profit 15.00% 61,722.30
F Harga Satuan Pekerjaan (D+E) 473,204.30

A.8.4.1.72 (K3) Pemasangan 1 m pipa baja Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.231 70,000.00 156,170.00
Tukang pipa L.02 OH 0.446 90,000.00 40,140.00
Mandor L.04 OH 0.223 100,000.00 22,300.00
JUMLAH TENAGA KERJA 218,610.00
B BAHAN
Pipa baja Ø 450 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.026 1,596,000.00 41,496.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.037 3,500,000.00 129,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 170,996.00
D Jumlah (A+B+C) 389,606.00
E Overhead & Profit 15.00% 58,440.90
F Harga Satuan Pekerjaan (D+E) 448,046.90

A.8.4.1.73 (K3) Pemasangan 1 m pipa baja Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.432 70,000.00 170,240.00
Tukang pipa L.02 OH 0.486 90,000.00 43,740.00
Mandor L.04 OH 0.243 100,000.00 24,300.00
JUMLAH TENAGA KERJA 238,280.00
B BAHAN
Pipa baja Ø 500 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.029 1,596,000.00 46,284.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.045 3,500,000.00 157,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 203,784.00
D Jumlah (A+B+C) 442,064.00
E Overhead & Profit 15.00% 66,309.60
F Harga Satuan Pekerjaan (D+E) 508,373.60

A.8.4.1.74 (K3) Pemasangan 1 m pipa baja Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.208 70,000.00 154,560.00
Tukang pipa L.02 OH 0.442 90,000.00 39,780.00
Mandor L.04 OH 0.221 100,000.00 22,100.00
JUMLAH TENAGA KERJA 216,440.00
B BAHAN
Pipa baja Ø 600 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.027 1,596,000.00 43,092.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.039 3,500,000.00 136,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 179,592.00
D Jumlah (A+B+C) 396,032.00
E Overhead & Profit 15.00% 59,404.80
F Harga Satuan Pekerjaan (D+E) 455,436.80

A.8.4.1.75 (K3) Pemasangan 1 m pipa baja Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.897 70,000.00 272,790.00
Tukang pipa L.02 OH 0.779 90,000.00 70,110.00
Mandor L.04 OH 0.390 100,000.00 39,000.00
JUMLAH TENAGA KERJA 381,900.00
B BAHAN
Pipa baja Ø 800 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.046 1,596,000.00 73,416.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.098 3,500,000.00 343,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 416,416.00
D Jumlah (A+B+C) 798,316.00
E Overhead & Profit 15.00% 119,747.40
F Harga Satuan Pekerjaan (D+E) 918,063.40

A.8.4.1.76 (K3) Pemasangan 1 m pipa baja Ø 900 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 4.403 70,000.00 308,210.00
Tukang pipa L.02 OH 0.081 90,000.00 7,290.00
Mandor L.04 OH 0.440 100,000.00 44,000.00
JUMLAH TENAGA KERJA 359,500.00
B BAHAN
Pipa baja Ø 900 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.052 1,596,000.00 82,992.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.115 3,500,000.00 402,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 485,492.00
D Jumlah (A+B+C) 844,992.00
E Overhead & Profit 15.00% 126,748.80
F Harga Satuan Pekerjaan (D+E) 971,740.80

A.8.4.1.77 (K3) Pemasangan 1 m pipa baja Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.895 70,000.00 342,650.00
Tukang pipa L.02 OH 0.979 90,000.00 88,110.00
Mandor L.04 OH 0.489 100,000.00 48,900.00
JUMLAH TENAGA KERJA 479,660.00
B BAHAN
Pipa baja Ø 1000 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.058 1,596,000.00 92,568.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.133 3,500,000.00 465,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 558,068.00
D Jumlah (A+B+C) 1,037,728.00
E Overhead & Profit 15.00% 155,659.20
F Harga Satuan Pekerjaan (D+E) 1,193,387.20

A.8.4.1.78 (K3) Pemasangan 1 m pipa baja Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.387 70,000.00 377,090.00
Tukang pipa L.02 OH 1.077 90,000.00 96,930.00
Mandor L.04 OH 0.539 100,000.00 53,900.00
JUMLAH TENAGA KERJA 527,920.00
B BAHAN
Pipa baja Ø 1100 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.064 1,596,000.00 102,144.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.150 3,500,000.00 525,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 627,144.00
D Jumlah (A+B+C) 1,155,064.00
E Overhead & Profit 15.00% 173,259.60
F Harga Satuan Pekerjaan (D+E) 1,328,323.60

A.8.4.1.79 (K3) Pemasangan 1 m pipa baja Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.897 70,000.00 412,790.00
Tukang pipa L.02 OH 1.176 90,000.00 105,840.00
Mandor L.04 OH 0.588 100,000.00 58,800.00
JUMLAH TENAGA KERJA 577,430.00
B BAHAN
Pipa baja Ø 1200 mm m 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavator type hari 0.070 1,596,000.00 111,720.00
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.167 3,500,000.00 584,500.00
hari 0.167 3,500,000.00 584,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 696,220.00
D Jumlah (A+B+C) 1,273,650.00
E Overhead & Profit 15.00% 191,047.50
F Harga Satuan Pekerjaan (D+E) 1,464,697.50

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.005 70,000.00 350.00
Tukang pipa L.02 OH 0.002 90,000.00 180.00
Mandor L.04 OH 0.001 100,000.00 50.00
JUMLAH TENAGA KERJA 580.00
B BAHAN
Pipa PVC Ø 63 mm buah 1.000 30,600.00 30,600.00
JUMLAH HARGA BAHAN 30,600.00
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003 50,000.00 150.00
(gergaji) /saw

JUMLAH HARGA ALAT 150.00

D Jumlah (A+B+C) 31,330.00


E Overhead & Profit 15.00% 4,699.50
F Harga Satuan Pekerjaan (D+E) 36,029.50

A.8.4.2.2 (K3) Pemotongan 1 m pipa PVC Ø 90 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.014 70,000.00 980.00
Tukang pipa L.02 OH 0.007 90,000.00 630.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA 1,710.00
KERJA
B BAHAN
Pipa PVC Ø 90 mm buah 1.000 64,000.00 64,000.00
JUMLAH HARGA BAHAN 64,000.00
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003 50,000.00 150.00
(gergaji) /saw

JUMLAH HARGA ALAT 150.00

D Jumlah (A+B+C) 65,860.00


E Overhead & Profit 15.00% 9,879.00
F Harga Satuan Pekerjaan (D+E) 75,739.00

A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.022 70,000.00 1,540.00
Tukang pipa L.02 OH 0.011 90,000.00 990.00
Mandor L.04 OH 0.002 100,000.00 200.00
JUMLAH TENAGA 2,730.00
B BAHAN KERJA

Pipa PVC Ø 110 mm buah 1.000 92,980.00 92,980.00


JUMLAH HARGA BAHAN 92,980.00
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003 50,000.00 150.00
(gergaji) /saw

JUMLAH HARGA ALAT 150.00


D Jumlah (A+B+C) 95,860.00
E Overhead & Profit 15.00% 14,379.00
F Harga Satuan Pekerjaan (D+E) 110,239.00

A.8.4.2.4 (K3) Pemotongan 1 buah pipa PVC Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.031 70,000.00 2,170.00
Tukang pipa L.02 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 3,820.00
B BAHAN
Pipa PVC Ø 150 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.003 50,000.00 150.00
pipa T1/manual (gergaji) /saw
JUMLAH HARGA ALAT 150.00

D Jumlah (A+B+C) 3,970.00


E Overhead & Profit 15.00% 595.50
F Harga Satuan Pekerjaan (D+E) 4,565.50

A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang pipa L.02 OH 0.040 90,000.00 3,600.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 10,070.00
B BAHAN
Pipa PVC Ø 200 mm buah 1.000 308,700.00 308,700.00
JUMLAH HARGA BAHAN 308,700.00
C PERALATAN
Peralatan potong pipa T1/manual hari 0.017 50,000.00 850.00
(gergaji) /saw

JUMLAH HARGA ALAT 850.00

D Jumlah (A+B+C) 319,620.00


E Overhead & Profit 15.00% 47,943.00
F Harga Satuan Pekerjaan (D+E) 367,563.00

A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.128 70,000.00 8,960.00
Tukang pipa L.02 OH 0.064 90,000.00 5,760.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 16,020.00
B BAHAN
Pipa PVC Ø 250 mm buah 1.000 483,750.00 483,750.00
JUMLAH HARGA BAHAN 483,750.00
C PERALATAN
Peralatan potong pipa T1/manual hari 0.030 50,000.00 1,500.00
(gergaji) /saw

JUMLAH HARGA ALAT 1,500.00

D Jumlah (A+B+C) 501,270.00


E Overhead & Profit 15.00% 75,190.50
F Harga Satuan Pekerjaan (D+E) 576,460.50
A.8.4.2.7 (K3) Pemotongan 1 buah pipa PVC Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.155 70,000.00 10,850.00
Tukang pipa L.02 OH 0.077 90,000.00 6,930.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 19,280.00
B BAHAN
Pipa PVC Ø 300 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.037 50,000.00 1,850.00
pipa T1/manual (gergaji) /saw
JUMLAH HARGA ALAT 1,850.00

D Jumlah (A+B+C) 21,130.00


E Overhead & Profit 15.00% 3,169.50
F Harga Satuan Pekerjaan (D+E) 24,299.50

A.8.4.2.8 (K3) Pemotongan 1 buah pipa PVC Ø 400 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.331 70,000.00 23,170.00
Tukang pipa L.02 OH 0.166 90,000.00 14,940.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 41,410.00
B BAHAN
Pipa PVC Ø 400 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.086 50,000.00 4,300.00
pipa T1/manual (gergaji) /saw
JUMLAH HARGA ALAT 4,300.00

D Jumlah (A+B+C) 45,710.00


E Overhead & Profit 15.00% 6,856.50
F Harga Satuan Pekerjaan (D+E) 52,566.50

A.8.4.2.9 (K3) Pemotongan 1 buah pipa PVC Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.420 70,000.00 29,400.00
Tukang pipa L.02 OH 0.210 90,000.00 18,900.00
Mandor L.04 OH 0.042 100,000.00 4,200.00
JUMLAH TENAGA KERJA 52,500.00
B BAHAN
Pipa PVC Ø 450 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 54.000 50,000.00 2,700,000.00
/ cilinder saw

JUMLAH HARGA ALAT 2,700,000.00

D Jumlah (A+B+C) 2,752,500.00


E Overhead & Profit 15.00% 412,875.00
F Harga Satuan Pekerjaan (D+E) 3,165,375.00

A.8.4.2.10 (K3) Pemotongan 1 buah pipa PVC Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.518 70,000.00 36,260.00
Tukang pipa L.02 OH 0.259 90,000.00 23,310.00
Mandor L.04 OH 0.052 100,000.00 5,200.00
JUMLAH TENAGA KERJA 64,770.00
B BAHAN
Pipa PVC Ø 500 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.069 50,000.00 3,450.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 3,450.00

D Jumlah (A+B+C) 68,220.00


E Overhead & Profit 15.00% 10,233.00
F Harga Satuan Pekerjaan (D+E) 78,453.00

A.8.4.2.11 (K3) Pemotongan 1 buah pipa PVC Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.623 70,000.00 43,610.00
Tukang pipa L.02 OH 0.311 90,000.00 27,990.00
Mandor L.04 OH 0.062 100,000.00 6,200.00
JUMLAH TENAGA KERJA 77,800.00
B BAHAN
Pipa PVC Ø 600 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.086 50,000.00 4,300.00
/ cilinder saw

JUMLAH HARGA ALAT 4,300.00

D Jumlah (A+B+C) 82,100.00


E Overhead & Profit 15.00% 12,315.00
F Harga Satuan Pekerjaan (D+E) 94,415.00

A.8.4.2.12 (K3) Pemotongan 1 buah pipa PVC Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.089 70,000.00 76,230.00
Tukang pipa L.02 OH 0.545 90,000.00 49,050.00
Mandor L.04 OH 0.109 100,000.00 10,900.00
JUMLAH TENAGA KERJA 136,180.00
B BAHAN
Pipa PVC Ø 800 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.160 50,000.00 8,000.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 8,000.00

D Jumlah (A+B+C) 144,180.00


E Overhead & Profit 15.00% 21,627.00
F Harga Satuan Pekerjaan (D+E) 165,807.00

A.8.4.2.13 (K3) Pemotongan 1 buah pipa PVC Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.141 70,000.00 79,870.00
Tukang pipa L.02 OH 0.571 90,000.00 51,390.00
Mandor L.04 OH 0.114 100,000.00 11,400.00
JUMLAH TENAGA KERJA 142,660.00
B BAHAN
Pipa PVC Ø 900 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.168 50,000.00 8,400.00
/ cilinder saw

JUMLAH HARGA ALAT 8,400.00

D Jumlah (A+B+C) 151,060.00


E Overhead & Profit 15.00% 22,659.00
F Harga Satuan Pekerjaan (D+E) 173,719.00

A.8.4.2.14 (K3) Pemotongan 1 buah pipa PVC Ø 1000 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.285 70,000.00 89,950.00
Tukang pipa L.02 OH 0.643 90,000.00 57,870.00
Mandor L.04 OH 0.129 100,000.00 12,900.00
JUMLAH TENAGA KERJA 160,720.00
B BAHAN
Pipa PVC Ø 1000 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.191 50,000.00 9,550.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 9,550.00

D Jumlah (A+B+C) 170,270.00


E Overhead & Profit 15.00% 25,540.50
F Harga Satuan Pekerjaan (D+E) 195,810.50

A.8.4.2.15 (K3) Pemotongan 1 buah pipa PVC Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.429 70,000.00 100,030.00
Tukang pipa L.02 OH 0.715 90,000.00 64,350.00
Mandor L.04 OH 0.143 100,000.00 14,300.00
JUMLAH TENAGA KERJA 178,680.00
B BAHAN
Pipa PVC Ø 1100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.213 50,000.00 10,650.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 10,650.00

D Jumlah (A+B+C) 189,330.00


E Overhead & Profit 15.00% 28,399.50
F Harga Satuan Pekerjaan (D+E) 217,729.50

A.8.4.2.16 (K3) Pemotongan 1 buah pipa PVC Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.573 70,000.00 110,110.00
Tukang pipa L.02 OH 0.787 90,000.00 70,830.00
Mandor L.04 OH 0.157 100,000.00 15,700.00
JUMLAH TENAGA KERJA 196,640.00
B BAHAN
Pipa PVC Ø 1200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.236 50,000.00 11,800.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 11,800.00

D Jumlah (A+B+C) 208,440.00


E Overhead & Profit 15.00% 31,266.00
F Harga Satuan Pekerjaan (D+E) 239,706.00

A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.002 70,000.00 140.00
Tukang pipa L.02 OH 0.001 90,000.00 90.00
Mandor L.04 OH 0.000 100,000.00 20.00
Operator L.08 OH 0.034 130,000.00 4,420.00
JUMLAH TENAGA KERJA 4,670.00
B BAHAN
Pipa HDPE Ø 63 mm buah 1.000 25,900.00 25,900.00
JUMLAH HARGA BAHAN 25,900.00
C PERALATAN
Peralatan potong hari 0.004 50,000.00 200.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 200.00

D Jumlah (A+B+C) 30,770.00


E Overhead & Profit 15.00% 4,615.50
F Harga Satuan Pekerjaan (D+E) 35,385.50

A.8.4.2.18 (K3) Pemotongan 1 buah pipa HDPE Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.006 70,000.00 420.00
Tukang pipa L.02 OH 0.003 90,000.00 270.00
Mandor L.04 OH 0.001 100,000.00 100.00
Operator L.08 OH 0.071 130,000.00 9,230.00
JUMLAH TENAGA KERJA 10,020.00
B BAHAN
Pipa HDPE Ø 100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.005 50,000.00 250.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 250.00

D Jumlah (A+B+C) 10,270.00


E Overhead & Profit 15.00% 1,540.50
F Harga Satuan Pekerjaan (D+E) 11,810.50

A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.009 70,000.00 630.00
Tukang pipa L.02 OH 0.005 90,000.00 450.00
Mandor L.04 OH 0.001 100,000.00 100.00
Operator L.08 OH 0.096 130,000.00 12,480.00
JUMLAH TENAGA KERJA 13,660.00
B BAHAN
Pipa HDPE Ø 125 mm buah 1.000 101,800.00 101,800.00
JUMLAH HARGA BAHAN 101,800.00
C PERALATAN
Peralatan potong hari 0.006 50,000.00 300.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 300.00

D Jumlah (A+B+C) 115,760.00


E Overhead & Profit 15.00% 17,364.00
F Harga Satuan Pekerjaan (D+E) 133,124.00

A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.016 70,000.00 1,120.00
Tukang pipa L.02 OH 0.008 90,000.00 720.00
Mandor L.04 OH 0.002 100,000.00 200.00
Operator L.08 OH 0.121 130,000.00 15,730.00
JUMLAH TENAGA KERJA 17,770.00
B BAHAN
Pipa HDPE Ø 150 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.009 50,000.00 450.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 450.00

D Jumlah (A+B+C) 18,220.00


E Overhead & Profit 15.00% 2,733.00
F Harga Satuan Pekerjaan (D+E) 20,953.00

A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.044 70,000.00 3,080.00
Tukang pipa L.02 OH 0.022 90,000.00 1,980.00
Mandor L.04 OH 0.004 100,000.00 400.00
Operator L.08 OH 0.171 130,000.00 22,230.00
JUMLAH TENAGA KERJA 27,690.00
B BAHAN
Pipa HDPE Ø 200 mm buah 1.000 259,600.00 259,600.00
JUMLAH HARGA BAHAN 259,600.00
C PERALATAN
Peralatan potong hari 0.017 50,000.00 850.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 850.00

D Jumlah (A+B+C) 288,140.00


E Overhead & Profit 15.00% 43,221.00
F Harga Satuan Pekerjaan (D+E) 331,361.00

A.8.4.2.22 (K3) Pemotongan 1 buah pipaHDPE Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.067 70,000.00 4,690.00
Tukang pipa L.02 OH 0.033 90,000.00 2,970.00
Mandor L.04 OH 0.007 100,000.00 700.00
Operator L.08 OH 0.221 130,000.00 28,730.00
JUMLAH TENAGA KERJA 37,090.00
B BAHAN
Pipa HDPE Ø 250 mm buah 1.000 404,300.00 404,300.00
JUMLAH HARGA BAHAN 404,300.00
C PERALATAN
Peralatan potong hari 0.023 50,000.00 1,150.00
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT 1,150.00

D Jumlah (A+B+C) 442,540.00


E Overhead & Profit 15.00% 66,381.00
F Harga Satuan Pekerjaan (D+E) 508,921.00

A.8.4.2.23 (K3) Pemotongan 1 buah pipa HDPE Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang pipa L.02 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.009 100,000.00 900.00
Operator L.08 OH 0.271 130,000.00 35,230.00
JUMLAH TENAGA KERJA 46,480.00
B BAHAN
Pipa HDPE Ø 300 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.030 50,000.00 1,500.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 1,500.00

D Jumlah (A+B+C) 47,980.00


E Overhead & Profit 15.00% 7,197.00
F Harga Satuan Pekerjaan (D+E) 55,177.00

A.8.4.2.24 (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.177 70,000.00 12,390.00
Tukang pipa L.02 OH 0.088 90,000.00 7,920.00
Mandor L.04 OH 0.018 100,000.00 1,800.00
Operator L.08 OH 0.371 130,000.00 48,230.00
JUMLAH TENAGA KERJA 70,340.00
B BAHAN
Pipa HDPE Ø 400 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.055 50,000.00 2,750.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 2,750.00

D Jumlah (A+B+C) 73,090.00


E Overhead & Profit 15.00% 10,963.50
F Harga Satuan Pekerjaan (D+E) 84,053.50

A.8.4.2.25 (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.225 70,000.00 15,750.00
Tukang pipa L.02 OH 0.113 90,000.00 10,170.00
Mandor L.04 OH 0.023 100,000.00 2,300.00
Operator L.08 OH 0.421 130,000.00 54,730.00
JUMLAH TENAGA KERJA 82,950.00
B BAHAN
Pipa HDPE Ø 450 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.070 50,000.00 3,500.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 3,500.00

D Jumlah (A+B+C) 86,450.00


E Overhead & Profit 15.00% 12,967.50
F Harga Satuan Pekerjaan (D+E) 99,417.50

A.8.4.2.26 (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.277 70,000.00 19,390.00
Tukang pipa L.02 OH 0.139 90,000.00 12,510.00
Mandor L.04 OH 0.028 100,000.00 2,800.00
Operator L.08 OH 0.471 130,000.00 61,230.00
JUMLAH TENAGA KERJA 95,930.00
B BAHAN
Pipa HDPE Ø 500 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.085 50,000.00 4,250.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 4,250.00

D Jumlah (A+B+C) 100,180.00


E Overhead & Profit 15.00% 15,027.00
F Harga Satuan Pekerjaan (D+E) 115,207.00

A.8.4.2.27 (K3) Pemotongan 1 buah pipa HDPE Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.333 70,000.00 23,310.00
Tukang pipa L.02 OH 0.167 90,000.00 15,030.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
Operator L.08 OH 0.571 130,000.00 74,230.00
JUMLAH TENAGA KERJA 115,870.00
B BAHAN
Pipa HDPE Ø 600 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.101 50,000.00 5,050.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 5,050.00

D Jumlah (A+B+C) 120,920.00


E Overhead & Profit 15.00% 18,138.00
F Harga Satuan Pekerjaan (D+E) 139,058.00

A.8.4.2.28 (K3) Pemotongan 1 buah pipa HDPE Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.601 70,000.00 42,070.00
Tukang pipa L.02 OH 0.301 90,000.00 27,090.00
Mandor L.04 OH 0.060 100,000.00 6,000.00
Operator L.08 OH 0.771 130,000.00 100,230.00
JUMLAH TENAGA KERJA 175,390.00
B BAHAN
Pipa HDPE Ø 800 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.179 50,000.00 8,950.00
/cilinder saw
JUMLAH HARGA ALAT 8,950.00

D Jumlah (A+B+C) 184,340.00


E Overhead & Profit 15.00% 27,651.00
F Harga Satuan Pekerjaan (D+E) 211,991.00

A.8.4.2.29 (K3) Pemotongan 1 buah pipa HDPE Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.913 70,000.00 63,910.00
Tukang pipa L.02 OH 0.456 90,000.00 41,040.00
Mandor L.04 OH 0.091 100,000.00 9,100.00
Operator L.08 OH 0.871 130,000.00 113,230.00
JUMLAH TENAGA KERJA 227,280.00
B BAHAN
Pipa HDPE Ø 900 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.270 50,000.00 13,500.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 13,500.00
D Jumlah (A+B+C) 240,780.00
E Overhead & Profit 15.00% 36,117.00
F Harga Satuan Pekerjaan (D+E) 276,897.00

A.8.4.2.30 (K3) Pemotongan 1 buah pipa HDPE Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.125 70,000.00 78,750.00
Tukang pipa L.02 OH 0.562 90,000.00 50,580.00
Mandor L.04 OH 0.112 100,000.00 11,200.00
Operator L.08 OH 0.971 130,000.00 126,230.00
JUMLAH TENAGA KERJA 266,760.00
B BAHAN
Pipa HDPE Ø 1000 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.332 50,000.00 16,600.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 16,600.00

D Jumlah (A+B+C) 283,360.00


E Overhead & Profit 15.00% 42,504.00
F Harga Satuan Pekerjaan (D+E) 325,864.00

A.8.4.2.31 (K3) Pemotongan 1 buah pipa HDPE Ø 1100 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.230 70,000.00 86,100.00
Tukang pipa L.02 OH 0.619 90,000.00 55,710.00
Mandor L.04 OH 0.124 100,000.00 12,400.00
Operator L.08 OH 1.071 130,000.00 139,230.00
JUMLAH TENAGA KERJA 293,440.00
B BAHAN
Pipa HDPE Ø 1100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa hari 0.350 50,000.00 17,500.00
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT 17,500.00

D Jumlah (A+B+C) 310,940.00


E Overhead & Profit 15.00% 46,641.00
F Harga Satuan Pekerjaan (D+E) 357,581.00

A.8.4.2.32 (K3) Pemotongan 1 buah pipa HDPE Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.619 70,000.00 113,330.00
Tukang pipa L.02 OH 0.809 90,000.00 72,810.00
Mandor L.04 OH 0.162 100,000.00 16,200.00
Operator L.08 OH 1.171 130,000.00 152,230.00
JUMLAH TENAGA KERJA 354,570.00
B BAHAN
Pipa HDPE Ø 1200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.477 50,000.00 23,850.00
/ cilinder saw

JUMLAH HARGA ALAT 23,850.00

D Jumlah (A+B+C) 378,420.00


E Overhead & Profit 15.00% 56,763.00
F Harga Satuan Pekerjaan (D+E) 435,183.00

A.8.4.2.33 (K3) Pemotongan 1 buah pipa GIP Ø 63 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.019 70,000.00 1,330.00
Tukang pipa L.02 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.002 100,000.00 200.00
2,430.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 63 mm buah 1.000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 85,000.00
C PERALATAN
Peralatan potong pipa T2/mekanik hari - 50,000.00 -
/ cilinder saw

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 87,430.00
E Overhead & Profit 15.00% 13,114.50
F Harga Satuan Pekerjaan (D+E) 100,544.50

A.8.4.2.34 (K3) Pemotongan 1 buah pipa GIP Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.058 70,000.00 4,060.00
Tukang pipa L.02 OH 0.029 90,000.00 2,610.00
Mandor L.04 OH 0.006 100,000.00 600.00
7,270.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 100 mm buah 1.000 245,000.00 245,000.00
JUMLAH HARGA BAHAN 245,000.00
C PERALATAN
Peralatan potong hari - 50,000.00 -
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 252,270.00


E Overhead & Profit 15.00% 37,840.50
F Harga Satuan Pekerjaan (D+E) 290,110.50

A.8.4.2.35 (K3) Pemotongan 1 buah pipa GIP Ø 125 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.092 70,000.00 6,440.00
Tukang pipa L.02 OH 0.046 90,000.00 4,140.00
Mandor L.04 OH 0.009 100,000.00 900.00
11,480.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 125 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik 50,000.00 -
/ cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 11,480.00


E Overhead & Profit 15.00% 1,722.00
F Harga Satuan Pekerjaan (D+E) 13,202.00

A.8.4.2.36 (K3) Pemotongan 1 buah pipa GIP Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.131 70,000.00 9,170.00
Tukang pipa L.02 OH 0.066 90,000.00 5,940.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
16,410.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 150 mm buah 1.000 355,000.00 355,000.00
JUMLAH HARGA BAHAN 355,000.00
C PERALATAN
Peralatan potong hari - 50,000.00 -
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 371,410.00
E Overhead & Profit 15.00% 55,711.50
F Harga Satuan Pekerjaan (D+E) 427,121.50

A.8.4.2.37 (K3) Pemotongan 1 buah pipa GIP Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.340 70,000.00 23,800.00
Tukang pipa L.02 OH 0.170 90,000.00 15,300.00
Mandor L.04 OH 0.034 100,000.00 3,400.00
42,500.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 200 mm buah 1.000 680,000.00 680,000.00
JUMLAH HARGA BAHAN 680,000.00
C PERALATAN
Peralatan potong pipa T2/mekanik hari - 50,000.00 -
/ cilinder saw

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 722,500.00


E Overhead & Profit 15.00% 108,375.00
F Harga Satuan Pekerjaan (D+E) 830,875.00

A.8.4.2.38 (K3) Pemotongan 1 buah pipa GIP Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.475 70,000.00 33,250.00
Tukang pipa L.02 OH 0.237 90,000.00 21,330.00
Mandor L.04 OH 0.047 100,000.00 4,700.00
59,280.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 250 mm buah 1.000 875,000.00 875,000.00
JUMLAH HARGA BAHAN 875,000.00
C PERALATAN
Peralatan potong pipa T2/mekanik hari - 50,000.00 -
/ cilinder saw

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 934,280.00


E Overhead & Profit 15.00% 140,142.00
F Harga Satuan Pekerjaan (D+E) 1,074,422.00

A.8.4.2.39 (K3) Pemotongan 1 buah pipa GIP Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.504 70,000.00 35,280.00
Tukang pipa L.02 OH 0.252 90,000.00 22,680.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
62,960.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 300 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik 50,000.00 -
/ cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,960.00


E Overhead & Profit 15.00% 9,444.00
F Harga Satuan Pekerjaan (D+E) 72,404.00

A.8.4.2.40 (K3) Pemotongan 1 buah pipa GIP Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.730 70,000.00 51,100.00
Tukang pipa L.02 OH 0.369 90,000.00 33,210.00
Mandor L.04 OH 0.074 100,000.00 7,400.00
91,710.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 400 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong 50,000.00 -
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 91,710.00


E Overhead & Profit 15.00% 13,756.50
F Harga Satuan Pekerjaan (D+E) 105,466.50

A.8.4.2.41 (K3) Pemotongan 1 buah pipa GIP Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.848 70,000.00 59,360.00
Tukang pipa L.02 OH 0.420 90,000.00 37,800.00
Mandor L.04 OH 0.085 100,000.00 8,500.00
105,660.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 450 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong 50,000.00 -
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 105,660.00


E Overhead & Profit 15.00% 15,849.00
F Harga Satuan Pekerjaan (D+E) 121,509.00

A.8.4.2.42 (K3) Pemotongan 1 buah pipa GIP Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.941 70,000.00 65,870.00
Tukang pipa L.02 OH 0.471 90,000.00 42,390.00
Mandor L.04 OH 0.094 100,000.00 9,400.00
117,660.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 500 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong 50,000.00 -
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 117,660.00


E Overhead & Profit 15.00% 17,649.00
F Harga Satuan Pekerjaan (D+E) 135,309.00

A.8.4.2.43 (K3) Pemotongan1 buah pipa GIP Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.864 70,000.00 60,480.00
Tukang pipa L.02 OH 0.432 90,000.00 38,880.00
Mandor L.04 OH 0.086 100,000.00 8,600.00
107,960.00
JUMLAH TENAGA KERJA
B BAHAN -
Pipa GIP Ø 600 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik 50,000.00 -
/ cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,960.00


E Overhead & Profit 15.00% 16,194.00
F Harga Satuan Pekerjaan (D+E) 124,154.00

A.8.4.2.44 (K3) Pemotongan 1 buah pipa GIP Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.567 70,000.00 109,690.00
Tukang pipa L.02 OH 0.783 90,000.00 70,470.00
Mandor L.04 OH 0.157 100,000.00 15,700.00
195,860.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 800 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik 50,000.00 -
/ cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 195,860.00


E Overhead & Profit 15.00% 29,379.00
F Harga Satuan Pekerjaan (D+E) 225,239.00

A.8.4.2.45 (K3) Pemotongan 1 buah pipa GIP Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.770 70,000.00 123,900.00
Tukang pipa L.02 OH 0.885 90,000.00 79,650.00
Mandor L.04 OH 0.177 100,000.00 17,700.00
221,250.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 900 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik 50,000.00 -
/ cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 221,250.00


E Overhead & Profit 15.00% 33,187.50
F Harga Satuan Pekerjaan (D+E) 254,437.50

A.8.4.2.46 (K3) Pemotongan 1 buah pipa GIP Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.974 70,000.00 138,180.00
Tukang pipa L.02 OH 0.987 90,000.00 88,830.00
Mandor L.04 OH 0.197 100,000.00 19,700.00
246,710.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1000 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong 50,000.00 -
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 246,710.00


E Overhead & Profit 15.00% 37,006.50
F Harga Satuan Pekerjaan (D+E) 283,716.50

A.8.4.2.47 (K3) Pemotongan 1 buah pipa GIP Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.178 70,000.00 152,460.00
Tukang pipa L.02 OH 1.089 90,000.00 98,010.00
Mandor L.04 OH 0.218 100,000.00 21,800.00
272,270.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong 50,000.00 -
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 272,270.00


E Overhead & Profit 15.00% 40,840.50
F Harga Satuan Pekerjaan (D+E) 313,110.50

A.8.4.2.48 (K3) Pemotongan 1 buah pipa GIP Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.382 70,000.00 166,740.00
Tukang pipa L.02 OH 1.191 90,000.00 107,190.00
Mandor L.04 OH 0.238 100,000.00 23,800.00
297,730.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong 50,000.00 -
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 297,730.00


E Overhead & Profit 15.00% 44,659.50
F Harga Satuan Pekerjaan (D+E) 342,389.50

A.8.4.2.49 (K3) Pemotongan 1 buah pipa DCI Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.071 70,000.00 4,970.00
Tukang pipa L.02 OH 0.014 90,000.00 1,260.00
Mandor L.04 OH 0.007 100,000.00 700.00
6,930.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.003 50,000.00 150.00
& handle crane 2 T
JUMLAH HARGA ALAT 150.00

D Jumlah (A+B+C) 7,080.00


E Overhead & Profit 15.00% 1,062.00
F Harga Satuan Pekerjaan (D+E) 8,142.00

A.8.4.2.50 (K3) Pemotongan 1 buah pipa DCI Ø 125 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.112 70,000.00 7,840.00
Tukang pipa L.02 OH 0.022 90,000.00 1,980.00
Mandor L.04 OH 0.011 100,000.00 1,100.00
10,920.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 125 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.010 50,000.00 500.00
& handle crane 2 T
JUMLAH HARGA ALAT 500.00

D Jumlah (A+B+C) 11,420.00


E Overhead & Profit 15.00% 1,713.00
F Harga Satuan Pekerjaan (D+E) 13,133.00

A.8.4.2.51 (K3) Pemotongan 1 buah pipa DCI Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.159 70,000.00 11,130.00
Tukang pipa L.02 OH 0.032 90,000.00 2,880.00
Mandor L.04 OH 0.016 100,000.00 1,600.00
15,610.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 150 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.018 50,000.00 900.00
& handle crane 2 T
JUMLAH HARGA ALAT 900.00

D Jumlah (A+B+C) 16,510.00


E Overhead & Profit 15.00% 2,476.50
F Harga Satuan Pekerjaan (D+E) 18,986.50

A.8.4.2.52 (K3) Pemotongan 1 buah pipa DCI Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.366 70,000.00 25,620.00
Tukang pipa L.02 OH 0.073 90,000.00 6,570.00
Mandor L.04 OH 0.037 100,000.00 3,700.00
35,890.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.054 50,000.00 2,700.00
& handle crane 2 T
JUMLAH HARGA ALAT 2,700.00

D Jumlah (A+B+C) 38,590.00


E Overhead & Profit 15.00% 5,788.50
F Harga Satuan Pekerjaan (D+E) 44,378.50

A.8.4.2.53 (K3) Pemotongan 1 buah pipa DCI Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.476 70,000.00 33,320.00
Tukang pipa L.02 OH 0.095 90,000.00 8,550.00
Mandor L.04 OH 0.048 100,000.00 4,800.00
46,670.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 250 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.073 50,000.00 3,650.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,650.00

D Jumlah (A+B+C) 50,320.00


E Overhead & Profit 15.00% 7,548.00
F Harga Satuan Pekerjaan (D+E) 57,868.00

A.8.4.2.54 (K3) Pemotongan 1 buah pipa DCI Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.512 70,000.00 35,840.00
Tukang pipa L.02 OH 0.102 90,000.00 9,180.00
Mandor L.04 OH 0.051 100,000.00 5,100.00
50,120.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 300 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.079 50,000.00 3,950.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,950.00

D Jumlah (A+B+C) 54,070.00


E Overhead & Profit 15.00% 8,110.50
F Harga Satuan Pekerjaan (D+E) 62,180.50

A.8.4.2.55 (K3) Pemotongan 1 buah pipa DCI Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.941 70,000.00 65,870.00
Tukang pipa L.02 OH 0.188 90,000.00 16,920.00
Mandor L.04 OH 0.094 100,000.00 9,400.00
92,190.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 400 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.158 50,000.00 7,900.00
/ cilinder saw

JUMLAH HARGA ALAT 7,900.00

D Jumlah (A+B+C) 100,090.00


E Overhead & Profit 15.00% 15,013.50
F Harga Satuan Pekerjaan (D+E) 115,103.50

A.8.4.2.56 (K3) Pemotongan 1 buah pipa DCI Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.137 70,000.00 79,590.00
Tukang pipa L.02 OH 0.227 90,000.00 20,430.00
Mandor L.04 OH 0.114 100,000.00 11,400.00
111,420.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 450 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.176 50,000.00 8,800.00
/ cilinder saw

JUMLAH HARGA ALAT 8,800.00

D Jumlah (A+B+C) 120,220.00


E Overhead & Profit 15.00% 18,033.00
F Harga Satuan Pekerjaan (D+E) 138,253.00

A.8.4.2.57 (K3) Pemotongan 1 buah pipa DCI Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.312 70,000.00 91,840.00
Tukang pipa L.02 OH 0.262 90,000.00 23,580.00
Mandor L.04 OH 0.131 100,000.00 13,100.00
128,520.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 500 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.192 50,000.00 9,600.00
/ cilinder saw

JUMLAH HARGA ALAT 9,600.00

D Jumlah (A+B+C) 138,120.00


E Overhead & Profit 15.00% 20,718.00
F Harga Satuan Pekerjaan (D+E) 158,838.00

A.8.4.2.58 (K3) Pemotongan 1 buah pipa DCI Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.309 70,000.00 91,630.00
Tukang pipa L.02 OH 0.262 90,000.00 23,580.00
Mandor L.04 OH 0.131 100,000.00 13,100.00
128,310.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 600 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.192 50,000.00 9,600.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 9,600.00

D Jumlah (A+B+C) 137,910.00


E Overhead & Profit 15.00% 20,686.50
F Harga Satuan Pekerjaan (D+E) 158,596.50

A.8.4.2.59 (K3) Pemotongan 1 buah pipa DCI Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.598 70,000.00 181,860.00
Tukang pipa L.02 OH 0.520 90,000.00 46,800.00
Mandor L.04 OH 0.260 100,000.00 26,000.00
254,660.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 800 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.310 50,000.00 15,500.00
/ cilinder saw

JUMLAH HARGA ALAT 15,500.00

D Jumlah (A+B+C) 270,160.00


E Overhead & Profit 15.00% 40,524.00
F Harga Satuan Pekerjaan (D+E) 310,684.00

A.8.4.2.60 (K3) Pemotongan 1 buah pipa DCI Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.370 70,000.00 235,900.00
Tukang pipa L.02 OH 0.674 90,000.00 60,660.00
Mandor L.04 OH 0.337 100,000.00 33,700.00
330,260.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 900 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.381 50,000.00 19,050.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 19,050.00

D Jumlah (A+B+C) 349,310.00


E Overhead & Profit 15.00% 52,396.50
F Harga Satuan Pekerjaan (D+E) 401,706.50

A.8.4.2.61 (K3) Pemotongan 1 buah pipa DCI Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.021 70,000.00 281,470.00
Tukang pipa L.02 OH 0.804 90,000.00 72,360.00
Mandor L.04 OH 0.402 100,000.00 40,200.00
394,030.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1000 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.441 50,000.00 22,050.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 22,050.00

D Jumlah (A+B+C) 416,080.00


E Overhead & Profit 15.00% 62,412.00
F Harga Satuan Pekerjaan (D+E) 478,492.00

A.8.4.2.62 (K3) Pemotongan 1 buah pipa DCI Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.731 70,000.00 331,170.00
Tukang pipa L.02 OH 0.946 90,000.00 85,140.00
Mandor L.04 OH 0.473 100,000.00 47,300.00
463,610.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.506 50,000.00 25,300.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 25,300.00

D Jumlah (A+B+C) 488,910.00


E Overhead & Profit 15.00% 73,336.50
F Harga Satuan Pekerjaan (D+E) 562,246.50

A.8.4.2.63 (K3) Pemotongan 1 buah pipa DCI Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.502 70,000.00 385,140.00
Tukang pipa L.02 OH 1.100 90,000.00 99,000.00
Mandor L.04 OH 0.550 100,000.00 55,000.00
539,140.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.576 50,000.00 28,800.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 28,800.00

D Jumlah (A+B+C) 567,940.00


E Overhead & Profit 15.00% 85,191.00
F Harga Satuan Pekerjaan (D+E) 653,131.00

A.8.4.2.64 (K3) Pemotongan 1 buah pipa baja Ø 63 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 70,000.00 1,960.00
Tukang pipa L.02 OH 0.006 90,000.00 540.00
Mandor L.04 OH 0.003 100,000.00 300.00
2,800.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 63 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.037 50,000.00 1,850.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 1,850.00

D Jumlah (A+B+C) 4,650.00


E Overhead & Profit 15.00% 697.50
F Harga Satuan Pekerjaan (D+E) 5,347.50

A.8.4.2.65 (K3) Pemotongan 1 buah pipa baja Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 70,000.00 5,950.00
Tukang pipa L.02 OH 0.017 90,000.00 1,530.00
Mandor L.04 OH 0.008 100,000.00 800.00
8,280.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.040 50,000.00 2,000.00
/ cilinder saw

JUMLAH HARGA ALAT 2,000.00

D Jumlah (A+B+C) 10,280.00


E Overhead & Profit 15.00% 1,542.00
F Harga Satuan Pekerjaan (D+E) 11,822.00

A.8.4.2.66 (K3) Pemotongan 1 buah pipa baja Ø 125 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.133 70,000.00 9,310.00
Tukang pipa L.02 OH 0.027 90,000.00 2,430.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
13,040.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 125 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.042 50,000.00 2,100.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 2,100.00

D Jumlah (A+B+C) 15,140.00


E Overhead & Profit 15.00% 2,271.00
F Harga Satuan Pekerjaan (D+E) 17,411.00

A.8.4.2.67 (K3) Pemotongan 1 buah pipa baja Ø 150 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.184 70,000.00 12,880.00
Tukang pipa L.02 OH 0.037 90,000.00 3,330.00
Mandor L.04 OH 0.018 100,000.00 1,800.00
18,010.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 150 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.045 50,000.00 2,250.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 2,250.00

D Jumlah (A+B+C) 20,260.00


E Overhead & Profit 15.00% 3,039.00
F Harga Satuan Pekerjaan (D+E) 23,299.00

A.8.4.2.68 (K3) Pemotongan 1 buah pipa baja Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.476 70,000.00 33,320.00
Tukang pipa L.02 OH 0.095 90,000.00 8,550.00
Mandor L.04 OH 0.048 100,000.00 4,800.00
46,670.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.060 50,000.00 3,000.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 3,000.00

D Jumlah (A+B+C) 49,670.00


E Overhead & Profit 15.00% 7,450.50
F Harga Satuan Pekerjaan (D+E) 57,120.50

A.8.4.2.69 (K3) Pemotongan 1 buah pipa baja Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.663 70,000.00 46,410.00
Tukang pipa L.02 OH 0.133 90,000.00 11,970.00
Mandor L.04 OH 0.066 100,000.00 6,600.00
64,980.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 250 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.068 50,000.00 3,400.00
/ cilinder saw

JUMLAH HARGA ALAT 3,400.00

D Jumlah (A+B+C) 68,380.00


E Overhead & Profit 15.00% 10,257.00
F Harga Satuan Pekerjaan (D+E) 78,637.00
A.8.4.2.70 (K3) Pemotongan 1 buah pipa baja Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.745 70,000.00 52,150.00
Tukang pipa L.02 OH 0.149 90,000.00 13,410.00
Mandor L.04 OH 0.074 100,000.00 7,400.00
72,960.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 300 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.072 50,000.00 3,600.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 3,600.00

D Jumlah (A+B+C) 76,560.00


E Overhead & Profit 15.00% 11,484.00
F Harga Satuan Pekerjaan (D+E) 88,044.00

A.8.4.2.71 (K3) Pemotongan 1 buah pipa baja Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.440 70,000.00 100,800.00
Tukang pipa L.02 OH 0.288 90,000.00 25,920.00
Mandor L.04 OH 0.144 100,000.00 14,400.00
141,120.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 400 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.105 50,000.00 5,250.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 5,250.00

D Jumlah (A+B+C) 146,370.00


E Overhead & Profit 15.00% 21,955.50
F Harga Satuan Pekerjaan (D+E) 168,325.50

A.8.4.2.72 (K3) Pemotongan 1 buah pipa baja Ø 450 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.399 70,000.00 97,930.00
Tukang pipa L.02 OH 0.280 90,000.00 25,200.00
Mandor L.04 OH 0.140 100,000.00 14,000.00
137,130.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 450 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.107 50,000.00 5,350.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 5,350.00

D Jumlah (A+B+C) 142,480.00


E Overhead & Profit 15.00% 21,372.00
F Harga Satuan Pekerjaan (D+E) 163,852.00
A.8.4.2.73 (K3) Pemotongan 1 buah pipa baja Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.558 70,000.00 109,060.00
Tukang pipa L.02 OH 0.312 90,000.00 28,080.00
Mandor L.04 OH 0.156 100,000.00 15,600.00
152,740.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 500 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.107 50,000.00 5,350.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 5,350.00

D Jumlah (A+B+C) 158,090.00


E Overhead & Profit 15.00% 23,713.50
F Harga Satuan Pekerjaan (D+E) 181,803.50

A.8.4.2.74 (K3) Pemotongan 1 buah pipa baja Ø 600 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.437 70,000.00 100,590.00
Tukang pipa L.02 OH 0.287 90,000.00 25,830.00
Mandor L.04 OH 0.144 100,000.00 14,400.00
140,820.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 600 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.113 50,000.00 5,650.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 5,650.00

D Jumlah (A+B+C) 146,470.00


E Overhead & Profit 15.00% 21,970.50
F Harga Satuan Pekerjaan (D+E) 168,440.50

A.8.4.2.75 (K3) Pemotongan 1 buah pipa baja Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.620 70,000.00 183,400.00
Tukang pipa L.02 OH 0.525 90,000.00 47,250.00
Mandor L.04 OH 0.262 100,000.00 26,200.00
256,850.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 800 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.166 50,000.00 8,300.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 8,300.00

D Jumlah (A+B+C) 265,150.00


E Overhead & Profit 15.00% 39,772.50
F Harga Satuan Pekerjaan (D+E) 304,922.50
A.8.4.2.76 (K3) Pemotongan 1 buah pipa baja Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.971 70,000.00 207,970.00
Tukang pipa L.02 OH 0.594 90,000.00 53,460.00
Mandor L.04 OH 0.297 100,000.00 29,700.00
291,130.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 900 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.183 50,000.00 9,150.00
/ cilinder saw

JUMLAH HARGA ALAT 9,150.00

D Jumlah (A+B+C) 300,280.00


E Overhead & Profit 15.00% 45,042.00
F Harga Satuan Pekerjaan (D+E) 345,322.00

A.8.4.2.77 (K3) Pemotongan 1 buah pipa baja Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.319 70,000.00 232,330.00
Tukang pipa L.02 OH 0.664 90,000.00 59,760.00
Mandor L.04 OH 0.332 100,000.00 33,200.00
325,290.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1000 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.201 50,000.00 10,050.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 10,050.00

D Jumlah (A+B+C) 335,340.00


E Overhead & Profit 15.00% 50,301.00
F Harga Satuan Pekerjaan (D+E) 385,641.00

A.8.4.2.78 (K3) Pemotongan 1 buah pipa baja Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.667 70,000.00 256,690.00
Tukang pipa L.02 OH 0.733 90,000.00 65,970.00
Mandor L.04 OH 0.367 100,000.00 36,700.00
359,360.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.218 50,000.00 10,900.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 10,900.00

D Jumlah (A+B+C) 370,260.00


E Overhead & Profit 15.00% 55,539.00
F Harga Satuan Pekerjaan (D+E) 425,799.00
A.8.4.2.79 (K3) Pemotongan 1 buah pipa baja Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.015 70,000.00 281,050.00
Tukang pipa L.02 OH 0.803 90,000.00 72,270.00
Mandor L.04 OH 0.402 100,000.00 40,200.00
393,520.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.236 50,000.00 11,800.00
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT 11,800.00

D Jumlah (A+B+C) 405,320.00


E Overhead & Profit 15.00% 60,798.00
F Harga Satuan Pekerjaan (D+E) 466,118.00

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


A.8.4.3.1 (K3) Pemasangan 1 buah Valve Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.429 70,000.00 100,030.00
Tukang pipa L.02 OH 0.715 90,000.00 64,350.00
Mandor L.04 OH 0.143 100,000.00 14,300.00
178,680.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 150 mm buah 1.000 3,250,000.00 3,250,000.00
JUMLAH HARGA BAHAN 3,250,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.100 3,500,000.00 350,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 350,000.00

D Jumlah (A+B+C) 3,778,680.00


E Overhead & Profit 15.00% 566,802.00
F Harga Satuan Pekerjaan (D+E) 4,345,482.00

A.8.4.3.2 (K3) Pemasangan 1 buah Valve Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.714 70,000.00 119,980.00
Tukang pipa L.02 OH 0.857 90,000.00 77,130.00
Mandor L.04 OH 0.171 100,000.00 17,100.00
214,210.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 200 mm buah 1.000 5,400,000.00 5,400,000.00
JUMLAH HARGA BAHAN 5,400,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.300 3,500,000.00 1,050,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,050,000.00
D Jumlah (A+B+C) 6,664,210.00
E Overhead & Profit 15.00% 999,631.50
F Harga Satuan Pekerjaan (D+E) 7,663,841.50

A.8.4.3.3 (K3) Pemasangan 1 buah Valve Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.714 70,000.00 119,980.00
Tukang pipa L.02 OH 0.857 90,000.00 77,130.00
Mandor L.04 OH 0.171 100,000.00 17,100.00
214,210.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 250 mm buah 1.000 9,250,000.00 9,250,000.00
JUMLAH HARGA BAHAN 9,250,000.00
C PERALATAN
Sewa Tripot/Tackel hari 0.400 3,500,000.00 1,400,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,400,000.00

D Jumlah (A+B+C) 10,864,210.00


E Overhead & Profit 15.00% 1,629,631.50
F Harga Satuan Pekerjaan (D+E) 12,493,841.50

A.8.4.3.4 (K3) Pemasangan 1 buah Valve Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.000 70,000.00 140,000.00
Tukang pipa L.02 OH 1.000 90,000.00 90,000.00
Mandor L.04 OH 0.200 100,000.00 20,000.00
250,000.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 300 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.500 3,500,000.00 1,750,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,750,000.00

D Jumlah (A+B+C) 2,000,000.00


E Overhead & Profit 15.00% 300,000.00
F Harga Satuan Pekerjaan (D+E) 2,300,000.00

A.8.4.3.5 (K3) Pemasangan 1 buah Valve Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.429 70,000.00 240,030.00
Tukang pipa L.02 OH 1.715 90,000.00 154,350.00
Mandor L.04 OH 0.343 100,000.00 34,300.00
428,680.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 400 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.000 3,500,000.00 3,500,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,500,000.00
D Jumlah (A+B+C) 3,928,680.00
E Overhead & Profit 15.00% 589,302.00
F Harga Satuan Pekerjaan (D+E) 4,517,982.00

A.8.4.3.6 (K3) Pemasangan 1 buah Valve Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.429 70,000.00 240,030.00
Tukang pipa L.02 OH 1.715 90,000.00 154,350.00
Mandor L.04 OH 0.343 100,000.00 34,300.00
428,680.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 450 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.000 3,500,000.00 3,500,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,500,000.00

D Jumlah (A+B+C) 3,928,680.00


E Overhead & Profit 15.00% 589,302.00
F Harga Satuan Pekerjaan (D+E) 4,517,982.00

A.8.4.3.7 (K3) Pemasangan 1 buah Valve Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 70,000.00 280,000.00
Tukang pipa L.02 OH 2.000 90,000.00 180,000.00
Mandor L.04 OH 0.400 100,000.00 40,000.00
500,000.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 500 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.000 3,500,000.00 3,500,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,500,000.00

D Jumlah (A+B+C) 4,000,000.00


E Overhead & Profit 15.00% 600,000.00
F Harga Satuan Pekerjaan (D+E) 4,600,000.00

A.8.4.3.8 (K3) Pemasangan 1 buah Valve Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.421 70,000.00 99,470.00
Tukang pipa L.02 OH 0.711 90,000.00 63,990.00
Mandor L.04 OH 0.142 100,000.00 14,200.00
177,660.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 600 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.600 3,500,000.00 2,100,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.300 1,450,000.00 435,000.00
JUMLAH HARGA ALAT 2,535,000.00

D Jumlah (A+B+C) 2,712,660.00


E Overhead & Profit 15.00% 406,899.00
F Harga Satuan Pekerjaan (D+E) 3,119,559.00

A.8.4.3.9 (K3) Pemasangan 1 buah Valve Ø 700 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.429 70,000.00 100,030.00
Tukang pipa L.02 OH 0.715 90,000.00 64,350.00
Mandor L.04 OH 0.143 100,000.00 14,300.00
178,680.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 700 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & hari 0.500 3,500,000.00 1,750,000.00
handle crane 2 T
Mobile crane £ 3 ton hari 0.500 1,450,000.00 725,000.00
JUMLAH HARGA ALAT 2,475,000.00

D Jumlah (A+B+C) 2,653,680.00


E Overhead & Profit 15.00% 398,052.00
F Harga Satuan Pekerjaan (D+E) 3,051,732.00

A.8.4.3.10 (K3) Pemasangan 1 buah Valve Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.786 70,000.00 125,020.00
Tukang pipa L.02 OH 0.893 90,000.00 80,370.00
Mandor L.04 OH 0.179 100,000.00 17,900.00
223,290.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 800 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.500 3,500,000.00 1,750,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.500 1,450,000.00 725,000.00
JUMLAH HARGA ALAT 2,475,000.00

D Jumlah (A+B+C) 2,698,290.00


E Overhead & Profit 15.00% 404,743.50
F Harga Satuan Pekerjaan (D+E) 3,103,033.50

A.8.4.3.11 (K3) Pemasangan 1 buah Valve Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.714 70,000.00 119,980.00
Tukang pipa L.02 OH 0.857 90,000.00 77,130.00
Mandor L.04 OH 0.171 100,000.00 17,100.00
214,210.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 900 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.750 3,500,000.00 2,625,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.750 1,450,000.00 1,087,500.00
JUMLAH HARGA ALAT 3,712,500.00

D Jumlah (A+B+C) 3,926,710.00


E Overhead & Profit 15.00% 589,006.50
F Harga Satuan Pekerjaan (D+E) 4,515,716.50

A.8.4.3.12 (K3) Pemasangan 1 buah Valve Ø 1000 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.571 70,000.00 179,970.00
Tukang pipa L.02 OH 1.286 90,000.00 115,740.00
Mandor L.04 OH 0.257 100,000.00 25,700.00
321,410.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 1000 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.000 3,500,000.00 3,500,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 1.000 1,450,000.00 1,450,000.00
JUMLAH HARGA ALAT 4,950,000.00

D Jumlah (A+B+C) 5,271,410.00


E Overhead & Profit 15.00% 790,711.50
F Harga Satuan Pekerjaan (D+E) 6,062,121.50

A.8.4.3.13 (K3) Pemasangan 1 buah Valve Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 70,000.00 210,000.00
Tukang pipa L.02 OH 1.500 90,000.00 135,000.00
Mandor L.04 OH 0.300 100,000.00 30,000.00
375,000.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 1100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.000 3,500,000.00 3,500,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 1.000 1,450,000.00 1,450,000.00
JUMLAH HARGA ALAT 4,950,000.00

D Jumlah (A+B+C) 5,325,000.00


E Overhead & Profit 15.00% 798,750.00
F Harga Satuan Pekerjaan (D+E) 6,123,750.00

A.8.4.3.14 (K3) Pemasangan 1 buah Valve Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 70,000.00 210,000.00
Tukang pipa L.02 OH 1.500 90,000.00 135,000.00
Mandor L.04 OH 0.300 100,000.00 30,000.00
375,000.00
JUMLAH TENAGA KERJA
B BAHAN
Valve Ø 1200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 1.000 3,500,000.00 3,500,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 1.000 1,450,000.00 1,450,000.00
JUMLAH HARGA ALAT 4,950,000.00

D Jumlah (A+B+C) 5,325,000.00


E Overhead & Profit 15.00% 798,750.00
F Harga Satuan Pekerjaan (D+E) 6,123,750.00

A.8.4.3.15 (K3) Pemasangan 1 buah Tee Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.106 70,000.00 7,420.00
Tukang pipa L.02 OH 0.053 90,000.00 4,770.00
Mandor L.04 OH 0.011 100,000.00 1,100.00
13,290.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 150 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.028 3,500,000.00 98,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 98,000.00

D Jumlah (A+B+C) 111,290.00


E Overhead & Profit 15.00% 16,693.50
F Harga Satuan Pekerjaan (D+E) 127,983.50

A.8.4.3.16 (K3) Pemasangan 1 buah Tee Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.216 70,000.00 15,120.00
Tukang pipa L.02 OH 0.108 90,000.00 9,720.00
Mandor L.04 OH 0.022 100,000.00 2,200.00
27,040.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.029 3,500,000.00 101,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 101,500.00
D Jumlah (A+B+C) 128,540.00
E Overhead & Profit 15.00% 19,281.00
F Harga Satuan Pekerjaan (D+E) 147,821.00

A.8.4.3.17 (K3) Pemasangan 1 buah Tee Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.326 70,000.00 22,820.00
Tukang pipa L.02 OH 0.163 90,000.00 14,670.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
40,790.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 250 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.039 3,500,000.00 136,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 136,500.00

D Jumlah (A+B+C) 177,290.00


E Overhead & Profit 15.00% 26,593.50
F Harga Satuan Pekerjaan (D+E) 203,883.50

A.8.4.3.18 (K3) Pemasangan 1 buah Tee Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.436 70,000.00 30,520.00
Tukang pipa L.02 OH 0.218 90,000.00 19,620.00
Mandor L.04 OH 0.044 100,000.00 4,400.00
54,540.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 300 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.500 3,500,000.00 1,750,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,750,000.00

D Jumlah (A+B+C) 1,804,540.00


E Overhead & Profit 15.00% 270,681.00
F Harga Satuan Pekerjaan (D+E) 2,075,221.00

A.8.4.3.19 (K3) Pemasangan 1 buah Tee Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.656 70,000.00 45,920.00
Tukang pipa L.02 OH 0.328 90,000.00 29,520.00
Mandor L.04 OH 0.066 100,000.00 6,600.00
82,040.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 400 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.500 3,500,000.00 1,750,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,750,000.00

D Jumlah (A+B+C) 1,832,040.00


E Overhead & Profit 15.00% 274,806.00
F Harga Satuan Pekerjaan (D+E) 2,106,846.00

A.8.4.3.20 (K3) Pemasangan 1 buah Tee Ø 450 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.766 70,000.00 53,620.00
Tukang pipa L.02 OH 0.383 90,000.00 34,470.00
Mandor L.04 OH 0.077 100,000.00 7,700.00
95,790.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 450 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.500 3,500,000.00 1,750,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 1,750,000.00

D Jumlah (A+B+C) 1,845,790.00


E Overhead & Profit 15.00% 276,868.50
F Harga Satuan Pekerjaan (D+E) 2,122,658.50

A.8.4.3.21 (K3) Pemasangan 1 buah Tee Ø 500 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.876 70,000.00 61,320.00
Tukang pipa L.02 OH 0.438 90,000.00 39,420.00
Mandor L.04 OH 0.088 100,000.00 8,800.00
109,540.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 500 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.600 3,500,000.00 2,100,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 2,100,000.00

D Jumlah (A+B+C) 2,209,540.00


E Overhead & Profit 15.00% 331,431.00
F Harga Satuan Pekerjaan (D+E) 2,540,971.00

A.8.4.3.22 (K3) Pemasangan 1 buah Tee Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.096 70,000.00 76,720.00
Tukang pipa L.02 OH 0.548 90,000.00 49,320.00
Mandor L.04 OH 0.110 100,000.00 11,000.00
137,040.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 600 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.193 3,500,000.00 675,500.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.096 1,450,000.00 139,200.00
JUMLAH HARGA ALAT 814,700.00

D Jumlah (A+B+C) 951,740.00


E Overhead & Profit 15.00% 142,761.00
F Harga Satuan Pekerjaan (D+E) 1,094,501.00

A.8.4.3.23 (K3) Pemasangan 1 buah Tee Ø 700 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.316 70,000.00 92,120.00
Tukang pipa L.02 OH 0.658 90,000.00 59,220.00
Mandor L.04 OH 0.132 100,000.00 13,200.00
164,540.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 700 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.225 3,500,000.00 787,500.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.113 1,450,000.00 163,850.00
JUMLAH HARGA ALAT 951,350.00

D Jumlah (A+B+C) 1,115,890.00


E Overhead & Profit 15.00% 167,383.50
F Harga Satuan Pekerjaan (D+E) 1,283,273.50

A.8.4.3.24 (K3) Pemasangan 1 buah Tee Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.536 70,000.00 107,520.00
Tukang pipa L.02 OH 0.768 90,000.00 69,120.00
Mandor L.04 OH 0.154 100,000.00 15,400.00
192,040.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 800 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.257 3,500,000.00 899,500.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.129 1,450,000.00 187,050.00
JUMLAH HARGA ALAT 1,086,550.00

D Jumlah (A+B+C) 1,278,590.00


E Overhead & Profit 15.00% 191,788.50
F Harga Satuan Pekerjaan (D+E) 1,470,378.50

A.8.4.3.25 (K3) Pemasangan 1 buah Tee Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.756 70,000.00 122,920.00
Tukang pipa L.02 OH 0.878 90,000.00 79,020.00
Mandor L.04 OH 0.176 100,000.00 17,600.00
219,540.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 900 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.321 3,500,000.00 1,123,500.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.161 1,450,000.00 233,450.00
JUMLAH HARGA ALAT 1,356,950.00

D Jumlah (A+B+C) 1,576,490.00


E Overhead & Profit 15.00% 236,473.50
F Harga Satuan Pekerjaan (D+E) 1,812,963.50

A.8.4.3.26 (K3) Pemasangan 1 buah Tee Ø 1000 mm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.976 70,000.00 138,320.00
Tukang pipa L.02 OH 0.988 90,000.00 88,920.00
Mandor L.04 OH 0.198 100,000.00 19,800.00
247,040.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 1000 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.366 3,500,000.00 1,281,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.183 1,450,000.00 265,350.00
JUMLAH HARGA ALAT 1,546,350.00

D Jumlah (A+B+C) 1,793,390.00


E Overhead & Profit 15.00% 269,008.50
F Harga Satuan Pekerjaan (D+E) 2,062,398.50

A.8.4.3.27 (K3) Pemasangan 1 buah Tee Ø 1100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.196 70,000.00 153,720.00
Tukang pipa L.02 OH 1.098 90,000.00 98,820.00
Mandor L.04 OH 0.220 100,000.00 22,000.00
274,540.00
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 1100 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.386 3,500,000.00 1,351,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.193 1,450,000.00 279,850.00
JUMLAH HARGA ALAT 1,630,850.00

D Jumlah (A+B+C) 1,905,390.00


E Overhead & Profit 15.00% 285,808.50
F Harga Satuan Pekerjaan (D+E) 2,191,198.50

A.8.4.3.28 (K3) Pemasangan 1 buah Tee Ø 1200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.416 70,000.00 169,120.00
Tukang pipa L.02 OH 1.208 90,000.00 108,720.00
Mandor L.04 OH 0.242 100,000.00 24,200.00
JUMLAH TENAGA KERJA 302,040.00
B BAHAN
Tee Ø 1200 mm buah 1.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel hari 0.450 3,500,000.00 1,575,000.00
& handle crane 2 T
Mobile crane £ 3 ton hari 0.225 1,450,000.00 326,250.00
JUMLAH HARGA ALAT 1,901,250.00
D Jumlah (A+B+C) 2,203,290.00
E Overhead & Profit 15.00% 330,493.50
F Harga Satuan Pekerjaan (D+E) 2,533,783.50
A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA
A.8.4.4.1 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.466 70,000.00 102,620.00
Tukang pipa L.02 OH 0.733 90,000.00 65,970.00
Mandor L.04 OH 0.147 100,000.00 14,700.00
JUMLAH TENAGA KERJA 183,290.00
B BAHAN
Pipa Ø 80 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.606 50,000.00 30,300.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.075 1,234,800.00 92,610.00
watt
Sewa Pompa hari 0.968 330,000.00 319,440.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 0.865 3,500,000.00 3,027,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,469,850.00

D Jumlah (A+B+C) 3,653,140.00


E Overhead & Profit 15.00% 547,971.00
F Harga Satuan Pekerjaan (D+E) 4,201,111.00

A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.646 70,000.00 115,220.00
Tukang pipa L.02 OH 0.823 90,000.00 74,070.00
Mandor L.04 OH 0.165 100,000.00 16,500.00
JUMLAH TENAGA KERJA 205,790.00
B BAHAN
Pipa Ø 100 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.650 50,000.00 32,500.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.159 1,234,800.00 196,333.20
watt
Sewa Pompa hari 1.078 330,000.00 355,740.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 0.911 3,500,000.00 3,188,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 3,773,073.20
D Jumlah (A+B+C) 3,978,863.20
E Overhead & Profit 15.00% 596,829.48
F Harga Satuan Pekerjaan (D+E) 4,575,692.68

A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.096 70,000.00 146,720.00
Tukang pipa L.02 OH 1.048 90,000.00 94,320.00
Mandor L.04 OH 0.210 100,000.00 21,000.00
262,040.00
JUMLAH TENAGA KERJA
B BAHAN -
Pipa Ø 150 mm buah 1.000 -
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.760 50,000.00 38,000.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.369 1,234,800.00 455,641.20
watt
Sewa Pompa hari 1.353 330,000.00 446,490.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.026 3,500,000.00 3,591,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 4,531,131.20
D Jumlah (A+B+C) 4,793,171.20
E Overhead & Profit 15.00% 718,975.68
F Harga Satuan Pekerjaan (D+E) 5,512,146.88

A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.546 70,000.00 178,220.00
Tukang pipa L.02 OH 1.273 90,000.00 114,570.00
Mandor L.04 OH 0.255 100,000.00 25,500.00
JUMLAH TENAGA KERJA 318,290.00
B BAHAN
Pipa Ø 200 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.870 50,000.00 43,500.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.579 1,234,800.00 714,949.20
watt
Sewa Pompa hari 1.628 330,000.00 537,240.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.141 3,500,000.00 3,993,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 5,289,189.20
D Jumlah (A+B+C) 5,607,479.20
E Overhead & Profit 15.00% 841,121.88
F Harga Satuan Pekerjaan (D+E) 6,448,601.08

A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.996 70,000.00 209,720.00
Tukang pipa L.02 OH 1.498 90,000.00 134,820.00
Mandor L.04 OH 0.300 100,000.00 30,000.00
374,540.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 250 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 0.980 50,000.00 49,000.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.789 1,234,800.00 974,257.20
watt
Sewa Pompa hari 1.903 330,000.00 627,990.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.256 3,500,000.00 4,396,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 6,047,247.20
D Jumlah (A+B+C) 6,421,787.20
E Overhead & Profit 15.00% 963,268.08
F Harga Satuan Pekerjaan (D+E) 7,385,055.28

A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 3.446 70,000.00 241,220.00
Tukang pipa L.02 OH 1.723 90,000.00 155,070.00
Mandor L.04 OH 0.345 100,000.00 34,500.00
JUMLAH TENAGA KERJA 430,790.00
B BAHAN
Pipa Ø 300 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 1.090 50,000.00 54,500.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.999 1,234,800.00 1,233,565.20
watt
Sewa Pompa hari 2.178 330,000.00 718,740.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.371 3,500,000.00 4,798,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 6,805,305.20
D Jumlah (A+B+C) 7,236,095.20
E Overhead & Profit 15.00% 1,085,414.28
F Harga Satuan Pekerjaan (D+E) 8,321,509.48

A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.346 70,000.00 304,220.00
Tukang pipa L.02 OH 2.173 90,000.00 195,570.00
Mandor L.04 OH 0.430 100,000.00 43,000.00
JUMLAH TENAGA KERJA 542,790.00
B BAHAN
Pipa Ø 400 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik hari 1.310 50,000.00 65,500.00
/ cilinder saw

Sewa Genset 1500 hari 1.419 1,234,800.00 1,752,181.20


watt
Sewa Pompa hari 2.728 330,000.00 900,240.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.601 3,500,000.00 5,603,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 8,321,421.20
D Jumlah (A+B+C) 8,864,211.20
E Overhead & Profit 15.00% 1,329,631.68
F Harga Satuan Pekerjaan (D+E) 10,193,842.88

A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 4.796 70,000.00 335,720.00
Tukang pipa L.02 OH 2.398 90,000.00 215,820.00
Mandor L.04 OH 0.480 100,000.00 48,000.00
JUMLAH TENAGA KERJA 599,540.00
B BAHAN
Pipa Ø 450 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 1.420 50,000.00 71,000.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 1.629 1,234,800.00 2,011,489.20
watt
Sewa Pompa hari 3.003 330,000.00 990,990.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.716 3,500,000.00 6,006,000.00
& handle crane 2 T
JUMLAH HARGA ALAT 9,079,479.20
D Jumlah (A+B+C) 9,679,019.20
E Overhead & Profit 15.00% 1,451,852.88
F Harga Satuan Pekerjaan (D+E) 11,130,872.08

A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.246 70,000.00 367,220.00
Tukang pipa L.02 OH 2.623 90,000.00 236,070.00
Mandor L.04 OH 0.525 100,000.00 52,500.00
JUMLAH TENAGA KERJA 655,790.00
B BAHAN
Pipa Ø 500 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 1.530 50,000.00 76,500.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 1.839 1,234,800.00 2,270,797.20
watt
Sewa Pompa hari 3.278 330,000.00 1,081,740.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.831 3,500,000.00 6,408,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 9,837,537.20
D Jumlah (A+B+C) 10,493,327.20
E Overhead & Profit 15.00% 1,573,999.08
F Harga Satuan Pekerjaan (D+E) 12,067,326.28

A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.146 70,000.00 430,220.00
Tukang pipa L.02 OH 3.073 90,000.00 276,570.00
Mandor L.04 OH 0.615 100,000.00 61,500.00
JUMLAH TENAGA KERJA 768,290.00
B BAHAN
Pipa Ø 600 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 1.750 50,000.00 87,500.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 2.259 1,234,800.00 2,789,413.20
watt
Sewa Pompa hari 3.828 330,000.00 1,263,240.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.061 3,500,000.00 7,213,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 11,353,653.20
D Jumlah (A+B+C) 12,121,943.20
E Overhead & Profit 15.00% 1,818,291.48
F Harga Satuan Pekerjaan (D+E) 13,940,234.68

A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.046 70,000.00 493,220.00
Tukang pipa L.02 OH 3.523 90,000.00 317,070.00
Mandor L.04 OH 0.705 100,000.00 70,500.00
JUMLAH TENAGA KERJA 880,790.00
B BAHAN
Pipa Ø 700 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 1.970 50,000.00 98,500.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 2.679 1,234,800.00 3,308,029.20
watt
Sewa Pompa hari 4.378 330,000.00 1,444,740.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.291 3,500,000.00 8,018,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 12,869,769.20
D Jumlah (A+B+C) 13,750,559.20
E Overhead & Profit 15.00% 2,062,583.88
F Harga Satuan Pekerjaan (D+E) 15,813,143.08

A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.946 70,000.00 556,220.00
Tukang pipa L.02 OH 3.973 90,000.00 357,570.00
Mandor L.04 OH 0.795 100,000.00 79,500.00
JUMLAH TENAGA KERJA 993,290.00
B BAHAN
Pipa Ø 800 mm buah 1.000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong hari 2.190 50,000.00 109,500.00
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 3.099 1,234,800.00 3,826,645.20
watt
Sewa Pompa hari 4.928 330,000.00 1,626,240.00
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.521 3,500,000.00 8,823,500.00
& handle crane 2 T
JUMLAH HARGA ALAT 14,385,885.20
D Jumlah (A+B+C) 15,379,175.20
E Overhead & Profit 15.00% 2,306,876.28
F Harga Satuan Pekerjaan (D+E) 17,686,051.48

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.002 5,000.00 10.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 487.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,127.00
E Overhead & Profit 15.00% 169.05
F Harga Satuan Pekerjaan (D+E) 1,296.05

A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.004 5,000.00 20.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 497.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,137.00
E Overhead & Profit 15.00% 170.55
F Harga Satuan Pekerjaan (D+E) 1,307.55

A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.008 5,000.00 40.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 517.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,157.00
E Overhead & Profit 15.00% 173.55
F Harga Satuan Pekerjaan (D+E) 1,330.55

A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.018 5,000.00 90.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 567.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,207.00
E Overhead & Profit 15.00% 181.05
F Harga Satuan Pekerjaan (D+E) 1,388.05

A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.031 5,000.00 155.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 632.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,272.00
E Overhead & Profit 15.00% 190.80
F Harga Satuan Pekerjaan (D+E) 1,462.80

A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.049 5,000.00 245.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 722.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,362.00
E Overhead & Profit 15.00% 204.30
F Harga Satuan Pekerjaan (D+E) 1,566.30

A.8.4.5.7 (K3) Pengetesan 1 m pipa Ø 300 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.071 5,000.00 355.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 832.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,472.00
E Overhead & Profit 15.00% 220.80
F Harga Satuan Pekerjaan (D+E) 1,692.80

A.8.4.5.8 (K3) Pengetesan 1 m pipa Ø 400 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.126 5,000.00 630.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 1,107.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,747.00
E Overhead & Profit 15.00% 262.05
F Harga Satuan Pekerjaan (D+E) 2,009.05

A.8.4.5.9 (K3) Pengetesan 1 m pipa Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.158 5,000.00 790.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 1,267.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,907.00
E Overhead & Profit 15.00% 286.05
F Harga Satuan Pekerjaan (D+E) 2,193.05

A.8.4.5.10 (K3) Pengetesan 1 m pipa Ø 600 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.001 100,000.00 80.00
JUMLAH TENAGA KERJA 640.00
B BAHAN
Air test (air bersih) m3 0.283 5,000.00 1,415.00
Bahan bakar liter 0.060 6,550.00 393.00
Oli liter 0.002 42,000.00 84.00
JUMLAH HARGA BAHAN 1,892.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,532.00
E Overhead & Profit 15.00% 379.80
F Harga Satuan Pekerjaan (D+E) 2,911.80

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Upah % 1.000 1,052,000.00 1,052,000.00
JUMLAH TENAGA KERJA 1,052,000.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,000.00 15,000.00
Kabel m 24.000 6,500.00 156,000.00
T Dus buah 3.000 2,000.00 6,000.00
L Bow buah 4.000 2,000.00 8,000.00
Las Dop buah 3.000 3,000.00 9,000.00
Klem buah 24.000 35,000.00 840,000.00
Mongkok buah 1.000 1,000.00 1,000.00
Saklar buah 1.000 12,500.00 12,500.00
Fitting buah 1.000 4,500.00 4,500.00
JUMLAH HARGA BAHAN 1,052,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 2,104,000.00
E Overhead & Profit 15.00% 315,600.00
F Harga Satuan Pekerjaan (D+E) 2,419,600.00

A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Upah % 1.000 993,500.00 993,500.00
JUMLAH TENAGA KERJA 993,500.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,000.00 15,000.00
Kabel m 15.000 6,500.00 97,500.00
T Dus buah 1.000 2,000.00 2,000.00
L Bow buah 2.000 2,000.00 4,000.00
Klem biasa buah 24.000 35,000.00 840,000.00
MCB buah 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 993,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,987,000.00
E Overhead & Profit 15.00% 298,050.00
F Harga Satuan Pekerjaan (D+E) 2,285,050.00

TAMBAHAN / LAIN-LAIN

Ls 1 Buah Pembuatan Papan Nama Proyek

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.200 70,000.00 14,000.00
Tukang kayu oh 0.600 90,000.00 54,000.00
Kepala tukang oh 0.060 95,000.00 5,700.00
Mandor oh 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 75,700.00

B BAHAN
Kayu Kaso 5/7 (kayu hutan) m3 0.020 3,500,000.00 70,000.00
Paku Biasa 2-5 kg 0.250 16,000.00 4,000.00
Kayu Dolken dia.8 8-10/4 m' btg 1.500 60,000.00 90,000.00
Triplek 6 mm lbr 0.350 83,000.00 29,050.00
Cetak papan nama dg bhn flexi cetak digital m' 1.000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 218,050.00
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 293,750.00


E Overhead & Profit 15.00% 44,062.50
F Harga Satuan Pekerjaan (D+E) 337,812.50

SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 70,000.00 17,500.00
Tukang batu oh 0.125 90,000.00 11,250.00
Kepala tukang oh 0.013 95,000.00 1,235.00
Mandor oh 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 31,285.00
B BAHAN
ubin granit bh 0.020 42,000.00 840.00
portland cement kg 0.250 1,400.00 350.00
pasir pasang m3 1.500 180,000.00 270,000.00
semen warna kg 0.350 6,000.00 2,100.00
JUMLAH HARGA BAHAN 273,290.00
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 304,575.00


E Overhead & Profit 15.00% 45,686.25
F Harga Satuan Pekerjaan (D+E) 350,261.25

SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 70,000.00 17,500.00
Tukang batu oh 0.120 90,000.00 10,800.00
Kepala tukang oh 0.012 95,000.00 1,140.00
Mandor oh 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 30,740.00
B BAHAN
keramik 40 x 40 bh 6.630 4,500.00 29,835.00
portland cement kg 9.800 1,400.00 13,720.00
pasir pasang m3 0.045 180,000.00 8,100.00
semen warna kg 1.300 6,000.00 7,800.00
JUMLAH HARGA BAHAN 59,455.00
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 90,195.00


E Overhead & Profit 15.00% 13,529.25
F Harga Satuan Pekerjaan (D+E) 103,724.25

SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.375 70,000.00 26,250.00
Tukang batu oh 0.180 90,000.00 16,200.00
Kepala tukang oh 0.018 95,000.00 1,710.00
Mandor oh 0.020 100,000.00 1,950.00
JUMLAH TENAGA KERJA 46,110.00
B BAHAN
granito 60 x 60 bh 3.000 46,800.00 140,400.00
portland cement kg 14.700 1,400.00 20,580.00
pasir pasang m3 0.068 180,000.00 12,150.00
semen warna kg 1.950 6,000.00 11,700.00
JUMLAH HARGA BAHAN 184,830.00
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 230,940.00


E Overhead & Profit 15.00% 34,641.00
F Harga Satuan Pekerjaan (D+E) 265,581.00

SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.060 70,000.00 4,200.00
Tukang batu oh 0.060 90,000.00 5,400.00
Kepala tukang oh 0.006 95,000.00 570.00
Mandor oh 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 10,470.00
B BAHAN
List gypsum profil m' 1.050 18,000.00 18,900.00
Tepung gypsum kg 0.150 18,500.00 2,775.00

JUMLAH HARGA BAHAN 21,675.00


C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 32,145.00


E Overhead & Profit 15.00% 4,821.75
F Harga Satuan Pekerjaan (D+E) 36,966.75

SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.100 70,000.00 7,000.00
Tukang batu oh 0.200 90,000.00 18,000.00
Kepala tukang oh 0.020 95,000.00 1,900.00
Mandor oh 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 27,400.00
B BAHAN
woodplank bh 0.250 60,000.00 15,000.00
Paku biasa 2" - 5" kg 0.050 16,000.00 800.00

JUMLAH HARGA BAHAN 15,800.00


C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,200.00


E Overhead & Profit 15.00% 6,480.00
F Harga Satuan Pekerjaan (D+E) 49,680.00
ABK.990.07 Menurunkan 1 m2 atap genteng

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Mandor L.15 OH 0.100 100,000.00 10,000.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 24,000.00


E Overhead & Profit 15.00% 3,600.00
JUMLAH 27,600.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 2,760.00 1,840.00

ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 75,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 75,000.00


E Overhead & Profit 15.00% 11,250.00
JUMLAH 86,250.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 8,625.00 5,750.00

ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.00 70,000.00 280,000.00
Tukang kayu L.02 OH 6.00 90,000.00 540,000.00
Kepala tukang L.03 OH 0.60 95,000.00 57,000.00
Mandor L.04 OH 0.20 100,000.00 20,000.00
JUMLAH TENAGA KERJA 897,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 897,000.00


E Overhead & Profit 15.00% 134,550.00
JUMLAH 1,031,550.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 103,155.00 68,770.00

ABK.990.05 Membongkar 1 m2 lantai tegel/floor

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.00 70,000.00 70,000.00
Mandor L.04 OH 0.10 100,000.00 10,000.00
JUMLAH TENAGA KERJA 80,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 80,000.00


E Overhead & Profit 15.00% 12,000.00
JUMLAH 92,000.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 9,200.00 6,133.33

SNI 2012 1 m³ Bongkaran Beton Bertulang

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 70,000.00 466,690.00
Mandor L.04 OH 0.333 100,000.00 33,300.00
JUMLAH TENAGA KERJA 499,990.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 499,990.00


E Overhead & Profit 15.00% 74,998.50
F Harga Satuan Pekerjaan (D+E) 574,988.50

SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 70,000.00 466,690.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 469,990.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 469,990.00


E Overhead & Profit 15.00% 70,498.50
F Harga Satuan Pekerjaan (D+E) 540,488.50
ABK.300.19 1 m3 Beton Bertulang AD. 1:2:3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Semen portland kg 232 1,400.00 324,800.00
Pasir beton m3 0.52 200,000.00 104,000.00
Spleet 2/3 cm m3 0.78 250,000.00 195,000.00
JUMLAH HARGA BAHAN 623,800.00
B TENAGA
Pekerja Oh 1.65 70,000.00 115,500.00
Tukang batu Oh 0.25 90,000.00 22,500.00
Kepala tukang Oh 0.025 95,000.00 2,375.00
Mandor Oh 0.08 100,000.00 8,000.00
JUMLAH TENAGA KERJA 148,375.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 772,175.00


E Overhead & Profit 15.00% 115,826.25
F Harga Satuan Pekerjaan (D+E) 888,001.25

- 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
GRC 4 mm lbr 0.35 52,500.00 18,375.00
Holo 4/4 meni btg 1.00 12,100.00 12,100.00
Holo 2/4 meni btg 0.34 11,000.00 3,740.00
Kawat Bwg 12 kg 0.10 10,000.00 1,000.00
Paku screw 2.5 cm bh 20.00 50.00 1,000.00
Adhesive kg 0.02 6,000.00 120.00
Kain kasa m' 2.00 400.00 800.00
Cat penutup 2 kali kg 0.03 25,000.00 750.00
Paku beton bh 4.00 175.00 700.00
JUMLAH HARGA BAHAN 38,585.00
B TENAGA
Pekerja oh 0.17 70,000.00 11,900.00
Tukang oh 0.28 90,000.00 25,200.00
Kep Tukang oh 0.03 95,000.00 2,850.00
Mandor oh 0.07 100,000.00 7,000.00
JUMLAH TENAGA KERJA 46,950.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,535.00


E Overhead & Profit 15.00% 12,830.25
F Harga Satuan Pekerjaan (D+E) 98,365.25

Ls 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Kabel Listrik NYA 3 x 2,5 mm m' 11.00 6,500.00 71,500.00
Instalasi lapu dan stop kontak ttk 1.00 32,500.00 32,500.00
JUMLAH HARGA BAHAN 104,000.00
B TENAGA
Pembantu tukang Listrik Oh 0.48 70,000.00 33,600.00
Tukang Listrik Oh 0.048 90,000.00 4,320.00
Kepala tukang Listrik Oh 0.048 95,000.00 4,560.00
JUMLAH TENAGA KERJA 42,480.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 146,480.00


E Overhead & Profit 15.00% 21,972.00
F Harga Satuan Pekerjaan (D+E) 168,452.00

Ls 1 Bh Pekerjaan Stop Kontak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Stop Kontak bh 1.000 12,500.00 12,500.00
JUMLAH HARGA BAHAN 12,500.00
TENAGA
Pembantu tukang Listrik Oh 0.2 70,000.00 14,000.00
Tukang Listrik Oh 0.02 90,000.00 1,800.00
Kepala tukang Listrik Oh 0.02 95,000.00 1,900.00
JUMLAH TENAGA KERJA 17,700.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,200.00


E Overhead & Profit 15.00% 4,530.00
F Harga Satuan Pekerjaan (D+E) 34,730.00

Ls 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Lampu SL 18 watt + fitting bh 1.000 27,000.00 27,000.00
JUMLAH HARGA BAHAN 27,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 70,000.00 14,000.00
Tukang Listrik Oh 0.02 90,000.00 1,800.00
Kepala tukang Listrik 0 0.02 95,000.00 1,900.00
JUMLAH TENAGA KERJA 17,700.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,700.00


E Overhead & Profit 15.00% 6,705.00
F Harga Satuan Pekerjaan (D+E) 51,405.00

Ls 1 Unit Pekerjaan Sekring Kast

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Sekring Kast bh 1.000 40,000.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 70,000.00 14,000.00
Tukang Listrik Oh 0.02 90,000.00 1,800.00
Kepala tukang Listrik Oh 0.02 95,000.00 1,900.00
JUMLAH TENAGA KERJA 17,700.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,700.00


E Overhead & Profit 15.00% 8,655.00
F Harga Satuan Pekerjaan (D+E) 66,355.00
Ls 1 Bh Pekerjaan MCB Box

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
MCB BOX bh 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 70,000.00 14,000.00
Tukang Listrik Oh 0.02 90,000.00 1,800.00
Kepala tukang Listrik Oh 0.02 95,000.00 1,900.00
JUMLAH TENAGA KERJA 17,700.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 52,700.00


E Overhead & Profit 15.00% 7,905.00
F Harga Satuan Pekerjaan (D+E) 60,605.00

- 1 m' Pekerjaan Over Spaneng

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Over Spaneng m' 1.000 9,000.00 9,000.00
JUMLAH HARGA BAHAN 9,000.00
TENAGA
Pembantu tukang Listrik Oh 0.24 70,000.00 16,800.00
Tukang Listrik Oh 0.024 90,000.00 2,160.00
Kepala tukang Listrik Oh 0.024 95,000.00 2,280.00
JUMLAH TENAGA KERJA 21,240.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,240.00


E Overhead & Profit 15.00% 4,536.00
F Harga Satuan Pekerjaan (D+E) 34,776.00

Ls 1 Bh Pekerjaan Saklar Ganda

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar Ganda bh 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
TENAGA
Pembantu tukang Listrik Oh 0.4 70,000.00 28,000.00
Tukang Listrik Oh 0.04 90,000.00 3,600.00
Kepala tukang Listrik Oh 0.04 95,000.00 3,800.00
JUMLAH TENAGA KERJA 35,400.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,400.00


E Overhead & Profit 15.00% 7,560.00
F Harga Satuan Pekerjaan (D+E) 57,960.00

Ls 1 Bh Pekerjaan Saklar Tunggal

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar tunggal bh 1.000 12,500.00 12,500.00
JUMLAH HARGA BAHAN 12,500.00
TENAGA
Pembantu tukang Listrik Oh 0.4 70,000.00 28,000.00
Tukang Listrik Oh 0.04 90,000.00 3,600.00
Kepala tukang Listrik Oh 0.04 95,000.00 3,800.00
JUMLAH TENAGA KERJA 35,400.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,900.00


E Overhead & Profit 15.00% 7,185.00
F Harga Satuan Pekerjaan (D+E) 55,085.00

A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang batu L.02 OH 0.750 90,000.00 67,500.00
Kepala tukang L.03 OH 0.075 95,000.00 7,125.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 187,125.00
B BAHAN
Batu belah m3 1.200 175,000.00 210,000.00
Semen Portland Kg 163.000 1,400.00 228,200.00
Pasir pasang m3 0.520 180,000.00 93,600.00
JUMLAH HARGA BAHAN 531,800.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 718,925.00
E Overhead & Profit 15.00% 107,838.75
F Harga Satuan Pekerjaan (D+E) 826,763.75

Sumber, 2017

Kepala Dinas Perumahan, Kawasan Permukiman Dan Pertanahan


Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012
Analisa EI-311a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.1.(1a)


JENIS PEKERJAAN : Galian Biasa / Kupasan (menggunakan alat berat)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0511 10,000.00 511.00


2. Mandor (L03) Jam 0.0256 14,285.71 365.00

JUMLAH HARGA TENAGA 876.01

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0256 482,600.60 12,330.56


2. Dump Truck (E08) Jam 0.3344 272,784.44 91,207.75
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 103,538.31

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 104,414.31


E. OVERHEAD & PROFIT 15.0 % x D 15,662.15
F. HARGA SATUAN PEKERJAAN ( D + E ) 120,076.46
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-322.rob
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2.(2).rob


JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.4294 10,000.00 24,293.83


2. Mandor (L03) Jam 0.6073 14,285.71 8,676.37

JUMLAH HARGA TENAGA 32,970.20

B. BAHAN

1. Bahan pilihan (M09) (M09) M3 1.1100 150,000.00 166,500.00

JUMLAH HARGA BAHAN 166,500.00

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 226,139.45 1,923.23
2. Dump Truck (E08) Jam 0.6073 272,784.44 165,674.50
3. Motor Grader (E13) Jam 0.0040 0.00 0.00
3. Tandem (E17) Jam 0.0161 286,807.14 4,618.89
4. Water Tanker (E23) Jam 0.0070 258,774.99 1,818.70
5. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 174,035.31

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 373,505.52


E. OVERHEAD & PROFIT 15.0 % x D 56,025.83
F. HARGA SATUAN PEKERJAAN ( D + E ) 429,531.35
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-611a
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (1)(a)


JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 10,000.00 20.83


2. Mandor (L03) Jam 0.0004 14,285.71 5.95

JUMLAH HARGA TENAGA 26.79

B. BAHAN

1. Aspal (M10) Kg 0.6790 12,200.00 8,283.51


2. Kerosene (M11) liter 0.3708 10,225.00 3,791.43

JUMLAH HARGA BAHAN 12,074.94

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 374,495.18 78.02


2. Compressor E05 Jam 0.0002 179,166.49 37.33

JUMLAH HARGA PERALATAN 115.35

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 12,217.07


E. OVERHEAD & PROFIT 15.0 % x D 1,832.56
F. HARGA SATUAN PEKERJAAN ( D + E ) 14,049.63
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Analisa EI-632.rob
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (2).rob


JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : Ton, m2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1406 10,000.00 1,405.62


2. Mandor (L03) Jam 0.0201 14,285.71 286.86

JUMLAH HARGA TENAGA 1,692.48

B. BAHAN

1. Pasir Kasar (M01a) M3 0.0139 200,000.00 2,784.66


2. Pasir Halus (M01c) M3 0.0139 180,000.00 2,506.19
3 Semen (M05) 31.5000 400.00 12,600.00
4 Aspal (M10) 92.7000 12,200.00 1,130,940.00

JUMLAH HARGA BAHAN 1,148,830.85

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 226,139.45 2,164.47
2. AMP E01 Jam 0.0201 6,233,983.42 125,180.39
3. Genset E12 Jam 0.0201 449,852.17 9,033.18
4. Dump Truck E08 Jam 0.0163 272,784.44 4,438.43
5. Asphalt Finisher E02 Jam 0.0290 - 0.00
6. Tandem Roller E17 Jam 0.0238 286,807.14 6,824.74
7 P. Tyre Roller E18 Jam 0.0082 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 147,641.21

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,298,164.54


E. OVERHEAD & PROFIT 15.0 % x D 194,724.68
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,492,889.22
MAKA HARGA UNTUK 1 M2 71,089.96
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017

HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter 452,479.00
2 A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter 529,701.50
3 A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter 481,804.00
4 A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank 69,005.98
5 A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran (direksikeet) 1,488,951.00
6 A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) 1,676,642.50
7 A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan 1,417,375.00
8 A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja 1,434,093.13
9 A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan 13,800.00
10 A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu 71,224.10
11 A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm 237,049.50
12 A. 2.2.1.12. Pembuatan 1 m2 jalan sementara 139,207.50
13 A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang 1,149,977.00
14 A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata 574,988.50
15 A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm 102,347.47
16 A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar 392,118.95
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
17 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m 63,250.00
18 A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m 77,625.00
19 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m 92,230.00
20 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m 84,180.00
21 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m 127,650.00
22 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m 101,775.00
23 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter 4,600.00
24 A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter 27,715.00
25 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah 46,000.00
26 A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) 46,000.00
27 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug 232,300.00
28 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL 322,057.50
29 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan 75,900.00
30 A.2.3.1.14. Pengurugan 1 m3 sirtu padat 230,000.00
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
31 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP 882,308.75
32 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP 826,763.75
33 A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 788,261.75
34 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP 761,190.75
35 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP 724,091.75
36 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP 541,032.45
37 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP 668,581.25
38 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP 641,510.25
39 A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping) 427,920.75
40 A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah 2,903,951.25
41 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm 880,727.50
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
42 A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara dengan beton rabat 939,438.29
43 A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125) 982,161.09
44 A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150) 1,015,491.62
45 A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 829,862.51
46 A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175) 1,055,110.03
47 A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220) 1,092,631.67
48 A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225) 1,121,207.65
49 A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250) 1,139,448.23
50 A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325) 1,170,785.43
51 A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350) 1,180,497.76
52 A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375) 1,264,638.42
53 A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425) 1,277,357.78
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan
tambahan 1,975,120.28
54 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100 1,265,143.75
55 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm 68,982.75
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
56 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm 161,437.00
57 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm 150,339.50
58 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 174,529.75
59 A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands 169,366.25
60 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 116,233.57
61 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 242,270.50
62 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 262,395.50
63 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 526,725.88
64 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 543,975.88
65 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 802,725.88
66 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 667,025.88
67 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 485,900.88
68 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton 170,516.25
69 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 95,714.50
70 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 118,760.50
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
71 A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 84,423.98
72 A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 105,550.10
73 A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 126,578.47
74 A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 158,322.28
75 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai) 168,778.13
76 A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai) 56,596.89
77 A.4.1.2.7.
A.4.1.2.8. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) 51,105.64
78 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak 6,704.50
79 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak 10,844.50
80 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak 8,774.50
81 A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak 55,763.50
82 A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak 57,321.75
83 A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak 51,583.25
84 A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak 780,047.76
85 A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak 744,063.23
86 A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak 1,252,359.83
87 A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m) 108,464.03
88 A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m) 108,464.03
89 A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m) 108,464.03
90 A.4.1.2.20. Bahan 1 m3 grout campuran 3,380,028.45
91 A.4.1.2.21. Bahan 1 m3 grout (tidak campuran) 5,043,900.00
92 A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak 50,324.00
93 A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak 139,919.35
94 A.4.1.2.24. Upah 1 titik joint dengan sling 44,022.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
95 A.4.2.1.1. Pemasangan 1 kg besi profil 30,224.88
96 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 30,224.88
97 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 133,106.75
98 A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku 637,071.25
99 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 43,452.75
100 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube 408,834.28
101 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 1,357,000.00
102 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC 3,204,797.00
103 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium 541,190.00
104 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium 660,675.00
105 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 150,073.28
106 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm 2,252,651.63
107 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium 644,048.88
108 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds 192,423.75
109 A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm 568,064.12
110 A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk 427,652.12
111 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis 360,835.50
112 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 161,736.00
113 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm 101,297.75
114 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi 203,384.21
115 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon 245,331.42
116 A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 201,451.08
117 A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75 217,651.88
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
118 A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP 290,030.00
119 A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 275,321.50
120 A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP 265,431.50
121 A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 260,291.00
122 A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 258,474.00
123 A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP 241,025.05
124 A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 140,093.00
125 A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 133,133.20
126 A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 129,133.50
127 A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP 126,617.30
128 A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP 125,255.70
129 A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP 122,532.50
130 A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP 120,520.00
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
131 A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP 106,921.48
132 A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP 108,663.04
133 A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 92,934.72
134 A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 96,637.26
135 A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP 82,125.64
136 A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP 82,057.10
137 A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP 70,885.31
138 A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP 70,894.28
139 A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 145,072.50
140 A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 145,072.50
141 A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP 239,155.15
142 A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai 255,304.31
143 A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai 261,344.69
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
144 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm 71,312.19
145 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm 63,639.39
146 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm 60,319.11
147 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 58,053.15
148 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 56,766.99
149 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm 55,737.51
150 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 55,171.71
151 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 54,605.91
152 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 56,987.10
153 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 54,153.50
154 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 47,378.17
155 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 48,457.02
156 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 85,151.52
157 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 68,419.48
158 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm 77,634.20
159 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 75,988.32
160 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 74,546.68
161 A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm 67,583.67
162 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 35,359.74
163 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 56,166.00
164 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 167,020.25
165 A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm 167,020.25
166 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 45,514.70
167 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah 26,635.38
168 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose 12,730.50
169 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP 55,730.15
170 A.4.4.2.27. Pemasangan 1 m2 acian 33,925.00
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
171 A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm 95,519.00
172 A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm 125,856.00
173 A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm 106,441.70
174 A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm 141,898.50
175 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm 390,269.75
176 A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm 202,849.65
177 A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm 131,945.25
178 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 25 cm x 25 cm 132,347.75
179 A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm 198,439.30
180 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm 96,727.65
181 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm 133,470.15
182 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm 77,131.65
183 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm 245,135.15
184 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm 1,099,049.25
185 A.4.4.3.44. Pemasangan 1 m2 lantai karpet 182,493.50
186 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) 112,027.25
187 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu 328,813.75
188 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor 328,813.75
189 A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm 227,740.25
190 A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm 221,001.25
191 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm 369,956.92
192 A.4.4.3.52. Pemasangan 1 m2 dinding keramik 30 cm x 30 cm corak 224,750.25
193 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm 227,740.25
194 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 25 cm x 40 cm 186,501.25
195 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm 1,192,783.45
196 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm 483,478.40
197 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras 131,880.28
198 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam 128,547.00
199 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm 187,928.30
200 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm 231,799.75
201 A.4.4.3.61. Pemasangan 1m2 floor harderner 79,664.33
202 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm 40,158.00
203 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm 57,776.00
204 A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm 154,019.50
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
205 A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm 645,725.00
206 A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm 155,192.50
207 A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm 653,855.50
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
208 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm 57,902.50
209 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm 728,944.75
210 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm 365,314.75
211 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm 109,106.25
212 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm 44,424.50
213 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm 221,127.75
214 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 38,346.75
215 A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium 601,864.00
216 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil 16,071.25
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
217 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 47,451.88
218 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 61,881.50
219 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super 42,331.50
220 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong 86,319.00
221 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur 97,819.00
222 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar 102,419.00
223 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180 63,618.00
224 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm 41,434.50
225 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm 45,114.50
226 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm 44,372.75
227 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm 49,892.75
228 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm 35,172.75
229 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm 37,748.75
230 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm 38,484.75
231 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm 41,060.75
232 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm 51,732.75
233 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm 35,908.75
234 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm 36,276.75
235 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm 39,220.75
236 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm 40,324.75
237 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm 43,268.75
238 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m 195,459.75
239 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m 174,069.75
240 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m 170,504.75
241 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m 109,899.75
242 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m 109,899.75
243 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m 109,899.75
244 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m 106,645.25
245 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m 102,769.75
246 A.4.5.2.30. Pemasangan 1 m2 genteng beton 92,494.50
247 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana 103,672.50
248 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai 142,312.50
249 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu 103,206.75
250 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton 105,460.75
251 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal 95,929.17
252 A.4.5.2.38. Pemasangan 1 m’ nok sirap 64,802.50
253 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang 58,696.00
254 A.4.5.2.40. Pemasangan 1 m’nok atap seng 39,220.75
255 A.4.5.2.41. Pemasangan 1 m2 atap alumunium 263,775.50
256 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation 29,583.75
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
257 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 15,085,268.75
258 A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 7,468,243.75
259 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II 381,311.25
260 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III 312,311.25
261 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 676,775.00
262 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 491,970.00
263 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II 814,775.00
264 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm 568,307.00
265 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II 614,709.50
266 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 669,070.00
267 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I 702,397.00
268 A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 611,805.75
269 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter 6,485,827.50
270 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I 16,328,045.00
271 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 9,495,205.00
272 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II 414,517.50
273 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II 585,580.00
274 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II 105,629.80
275 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III 164,967.50
276 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 168,647.50
277 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 95,450.00
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
278 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 95,680.00
279 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 179,946.25
280 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II 360,220.25
281 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I 338,790.00
282 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm 54,119.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
283 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik 329,130.00
284 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa 202,342.50
285 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi 109,710.00
286 A.4.6.2.4. Pemasangan 1 buah kunci silinder 138,460.00
287 A.4.6.2.5. Pemasangan 1 buah engsel pintu 40,313.25
288 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 41,055.00
289 A.4.6.2.7. Pemasangan 1 buah engsel angin 53,992.50
290 A.4.6.2.8. Pemasangan 1 buah spring knip 44,591.25
291 A.4.6.2.9. Pemasangan 1 buah kait angin 27,916.25
292 A.4.6.2.10. Pemasangan 1 buah door closer 383,582.50
293 A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel) 38,410.00
294 A.4.6.2.12. Pemasangan 1 buah door holder 88,032.50
295 A.4.6.2.13. Pemasangan 1 buah door stop 58,822.50
296 A.4.6.2.14. Pemasangan 1 buah rel pintu sorong 476,330.00
297 A.4.6.2.15. Pemasangan 1 buah kunci lemari 194,033.75
298 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm 100,889.50
299 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm 115,753.25
300 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm 214,055.25
301 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm 490,181.75
302 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm 190,066.25
303 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm 347,846.25
304 A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm 284,941.25
305 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm 2,556,076.25
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
306 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama 13,857.50
307 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 13,052.50
308 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual 13,627.50
309 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 37,662.50
310 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 52,348.00
311 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil 29,491.75
312 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur 43,392.58
313 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter 19,808.75
314 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis 38,918.88
315 A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 22,618.78
316 A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 16,029.85
317 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium 9,532.35
318 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih 16,041.93
319 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) 8,334.63
320 A.4.7.1.15. Pemasangan 1 m2 wallpaper 126,442.50
321 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 27,795.50
322 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah 58,072.13
323 A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis 59,828.75
324 A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 31,050.00
325 A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis 141,243.00
326 A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 123,498.50
327 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 1,921,535.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
328 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock 1,906,895.50
329 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen 443,267.50
330 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso 391,057.50
331 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir 1,182,660.00
332 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel 1,341,974.10
333 A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3 1,099,572.50
334 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 1,099,572.50
335 A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3 360,726.25
336 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel 941,217.50
337 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso 750,662.50
338 A.5.1.1 14. Pemasangan 1 buah floor drain 107,697.50
339 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 442,957.00
340 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm 710,740.25
341 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm 850,876.38
342 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” 63,798.17
343 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ” 61,065.00
344 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ” 79,850.25
345 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” 155,750.25
346 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½” 239,165.50
347 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” 193,964.75
348 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” 493,907.75
349 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” 18,377.00
350 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” 21,247.40
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
351 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 26,550.91
352 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ” 42,935.25
353 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 51,039.30
354 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ” 74,661.74
355 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 122,284.68
356 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 140,844.81
357 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm 391,828.00
358 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm 222,579.05
359 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm 902,355.67
360 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm 179,624.25
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG
361 A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC Ø 63 mm 71,024.00
362 A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC Ø 90 mm 119,266.50
363 A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC Ø 110 mm 162,380.00
364 A.8.4.1.5 (K3) Pemasngan 1 m pipa PVC Ø 200 mm 478,837.00
365 A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC Ø 250 mm 730,008.50
366 A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm 111,182.00
367 A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm 200,123.00
368 A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm 389,654.50
369 A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm 653,131.00
370 A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm 147,234.50
371 A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 100 mm 339,250.00
372 A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 125 mm 64,423.00
373 A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 150 mm 481,033.50
374 A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm 896,471.00
375 A.8.4.1.38 (K3) Pemasangan 1 m pipa GIP Ø 250 mm 1,142,732.00
376 A.8.4.1.49 (K3) Pemasangan 1 m pipa DCI Ø 100 mm 1,583,607.50
377 A.8.4.1.50 (K3) Pemasangan 1 m pipa DCI Ø 125 mm 1,591,140.00
378 A.8.4.1.51 (K3) Pemasangan 1 m pipa DCI Ø 150 mm 1,598,592.00
379 A.8.4.1.52 (K3) Pemasangan 1 m pipa DCI Ø 200 mm 1,625,801.00
380 A.8.4.1.53 (K3) Pemasangan 1 m pipa DCI Ø 250 mm 308,395.50
381 A.8.4.1.64 (K3) Pemasangan 1 m Pipa baja Ø 63 mm 72,369.50
382 A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm 81,385.50
383 A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm 89,194.00
384 A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm 95,956.00
385 A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm 141,542.00
386 A.8.4.1.69 (K3) Pemasangan pipa baja Ø 250 mm 165,485.00
A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA
387 A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm 36,029.50
388 A.8.4.2.2 (K3) Pemotongan 1 m pipa PVC Ø 90 mm 75,739.00
389 A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm 110,239.00
390 A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm 367,563.00
391 A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm 576,460.50
392 A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm 35,385.50
393 A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm 133,124.00
394 A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 150 mm 20,953.00
395 A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm 331,361.00
396 A.8.4.2.22 (K3) Pemotongan 1 buah pipaHDPE Ø 250 mm 508,921.00
397 A.8.4.2.33 (K3) Pemotongan 1 buah pipa GIP Ø 63 mm 100,544.50
398 A.8.4.2.34 (K3) Pemotongan 1 buah pipa GIP Ø 100 mm 290,110.50
400 A.8.4.2.36 (K3) Pemotongan 1 buah pipa GIP Ø 150 mm 427,121.50
401 A.8.4.2.37 (K3) Pemotongan 1 buah pipa GIP Ø 200 mm 830,875.00
402 A.8.4.2.38 (K3) Pemotongan 1 buah pipa GIP Ø 250 mm 1,074,422.00
517 A.8.4.2.39 (K3) Pemotongan 1 buah pipa GIP Ø 300 mm 72,404.00
518 A.8.4.2.40 (K3) Pemotongan 1 buah pipa GIP Ø 400 mm 105,466.50
519 A.8.4.2.41 (K3) Pemotongan 1 buah pipa GIP Ø 450 mm 121,509.00
520 A.8.4.2.42 (K3) Pemotongan 1 buah pipa GIP Ø 500 mm 135,309.00
521 A.8.4.2.43 (K3) Pemotongan1 buah pipa GIP Ø 600 mm 124,154.00
522 A.8.4.2.44 (K3) Pemotongan 1 buah pipa GIP Ø 800 mm 225,239.00
523 A.8.4.2.45 (K3) Pemotongan 1 buah pipa GIP Ø 900 mm 254,437.50
524 A.8.4.2.46 (K3) Pemotongan 1 buah pipa GIP Ø 1000 mm 283,716.50
525 A.8.4.2.47 (K3) Pemotongan 1 buah pipa GIP Ø 1100 mm 313,110.50
526 A.8.4.2.48 (K3) Pemotongan 1 buah pipa GIP Ø 1200 mm 342,389.50
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
414 A.8.4.3.1 (K3) Pemasangan 1 buah Valve Ø 150 mm 4,345,482.00
415 A.8.4.3.2 (K3) Pemasangan 1 buah Valve Ø 200 mm 7,663,841.50
416 A.8.4.3.3 (K3) Pemasangan 1 buah Valve Ø 250 mm 12,493,841.50
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA
420 A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm 1,296.05
421 A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm 1,307.55
422 A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm 1,330.55
423 A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm 1,388.05
424 A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm 1,462.80
425 A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm 1,566.30
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
426 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi) 2,419,600.00
427 A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) 2,285,050.00
A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP 826,763.75
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
- TAMBAHAN / LAIN-LAIN
428 Ls 1 Buah Pembuatan Papan Nama Proyek 337,812.50
429 SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40 350,261.25
430 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40 103,724.25
431 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60 265,581.00
432 SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil 36,966.75
433 SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank 49,680.00
434 ABK.990.07 Menurunkan 1 m2 atap genteng 1,840.00
435 ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond 5,750.00
436 ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda 68,770.00
437 ABK.990.05 Membongkar 1 m2 lantai tegel/floor 6,133.33
438 SNI 2012 1 m³ Bongkaran Beton Bertulang 574,988.50
439 SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah 540,488.50
440 ABK.300.19 1 m3 Beton Bertulang AD. 1:2:3 888,001.25
441 - 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan 98,365.25
442 Ls 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak 168,452.00
443 Ls 1 Bh Pekerjaan Stop Kontak 34,730.00
444 Ls 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting 51,405.00
445 Ls 1 Unit Pekerjaan Sekring Kast 60,605.00
446 Ls 1 Bh Pekerjaan MCB Box 60,605.00
447 - 1 m' Pekerjaan Over Spaneng 34,776.00
448 Ls 1 Bh Pekerjaan Saklar Ganda 57,960.00
449 Ls 1 Bh Pekerjaan Saklar Tunggal 55,085.00
JALAN LINGKUNGAN
450 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) 120,076.46
451 Analisa EI-321.rob : Timbunan Biasa 360,999.89
452 Analisa EI-322.rob : Timbunan Pilihan 429,531.35
453 Analisa EI-331.rob : Penyiapan Badan Jalan 223.76
454 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair 14,049.63
455 Analisa EI-612a : Lapis Perekat - Aspal Cair 14,493.30
456 Analisa EI-621 : Agregat Penutup BURTU 15,797.85
457 Analisa EI-631.rob : Latasir Kelas A (SS-A) 60,929.92
458 Analisa EI-632.rob : Latasir Kelas B (SS-B) 71,089.96
459 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam 2,065,518.54
460 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam 2,185,728.83
461 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor 375,317.93
462 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) 2,020,687.36

Sumber, 2017

Kepala Dinas Perumahan, Kawasan Permukiman Dan Pertanahan Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017

HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

1 A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 788,261.75


2 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 43,452.75
3 A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 92,934.72
4 A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 96,637.26
5 A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP 82,125.64
6 A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP 82,057.10
7 A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP 70,885.31
8 A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP 70,894.28
9 A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP 239,155.15
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
426 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi) 2,419,600.00
427 A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) 2,285,050.00
- TAMBAHAN / LAIN-LAIN
428 Ls 1 Buah Pembuatan Papan Nama Proyek 337,812.50
429 SNI 7395:2008 N0.6.9Memasang 1 m2 lantai ubin granit ukuran 40 x 40 350,261.25
430 SNI 03-7395:2008 N0.6.9
Memasang 1 m2 lantai keramik ukuran 40 x 40 103,724.25
431 SNI 03-7395:2008 N0.6.9
Memasang 1 m2 lantai granit ukuran 60 x 60 265,581.00
432 SNI 2839:2008 N0.6.8Memasang 1 m' List Plafond Gypsum Profil 36,966.75
433 SNI 2839:2008 N0.6.81 m' Pasang Listplank Woodplank 49,680.00
434 ABK.990.07 Menurunkan 1 m2 atap genteng 1,840.00
435 ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond 5,750.00
436 ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda 68,770.00
437 ABK.990.05 Membongkar 1 m2 lantai tegel/floor 6,133.33
438 SNI 2012 1 m³ Bongkaran Beton Bertulang 574,988.50
439 SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah 540,488.50
440 ABK.300.19 1 m3 Beton Bertulang AD. 1:2:3 888,001.25
441 - 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan 98,365.25
442 - 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak 168,452.00
443 - 1 Bh Pekerjaan Stop Kontak 34,730.00
444 - 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting 51,405.00
445 - 1 Unit Pekerjaan Sekring Kast 60,605.00
446 - 1 Bh Pekerjaan MCB Box 60,605.00
447 - 1 m' Pekerjaan Over Spaneng 34,776.00
448 - 1 Bh Pekerjaan Saklar Ganda 57,960.00
449 Ls 1 Bh Pekerjaan Saklar Tunggal 55,085.00
JALAN LINGKUNGAN
450 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) 120,076.46
451 Analisa EI-321.rob : Timbunan Biasa 360,999.89
452 Analisa EI-322.rob : Timbunan Pilihan 429,531.35
453 Analisa EI-331.rob : Penyiapan Badan Jalan 223.76
454 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair 14,049.63
455 Analisa EI-612a : Lapis Perekat - Aspal Cair 14,493.30
456 Analisa EI-621 : Agregat Penutup BURTU 15,797.85
457 Analisa EI-631.rob : Latasir Kelas A (SS-A) 60,929.92
458 Analisa EI-632.rob : Latasir Kelas B (SS-B) 71,089.96
459 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam 2,065,518.54
460 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam 2,185,728.83
461 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor 375,317.93
462 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) 2,020,687.36

Sumber, 2017

Kepala Dinas Perumahan, Kawasan Permukiman Dan Pertanahan Kabupaten Cirebon


HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012
RENCANA ANGGARAN BIAYA (RAB)

Kegiatan : Rehabilitasi Sedang/Berat Puskesmas/Puskesmas Pembantu (Bantuan Gubernur)


Pekerjaan : Penataan Halaman / Pengaspalan
Lokasi : Puskesmas Palimanan Kabupaten Cirebon
Tahun : 2019

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN ANALISA VOL SAT
(Rp.) (Rp.)

I PEKERJAAN PENGASPALAN
1 Mobilisasi dan Demobilisasi 1.00 ls 4,947,000.00 4,947,000.00

2 Pembersihan dan Perataan Lapangan 1.00 Ls 2,000,000.00 2,000,000.00


3 Pek. Lapis Pondasi Agregat Kelas C t = 10 c Analisa EI-322.rob 122.50 m3 515,437.61 63,141,107.81

4 Pek. Lapis Resap Pengikat (Prime Coat) Analisa EI-611a 428.75 ltr 16,859.56 7,228,534.36
5 Pek. Latasir Kelas B (SS - B) Analisa EI-632.rob 1,225.00 m2 85,307.96 104,502,245.47

181,818,887.64

JUMLAH TOTAL : 181,818,887.64

PPn 10 % : 18,181,888.76

JUMLAH TOTAL : 200,000,776.40

DIBULATKAN : 200,000,000.00

Terbilang : Dua Ratus Juta Rupiah


REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

Kegiatan : Rehabilitasi Sedang/Berat Puskesmas/Puskesmas Pembantu (Bantuan Gubernur)


Pekerjaan : Penataan Halaman / Pengaspalan
Lokasi : Puskesmas Palimanan Kabupaten Cirebon
#REF!
#REF! #REF!
Tahun : 2019

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)
(1) (2) (3)

I PEKERJAAN PENGASPALAN 181,818,887.64

#REF! #REF! #REF!

JUMLAH : #REF!
BIAYA PERENCANAAN (3%) #REF!
BIAYA PENGAWASAN (2%) #REF!
PPn 10 % : #REF!
JUMLAH TOTAL : #REF!
DIBULATKAN : #REF!
Terbilang :
Enam Puluh Dua Juta Rupiah

Cirebon, September 2017


Dibuat Oleh,
Konsultan Perencana
CV. DEVRINA AESTETIKA

NANA NURCAHYANA, BAE


Direktur
HARGA PERKIRAAN SENDIRI (HPS)

Kegiatan : Pelayanan Kesehatan Bagi Peserta JKN Pada Puskesmas Sindanglaut


: Belanja Modal Pembangunan Tempat/Halaman
Pekerjaan
Parkir
- Pengaspalan Halaman Parkir
- Penambahan Atap Area Parkir
Lokasi : Puskesmas Sindanglaut Kecamatan Lemahabang Kabupaten Cirebon
Tahun : 2017

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN ANALISA VOL SAT
(Rp.) (Rp.)

I PEKERJAAN PENGASPALAN

1 Mobilisasi dan Demobilisasi 1.00 ls 1,000,000.00 1,000,000.00

2 Pembersihan dan Perataan Lapangan 1.00 Ls 735,000.00 735,000.00

3 Galian Tanah Biasa t = 10 Cm Analisa EI-311a 23.11 m3 120,076.46 2,775,387.28

4 Pek. Lapis Pondasi Agregat Kelas C t = 5 cm Analisa EI-322.rob 11.56 m3 429,531.35 4,963,986.38

5 Pek. Lapis Pondasi Agregat Kelas C t = 15 cm Analisa EI-322.rob 34.67 m3 429,531.35 14,891,959.14

6 Pek. Lapis Resap Pengikat (Prime Coat) Analisa EI-611a 71.65 ltr 14,049.63 1,006,681.94

7 Pek. Latasir Kelas B (SS - B) Analisa EI-632.rob 231.14 m2 71,089.96 16,431,378.58

41,804,393.32

II PEKERJAAN PENUTUP ATAP (tambahan tempat parkir)

1 Pemasangan Rangka Hollow 40/40 Atap Spandek 21.75 m2 546,000.00 11,875,500.00

11,875,500.00
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)

Kegiatan
### : Pelayanan Kesehatan Bagi Peserta JKN Pada Puskesmas Sindanglaut
Pekerjaan
### : Belanja Modal Pembangunan Tempat/Halaman Parkir
### - Pengaspalan Halaman Parkir
### - Penambahan Atap Area Parkir
Lokasi ### : Puskesmas Sindanglaut Kecamatan Lemahabang Kabupaten Cirebon
Tahun ### : 2017

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)
(1) (2) (3)

I ###
PEKERJAAN PENGASPALAN 181,818,887.64
###
#REF! ### #REF! #REF!

JUMLAH : #REF!
BIAYA PERENCANAAN (3%) #REF!
BIAYA PENGAWASAN (2%) #REF!
PPn 10 % : #REF!
JUMLAH TOTAL : #REF!
DIBULATKAN : #REF!
Terbilang :
Enam Puluh Dua Juta Rupiah

Cirebon, September 2017

Kepala Puskesmas Sindanglaut kab. Cirebon


Selaku Pejabat Pelaksana Teknis Kegiatan

dr. H. M. AKHDIYAT
NIP . 19610319 198611 1 001

S-ar putea să vă placă și