ADOPTING SCHEDULE OF RATES 2019-2

RATES OF LABOUR

Sch. Sch.
Item Description Unit Rate Actual 5% 10% Sl. No. Item
No. No.

2 Axe Mazdoor Day 398.00 398.00 417.90 437.80

4 Blacksmith - I Class Day 502.00 502.00 527.10 552.20 A

4A Blacksmith - II Class Day 483.00 483.00 507.15 531.30 1

5 Boat Mazdoor Day 422.00 422.00 443.10 464.20 1 a

8 Bullocks pair with driver (with bandy) Day 787.00 787.00 826.35 865.70 2 b

8A Bullocks single with driver (with bandy) Day 566.00 566.00 594.30 622.60 2

11 Carpenter - I Class Day 638.00 638.00 669.90 701.80 3 a

12 Carpenter - II Class Day 609.00 609.00 639.45 669.90 4 b

13 Caulker Day 440.00 440.00 462.00 484.00 3

15 Cleaner - First Grade Day 339.00 339.00 355.95 372.90 5 a

15A Cleaner - Second Grade Day 336.00 336.00 352.80 369.60 6 b


18 Ferry Mazdoor Day 440.00 440.00 462.00 484.00 7 c

19 Fitter - I Class Day 576.00 576.00 604.80 633.60 3A

19A Fitter - II Class Day 560.00 560.00 588.00 616.00 8 a

20 Fitter (Pipe Laying / Bar bending) I Class Day 566.00 566.00 594.30 622.60 4

20A Fitter (Pipe Laying / Bar bending) II Class Day 549.00 549.00 576.45 603.90 9 a

21 Floor Polisher Day 502.00 502.00 527.10 552.20 10 b

22 Gardener Day 398.00 398.00 417.90 437.80 11 c

25 Hammer Mazdoor Day 404.00 404.00 424.20 444.40 8

26 Head Mazdoor for Well Sinking Day 422.00 422.00 443.10 464.20 15 a

27 Driver (Light Duty) Day 502.00 502.00 527.10 552.20 13 b

27A Driver (Heavy Duty) Day 537.00 537.00 563.85 590.70 10

28 Jumper Mazdoor Day 398.00 398.00 417.90 437.80 14 a

36 Maistry, Road Inspector & Work Inspector Day 484.00 484.00 508.20 532.40 15 b

Maistry, Road Inspector &


36A Day 537.00 537.00 563.85 590.70 11
Work Inspector (Degree Holder)
37 Mason for Brick Work - I Class Day 652.00 652.00 684.60 717.20 16 a

37A Mason for Brick Work - II Class Day 609.00 609.00 639.45 669.90 17 b

38 Mason for Stone Work - I Class Day 652.00 652.00 684.60 717.20 12

38A Mason for Stone Work - II Class Day 609.00 609.00 639.45 669.90 18 a

39A Mazdoor - I Class Day 426.00 426.00 447.30 468.60 19 b

39B Mazdoor - II Class Day 368.00 368.00 386.40 404.80 13

39C Head Mazdoor Day 440.00 440.00 462.00 484.00 20 a

40 Mechanic - I Class Day 502.00 502.00 527.10 552.20 21 b

40A Mechanic - II Class Day 483.00 483.00 507.15 531.30 22 c

42 Mopla - I Class Day 501.00 501.00 526.05 551.10 23 d

42A Mopla - II Class Day 483.00 483.00 507.15 531.30 24 e

43 Navagonies or Javali Man - I Class Day 422.00 422.00 443.10 464.20 25 f

44 Painter / Varnisher - I Class Day 522.00 522.00 548.10 574.20 26 g

44A Painter / Varnisher - II Class Day 505.00 505.00 530.25 555.50 23A

46 Pile Driver Day 463.00 463.00 486.15 509.30 27 a

47 Plumber - I Class Day 566.00 566.00 594.30 622.60 28 b


47A Plumber - II Class Day 549.00 549.00 576.45 603.90 23C

48 Pump Driver Day 440.00 440.00 462.00 484.00 29 a

52 Sawyer Day 463.00 463.00 486.15 509.30 30 b

54 Smith - I Class Day 501.00 501.00 526.05 551.10 31 c

54A Smith - II Class Day 483.00 483.00 507.15 531.30 32 d

55 Sprayer Mazdoor (for bitumen, tar etc.,) Day 398.00 398.00 417.90 437.80 33 24

56 Stone Cutter - I Class Day 501.00 501.00 526.05 551.10 B

56A Stone Cutter - II Class Day 483.00 483.00 507.15 531.30 38 27

58 Syrang - I Class Day 501.00 501.00 526.05 551.10 39 28

58A Syrang - II Class Day 483.00 483.00 507.15 531.30 40 29

60 Thatcher Day 422.00 422.00 443.10 464.20 41 29a

62 Tinker - I Class Day 404.00 404.00 424.20 444.40 42 30

62A Tinker - II Class Day 398.00 398.00 417.90 437.80 43 30a

63 Turner - I Class Day 463.00 463.00 486.15 509.30 44 32

63A Turner - II Class Day 440.00 440.00 462.00 484.00 45 33

64 Time Keeper - I Class Day 501.00 501.00 526.05 551.10 46 33 (A) I


64A Time Keeper - II Class Day 483.00 483.00 507.15 531.30 47 II

67 Welder / Bracer - I Class Day 501.00 501.00 526.05 551.10 48 (B)

67A Welder / Bracer - II Class Day 483.00 483.00 507.15 531.30 49 34

68 Well Diver for removing silt-I Class Day 501.00 501.00 526.05 551.10 50 35

68A Well Diver for removing silt-II Class Day 483.00 483.00 507.15 531.30 51 36

69 Well Sinker - I Class Day 566.00 566.00 594.30 622.60 52 38

69A Well Sinker - II Class Day 549.00 549.00 576.45 603.90 53 39 a


Well Sinking Diver working with Helmet
70 Day 584.00 584.00 613.20 642.40 54 b
(above two metres depth of water)

72 Wodder Day 422.00 422.00 443.10 464.20 55 40

Technical Assistant 0.00 56 41

76A Technical Assistant-Grade-I (B.E. Passed) Day 837.00 837.00 878.85 920.70 57 42

Technical Assistant-Grade-II
76B (Diploma in Engineering Passed / B.E. Failed / Day 754.00 754.00 791.70 829.40 58 43 a
Degree in Geology for Ground water works)
Technical Assistant-Grade-III
76C (Diploma in Engineering Failed / Day 638.00 638.00 669.90 701.80 59 44 a
I.T.I (civil) Passed

76D Cinema Operator (I.T.I. Passed) Day 526.00 526.00 552.30 578.60 60 b

76E B.Sc., (Agriculture) Passed Day 754.00 754.00 791.70 829.40 61 c

Laboratory Assistant-Grade-I
77A Day 638.00 638.00 669.90 701.80 62 45 a
(Post Graduate in Science)

Laboratory Assistant-Grade-II
77B (Degree in Science / Day 584.00 584.00 613.20 642.40 63 b
Degree in Geology for Ground water)

Laboratory Assistant-Grade-III
77C Day 526.00 526.00 552.30 578.60 64 c
(With Degree Qualifiacation to work as works clerk)

78A Mazdoor employed for Geological maping Day 426.00 426.00 447.30 468.60 65 d

Mazdoor employed for Pitting, Trenching, Sampling


78B Day 426.00 426.00 447.30 468.60 66 e
and Drilling works

Mazdoor employed for Geophysical investigation


78C Day 426.00 426.00 447.30 468.60 67 f
works

78D Head Mazdoor to Supervise exploratory works Day 450.00 450.00 472.50 495.00 68 g(i)
79 Mixer Operator (including concrete mixer) Day 463.00 463.00 486.15 509.30 69 g(ii)

80 Mixer Driver Day 440.00 440.00 462.00 484.00 70 46 a

81 Compressor Operator Day 443.00 443.00 465.15 487.30 71 b

Computer Operator-Grade-I
89A [B.E. (Computer Science) / Day 837.00 837.00 878.85 920.70 72 c
M.Sc., (Computer Science)]

Computer Operator-Grade-II
89B [B.Sc. (Computer Science) / Day 754.00 754.00 791.70 829.40 73 d
Diploma in Computer Science]

Irrigation Community Organaiser - Grade-I


90A [B.E. (Agri) Passed / B.Sc. (Agri) Passed / Day 807.00 807.00 847.35 887.70 74 e
P.G. (Geology) & Rural Development]
Irrigation Community Organaiser - Grade-II
90B [B.E. (Agri) Failed / B.Sc. (Agri) Failed / Day 672.00 672.00 705.60 739.20 48
Diploma in Agri. Passed]

95 Heatmaster Operator Day 422.00 422.00 443.10 464.20 75 I

96 Raker Day 440.00 440.00 462.00 484.00 76 ii

97 Geological Assistant Day 619.00 619.00 649.95 680.90 77 iii

98 Stone & Crusher Operator Day 443.00 443.00 465.15 487.30 78 iv


99 Heavy Mazdoor Day 463.00 463.00 486.15 509.30 79 v

Electrical Workers 0.00 0.00 80 vi

100 Wireman Grade-I / Electrician Grade-I Day 568.00 568.00 596.40 624.80 81 vii

101 Wireman Grade-II / Electrician Grade-II Day 537.00 537.00 563.85 590.70 82 viii

102 Electrical Helper Day 422.00 422.00 443.10 464.20 83 ix

103 Lift Operator Day 484.00 484.00 508.20 532.40 84 x

104 Laboratory Attendant Day 361.00 361.00 379.05 397.10 85 xi


105 Sound Service Operator Day 404.00 404.00 424.20 444.40 49 A

106 Electrical Maistry Day 619.00 619.00 649.95 680.90 I

RATES OF OTHER CONSTRUCTION MATERIALS

Sl.
Name of Material Unit Rate ii
No.
1 Water proofing compound Kg 41.50 iii

2 Mild Steel Flats of all sizes 47.00 Kg 40.45

iv

3 Mild Steel Square Rods of all sizes 47.00 Kg 40.45


86 49 b

4 First Quality Design Ceramic tiles of All colours a I

i 305 mm x 305 mm x 6 mm Each 45.00

b ii

ii 200 mm x 200 mm x 6 mm Each 19.80


87 51

iii 200 mm x 100 mm x 6 mm Each 10.70 a I


5 First Quality Plain ceramic tiles of all colours b ii

i 305 mm x 305 mm x 6 mm Each 32.20


88 52

ii 200 mm x 200 mm x 6 mm Each 14.40


89 53

iii 200 mm x 100 mm x 6 mm Each 7.40


90 54

6 First quality White glazed tiles 91 54a

i 150 mm x 150 mm x 6 mm Each 7.70


92 57

ii 100 mm x 200 mm x 6 mm Each 6.70


93 57A

7 First quality colour glazed tiles


94 57B

i 150 mm x 150 mm x 6 mm Each 8.90 95 58

ii 100 mm x 200 mm x 6 mm Each 7.70

96 58A

8 First quality colour glazed tiles with printed design

97 58B

i 150 mm x 150 mm x 6 mm Each 10.50 100 59


ii 100 mm x 200 mm x 6 mm Each 9.50
101 60

9 White Cement Kg 22.00


102 62

10 Colour Cement (White cement mixed with colouring Kg 26.60


pigments) 103 63 (I)

11 Multi-colour marble chips of all Grades / Sizes Bag 88.60


104 ii

12 White Marble slab (Adanga) 18 mm to 20 mm thick


105 iii

i 4'0'' x 2'0'' and above sq.m. 1365.00


C

ii 2'0'' x 2.0" or 2'0" x 1'0" or 1'0" x 1'0" sq.m. 682.00


106 66

13 Granite tiles - (Superfine polished with Machine cut


edges) of size 2'0" x 1'0" or 1'0" x 1'0" or 1'0" x
0'6", of 10 mm thick 107 67

a Jet Black sq.m. 844.00


108 68

b Ruby Red, Raw Silk sq.m. 756.00

c Sinthetic Grey, Paradise and Similar varieties. sq.m. 714.00


110 71
14 Granite slabs (Super fine polished with machine cut
edges) of sizes 4'x2' and above 18mm to 20mm 111 72
thick.
a Jet Black sq.m. 1690.00 112 73

b Ruby Red, Raw Silk sq.m. 1580.00


113 74

c Sinthetic Grey, Paradise and Similar varieties. sq.m. 1420.00 114 75 (I)

15 Polished shahabad stone slabs of 20 mm thick with sq.m. 309.00


machine cut edges of size 2' 0" x 2'0" and above. 115 ii

16 Polished shahabad stone slabs 20 mm thick with sq.m. 367.00


machine cut edges of size below 2' 0" x 2'0". 116 iii

17 Polished Rajasthan Kota stone slabs of 20 mm thick sq.m. 472.00


with machine cut edges of size 2' 0" x 2'0" and 117 iv
above.

18 Polished Rajasthan Kota stone slabs of 20 mm thick sq.m. 535.00


with machine cut edges of size below 2' 0" x 2'0". 118 v

19 Dolphur stone slabs - semi polished with machine


cut edges of all sizes 119 vi

a 40 mm thick sq.m. 408.00


120 vii

b 20 mm thick sq.m. 372.00


121 viii
20 Aluminium strips of size 40 mm wide x 1.5 mm RM 32.30
thick 122 ix

21 Brass strips of size 40 mm wide x 1.5 mm thick RM 67.30 123 xiii

22 Glass strips of size 40 mm wide and 4 mm thick RM 15.30

76

23 Marblex Tiles 3 mm thick sq.m. 664.00 125 I

24 Red Oxide - Superior quality for floor finish Kg 141.00

126 ii

25 Decorative pressed tiles of 12 mm thick of all sizes sq.m. 1045.00


and shapes 77

26 Exterior Emulsion Paint - Water based primer Litre 147.00


(Liquid) 127 I

27 Alkali Resistant Distemper Primer Litre 131.70


128 ii

28 Sandtex matt Litre 154.00 129 77A

29 Vinaratex or equivalent Textured coat sq.m. 198.00


130 77B

30 Best Lac Polish / French Polish Litre 257.00


131 77D
31 Varnish Litre 264.00
78

32 Cotton Waste Kg 10.10


132 I

33 Cement based Hydraulically pressed Anti skid tiles sq.m. 496.00


(pattern design) - 20 mm thick 133 ii

34 Marble Powder Kg 4.45 134 iii

35 Polishing Stone 135 iv

i Rough Each 65.20 136 78A

ii Medium Each 87.10 137 78B

iii Fine / Nice Each 99.70 138 78C

36 Oxalic Acid Kg 37.80 79

37 Tupentine Litre 23.10 139 i

38 Mansion polish 400 gram 144.90 140 ii

39 Poly Sulphide Kg 171.90 141 80

40 Primer for expansion joints Kg 147.90 142 81

41 Filler material sq.m. 141.00 143 a

42 Bond Breaker RM 3.65 144 b

43 PVC Water Bar 150mm wide with singel bulb RM 280.00 90


44 Plain G.I. sheet 0.8mm thick (22 Gauge) sq.m. 354.00 145 a

45 Phil Plug Each 4.90 146 b

46 G.I. Screws 147 c

i 30mm x 6mm Each 1.25 148 d

ii 19mm x 6mm Each 0.79 90.1

47 G.I. Limpet / Cup Washers Each 1.84


149 a

48 Bitumen washers 15mm dia Each 1.10


150 b

49 Asbestos Cement pipe - 100mm dia 3 RM 139.90

151 c

50 A.C. shoe - 100mm dia Each 44.40

152 d

51 A.C. Bend - 100mm dia Each 50.80

153 e

52 A.C. Cylindrical Cowl - 100mm dia Each 76.30

154 90.2
53 C.I. Brackets for A.C. pipe 100mm dia Each 19.50

155 91

54 C.I. Grating - 100mm dia Each 31.20

156 92

55 Asbestos cement fully corrugated sheet - 6mm thick sq.m. 184.20

157 93

56 Asbestos cement plain sheet

i 6mm thick sq.m. 165.30

158 111

ii 4mm thick sq.m. 114.50


159 112

57 Asbestos cement adjustable ridges Pair 190.70


160 113

58 G.I. "J" or "L" Bolts with nuts 6mm Dia Each 3.80
161 113 b
59 Steel - special extruded sections for steel windows Kg 60.90
and ventilators conforming to I.S.S. 7452 / 1990
including Fabrication charges 162 114

60 CRCA pressed steel Box section 18 Gauge or


1.25mm thick for Door frames including providing
holes and fixing wooden blocks for fixing furniture 163 126 I
and fittings

a With one coat of Red oxide priming coat. RM 350.00 164 ii

b With powder coated primer RM 373.00


165 iii

61 Aluminium extruded sections (for Doors, windows,


ventilartors, partitions, false ceiling etc.) including
charges for Anodising for 15 micron thickness - 166 129

a Natural colour matt finish. Kg 287.00 167 130

b With powder coating of any colours. Kg 307.00


168 131

62 Alumninum Extruded Box Section for Staircase Kg 359.00


Hand Rails including charges for Adnodising for 15
micron thickness - Natural colour matt finish 98 58c

63 Rubber beading for aluminium glazed doors RM 37.25

64 Rubber beading for aluminium glazed windows. RM 28.40 99 58d

65 PVC / Woollen felt for aluminium doors 6mm thick RM 7.50


66 Pivot for Aluminium Door Set 146.00 12

67 Hydraulic Door closer of various sizes of approved Each 890.00


quality using Aluminium Extruded section body
tubular type universal hydraulic door closer with
double speed adjustment like HARDWYN (make) 13
'GAZEL' (or) equivalent (with ISI Monogram)

68 Hydraulic Floor springs of various sizes double acton Each 2035.00


hydraulic floor sping of approved quality, brand,
manufacture asper BIS standards for doors
including cost of cutting floors as required,
embedding in to floors and Stainles Steel Cover
plates with Aluminium Pivet and single piece M.S. 14
sheet outer box with side plate etc., capaple of
taking upto 130 Kg. weight from door shutter, like
HARDWYN make (U-32) or its euivalent with ISI
monogram.

69 Lock for Aluminium doors Each 251.00 a

70 Lock for Aluminium sliding windows Each 62.80


b

71 Aluminium Grill of standard pattern (diamond sq.m. 1835.00


shape) - 10mm thick including 'F' (or) 'H' Section. c

72 Aluminium Grill of standard pattern (diamond sq.m. 1485.00


shape) - 6mm thick including 'F' (or) 'H' Section.

73 Bolts and Nuts 10mm dia for false ceiling Each 5.50 37

74 Rawl Plugs for false ceiling Each 9.35 a


75 PVC Roller for sliding windows Each 13.75 b

76 Synthetic Resin - Fevicol or equivalent (Phenol Kg 194.00


Formal Dehide based Resin)
77 Butt Hinges with nylon washers of various sizes. 109
Length and width (with required screws).
a 125mm x 30mm Each 78.40

b 100mm x 30mm Each 62.90


124

c 75mm x 30mm Each 43.20

d 50mm x 30mm Each 34.80

78 Tower Bolts of various lengths and diameter (with


required screws)
a 400mm long and 12mm dia Each 148.30

b 300mm long and 12mm dia Each 114.10

c 250mm long and 12mm dia Each 85.50

d 200mm long and 12mm dia Each 71.90

e 150mm long and 12mm dia Each 56.70

f 100mm long and 10mm dia Each 49.80

g 75mm long and 10mm dia Each 34.80

79 Aldrops of following lengths and diameter with


required screws, bolts and nuts.
a 300mm long and 16mm dia Each 183.40
b 250mm long and 16mm dia Each 158.20

c 200mm long and 16mm dia Each 107.10

d 200mm long and 12mm dia Each 88.90

80 Handles "D" type of various sizes with required


screws
a 200mm long Each 56.20

b 150mm long Each 50.40

c 100mm long Each 30.90

81 Ornamental handles of various sizes with required


screws
a 200mm long Each 144.90

b 150mm long Each 96.60

c 100mm long Each 53.30

82 Aluminium door stopper with rubber bush with Each 43.80


required screws
83 Rubber bush - 40 mm dia and 60 mm long with Each 22.50
required screws
84 Mortice Lock-(Godrej or equivalent) with required
screws with 3 Keys
a With night latch Each 525.00

b Without night latch Each 391.00

c Wire nails Kg 62.20

85 Teakwood beading
a 15mm x 12mm RM 15.00

b 35mm x 12mm RM 38.10

86 Teakwood Beading (ordinary)

a 30mm x 12mm RM 31.60

b 25mm x 12mm RM 25.40

87 Teakwood beading - Ornamental / design

a 40mm x 12mm RM 88.90

b 40mm x 15mm RM 101.80

c 25mm x 12mm RM 69.60

d 15mm x 12mm RM 47.90

88 Medium Desity Fibre (MDF) Board - Exterior Grade, sq.m. 2120.00


Both sides pre-lamiated including external lipping
with kiln dried soft wood 35mm thick

89 Medium Density Fibre (MDF) Board - exterior Grade sq.m. 1020.00


- Both sides pre-laminated, 12mm thick

90 MDF Board exterior Grade - Plain including external


lipping with kiln dried soft wood

i 35mm thick sq.m. 1730.00

ii 30mm thick sq.m. 1595.00

91 Medium density fibre (MDF) Board 12 mm thick


Exterior grade - with melamine finish.

a One side melamine finish sq.m. 1080.00

b Both sides melamine finish sq.m. 1215.00


92 Medium density fibre (MDF) board - Exterior grade -
Plain - With teak wook external lipping alround

a 35mm thick sq.m. 1860.00

b 30mm thick sq.m. 1650.00

93 Solid core Flush shutters with Teak ply on both side sq.m. 2190.00
with teak wook lipping alround 35 mm thick

94 Solid core Flush shutters with Teak ply on one side sq.m. 1925.00
and commercial ply on other side with teak wook
lipping alround 35 mm thick

95 Solid core Flush shutters with commercial ply on sq.m. 1650.00


both side with teak wook lipping alround 35 mm
thick

96 Solid PVC door shutters using 19 Gauge 19mm MS


square tubes for styles and outer frames. 15mm
MS square tubes for top, lock and bottom rails. The
steel tubes shall be covered with 5mm thick solid
PVC sheets. Shutter using 5mm thick solid PVC
sheets for panelling shall rigidly fixed in position
including necessary furniture and fittings. The over
all size of styles shall be 50mm x 30mm. The over
all size of top rail, Lock rail and bottom rail shall be
75mm x 30mm. The over all size of frames shall be
50mm x 45mm, with suitable rabate for housing the
shutter.

a Solid panel PVC door with frame sq.m. 2800.00


b Solid panel PVC door without frame sq.m. 2360.00

97a FRP door Sutter with FRP door frames made out of sq.m. 3880.00
FRP Sheets of 3mm thick of over all size 65mm x
50mm with rebate suitably reinforced using MS
Angle / Flats, cost of holdfasts and solid core FRP
shutter Panel of 5mm thick and hollow core frames
of 3m wall thickness for styles and rails etc., of
sizes specified by Engineers.

b Excluding door frames sq.m. 2980.00

98a PVC panelled door shutters hollow type - 200 mm x sq.m. 1995.00
20 mm panels with 1 mm wall thickness for panels
and styles and rails of suitable size with 2 mm wall
thickness suitably reinforced using MS Angle / Flat
including cost of necessary Aluminium hinges and
other furniture fittings.
b Excluding door frames sq.m. 1685.00

99 RCC door frame of 100mm x 65mm cross sectional RM 273.00


size with necessary rebate for housing the shutters,
manufactured with cement concrete of grade not
less than M20 using 10 mm and below graded stone
jelly and using steel reinforcement as per C.E. (B)
circular instructions.

100 Stainless Steel (Salem Stainless Steel) Door Frame RM 892.00


(Box Section using Stainless Steel Plate of 1 mm
thick) of size 100 mm x 60 mm with a rebate of
30 / 35 mm x 15 mm on one side of the frame
including supplying and fixing dovetail splayed end
stainless steel Hold fast etc.,
101 Stainless Steel (Salem Stainless Steel) Door Frame RM 1205.00
(Box Section using Stainless Steel Plate of 1.6mm
thick) of size 100mm x 60mm with a rebate of 30 /
35mm x 15mm on one side of the frame including
supplying and fixing dovetail splayed end stainless
steel hold fast etc.,

102 Supplying and erecting pull and push type rolling


shutter with ISI make of approved size and section
using 18 GI sheet. The shutter shall be painted
with one coat of red oxide primer and the rate is
inclusive of hood covers, transportation charges
etc.,

A ROLLING SHUTTERS (WITH ISI MONOGRAM)

a Manually operated (up to 8 m2 area) sq.m. 2110.00

b Gear operated type (from 8 m2 to 12 m2 area) sq.m. 2350.00

c Electrically operated type (exceeding 12m2 area) sq.m. 2550.00

B ROLLING GRILLS (WITH ISI MONOGRAM)

a Manually operated (up to 8 m2 area) sq.m. 2150.00

b Gear operated (from 8 m2 to 12 m2 area) sq.m. 2420.00

c Electrically operated (exceeding 12m2 area) sq.m. 2690.00

103 Barbed Wire - 10 Gauge - Two ply and four pronged 1 Kg or 60.30
(Galvanised) 6 RM

104 Chain link - 2" x 2" using 10 Gauge Galvanised Iron sq.m. 155.70
Wire (of all sizes)

105 Pin Headed / Fluted / Figured Glass 3mm thick sq.m. 220.00
106 Plain Glass - 4mm thick sq.m. 298.00

107 Plain Sheet Glass - 5.5mm thick sq.m. 352.00

108 Metal screws (for Aluminium Doors, windows etc.)

i 75mm x 8mm Each 2.15

ii 38mm x 6mm Each 1.50

iii 19mm x 8mm Each 1.05

iv 19mm x 6mm Each 0.79

109 Cement paint (First quality) Kg 48.50

110 Oil Bound Distemper Kg 71.70

111 Acrylic Distermper Kg 82.80

112 Primer for Plastic Emulsion paint Litre 143.30

113 Plastic Emulsion paint (First quality) Litre 287.00

114 Wood Primer Litre 143.30

115 Synthetic Enamel paint for Wood work Litre 232.00

116 Red Oxide primer for Iron work Litre 133.00

117 Synthetic Enamel paint for Iron work Litre 221.00

118 G.I. Pipes "B" Class

i 65 mm dia RM 242.00

ii 50 mm Dia RM 207.00

iii 40 mm Dia RM 161.60

iv 32 mm Dia RM 149.90
v 25 mm Dia RM 126.80

vi 20 mm Dia RM 97.70

vii 15 mm Dia RM 69.20

119 G.I.Specials

A Union

i 50 mm Dia Each 263.70

ii 40 mm Dia Each 195.60

iii 32 mm Dia Each 126.30

iv 25 mm Dia Each 97.70

v 20 mm Dia Each 69.20

vi 15 mm Dia Each 57.60

B G.I. Elbow

i 50 mm Dia Each 126.80

ii 40 mm Dia Each 97.70

iii 32 mm Dia Each 86.20

iv 25 mm Dia Each 57.60

v 20 mm Dia Each 25.20

vi 15 mm Dia Each 15.80

C G.I. Bend

i 50 mm Dia Each 115.20

ii 40 mm Dia Each 86.20

iii 32 mm Dia Each 69.20


iv 25 mm Dia Each 51.50

v 20 mm Dia Each 23.00

vi 15 mm Dia Each 13.50

D G.I. TEE

i 50 mm Dia Each 138.50

ii 40 mm Dia Each 109.20

iii 32 mm Dia Each 97.70

iv 25 mm Dia Each 80.60

v 20 mm Dia (30.00) Each 34.40

vi 15 mm Dia Each 28.40

E G.I. COUPLING

i 50 mm Dia Each 69.20

ii 40 mm Dia Each 57.60

iii 32 mm Dia Each 46.10

iv 25 mm Dia Each 28.40

v 20 mm Dia Each 15.80

vi 15 mm Dia Each 13.50

F G.I. REDUCER

i 50 mm x 40 mm Dia Each 92.30

ii 40 mm x 32 mm Dia Each 69.20

iii 32 mm x 25 mm Dia Each 51.50

iv 25 mm x 20 mm Dia Each 28.40


v 20 mm x 15 mm Dia Each 20.10

vi 40 mm x 25 mm Dia Each 51.50

vii 32 mm x 20 mm Dia Each 40.00

G G.I. REDUCER ELBOW

i 50 mm x 40 mm Dia Each 109.20

ii 40 mm x 32 mm Dia Each 92.30

iii 32 mm x 25 mm Dia Each 69.20

iv 25 mm x 20 mm Dia Each 51.50

v 20 mm x 15 mm Dia Each 40.00

vi 40 mm x 25 mm Dia Each 72.00

vii 32 mm x 20 mm Dia Each 57.10

H G.I. REDUCER TEE

i 50 mm x 40 mm Dia Each 138.50

ii 40 mm x 32 mm Dia Each 115.20

iii 32 mm x 25 mm Dia Each 97.70

iv 25 mm x 20 mm Dia Each 74.60

v 20 mm x 15 mm Dia Each 69.20

vi 40 mm x 25 mm Dia Each 103.70

vii 32 mm x 20 mm Dia Each 80.60

I G.I. HEX NIPPLE

i 50 mm Dia Each 86.20

ii 40 mm Dia Each 69.20


iii 32 mm Dia Each 57.60

iv 25 mm Dia Each 43.30

v 20 mm Dia Each 34.40

vi 15 mm Dia Each 23.00

120 Gun Metal Gate Valve (Heavy Duty)

i 65 mm dia Each 1480.00

ii 50 mm Dia Each 1205.00

iii 40 mm Dia Each 950.00

iv 32 mm Dia Each 739.00

v 25 mm Dia Each 577.00

vi 20 mm Dia Each 341.00

Note: Gate Valves should be used only in devlivery


line to OHT scour pipe in OHT (for cleaning of OHT)
where pressure pumping is involved. In all other
cases only wheel valve should be used.

121 Gun Metal Wheel Valve (Heavy Duty)

i 40 mm Dia Each 634.00

ii 32 mm Dia Each 499.00

iii 25 mm Dia Each 342.00

iv 20 mm Dia Each 235.00

v 15 mm Dia Each 166.00


122 Brass chromium plated screw down Tap 15 / 12mm Each 200.00
Dia (Heavy Type)

123 Chromium plated stop cock 15mm Dia Each 147.00

124 Brass chromium plateed pillar Tap (Heavy type)- Each 263.00
15/12mm Dia

125 Brass chromium plated shower Rose - 100mm Dia Each 189.00

126 Wooden plug, clamp and screws Set 11.90

127 Shellac 100 gram 18.00

128 Thread Ball Each 3.50

129 Oriya Type Indian Water closet 580mm x 440mm


with "P" or "S" Trap

i White Set 1170.00

ii Colour Set 1490.00

130 European Water closet with "P" or "S" Trap with


Double Flapped seat and seat cover with Brass
Hinges and 10 litre capacity PVC low level flushing
tank with all internal fittings

i White Set 3000.00

ii Colour Set 3390.00

131 European water closet with "P" or "S" Trap with


Double falpped seat and seat cover with Brass
Hinges and 12.5 litre capacity porcelin low level
flushing tank with all internal fittings

i White Set 4230.00


ii Colour Set 5090.00

132 Wash Hand Basin of size 550mm x 400mm with all


accessories such as cast iron brackets, 32mm dia
C.P. waste coupling, rubber plug and chain, 32mm
dia 'B' Class G.I. waste pipe, 15mm dia G.M. wheel
valve, 15mm dia nylon connection, 15mm dia brass
nipples, 15mm C.P. pillar tap etc.

i White without pedastal Set 1625.00

ii White with pedastal Set 1955.00

iii Colour without pedastal Set 2175.00

iv Colour with pedastal Set 2405.00

133 White Porcelin Sink of size 600mm x 450mm x Set 2085.00


200mm with 32mm dia 'B' Class G.I. waste water
pipe and 32mm dia C.P. waste coupling.

134 Cuddapah Slab Sink of size 600mm x 450mm x Set 748.00


200mm with 32mm dia 'B' Class G.I. waste water
pipe & 32mm dia C.P. waste coupling.

135 Cuddapah Slab Sink of size 600mm x 600mm x Set 991.00


200mm with 32mm dia 'B' Class G.I. waste water
pipe & 32mm dia C.P. waste coupling.
136 Lipped Mouth Porcelin Flat Back Urinal with all
accessories such as 32mm dia Bell mouth PVC
connection, 15mm dia G.M. wheel value, 15mm dia
'B' Class G.I. waste water pipe, 15mm dia nylon
connection, 15 mm dia brass nipple etc.,

i White Set 913.00

ii Colour Set 1045.00

137 Porcelin soap dish of size 150mm x 150mm x


50mm

i White Each 190.50

ii Colour Each 261.00

138 Brass chromium plated soap tray of size 150mm x Each 160.30
100mm

139 Brass chromium plated towel rail 60cm long and Set 261.20
20mm dia with brackets

140 Anodised Aluminium Towel Rail 60cm long and Set 128.00
20mm dia with Brackets.

141 PVC / Fibre Glass framed 5.5mm thick mirror, shelf


type with Hard Board Backing

i 600mm x 450mm Each 462.00

ii 500mm x 400mm Each 372.00

142 Stone ware gully trap of size 150mm x 100m with Each 165.50
cast Iron Double Gratings

143 Cast Iron Nahini / Floor Trap with stainless Steel


Grating
i 100mm x 75mm Each 271.50

ii 75mm x 50mm Each 212.70

144 PVC Nahini / Floor Trap with PVC Grating

i 100mm x 75mm Each 150.00

ii 75mm x 50mm Each 131.40

145 First Quality cast Iron pipe

i 150mm Dia RM 985.00

ii 100mm Dia RM 594.00

iii 75mm Dia RM 474.00

iv 50mm Dia RM 336.00

146 First Quality cast Iron Specials

A Plain Bend

i 150mm Dia Each 533.00

ii 100mm Dia Each 260.00

iii 75mm Dia Each 200.00

iv 50mm Dia Each 153.00

B Bend with Door

i 150mm Dia Each 617.00

ii 100mm Dia Each 312.00

iii 75mm Dia Each 260.00

iv 50mm Dia Each 206.00

C Plain TEE
i 150mm Dia Each 1068.00

ii 100mm Dia Each 474.00

iii 75mm Dia Each 324.00

iv 50mm Dia Each 223.00

D TEE with Door

i 150mm Dia Each 1128.00

ii 100mm Dia Each 546.00

iii 75mm Dia Each 379.00

iv 50mm Dia Each 271.00

E "Y" Junction with Door (single)

i 150mm Dia Each 1186.00

ii 100mm Dia Each 594.00

iii 75mm Dia Each 414.00

iv 50mm Dia Each 296.00

F "Y" Junction with Door (Double)

i 150mm Dia Each 1307.00

ii 100mm Dia Each 664.00

iii 75mm Dia Each 498.00

G COWL

i 150mm Dia Each 324.00

ii 100mm Dia Each 195.00

iii 75mm Dia Each 130.00


iv 50mm Dia Each 100.00

147 Stone Ware Pipe

i 150mm Dia Each 99.20


(0.6.RM)
ii 100mm Dia Each 61.60
(0.6.RM)
148 Stone ware specials

A Stone ware TEE

i 150mm Dia Each 161.30

ii 100mm Dia Each 124.40

B Stone Ware Bend

i 150mm Dia Each 136.70

ii 100mm Dia Each 98.70

C Stone ware "Y" Junction

i 150mm Dia Each 166.40

ii 100mm Dia Each 123.90

149 Spun Yarn Kg 12.80

150 Hemp Yarn Kg 11.50

151 Gunny Tape / Kithan sq.m. 11.50

152 Tar Kg 39.90

153 Bitumen Felt 15 mm thick pad sq.m. 228.00


154 Supplying, fabricating, erecting and fixing Hilux (or)
equivalent board false ceiling upto a ceiling height
of 4.5m from floor level.

a Using Hilux board plain sheets (10mm thick) sq.m. 945.00

b Using perforated sheets (10mm thick) sq.m. 967.00

155 Supplying and laying Glass wool for insulation


including necessary packing materials.

a Using 50mm thick Glass wool sq.m. 382.00

b Using 25mm thick Glass wool sq.m. 203.00


WATER SUPPLY AND SANITARY ARRANGEMENTS

PVC ITEMS FINOLEX (OR) EQUIVALANT


213
(WITH ISI MONOGRAM)

1 PVC Pipes 4 kg. per cm2 4 kg. per


cm2
a 50 mm Dia RM 55.10 55.10

b 63 mm Dia RM 79.80 79.80

c 75 mm Dia RM 110.90 110.90

d 90 mm Dia RM 129.30 129.30

e 110 mm Dia RM 172.80 172.80

f 160 mm Dia RM 357.00 357.00

PVC ITEMS FINOLEX (OR) EQUIVALANT


(WITH ISI MONOGRAM)

1 PVC Pipes 6 kg. per cm2 6 kg. per


cm2
a 50 mm Dia RM 86.30 86.30

b 63 mm Dia RM 116.80 116.80

c 75 mm Dia RM 166.30 166.30

d 90 mm Dia RM 197.60 197.60

e 110 mm Dia RM 259.30 259.30

f 160 mm Dia RM 506.00 506.00

PVC ITEMS FINOLEX (OR) EQUIVALANT 10 kg. per cm2 10 kg.


(WITH ISI MONOGRAM) per cm2
1 PVC Pipes

a 15 mm Dia RM 14.60 14.60

b 20 mm Dia RM 21.60 21.60

c 25 mm Dia RM 36.80 36.80

d 32 mm Dia RM 55.10 55.10

e 40 mm Dia RM 86.30 86.30

f 50 mm Dia RM 129.00 129.00

Note (1) For Rainwater down fall pipe works, only PVC
Pipe of working Pressure of 4 kg. per sq.cm. shall
be adopted.

(2) For Sanitary arrangement items of works, only


PVC Pipe of working Pressure of 6 kg. per sq.cm.
shall be adopted.

(3) For Water Supply arrangement items of works,


only PVC Pipe of working Pressure of 10 kg. per
sq.cm. shall be adopted.
214 PVC Specials for water supply arrangements

A Coupler 10 kg. per cm2

a 15 mm Dia Each 3.50 3.50

b 20 mm Dia Each 4.10 4.10

c 25 mm Dia Each 4.80 4.80

d 32 mm Dia Each 6.00 6.00

e 40 mm Dia Each 9.00 9.00

f 50 mm Dia Each 12.20 12.20

B Elbow

a 15 mm Dia Each 5.30 5.30

b 20 mm Dia Each 6.00 6.00

c 25 mm Dia Each 8.50 8.50

d 32 mm Dia Each 12.20 12.20

e 40 mm Dia Each 17.20 17.20

f 50 mm Dia Each 24.50 24.50

C BEND

a 15 mm Dia Each 6.00 6.00

b 20 mm Dia Each 7.30 7.30

c 25 mm Dia Each 9.70 9.70

d 32 mm Dia Each 14.60 14.60

e 40 mm Dia Each 19.60 19.60

f 50 mm Dia Each 30.70 30.70


D Tee

a 15 mm Dia Each 7.30 7.30

b 20 mm Dia Each 8.50 8.50

c 25 mm Dia Each 12.20 12.20

d 32 mm Dia Each 14.70 14.70

e 40 mm Dia Each 23.40 24.50

f 50 mm Dia Each 36.80 36.80

E End Cap

a 15 mm Dia Each 3.50 3.50

b 20 mm Dia Each 4.80 4.80

c 25 mm Dia Each 6.00 6.00

d 32 mm Dia Each 7.30 7.30

e 40 mm Dia Each 11.40 11.40

f 50 mm Dia Each 15.80 15.80

F Reducer

a 20 mm x 15 mm Each 4.80 4.80

b 25 mm x 20 mm Each 5.30 5.30

c 32 mm x 25 mm Each 8.50 8.50

d 40 mm x 32 mm Each 11.40 11.40

e 50 mm x 40 mm Each 19.60 19.60

G Reducer Tee

a 20 mm x 15 mm Each 7.30 7.30


b 25 mm x 20 mm Each 8.50 8.50

c 32 mm x 25 mm Each 12.20 12.20

d 40 mm x 32 mm Each 14.70 14.70

e 50 mm x 40 mm Each 24.50 24.50

H Reducer Elbow

a 20 mm x 15 mm Each 6.00 6.00

b 25 mm x 20 mm Each 7.30 7.30

c 32 mm x 25 mm Each 9.70 9.70

d 40 mm x 32 mm Each 12.20 12.20

e 50 mm x 40 mm Each 18.30 18.30

I Jet Nipple

a 25 mm Dia Each 15.80 15.80

b 32 mm Dia Each 20.70 20.70

NEW ITEMS

J PVC Door Bend 10 kg. per cm2

a 15mm Dia Each 6.00

b 20mm Dia Each 7.30

c 25mm Dia Each 9.70

d 32mm Dia Each 14.60

e 40mm Dia Each 19.60

f 50mm Dia Each 28.40

K PVC Door Tee


a 15mm Dia Each 7.30

b 20mm Dia Each 8.50

c 25mm Dia Each 12.20

d 32mm Dia Each 14.70

e 40mm Dia Each 24.30

f 50mm Dia Each 27.60

201 PVC SPECIALS FOR SANITARY ARRANGEMENTS


FINOLEX (OR) EQUIVALENT (WITH ISI "O" Ring By
MONOGRAM) Jointing pasting

A Elbow

a 75 mm Each 64.60 64.60 52.90 52.90

b 90 mm Each 82.80 82.80 63.90 63.90

c 110 mm Each 100.40 100.40 82.80 82.80

d 160 mm Each 112.30 112.30 94.80 94.80

B Door Elbow

a 75 mm Each 82.80 82.80 59.20 59.20

b 90 mm Each 106.60 106.60 71.00 71.00

c 110 mm Each 130.20 130.20 112.30 112.30

d 160 mm Each 154.10 154.10 130.40 130.40

C Tee

a 75 mm Each 88.60 88.60 82.80 82.80

b 90 mm Each 112.30 112.30 100.40 100.40

c 110 mm Each 147.90 147.90 136.00 136.00


d 160 mm Each 166.00 166.00 147.10 147.10

D Tee with Door (Single)

a 75 mm Each 112.30 112.30 106.60 106.60

b 90 mm Each 136.00 136.00 118.30 118.30

c 110 mm Each 171.60 171.60 159.80 159.80

d 160 mm Each 207.20 207.20 189.80 189.80

E Tee with Door (Double)

a 75 mm Each 142.00 142.00 136.00 136.00

b 90 mm Each 195.30 195.30 177.40 177.40

c 110 mm Each 237.30 237.30 224.70 224.70

d 160 mm Each 271.90 271.90 241.50 241.50

F Bend

a 75 mm Each 71.00 71.00 59.20 59.20

b 90 mm Each 88.60 88.60 71.00 71.00

c 110 mm Each 106.60 106.60 88.60 88.60

d 160 mm Each 118.30 118.30 100.40 100.40

G "Y"

a 75 mm Each 94.80 94.80 88.60 88.60

b 90 mm Each 118.30 118.30 106.60 106.60

c 110 mm Each 154.10 154.10 142.20 142.20

d 160 mm Each 171.60 171.60 154.10 154.10

H "Y" with Door (single)


a 75 mm Each 112.30 112.30 106.60 106.60

b 90 mm Each 142.30 142.30 124.20 124.20

c 110 mm Each 189.80 189.80 166.00 166.00

d 160 mm Each 218.00 218.00 193.00 193.00

I "Y" with Door (Double)

a 75 mm Each 154.00 154.00 147.80 147.80

b 90 mm Each 207.00 207.00 189.80 189.80

c 110 mm Each 249.00 249.00 236.20 236.20

d 160 mm Each 301.00 301.00 271.00 271.00

J Double Tee with Door (Single)

a 75 mm Each 195.00 195.00 159.80 159.80

b 90 mm Each 224.00 224.00 183.50 183.50

c 110 mm Each 265.00 265.00 231.00 231.00

d 160 mm Each 296.00 296.00 260.00 260.00

K Double "Y" with Door (single)

a 75 mm Each 213.00 213.00 177.00 177.00

b 90 mm Each 237.00 237.00 201.00 201.00

c 110 mm Each 271.00 271.00 254.00 254.00

d 160 mm Each 331.00 331.00 296.00 296.00

L Reducer

a 75 mm x 63 mm Each 64.70 64.70 52.90 52.90

b 110 mm x 63 mm Each 82.80 82.80 71.00 71.00


c 110 mm x 75 mm Each 94.80 94.80 82.80 82.80

d 110 mm x 90 mm Each 106.50 106.50 94.80 94.80

f 160 mm x 110 mm Each 124.20 124.20 118.30 118.30

M Shoe

a 110 mm dia Each -- -- 71.00 71.00

b 160 mm dia Each -- -- 106.50 106.50

N Vent Cowl

a 50 mm dia Each -- -- 29.30 29.30

b 75 mm dia Each -- -- 47.30 47.30

c 110 mm dia Each -- -- 70.00 70.00

202 PVC AND HDPE PIPES FOR BORE WELLS

A Special Blue Pipes for Bore Well

a 110 mm dia RM -- -- 295.00 295.00

b 125 mm dia RM -- -- 331.00 331.00

c 140 mm dia RM -- -- 381.00 381.00

d 160 mm dia RM -- -- 430.00 430.00

B Special Blue Slotted Pipes for Bore Wells

a 110 mm dia RM -- -- 307.00 307.00

b 125 mm dia RM -- -- 350.00 350.00

c 140 mm dia RM -- -- 406.00 406.00

d 160 mm dia RM -- -- 493.00 493.00


C End Cap for Bore Well

a 110 mm dia Each -- -- 92.30 92.30

b 125 mm dia Each -- -- 98.70 98.70

c 140 mm dia Each -- -- 111.00 111.00

d 160 mm dia Each -- -- 122.80 122.80

D HDPE PIPES FOR SUB-MERSIBLE PUMP IN BORE


WELL Class-5 1 MPa or 10 kg. / cm2 pressure)

a 20 mm dia RM -- -- 30.40 30.40

b 25 mm dia RM -- -- 55.10 55.10

c 32 mm dia RM -- -- 73.90 73.90

d 40 mm dia RM -- -- 104.50 104.50

e 50 mm dia RM -- -- 148.00 148.00

OTHER ITEMS :

203 PVC screw down tap heavy type 20 mm dia Each 79.40 79.40 75.70 75.70

204 PVC screw down tap heavy type 15 mm dia Each 61.40 61.40 58.50 58.50

205 PVC Adhesive (solution) 100 gm 33.70 33.70 32.10 32.10

206 PVC low level flushing tank with all internal fittings
- (wall mounting type)

a White - 10 litre capacity Set 847.00 847.00 807.00 807.00

b White - 7.5 litre capacity Set 647.00 647.00 617.00 617.00

c Colour - 10 litre capacity Set 959.00 959.00 914.00 914.00

d Colour - 7.5 litre capacity Set 762.00 762.00 726.00 726.00

207 PVC Water Tank Litre 8.60 8.60 8.20 8.20


NEW ITEMS (2017-2018)

208 UPVC Pipe (Un-Plasticized Polyvinyl Chloride) UPVC


used for residential and home applications, water
pressure in residential areas do not normally
a exceed
15 mm the
Dia maximum tolerance. (Schedule-40) RM 36.30 36.30

b 20 mm Dia RM 52.10 52.10

c 25 mm Dia RM 75.60 75.60

d 32 mm Dia RM 102.50 102.50

e 40 mm Dia RM 113.80 113.80

f 50 mm Dia RM 156.70 156.70

g 65 mm Dia RM 233.00 233.00

h 80 mm Dia RM 298.00 298.00

i 100 mm Dia RM 391.00 391.00

j 150 mm Dia RM 653.00 653.00

209 UPVC Pipe (Un-Plasticized Polyvinyl Chloride) UPVC


used for commercial applications operate and
designed to handle higher water pressure
(Schedule-40)

a 15 mm Dia RM 45.60 45.60

b 20 mm Dia RM 64.30 64.30

c 25 mm Dia RM 91.40 91.40

d 32 mm Dia RM 126.00 126.00

e 40 mm Dia RM 155.00 155.00

f 50 mm Dia RM 211.00 211.00


g 65 mm Dia RM 301.00 301.00

h 80 mm Dia RM 433.00 433.00

i 100 mm Dia RM 642.00 642.00

j 150 mm Dia RM 1073.00 1073.00

210 CPVC (Chlorinated Poly Vinyl Chloride) Pipe (Higher


pressure rating with higher pipe thickness)
Standard Dimension Ratio-11

a 15 mm Dia RM 66.00 66.00

b 20 mm Dia RM 100.00 100.00

c 25 mm Dia RM 156.00 156.00

d 32 mm Dia RM 233.00 233.00

e 40 mm Dia RM 256.00 256.00

f 50 mm Dia RM 279.00 279.00

g 65 mm Dia RM 303.00 303.00

211 CPVC (Chlorinated Poly Vinyl Chloride) Pipe (Lesser


pressure rating with lesser pipe thickness) Standard
Dimension Ratio-13.50

a 15 mm Dia RM 57.80 57.80

b 20 mm Dia RM 91.70 91.70

c 25 mm Dia RM 133.20 133.20

d 32 mm Dia RM 202.00 202.00

e 40 mm Dia RM 223.00 223.00

f 50 mm Dia RM 243.00 243.00


g 65 mm Dia RM 263.00 263.00

226 UPVC Specials

I Elbow

a 50 mm Dia Each 74.80

b 40 mm Dia Each 49.80

c 32 mm Dia Each 37.40

d 25 mm Dia Each 24.90

e 20 mm Dia Each 15.30

f 15 mm Dia Each 10.20

II Tee

a 50 mm Dia Each 103.60

b 40 mm Dia Each 64.30

c 32 mm Dia Each 48.50

d 25 mm Dia Each 32.80

e 20 mm Dia Each 19.00

f 15 mm Dia Each 13.50

III UNION

a 25 mm Dia Each 56.40

b 32 mm Dia Each 76.10

c 40 mm Dia Each 112.80

IV REDUCER
a 50 mm x 40 mm Dia Each 51.10

b 40 mm x 32 mm Dia Each 32.80

c 32 mm x 25 mm Dia Each 23.80

d 25 mm x 20 mm Dia Each 14.40

e 20 mm x 15 mm Dia Each 10.70

V REDUCER ELBOW

a 50 mm x 40 mm Dia Each 99.70

b 40 mm x 32 mm Dia Each 68.50

c 32 mm x 25 mm Dia Each 49.80

d 25 mm x 20 mm Dia Each 32.60

e 20 mm x 15 mm Dia Each 27.00

VI REDUCER TEE

a 50 mm x 40 mm Dia Each 114.10

b 40 mm x 32 mm Dia Each 76.10

c 32 mm x 25 mm Dia Each 55.10

d 25 mm x 20 mm Dia Each 32.80

e 20 mm x 15 mm Dia Each 26.20

VII HEX NIPPLE

i 50 mm Dia Each 160.00

ii 40 mm Dia Each 106.30

iii 32 mm Dia Each 69.50

iv 25 mm Dia Each 49.80


227 CPVC Specials

I Elbow

a 50 mm Dia Each 313.00

b 40 mm Dia Each 152.00

c 32 mm Dia Each 91.40

d 25 mm Dia Each 43.00

e 20 mm Dia Each 20.40

f 15 mm Dia Each 17.70

II Tee

a 50 mm Dia Each 394.00

b 40 mm Dia Each 209.00

c 32 mm Dia Each 116.70

d 25 mm Dia Each 51.80

e 20 mm Dia Each 33.40

f 15 mm Dia Each 23.80

III COUPLING

a 50 mm Dia Each 214.90

b 40 mm Dia Each 103.00

c 32 mm Dia Each 56.10

d 25 mm Dia Each 27.90

e 20 mm Dia Each 16.30

f 15 mm Dia Each 13.60


IV UNION

a 50 mm Dia Each 567.00

b 40 mm Dia Each 315.00

c 32 mm Dia Each 190.00

d 25 mm Dia Each 118.00

e 20 mm Dia Each 93.50

f 15 mm Dia Each 60.00

V NIPPLE

a 50 mm Dia Each 375.00

b 40 mm Dia Each 238.00

c 32 mm Dia Each 163.00

d 25 mm Dia Each 104.40

e 20 mm Dia Each 68.90

f 15 mm Dia Each 62.70

NEW ITEMS

172 Hire charges for polishing machinery Day 222.00

173 Electricity charges Unit 11.60

156 Vertified Tiles of size 600 x 600 x 8mm sq.m. 597.00

157 Pre-polished concrete anti-skid step tiles of 20mm sq.m. 599.00


thick

166 Teak wood plug Each 1.05


167 Teak wood plug (50 x 50 x 100mm) Each 5.25

169 Welding charges

a 50mm Each 2.05

b 40mm Each 1.60

170 Add for painting / tarring for Hex Nipple Each 2.75

162 Brass Screws (30 x 6mm) Each 2.35

163 Brass Screws (75 x 10mm) Each 4.75

160 CI Brackets for fixing the sink Set 104.90

159 Squatting Urinal Set 442.00

168 Manhole Cover 60 x 60cm (heavy duty) with frame Each 1810.00

164 Special clamp, teak wood plugs and screws Set 21.00

165 PVC clamp, teak wood plugs and screws Set 8.30

158 Colour designed glazed tiles 300 x 200 x 6mm Each 28.30

161 Swan Neck Tap Each 246.00

171 Labour charges for fixing cuddapah slab to cup- sqm 44.70
board

New item (2017-18)


Labour charges for Fixing aluminium doors,
159 sq.m. 478.00
windows and ventilators

Stainfree Nano polished Vertified tiles 600 x 600 x


174 sq.m. 603.00
8mm

175 Double charged Vertified tiles 600 x 600 x 8mm sq.m. 900.00

176 Double charged Vertified tiles 800 x 800 x 10mm sq.m. 1150.00

Joint free Rectified Glazed Ceramic Flooring tiles


177 Each 53.00
305 x 305 x 8mm
Supplying and fixing in position White / Colour
Glazed Model Floor Mounted European Water Closet
of best quality and approved make with 100mm “P”
or “S” trap connecting with CI pipe of 100mm dia /
PVC pipe of 110mm dia, double flapped rigid PVC
black seat and seat cover with CP brass hinges
including cost of white cement, cement for packing,
spun yarn, teak wood plugs, brass screws, etc.,
including supplying and fixing 10 litres capacity
PVC / 12.5 litres capacity porcelin low level
flushing tank with a pair of CI brackets, etc.,
complete with all fittings, such as, 15mm brass
ball valve with polythene float with brass handle,
union coupling connected by means of 40mm white
178 PVC flush hand using indian adopter joint including Each 4925.00
all internal fittings, such as, 15mm bras
connections, 15mm GM wheel valve, 15mm brass
nipple (2 Nos.), 15mm nylon connection, TW plugs,
screws and also giving necessary connection to the
PVC pipe and painting the CI brackets with 2 coats
of approved paint over one coat of red oxide
primer, dismantling the masonry and re-doing the
dismantled masonry to original condition, etc.,
complete complying with standard specifications.
(The EWC and flushing tank with all accessories
should be got approved by the Executive Engineer
before use on works) Floor Fitting
Supplying and fixing in position White / Colour Special
Delux Model Glazed Cascade Type Parryware /
Hindware / Equivalent Wall Mounted European Water
Closet of best quality and approved make with 100mm
“P” or “S” trap connecting with CI pipe of 100mm dia /
PVC pipe of 110mm dia, double flapped rigid PVC black
seat and seat cover with CP brass hinges including cost of
white cement, cement for packing, spun yarn, teak wood
plugs, brass screws, etc., including supplying and fixing
10 litres capacity PVC / 12.5 litres capacity porcelin low
level flushing tank with a pair of CI brackets, etc.,
complete with all fittings, such as, 15mm brass ball valve
with polythene float with brass handle, union coupling
connected by means of 40mm white PVC flush hand
using indian adopter joint including all internal fittings,
such as, 15mm bras connections, 15mm GM wheel valve,
15mm brass nipple (2 Nos.), 15mm nylon connection, TW
plugs, screws and also giving necessary connection to the
179 PVC pipe and painting the CI brackets with 2 coats of Each 5775.00
approved paint over one coat of red oxide primer,
dismantling the masonry and re-doing the dismantled
masonry to original condition, etc., complete complying
with standard specifications. (The EWC and flushing tank
with all accessories should be got approved by the
Executive Engineer before use on works) with 10 litres
capacity flushing tank with all internal dual flush fittings
with normal seat cover
Wall Fitting

180 Vinyl Flooring 2mm thick sq.m. 537.00


Manufacturing, Supplying and Fixing of Stainless Steel
Hand rails for staircase using 50mm dia 304L Grade
Stainless Steel pipe of 1.60mm thick at required locations
to a height of
900mm from finished floor level welded to 38mm
dia
Stainless Steel pipe post of 1.00mm thick as vertical
at
900mm centre with 2 Nos. of 25mm dia intermediate
181 sq.m. 5375.00
horizontal stainless steel pipe of 1.60mm thick in
between. The vertical pipe has to be welded to the 100 X
100 X 6mm MS base plate encased in the base concrete.
The rate is inclusive of the charges for cutting, bending,
welding, grinding, polishing, conveyance, electrical
charges, etc. complete

Manufacturing, Supplying and Fixing of Stainless Steel


182 Hand rails for staircase near wet riser using 50mm dia RM 1790.00
304L Grade Stainless Steel pipe of 1.60mm thick will be
provided with tubular supports made of 304L Grade
183 Stainless
PVC Mould Steel
CI pipe
stepsof for sump Each 224.00
25mm dia of 1.60mm thick welded to the railing.
The
184 supports
Verticalwill be grouted into the wall and provided with
blinds
93.00mm thick Stainless Steel circular base plate of 304
Grade. The rate shall included for grouting into concrete
with necessary supporting arrangements the hand rail
a Oridinary
in floor polishing buffing, bonding, cutting, grinding, sq.m. 896.00
conveyance, welding charges, electrical charges, etc.
complete
b Premium sq.m. 1344.00

185 Stainless Steel Health Faucet Each 985.00

186 High Density fibre (HDF) board sq.m. 2147.00


Providing and fixing of Aluminium Composite Panel (ACP)
187 4 sided having 50 x 25 x 1.50mm frame work vertical sq.m. 4265.00
and horizontals out of specially designed extruded
sections
Designing withstand
the Semiwind pressure
Unitised of 180Glazing
Structural Kg/sq.m and
System
188 fabricated fixed at all level elevation and
with open groove joint as per design intent, preparation heights. sq.m. 4700.00
The
of extruded
shop drawings section cutting and
for approval, fixing
supply, requirederect
fabricate, spaceas
extruded
per section
approved shopshall be of
drawings at all floor levels and
189 6063 andheights
all floor
Bitumen alloy
padofincluding
BSH 9 confirming
conducting T field
is – 63400
test asrate
per the
shall included to fix the main frame with
test criteria set out in the particular specification necessary
clamps, fasteners,
(Metholodgy shouldbolt nutsapproved
be got etc. The main
by theframeDept.of
extruded section
Officials.) Design shall
the be of 22843
framing & 22739
system (i.e. (H9)&grade
male
a 12mm thick
conforming to BS sq.m. 467.00
Female frame) to 4174
support (or) IS 8147.
vision panels,Rate shall included
spandrel panels
4mm thick ACP sheet (0.25
either with glass or aluminium composite panel,
+ 3.5 + 0.25)
openable, alstrong
window panelsor equivalent fixing with
on a continuous spacer
framing
b 20mm
tape andthick
supported the ACP sheet
between floors.bounded with special
Also design the split type
framing sq.m. 699.00
structural
unutilized sealant of dow corning
glazing system in case of789 or equivalent
strip or punchedin
dust free conditions the gaps between
windows with vision panel proposed with either ACP sheet to be
filed with /whether
insulated Monolithic sealant
glass, and backer
groove rod in
width or the
12mm foam
system
sheet
both intohorizontal
ensure water and and air tightness
vertical shall not be in all
morecomplete
than
complying
20mm. Glazing with standard
of panel specification
shall be doneas directed
only by the
at factory at
departmental
the controlled officer
atmosphere
Pre-Painted Galvanized Iron Window (Airtight Model)
with Grill
Specification:
Providing and fixing for Pre-Painted GI Window fabricated
from roll formed sections made of Galvanized Iron
Color Coated / Powder Coated (Base steel as per IS 513
„D‟ quality, galvanized as per IS 277 with zinc of 120
GSM / sqm.) with total coated thickness of 0.6mm.
Coated Sections should be with Primer Coat of Epoxy
Primer of 5-7 microns thick, finished paint with a
polyester paint of 12-16 microns thich and back coated
with alkyd backer of 5-7 microns or powder coated with
pure polyester powder upto 50-60 microns thick.
Sections for shutter shuld be of 46 x 46mm and external
frame should be of 46 x 52mm. Section for glass
beading should be of 18 x 25mm and centre mullion
should be of 46 x 70mm. The frame and shutter sections
should be cut to length and miter joined with corner
190 bracket made of glass filled Nylon.Mullion Section should sq.m. DELETED
be joined with Frame / Mullion using Nylon Mullion Cap
Ethyl Propylene Diamine Monomer (EPDM) Gasket should
be used all around glass in shutter between frame and
galzed shutter and both sides of fixed glass. Handle
made of high grade Aluminum Powder coated and with
nylon receiver–1 each shutter. Friction hinge-1 set for
each shutter. Glass shutter and fixing glass portions
should be provided with a Acrylic Sheet of minimum
6mm thickness. Windows should be provided with grill
made of 10mm square. MS Bars welded at 4” intervals
centre to centre,
5mm x 12mm MS flat. Total grill unit should be powder
coated and fixed to window frame with Rivets. The above
frame should be fixed to brick / concrete masonry by
using nylon self-expanding caps and driving MS
electroplated
80mm long screws into the caps through frames. The
Pre- Painted Galanized Iron Window should be got
approved from the Executive Engineer before use on
work
UPVC Window
Specification:
Supplying and fixing UPVC (Un-Plasticized
Polyvinyl Chloride) Windows of casement type
(open) from the profile the size of outer frame
60mm x 58mm and shutter profile are
reinforcement with GI/1mm 125GSM and 100%
corrosion free, the profiles are multi chambered
sections with wall thick of 2mm. The EPDM rubber
(black colour) covered with over all the edges of
frame and shutter the shutter will be provided with
Espag multi power point locks and also it operates
as handle. The corners and joints should be welded
and cleaned. Radiations free pin headed plain or
brown colour glass 4mm thick should be provided to
the shutter and it should not allow leakage of water
191 even at most ranging storms and should have key sq.m. 6300.00
lockable action, security protective hinges, strong
locking systems and as per size for arresting
noise and energy loss. The connecting mechanism
between sash and outer frame that enables opening
of the window. The window should be fixed to the
wall with 100% packing with screws and silicon
packing all round the frames. The window should be
got approved from the Executive Engineer before
use on work
UPVC Ventilator
Specification:
Supplying and fixing UPVC (Un-Plasticized
Polyvinyl Chloride) Louvered Ventilators of from the
profile the size of outer frame 60mm x 58mm and
shutter profile size of 60 x 78mm both profiles are
reinforced with GI/1mm 125GSM and 100%
corrosion free, the profile are multi chambered
sections with wall thick of 2mm. The EPDM rubber
192 (black colour) covered with all over the edges of sq.m. 6825.00
frame and shutter. The corners and joints should be
welded and cleaned. Radiations pin headed glass
4mm thick should be provided in the louvers. The
window should be fixed to the wall with 100%
packing with screws and silicon packing all round
the frames. The ventilator should be got approved
from the Executive Engineer before use on work
FOAMED PVC DOOR FRAME RM 447.00
Specification:
Providing factory made pre-laminated FPVC
(Formed Polyvinyl Chloride) Door Frame of the size
105 x 40mm witha wall thickness of 10mm made
out of extruded rigid FPVC profile mitre joined with
6 Nos. of 5mm long screw. The door frame shall be
fixed to the wall by using 80mm long screws
through the frame with the help of PVC fasteners of
3 Nos. to be provided for each vertical member, GI
stiffeners of ('U' channel of size 29 x 9, 1mm,
150mm long) - 3 Nos. at hinge point, frame
reinforcement of ('U' GI channel of size 46 x 22 x
0.6mm), bottom tie rod of ('U' GI channel size of 15
x 15 x 1mm), etc., complete complying with the
standard specification. The door frame should be
got approved from the Executive Engineer before
use on work
ABS DOOR Specification:
Providing and fixing of ABS (Acrolynitrile Butadiene
Styrene)
Door using factory made plain FPVC (Foamed Polyvinyl
Chloride) door frame of the size 105 x 40mm with a wall
thickness of 10mm made out of extruded rigid FPVC
profile mitre joined with 10 Nos. of 50mm long screw.
The door frame shall be fixed to the wall by using 80mm
long screws through the frame with the help of PVC
fasteners to be provided for each vertical member,
stiffeners of („U‟ Channel of size 29 x 9 x 1mm, 150mm
long) 3 Nos. at hinge point, frame reinforcement of („U‟
GI Channel of size 46 x 22 x 0.06mm), bottom tie rod
of („U‟ GI Channel size of 15 x 15 x 1mm), the ABS
Shutter of 35mm thick factory made plain pre-laminated.
ABS (Acrolynitrile Butadiene Styrene) door shutter
moulded in different designs, consisting of all round
Frame made out of water proof solid foam PVC bar of size
193 20x32mm, reinforced by 32 x 32mm - 2 Nos. for vertical
made out of LVL (Laminated Veneer Lumber), core
material of 32mm thick high density craft paper honey
comb board, sandwiched on both sides with pre-
laminated ABS sheet thickness of 1.5mm. PVC edge
banding of size 0.45mm on the vertical sides.
Hardware made out of ball bearing butterfly hinges -
3 Nos. for each shutter and ISI make SS round lock
complete, including cost of Materials, conveyance and all
other incidental charges and labour charges for fixing the
Door neatly etc., complete complying with the standard
specification. The door shutter and frame should be got
approved from the Executive Engineer before use on
work

a Plain pre laminated door sq.m. 5775.00


b Design pre laminated door sq.m. 6090.00

Rubber moulded Hydraulic pressed paver


194
block

a 83mm thick sq.m. 537.00

b 63mm thick sq.m. 447.00

195 TAMIN paver block of size - supply at site

a 60mm thick Sqft 50.10

b 80mm thick Sqft 60.00

196 Solar refelective ceramic tiles of size

a 305 x 305 x 7mm thick Sqm 464.00

b 305 x 240 x 6mm thick Sqm 383.00

Aerated auto claved cellur concrete block 60 x 20 x


197 Each 40.70
10- 30cm

198 Plasticizer/ super plasticizer kg 42.00


NEW LABOURS FOR HERITAGE WORKS (2018-
Actual 5% 10%
2019)

26 Skilled Mason Class - I for Heritage Work Day 920.00 920.00 966.00 1012.00

27 Skilled Mason Class - II for Heritage Work Day 805.00 805.00 845.25 885.50

NEW LABOURS FOR HERITAGE WORKS

30 Skilled Sthapati Brick Mason for Heritage Work Day 1150.00 1150.00 1207.50 1265.00

NEW LABOURS FOR HERITAGE WORKS

33 Skilled Sthapati Stone Mason for Heritage Work Day 1150.00 1150.00 1207.50 1265.00

NEW ITEMS (2018-2019)

Fine polished steel grey granite slab 1200mm x 1470.00


14d Sqm.
600mm, 16mm to 18mm thick

Fine polished Blue Pearl granite slab 1200mm x 7350.00


14e Sqm.
600mm, 16mm to 18mm thick
14(1) Flammed steel grey granite slab 1200mm x 1780.00
Sqm.
a 600mm, 16mm to 18mm thick

14(1) Flammed Ruby granite slab 1200mm x 600mm, 1890.00


Sqm.
b 16mm to 18mm thick

NEW ITEMS (2018-2019)

Making through holes in Plain or Reinforced Cement


Concrete with Diamond Core Drilling System by
200
using BOSCH power tools of following diamete -
Depth per cm

a 100mm Each 315.00

b 150mm Each 420.00

c 200mm Each 472.00

Dadooing Ceramic Tiles of size 300mm x 450mm


201 Each 57.20
x8mm
Dadooing Ceramic Tiles of size 300mm x 600mm
202 Each 85.00
x10mm
Supplying and Installing Metal False Ceiling using
Fire Rretardant Galvanized Steel Sheet Plain lay in
tile size 600mm x 600mm, 0.5mm thick, powder
coated onexternal surface and shall have flange on
all four sides to rest on the exposed grids. The
system to give 600mm x 600mm centre to centre
'T'. The 'T' shall be not be dipped GI Tee Section
3600mm long main Tee. 24mm wide and cross Tee
panels are formed by running main runner of 'T'
section of size 30mm x 24mm powder coated at
bottom at intervals with powder coating at bottom.
Necessary provision of inter locking of 'T' section
are made at required intervals not exceeding
1200mm. The main runners are suspended from
the ceiling by means of 4mm dia. GI rods fixed to
the ceiling using anchor fasteners of 50mm x 8mm
203 size with nylon inset and hooked to the main Sqm. 3060.00
rubbers using clips. The last hangers at end of each
rubber should not be greater than 600mm from the
adjacent wall. The last panel shall be placed at the
side wall using edge profile 'L' Angle of size 20mm x
20mm and fixed to the side wall the false ceiling
should be fixed of same level and should present a
neat look
Providing and fixing of 1.2mm thick Lead Lining
Door for X-Ray Rooms, Scanning Rooms with Mild
Steel Door Frames 105mm x 57mm X 18 G and 12
G x 50mm Shutter made of GI with PWG finish and
honey wool insulations with SS 101mm x 75mm x
3mm SS 304 Ball Bearings Butt Hinges, Mortice
Sash Lock ML 100A,
50mm BS, 85mm centre, CL 207 : Key & Knob
204 70mm, 5 Pin Cylinder with Handle SS Finish (Dorma Sqm. 13650.00
Make), Heavy Duty Door Closer, Frames fixed wih
walls using Mortice Sash Lock ML 100A, 50mm BS,
85mm centre
CL207: Key & Knob 70mm, 5 Pin Cylinder with
Handle SS Finish (Dorma Make) all neccesary
accessories and fittings as per the required and as
per the approval for the Department Officer
Sqm. 13000.00
Post Tensioning Work:
Design and execution of post tensioning work,
including decoiling, the strands, cutting to the
required lengths, supplying, laying of HT strands
sheathing (GI corrugated ducts 0.3mm thick)
jointing with couplers and inserting the strands,
profiling, fixing liveend anchorages, including supply
of stressing anchorages, suitable for 5-5 & 5-4
tendons, grout vents, making dead end anchorages,
including flowering the strands, fixing tendon
support bars, supervising the fixing of antibursting
reinforcement, stressing the cables, end trimming,
grouting the cables, with cement slurry, mixed with
admixtures with required tools, plants, and
machineries, and consumables etc. (Shuttering,
205 concreting & reinforcement steel shall be paid under Sqm. 194000.00
respective items) at all heights including all leads,
lifts, coordination, with the post- tensioning agency,
preparation of drawings, obtaining approval from
the Employer / Architect etc. Rate to include
providing water, power, cement and admixture for
grouting,packing of sheathing and anchorages
blockings, filling of recess pockets after stressing
using grouts (cement slurry mixed with approved
admixtures) including providing access to post
tensioning at all heights including all leads, lifts etc.,
all complete and as approved and as directed by the
Employer Architect but excluding shuttering,
concreting & reinforcement steel which shall be
payable under respective
items separately.
Supplying, fabricating and fixing in position factory
made Stainless Steel Flush Door Shutter 35mm
thick using SS 304 Grade 1.6 mm thick, Stainless
Sheets on both sides (Equivalent to IS 6911-04 Cr.
19, Ni 9) minimum 8-8.5% nickel and 18%
chromium sourced from original stainless steel
manufacturer with view panel size 30mm x 45mm
made up of 6mm thick clear toughened glass fitted
with double side adhesive tape and finished with
dowconing silicon sealant, floor pring for each
206 shutter, consealed tower bolt, suitable stainless Sqm. 36700.00
steel locking arrangement and other necessary
furniture fittings of approved quality. The vertical
styles and other frame members and cross
stiffeners shall be of same quality stainless steel
box section of suitable size and thickness with
proper core material as prescribed by the
Departmental Officers

207 Brass Letters

a 25cm (10”) Each 892.00

b 37cm (15”) Each 1260.00

c Emblem (15”) Each 12600.00

208 Manhole Cover SFRC


a 600mm x 600mm Each 2625.00

b 750mm x 750mm Each 2885.00

c 900mm x 900mm Each 3150.00

209 Incinerator for Ladies Bathroom (For School Works) Each 33600.00

210 Polycarbonate Sheet 6mm thick Sqm. 630.00

211 Melamine Polish Sqm. 630.00


Supplying and erecting in position of following liters
capacity Industrial Model Reverse Osmosis Water-
cum-
Purifier to deliver Potable Water with World Health
Organisation (WHO) Standards with following
accessories.
(a) MS Skid - 1 No.
(b) Media 11054 No. Vessel with 20 nb Multiport
Valve (with Media Pubble and Fine Sand and
Activated Carbon Filling) set
(c) Feed Pump 0.50 HP – 1 No.
(d) Vertical Pump 2-9, 2.00 HP / Single Phase – 1
No.
212
(e) Membrane 40 x 40 filmtech (or) equilaents /
Osmonic (USA) - 1 No. and Membrane Pressure
Vessel 40 x 40 -1 No. & Pressure Gauge - 2 Nos.
(f) Flow Meter - 1 No. 20” Filter with Housing - 1
No.
Low Pressure Switch - 1 No.,
Level Switch - 1 No. &
Necessary CPVC Pipes and Fittings.
The system shall be provide with Two Panel Control
System with necessary Stainless Valves and Fittings
and Float Control etc. The rate should be inclusive
of all civil works, wherever necessary to install the
System in position and intact

50 lit set 39150.00


250 lit set 105000.00

500 lit set 220000.00

1000 lit set 367000.00

2000 lit set 504000.00

NEW ITEMS (2019-2020)

Tactile Paver Type of New Tek BT Yellow Colour


20 Ceramic Tiles of size 305 X 305 X 15mm for Vision Sqm. 2000.00
Impairment Person.

Providing and Filling the tile joint with epoxy grout


with following specification:
Surface preparation including cleaning the joint to
be free from dust and loose particles. Providing
21 masking tape on either side of the tile joint edges Sqm. 430.00
and providing sealing the tile gap with epoxy tile
joint grout and finishing neatly and as directed by
the departmental officers. The rate inclusive of cost
of materials and labour, etc. complete.

1 NOSING FOR GRANITE SLAB

a SINGLE NOSING RM 190.00

b DOUBLE NOSING RM 360.00


35 PVC Trims (Beading) RM 90.00

36 Terracota Jally of size 20 X 20 X 0.75mm Each 38.00

Providing Cup-board Shutter using termite / water


proof plywood of 19mm thick over which laminated
sheet of 0.8mm thick fixed inside the shutter and
1mm thick fixed in the outside of the shutter using
fevicol along with necessary furniture fittings, such
113 as, hydralic hinges, tower bolt, handles, multi Sqm. 4900.00
purpose locks etc., as directed by the Departmental
Officers. The design pattern, water proof plywood,
laminate sheet and other materials should be got
approved from the Executive Engineer befoe use on
work.

115 Supplying and fixing of PVC Sliding Door with Roller Sqm. 3000.00

138 Exterior Emulsion Paint Litre 295.00

Painting the wall with Texture Finish Paint including


139 Sqm. 400.00
labour charges

140 Providing Wall Putty including labour charges Sqm. 50.00

141 300mm dia RCC Hume Pipe RM 2185.00

CP Wall Mixture Tap 3 in 1 system with Hand


152 Each 4025.00
Showers
153 CP Two Way Bib Cock with Health Faucet Each 2000.00

154 CP Shower Arm with Overhead Shower Rose Each 1150.00

159 CP Heavy Duty Bottle Trap 32mm Each 1075.00

160 CP Angle Cock Tap Each 755.00

166 SS Elbow Action Tap of size 15mm Each 1500.00

167 SS Heavy Duty Long Body Tap 15mm Each 1500.00

168 SS Swan Neck Tap Each 1000.00

Supplying and fixing of SS Sink of size 1200 x 550 x


174 Each 18000.00
180mm

Supplying and fixing of Granite Sink of size 600 x


175 Each 4026.00
600 x 250mm

Supplying and fixing of Ornamental Type White


176 Glazed Porcelain Corner 'L' Type Wash Hand Basin Each 3450.00
of size 350mm

Supplying and fixing of Oval Shape Wash Hand


177 Each 2815.00
Basin of size 560 x 450mm

Supplying and fixing of White Glazed Porcelain Oval


178 Shape Special Type Urinal of size 382 x 398 x Each 9775.00
601mm
182 SS Towel Rack 600mm long with lower Hanger Each 1500.00

185 Special Type Mirror of size 1000 x 780mm Each 2500.00

Providing Polymer Coating (Water Proof Coating) for


sunken Portion of toilet with following specification
and the surface shall be cleaned to remove all dust,
foreign, matters lose materials or any other
deposits of contamination by rubbing with wire
brush.
Slurry: Dry blend and polymer liquid blend shall be
mixed into the desired ratio as per recommendation
200 of the supplier. The mix shall be stirred throughly Sqm. 320.00
until no bubbles remain in the mix. Any lumps
found in mix shall be removed.
Apply first coat of polymer modified cementitious
slurry by brush on wet cleaned surface. After
drying, second coat shall be applied on the first coat
as directed by the departmental officers etc. The
rate inclusive of cost of materials and labour, etc.,
complete.

201 Providing Cornice Work for Gyp Board False Ceiling RM 185.00

8mm thick Calcium Silicate Board Designed and


202 Sqm. 1500.00
Perforated for False Ceiling

203 Termite Proof / Water Proof Plywood 19mm thick Sqm. 1300.00

204 Laminated Sheet 0.8mm thick (inside) Sqm. 240.00


205 Laminated Sheet 1mm thick (outside) Sqm. 400.00

206 Vitrified Tiles of size 600 x 600 x 8mm Sqm. Deleted

235 Providing Strong Room Door for Sub-Treasuries Each 290000.00


Pre-painted Galvanized Iron Windows (Air Tight
Model) with Grill and Glass:
Providing and fixing Ajanta Cave Model Window
fabricated from roll formed sections made of
galvanized steel colour coated / powder coated
(Base steel as per IS 513 'D' quality, galvanized as
per IS 277 with zinc of 120 grams / sqm.) with total
coated thickness of 0.60mm.
Paint specification: Coated sections should be with
primer coat of epoxy primer of 5-7 microns thick
finish paintd with a polyester paint of 12-16 microns
thick and back coated with alkyd backer of 5-7
microns.
Dimensions of sections: Sections for shutter should
be of 46 x 46mm and external frame should be of
46 x 52mm. Section for glass beading should be of
18 x 25mm and centre mullion should be of 46 x
70mm.
Fixing details: The frame and shutter sections
should be cut to length and mitre joined with corner
bracket made of CRCA electro plated. Mullion
236 section should be joined with frame / mullion using Sqm. 5350.00
nylon mullion cap. Ethyl Propylene Diamine
Monomer (EPDM) Gasket should be used all around
glass in shutter between frame and glazed shutter
and both sides of fixed glass.....
Accessories: Handle made of high grade aluminium
powder coated and with nylon receiver. Gaskets
made of Ethyl Propylene Diamine Monomer (EPDM).
Corner brackets made of CRCA with zinc
phosphating. Mullion caps made of glass filled
nylon.
Glass: Glass shutter and fixing glass portion should
be provided with a glass of 5mm plain float glass.
Grill: Windows should be provided with grill made of
10mm square MS bars welded to 12mm x 5mm flat
at 4" intervals. Total grill unit should be power
coated and fixed to window frame with screws.
The above frame should be fixed to brick / concrete
masonry by using nylon self-expanding caps and
driving MS electro plated 80mm long screws into
the caps through frames.
Pre-painted Galvanized Iron Windows (Semi Air
Tight Model) with Grill and Glass:
Providing and fixing Eco 3000 Series Window
fabricated from roll formed sections made of
galvanized steel colour coated / powder coated
(Base steel as per IS 513 'D' quality, galvanized as
per IS 277 with zinc of 120 grams / sqm.) with total
coated thickness of 0.58mm.
Paint Specification: Coated sections should be with
primer coat of epoxy primer of 5-7 microns thick
finish painted with a polyester paint of 12-16
microns thick and back coated with alkyd backer of
5-7 microns.
Dimensions of sections: Sections for frame should
be of 48 x 50mm, section for glazed shutter frame
should be 47 x 20mm and section for fixed glass
bead should be of 12 x 12mm.
Fixing details: The frame and shutter frame sections
should be cut to length and mitre joined with
237 Sqm. 5000.00
polypropylene corner bracket. Mullion section
should be joined with frame / mullion using nylon
mullion cap. Ethyl Propylene Diamine Monomer
(EPDM) Gasket should be used all around glass in
shutter..........
Accessories: Each glazed shutter should be
provided with SS pivot hinges-1 set, Polypropylene
handle-1 No. with receiver and aluminium peg stay
powder coated-1 No.
Glass: Glass shutter and fixing glass portion should
be provided with a glass of 4mm Pinhead Glass.
Grill: Windows should be provided with grill made of
10mm square MS bars welded to 12mm x 5mm flat
at 4" intervals. Total grill unit should be power
coated and fixed to window frame with screws.
Window Frame should be fixed to brick masonry /
concrete masonry by using Nylon self-expanding
caps and driving MS electroplated 80mm long
screws into the caps through frames.
Pre-Painted Galvanized Iron Windows with Glass,
Grill & Fly Mesh:
Providing and fixing Windows from roll formed
sections made of galvanized steel powder coated
(Base steel as per IS 513 'D' quality, galvanized as
per IS 277 with zinc of 120 grams / sqm.) with total
coated thickness of 0.58mm.
Paint Specification: Coated sections should be with
primer coat of epoxy primer of 5-7 microns thick,
finish painted with a polyester paint of 12-16
microns thick and back coated with alkyd backer of
5-7 microns.
Dimensions of sections: Section for frame should be
of 72mm x 55mm, section for mullion should be of
72mm x 50mm, section for shutter frame should be
of 47mm x 20mm, section of fixed glass bead
should be of 12mm x 12mm and section for fly
mesh shutter frame should be of 40mm x 20mm.
Fixing details: Section for frame, glazed shutters
and mesh shutters should be cut to length and
mitre joined with polypropylene corner brackets,
238 mullion section should be joined with frame / Sqm. 6600.00
mullion using mullion cap... Ethyl Propylene
Diamine Monomer (EPDM) Gasket should be used
all around glass in shutter and fixed glass. Spoon
profile should be used around Fly mesh to fix mesh
in mesh shutter.
Accessories: Each glazed shutter and mesh shutter
should be Provided with SS pivot hinges - 1set,
Polypropylene handle - 1 No. with receiver and
aluminium powder coated peg stay - 1 No. for
glazed
Glass: Glass shutter and fixed glass portion should
be provided with a glass of 4mm pinhead glass.
Mesh: Mesh shutter should be provided with grill
made of 10mm square MS bars welded to 5mm x
12mm flat at 4" intervals. Total grill unit should be
powder coated and fixed to window frame with
screws.
Window frame should be fixed to brick / concrete
masonry by using nylon self-expanding caps and
driving MS electro plated 80mm long screws into
the caps through frames.
Pre-Painted Galvanized Iron Two Track Sliding
Window: Providing and fixing pre-painted two track,
two panel sliding sytem fabricated from roll formed
sections made of galvanized steel powder coated
(Base steel as per IS 513 'D' quality, galvanized as
per IS 277 with zinc of 120 grams / sqm.) with total
coated thickness of 0.58mm.
Paint specification: Coated sections should be with
primer coat of epoxy primer of 5-7 microns thick,
finish painted with a polyester paint of 12.16
microns thick and back coated with alkyd backer of
5-7 microns.
Dimensions of sections: Section for frame two track
239 should be of 59mm x 44mm, section for shutter Sqm. 4800.00
should be of 35mm x 49mm for window, section for
euro groove should be of 25mm x 24mm and for
lap strip should be 30mm x 41mm.
Fixing details: The frame and shutter sections
should be cut to length, joined with corner brackets
made of glass filled nylon. Ethyl Propylene Diamine
Monomer (EPDM) Gasket should be used all around
glass.
Accessories: Corner brackets made of glass filled
nylon gasket made of Ethyl Propylene Diamine
Monomer (EPDM). Locking system should be of
single pin locking for windows. Single wheel rollers
for windows should be Provided.
Glass: Glass shutter and fixed glass portion should
be provided with a glass of 4mm pinhead glass.
Window frame should be fixed to brick / concrete
masonry by using nylon self-expanding caps and
driving MS electro plated 80mm long screws into
the caps through frames.
Pre-Painted Galvanized Iron Three Track Sliding
Windows: Providing and fixing pre-painted three
track, three panel sliding system fabricated from
roll formed sections made of galvanized steel colour
coated (Base steel as per IS 513 'D' quality,
galvanized as per IS 277 with zinc of 120 grams /
sqm.) with total coated thickness of 0.58mm.
Paint specification: Coated sections should be with
primer coat of epoxy primer of 5-7 microns thick,
finish painted with a polyester paint of 12-16
microns thick and back coated with alkyd backer of
5-7 microns.
Dimensions of sections: Section for outer frame
three track should be of 92mm x 44mm, section for
shutter should be of 35mm x49mm for window,
section for euro groove should be of 25mm x 24mm
240 and for lap strip should be 30mm x 41mm. Sqm. 5300.00
Fixing details: The frame and shutter sections
should be cut to length, joined with corner brackets
made of glass filled nylon. Ethyl Propylene Diamine
Monomer (EPDM) Gasket should be used all around
glass.
Accessories: Corner brackets made of glass filled
nylon. Gasket made of Ethyl Propylene Diamine
Monomer (EPDM). Locking system should be of
single pin locking for windows. Single wheel rollers
for windows should be provided.
Glass: Glass shutter and fixed glass portion should
be provided with a glass of 4mm pinhead glass.
Window frame should be fixed to brick / concrete
masonry by using nylon self-expanding caps and
driving MS electro plated 80mm long screws into
the caps through frames.
Pre-Painted Galvanized Iron Fixed Louvered
Ventilators with Glass and Grill:
Providing and fixing louvered ventilator fabricated
from roll formed sections made of galvanized steel
colour coated / powder coated (Base steel as per IS
513 'D' quality, galvanized as per IS 277 with zinc
of 120 grams / sqm.) with total coated thickness of
0.58mm.
Paint Specification: Coated sections should be with
primer coat of epoxy primer of 5-7 microns thick,
finish painted with a polyester paint of 12-16
microns thick and back coated with alkyd backer of
5-7 microns.
Dimensions of sections: The section for external
frame should be of 57mm x 33mm.
Fixing details: The section should be cut to length,
241 joined with profile to profile component. Sqm. 4800.00
Accessories: Glass holding flanges made of glass
filled nylon.
Glass: Louvers should be provided with 4mm
pinhead glass.
Grill: Ventilator should be provided with grill made
of 10mm Square MS bars to 12mm x 5mm flat at 4"
intervals. Total grill unit should be powder coated
and fixed to ventilator frame with screws.
The above frames should be fixed to brick /
concrete masonry walls and floor by means of self-
expanding screws.
Pre-Painted Galvanized Iron Door Frame:
Providing and fixing door frames from sections
made of galvanized steel powder coated (Base steel
as per IS 513 'D' quality, galvanized as per IS 217
with zinc of 120 grams / sqm.). The factory made
section should be with a powder coating of pure
polyester powder of 50-60 microns thick with total
coated thickness of 1.25mm. Size of door frame
section should be of 105 x 60mm with a rebate of
37mm to accommodate 35mm thick door shutter.
The frame section should have groove to insert
242 gasket. 2 tie rods of 10mm tor steel to be provided Rm 580.00
at bottom. Provision for aldrop, mortise lock to be
made in the section as section should be cut to
length, and joined by way of welding.
Note: 1.25mm thick (Total coated thickness
tolerance as per IS 513)
Pre-Painted Galvanized Iron windows (Air Tight
Model) with Acrylic sheet & Grill:
Providing and fixing Ajanta Cave Model window
fabricated from roll formed sections made of
galvanized steel colour coated / powder coated
(Base steel as per IS 513 'D' quality, galvanized as
per IS 277 with zinc of 120 grams / sqm.) with total
coated thickness of 0.6mm.
Paint specification: Coated sections should be with
primer coat of epoxy primer of 5-7 thick, finish
painted with a polyester paint of 12-16 microns
thick and back coated with alkyd backer of 5-7
microns.
Dimensions of sections: Sections for shutter should
be of 46 x 46mm and external frame shoule be of
46 x 52mm. Section for glass beading should be of
243 18 x 25mm and centre mullion should be 46 x Sqm. 5700.00
70mm.
Fixing details: The frame and shutter sections
shoule be cut to length and mitre joined with corner
bracket made of CRCA electro plated. Mullion
section should be joined with frame / mullion using
nylon mullion cap. Ethyl Propylene Diamine
Monomer (EPDM) Gasket should be used all around
glass in shutter, between frame and glazed shutter
and both sides of fixed glass.....
Accessories: Handle made of high grade Aluminium
Powder coated and with nylon receiver. Gaskets
made of Ethyl Propylene Diamine Monomer (EPDM).
Corner brackets made of CRCA with zinc
phosphating. Mullion caps made of glass filled
nylon.
Glass: Glass shutter and fixing glass portions should
be provided with a glass of 6mm acrylic sheet.
Grill: Windows should be provided with grill made of
10mm square MS bars welded to 12mm x 5mm flat
at 4" intervals. Total grill unit should be powder
coated and fixed to window frame with rivet. The
above frame should be fixed to brick / concrete
masonry by using nylon self-expanding caps and
driving MS electro plated 80mm long screws into
the caps through frames.
Structural Glazing:
Providing and fixing structural glazing fabricated
from roll formed sections made of galvanized steel
colour coated (Base steel as per IS 513 of 'D'
quality, galvanized as per IS 277 with zinc of 120
grams / sqm.) with total coated thickness of
0.72mm. The glass holding section made of 304
grade SS of 0.6mm thick. Galvanized steel sections
are to be used as stiffeners inside the colour coated
steel / powder coated sections as per the design
requirement. Design calculations are made to suit
wind pressures as given in IS 875.
Paint Specifications: Primer coat with epoxy primer
of 5-7 microns thick, finish painted with a polyester
244 paint of 12-16 microns thick and back coated with Sqm. 5700.00
alkyd backer of 5-7 microns or powder coated with
pure polyester powder upto 50-60 microns thick.
Dimensions: The section should be of 37 x 53mm
for frame vertical, 37 x 53mm for frame horizontal
section and section for reinforcement should be of
31 x 55mm. glass holding section should be of 37 x
37mm for top and bottom grids in between should
be of 37 x 18mm.........
Accessories: Brackets made of CRCA powder coated
/ electro plated should be used to fix vertical at top
and bottom and vertical to slab as per site
requirement. Polyurethane brackets should be used
to connect horizontal section to vertical sections.
Silicone: Natural cure, with good UV resistance to
be used.
The above frame should be fixed to brick / concrete
masonry by using nylon self-expanding cap and
driving MS electro plated 80mm long screws into
the caps through frames.
Glass: 5mm reflective Saint Gobain OR equivalent.
Pre-painted Galvanized Iron Fixed Louvered
Ventilators with Glass, Mesh and Grill:
Providing and fixing louvered ventilator fabricated
from roll formed sections made of galvanized steel
colour coated / powder coated (Base steel as per IS
513 of 'D' quality, Galvanized as per IS 277 with
zinc of 120 grams / sqm.) with total coated
thickness of 0.58mm.
Paint specification: Coated sections should be with
primer coat of epoxy primer of 5-7 microns thick,
finish painted with a polyester paint of 12-16
microns thick and black coated with alkyd backer of
5-7 microns.
245 Sqm. 5100.00
Dimensions of section: The section for external
frame should be of 57 x 33mm.
Fixing details: The section should be cut to length
and joined with profile to profile component.
Accessories: Glass holding flanges made of glass
filled nylon.
Glass: Louvers should be provided with 4 mm thick
pinhead glass.
Mesh: Mesh should be provided with a SS 32 gauge
fly mesh of 304 grades with 144 holes per squre
Inch.

Grill: Ventilator should be provided with grill made


of 10mm square MS bars welded to 12mm x 5mm
flat at 4" intervals. Total grill unit should be powder
coated and fixed to window frame with screws.
The above frames should be fixed to concrete /
masonry walls and floor by means of self expanding
screws.
Providing UPVC (Un-Plasticized Polyvinyl Chloride)
Door: Providing and fixing casement doors
fabricated from un-plasticized polyvinyl chloride
(uPVC) sections.
Profiles: The profiles should be three chamber
system which provides high insulation properties
with outer frame 60mm x 55mm with an outer wall
thickness of 2.4mm. The window unit should be
designed with all corner joints mitred and fusion
welded. Windows should be steel reinforced with 25
246 x 24 x 25mm steel reinforcement with a thickness Sqm. 7000.00
of 1mm to have dimensional stability. The sash
should be of 60 x 102mm. The mullion should be of
60 x 74mm. The profiles should have co-extruded
seals.
Hardware: All the hardware like friction stays,
handles should be screwed with self tapping screws.
The handles, locks should be designed so that they
cannot be released from outside.
Glazing: The window system should be glazed with
5mm plain float glass / 6mm bison lam.

Installation: The profiles should be cut to length


and welded 45 degrees. The window should be
desinged such that the water drainage does not
pass through the reinforcement chamber. The
window system should be fixed directly to the
plastered brick wall using self expanding nylon plug
and driving ms electroplated screws into plug.

251 Autoclaved Cellular Aerated Concrete Blocks


a 600mm x 200mm x 100mm Each 44.50

b 600mm x 200mm x 150mm Each 66.75

c 600mm x 200mm x 200mm Each 89.00

d 600mm x 200mm x 225mm Each 100.50

e Self Curing AAC Joint Mortar 40 Kg / bag 595.00

f Ready Mix Plaster for Rendering 50 Kg / bag 295.00

Aerated Auto Claved Cellular Concrete Block 60cm x


252 Each Deleted
20cm x 10-30cm

256 Supplying and fixing of SS Wall Cladding Sqm. 12500.00

257 Supplying and fixing of SS False Ceiling Sqm. 7500.00

Supplying and Fixing of Aluminium Dye Cast Letters


of approved size and colour. The colour treatment
258 process is achieved with MRF colour coat and then
the processed coloured layer is set into the kiln for
the heat treatment process for the following sizes.

a Aluminium Dye Cast Letters 9" size Each 1040.00


b Aluminium Dye Cast Letters 6" size Each 660.00

Providing Wall Panelling using one side teak wood


sheet with melamine polishing with following
specification. The frame using aluminium tubular
section of size 50mm x 25mm x 2mm thick fixing
horizontally and vertically in position with wall at
interval of 0.60m in both directions, fixing water
proof plywood of 12mm thick over the aluminium
frame work with necessary screws. One side teak
259 wood sheet of 3.5mm thick will be fixed over the sqm. 5668.00
plywood using fevicol and finishing with melamine
polishing and the rate inclusive of conveyance to
site and labour charges and as directed by the
Departmental Officers. The design pattern, water
proof plywood, OST sheet and other materials to be
used shall be got approved by the Executive
Engineer concerned before use on work etc.,
complete.
Providing and fixing Acoustic wall Panelling
(equivalent ot Armstrong ) in channelled wood
works perforated panels of width 192mm, thickness
of 15mm and length of 2400mm or as per required
by the Departmental Engineer made of a high
density fibre board with minimum 725 kg./m3
density substrate with a laminated facing as per the
approved shade and finish and a melamine
balancing layer on the reverse side. The boards
shall have a special peforation pattern where the
260 visible surface has a "Helmholtz"fluted perforation sqm 8046.00
of 3mm width and 21mm of visible panel each. The
edges of the panels shall be "tongue" and grooved"
to receive special clips for installation. The back of
the perforated panel shall have sound absorbing not
woven acoustical fleese having NRC of 0.52. The
panels shall be mounted on special aluminium
splines using clips provided by Armstrong and
approved by the Engineer-in-Charge.................
Installation: Install aluminium box section (provided
by others) of section 50mm x 25mm or as
approved by the Engineer-in-Charge on the solid
wall horizontally using screws and plugs at spacing
of 600mm centre to centre. Screw the aluminium
extruded keel for channelled wood works provided
by Armstrong over the lowest and second
aluminium section at an on centre distane of
600mm. Place the inside clip on the groove end of
ht epanel along the aluminium keel and then place
the tongue end of the next panel. Continue
installing rows of panels by inserting the tongue
into groove of the earlier inserted panel and
progeressively installing inside clips into the next
keel till the actual height in achieved. Finish off the
edges using wooden moulding of matching colour
(provided by others) Installation to be carried out
by Armstrong Trained Installation Team and
installation should be carried out as per Armstrong
Recommended Procedure.
Supplying and fixing the Wall Panelling with the
following specification fixing horizontally and
vertically in position of wall. Fixing the water proof
ply wood 9mm thick board over the country wood
planks. Over the ply wood OST sheet of 4mm thick
will be fixed with necessary screws and fevicol
giviing neat finish. The top will be finished with two
coats of sanding polishing. The surface will be
finished with necessary design as directed by the
261 Departmental Officers. The rate inclusive of all sqm 5250.00
materials, labour power and conveyance of
materials to the work site, loading & unloading etc.,
and as per drawing and design by the Departmental
Officers. The water proof ply wood and OST sheet
and other materials to be used shall be got
approved by the Executive Engineer concerned
before use on work, etc., complete as per standard
specification.

Medical Gas Arrangements


Medial Gas Copper Pipeline arrangement to hang on
the wall of socket type connection installation of
seamless cleaned and degreased non aresenical
phosphorous gas copper pipe line with saddles
complete with brazing work including all copper
fitting (tee, elbow, reducer, coupling) The copper
pipelines should be tested suitable for a steam of
working pressure of 17.34 kg/ cm2 (17 bar) and
confirm to BS 864 Standard with specially made for
270 brazed socket type connection. The medical gas
copper pipeline should be tested as per standard
and commissioning after painting as per
International Code No. IS 2379/1963 Table-V. The
pipe lines installed at hte various wings and floors
etc., complete as directed by the Departmental
Officers as per IS code 12827/1989 & ISO
7396/1987 Specification.

10mm OD 0.90mm thick copper pipe


a RM 308.00

15mm OD 0.90mm thick copper pipe


b RM 448.00

22mm OD 0.90mm thick copper pipe


c RM 748.00

28mm OD 0.90mm thick copper pipe


d RM 924.00

42mm OD 1.20mm thick copper pipe


e RM 2000.00

54mm OD 1.20mm thick copper pipe


f RM 2500.00
Gas Outlet Points: (Self sealing type - Single / DIN
outlet pipe) with 'S' type bracket made up of copper
and the out let of non-interchangeable for other
gas. The outlet points are brazed with brass bracket
with self sealing valve (Stainless Steel) with all
271 accessories and complete set and are covered by Each 1144.00
plastic cover duly colour coated as per specific gas
and button cover etc., complete as directed by the
Departmental Officers and as per IS Code
12827/1989 & ISO 7396/1987 Specification.

Oxygen Manifold arrangement of 2 banks x 12


cylinder each wing with semi automatic control
panel which includes contact gauge 2 No., oulet
pressure gauge, brass heavy dut IO x regulator 2
Nos., with suitable adopter, flexible SS Hose.
Manifold shall be of a construction and of a designs
and material suitable for the service pressure in
accordance with IS 12827-1989. Emergency alarms
with illuminating display for low/ high pipeline
pressure and malfunctioning of system.
1) Manifold top frame with provision for connecting
272 12 cylinders on right bank and 12 cylinder on left Each 162800.00
bank with high pressure interconnecting tubing,
silver brazing, non return for claping 2 x 12
cylinders and related fastener. The O2 manifold
should with stand a pressure of 140kg. / CM2 The
installation is commissioned after testing as per
standards and painted as per International Code
and as directed by the Departmental Officers as per
IS Code 12827 /1989 & ISO 7396/1987
Specification .
Nitrous Oxide Manifold Arrangements of 2 banks 3
Cylinder each wing, with automatic control panel
which includes contact gauge 2 Nos. outlet pressure
gauge, brass heavy duty IOX regulator 2 Nos. with
suitable adopter, flexible SS hose. Manifold shall be
of a construction and of a designs and material
suitable for the service pressure in accordance with
IS 12827 -1989. Emergency alarams with
illuminating display for low / high pipe line pressure
and malfunctioning of system.
1) 2 x3 cyliner Nitrus Oxide Manifold should be
suitable with stand a pressure of 140kg/ Cm2 and
above along with high pressure copper annealed tail
273 Each 92400.00
pipes with end brass adapter suitable for Nitrous
Oxide Cyliners and manifold.
2) Top frames comprising of high pressure copper
pipe of size 12mm ID 1.5mm wall thick with high
pressure brass fittings made of high tensile brass
and connetions through non -return valves, high
pressure copper tail pipes made of high pressure
copper pipe size of 7mm ID 1.5mm thick.
3) The disign of middle and bottom frames should
be provided to fit both round and flat bottom
cylinders safely with fitted heavy duty regualtor.
The Manifold should be tested at 3500 pig as per IS
12827/1989 & ISO 7396 / 1987 Specification.
Brass Isolation Valve suitable for the copper pipe
and should be of not lubricated 90 degree turn lever
ball valve of reputed make, connected in line with
medical gas pipe line system by using suitable size
brass valve adopter union, ferrule, nipple, rubber
"O" ring, tapion lap and etc. All pipe line regulators
274 shall be capable of controlling pipe line pressure
and must compatible with the requirements
specified in IS 12827 /1989. All valves should be
pneumatically tested for twice the working pressure
for the gas line as per IS Code 12827/1989 & ISO
7396/1987 Specification,

15mm Isolation Valve


a Each 1188.00

22mm Isolation Valve


b Each 1804.00

28mm Isolation Valve


c Each 2068.00

42mm Isolation Valve


d Each 3800.00

Theatre Vaccum Unit: The unit should comprise of


two reusable 2000ml shatter resistant bottle. Each
made up of ply carbonate material and fully
autoclavable at 134 degree centigrade, should have
275 a vaccum regulator with instant ON/OFF switch and Each 10500.00
three way left, right or both. All the above itesm
should be mounted on atrolleyy having free moving
castor wheels. (As per IS12827/1989 & ISO
7396/1987)
Flow Meter made up of Brass with Humidifier Bottle
Flow Meter should be back pressure compressed
and should be accurate gas flow measurement with
control range 0-13 litres per miniute. It should
meet strict permission and dumbling standard. The
meter body should be made of brass materials. The
humidifier bottle should be made of unbreadkable
276 polycorbonate material and auto cleavable at 134 Each 1337.00
degree centigrate. The includes flow meter and its
accessories (silicon tube with mask.) The cost of
materials including transport, etc., complete as per
standard specification and as directed by the
Dpartmental Officer and as per IS 12827/1987 &
ISO 7396/1987

Ward Vaccum Unit with Gauge both mounted on a


collection jar of capacity 600 ml and with a wall
bracket for mounting it on the wall. The collection
jar should be made of unbreadkable polycarbonate
materials which is fully auto cleavable at 134
277 degree centigrade as per standard specification and Each 1600.00
as directed by the Departmental Officer and as per
IS 12827/1989 & ISO 7396/1987 Specification .
The rate includes cost of silicon hose with SS nipple
on either side.
Supply, installation, testing and commissioning of
equivalent to Intersoil Rand Receprocating Air
Cooled Type (10HP + 5HP) rating Vaccum Pump as
per following provsiions.
As per IS 12827 /1989 & ISO 7396/1987
Specification.
a) Vaccum pump -10HP- 1set
b) Electric motor - 5HP - 1 No.
c) DOL Starter with OLR - 1 No.
d) Vaccum switch - 1 No.
278 e) Vaccum Gauge - 1 No. Each 395000.00
f) Control frame wth Fittings - 1 No.
g) Suction Scrubber - 1 No
i) GI & MS fittings- 1 No.
j) Brass fittings - 1 No.
k) Exhaust Silencer - 1 No.
l) Base frame for motro and vaccum pump - 1 set
m Pilot line with fittings - 1 set, Vaccum Room & Air
Compressor Room Inside
Supply, installation , testing and commissioning of
Compressed Air System of Reciprocating Oil Free
Air Compressor belt driven type air compressor with
following provisions.
As per IS 12827 /1989 & ISO 7396/1987
Specification.
a) 10HP Air Compressor - 2 Nos.
b) Electric Motor 10 HP - 2 Nos.
c) Dol Starter - L&T - 10HP - 1 No.
d) Base Frame Kit (for Motor and Compressor)-
1set.
e) Pressure Switch - 1 No.
f) Pressure Gauge - 1 No.
279 Each 415000.00
g) NRV and Pilot Fittings - 1No.
h) Delivery Tube - 1 No.
i) Foundation Bolts & Anchor Fasteners - 1 Lot
j) Belt Guard - 1 No.
k) Air Driver 50 to 60 cfm. capacity - 1No. Drain
Ball Valve - 1No. Air Outlet Compressor Room
Inside Accessories.
Non-Return Valves, Air Pressure Switch, Pressure
Gauge, Isolation Valves, Air Filters etc.,
Inter connecting piping: Mild Steel Pipe of 2" with
fittings.

Supply, installation, testing and commissioning of


MS fabricated Vertical Mounted Type 1000 liters
capacity Vaccum Receiver with inlet and outlet and
280 drain holes provided suitable to operate with Each 85800.00
vaccum pump etc as directed by the Departmental
Officers.
Supply, installation, testing and commissioning of
MS fabricated Vertical Mounted Type 1000 liters
capacity Compressed Air Receiver with inlet and
281 outlet and drain holes provided suitable to operate Each 85800.00
with vaccum pump etc as directed by the
Departmental Officers.

Single Arm Pendent Mounted on Ceiling Height as


directed by the Departmental Officers. All items are
MS Powder coated. The cost includes cost of all
materials, labour charges, dismantling and re-doing
282 masonry to original condtion, painting of masonry Each 142000.00
works taxes including tranports, risk allowance,
scaffolidng etc., complete and as per IS Code
12827 / 1989 & ISO 7396/1987 Specification

Bed Head Panel of size 1m, length, height 0-0.30cm


and depth of 4". The aluminium powder coated with
requirement colour for provisioin points of o2-2 No.
283 Air 1 No. Vaccum 1 No. with double electrical socket Each 16000.00
with switch 2 Nos. with 2 set with IV - bottle holder
fixing to the wall hanging including monitor stand
etc., complete.
Supplying, fabricating and fixing slotted carriers
with the following specifications. The carriers should
be made of GI sheet of 16G with slots. The size of
carrier is 300 x 40mm and are to be spaced at 50
cm centre to centre. The carriers are to be fixen on
suspenders with the help of lock nuts. These
suspenders are made of galvanised MS rods size of
6mm dia. The suspenders should be threaded to its
full length so that the carrier shall be fixed at any
284 height depending on the onsite requirement. The Each 145.00
suspenders are to be fixed on the soffit of ceiling
with self fixing anchore bolts. All components of
suspenders and slotted carriers should be
galvanised. The rate includes cost of all materials,
labour charges for drilling and fixing the whole
assembly at required places, complete and as
directed by the Departmental Officers.

Supplying and fixing of Cylinder 46 Litre "D" Type


Empty Seamless Medical Nitrous Cylinder with Valve
285 and as per IS Code 12827/1989 & ISO 7396 /1987 Each 14120.00
Specification etc., complete and complying with
standard specification.
Supplying and fixing of Cylinder 46 Litre "D" Type
Empty Seamless Medical Oxygen Cylinder with
286 Valve and as per IS Code 12827/1989 & ISO 7396 / Each 14120.00
1987 Specification etc., complete and complying
with standard specification.
Supplying, fabricating and fixing Oxygen Boyles Kit
for Operation Theatre with following specification :
The Boyles Kit Hose is made of silicon and of white
colour as epr standard suitable adoptor fixed on
higher end of hose to connect outlet unit Boyles
287 Machine. The adopter must be made of SS of Each 1600.00
superor quallity. The rate includes cost of all
materials and labour charges for fixing in proper
position etc., complete and complying with standard
specification .

Supplying, fabricating and fixing Nitrous Oxide


Boyles Kit for Operation Theatre with following
specification : The Boyles Kit Hose is made of silicon
and of white colour as epr standard suitable adoptor
fixed on higher end of hose to connect outlet unit
288 Boyles Machine. The adopter must be made of SS Each 1600.00
of superor quallity. The rate includes cost of all
materials and labour charges for fixing in proper
position etc., complete and complying with standard
specification .

FIRE FIGHTING ARRANGEMENTS

Wrapping and Coating Anti-Corrosive Treatment for


under ground MS pipe having one cost of anti-
corrosive metal primer, one layer of asphalt tar
289
tape wound over the MS pipe as per standard
methods as per standard specification as directed
by the Departmental Officers.

a 100mm dia RM 350.00


b 80mm dia RM 250.00

Supply, erection, testing commissioning of 80mm


dia Heavy Duty Foot Valve including necessary MS
flange of table'E' gaskets, bolts & nuts, etc.,
290 Each 13000.00
installed as end of 80mm dia suction pipeline at
sump as per the standard method and as directed
by the Departmental Officers.

Supply, erection, testing and commissioning of cast


iron body and gun metal or stainless steel Internal
Not Return Valve of size of 80mm dia to control one
way flow of water to be installed pump room at
delivery line and near overhead tank at terrace
level near to jockey pump and motor including
291 necessary MS flange of table 'E' gaskets, bolts & Each 10500.00
nuts etc., as per IS 5312 including conveyance, all
incidental charges, necessary scaffolding and re-
doing the dismantled portions to its original
condition wherever found necessary etc., complete
as per standard specification and as directed by the
Departmental Officers.

Supply and laying of following sizes of Armoured


Aluminium Cables for electrical motor, control
panel, pressure switch, jockey motor etc., The rate
inclusive of all incidental charges, necessary
292 scaffolding and re-doing the dismantled portions to
its original condition wherever found necessary,
etc., complete as per standard specification and as
directed by the Departmental Officers Make:
POLYCAB/ PARACON / FINOLEX / EQUIVALEN.
a 3 core 95 sq.mm armoured aluminium cable RM 500.00

b 4 core 16 sq.mm armoured aluminium cable RM 215.00

c 4 core 10 sq.mm armoured aluminium cable RM 175.00

2 core 1.5 sq.mm armoured multi strand aluminium


d RM 135.00
cable

e 3 core 10 sq.mm armoured aluminium cable RM 175.00

f 10 core 2.5sq.mm armoured aluminium cable RM 395.00

g 2 core 2.5 sq.mm armoured aluminium cable RM 155.00

Supply, Installation, testing and commissioning of


Micro Processor based Conventional 12 Zone Fire
Alarm Control Panel having the rating of 24 volt DC
power supply, consisting 230/24 volt SMPS unit, 2
293 Nos. of 12 volt, 7 AH standby batteries, suitably Each 77000.00
mounted on wall using fixing accessories like
screws, plug, clamps and etc., as per standard
methods and as directed by the Departmental
Officers.
Supply, Installation, testing and commissioning of
Micro Processor based Conventional 4 Zone Fire
Alarm Control Panel having the rating of 24 volt DC
power supply, consisting 230/24 volt SMPS unit, 2
294 Each 45000.00
Nos. of 12 volt, 7 AH standby batteries, suitably
mouned on wall using fixing accessories like screws,
plug, clamps and etc., as per standard methods and
as directed by the Departmental Officers.

Supply, Installation, testing and commissioning of


Conventional Smoke Detector suitably mounted on
ceiling with MS junction box / false ceiling using
295 Each 2100.00
fixing accessories llike screws, plug, clamps, etc., as
per standard methods and as directed by the
Departmental Officers, (Make: Apollo / Equivalent)

Supply, installation, testing and commissioning of


Manual Call Point (MCP) providing on wall using
fixing accessories like screws, plug, clamps and
296 Mtr 1600.00
etc., as per standard methods and as directed by
the Departmental Officers, (Make: Ravel /
Equivalent)

Supply, installation, testing and commissioning of


Electronic Hooter / Sounder providing on wall using
fixing accessories like screws, plug, clamps and
297 Each 1550.00
etc., as per standard methods and as directed by
the Departmental Officers, (Make: Ravel /
Equivalent)
Supply and laying of FRLS PVC insulated 2 core 1.5
sq.mm Armoured Copper Cable on ceiling / wall
298 using fixing accessories like screws, plug, clamps Each 100.00
and etc., as per standard methods and as directed
by the Departmental Officers.

Supply and fixing of Water CO2 Stored Pressure


Type 9 litres capacity Fire Extinguisher as per new
299 IS 15683 complete with control valve, gun metal Each 6000.00
cap, pressure gauge, operation sticker, discharges
hose, wall mounting bracket, safety clip, etc., as
directed by Departmental Officers.
Supply and erection of Double Leaves Fire Rated
Door with Frame having the dimension of 1800mm
x 700mm with following specifications.
A.Door Frame 1.6mm: Galvanized 120 GSM
branded make JSW
b.Door leaf 1mm: Galvanized 120 GSM branded
make JSW
c.Shutter Thickness: 46mm
d.Honeycomb: In-fill
e.Glue Macroplast UR-7221
f.Door Hinges: 4" x 3" x 3mm, Double Ball: Make
Assa Abloy Yale Ball bearing Butt Hinges Grade
SS304 - Finish SS
g.Door Closer with Standard Arm Finish:Silver
h.Lock Set: Dead Lock with both side key
i.Door Orientation: To be confirmed by client
300 Each 73000.00
j. Mounting of door: Brick wall mounted
k. Powder Coating : Powder coated in standard RAL
paint colour of PO Red (60 to 90) Microns
l.Single Point Panic Bar (2 Horizontal): Make Assa
Abloy Yale or Equivalent
m. Dead Lock with both side key: Make Assa Abloy
Yale or Equivalent
n.Vision Panel 200 x 300mm 2 Hrs. Fire Glass
Schott Pyran with Frame
0.Rated Glass Schott Pyran with Frame
p.Anchor Bolt with Endcaps
The above assembly mounted on concrete or brick
wall including the cost of cutting, chipping, concrete
packing, plastering, scaffolding all other conveyance
as per standard methods and as directed by the
Departmental Officers.
Supply, erection, testing and commissioning of fire
fighting application Monoblock Motor Pumpset of
1100 LPM at 45 metres head to develop 3.5kg /
sq.mm at the highest and farthest hydrant point to
make 30m water jet at the time of fire fighting
emergency circumstances, coupled with 15KW /
20HP rated three phase 414 volts, 50 HZ, 2880 rpm
301 Each 219000.00
electrical motor the pump with cast iron body,
bronze impeller, rope gland packaging, suction size
of 100mm dia, delivery size of 80 mm dia, including
the cost of foundation concrete, anti-vibration
mounting, rain safety hood and etc., complete as
directed by the Departmental Officers. (Make:
Kirloskar KDS 2050 + or Equivalent)

Supply, erection, testing and commissioning of fire


fighting application Monoblock Motor Pumpset of
900 LPM at 40 metres head to develop 3.5kg /
sq.cm at the heighest and farthest hydrant point to
make 30m water jet at the time of fire fighting
emergency circumstances, coupled with 15KW /
20HP rated three phase 414 volts, 50 HZ, 2880 rpm
302 Each 133000.00
electrical motor the pump with cast iron body,
bronze impeller, rope gland packaging, suction size
of 100mm dia, delivery size of 80 mm dia, including
the cost of foundation concrete, anti-vibration
mounting, rain safety hood and etc., complete as
directed by the Departmental Officers. (Make:
Kirloskar KDS 2050 + or Equivalent)
Supply, erection, testing and commissioning of Fire
fighting Electrical Control Panel of 15 HP, 415V, 50
HZ Rating Wall Mounted Type fabricated using
CRCA sheet, hinged lockable door, dust and vermin
proof with following provisions:
a. 63Amps, 4 Pole MCB - Incomer, 6 Amps, 2 Pole
MCB for Control Circuit - 1 set
b. R, Y, B Phase Indication Lamp, Volt Meter (0-
500) V), Ammeter (0-50 A), Volt Meter Selector
Switch - 1 set
c. 32 Amps Power Contactor with 230 V Coil, 14 -
23 Amps Over Load Relay - 1 set
303 Each 78500.00
d. Single Phase Preventer - 1 No.
e.Indication Lamp for Motor ON/OFF/TRIP - 1 set
f. AUTO / MANUAL Selector Switch, ON/OFF Push
Button - 1 set.
g. Add on Block, Terminal Block, Power Wiring,
Control Wiring, Connectors, Cable Lugs, Slotted
Cable Cover.
The above panel mounted on wall using anchor
fasterners bolts, plugs, incoming and outgoing cable
connection and all works carried out as per
standard methods and as directed by the
Departmental Officers,
Supply, erection, testing and commissioning of Fire
fighting Application Horizontal Centrifugal Type
Pump Rated for 2280 LPM at 70 metres head with
Electrical Motor of 60 HP of 415 volt 3 phase
304 connection complete with base plate and Each 405000.00
accessories (Make: Kirloskar or Equivalent). The
rate inclusive of necessary vibration, bad mounting
etc., as per standard method as directed by the
Departmental Officers.
pressure of 3.5kg/ sq.cm at highest and farthest
outlet as specified flow of 2280 LPM at 70m head
conforming to IS 1520.
b. 68 BHP, 1500 RPM water cooled with radiator,
diesel engine conforming to relevant BS & IS
standard complete. Auto starting mechanism, 12
volts/24 volts electric starting equipment like self
motor, dyanamo, solenoid switches etc.,
c. 110 litres capacity diesel tank mounted over
stand fabricated using 25mm x 25mm x 6mm size
MS angle providing with level indicator, inlet port,
outlet port, drain port and diesel return line port
and fuel pre-filter, after filter etc (Make: Kirloskar /
Equivalent)
d. Exhaust system having flexible metallic mufier,
100mm dia MS heavy pipe extended upto 1m,
305 Each 1085000.00
outside pump house duly insulated with 50mm thick
glass wool with 1mm thick aluminium sheet
cladding, residential silencer with necessary MS
support arrangements from wall or ceiling as per
site condition .....
e. Dash board consisting the instruments like
temperature gauge, galvano type DC Ammeter,
lubricant oil pressure gauge, ignition switch,
emergency stop and all other protection equipment
as per specification, stop selenied for auto stop in
the event of fault with audio indications, painted
with post office red colour etc., as directed.
f. 12V/ 24 V storage battery, maintenance free
tape, 180 AH rating, MS fabricated common base
plate, coupling guard, foundation bolts etc., as
directed.
Supply, erection, testing and commissioning Mono
Block type Fire fighting Pressurisation Pump of 180
LPM 110 metres head at 10 HP with suitable base
frame incluidng necessary vibration bad mounting
306 Each 198000.00
etc., including conveying, fixing and incidental
charges, etc., complete as per standard
specification and as directed by the Departmental
Officers (Make: Kirloskar / Equivalent)

Supply, erection testing and commissioning of Fire


fighting 2 way Fire Brigade Inlet with necessary gun
metal 63mm dia non-return spring shutter
arrangements so that to control one way flow at the
time of emergency water supply by fire and rescue
service fire engine entry including conveyance, all
307 Each 12000.00
incidental charges, necessary scaffolding and re-
doing the dismantled protions to its original
condition wherever found necessary, etc., complete
as per standard specification and as directed by the
Departmental Officers (Make: KIARTAR / OMEX /
EQUIVALENT)

Supply, erection, testing and commissioning of


Diesel Engine Pump Main Control Panel & Jockey
Pump including necessary auto cut-in, cut-off and
manual operations, battery charger switch
308 Each 115000.00
arrangements, voltmeter, ammeter and running
indication siren provision, wall mounting type etc.,
as per the standard method and as directed by the
Departmental Officers.
Supply and laying of 4 core 10 sq.mm armoured
copper cable for power wiring to the Terrace Pump
Motor with runs of 14 SWG TC wire for earthing,
309 providing in wall with suitable size GI Clamps, RM 555.00
screws, wooden plug, end termination by using
suitable size cable glands, copper sockets and etc.,
as directed by the Departmental Officers.

Supply and laying of 2 core 1.5 sq.mm armoured


copper cable for control wiring to the Terrace Pump
Motor with runs of 14 SWG TC wire for earthing,
310 providing in wall with suitable size GI clamps, RM 135.00
screws, wooden plug, end termination by using
suitable size cable glands, copper sockets and etc.,
as directed by the Departmental Officers.

Supply, erection, tesing and commissioning of Fire


Fighting Application direct on line main control
panel to control electrical Terrace Pump Motor of
3.75KW / 5HP rated 415 volts / 50 Hz 3 phase,
311 Each 51500.00
2880 RPM including necessary auto/ manual
operations, over head relay, selector, switches
arrangements, voltmeter and ammeter provision,
etc., as directed by the Departmental Officers.

Servicing the following sizes cast iron body Sluice


Valves by disconnecting from hydrant line,
dismantling inspecting the internal shutter,
312 replacing valve seating, checking operating lever,
lubricating for miving parts, reconnecting with
hudrant system as per standard methods and as
directed by the Departmental Officers.

a 80mm dia Each 1400.00


b 65mm dia Each 1200.00

Supply and fixing of Fire fighting application oblique


type stainless steel Hydrant Valve of size 63mm dia
with oblique type instantaneous coupling wht
rotating wheel to open and close the valve including
MS flange of table 'E' bolts & nuts with washer as
per IS 5290 at ring main around the building and
313 wet riser inside the building including conveyance, Each 9950.00
all incidental charges, necessary scaffolding and re-
doing the dismantled portions to its original
condition wherever found necessary etc complete
as per standard specification and as directed by the
Departmental Officers. Make: OMEX / KARTAR /
LIFE GUARD / SAFE GUARD / EQUIVALENT.

Supply, installation of Fire fighting Application 180


degree swinging type, hose reel drum with 20mm
dia braided thermoplastic hose 30 metres long, so
as to extend to necessary distance by self rolling
spindle wheel including necessary 20 mm dia ball
valve and open and close spray nozzie, warm clip,
etc., as per the standard pattern of nay reputed
314 make at every floor nearer to hydrant valve, Each 13420.00
including conveyance, all incidental charges,
necessary scaffolding and re-doiing the dismantled
portions to its original condition wherever found
necessary., etc complete as per standard
specification and as directed by the Departmental
Officers. Make: OMEX / KARTAR / LIFE GUARD /
SAFE GUARD / EQUIVALENT.
Supply, and fixing in position of Fire fighting
Application Hose of 63mm dia of 15 metres length
binded by coppper wire with 63mm dia stainless
steel male and female instantaneous fire fighting
special coupling as per IS 901 as directed by the
Departmental Officers. Near every hydrant points
315 including conveyance, all incidental charges, Each 8870.00
necessary scaffolding and re-doing the dismantled
portions to its original condition whererver found
necessary etc complete as per standard
specification and as directed by the Departmental
Officers. Make: OMEX / KARTAR / LIFE GUARD /
SAFE GUARD / EQUIVALENT.

Supply, and fixing in position of Fire fighting


Application 63mm dia stainless steel short length
Branch Pipe with hexagonal type spray nozzie of
15mm (or) 20mm jet bore. Near every hydrant
points including conveyance, all incidental charges,
316 necessary scaffolding and re-doing the dismantled Each 3280.00
portions to its original condition whererver found
necessary etc complete as per standard
specification and as directed by the Departmental
Officers. Make: OMEX / KARTAR / LIFE GUARD /
SAFE GUARD / EQUIVALENT.
Supply of Fire fighting Application Application MS
Hose Box to keep two number of hoses and 1 no. of
branch pipe with nozzie having proper glass window
type double door with universe open key, painted
inside white and outside Post Office Red. Near every
hydrant points including conveyance, all incidental
317 Each 7650.00
charges, necessary scaffolding and re-doing the
dismantled portions to its original condition
whererver found necessary etc complete as per
standard specification and as directed by the
Departmental Officers. Make: OMEX / KARTAR /
LIFE GUARD / SAFE GUARD / EQUIVALENT.

Supply and fixing nominal bore quartized bulb type


sprinkler bulb 68 Deg C fast response pendent type
including GI coller for each sprinkler bulb, mounted
in MS pipe ling using suitable size MS threaded
coupling, thread, shellac etc., as per standard
mehtods and including conveyance, all incidental
318 Each 450.00
charges, necessary scaffolding and re-doing the
dismantled portions to its original condition
whererver found necessary etc complete as per
standard specification and as directed by the
Departmental Officers. Make: OMEX / KARTAR /
LIFE GUARD / SAFE GUARD / EQUIVALENT.
Supply, erection, testing and commissioning of
following MS 'C' Class Heavy Duty Pipe as per IS
1239 to withstand a developing pressure of 10kg
/sq.cm including necessary fittings like MS flange of
table 'E' elbows, reducers, gaskets, bolt, nuts wth
washerr & joints as per standard method of arc
welding, including one coat of metal primer and two
319
coat of Post Officer Red painting including
conveyance, all incidental charges, necessary
scaffolding and re-doing the dismantled portions to
its original condition whererver found necessary etc
complete as per standard specification and as
directed by the Departmental Officers. Make:
JINDAL/ EQUIVALENT.

a 250mm dia RM 5500.00

b 200mm dia RM 4100.00

c 150mm dia RM 2950.00

d 100mm dia RM 2050.00

e 80mm dia RM 1600.00

f 65mm dia RM 1350.00

g 50mm dia RM 800.00


h 40mm dia RM 600.00

i 25mm dia RM 500.00

Wrapping and Coating Anti-Corrosive Treatment for


the following under ground MS pipe having one coat
of anti-corrosive metal primer, one layer of asphalt
320
tar tape wound over the MS Pipe as per standard
methods as per standard specification and as
directed by the Departmental Officers.

a 200mm dia RM 450.00

b 150mm dia RM 400.00

Supply, erection testing and commissioning of


following sizes of Heavy Duty Foot Valve including
all accessories, such as MS flange of table 'E'
gaskets, bolts & nuts etc., installed at end of
150/200mm dia suction pipe line at sump i
321 including conveyance, all incidental charges,
necessary scaffolding and re-doing the dismantled
portions to its original condition whererver found
necessary etc complete as per standard
specification and as directed by the Departmental
Officers. Make: NORMEX / KARTAR / EQUIVALENT.

a 200mm dia Each 31000.00


b 150mm dia Each 24000.00

c 100mm dia Each 15000.00

Supply, erection, testing and commissioning of cast


iron body and bronze internal non-rising spindle
sluice valve of sizes at required places to control
the flow of water including necessary MS flange of
table 'E' gaskets, bolts & nuts including
322 conveyance, all incidental charges, necessary
scaffolding and re-doing the dismantled portions to
its original condition whererver found necessary etc
complete as per standard specification and as
directed by the Departmental Officers. Make:
NORMEX / KARTAR / EQUIVALENT.

a 250mm dia Each 58000.00

b 200mm dia Each 37500.00

c 150mm dia Each 22100.00

d 100mm dia Each 14900.00

e 80mm dia Each 11000.00

f 65mm dia Each 8300.00


Supply, erection, testing and commissioning of Cast
iron and Gun metal or stainless steel internal Non
return valve of following sizes to control one way
flow of water to be installed pump room at delivery
line and near overhead tank at terrace level near to
jockey pump and motor including necessary MS
323 flange of table 'E' gaskets, bolts & nuts etc., as per
IS 5312 including conveyance, all incidental
charges, necessary scaffolding and re-doing the
dismantled portions to its original condition
whererver found necessary etc complete as per
standard specification and as directed by the
Departmental Officers.

a 200mm dia Each 46100.00

b 150mm dia Each 27000.00

c 100mm dia Each 11200.00

Supply, erection, testing and commissioning of Gun


metal Gate Valve of size 50mm dia size including
necessary MS flange of table 'E' gaskets, bolts &
nuts etc., installed at pump house delivery line for
the purpose of priming water to suction line
324 including conveyance, all incidental charges, Each 5050.00
necessary scaffolding and re-doing the dismantled
portions to its original condition whererver found
necessary etc complete as per standard
specification and as directed by the Departmental
Officers. Make: LEADER / EQUIVALENT.
Supply, erection, testing and commissioning of Gun
Metal Non - Return Valve of size 50mm dia
including necessary MS flange of table 'E' gaskets,
bolts & nuts etc., installed at pump house delivery
line for the purpose of priming to suction line so
325 Each 4900.00
that to control one way including conveyance, fixing
and incidental charges etc., complete as per
standard specification and as directed by the
Departmental Officers. Make:
LEADER/EQUIVALENT.

Supply and providing 1000 litres capacity Priming


326 Each 9000.00
Tank made up of PVC. Make: SINTEX/EQUIVALENT.

Priming Tank mounted with the supporting


arrangement fabricated using MS angle for the
height of 3 metres from the floor level, inlet, outlet,
327 Each 13500.00
and drain arrangements inside the fire fighting
pump room, as directed by the Departmental
Officers.

Supply and laying of following size of Armoured


Aluminium / Copper Cables for electrical motor,
control panel, pressure switch, jockey motor etc.,
all incidental charges, necessary scaffolding and re-
328 doing the dismantled portions to its original
condition whererver found necessary etc complete
as per standard specification and as directed by the
Departmental Officers. Make: POLYCAB /PARACON /
FINOLEX /EQUIVALENT.

a 3 core 185 sq.mm armoured aluminium cable RM 1500.00

b 3 core 10 sq.mm armoured copper cable RM 670.00


c 10 core 2.5 sq.mm armoured copper cable RM 600.00

d 2 core 2.5 sq.mm armoured copper cable RM 200.00

Earthing arrangements with GI Earth Plate including


charcoal and salt with necessary excavation in all
soils and to full depth as may be required and
329 Each 6000.00
masonry work, re-filling the sides of foundation with
excavated earth as per the standard specifcation
and as directed by the Departmental Officers.

Supply, erection, testing and commissioning of


Pressure Gauge with 0 to 14kg. Range of reputed
make with necessary valve, milling thread MS
coupling fixed at delivery pipe ling in pump house to
read the developing pressure including conveyance,
330 all incidental charges, necessary scaffolding and re- Each 3100.00
doing the dismantled portions to its original
condition whererver found necessary etc complete
as per standard specification and as directed by the
Departmental Officers. Make: H-GURU / ISI MAKE /
EQUIVALENT.
Supply, erection, testing and commissioning of
suitable Pressure Switch of reputed make line
indfoss or Donfoss including necessary valves,
couplings, etc., connected with electrical main
control panel and setup at proper differential so as
to auto start and auto stop the electrical motor,
331 jockey motro including conveyance, all incidental Each 5200.00
charges, necessary scaffolding and re-doing the
dismantled portions to its original condition
whererver found necessary etc complete as per
standard specification and as directed by the
Departmental Officers. Make: DONFOSS /
INDFOSS / ISI MAKE / EQUIVALENT.

Supplying, installation, testing and commissioning


of Fire Fighting Electrical Control Panel of cubical
construction, floor mounted type fabricated using
CRCA sheet, compartmentalised with hinged
lockable door dust and vermin proof, cable alley,
inter connection having switch gears and
332 Each 525000.00
accessories mounting and internal wiring, earth
terminals, numberings, necessary metering
protections and indications complete in all respect
suitable for operation on 415 volt, 3 phase, 50 Hz
AC supply with enclosure protection class IP 54 and
mounted with the followings.
A.Coomon Panel in Fire Pump House
(i) Incomer
a. 1 No. 600A TP & N SDFU with HRC fuses
b. 1 set of 600 A, 4 bar aluminium bus bar, 415V,
50 |Hz AC supply
c. 1 No. (0-500A) digital ammeter with selector
switch & CTs
d. 1 No. (0-500V) digital voltmeter with selector
switch and control fuses
e. 3 Nos. phase indication lamp LED type with
toggle switches with control fuses.

(ii) Outgoing
a. Main Fire Pump
400 A TPN SDFU with HRC fuses with suitable HP
fully automatic starter / delta starter with over load
protection , digital ammeter with built- in selector
switch and suitable CTs, current sensing type single
phasing preventer complete with all accessories and
internal wiring required for automatic operaton,
selector switch for auto/ manual / OFF operation - 1
No......
b. Jockey Pump
125 A TPN SDFU with HRC fuses with suitable HP
fully automatic starter/ delta starter with over load
protection, current sensing type single phasing
preventer complete with all accessories and internal
wiring required for automatic opertion, selector
switch for auto / manual operation - 1 No.
c. Diesel Engine Control comprising of :
1. Auto / manual selector switch and 3 attempt
starting device, timers and relays as required, push
buttons, start / stop in manual mode.
2. Indication lamp for high/ low lubircant oil
pressure, high water termperature and engine ON
indication.
3. Battery charger suitable for 12V/ 24 V DC with
boost and tickle selector switch, 0-15V/0-30V DC
volt meter, 0-20A DC ammeter
4. All standard relays and accessories for automatic
operation of diesel engine.
5. The above combined panel mounted over MS
channel fabricated frame with cement concrete
platform, all other connection works carried out as
per standard methods and including conveying,
fixing and incidental charges, etc., complete as per
standard specifiction and as directed by the
Departmental Officers.
Motor Driven Fire Pumpset suitable for automatic
operation and consisting of following .
A. 1 No. horizontal split casing centrifugal type fire
pum capable of delivering 4550 LPM against a total
head of 110 metres, so as to ensure a miniimum
pressure of 3.5kg. per sq.cm at the fartherst top
most hydrant / outlet with pum pcasing of cast iron
to grad FG 200, IS 210-1978 and parts like
impeller, shaft sleeve, bearing ring etc., of non
corrosive metal either like brone, brass or gun
metal and shaftof stanless steel.
b. 1 No. suqirrel cage induction motor of 175 HO,,
415 Volt, 3 phase 50 Hz rating, conforming to IS
325-1978 with class "F" insulation, totally enclosed,
333 IP 55 for enclosure fan cooled type conforming to Each 825000.00
relevant protection clause of IS 4691, synchronous
speed of 2900 RPM.
c. Common bed plate fabricated with MS channel /
Cast iron type for assembling the pump and motro
flexible coupling between the pump and the motor
wiht coupling guard for protection - 1 No.
d. Making cement concrete foundation suitable for
the above pumpset including vibration isolation
pads as necessary, foundation bolts, brackets,
clamp fixtures, grouting etc., In accordance with
the manufacture's design and as per standard
methods and including conveying, fixing and
incidiental charges, etc., complete as per standard
specification and as directed by the Departmentaql
Supply, installation, testing and commissioning of
Diesel Engine Driven Main Fire Pump suitable for
automatic operation and consisting of following and
complete in all respects as required.
A. 1 No. horizontal split casing centrifugal type fire
pump capable of delivering 4550 LPM against a total
head of 110 metres, so as to ensure a minimum
pressure of 3.5kg. per sq.cm at the fartherst top
most hydrant / outlet with pump casing of cast iron
to grade FG 200, IS 210-1978 and parts like
impeller, shaft sleeve, bearing ring etc., on non -
corrosive metal either like bronze, brass or gun
334 Each 1240000.00
metal and shaft of stainless steel.
b. 190 HP, 1500 RPM water cooled with radiator,
diesel engine conforming to relevant BS & IS
standard complete.
c.Auto starting mechanism, 12 volts / 24 volts
eletric starting equipment like self motor, dynamo,
solenoid switches etc.
d. 110 litres capacity diesel tank mounted over
stand fabricated using 25mm x 25mm x 6mm size
MS angle providing with level indicator, inlet port,
outlet port, drain port and diesel return line port
and fuel pre-filter, after filter etc..............
e.Exhaust system having flexible metallic mufler,
100mm dia MS heavy pipe extended upto 1m
ouside pump house duly insulated with 50mm thick
glass wool wth 1mm thick aluminium sheet
cladding, residential silencer with necessary MS
support arrangements from wall or ceiling as per
site condition.
f. Dash board consisting the instruments like
Temperature Gauge, Galvano Type DC Ammeter,
Lubricant Oil Pressure Gauge, Ignition Switch,
Emergency stop and all other protection equipment
as per specification, stop soleneid for auto stop in
the event of fault wtih audio indications, painted
with Post Office Red Colour etc.,as required.
g. 12V /24V storage battery, maintenance free
tape, 180 AH rating, MS fabricated common base
plate, coupling guard, foundation bolts etc., as
required.
h. Postioning the diesel engine driven fire pump
over cement concrete foundation using suitable size
anti-vibration mounting arrangement.
All works including conveying , fixing and incidental
charges etc., complete as per standard specification
and as directed by the Departmental Officers.
Make: KIRLOSKAR ? EQUIVALENT.
Supplyu, installation testing and commissioning of
Diesel Engine Driven Main Fire Pump suitable for
automatic operation and consisting of followings
complete in all respects as required.
A. 1 No. horizontal split casing centrifugal type fire
pump capable of delivering 4550 LPM against a total
head of 110 metres, so as to ensure a minimum
pressure of 3.5kg. per sq.cm at the fartherst top
most hydrant / outlet with pump casing of cast iron
to grade FG 200, IS 210-1978 and parts like
impeller, shaft sleeve, bearing ring etc., on non -
corrosive metal either like bronze, brass or gun
335 Each 1145000.00
metal and shaft of stainless steel.
b. 100 BHP, 1500 RPM water cooled with radiator,
diesel engine conforming to relevant BS & IS
standard complete.
c.Auto starting mechanism, 12 volts / 24 volts
eletric starting equipment like self motor, dynamo,
solenoid switches etc.
d. 110 litres capacity diesel tank mounted over
stand fabricated using 25mm x 25mm x 6mm size
MS angle providing with level indicator, inlet port,
outlet port, drain port and diesel return line port
and fuel pre-filter, after filter etc..............
e.Exhaust system having flexible metallic mufler,
100mm dia MS heavy pipe extended upto 1m
ouside pump house duly insulated with 50mm thick
glass wool wth 1mm thick aluminium sheet
cladding, residential silencer with necessary MS
support arrangements from wall or ceiling as per
site condition.
f. Dash board consisting the instruments like
Temperature Gauge, Galvano Type DC Ammeter,
Lubricant Oil Pressure Gauge, Ignition Switch,
Emergency stop and all other protection equipment
as per specification, stop soleneid for auto stop in
the event of fault wtih audio indications, painted
with Post Office Red Colour etc.,as required.
g. 12V /24V storage battery, maintenance free
tape, 180 AH rating, MS fabricated common base
plate, coupling guard, foundation bolts etc., as
required.
h. Postioning the diesel engine driven fire pump
over cement concrete foundation using suitable size
anti-vibration mounting arrangement.
All works including conveying , fixing and incidental
charges etc., complete as per standard specification
and as directed by the Departmental Officers.
Make: KIRLOSKAR ? EQUIVALENT.
Supplym erection, testing and commissioning of
180 LPM, 70 metres, Head Pressurization Pump
with 10 HP electrical motor of Kirloskar make with
suitable base frame incluidng necessary vibration
336 Each 102000.00
bad mounting etc.,m including conveying, fixing and
incidental charges, etc., complete as per standard
specification and as directed by the Departmental
Officers. Make : KIRLOSKAR / EQUIVALENT.

Supply , erection testing and commissioning of Fire


Fighting 4 Way Fire Brigade inlet with necessary
gun metal 63mm dia non return spring shutter
arrangements, so that to control one way flow at
the time of emergency water supply by fire and
rescue service fire engine entry ncluding
337 Each 14500.00
conveyance, all incidental charges, necessary
scaffolding and re-doing the dismantled portions to
its original condition whererver found necessary etc
complete as per standard specification and as
directed by the Departmental Officers. Make:
KIARTAR / OMEX / EQUIVALENT.

Supply, erection, testing and commissioning of Air


Release Valve of 20mm dia so as to release airlock
in 100mm dia MS pipe at top most wet riser,
ncluding conveyance, all incidental charges,
338 necessary scaffolding and re-doing the dismantled Each 1450.00
portions to its original condition whererver found
necessary etc complete as per standard
specification and as directed by the Departmental
Officers. Make: KARTAR/ EQUIVALENT.
Providing, fixing pipe supports from coloumns / wall
or suspenders from roof slab to suit various dia of
pipes made out of GI / MS adjustable rods threaded
for a sufficient length to adjust the height of
339
support along with clamping arrangement for
holding pipes of anchor fastening, arrangement
a design
100mm dia of hanger and should confirm with Each 280.00
specification.

b 80mm dia Each 270.00

c 50mm dia Each 250.00

d 40mm dia Each 140.00

Supply and fixing of stored pressure ABC (Mono


Ammonium Phospate) Powder Type Fire
Extinguisher of 6 kg. capacity as per IS 15683 with
pressure gauge, discharge hose & control nozzie,
wall mounting bracket, safety clip etc., ncluding
340 conveyance, all incidental charges, necessary Each 4500.00
scaffolding and re-doing the dismantled portions to
its original condition whererver found necessary etc
complete as per standard specification and as
directed by the Departmental Officers. Make:
EXCELLENT/ SAFETY FIRST ? EQUIVALENT.
Supply and fixing Carbon-di-Oxide Gas Type 2 kg.
capacity Fire Extinguisher as per New IS:15683.,
complete with control valve, discharge hose with
horn, wall mounting bracket, safety clip etc.,
ncluding conveyance, all incidental charges,
341 necessary scaffolding and re-doing the dismantled Each 7500.00
portions to its original condition whererver found
necessary etc complete as per standard
specification and as directed by the Departmental
Officers. Make: EXCELLENT / SAFETY FIRST ?
EQUIVALENT.

Supply and ketp in position of Trolley Mounted


Water CO2 Stored Pressure Type 50 litres capacity
Fire Extinguisher as per IS: 13385, complete with
control valve, gun metal cap, pressure gauge,
operation sticker, discharge hose, mounting trolley
with moving wheel, safety clip etc., ncluding
342 Each 21000.00
conveyance, all incidental charges, necessary
scaffolding and re-doing the dismantled portions to
its original condition whererver found necessary etc
complete as per standard specification and as
directed by the Departmental Officers. Make:
EXCELENT/SAFETY FIRST / EQUIVALENT.
Supply and ketp in position of Trolley Mounted tYPE
22.5 KG. Carbon-di-Oxide Fire Extinguisher as per
IS 15683, complete with control valve, gun metal
cap, pressure gauge, operation sticker, discharge
hose, mounting trolley with moving wheel, safety
clip etc., ncluding conveyance, all incidental
343 Each 29000.00
charges, necessary scaffolding and re-doing the
dismantled portions to its original condition
whererver found necessary etc complete as per
standard specification and as directed by the
Departmental Officers. Make: EXCELENT/SAFETY
FIRST / EQUIVALENT.

Servicing the SS Hydrant Valves by disconnecting


from pipe line, dismantling, checking the operation
of rorating spindle, replacing rubber 'O' ring of
valve seating , replacing rubber gasket of 80mm dia
344 Each 1450.00
OD x 65mm dia ID, repaking the 5/8" x 21/2" bolt,
nut, washers, re-connecting with hydrant system as
per standard methods and as directed by the
Departmental Officers.

Servicing the First Aid Hose Reel Drum assembly by


disconnecting from hydrant line, replacing shut off
nozzie, warm clip, lubricating the rotating assembly,
345 replacing 20mm dia, 30 metres long rubber hose, Each 3500.00
re-connecting with hydrant system as per standard
methods and as directed by the Departmental
Officers.
Servicing the following sizes of cast iron body Sluice
Valves by disconnecting from hydrant line,
dismantling, inspecting the internal shutter,
346 replacing valve seating, checking operating, lever,
lubricating for moving parts, re-connecting with
hydrant system, as per standard methods and as
directed by the Departmental Officers.

a 150mm dia Each 2700.00

b 100mm dia Each 1800.00

Supply and fixing in position of 12 Volt 180 AH Lead


Acid, Sealed Maintenance Free (SMF) batteries with
connecting leads, lugs terminal post, etc., as per
standard methods and ncluding conveyance, all
incidental charges, necessary scaffolding and re-
347 Each 25000.00
doing the dismantled portions to its original
condition whererver found necessary etc complete
as per standard specification and as directed by the
Departmental Officers. Make: EXCELENT/SAFETY
FIRST / EQUIVALENT.

New Items

352 1.0 HP Jet Pump Set Each 8750.00

353 1.5 HP Jet Pump Set Each 15000.00


354 3.0 HP Jet Pump Set Each 25000.00

355 2.0 HP Submergible Pump Each 15000.00

356 3.0 HP Submergible Pump Each 34500.00

357 5.0 HP Submergible Pump Each 51000.00

358 3 Phase Panel Board including labour charges Each 13000.00

359 Nylon Rope for Bore-well RM 60.00

364
UPVC Union 50mm dia Each 240.00
III d

IV Coupler

a 50mm dia Each 60.50

b 40mm dia Each 44.00

c 32mm dia Each 35.50

ANNESURE -VIII/ NEW TECHNIQUES


Rates of Materials / Geogrids

Bi-Axial Extruded GeoGrids of Minimum Tensile


1 Strength 15KN/m in the longitudinal and transverse Sqm. 100.00
direction
Bi-Axial Extruded GeoGrids of Minimum Tensile
2 Strength 20KN/m in the longitudinal and transverse Sqm. 115.00
direction
Bi-Axial Extruded GeoGrids of Minimum Tensile
3 Strength 30KN/m in the longitudinal and transverse Sqm. 185.00
direction
Bi-Axial Extruded GeoGrids of Minimum Tensile
4 Strength 40KN/m in the longitudinal and transverse Sqm. 275.00
direction
Synthetic Geogrid having Ultimate Tensile Strength
5 Sqm. 220.00
100KN/m

Synthetic Geogrid having Ultimate Tensile Strength


6 Sqm. 230.00
150KN/m

Synthetic Geogrid having Ultimate Tensile Strength


7 Sqm. 320.00
200KN/m

Synthetic Geogrid having Ultimate Tensile Strength


8 Sqm. 355.00
250KN/m

Synthetic Geogrid having Ultimate Tensile Strength


9 Sqm. 365.00
300KN/m

Synthetic Geogrid having Ultimate Tensile Strength


10 Sqm. 370.00
350KN/m

Synthetic Geogrid having Ultimate Tensile Strength


11 Sqm. 475.00
400KN/m
Synthetic Geogrid having Ultimate Tensile Strength
12 Sqm. 535.00
500KN/m

Synthetic Geogrid having Ultimate Tensile Strength


13 Sqm. 550.00
600KN/m

Synthetic Geogrid having Ultimate Tensile Strength


14 Sqm. 685.00
700KN/m

Synthetic Geogrid having Ultimate Tensile Strength


15 Sqm. 750.00
800KN/m

Synthetic Geogrid having Ultimate Tensile Strength


16 Sqm. 900.00
900KN/m

Synthetic Geogrid having Ultimate Tensile Strength


17 Sqm. 1025.00
1000KN/m

Synthetic Geogrid having Ultimate Tensile Strength


18 Sqm. 1000.00
1100KN/m

Synthetic Geogrid having Ultimate Tensile Strength


19 Sqm. 1088.00
1200KN/m

Drainage Composite

Geosynthetic Drainage with Two Filtering Non-


woven Geotextiles having a "W" Configuration as
longitudinal parallel channels. Minimum thickness to
be 7.2mm, with two filtering UV stabilized
polypropylene nonwoven Geotextiles of minimum
20 sqm. 530.00
thickness of 0.75mm having pores of 150 micron
and tensile strength of 8.0 KN/m and having plane
flow capacity of 2.1L/(m.s) at hydraulic gradient of
1.0 & 20 kpa pressure, tensile strength of 18kN/m
with mass per unit area of 740 gsm.
Geosynthetic Drainage Composite having
thermobonding a draining core - HDPE geonet
comprises of two sets of parallel overlayed ribs
integrally connected to have a rhomboidal shape
with a polyethylene film and nonwoven Geotextiles
21 Sqm. 630.00
having mass per unit area 130g/m2 and tensile
strength of 8.0 kN/m having in plane flow cpacity of
0.7 L/(ms) at hydraulic gradient of 1.0 & 20 kPa
pressure and tensile strength of 13.5 kN/m with
mass per unit area of 830 gsm.
II RATES OF WORKS

A.Geosynthetics - Geotextiles

Providing and laying Woven Geotextiles of Type-


I on the prepared subgrade as the separator cum
1 Sqm. 148.00
reinforcement with necessary overlap as per
drawing and as per MORTH Specification 702

Providing and laying Woven Geotextiles of


Type-II on the prepared subgrade as the
2 separator cum reinforcement with necessary Sqm. 136.00
overlap as per drawing and as per MORTH
Specification 702
Providing and laying Woven Geotextiles of
Type-III on the prepared subgrade as the
3 separator cum reinforcement with necessary Sqm. 123.00
overlap as per drawing and as per MORTH
Specification 702
Providing and laying needle punched and
mechanically bonded Non-Woven Geotextiles of
4 Type-I indigenously manufactured from high Sqm. 140.00
quality fibres on the prepared subgrade for
separation as per MORTH Specification 702
Providing and laying needle punched and
mechanically bonded Non-Woven Geotextiles of
5 Type-II indigenously manufactured from high Sqm. 125.00
quality fibres on the prepared subgrade for
separation as per MORTH Specification 702
Providing and laying needle punched and
mechanically bonded Non-Woven Geotextiles of
6 Type-III indigenously manufactured from high Sqm. 110.00
quality fibres on the prepared subgrade for
separation as per MORTH Specification 702

B. Geosynthetics - Geomembranes

Supplying and laying of HDPE Geomembrane 750


micron thickness of smooth surfaces on both
sides / only one face textured. The width of
geomembrane roll shall not be less than 4.5m a
7 easily accessible location including top and bottom Sqm. 135.00
with all leads and lifts manpower and machinery,
materials labour etc., complete and as directed by
the Engineer-in-Charge as per MORTH Specification
701
Supplying and laying of HDPE Geomembrane 1000
micron thickness of smooth surfaces on both
sides / only one face textured. The width of
geomembrane roll shall not be less than 4.5m a
8 easily accessible location including top and bottom Sqm. 163.00
with all leads and lifts manpower and machinery,
materials labour etc., complete and as directed by
the Engineer-in-Charge as per MORTH Specification
701
Supplying and laying of HDPE Geomembrane 1500
micron thickness of smooth surfaces on both
sides / only one face textured. The width of
geomembrane roll shall not be less than 4.5m a
9 easily accessible location including top and bottom Sqm. 189.00
with all leads and lifts manpower and machinery,
materials labour etc., complete and as directed by
the Engineer-in-Charge as per MORTH Specification
701

C.Geogrids

Supplying and laying high strength flexible Geogrids


(HSFG) as soil reinforcement /basal reinforcement
as per MORTH 3100 and IRC 113, made of high
10 tenacity polyester core with polyethylene coating
with Minimum Long Term Design Strength (LTDS)
of more than 50% of Ultimate Tensile Strength at
30 degree celsius corresponding to 12% strain.

a Ultimate Tensile Strength -100kN/m Sqm. 347.95

b Ultimate Tensile Strength -150kN/m Sqm. 362.70

c Ultimate Tensile Strength -200kN/m Sqm. 495.15

d Ultimate Tensile Strength -250kN/m Sqm. 546.65

e Ultimate Tensile Strength -300kN/m Sqm. 561.35

f Ultimate Tensile Strength -350kN/m Sqm. 568.70

g Ultimate Tensile Strength -400kN/m Sqm. 723.25


h Ultimate Tensile Strength -500kN/m Sqm. 811.55

i Ultimate Tensile Strength -600kN/m Sqm. 833.65

j Ultimate Tensile Strength -700kN/m Sqm. 1032.30

k Ultimate Tensile Strength -800kN/m Sqm. 1128.00

l Ultimate Tensile Strength -900kN/m Sqm. 1348.75

m Ultimate Tensile Strength -1000kN/m Sqm. 1532.70

n Ultimate Tensile Strength -1100kN/m Sqm. 1495.70

o Ultimate Tensile Strength -1200kN/m Sqm. 1625.40

Supplying and laying of Bi-Axial Extruded High


Modulus Polypropylene Geogrids conforming to
MORTH SPECIFICATION for base/sub-base
reinforcement having minimum Tensile Strength
11 15 kN/m in the longitudinal and transverse Sqm. 171.35
direction, with 5 kN/m and 7 kN/m tensile strength
at 2% and 5% strain respectively in the longitudinal
and transverse direction, junction efficiency not less
than 95% and with 38mm x 38mm mesh opening.
Supplying and laying of Bi-Axial Extruded High
Modulus Polypropylene Geogrids conforming to
MORTH SPECIFICATION for base/sub-base
reinforcement having minimum Tensile Strength
12 20 kN/m in the longitudinal and transverse Sqm. 193.45
direction, with 7 kN/m and 14 kN/m tensile strength
at 2% and 5% strain respectively in the longitudinal
and transverse direction, junction efficiency not less
than 95% and with 38mm x 38mm mesh opening.

Supplying and laying of Bi-Axial Extruded High


Modulus Polypropylene Geogrids conforming to
MORTH SPECIFICATION for base/sub-base
reinforcement having minimum Tensile Strength
30 kN/m in the longitudinal and transverse
13 Sqm. 296.45
direction, with 10.5 kN/m and 21 kN/m tensile
strength at 2% and 5% strain respectively in the
longitudinal and transverse direction, junction
efficiency not less than 95% and with 38mm x
38mm mesh opening.
Supplying and laying of Bi-Axial Extruded High
Modulus Polypropylene Geogrids conforming to
MORTH SPECIFICATION for base/sub-base
reinforcement having minimum Tensile Strength
40 kN/m in the longitudinal and transverse
14 Sqm. 428.90
direction, with 14 kN/m and 28 kN/m tensile
strength at 2% and 5% strain respectively in the
longitudinal and transverse direction, junction
efficiency not less than 95% and with 38mm x
38mm mesh opening.
Providing and laying Fibreglass Geogrids of
Tensile Strength - 50kN/m manugactured from
high quality fibre glass strands and coated with a
15 Sqm. 150.00
polymer modified bitumen as reinforcement to
asphalt overlay flexible pavements and asphalt over
distressed grid PCC as per MORTH Specification 708

Providing and laying Fibreglass Geogrids of


Tensile Strength - 100kN/m manugactured from
high quality fibre glass strands and coated with a
16 Sqm. 243.00
polymer modified bitumen as reinforcement to
asphalt overlay flexible pavements and asphalt over
distressed grid PCC as per MORTH Specification 708

D.Geosynthetic Clay Liners (GCL)

Supplying and laying of 6.5mm thick GCL consisting


of a layer of bentonite encapsuled between two
nonwoven polypropylene needle punched
Geotextiles with 11kN/m tensile strength in
longitudinal direction and 4200 g/me bentonite
17 content. The width of GCL roll shall not be less than Sqm. 427.00
4.55m at easily accessible location including top
and bottom with all leads and lifts manpower and
machinery materials labour etc complete and as
directed by Engineer-in-Charge as per MORTH
Specificatio 700
Supplying and laying of 6.5mm thick GCL consisting
of a layer of bentonite encapsuled between two
nonwoven polypropylene needle punched
Geotextiles with 11.7kN/m tensile strength in
longitudinal direction and 3000 g/me bentonite
18 content. The width of GCL roll shall not be less than Sqm. 412.00
5m at easily accessible location including top and
bottom with all leads and lifts manpower and
machinery materials labour etc complete and as
directed by Engineer-in-Charge as per MORTH
Specificatio 700

E.Drainage Composite
Supplying and laying of drainage composite for use
behind walls, between two different fills, alongside-
drains of road, below concrete lining of canals etc.
Gepcomposite for planar drainage, realized by
thermo bonding a draining core in extruded
monofilaments with two filtering nonwoven
Geotextiles that may also be working as separation
or protecting layers. The draining three dimensional
core will have a "W" confiquration as longitudinal
parallel channels. Minimum thickness to be 7.2mm,
with two filtering UV stabilized polypropylene
19 Sqm. 804.20
nonwoven Geotextiles of minimum thickness of
0.75mm characteristic opening size (0.90) of 110
micron and tensile strength of 8.0 kN/m that will be
working as separation or protecting layer,
Geocomposite having in plane flow capacity of 2.1
L/(m.s) at hydraulic gradient of 1.0 & 20 kPa
pressure and tensile strength of 18 kN/m with mass
per unit area of 740 gsm, supplied in the form of
roll for easy transportation to site work as per
detailed specification all complete as per directions
of Engineer-in-Charge
Supplying and laying of drainage composite for use
behind walls, between two different fills, alongside-
drains of road, below concrete lining of canals etc.
having thermo bonding a draining core - HDPE
geonet comprises of two sets of parallel overlayed
ribs integrally connected to have a rhomboidal
shape with a polyethylene film and a novwoven
Geotextiles having mass per unit area 130 gsm and
tensile strength of 8.0 kN/m that will be working as
20 Sqm. 951.35
separation or protecting layer, Geocomposite
having in plane flow capacity of 0.7L/(m.s) at
hydraulic gradient of 1.0 & 20 kPa pressure and
tensile strength of 13.5 kN/m, with mass per unit
area of 830 gsm, at easily accessible location
including top and bottom, with all leads and lifts,
materials, manpower and machinery, materials,
labour etc. complete and as directed by Engineer-
in-Charge

VI Gabion

Providing and making Gabion structure with


Mechanically Woven Double Twisted Hexagonal
Shaped Wire Mesh Gabion Boxes as per IS
16014:2012, MORTH Clause 2500, of required size,
Mesh Type 10 x 12 (D=100mm with tolerance of +
(or) - 2%) Zinc Coated, Mesh Wire diameter 3.0
mm, mechanically edged / selvedged with partitions
21 cum 3363.00
at every 1m interval and shall have miniumum 10
numbers of openings per meter of mesh
perpendicular to twist, tying with lacing wire of
diameter 2.2mm, supplied @3% by weight of
Gabion boxes, filled with boulders with least
dimension of 200 mm, as per drawing, all complete
as per direction of Engineer-in-Charge
Providing and making Gabion structure with
Mechanically Woven Double Twisted Hexagonal
Shaped Wire Mesh Gabion Boxes as per IS
16014:2012, MORTH Clause 2500, of required size,
Mesh Type 10 x 12 (D=100mm with tolerance of +
(or) - 2%) Zinc + PVC Coated, Mesh Wire
diameter 2.7/3.7mm, mechanically edged/
22 selvedged with partitions at every 1m interval and cum 3584.00
shall have minimum 10 numbers of openings per
meter of mesh perpendicular to twist, tying with
lacing wire of diameter 2.2/3.2mm (ID/OD)
supplied @3% by weight of Gabion boxes, filled
with boulders with least dimension of 200mm, as
per drawing, all complete as per directions of
Engineer-in-Charge

Providing and making Gabion structure with


Mechanically Woven Double Twisted Hexagonal
Shaped Wire Mesh Gabion Boxes as per IS
16014:2018, SP 116:2018 of required size, Mesh
Type 10 x 12 (D=100mm with tolerance of +(or) -
2%) Zinc + 10% Aluminium Alloy + PVC
Coated, Mesh Wire diameter 2.7/3.7mm, (ID/OD),
23 mechanically edged/ selvedged with partitions at cum 4099.00
every 1m interval and shall have minimum 10
numbers of openings per meter of mesh
perpendicular to twist, tying with lacing wire of
diameter 2.2/3.2mm (ID/OD) supplied @3% by
weight of Gabion boxes, filled with boulders with
least dimension of 200mm, as per drawing, all
complete as per directions of Engineer-in-Charge
ANNESURE -IX
RATES OF LABOUR, RATES OF MATERIALS AND
RATES OF WORKS EXCLUSIVELY FOR TEMPLE
WORKS
I RATES OF LABOUR
A Ornamental Brick Work

1 Sthapathy -I Class (Marking) Day 1150.00

2 Silpi- I Class Day 920.00

3 Silpi- II Class Day 840.00

4 Assistant Silpi Day 600.00

B Panchavarnam Work

5 Artist Painter -I Class Day 862.00

6 Artist Painter -II Class Day 690.00

7 Assistant Painter Day 432.00

C Sudhai Work

8 Silpi for Vigraham Day 1150.00

9 Silpi for Ornamental Varagam Day 920.00

D Wood Work

10 Vigraha Sthapathy Day 1150.00

11 Sthapathy -I Class Day 1150.00


12 Sthapathy -II Class Day 977.00

13 Silpi - I Class Day 920.00

14 Silpi - II Class Day 840.00

15 Sthapathy Assistant Day 840.00

E Ornamental Stone Work

16 Sthapathy -I Class (Marking) Day 1150.00

17 Sthapathy -II Class (Supervisor Sthapathy) Day 977.00

18 Silpi - I Class Day 920.00

19 Silpi - II Class Day 840.00

20 Smith - I Class Day 920.00

21 Smith - II Class Day 840.00

22 Assistant Silpi Day 600.00

II RATES OF MATERIALS
Supply of high quality Burma Teak wood meant for
1
the purpose of making the following items
Temple Pattern Ornamental Doors with high quality
Burma Teak wood with 2" minimum to 7" maximum
thick Ornamental frames, 2" thick to 5" thick
a Kamala (Flower Planks), Creeper, Birds, Animal cum 309800.00
Figures, Sculptures, etc. Backside 1" thick to 3"
plank including necessary carving, shaping ,
wastage, etc., as per approved plan and design.

Temple Chariot Ornamental Works consisting of


Architectural Embellishments like, Peetas, Padmas,
Pillars, Pilasters, Bodhikas, Kapotams, Koodu,
b cum 324800.00
Sikaram and other Ornamental Cornice works and
also necessary Creepers, Kamalams, Animal, Bird
figures and Sculptures.
Kodimaram (Dwajasthambam) Stem 9" to 18" dia
c cum 339800.00
upto 30 feet height

2 Supply of Teakwood for making the following items.

Temple Pattern Ornamental Doors with high quality


Teak wood (country) with 2" minimum to 7"
maximum thick Ornamental frames, 2" thick to 5"
a thick Kamala (Flower Planks), Creeper, Birds, cum 199000.00
Animal Figures, Sculptures, etc. Backside 1" thick to
3" plank including necessary carving, shaping ,
wastage, etc., as per approved plan and design.

Temple Chariot Beams, Temple Wooden Uttarams


b cum 213021.00
with minimum 9" thick to 18"

Kodimaram (Dwajasthambam) Stem 9" to 18" dia


c cum 213021.00
upto 30 feet height
Supply of Country Wood for making the following
3
items using Vengai Wood

Temple Pattern Ornamental Doors with high quality


Country wood with 2" minimum to 7" maximum
thick Ornamental frames, 2" thick to 5" thick
a kamala (Flower Planks), Creeper, Birds, Animal cum 120700.00
Figures, Sculptures, etc. Backside 1" thick to 3"
plank including necessary carving, shaping ,
wastage, etc., as per approved plan and design.

Kodimaram (Dwajasthambam) Stem 9" to 18" dia


b cum 135700.00
upto 30 feet height

Temple Chariot Beams, Temple Wooden Uttarams


c cum 150700.00
with minimum 9" thick.

Supply of Country Wood for making the following


4
items using Illuppai Wood

Temple Chariot Beams, Temple Wooden Uttarams


a cum 95270.00
with minimum 9" to 18" thick.
Supply of Country Wood for making the following
items using Atthi Wood.
5
Temple God and Goddess Vahanams of required
shape and size with ornamental features.
a Scantling upto 40cm dia cum 31500.00

b Scantling upto 40cm dia cum 45348.00

Supply of Country Wood for Temple wood work


6 cum 45348.00
plank 9" to 15" width and frames upto 6" thick.

Supply of Country Wood for making the following


7
items using Mavili Wood upto 40cm dia
Temple God and Goddess Vahanams of required
a cum 45348.00
shape and size with ornamental features.

Supply of cut stone for carrying out Garpagraham,


8 Arthamandapam, Maha Mandapam, Thirumathil and
other Temple Structures up to 10 feet length

a Thirumathi (Compound wall) cum 12400.00

b Pillar (Column) cum 14000.00

c Uthiram (Beam) cum 14000.00

d Pavukkal (Ceiling Stone) cum 14000.00

e Flooring cum 12400.00

f Nilaikal (Door Frame) cum 14000.00

Supply of cut stone for carrying out Garpagraham,


Arthamandapam, Maha Mandapam, Thirumathil and
9
other Temple Structures above 10 feet length upto
14 feet length.

a Pillar (Column) cum 16800.00

b Uthiram (Beam) cum 16800.00

c Pavukkal (Ceiling Stone) cum 16800.00

d Nilaikal (Door Frame) cum 16800.00

III RATES OF WORKS


Scaffolding charges for Vimanams and Gopurams
with casurina posts coconut or palm trees wherever
necessary for main, form work and providing with
net lawn /PVC mesh coverings, providing ladder
1
arrangements, country wood plank for working,
inspection etc. complete, hire charges only for
erection, maintenance and removing the same on
completion of the work.

a Vimanam / Gopuram upto 15' - 0' height Sqm. 176.00

b Vimanam / Gopuram upto 25' - 0' height Sqm. 236.00

c Gopurams upto 50' - 0' height Sqm. 301.00

d Gopurams upto 75' - 0' height Sqm. 377.00

e Gopurams upto 100' - 0' height Sqm. 452.00

f Gopurams upto 150' - 0' height Sqm. 552.00

Labour Charges for Old Stone Removing:


Chitranvanam, Padma Jagati, Adhistanam, Kandam,
Pattiyal, Jagati, Kumudagam, Aswapadam,
Sthamaba, Sthambam, Kalasam, Thadi, Kudam,
2 Sqm. 1076.00
Palagai, Veerakandam, Bodhiyal, Uthiram, Kambu,
Eludham, Kabothagam, Viyalam, Koodu, Ullvari,
Pavukkal, Thun, Flooring, Nilaikal, Bodhiyal Thani,
Uthiram.

Labour Charges for Old Stone Removing:


3 cum 3530.00
Thanithun, Uthiram, Bodhiyal

Labour Charges for Old Stone Fixing:


4 Chitranvanam, Padma Jagati, Adhistanam, Kandam, Sqm. 1615.00
Pattiyal, Jagati, Kumudagam.
Labour Charges for Old Stone Fixing:
Aswapadam, Sthamaba, Sthambam, Kalasam,
Thadi, Kudam, Palagai, Veerakandam, Bodhiyal,
5 Sqm. 2153.00
Uthiram, Kambu, Eludham, Kabothagam, Viyalam,
Koodu, Ull varai, Pavukkal, Thun, Flooring, Nilaikal,
Bodhiyal, Thani, Uthiram.
ANNEXURE -X
ADDITIONAL NEW ITEMS FOR HIGHWAYS
DEPARTMENT

Supplying and installation of STRIP SEAL


EXPANSION JOINT system confirming to
specifications for road and bridge works in the
40mm wide expansion gap provided in between
decks over piers and in between deck and dirt wall
1 RM 11800.00
over abutment with fatigue tested structural steel
section at the nosing and anchorage assembly,
including labour, equipment and incidental charges
for fixing the joints complete in all respects, as per
section 2600 of MORT & H specification (V Revision)

Supplying and fixing 300mm wide PVC


EXPANSION JOINT in the 20mm expansion gap
provided in between decks over piers and in
2 between deck and dirt wall over abutment as shown RM 550.00
in the drawing including cost and conveyance of
expansion joints including shalimar pad and joint
sealant etc., complete.
Supplying and fixing GI DRAINAGE SPOUTS
100mm dia as per GOI drawing SD/205 with grating
arrangements at top as shown in the drawing and
100mm dia drainage spout projecting atleast
3 300mm beyond the bottom of deck slab as shown Each 2100.00
in the drawing, including cost and conveyance of
Galvanised iron pipes and flats and fixing them in
position etc., complete as per cl 2705 of MORT & H
specification (V Revision)

Supplying and fixing KRAFT PAPER for full width of


seating of deck slab and including cost and
4 conveyance to worksite, labour for fixing the same Sqm. 100.00
in correct position and all other incidental charges
etc, complete
Supplying and fixing of ELASTOMERIC BEARING
as shown in the drawing including cost and
conveyance to work site, labour for fixing the
5 cu.cm 1.50
bearing in position and all other incidental charges
etc., complete as per section 2000 of MORT & H
specification (V Revision)

Supply of NP3 Class RCC Pipe confirming to IS


458/2003 including csot of pipe as a finished work
including all other incidental charges, testing
6 charges including loading, unloading, transport and
delivery in good condition at work site etc.,
complete as directed by the Departmental Officers,
as per standard specificaitons.

a 1200mm dia RM 5400.00

b 1000mm dia RM 3700.00

c 900mm dia RM 3300.00


Hoisting and fixing of NP3 Class RCC Pipe and
Collars in proper gradient including all labour
7 charges and all other incidental charges etc.,
complete as directed by the Departmental Officers,
as per standard specifications.

a 1200mm dia RM 227.00

b 1000mm dia RM 197.00

c 900mm dia RM 240.00


ANNEXURE- XI
BASIC RATES OF HIRE CHARGES FOR TOOLS
AND PLANTS
1 Power Roller / Road Roller Each 880.00

2 Tipper 10 Tonnes Each 1167.00

3 Loader Each 1297.00

4 Paver Finisher Each 2625.00

5 Vibrator Roller 8-10 Tonne Each 5832.00

6 Mini Hot Mix Plant 6/10 Each 1806.00

7 Water Sprinkler Each 1235.00

8 Wet Mix Plant 75 Ton Capacity Each 9614.00

9 Electrical Generating Set 125 KVA Each 5525.00

10 Water Tan 6 KL Capacity (GSB) Each 2139.00


11 Motor Grader 110 JP Each 14422.00

12 Tractor - Rotovator Each 3020.00

13 Water Tanker (WMM) Each 918.00

14 Base Mix Plant (Pug Mill) Each 7176.00

15 Central Hot Mix Plant Each 10361.00

16 Bitumen Boiler Each 221.00

17 Tractor with Dozer Each 4800.00

18 JCB Each 5600.00

19 Dewatering Pump with Engine Each 1878.00

20 Ajax Self Loading Concrete Mixer Each 8000.00

PART - A

INCANDESCENT BULBS 230V / 250V GRADE B.C / E.S


WITH ISI

a 15 Watts Each 11.20

b 25 Watts Each 11.20

c 40 Watts Each 11.20

d 60 Watts Each 11.20


e 100 Watts Each 11.20

f 200 Watts Each 22.40

INCANDESCENT BULB 230V/250V GRADE B.C/E.S

Colour 15 Watts Each 13.70

Blended Lamp 160 Watts Each 271.00

PLLAMP (PHILIPS / OSRAM)

a 9 Watts Each 84.10

b 11 Watts Each 89.70

c 18 Watts Each 141.20

d 36 Watts Each 157.00

FLUORESCENT TUBULAR LAMPS WITH ISI MARK.

a Cool Day light 2 Ft.20 Watts Each 42.30

b Cool Day light 4 Ft.40 Watts Each 42.30

c Cool Day light 4 Ft.36 Watts Each 41.30

MERCURY VAPOUR DISCHARGE LAMP 230V GRADE 3 PIN


BC

a 80 Watts Each 194.80

b 125 Watts Each 204.00


c 250 Watts Each 498.00

d 400 Watts Each 702.00

BOX TYPE SINGLE FLUORESCENT FITTING WITH COPPER


CHOKE AND CONDENSOR COMPLETE WITH ISI MARK.

a 4. Ft 40 Watts with ballast. Each 360.00

b 4 Ft. 40 Watts Box type with Ballast. Each 529.00


(Philips / Crompton / Wipro)

BOX TYPE TWIN FLUORESCENT FITTING WITH COPPER


CHOKE AND CONDENSOR (HPF) COMPLETE WITH ISI
MARK.

a 4 Ft. 40 Watts Each 676.00

b 4 Ft. 40 Watts Box type of Each 882.00


(Philips / Crompton) with Ballast.

INDUSTRIAL TYPE FLUORESCENT FITTING STOVE


ENAMELLED WITH COPPER CHOKE AND CONDENSOR
(HPF) 4' 40 W

a Single type suitable for 1 No.tube Each 994.00

b Twin type suitable for 2 Nos. tube Each 1224.00

DECORATIVE AND SINGLE FLUORESCENT TYPE FITTING


WITH COPPER CHOKE & CONDENSOR (HPF) COMPLETE
SUITABLE FOR ONE NUMBER FLUORESCENT TUBE WITH
ISI MARK

a 4 Ft. 40 Watts with Perspex Deleted


DECORATIVE TWIN FLUORESCENT TYPE FITTING WITH
COPPER CHOKE & CONDENSOR COMPLETE SUITABLE
FOR 2 NOS. FLUORESCENT TUBES

a 4' 40 W Twin Mirror optic Recessed mounting Each 1713.00


fitting.

b 4' 40 W Twin Mirror optic Suspension type fitting. Each 3090.00


(Philips / Crompton / Wipro)

c 4'40 W Twin Mirror optic Recessed mounting type Each 2264.00


Philips / Crompton / wipro.

SINGLE TYPE STREET LIGHT FLUORESCENT FITTING


SUITABLE FOR THE ONE NO. FLUORESCENT TUBE WITH
COPPER CHOKE & CONDENSOR COMPLETE

a 4 Ft. 40 Watts type Each 754.00

TWIN TYPE STREET LIGHTS FLUORESCENT FITTING


SUITABLE FOR 2 NOS. FLUORESCENT TUBES WITH
COPPER CHOKE & CONDENSOR COMPLETE

a 4 Ft. 40 Watts type Each 1014.00

POST TOP LANTERN FITTING OF (INTEGRAL TYPE WITH


COPPER CHOKE & CONDENSOR & NECESSARY
ACCESSORIES (PHILIPS / CROMPTON GREAVES /
WIPRO) (SPHERICAL / RIBBED / CONICAL ACRYLIC
COVER)

a Suitable for 125 Watts M.V. Lamp Each 3650.00

b Suitable for 70 Watts S.V. Lamp Each 3845.00

c Post top lantern fitting with S.C. holder suitable for Each 2100.00
160W blended lamp / incandescent lamp
STARTERS FOR FLUORESCENT TUBES

a Starters of capacity 20 Watts Each 11.20

b Starters of capacity 40 Watts Each 11.20

POLYSTER FILLED COPPER CHOKE 250V / 50HZ GRADE


SUITABLE FOR (Philips / Crompton / Wipro)

a 20 Watts fluorescent tube Each 199.00

b 40 Watts fluorescent tube Each 199.00

c 36 / 40W Electronic ballast for flu. Tube Each 330.00


(Philips / Crompton)

d 36 / 40W Electronic ballast for flu. Tube Each 269.00


(Indo Asean / Equivalent)

CONDENSOR FOR S.V. / M.V. LAMP

a 8 Mfd for 80 Watts Bulb Each 126.00

b 10 Mfd for 125 Watts Bulb Each 151.00

c 15 Mfd for 250 Watts Bulb Each 201.00

d 20 Mfd for 400 Watts Bulb Each 278.00

Battern type Bakelite Holder for lamp Each 20.20

Water tight bulk head fitting suitable for 100 / 60 Each 336.00
Watts lamp with guard heavy type (PHILIPS / BAJAJ
/ CROMPTON GREAVES)
Ceiling Rose Each 16.80

a Ceiling fixtures 250 / 300 mm complete with Each 198.00


Gallery etc. Clear glass opac / crystal suitable for 40
/ 60 Watts Bulb.

b. Ceiling luminaire with mirror optics suitable for 2 Each 1254.00


Nos. 9 watts / 11 watts (Philips / Crompton / Bajaj)

(For Items 6 to 13, 20 & 22, the rates are exclusive of


cost of tubes and lamps)

Fan clamp (dia 12mm) with 6mm MS side plates & Each 134.00
45 cm cross arm

CALL BELLS

a Call bell / Buzzer 6 mm suitable for AC / DC Each 50.40

b Push bell Each 20.20

c Gong bell 9" size suitable for 250V Each 504.00

d Gong bell 12" size suitable for 250V Each 730.00

WATER HEATER WITH I.S.I MARK

a Automatic Electrical Water Heater with copper Each 5880.00


container, with Glass Wool / Puf insulation with MS
powder coated shell suitable for 25 Litres capacity
230V / 1000W
b Automatic Electrical Water Heater with copper Each 7940.00
container, with Glass Wool / Puf insulation with MS
powder coated shell suitable for 25 Litres capacity
230V / 1000W (Venus / Racold)

c Automatic Electrical Water Heater with copper Each 6820.00


container, with Glass Wool / Puf insulation with MS
powder coated shell suitable for 35 Litres capacity
230V / 1000W

d Automatic Electrical Water Heater with copper Each 9120.00


container, withGlass Wool / Puf insulation with MS
powder coated shell suitable for 35 Litres capacity
230V / 1000W (Venus / Racold)

PART "B"

FANS - CONFORMING TO ISS 374 / 1979.

a A.C Ceiling fan complete 1200 mm (48") sweep Each 1340.00


with 300mm Down rod. (without regulator)

b A.C Ceiling fan complete 1400 mm (56") sweep Each 1440.00


with 300mm Down rod. (without regulator)

c Stepped electronic 300W / 450W square type fan Each 228.00


regulator (Anchor Deluxe / Equivalent)

d Dimmer type electronic 300W / 450W square type Each 182.00


fan regulator (Anchor Deluxe / Equivalent)

e A.C. Ceiling fan complete 1200mm (48") sweep Each 1520.00


with 300mm Down rod (without regulator)
(Crompton make)
f A.C. Ceiling fan complete 1400mm (56") sweep Each 1640.00
with 300mm Down rod (without regulator)
(Crompton make)

EXHAUST FANS

a A.C Exhaust Fan 225mm (9") sweep (Light duty) Each 1240.00

b A.C Exhaust Fan 300mm (12") sweep (Light duty) Each 1420.00

c A.C Exhaust Fan 375mm (15") sweep (Light duty) Each 1460.00

d A.C Exhaust Fan 450mm (18") sweep (Light duty) Each 2060.00

e A.C Exhaust Fan 375mm (15") sweep (Heavy duty) Each 2700.00

f A.C Exhaust Fan 450mm (18") sweep (Heavy duty) Each 3360.00

LOUVER SHUTTERS ARRANGEMENTS

a M.S / Fibre Louvers shutters arrangements for 300 Each 269.00


mm A.C Exhaust Fan.

b M.S / Fibre Louvers shutters arrangements for 375 Each 285.00


mm A.C Exhaust Fan.

c M.S / Fibre Louvers shutters arrangements for 450 Each 319.00


mm A.C Exhaust Fan.

PART "C"

SWITCHES

a 5 Amps (flush type) Dozen 207.00


b 5 Amps (Flush type staircase) Dozen 258.00

DOUBLE POLE SWITCHES (GEM / HPL / HAVELLS /


EQUIVALENT)

a 16 Amps DP switch with metal clad (Front handle) Each 485.00

b 32 Amps DP switch with metal clad (Front handle) Each 994.00

c 16 Amps DP switch with metal clad (side handle). Each 401.00

d 32 Amps DP switch with metal clad (side handle) Each 902.00

A TRIPLE POLE SWITCHES (side Handle) (Standard / HPL /


Havell's / Equivalent)

a 100 Amps TPN Switch with HRC fuses sheet steel Each 6820.00
double break

b 125 Amps TPN Switch with HRC fuses sheet steel Each 7470.00
double break

c 200 Amps TPN Switch with HRC fuses sheet steel Each 9650.00
double break

d 315 Amps TPN Switch with HRC fuses sheet steel Each 13700.00
double break

e 400 Amps TPN Switch with HRC fuses sheet steel Each 17640.00
double break

f 16 Amps TPN Metal clad switch with rewirable fuse Each 1035.00
units.
g 32 Amps TPN Metal clad switch with rewirable fuse Each 1530.00
units.

h 63 Amps TPN Metal clad switch with rewirable fuse Each 3330.00
units.

i 100 Amps Metal clad switch with rewirable fuse Each 6550.00
units.

j 200 Amps metal clad switch with rewirable fuse Each 9940.00
units.

A SWITCH DISCONNECTOR FUSE UNITS IN SHEET STEEL


ENCLOSURE (SDF) (L & T / SIEMENS)

1 63A TPN switch disconnector fuse units in sheet Each 4210.00


steel enclosure with HRC fuses Double break.

2 100A TPN switch disconnector fuse units in sheet Each 7080.00


steel enclosure with HRC fuses Double break.

3 125A TPN switch disconnector fuse units in sheet Each 8360.00


steel enclosure with HRC fuses Double break.

4 200A TPN switch disconnector fuse units in sheet Each 10500.00


steel enclosure with HRC fuses Double break.

5 250A TPN switch disconnector fuse units in sheet Each 13100.00


steel enclosure with HRC fuses Double break.
6 315A TPN switch disconnector fuse units in sheet Each 15700.00
steel enclosure with HRC fuses Double break.

7 400A TPN switch disconnector fuse units in sheet Each 18000.00


steel enclosure with HRC fuses Double break.

B SWITCH DISCONNECTOR FUSE UNITS IN OPEN


EXECUTION (INTERIOR FOR CUBICAL) (L & T / SIEMENS)

1 63A TPN switch disconnector fuse units interior only Each 2780.00
with HRC fuses Double break.

2 100A TPN switch disconnector fuse units interior Each 5060.00


only with HRC fuses Double break.

3 125A TPN switch disconnector fuse units interior Each 6900.00


only with HRC fuses Double break.

4 200A TPN switch disconnector fuse units interior Each 8900.00


only with HRC fuses Double break.

5 250A TPN switch disconnector fuse units interior Each 11600.00


only with HRC fuses Double break.

6 315A TPN switch disconnector fuse units interior Each 14580.00


only with HRC fuses Double break.

7 400A TPN switch disconnector fuse units interior Each 17200.00


only with HRC fuses Double break.

FUSE UNITS (Anchor / Equivalent)

a 16 Amps Porcelain Fuse unit (500V) Each 56.00


b 32 Amps Porcelain Fuse unit (500V) Each 99.00

c 63 Amps Porcelain Fuse unit (500V) Each 222.00

d 100Amps Porcelain Fuse unit (500V) Each 399.00

e 200 Amps Porcelain Fuse unit (500V) Each 646.00

SINGLE PHASE DBS (GEM / Equivalent)

a 4 Way DB 16 Amps / Way with fuse & Neutral each Each 539.00
(250V)

b 6 Way DB 16 Amps / Way with fuse & Neutral each Each 733.00
(250V)

c 8 Way DB 16 Amps / Way with fuse & Neutral each Each 909.00
(250V)

THREE PHASE DBS (GEM / Equivalent)

a 4 Way TPDB 16A / Way with fuse & Neutral link Each 2125.00

b 6 Way TPDB 16A / Way with fuse & Neutral link Each 2910.00

c 8 Way TPDB 16A / Way with fuse & Neutral link Each 3520.00

d 4 Way TPDB 32A / Way with fuse & Neutral link Each 2690.00

e 6 Way TPDB 32A / Way with fuse & Neutral link Each 3590.00

f 8 Way TPDB 32A / Way with fuse & Neutral link Each 4540.00

g 4 Way TPDB 63A / Way with fuse & Neutral link Each 6280.00
h 6 Way TPDB 63A / Way with fuse & Neutral link Each 8080.00

CHANGE OVER SWITCHES (GEM / HAVELL'S / HPL /


STANDARD / EQUIVALENT)

a 16 Amps three phase 500V 4 pole Change over Each 1460.00


switch

b 32 Amps three phase 500V 4 pole Change over Each 1730.00


switch

c 63 Amps three phase 500V 4 pole Change over Each 3780.00


switch

d 100 Amps three phase 500V 4 pole Change over Each 6010.00
switch

e 200 Amps three phase 500V 4 pole Change over Each 11300.00
switch

PART "D"

a 5 Amps 3 pin & 2 pin combined flush type wall Each 28.20
socket only.

b 5 Amps / 15 Amps 3 pin flush type wall socket only. Each 63.50

c 5 Amps 3 pin Top Each 39.90

d 15 Amps 3 pin Top Each 56.50

e 15 Amps Flush type switch Each 65.80

f 10 Amps M.C plug with 3 pin top Each 211.00


g 20 Amps M.C plug with 3 pin top Each 240.00

A SINGLE PHASE WATT HOUR METERS (HPL / Equivalent)

a A.C single phase 230V / 250V / 50 HZ 5 Amps Watt Each 1120.00


Hour Meter.

b A.C single phase 230V / 250V / 50 HZ 10 Amps Each 1120.00


Watt Hour Meter.

c A.C single phase 230V / 250V / 50 HZ 20 Amps Each 1120.00


Watt Hour Meter.

B THREE PHASE WATT HOUR METERS (Anchor / Equivalent)

a A.C 3 phase 400V 50HZ unbalanced load 4 wire 10 Each 2310.00


Amps watt hour meter.

b A.C 3 phase 400V 50HZ unbalanced load 4 wire 25 Each 2310.00


Amps watt hour meter

c A.C 3 phase 400V 50HZ unbalanced load 4 wire 50 Each 2930.00


Amps watt hour meter

PART "E"

SERVICE CONNECTION ACCESSORIES L.T. 1100V PVC


ALUMINIUM ARMOURED UNDER GROUND CABLE WITH
ISI MARK.

a 2 Core 6 sq.mm PVC armoured UG cable Metre 99.20

b 2 Core 10 sq.mm PVC armoured UG cable Metre 120.80


c 2 Core 16 sq.mm PVC armoured UG cable Metre 131.00

d 2 Core 25 sq.mm PVC armoured UG cable Metre 148.90

e 31/2 Core 25 sq.mm PVC armoured UG cable Metre 224.30

f 31/2 Core 35 sq.mm PVC armoured UG cable Metre 264.00

g 31/2 Core 50 sq.mm PVC armoured UG cable Metre 344.00

h 31/2 Core 70 sq.mm PVC armoured UG cable Metre 441.00

i 31/2 Core 95 sq.mm PVC armoured UG cable Metre 571.00

j 31/2 Core 120 sq.mm PVC armoured UG cable Metre 698.00

k 31/2 Core 150 sq.mm PVC armoured UG cable Metre 826.00

l 31/2 Core 185 sq.mm PVC armoured UG cable Metre 1010.00

m 31/2 Core 240 sq.mm PVC armoured UG cable Metre 1280.00

n 31/2 Core 300 sq.mm PVC armoured UG cable Metre 1570.00

o 31/2 Core 400 sq.mm PVC armoured UG cable Metre 2000.00

p 4 Core 6 sq.mm PVC armoured UG cable Metre 128.50

q 4 Core 10 sq.mm PVC armoured UG cable Metre 140.70

r 4 Core 16 sq.mm PVC armoured UG cable Metre 185.60

PVC INSULATED SINGLE CORE MULTI STRAND FIRE


RETARDANT FLEXIBLE COPPER CABLE WITH ISI MARK
CONFORMING TO IS:694/1990.
a 14 / 0.3 (1.0 sq.mm.) Metre 9.10

b 22 / 0.3 (1.5 sq.mm.) Metre 14.30

c 36 / 0.3 (2.5 sq.mm.) Metre 22.20

d 56 / 0.3 (4 sq.mm.) Metre 35.20

e 84 / 0.3 (6 sq.mm.) Metre 52.20

f 140 / 0.3 (10 sq.mm.) Metre 78.30

g 101 / 0.45 (16 sq.mm.) Metre 128.00

h 168 / 0.45 (25 sq.mm.) Metre 282.00

CONDUCTOR

a Hard drawn copper conductor (Gauge No. 8&6) KG 529.00

b 14 SWG TC wire KG 541.00

c G.I.No.8 wire and No. 6 wire KG 89.70

CABLE GLANDS 0.00

a Cable gland suitable for 2 core 4sq.mm UG cable. Each 19.80

b Cable gland suitable for 2 core 6 sq.mm UG cable. Each 24.60

c Cable gland suitable for 2 core 10 sq.mm UG cable. Each 29.30


d Cable gland suitable for 2 core 16 sq.mm UG cable. Each 43.40

e Cable gland suitable for 2 core 25 sq.mm UG cable. Each 51.80

f Cable gland suitable for 31/2 core 25 sq.mm UG Each 51.80


cable.

g Cable gland suitable for 31/2 core 35 sq.mm UG Each 65.80


cable.

h Cable gland suitable for 31/2 core 50 sq.mm UG Each 65.80


cable.

I Cable gland suitable for 31/2 core 70 sq.mm UG Each 81.10


cable.

j Cable gland suitable for 31/2 core 95 sq.mm UG Each 98.90


cable.

k Cable gland suitable for 31/2 core 120 sq.mm UG Each 125.90
cable

l Cable gland suitable for 31/2 core 150 sq.mm UG Each 165.70
cable

m Cable gland suitable for 31/2 core 185 sq.mm UG Each 196.00
cable

n Cable gland suitable for 31/2 core 240 sq.mm UG Each 196.00
cable

o Cable gland suitable for 31/2 core 300 sq.mm UG Each 234.00
cable
p Cable gland suitable for 31/2 core 400 sq.mm UG Each 334.00
cable

q Cable gland suitable for 31/2 core 500 sq.mm UG Each 389.00
cable

r Cable gland suitable for 4 core 6 sq.mm UG cable Each 24.60

s Cable gland suitable for 4 core 10 sq.mm UG cable. Each 29.00

t Cable gland suitable for 4 core 25 sq.mm UG cable. Each 51.80

FUSE WIRE (COPPER)

a 5 Amps fuse wire KG 529.00

b 10 Amps fuse wire KG 529.00

c 20 Amps fuse wire KG 529.00

NEUTRAL LINK 15 AMPS

a 4 Way Neutral link Each 27.00

b 6 Way Neutral link Each 40.00

c 8 Way Neutral link Each 49.90

d 12 Way Neutral link Each 72.40

PART "F"

M.S.BOX WITH PAINTING (16 SWG)


a M.S.Box of size (100 x 100 x 75 mm) Each 49.40

b M.S.Box of size (150 x 100 x 75 mm) Each 68.30

c M.S.Box of size (200 x 150 x 75 mm) Each 111.00

d M.S. Box complete with Lock & Key arrangements Each 336.00
with painting of size (300 x 200 x 100mm)

PART "G"

MS ANGLES

a 11/2"x11/2"x1/4" (37.5 x 37.5 x 6.24mm) (1M=3.25 KG 51.40


kg)

b 11/2" x 11/2" x 1/2" (37.5 x 37.5 x 12.5mm) KG 51.40

c 2" x 2" x 1/2" (50 x 50 x 12.5mm) KG 51.40

ALUMINIUM FLAT

a Aluminium Flat (1" x 1/4") (25 x 6.25mm) KG 195.00

b Aluminium Flat (1" x 1/8") KG 195.00

COPPER FLAT

a Copper Flat (25 x 3mm) KG 529.00

b Copper Flat (25 x 6mm) KG 529.00

c Copper Flat (33 x 6mm) KG 529.00

d Copper Flat (50 x 6mm) KG 529.00


POWER CAPACITOR

a Power capacitor for power factor improvement with KVAR 370.00


oil filled with discharge resistance 3 phase 415 /
440V 50 HZ conforming to ISS:2384 with ISI
marking.

PART "H"

CONDUIT MATERIALS 16 GAUGE.

a Conduit pipe 16mm (5/8") Heavy Gauge Metre 33.60

b Conduit pipe 19mm (3/4") Heavy Gauge Metre 34.70

c Conduit pipe 25mm (1") Heavy Gauge Metre 42.70

d Conduit pipe 32mm (11/4") Heavy Gauge Metre 56.00

e Conduit pipe 38mm (11/2") Heavy Gauge Metre 66.00

CONDUIT TEE BENDS

a Conduit Tee bends 16mm (5/8") Dozen 94.00

b Conduit Tee bends 19mm (3/4") Dozen 95.00

c Conduit Tee bends 25mm (1") Dozen 114.00

d Conduit Tee bends 32mm (11/4") Dozen 118.00

e Conduit Tee bends 38mm (11/2") Dozen 147.00

f Conduit Tee bends 50mm (2") Dozen 184.00


CONDUIT BENDS - 16 GAUGE

a Conduit solit bends 16mm (5/8") Dozen 89.00

b Conduit solit bends 19mm (3/4") Dozen 99.00

c Conduit solit bends 25mm (1") Dozen 117.00

d Conduit solit bends 32mm (11/4") Dozen 138.00

e Conduit solit bends 38mm (11/2") Dozen 196.00

f Conduit solit bends 50mm (2") Dozen 240.00

CONDUIT INSPECTION BEND-16 GAUGE

a Conduit Inspection bends 16mm (5/8") Dozen 89.00

b Conduit Inspection bends 19mm (3/4") Dozen 92.00

c Conduit Inspection bends 25mm (1") Dozen 118.00

d Conduit Inspection bends 32mm (11/4") Dozen 142.00

e Conduit Inspection bends 38mm (11/2") Dozen 184.00

f Conduit Inspection bends 50mm (2") Dozen 209.00

g Conduit Inspection bends 65mm (21/2") Dozen 269.00

PART "I"

P.V.C.(RIGID) PIPES (1.8MM THICK) WITH ISI

a P.V.C. rigid pipes 16mm (5/8") Metre 14.40


b P.V.C. rigid pipes 20mm (3/4") Metre 20.80

c P.V.C. rigid pipes 25mm (1") Metre 30.90

d P.V.C. rigid pipes 32mm (11/4") Metre 46.80

e P.V.C. rigid pipes 40mm (11/2") Metre 66.70

f P.V.C. rigid pipes 50mm (2") Metre 99.90

P.V.C. RIGID BENDS

a P.V.C. rigid bends 16mm (5/8") Each 3.35

b P.V.C. rigid bends 20mm (3/4") Each 3.35

c P.V.C. rigid bends 25mm (1") Each 4.55

d P.V.C. rigid bends 32mm (11/4") Each 8.10

e P.V.C. rigid bends 40mm (11/2") Each 20.20

f P.V.C. rigid bends 50mm (2") Each 24.50

P.V.C COUPLES

a P.V.C Couples 16mm (5/8") Dozen 14.40

b P.V.C Couples 19mm (3/4") Dozen 14.40

c P.V.C Couples 25mm (1") Dozen 28.00

d P.V.C Couples 32mm (11/4") Dozen 63.90

e P.V.C Couples 38mm (11/2") Dozen 137.00


f P.V.C Couples 50mm (2") Dozen 143.00

P.V.C. TEES

a P.V.C. Tees 16mm (5/8") Dozen 14.40

b P.V.C. Tees 19mm (3/4") Dozen 16.70

c P.V.C. Tees 25mm (1") Dozen 21.30

d P.V.C. Tees 32mm (11/4") Dozen 95.40

e P.V.C. Tees 38mm (11/2") Dozen 307.00

f P.V.C. Tees 50mm (2") Dozen 336.00

P.V.C. SADDLES Dozen

a P.V.C. Saddles 16mm (5/8") Dozen 3.35

b P.V.C. Saddles 19mm (3/4") Dozen 3.85

c P.V.C. Saddles 25mm (1") Dozen 4.45

d P.V.C. Saddles 32mm (11/4") Dozen 5.60

e P.V.C. Saddles 38mm (11/2") Dozen 6.70

f P.V.C. Saddles 50mm (2") 13.40

P.V.C. JUNCTION BOXES

a Junction Boxes 1, 2, 3 & 4 way 16mm (5/8") Dozen 44.80

b Junction Boxes 1, 2, 3 & 4 way 19mm (3/4") Dozen 44.80


c Junction Boxes 1, 2, 3 & 4 way 25mm (1") Dozen 52.70

d Junction Boxes 1, 2, 3 & 4 way 32mm (11/4") Dozen 117.00

e Junction Boxes 1, 2, 3 & 4 way 38mm (11/2") Dozen 139.00

P.V.C. HYLEM SHEETS

a Hylem sheet 3mm Thick Sq.m 685.00

INSULATION TAPE P.V.C

a PVC Insulation Tape (19mm) Roll/10mt 16.70

b Empire Tape (12mm) Roll/10mt 22.40

c Empire Tape (19mm) Roll/10mt 26.90

PART "J"

TEAK WOOD MATERIALS

T.W. BOX CONCEALED TYPE

a T.W. Box concealed type 12" x 8" x 3" Each 84.20

b T.W. Box concealed type 8" x 6" x 3" Each 44.80

c T.W. Box concealed type 6" x 4" x 3" Each 20.10

d T.W. Box concealed type 4" x 4" x 3" Each 16.70

e T.W. Plugs 11/2" x 1" x 2" 1000 Nos. 347.00

f T.W. Round blocks 100 Nos. 673.00


PART " K"

CRIMPING LUGS SUITABLE FOR THE FOLLOWING SIZES

Size
Aluminimum Copper

a 4.0 Sq.mm Each 1.60 4.65

b 6.0 Sq.mm Each 1.80 4.65

c 10.0 Sq.mm Each 2.30 5.85

d 16.0 Sq.mm Each 2.30 7.00

e 25.0 Sq.mm Each 3.50 11.75

f 35.0 Sq.mm Each 4.65 12.90

g 50.0 Sq.mm Each 7.00 15.25

h 70.0 Sq.mm Each 9.35 24.65

j 95.0 Sq.mm Each 10.60 30.60

j 120.0 Sq.mm Each 14.10 42.30

k 150.0 Sq.mm Each 18.80 54.10

l 185.0 Sq.mm Each 24.65 82.40

m 225.0 Sq.mm Each 36.50 117.30

n 240.0 Sq.mm Each 40.00 117.30


o 300.0 Sq.mm Each 55.30 158.70

p 400.0 Sq.mm Each 82.40 240.70

CABLE ROUTE INDICATOR

a Cable route indicator for L.T. Cable Each Box 78.50

b Cable route indicator for H.T. Cable Each Box 78.50

PART "L"

BRASS SCREWS

a Brass Screws (20mm) 3/4" No.6 Gross 72.90

b Brass Screws (25mm) 1" No.6 Gross 78.50

c Brass Screws (40mm) 11/2" No.6 Gross 84.10

d Brass Screws (20mm) 3/4" No.8 Gross 72.90

e Brass Screws (25mm) 1" No.8 Gross 78.50

f Brass Screws (50mm) 2" No.10 Gross 162.00

g Brass Screws (75mm) 3" No.10 Gross 240.00

Coach screws 2" x 1/4" (50 x 6.25mm) Dozen 14.50

CONDUIT SADDLES

a Conduit Saddles 16mm (5/8") Gross 44.80

b Conduit Saddles 19mm (3/4") Gross 47.70


c Conduit Saddles 25mm (1") Gross 56.00

d Conduit Saddles 32mm (11/4") Gross 72.90

e Conduit Saddles 38mm (11/2") Gross 89.70

f Conduit Saddles 50mm (2") Gross 100.90

g Conduit Saddles 65mm (21/2") Gross 115.00

A SODIUM VAPOUR FITTINGS & LAMP (for External


electrification & campus lighting)

a 250 Watts Sodium Vapour fittings Each 3550.00

b 250 Watts Sodium Vapour Lamp Each 785.00

c 150 Watts Sodium Vapour fittings Each 3500.00

d 150 Watts Sodium Vapour Lamp Each 673.00

e 70 Watts Sodium Vapour fittings Each 2830.00

f 70 Watts Sodium Vapour Lamp Each 448.00

B SODIUM VAPOUR LAMP FITTING SINGLE PIECE DIE CAST


ALUMINIUM HOUSING AND LAMP FOR HEAVY TRAFFIC
ROADS (PHILIPS / CROMPTON GREAVES / WIPRO /
BAJAJ)

a 400 Watts Sodium Vapour fittings Each 10600.00

b 400 Watts Sodium Vapour Lamp Each 1100.00

c 250 Watts Sodium Vapour fittings Each 7240.00


d 250 Watts Sodium Vapour lamp Each 890.00

e 150 Watts Sodium Vapour fittings Each 6800.00

f 150 Watts Sodium Vapour Lamp Each 730.00

g 70 Watts Sodium Vapour fittings Each 2910.00

h 70 Watts Sodium Vapour Lamp Each 504.00


All other
MINIATURE CIRCUIT BREAKERS 240 V / 415V 50 HZ - AC
makes
SUPPLY suitable for both lighting and Motor Circuits.
with ISI
(Std.) /
Legrand / Hager
HPL /
Havell's /
Equivalent
)
a Single Pole 6 A to 32A, 10KA Each 184.00 135.00

b Single Pole 40A, 10KA Each 375.00 280.00

c Single Pole & Neutral 6 A to 32A,10KA Each 534.00 405.00

d Single Pole & Neutral 40A,10KA Each 865.00 560.00

e Double Pole 6 A to 32A,10KA Each 534.00 445.00

f Double Pole 40A,10KA Each 865.00 610.00

g Triple Pole 6 A to 32A,10KA Each 859.00 670.00

h Triple Pole 63A,10KA Each 1328.00 1080.00

I Triple Pole & Neutral 6 A to 32A,10KA Each 1140.00 875.00


j Triple Pole & Neutral 63A,10KA Each 1708.00 1360.00

k Four Pole 6 A to 32A,10KA Each 1140.00 935.00

l Four Pole 63A,10KA Each 1708.00 1440.00


All other
PLUG AND SOCKETS IN SHEET STEEL ENCLOSURE
makes
WITHOUT M.C.B.S
with ISI
Legrand (MDS) / (Std.) /
Hager (L&T) HPL /
Havell's /
Equivalent
)
a 10 A Single Pole Each 884.00 530.00

b 20 A Single Pole Each 949.00 535.00

c 20 A Double Pole Each 1029.00 --

d 20 A Triple Pole Each 1751.00 1010.00

e 32 A Triple Pole Each 2075.00 1370.00

f 63 A Triple Pole Each 8410.00 --

1 RCCB / ELCB

a 10 Amps 30 MA DP Each 2497.00 1835.00

b 25 Amps 30 MA DP Each 2074.00 1585.00

c 40 Amps 30 MA DP Each 2284.00 1680.00

2 RCCB / ELCB
FOUR POLE

a 25 Amps 30 MA Each 2835.00 1945.00

b 40 Amps 30 MA Each 2873.00 1995.00

c 63 Amps 30 MA Each 3319.00 2275.00

HRC - FUSES

a 16 Amps Each 56.00 30.00

b 32 Amps Each 58.00 50.00

c 63 Amps Each 120.00 63.00

d 125 Amps Each 280.00 140.00

e 160 Amps Each 350.00 189.00

f 200 Amps Each 360.00 189.00

g 250 Amps Each 500.00 279.00


All other
MCB ISOLATORS
makes
with ISI
Legrand (MDS) / (Std.) /
Hager (L&T) HPL /
Havell's /
Equivalent
)
a 32A - DP Each 282.00 --

b 32A - TP Each 470.00 --


c 32A - FP Each 538.00 --

a 40A - DP Each 389.00 270.00

b 40A - TP Each 674.00 495.00

c 40A - FP Each 871.00 603.00

a 63A - DP Each 520.00 342.00

b 63A - TP Each 781.00 538.00

c 63A - FP Each 951.00 630.00

a 100A - DP Each -- 441.00

b 100A - TP Each 624.00 702.00

c 100A - FP Each 1001.00 768.00

HORIZONTAL THREE PHASE DISTRIBUTION BOARD WITH


MCBS
4 way / 6 way / 8 way / 12 way TPMCB sheet steel All other
distribution boards flush type / surface type fitted with makes
bus bars and neutral links with single / three phase MCB with ISI
outgoings and separate 4 way provision for Legrand (MDS) / (Std.) /
accommodating One No. 4 pole incoming MCB / Isolator Hager (L&T) HPL /
and another separate 4 way provision for accommodating Havell's /
One No. 4 pole ELCB / RCD with label holder and Equivalent
provisions for taking up cable for size not less than 35 )
sq.mm.

I Module type with IP 20 protection


a 4 ways 3 phase DB Each 1674.00 1050.00
No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12

b 6 ways 3 phase DB Each 2074.00 1315.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 18

c 8 ways 3 phase DB Each 2465.00 1595.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24

d 12 ways 3 phase DB Each 3667.00 2175.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36

II TPMCB DB with metal door cover with IP 42 protection

a 4 ways 3 phase DB Each 2261.00 1795.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12
b 6 ways 3 phase DB Each 2790.00 2270.00
No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 18

c 8 ways 3 phase DB Each 3342.00 2780.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24

d 12 ways 3 phase DB Each 4927.00 3764.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36

III TPMCB DB with acrylic door cover with IP42 protection

a 4 ways 3 phase DB Each 2629.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12

b 6 ways 3 phase DB Each 3230.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 18
c 8 ways 3 phase DB Each 3850.00 --
No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24

d 12 ways 3 phase DB Each 5866.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36

IV Industrial type TPMCB DB with IP 54 protection

a 4 ways 3 phase DB Each 6364.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12

b 6 ways 3 phase DB Each 7659.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 18

c 8 ways 3 phase DB Each 8377.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24

d 12 ways 3 phase DB Each 11700.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
VERTICAL THREE PHASE DISTRIBUTION BOARD WITH
MCBS
4 way / 8 way / 12 way vertical TPMCB sheet steel All other
distribution boards flush type / surface type fitted with makes
bus bars and neutral links with single / three phase MCB with ISI
outgoings and separate 4 way provision for Legrand (MDS) / (Std.) /
accommodating One No. 4 pole incoming MCB / Isolator Hager (L&T) HPL /
and another separate 4 way provision for accommodating Havell's /
One No. 4 pole ELCB / RCD with label holder and Equivalent
provisions for taking up cable for size not less than 35 )
sq.mm.

I Module type with IP 20 protection

a 4 ways 3 phase DB Each 4650.00 3390.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12

b 8 ways 3 phase DB Each 5738.00 4525.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24

c 12 ways 3 phase DB Each 8350.00 5525.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36

II TPMCB DB with metal door cover with IP 42 protection


a 4 ways 3 phase DB Each 5397.00 4435.00
No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12

b 8 ways 3 phase DB Each 6833.00 5450.00


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24

c 12 ways 3 phase DB Each 9148.00 6700.00


No. of ways incomer MCB / Isolatore - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36

III TPMCB DB with acrylic door cover with IP42 protection

a 4 ways 3 phase DB Each 6514.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12

b 8 ways 3 phase DB Each 8278.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24
c 12 ways 3 phase DB Each 11044.00 --
No. of ways incomer MCB / Isolatore - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36

IV Industrial type TPMCB DB with IP 54 protection

a 4 ways 3 phase DB Each 10110.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 12

b 8 ways 3 phase DB Each 12184.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 24

c 12 ways 3 phase DB Each 16365.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of outgoings ways - 36
7 SEGMENTS (3 TIER) 3 PHASE DISTRIBUTION BOARD
WITH MCB
4 way / 6 way / 8 way / 12 way TPMCB sheet steel
distribution boards flush type / surface type fitted with
bus bars and neutral links with single / three phase MCB All other
outgoings and separate 4 way provision for makes
accommodating One No. 4 pile incoming MCB / Isolator with ISI
and another separate 4 way provision for accommodating Legrand (MDS) / (Std.) /
One No. 4 pole ELCB / RCD (totally 8 ways in one Hager (L&T) HPL /
segment) (3 x 4 ways in each segment) and separate Havell's /
provisions for MCB / Isolator (totally 12 Nos.) for sub Equivalent
incomers in 3 segments with label holder and provisions )
for taking up cable for size not less than 35 sq.mm.

I Module type with IP 20 protection

a 4 ways 3 phase DB Each 5013.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of sub-incomers - 12
No. of outgoings ways - 12

b 6 ways 3 phase DB Each 5377.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of sub-incomers - 12
No. of outgoings ways - 18

c 8 ways 3 phase DB Each 5709.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of sub-incomers - 12
No. of outgoings ways - 24
d 12 ways 3 phase DB Each 6576.00 --
No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of sub-incomers - 12
No. of outgoings ways - 36

II TPMCB DB with metal / acrylic door cover with IP 42


protection

a 4 ways 3 phase DB Each 5328.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of sub-incomers - 12
No. of outgoings ways - 12

b 6 ways 3 phase DB Each 6000.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of sub-incomers - 12
No. of outgoings ways - 18

c 8 ways 3 phase DB Each 6700.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of sub-incomers - 12
No. of outgoings ways - 24

d 12 ways 3 phase DB Each 8515.00 --


No. of ways incomer MCB / Isolator - 4
No. of ways incomer ELCB / RCD - 4
No. of sub-incomers - 12
No. of outgoings ways - 36
SINGLE PHASE DISTRIBUTION BOARD WITH MCBs
4 way / 8 way / 12 way vertical SPMCB sheet steel
distribution boards flush type / surface type fitted with All other
bus bars and neutral links with single phase MCB makes
outgoings and separate 2 way provision for with ISI
accommodating One No. 2 pole incoming MCB / Isolator Legrand (MDS) / (Std.) /
and another separate 2 way provision for accommodating Hager (L&T) HPL /
One No. 2 pole ELCB / RCD with label holder and Havell's /
provisions for taking up cable for size not less than 35 Equivalent
sq.mm. )

I Module type with IP 20 protection

a 4 ways 3 phase DB Each 612.00 333.00


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 4

b 4 ways 3 phase DB Each 766.00 423.00


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 8

c 4 ways 3 phase DB Each 906.00 576.00


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 12

II SPMCB DB with metal door cover with IP 42 protection


a 4 ways 3 phase DB Each 891.00 585.00
No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 4

b 4 ways 3 phase DB Each 1113.00 795.00


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 8

c 4 ways 3 phase DB Each 1341.00 1025.00


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 12

III SPMCB DB with acrylic door cover with IP42 protection

a 4 ways 3 phase DB Each 1056.00 --


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 4

b 4 ways 3 phase DB Each 1244.00 --


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 8
c 4 ways 3 phase DB Each 1505.00 --
No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 12

IV Industrial type TPMCB DB with IP 54 protection

a 4 ways 3 phase DB Each 2669.00 --


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 4

b 4 ways 3 phase DB Each 3135.00 --


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 8

c 4 ways 3 phase DB Each 3615.00 --


No. of ways incomer MCB / Isolator - 2
No. of ways incomer ELCB / RCD - 2
No. of outgoings ways - 12
HEDULE OF RATES 2019-20 (WITH EFFECT FROM 17.06.2020)
RATES OF MATERIAL RAT

Schedul
Description Unit Rate e Item
No.

Cement MT 5750.00

Steel MT 45000.00

BRICKS AND TILE PRODUCTS

Second Class Table Moulded Chamber Burnt Bricks 1

9" x 41/2" x 3" 1000 Nos. 7435.00 2

9" x 43/8" x 23/4" 1000 Nos. 7150.00 3

Second Class Ground Moulded Chamber Burnt Bricks 4

9" x 41/2" x 3" 1000 Nos. 6405.00 5

9" x 43/8" x 23/4" 1000 Nos. 6220.00 9

Third Class Country Brick Kiln Burnt 9C

83/4" x 41/4" x 23/4" 1000 Nos. 5385.00 9D

83/4" x 41/4" x 21/4" 1000 Nos. 4235.00


83/4" x 41/4" x 2" 1000 Nos. 4055.00

Fly Ash Bricks 10

230 x 110 x 70mm 1000 Nos. 6220.00 11

230 x 110 x 75mm 1000 Nos. 6405.00

Specially moulded country brick for well steining 11A

83/4" x 41/4" x 2" 1000 Nos. 2385.00 11B

Perforated bricks 19 x 9 x 9cm 1000 Nos. 3635.00 12

Terrace bricks 15 x 7.5 x 2.5cm 1000 Nos. 934.00 13

Flat Tiles 14

15cm x 15cm x 12mm 1000 Nos. 782.00 15

15cm x 15cm x 20mm 1000 Nos. 928.00 16

Brick Jelly 17

40mm size cu.m. 666.00 18

20mm size cu.m. 742.00 19

Pressed Tiles 20
20 x 20 x 2cm 1000 Nos. 10920.00 22

23 x 23 x 2cm 1000 Nos. 15487.00 23

Pan Tiles 24

23cm x 8cm x 1.7cm 1000 Nos. 425.00 25

16.5cm x 8cm x 1.7cm 1000 Nos. 350.00 26

Best Mangalore Tiles 27

I Class'A' 1000 Nos. 10185.00 28

Class 'AA' 1000 Nos. 10395.00 29

Best Mangalore Ridge Tiles 1000 Nos. 29820.00 32

Best Mangalore Ceiling Tiles 1000 Nos. 6268.00 33

Best Mangalore Glass Roofing Tiles Each 294.00 34

Best Mangalore Ventilating Tiles (Single) Each 44.00 36

Best Mangalore Ventilating Tiles (Double) Each 56.00 37

Mosaic Flooring Tiles (Grey) 38

Mosaic (Grey) Tile 25 x 25 x 2cm 1000 Nos. 11445.00 38A

Mosaic (Grey) Tile 20 x 20 x 2cm 1000 Nos. 7318.00 38B


Mosaic (other Colour) 38C

Mosaic (other colour) Tile 25 x 25 x 2cm 1000 Nos. 15802.00 38D

Mosaic (other colour) Tile 20 x 20 x 2cm 1000 Nos. 9324.00 38E

Mosaic (Green) Tile 20 x 20 x 2cm 1000 Nos. 11445.00 38F

Mosaic (Green) Tile 25 x 25 x 2cm 1000 Nos. 17955.00 38G

Mosaic Chequered tile Grey colour size 25 x 25 x 2cm 1000 Nos. 14385.00

STONE AND ROAD MATERIALS 39

Rough stone for masonry works (Hard Granite) cu.m. 433.00 39A

Rough stone for revetment works cu.m. 375.00 40A

Jeddy size for Revetment (Hard Granite) cu.m. 412.00 42A

Cut stone pillar of size 0.15 x 0.15 x 2.1m Each 160.00 42B

From boulders without blasting for revetment cu.m. 110.00 44

From boulders without blasting for masonry cu.m. 143.00 46

Course Rubble stone for masonry works cu.m. 346.00 46A

Course Rubble stone for Arch works cu.m. 375.00 47

Chisel dressed stone 70cm x 30cm x 29cm Each 171.00 48


Chisel dressed stone 37cm x 30cm x 29cm Each 154.00 49

Hammer dressed stone 37cm x 30cm x 29cm Each 119.00

Cutstone fully dressed to size on all faces cu.m. 6195.00 49

Cut stone Roughly dressed cu.m. 4263.00 50

Ashlar arch stone fully dressed to size all faces cu.m. 4704.00 50A

Flooring stone SS Size (Not less than 10cm thick) cu.m. 344.00 50B

Stone slab for culvert (3 faces one line dressed) Above


cu.m. 4488.00 50C
1.2m
Stone slab for culvert (3 faces one line dressed) Upto
cu.m. 4079.00 50D
1.2m

Stone slab for culvert (3 faces two line dressed) cu.m. 4998.00 61

For Lintel coping (3 faces two line dressed) cu.m. 4998.00 62

Bond Stones cu.m. 624.00 67

Kilometre stone 1.65 x 0.45 x 0.15m Each 427.00 67A


Hecta metre stone 0.9x0.1x0.1m Each 119.00 72

Hecta metre stone 0.75x0.23x0.1m Each 218.00 76

Hecta metre stone 0.9x0.15x0.15m Each 214.00 77

Demarcation Stone (two line dressed for top 30 cm)


Each 89.00 78
75 x 15 x 15 cm

Demarcation Stone (two line dressed for top 30 cm)


Each 114.00 78A
90 x 23 x 23 cm

Demarcation Stone (two line dressed for top 30 cm)


Each 106.00 79
76 x 23 x 23 cm

Demarcation Stone (two line dressed for top 30 cm)


Each 97.00 A
90 x 15 x 15 cm

DemarcationStone with letter cut 75 x 15 x 15cm Each 119.00 B

Edge Stone 45 x 15 x 15 cm Each 54.00 80

T.R.S. Bench mark stone the exposed surface neatly


dressed to a height of 15cm including cutting letters Each 137.00 81
15 x 15 x 60cm
T.R.S. Bench mark stone the exposed surface neatly
dressed to a height of 15cm including cutting letters Each 99.00 82A
10 x 10 x 25cm

Guard Stone (Two line dressed for 45 cm) 23cm dia


Each 158.00 84
1.0m long

Guard Stone (Top 0.7m chisel dressed and 0.50m


bottom roughly dressed) 0.23 x 0.23 x 1.20m long. Each 169.00 85
Two line dressed top 45cm) 23cm dia 1.0m long

Guard Stone (Top 0.7m chisel dressed and 0.50m


bottom roughly dressed) 0.23 x 0.23 x 0.90m long. Each 158.00
Two line dressed top 45 cm) 23cm dia 0.90m long

Guard Stone (Top 0.7m chisel dressed and 0.50m


bottom roughly dressed) 0.15 x. 0.15 x 0.90m long. Each 110.00 86
Two line dressed top 45 cm) 23cm dia 0.90m long

Guard Stone 23 cm dia 0.90cm long Each 81.00 88


Hard Broken Granite Stone Jelly (I.S.S.) Machine
89
crushed / Hand broken

HBGS Jelly 90 mm size cu.m. 420.00 90

HBGS Jelly 80 mm size cu.m. 470.00 90A

HBGS Jelly 63 mm size cu.m. 543.00 91

HBGS Jelly 50 mm size cu.m. 630.00 92A


HBGS Jelly 40 mm size cu.m. 980.00 92B

HBGS Jelly 25 mm size cu.m. 842.00 92C

HBGS Jelly 20 mm size cu.m. 1364.00

HBGS Jelly 12 mm size cu.m. 1266.00 1

HBGS Jelly 10 mm size cu.m. 931.00 1a

HBGS Jelly 6 mm size cu.m. 630.00 2

HBGS Jelly 3 mm size cu.m. 567.00 a


Broken Stone from surface stone & boulders b

Broken Stone from surface stone & boulders 40mm


cu.m. 3
size

Broken Stone from surface stone & boulders 50mm


cu.m.
size
Broken Stone from surface stone & boulders 60mm
cu.m. A
size

Broken Stone from surface stone & boulders 75mm


cu.m. 1
size

Quartz metal 2

Quartz metal 50 mm cu.m. 94.00 B

Quartz metal 40 mm cu.m. 95.00 1

Soft Broken Stone 2

Soft Broken Stone 63mm size cu.m. 72.00


Soft Broken Stone 40mm size cu.m. 81.00 A

Laterite 40 to 75mm size cu.m. 94.00 1

Kankar 40 to 75mm size cu.m. 94.00 2

Soling stones unblasted 15cm cube cu.m. 110.00 3

Soling stones blasted 15cm cube cu.m. 180.00 B

Gravel cu.m. 210.00 1

Well Gravel cu.m. 157.00 2

Screened Kankar Gravel cu.m. 115.00 3

Quarry Rubbish cu.m. 93.00

Stone Dust cu.m. 119.00 1

Pond Ash (wet / dry) cu.m. 92.00 2

Sand for Mortar cu.m. 447.00


Sand for Filling cu.m. 447.00 156 A

Clay for Puddle & Masonry cu.m. 36.00 156B

Cuddapah Slab 50mm Thick sq.m. 409.00 156C

Cuddapah Slab 38 / 40mm Thick sq.m. 394.00 156D

Cuddapah Slab 20 / 30mm Thick sq.m. 363.00 156E

LIME 156F

Shell lime (Slaked & Screened) cu.m. 1272.00 156G

Freshly Slaked & Screened Burnt Lime Stone cu.m. 937.00 156H

Stone Lime or Lime Metal cu.m. 81.00 156 I

D.Timber and Roofing Materials

TW Scantlings (over 3m for joist and rafters) - Malabar cu.m. 116600.00 318
TW Scantlings (for Tie beams and principal rafters) -
cu.m. 114700.00 319
Malabar

TW Scantlings (over 2m & below 3m in length) -


cu.m. 111600.00 320
Malabar

TW Scantling (below 2m in length) - Malabar cu.m. 99400.00 321

TW Planks (Over 45cm wide & 12mm Thick) cu.m. 123100.00

TW Planks (30 - 45cm wide & 12mm Thick) cu.m. 114300.00 338

TW Planks (30 - 45cm wide & 12 - 25mm Thick) cu.m. 107000.00 339

TW Planks (30 - 45cm wide & 25 - 40mm Thick) cu.m. 102600.00

TW Planks (15 - 30cm wide & 12mm Thick) cu.m. 99900.00 357

TW Scantling (15 - 30cm wide & 12-25mm Thick) cu.m. 95000.00 357A

TW Planks (15 - 30cm wide & 25- 40mm Thick) cu.m. 93100.00 357B

TW Planks (Upto 15cm wide & 12mm Thick) cu.m. 91300.00 357C
TW Planks (Upto 15cm wide & 12-25mm Thick) cu.m. 91300.00 357 D

TW Planks (Upto 15cm wide & 25-40mm Thick) cu.m. 86200.00 357 E

Teak wood Reepers 357 F

TW Reepers 50 x 25mm RM 76.00

TW Reepers 50 x 12mm RM 61.00 369 B

Country Wood Scantling 369 B(i)

CW Scantling (upto 4m in length) cu.m. 34300.00 (ii)

CW Scantling (over 4m in length) cu.m. 36200.00 (iii)

CW Scantling (for tie beams & Principal rafters for


cu.m. 36200.00
trusses)

Jack wood Scantlings (upto 4 m) cu.m. 37900.00 375A

Silver oak Scantlings cu.m. 15500.00 375B


Country Wood Planks 378A

CW Planks (upto 30cm wide-40mm thick) cu.m. 39400.00 378B

CW Planks (upto 30cm wide-25mm thick) cu.m. 39400.00

CW Planks (over 30cm wide-40mm thick) cu.m. 39400.00 1

CW Planks (over 30cm wide-25mm thick) cu.m. 39400.00

JW Planks (25mm-40mm thick) cu.m. 41300.00 2

Silver Oak Plank (40mm thick) cu.m. 17600.00

Bluegum Plank cu.m. 18100.00 3

Country Wood Reepers

CW Reepers (50 x 25mm) RM 34.60 4

CW Reepers (50 x 12mm) RM 24.90

Mango plank cu.m. 16700.00 5

Palmyrah rafter (50 - 60mm wide & 125mm depth) RM 49.50

Palmyrah Leaves 100 Nos. 255.00 6

Palmyrah Leaves (Labour for cutting) 100 Nos. 40.20

Casurina poles 7
Casurina poles 13cm - 15cm dia RM 33.00

Casurina poles 10cm - 13cm dia RM 25.20 8

Casurina poles 8cm - 10cm dia RM 19.20

Casurina poles 5cm - 8cm dia RM 17.50 9

Eucalyptus Poles

13cm to 15cm dia RM 33.00

10cm to 13cm dia RM 23.60 1

8cm to 10cm dia RM 19.20 2

5cm to 8cm dia RM 16.40 3

below 5cm RM 15.00 4

Eucalyptus Bullies 4cm to 5cm dia and cross ties RM 12.00 6


Casurina Bullies 4cm - 5cm dia and cross ties RM 13.50 7

Bamboo Large (10cm dia and above) RM 12.00 8

Bamboo (7.5cm - 10cm dia) RM 10.60 11

E. Metal and Iron Items 12

Mild steel plates or sheets BG 10 Kg 41.20 13

Mild steel Angles 25 x 25 x 3 mm Kg 41.20 14

Binding wire (Black 18 G) Kg 43.75 19

Binding wire (Galvanised-18 G) Kg 43.75 20


G.I. Sheets 30cm wide and 1.6 mm Thick sq.m. 304.00 21

Weld mesh 7.5 x 2.5cm. 10 Gauge sq.m. 295.00 a

Weld mesh 7.5 x 5cm. 10 Gauge sq.m. 264.00 b

Weld mesh 10 x 10cm. 10 Gauge sq.m. 143.00 22

Chicken mesh sq.m. 31.65 23

Fly proof mesh sq.m. 91.00

Supplying mild steel grills for windows, ventilators, rtc.,


Kg 54.50 50 A
including priming coat

Crushed stone sand (Commercially called M-SAND) cum 1250.00 50 B

NEW ITEMS 50 C

Plastering sand (P-Sand) cum 1255.00 69

NEW ITEMS FOR HERITAGE WORKS I


Special Bricks 8" x 4" x 2" for Heritage Works 1000 Nos. 12600.00 ii

Terrace bricks 6" x 3" x 1" for Heritage Works 1000 Nos. 9450.00 iii

Wire cut bricks for Heritage Works iv

9" x 4" x 3" 1000 Nos. 12600.00

9" x 4" x 2" 1000 Nos. 10500.00 121

9" x 6.5" x 2" 1000 Nos. 15750.00 125

NEW ITEMS FOR HERITAGE WORKS 125A

ATTANGUDI TILES FOR HERITAGE WORKS 127

Size 8" x 8" x 3/4" EACH 26.00 128


Size 10" x10" x 3/4" EACH 31.50 35A

NEW ITEMS FOR HERITAGE WORKS

Unslaked Pollachi Lime for Heritage Works cum 9945.00

NEW ITEMS FOR HERITAGE WORKS

Seasoned Teakwood for Scantling and Planks for


cum 185200.00
Heritage Works

Supplying mild steel grills for windows, ventilators, rtc., 75.40


including priming coat
RATES OF WORKS

Description Unit Rate Actual 5% 10%

A. Clearing the Site

Clearing Heavy Jungle sq.m. 5.20 5.20 5.46 5.72

Clearing Light Jungle sq.m. 3.90 3.90 4.10 4.29

Clearing Scrub Jungle sq.m. 3.60 3.60 3.78 3.96

Uprooting & removing large palmyrah / coconut stumps Each 105.00 105.00 110.25 115.50

Uprooting & removing small palmyrah / coconut stumps Each 75.40 75.40 79.17 82.94

Removing weeds in channel and drain sq.m. 1.40 1.40 1.47 1.54

Cleaning Juliflora jungle with uprooting sq.m. 5.90 5.90 6.20 6.49

Cleaning Juliflora jungle without uprooting sq.m. 4.50 4.50 4.73 4.95

B. Dismantling
Dismantling, clearing away and carefully stacking materials
useful for re-use for any thickness of walls

Brick / stone in clay walls under 3m high cu.m. 44.80 44.80 47.04 49.28

Brick / stone in clay walls, add for every additional 3m or part


cu.m. 14.90 14.90 15.65 16.39
there of over the initial height of 3m

Mud / sun dried brick walls under 3m high cu.m. 30.00 30.00 31.50 33.00

Mud / sun dried brick walls, add for every additional 3m or part
cu.m. 8.60 8.60 9.03 9.46
there of over the initial height of 3m

Brick / stone masonry in lime mortar walls under 3m high cu.m. 137.00 137.00 143.85 150.70

Brick / stone masonry in lime mortar walls, add for every


cu.m. 15.20 15.20 15.96 16.72
additional 3m or part there of over the initial height of 3m

Brick / stone masonry in Cement mortar walls under 3m high cu.m. 168.00 168.00 176.40 184.80

Brick / stone masonry in Cement mortar walls, add for every


cu.m. 17.80 17.80 18.69 19.58
additional 3m or part there of over the initial height of 3m

Terracing work in roof or floor sq.m. 45.50 45.50 47.78 50.05

Flag stone in roof or floor including lifting sq.m. 24.00 24.00 25.20 26.40

Cut stone slab over culverts upto 3.3m height below G.L cu.m. 700.00 700.00 735.00 770.00

Cut stone slab over culverts over 3.3m height below G.L cu.m. 730.00 730.00 766.50 803.00

Removal of cut stone slabs & RCC cover slabs sq.m. 305.00 305.00 320.25 335.50
Refixing cut stone slab cu.m. 334.00 334.00 350.70 367.40

Pantile or Mangalore tiled roof without roof timbers sq.m. 11.90 11.90 12.50 13.09

Flat & pan tiles or Manglore tile over flat tiles, with out roof
sq.m. 16.60 16.60 17.43 18.26
timbers

AC sheet roofing without roof timbers sq.m. 10.60 10.60 11.13 11.66

Corrugated iron sheet roofing with pan tiles over, without roof
sq.m. 17.80 17.80 18.69 19.58
timbers

Old thatched roof, including tying materials into small bundles for
sq.m. 5.20 5.20 5.46 5.72
reuse.

Wrought & putup framed timbers in roofs / floors cu.m. 440.00 440.00 462.00 484.00

Doors & windows including removal of frames, hinges and


sq.m. 91.10 91.10 95.66 100.21
fastenings

Dry stones apron or revetment, stacking within 40m lead cu.m. 78.00 78.00 81.90 85.80

Grouted rough stones apron or revetment, stacking within 40m


cu.m. 91.10 91.10 95.66 100.21
lead

Dry stone masonry walls cu.m. 66.50 66.50 69.83 73.15

Dismantling lime concrete cu.m. 211.00 211.00 221.55 232.10

Dismantling plain Cement concrete cu.m. 289.00 289.00 303.45 317.90

Dismantling RCC cu.m. 4390.00 4390.00 4609.50 4829.00

Chipping of concrete & roughening the surface sq.m. 24.00 24.00 25.20 26.40

Pressed tiles & weathering course sq.m. 27.30 27.30 28.67 30.03
One course of pressed tile roof finish in Cement Mortar sq.m. 15.20 15.20 15.96 16.72

One course of terrace bricks roof finish in Cement mortar sq.m. 17.80 17.80 18.69 19.58

Two course of flat tiles roof finish in cement mortar sq.m. 17.80 17.80 18.69 19.58

Mosaic in situ finish in cement mortar in flooring and in wall


sq.m. 37.60 37.60 39.48 41.36
surface

Floor finish and dadooing walls in cement mortar with mosaic


sq.m. 36.20 36.20 38.01 39.82
tiles / glazed tiles / cuddapah slabs

C. Quarrying and Blasting

Hard rock measured in solid including blasting & stacking cu.m. 517.00 517.00 542.85 568.70

Removing hard rock by wedging, chiseling and trimming to


cu.m. 1035.00 1035.00 1086.75 1138.50
proper shape where blasting is prohibited.

Mediun rock and dense medium rock requiring blasting cu.m. 264.00 264.00 277.20 290.40

Extra for every additional 10m lead or part thereof over the
cu.m. 6.20 6.20 6.51 6.82
initial lead for blasted materials

Extra for every additional 1m lead or part thereof over the initial
cu.m. 6.40 6.40 6.72 7.04
lift of 2m for blasted materials

Benching, hard rock upto an average 10 cm depth sq.m. 500.00 500.00 525.00 550.00

Drilling holes in hard granite 40mm diameter RM 166.00 166.00 174.30 182.60

Drilling holes in hard granite 45mm diameter RM 194.00 194.00 203.70 213.40

Drilling holes in hard granite 50mm diameter RM 233.00 233.00 244.65 256.30

Drilling holes in hard granite 75mm diameter RM 265.00 265.00 278.25 291.50
Drilling holes in hard granite 32mm diameter RM 140.00 140.00 147.00 154.00

D. Earth Work

ORDINARY SOIL SS20A Earth work excavating and depositing on


bank with initial lead of 10m & initial lift of 2m in Sand, silt or
other loose soil, wet sand or silt not under water, light black cu.m. 53.50 53.50 56.18 58.85
cotton soil sandy loam and ordinary soil including ecxcavated
earth SS.20.A

ORDINARY SOIL SS20B Earth work excavating and depositing on


bank with initial lead of 10m & initial lift of 2m in Sand, silt or
other loose soil, wet sand or silt not under water, light black cu.m. 48.80 48.80 51.24 53.68
cotton soil, sandy loam and ordinary soil including excavated
earth SS.20.B

Sand & Silt Under Water SS20B Earth work excavating and
depositing on bank with a initial lead of 10 m & initial lift of 2m in
cu.m. 61.10 61.10 64.16 67.21
Slush and silt under water upto 0.75m depth requiring the aid of
basket and vessels SS.20.B

Trimming the bed and the side slope of the bank in all soils
except hard rock upto a thickness of 7.5 cm and making it ready cu.m. 12.50 12.50 13.13 13.75
to receive the concrete

Trimming the bed and the side slope of the bank in all soils
except hard rock upto a thickness of 7.5 cm to 15 cm and cu.m. 15.10 15.10 15.86 16.61
making it ready to receive the concrete
Sectioning during forming bunds when earth moving
cu.m. 9.20 9.20 9.66 10.12
machineries, lorries and rollers are used for consolidation.

HGS SS.20.A. Earth work excavating and depositing on bank


with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff
cu.m. 77.90 77.90 81.80 85.69
black cotton, hard red earth, shales,murram, gravel, stoney
earth and earth mixed with small size boulders SS.20.A.

HGS SS.20.B. Earth work excavating and depositing on bank


with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff
cu.m. 73.10 73.10 76.76 80.41
black cotton, hard red earth, shales,murram, gravel, stoney
earth and earth mixed with small size boulders SS.20B

SDR - (Not Requiring Blasting) Earth work excavating and


depositing on bank with initial lead of 10 m & initial lift of 2m in
cu.m. 108.90 108.90 114.35 119.79
Soft disintegrated rock, laterite, soft rock or kankar, not
requiring blasting.

LOOSE BOULDERS Earth work excavating and depositing on


bank with initial lead of 10 m & initial lift of 2m in loose boulders cu.m. 172.80 172.80 181.44 190.08
in excavation of various size 150mm to 625 mm
MR-&-DMR (Not Requiring Blasting) Earth work excavating and
depositing on bank with initial lead of 10 m & initial lift of 2m in cu.m. 191.20 191.20 200.76 210.32
medium rock and dense medium rock not requiring blasting

Extra for every additional 10 metre lead or part thereof over the
cu.m. 8.90 8.90 9.35 9.79
initial lead

Extra for every additional 1 metre lift or part thereof over the
cu.m. 7.10 7.10 7.46 7.81
initial lift

Breaking clods, consolidating and sectioning cu.m. 4.40 4.40 4.62 4.84

Breaking clods, consolidating and sectioning the earth scooped


cu.m. 13.50 13.50 14.18 14.85
by Bull Dozers.

Add to relevant T.N.D.S.S. No.20.A, rates for new tank bunds


0.00
and closing breaches for extra watering and consolidation,

By hand roller cu.m. 15.10 15.10 15.86 16.61

By power roller including hire charges cu.m. 25.50 25.50 26.78 28.05

Benching Old Embankment Slopes 45cm x 45cm cu.m. 2.80 2.80 2.94 3.08

Puddle wall work cu.m. 120.70 120.70 126.74 132.77


Turfing in slopes including watering and fixing with initial lead
cu.m. 25.50 25.50 26.78 28.05
upto 50m

Refilling with excavated sand complying with standard


cu.m. 22.40 22.40 23.52 24.64
specification for filling in foundation and basement.

Refilling with excavated soil (other than sand) complying with


cu.m. 25.50 25.50 26.78 28.05
standard specification for filling in foundation and basement.

E. OPEN WELL EXCAVATION

Earth work open well excavation complying with relevant clauses


of T.N.D.S.S. Well sinking and with lead upto 10 metre in sand,
silt or other loose soil, Wet sand or silt not under water, light cu.m. 48.80 48.80 51.24 53.68
black cotton soil, sandy loam and ordinary soil - First depth of 2
metre.

Earth work open well excavation complying with relevant clauses


of T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard
stiff clay, stiff black coton soil, hard red earth, shales, murram, cu.m. 72.90 72.90 76.55 80.19
gravel, stoney earth and earth mixed with small size boulders
and hard gravely soil - First depth of 2 metre
Earth work open well excavation complying with relevant clauses
of T.N.D.S.S. Well sinking and with lead upto 10 metre in soft
cu.m. 112.30 112.30 117.92 123.53
disintegrated rock, laterite, soft rock or kankar not requiring
blasting - First depth of 2 metre

Open well excavation complying with relevant clauses of


T.N.D.S.S. Well sinking and with lead upto 10 metre in Medium
cu.m. 180.70 180.70 189.74 198.77
rock and dense medium rock not requring blasting - First depth
of 2 metre

Open well excavation complying with relevant clauses of


T.N.D.S.S. Well sinking and with lead upto 10 metre in Medium
cu.m. 271.00 271.00 284.55 298.10
rock and dense medium rock requiring blasting - First depth of 2
metre

Open well excavation complying with relevant clauses of


T.N.D.S.S. Well sinking and with lead upto 10 metre in Hard
cu.m. 530.00 530.00 556.50 583.00
granite measured in solid including blasting and stacking - First
depth of 2 metre

Sinking well in loose soils, light black cotton soil, sandy loam and
ordinary soil under water including bailing or pumping charges if cu.m. 75.70 75.70 79.49 83.27
necessary etc., complete First depth of 2 metres
Sinking well in Sand, including bailing or pumping charges if
cu.m. 106.20 106.20 111.51 116.82
necessary etc., complete - First depth of 2 metres

Sinking well in hard stiff clay, light black cotton soil, hard red
earth, shales, murram, gravel, stoney earth, and earth mixed
with small size boulders and hard gravelly soil including bailing or cu.m. 106.20 106.20 111.51 116.82
pumping charges if necessary etc., complete - First depth of 2
metres

F. RATE FOR EARTHWORK DEPLOYING MACHINERIES

Earth work in all soils except hard rock requiring blasting and
conveying for formation of bund with lead of 0 to 100 metre
deploying earth moving machineries and tippers including cu.m. 45.55 45.55 47.83 50.11
benching, formation of bunds, breaking clods, sectioning etc
complete

Earth work in all soils except hard rock requiring blasting and
conveying for formation of bund with an extra lead of every 100
metre or part thereof deploying earth moving machineries and cu.m. 3.60 3.60 3.78 3.96
tippers including benching, formation of bunds, breaking clods,
sectioning etc complete

Earth work deploying earth moving machineries for desilting


channel and forming bund on either side and depositing the earth
on banks including jungle clearance etc complete

having width up to 3m cu.m. 26.85 26.85 28.19 29.54


having width of 3m -10m cu.m. 32.95 32.95 34.60 36.25

Earth work excavation deploying earth moving machineries for


desilting channel having a width of more than 10m and forming
cu.m. 38.30 38.30 40.22 42.13
bund on either side and depositing the earth on banks including
jungle clearance etc complete

G.LIFT CHARGES - Concrete - Brick or Stone Masonry


above or below Ground Level

Concrete, above ground level

Add to the basic rates for works upto 4.50M height in ground
floor (height to be reckoned from floor level ie., plinth level in cu.m. 78.20 78.20 82.11 86.02
GL)

Add for works in every upper floor over the rate of preceeding
cu.m. 154.00 154.00 161.70 169.40
floor

Brick or Stone Masonry above GL 0.00 0.00

Add to the basic rates for works upto 4.50M height in ground
floor (height to be reckoned from floor level ie., plinth level in cu.m. 51.50 51.50 54.08 56.65
GL)

Add for works in every upper floor over the rate of preceeding
cu.m. 103.80 103.80 108.99 114.18
floor

STATEMENT II
Concrete, Below ground level

Add the basic rate for works above 1.50m depth and upto 4.5m
cu.m. 77.00 77.00 80.85 84.70
depth below ground level

Add the basic rate for works above 4.50m depth and upto 9m
cu.m. 154.50 154.50 162.23 169.95
depth below ground level

Add extra over the above item 2 for every additional 4.50m
cu.m. 154.50 154.50 162.23 169.95
depth beyond 9.0m depth below ground level

Brick or Stone Masonry below GL

Add the basic rate for works above 1.50m depth and upto 4.50m
cu.m. 51.70 51.70 54.29 56.87
depth below GL

Add the basic rate for works above 4.50m depth and upto 9.0m
cu.m. 103.80 103.80 108.99 114.18
depth below GL

Add extra over the above item 2 for every additional 4.50m
cu.m. 103.80 103.80 108.99 114.18
depth beyond 9.0m depth below ground level

H.Concrete Vibrators 0.00 0.00

Where vibrators are specified for consolidation in PCC, this rate


per cu.m. over and above the provision made in the standard cu.m. 45.60 45.60 47.88 50.16
data book for consolidation with manual labour may be allowed.

Where vibrators are specified for consolidation in RCC, this rate


per cu.m. over and above the provision made in the standard cu.m. 61.50 61.50 64.58 67.65
data book for consolidation with manual labour may be allowed.

Scaffolding, Centering, etc., 0.00 0.00


Scaffolding Charges for Plastering for Repair Works only. 4m to
sq.m. 0.00 0.00
6m above Ground Level

Scaffolding Charges for Plastering for Repair Works only. 6m


sq.m. 0.00 0.00
to10m above Ground Level

Scaffolding Charges for Plastering for Repair Works only over


sq.m. 0.00 0.00
10m above Ground Level

Scaffolding Charges for White or Colour Washing for Repair


sq.m. 0.00 0.00
Works only. 4m to 6m above Ground Level

Scaffolding Charges for White or Colour Washing for Repair


sq.m. 0.00 0.00
Works only. 6m to 10m above Ground Level

Scaffolding Charges for White or Colour Washing for Repair


sq.m. 0.00 0.00
Works only over 10m above Ground Level

Scaffolding Charges for Painting for Repair Works only. 4m to


sq.m. 0.00 0.00
6m above Ground Level

Scaffolding Charges for Painting for Repair Works only. 6m to


sq.m. 0.00 0.00
10m above Ground Level

Scaffolding Charges for Painting for Repair Works only over 10m
sq.m. 0.00 0.00
above Ground Level

I. Plastering 0.00 0.00

Clean removal of lime plaster from walls and racking out joints
20 mm deep or from terraced roofs racking out joints 12 mm sq.m. 6.20 6.20 6.51 6.82
deep
Clean removal of lime plaster from walls sq.m. 4.80 4.80 5.04 5.28

Clean removal of Cement plaster from walls sq.m. 5.10 5.10 5.36 5.61

Clean removal of Cement plaster from walls and racking out


sq.m. 6.70 6.70 7.04 7.37
joints 20mm deep

J. White Washing, Colour Washing & Distempering

Thorough scrapping of old plastered surface sq.m. 2.80 2.80 2.94 3.08

Washing of plastered surface with soap, soda and water (or with
sq.m. 3.50 3.50 3.68 3.85
soda lime, brush and water)

K. Painting, Wood oiling, Tarring, Varnishing, Bee's


waxing Etc.,

Removing old paint from doors and windows by blow lamp and
sq.m. 22.60 22.60 23.73 24.86
scrapping, including removal and re-fitting of shutters.

Removing old paint from doors and windows by scrapping and


sq.m. 9.50 9.50 9.98 10.45
refitting of shutters.

Removing paint from doors,windows & wood works by manual


sq.m. 6.50 6.50 6.83 7.15
labour

Removing old paint from structural steel by blow lamp or sand


sq.m. 13.50 13.50 14.18 14.85
paper
Scrapping and removing old paint from structural steel by
sq.m. 6.00 6.00 6.30 6.60
manual labour

Removing old paint from iron surface with sand paper sq.m. 5.70 5.70 5.99 6.27

Repolishing the mosaic flooring including polishing stone and


hire charges for polishing machine but excluding cost of electrical sq.m. 13.30 13.30 13.97 14.63
charges

L. Miscellaneous

Supplying and filling up the empty cement gunny bags with sand,
stitching them, conveying the same to site and stacking as
Bag 5.70 5.70 5.99 6.27
directed within a lead of 10 m excluding cost of bags, Jute,
thread, needle,sand etc., (Labour only)

Driving piles up to 15 cm dia in river bed RM 17.70 17.70 18.59 19.47

Pointing the edge and driving bamboo / casurina / eucalyptus


Each 15.10 15.10 15.86 16.61
piles into river bed for the first 1m depth below ground level.

Driving bamboo / casurina / eucalyptus piles into ground beyond


RM 15.10 15.10 15.86 16.61
1m depth from ground level. For every 1m (or) part thereof

M. River Conservancy of Korambu Works

Brush wood bundles one metre girth and one metre long within one
2.90 2.90 3.05 3.19
an initial lead of 1.6 K.M. bundle

one
Extra for every additional lead of 1.6 KM (for the above item) 0.34 0.34 0.36 0.37
bundle
Driving casurina piles into bed including scaffolding etc.,
RM 7.30 7.30 7.67 8.03
complete

Casurina walling pieces 40 mm to 50 mm diameter including


RM 10.20 10.20 10.71 11.22
fixing with nails and tying with ropes

N. Cuting and Threading of G.I.Pipe

15 mm dia G.I. Pipe Cutting Each 6.20 6.20 6.51 6.82

15 mm dia G.I. Pipe Threading Each 8.70 8.70 9.14 9.57

20 mm dia G.I. Pipe Cutting Each 6.20 6.20 6.51 6.82

20 mm dia G.I. Pipe Threading Each 8.90 8.90 9.35 9.79

25 mm dia G.I. Pipe Cutting Each 7.40 7.40 7.77 8.14

25 mm dia G.I. Pipe Threading Each 18.40 18.40 19.32 20.24

32 mm dia G.I. Pipe Cutting Each 8.90 8.90 9.35 9.79

32 mm dia G.I. Pipe Threading Each 24.80 24.80 26.04 27.28

40 mm dia G.I. Pipe Cutting Each 12.00 12.00 12.60 13.20

40 mm dia G.I. Pipe Threading (48.40) Each 27.90 27.90 29.30 30.69

50 mm dia G.I. Pipe Cutting Each 15.40 15.40 16.17 16.94

50 mm dia G.I. Pipe Threading (13.50) Each 31.00 31.00 32.55 34.10

65 mm dia G.I. Pipe Cutting Each 16.70 16.70 17.54 18.37


65 mm dia G.I. Pipe Threading Each 37.40 37.40 39.27 41.14

80 mm dia G.I. Pipe Cutting Each 21.80 21.80 22.89 23.98

80 mm dia G.I. Pipe Threading Each 47.10 47.10 49.46 51.81

100 mm dia G.I. Pipe Cutting Each 31.00 31.00 32.55 34.10

100 mm dia G.I. Pipe Threading Each 62.40 62.40 65.52 68.64

O. Labour Wrought and Put-up for Doors, Windows &


Ventilators

Labour wrought and put up in position of frames inclusive of


cu.m. 8935.00 8935.00 9381.75 9828.50
fixing holdfasts for doors, windows, ventilators etc.,

Labour wrought and put up in position Shutters for fully panelled


doors (external or internal) moulded panels including labour
sq.m. 1005.00 1005.00 1055.25 1105.50
charges for fixing furniture fittings complying with standard
drawings and standard specification.

Labour wrought and put up in position Shutters for fully panelled


doors internal five plywood panels including labour charges for
sq.m. 838.00 838.00 879.90 921.80
fixing furniture fittings complying with standard drawings and
standard specification.

Labour wrought and put up in position Shutters for glazed and


panelled doors including labour charges for fixing furniture
sq.m. 938.00 938.00 984.90 1031.80
fittings complying with standard drawings and standard
specification.

Labour wrought and put up in position Shutters for Framed and


planked doors including labour charges for fixing furniture fittings sq.m. 783.00 783.00 822.15 861.30
complying with standard drawings and standard specification.
Labour wrought and put up in position Shutters for ledged and
braced and planked doors including labour charges for fixing
sq.m. 529.00 529.00 555.45 581.90
furniture fittings complying with standard drawings and standard
specification.

Labour wrought and put up in position Shutters for Glazed


windows including labour charges for fixing furniture fittings sq.m. 938.00 938.00 984.90 1031.80
complying with standard drawings and standard specification.

Labour wrought and put up in position Shutters for Windows


panelled including labour charges for fixing furniture fittings sq.m. 1009.00 1009.00 1059.45 1109.90
complying with standard drawings and standard specification.

Labour wrought and put up in position Shutters for windows


ledged and braced and planked doors including labour charges
sq.m. 529.00 529.00 555.45 581.90
for fixing furniture fittings complying with standard drawings and
standard specification.

Labour wrought and put up in position Frames, shutters for


Ventilators glazed fixed double frames and with wire netting
sq.m. 838.00 838.00 879.90 921.80
complete fixed in position in accordance with standard drawings
and standard specification.

Labour wrought and put up in position Frames, Shutters for


Swing Ventilators and fixed in position in accordance with sq.m. 784.00 784.00 823.20 862.40
standard drawings and standard specification.

Labour charges for fixing doors alongwith frames in position etc.,


sq.m. 149.00 149.00 156.45 163.90
complete (finished work)

Labour charges for fixing windows and ventilators along with


sq.m. 187.00 187.00 196.35 205.70
frames in position etc., complete.
Labour wrought and put up in position Flush shutters

Single leaf shutter sq.m. 140.00 140.00 147.00 154.00

Double leave shutters sq.m. 216.00 216.00 226.80 237.60

Labour wrought and put up in position fly proof wire gauge


sq.m. 501.00 501.00 526.05 551.10
shutters for doors, windows and ventilators.

Labour wrought and put up for Providing teak wood weldmesh


sq.m. 700.00 700.00 735.00 770.00
screen with frames 3"x3" (0.075m x 0.075m)

P.Breaking Metals

Labour charges for breaking 40mm metal from departmental


cu.m. 266.00 266.00 279.30 292.60
blasted stones

Labour charges for breaking 20mm metal from departmental


cu.m. 397.00 397.00 416.85 436.70
blasted stones

Labour charges for breaking 50mm metal from departmental


cu.m. 159.00 159.00 166.95 174.90
blasted stones

Q.Cement Mortar

Grinding Mortar (Special Grinding lime) cu.m. 241.00 241.00 253.05 265.10
Grinding Mortar (Ordinary grinding lime) cu.m. 184.00 184.00 193.20 202.40

Mixing Mortar - Cement by manual cu.m. 75.70 75.70 79.49 83.27

Mixing Mortar - Cement by Machine Mixing cu.m. 100.00 100.00 105.00 110.00

R.Metal and Iron works

Petty ironwork for truss, straps etc., (Wrought & fixed) labour
Kg 36.20 36.20 38.01 39.82
only

Iron works for trusess & record racks (labour only) Kg 33.40 33.40 35.07 36.74

Supplying & fixing mild steel grills for windows, ventilators, etc.,
Kg 20.90 20.90 21.95 22.99
including priming coat.

Fixing M.S.Rods round / square for windows Kg 19.40 19.40 20.37 21.34

Fixing Iron bars in windows and ventilators Kg 19.40 19.40 20.37 21.34
Dismantling RCC Using deploying machinaries cum 3229.00 3229.00 3390.45 3551.90
3000000.00

3000000.00

200000.00

298704.00
298704.00

499783.00
1487411.00
1487411.00

500000.00

2484906.00
1495360.00

100000.00
50000.00
500000.00

400000.00

159300.00

20000.00

13000.00

500.00

208507.00

15356.00

1800000.00

1700000.00

208507.00

15356.00

1800000.00

208507.00

15356.00

1800000.00
187000.00

1787480.00

994920.00

-25000.00

208507.00

1800000.00

187000.00

1787480.00

994920.00

-25000.00

26711068.00

179027425.00
500000.00
LEAD STATEMENT - 2019-2020

Sl. Distance Loading &


Material Source of Supply Unit Cost IC Lead Charges Total
No. (Kms) Unloading

1 Cement Vadavalli 3 MT 5750.00 0.00 19.14 0.00 5769.14


2 Steel Vadavalli 3 MT 45000.00 0.00 19.14 0.00 45019.14
3 Sand for mortor Kinathukadavu 33 cu.m. 447.00 0.00 286.96 0.00 733.96
4 Sand for filling Kinathukadavu 33 cu.m. 447.00 0.00 286.96 0.00 733.96
5 II Class Table Moulded Chamber Burnt Bricks of
Kanuvai 8 1000 Nos. 7435.00 0.00 114.64 0.00 7549.64
size 9" x 41/2" x 3"
6 II Class Table Moulded Chamber Burnt Bricks of
Kanuvai 8 1000 Nos. 7150.00 0.00 114.64 0.00 7264.64
size 9" x 43/8" x 23/4"
7 II Class Ground Moulded Chamber Burnt Bricks of
Kanuvai 8 1000 Nos. 6405.00 0.00 114.64 0.00 6519.64
size - 9" x 41/2" x 3"
8 II Class Ground Moulded Chamber Burnt Bricks of
Kanuvai 8 1000 Nos. 6220.00 0.00 114.64 0.00 6334.64
size 9" x 43/8" x 23/4"
9 Country Bricks of size
Kanuvai 8 1000 Nos. 5385.00 0.00 68.88 0.00 5453.88
8"3/4 x 41/4" X23/4"
10 Country bricks of size
Kanuvai 8 1000 Nos. 4235.00 0.00 68.88 0.00 4303.88
83/4" x 41/4" x 21/4"
11 Fly ash Bricks of size 230x110x70mm Kanuvai 8 1000 Nos. 6220.00 0.00 114.64 0.00 6334.64
12 HGB 90mm ISS metal Madukkarai 24 cu.m. 420.00 0.00 102.00 0.00 522.00
13 HGB 40mm ISS metal Madukkarai 24 cu.m. 980.00 0.00 219.28 0.00 1199.28
14 HGB 25mm ISS metal Madukkarai 24 cu.m. 842.00 0.00 219.28 0.00 1061.28
15 HGB 20mm ISS metal Madukkarai 24 cu.m. 1364.00 0.00 219.28 0.00 1583.28
16 HGB 12mm ISS metal Madukkarai 24 cu.m. 1266.00 0.00 219.28 0.00 1485.28
17 HGB 10mm ISS metal Madukkarai 24 cu.m. 931.00 0.00 219.28 0.00 1150.28
18 HGB 10-12mm ISS metal Madukkarai 24 cu.m. 1098.50 0.00 219.28 0.00 1317.78
19 HGB 6mm ISS metal Madukkarai 24 cu.m. 630.00 0.00 219.28 0.00 849.28
20 HGB 6-10mm ISS metal Madukkarai 24 cu.m. 780.50 0.00 219.28 0.00 999.78
21 Brick jelly 40mm Kanuvai 8 cu.m. 666.00 0.00 56.00 0.00 722.00
22 Brick jelly 20mm Kanuvai 8 cu.m. 742.00 0.00 56.00 0.00 798.00
23 Shell lime Local 0 cu.m. 1272.00 0.00 0.00 0.00 1272.00
24 Slacked lime for mortor Local 0 cu.m. 937.00 0.00 0.00 0.00 937.00
25 Pressed tiles 20 x 20 x 2cm Coimbatore 14 1000 Nos. 10920.00 0.00 77.01 0.00 10997.01
26 Pressed tiles 23 x 23 x 2cm Coimbatore 14 1000 Nos. 15487.00 0.00 77.01 0.00 15564.01
27 Gravel Kanuvai 8 cu.m. 210.00 0.00 81.60 0.00 291.60
28 Rough Stone Madukkarai 24 cu.m. 433.00 0.00 219.28 0.00 652.28
29 Bond Stone Madukkarai 24 cu.m. 624.00 0.00 219.28 0.00 843.28
30 Stone dust Madukkarai 24 cu.m. 119.00 0.00 150.64 0.00 269.64
Note: Certificate shall be issued to the effect that the lead particulars furnished above are correct to the best of his knowledge and belief and the rates
adopted are based on the current Schedule of Rates for the year 2012-13, by an Engineer not below the rank of Asst. Exe.Engineer
DATA
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1 CEMENT MORTAR 1:1.5

960.00 KG CEMENT 5769.14 MT 5538.37


1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
Rate for 1 cu.m. 6348.03
1 CEMENT MORTAR 1:2

720.00 KG CEMENT 5769.14 MT 4153.78


1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
Rate for 1 cu.m. 4963.44

2 CEMENT MORTAR 1:3


480.00 KG CEMENT 5769.14 MT 2769.19
1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
3578.85

3 CEMENT MORTAR 1:4


360.00 KG CEMENT 5769.14 MT 2076.89
1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
Rate for 1 cu.m. 2886.55

4 CEMENT MORTAR 1:5


288.00 KG CEMENT 5769.14 MT 1661.51
1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
Rate for 1 cu.m. 2471.17

5 CEMENT MORTAR 1:6


240.00 KG CEMENT 5769.14 MT 1384.59
1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
Rate for 1 cu.m. 2194.25
6 CEMENT MORTAR 1:8
* 180.00 KG CEMENT 5769.14 MT 1038.45
J 1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
Rate for 1 cu.m. 1848.11

7 LIME MORTAR 1:2


0.50 cu.m. LIME STONE 937.00 cu.m. 468.50
1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. GRINDING MORTAR 184.00 cu.m. 184.00
Rate for 1 cu.m. 1386.46

8 Lime Mortar 1:2 using Shell Lime for Vertical Joint

0.50 cu.m. SHELL LIME 1272.00 cu.m. 636.00

Page 1
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. GRINDING MORTAR 184.00 cu.m. 184.00
Rate for 1 cu.m. 1553.96

9 Combination Mortor (Cement:Lime:Sand) 1:1:7


* 205.70 KG using
CEMENTShell Lime for Vertical Joint 5769.14 MT 1186.71
J 0.14 cu.m. LIME STONE 937.00 cu.m. 131.18
1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
1.00 cu.m. GRINDING MORTAR 184.00 cu.m. 184.00
sundries
Rate for 1 cu.m. 2311.55

10 Combination Mortor (Cement:Lime:Sand) 1:1:8


* 180.00 KG using
CEMENTShell Lime for Vertical Joint 5769.14 MT 1038.45
J 0.13 cu.m. LIME STONE 937.00 cu.m. 121.81
1.00 cu.m. SAND FOR MORTAR 733.96 cu.m. 733.96
1.00 cu.m. MIXING CHARGES 75.70 cu.m. 75.70
1.00 cu.m. GRINDING MORTAR 184.00 cu.m. 184.00
sundries
Rate for 1 cu.m. 2153.92

11 Brick Jelly Lime Concrete 1:2:5 using 40mm brick


jelly in Lime Mortar 1:2 - 10 cu.m.

9.50 cu.m. Broken Brick Jelly (40mm size ) 722.00 cu.m. 6859.00
3.80 cu.m. Lime Mortar 1:2 1386.46 cu.m. 5268.55
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Total for 10 cu.m. 25953.00
Rate for 1 cu.m. 2595.30

12 Brick Jelly Lime Concrete 1:2:5 using 20mm brick


jelly in Lime Mortar 1:2 - 10 cu.m.

* 9.50 cu.m. Broken Brick Jelly (20mm size ) 798.00 cu.m. 7581.00
J 3.80 cu.m. Lime Mortar 1:2 1386.46 cu.m. 5268.55
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Total for 10 cu.m. 26675.00
Rate for 1 cu.m. 2667.50

11 Labour wrought and put up for 1 cu.m.


4.50 Nos. Carpenter I Class 638.00 Each 2871.00
13.20 Nos. Carpenter II Class 609.00 Each 8038.80
8.80 Nos. Mazdoor I Class 426.00 Each 3748.80
Sundries for nails, screws, etc. 146.59
Total 14805.19
Rate for 1 cu.m. 14805.19

Page 2
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
12 Priming coat for new iron work - 10 sq.m.
1.33 lit. Red oxide primer 133.00 lit. 176.89
0.70 Nos. Painter I Class 522.00 Nos. 365.40
Sundries for brushes etc., LS 2.65

Rate for 1 sq.m. 54.50

Page 3
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
MAIN DATA
1 Earth work excavation for foundation (for narrow excavation) in all
soils and sub-soils and to full depth as may be directed except in rock
requiring blasting inclusive of shoring shuttering, bailing out water
wherever necessary and depositing the surplus earth within the compound
in places shown by the departmental officers with an initial lead of 10 mts
and initial lift of 2 mts. and clearing and levelling the site, etc., complete
complying with standard specification.

Note: The cost of earth work excavation shall be calculated based on the
classifications of soils furnished in the trial pit details appended with the
estimates
cu.m. Earth work excavation in soil 60.95 cu.m. 60.95
1.00
(average rate) (HS+OS)/2 (42.50+63.60/2)
1.00 cu.m. Add 100% extra 60.95 cu.m. 60.95
0.33 cu.m. Refilling charges 25.50 cu.m. 8.50
130.40
Rate for 1 cu.m. 130.40

2 Earth work open excavation in all soils and sub-soils and to full depth
as may be directed except in rock requiring blasting inclusive of shoring
shuttering, bailing out water wherever necessary and depositing the
excavated earth with a lead of 10 mts. within the compound in places
shown by the departmental officers and clearing and levelling the site,
etc., complete complying with standard specification.

1.00 cu.m. Earth work excavation in soil (average rate) 60.95 cu.m. 60.95
Rate for 1 cu.m. 60.95

3 Supplying and filling in foundation, basement, etc with filling sand in


layers of not more than 15 cm thick well watered, rammed and
consolidated etc. complete complying with standard specification and as
directed by the departmental officers.
1.00 cu.m. Cost of sand for filling 733.96 cu.m. 733.96
1.00 cu.m. Refilling charges 22.40 cu.m. 22.40
Rate for 1 cu.m. 756.36

4 Refilling with excavated earth other than sand with an initial head load of
100 mts. and depositing the earth as shown by the departmental officers in
layers of not more than 15 cm thick well rammed, watered and consolidated etc.
complete complying with standard specification

1.00 cu.m. Refilling with earth 25.50 cu.m. 25.50


Rate for 1 cu.m. 25.50
5 Supplying and filling basement with conveyed earth from 10 km
* 1.00 cu.m. Cost of earth (HGS/SS 20B) 73.10 cu.m. 73.10
M 1.00 cu.m. Lead charges [10x9.62] 96.20 cu.m. 96.20
1.00 cu.m. Refilling charges 25.50 cu.m. 25.50
194.80
Rate for 1 cu.m. 194.80

6 Supplying and FILLING GRAVEL Supplying and filling in 'foundation and


basement with filling sand in layers of not more than 15cm.thick well rammed
watered and compacted -1m3 etc., complete complying with standard
specification.
* 1.00 cu.m. Cost of Gravel 291.60 cu.m. 291.60
M 1.00 cu.m. Refilling charges 25.50 cu.m. 25.50

Page 4
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
317.10
Rate for 1 cu.m. 317.10
7 Supplying and filling 40mm guauge HBGS stone jelly for dispersion
trench including loading conveying and unloading and as directed by the
departmental officers etc. complete complying with standard specification.

* 1.00 m3 Cost of 40mm HBGS stone jelly 1199.28 m3 1199.28


M 1.00 m3 Refilling with sand as per S.I.No. 25.50 m3 25.50
1224.78
Rate for 1 m 3 1224.80

8 Supplying and filling 25mm guauge HBGS stone jelly for dispersion
trench including loading conveying and unloading and as directed by the
departmental officers etc. complete complying with standard specification.

* 1.00 m3 Cost of 25mm HBGS stone jelly 1061.28 m3 1061.28


M 1.00 m3 Refilling with sand as per S.I.No. 25.50 m3 25.50
1086.78
Rate for 1 m 3 1086.80
9 Supplying and filling 20mm guauge HBGS stone jelly for dispersion
trench including loading conveying and unloading and as directed by the
departmental officers etc. complete complying with standard specification.

* 1.00 m3 Cost of 20mm HBGS stone jelly 1583.28 m3 1583.28


M 1.00 m3 Refilling with sand as per S.I.No. 25.50 m3 25.50
1608.78
Rate for 1 m 3 1608.80

10 S&F sand gravel mix (1:1) in foundation & basement

MAIN DATA
0.50 M3 Cost of filling sand 733.96 M3 366.98
0.50 M3 Cost of filling Graval 291.60 M3 145.80
1.00 M3 Mixing charges 75.70 M3 75.70
0.50 M3 Labour for filling sand 22.40 M3 11.20
0.50 M3 Labour for filling gravel 25.50 12.75
612.43
Rate for 1 cu.m. 612.40

11 Providing and laying sand gravel mix (1:1) at the rate of 0.62 cu.m of
filling sand and 0.66 cu .m of gravel to consolidated 1hide of 150mm
designed to attain a CBR value of not less than 20 including cost and
conveyance of sand gravel from approved sources to work site and
stacking them to the departmental gauge for premeasurement including
labour charges labour charges for power roller watering and all other tools
and plants employed including all other incidental charges etc., complete
(For road works)

* Labour charges for mixing 950 sqm


M 6.00 Each Mazdoor I class 426.00 Each 2556.00
24.00 Each Mazdoor II class 368.00 Each 8832.00
Total for 10 m 3 11388.00
1138.80
Daily outturn = 950 / sqm for 10mm
Labour charges for 10sqm
=4230 x10 /950 119.87
Labour charges for refilling
1.00 M3 Labour charges for filling sand 22.40 M3 22.40
1.00 M3 Labour charges for filling graval 25.50 M3 25.50

Page 5
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
47.90
=40.20/2 23.95
MAIN DATA
0.55 M3 Cost of filling sand 733.96 M3 403.68
0.58 M3 Cost of filling Graval 291.60 M3 169.13
1.00 M3 Mixing charges 119.87 M3 119.87
1.00 M3 Filling charges 23.95 M3 23.95
716.63
Rate for 1 cu.m. 716.63 /M3 716.60

12 Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken
stone jelly) using 40 mm gauge hard broken granite stone jelly for
foundation including dewatering wherever necessary and laid in layers
of not more than 15 cm thick well rammed, consolidated and curing etc.
complete complying with standard specification

9.00 cu.m. Broken stone Jelly - 40mm size 1199.28 cu.m. 10793.52
4.50 cu.m. Cement mortar (1:5) 2471.17 cu.m. 11120.28
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Total for 10 cu.m. 35739.00
3573.90
Rate for 1 cu.m. 3573.90

13 Cement Concrete 1:5:10 (One cement, Five sand and Ten hard broken
stone) using 40 mm gauge hard broken jelly for flooring including laying,
consolidating, finishing, rendering the top surface rough to receive the
floor, curing, etc. complete complying with standard specification. (The
rate is inclusive of necessary planking for panelling wherever necessary
and as directed by the departmental officers

9.00 cu.m. 40mm Machine Crushed Stone Jelly 1199.28 cu.m. 10793.52
4.50 cu.m. Cement mortar (1:5) 2471.17 cu.m. 11120.28
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Total for 10 cu.m. 35739.00
3573.90
Rate for 1 cu.m. 3573.90

14 Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken
stone jelly) using 40 mm gauge hard broken granite stone jelly for
foundation including dewatering wherever necessary and laid in layers of
not more than 15 cm thick, well rammed, consolidated and curing etc.
complete complying with standard specification

* 9.00 cu.m. Broken stone Jelly - 40mm size 1199.28 cu.m. 10793.52
M 4.50 cu.m. Cement mortar (1:4) 2886.55 cu.m. 12989.48
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Total for 10 cu.m. 37608.20
Rate for 1 cu.m. 3760.80

Page 6
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
15 Cement Concrete 1:3:6 (One Cement, Three sand and Six broken stone
jelly) using 40mm size hard broken stone jelly for dummy columns,
excluding cost of centering shuttering reinforcement grills and fabrication
charges but including curing etc. complete. (Reinforced Cement Concrete
1:2:4 for slab to be extended upto top of splashing with pressed tiles and
future extension rods to be embedded in CC 1:3:6 (One Cement, Three
Sand and Six hard broken stone jelly). Dummy columns should be at
least 1 metre height)

9.00 cu.m. Broken stone jelly 40mm 1199.28 cu.m. 10793.52


4.50 cu.m. Cement mortar 1:3 3578.85 cu.m. 16104.81
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Total for 10 cu.m. 40723.53
Rate for 1 cu.m. 4072.40

a For Ground floor 4072.40 78.20 4150.60


b For First floor 4150.60 154.00 4304.60
c For Second floor 4304.60 154.00 4458.60
d For Third floor 4458.60 154.00 4612.60
e For Fourth floor 4612.60 154.00 4766.60

16 Plain Cement Concrete 1:2:4 (one cement, two sand and four hard
broken stone jelly) using 20mm jelly for wearing coat including laying,
compacting, finishing and curing, etc., complete as per standard
specificatins and as directed by the departmental officers.

9.00 cu.m. Broken Stone (20mm size ) 999.78 cu.m. 8998.02


4.50 cu.m. Cement Mortar 1:2 4963.44 cu.m. 22335.48
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Rate for 10 cu.m. 45158.70
Rate for 1 cu.m. 4515.90

17 Damp proof course with Cement Mortar 1:4 (One Cement and Four
sand) 12mm thick mixed with best approved quality water proofing
compound conforming to Indian Standard specification as specified by the
departmental officers at 2% by weight of cement used, finishing and
curing etc. complete complying with standard specification.

0.14 cu.m. Cement Mortar 1:4 2886.55 cu.m. 404.12


1.00 Kg Water proofing compound 41.50 Kg 41.50
1.10 Nos. Mason I Class 652.00 Each 717.20
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
Total for 10 sq.m. 1780.62
Rate for 1 sq.m. 178.10

Page 7
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
18 Supplying and erecting steel centering including necessary supports for
plane surfaces for Reinforced Cement Concrete works such as column
footings, column pedestals, plinth beams, grade beams, staircase steps,
etc. which require only nominal strutting using mild steel sheets of size
90cm x 60cm and 10 BG stiffened with welded mild steel angles of size
25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size
10cm x 6.5cm spaced at about 75cm centre to centre or at suitable
intervals etc. complete in all floors complying with standard specifcation.
(Payment for centering shall be given after the concrete is laid)

Sub-Data for strutting


98.50 RM Casurina props 10 to 13 cm dia. 25.20 RM 2482.20
Assuming 5 uses, Rate for 1 use 496.44
0.30 Nos. Carpenter I Class 638.00 Each 191.40
0.30 Nos. Mazdoor I Class 426.00 Each 127.80
LS Add for wedges and nails 9.30
Total for 10 sq.m. 824.94
Rate for 1 sq.m. 82.49
Main data
10.00 sq.m. Rate for centering for slab as per (a) 667.00 sq.m. 6670.00
10.00 sq.m. Deduct or strutting 82.49 sq.m. -824.94
Total for 10 sq.m. 5845.06
Rate for 1 sq.m. 584.55
19 Supplying and erecting centering for sides and soffits including
necessary supports and strutting upto 3.29 M height for plane surfaces as
detailed below in all floors with all cross bracings using Mild Steel sheets
of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of
size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size
10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by
casurina props of 10cm to 13 cm dia spaced at not more than 75 cm
centre to centre etc. complete complying with the standard specificaiton.
(Payment for centering shall be given after the concrete is laid)

a For plane surfaces such as RCC floor slab, roof slab, beams, lintels,
bed blocks, landing slab, waist slab, portico slabs and beams, etc.

Sub Data: 1
Cost of MS sheets and angles for each set:
Weight of MS sheets 10 gauge of size 90cm x
60cm x 3.175mm
3.175 x 7850 / 1000 x 0.54 = 13.46 Kg
Weight of MS angles of size 25cm x 25mm x
3mm:
3.6 x 1.1 kg / m = 4.00 Kg

13.46 Kg Cost of MS sheets 41.20 Kg 554.55


4.00 Kg Cost of MS angles 41.20 Kg 164.80
719.35
LS Add for cutting, bending, welding charges etc. LS 71.94
Total for one set (A) 791.29
Sub Data: 2
Cost of MS sheets and angles and silver oak joists
and casurina props for 1 sq.m.

Page 8
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Set Cost of MS sheets and MS angles (as per A) 791.29 Each 15034.46
19.00
(Adopting 40 uses)
Total for 40 uses 15034.46
Total for 1 use / sq.m. (B) 375.86

0.12 cu.m. Cost of silver oak joists of size 10cm x 6.5cm 15500.00 cu.m. 1860.00
98.50 RM Cost of casurina props 10 to 13cm dia. 25.20 RM 2482.20
Total for 5 uses 4342.20
(Adopting 5 uses for silver oak / country wood 4342.20
joists and casurina props
Total for 1 use / sq.m. (C) 868.44

Main Data for centering for 10 sq.m.


10.00 sq.m. Cost of MS sheets and angles (B) 375.86 Each 375.86
10.00 sq.m. Cost of silver oak joists and casurina props (C) 868.44 cu.m. 868.44
LS Add for silver planks LS 34.74
3.80 Nos. Carpenter I Class 638.00 Each 2424.40
5.40 Nos. Mazdoor I Class 426.00 Each 2300.40
1.00 No Fitter II Class 549.00 Each 549.00
LS Add for wedges, coils, nails, etc., LS 43.42
LS For periodical cleaning and painting of MS sheets LS 63.95
& angles (5% of cost of sheet & angle)
Total for 10 sq.m. 6660.21
(or) say, Rate for 1 sq.m. (a) 667.00
b For plane surfaces such as vertical slab, side slabs of boxing,
vertical drops, facia, vertical wall, etc.

1.00 sq.m. Centering for slab, etc., as per (a) 667.00 1 sq.m. 667.00
Add 10% extra 66.70
Total for 1 sq.m. 733.70
(or) Total for 1 sq.m. 733.70
c For plane surfaces such as rectangular or square RCC columns,
sunshades, top and bottom slab of RCC boxing, etc.

1.00 sq.m. Centering for slab and beams etc., as per (a) 667.00 1 sq.m. 667.00
Add 20% extra 133.40
Total for 1 sq.m. 800.40
(or) Total for 1 sq.m. 800.40

d For circular columns


1.00 sq.m. Centering for square columns etc., as per (c) 800.40 sq.m. 800.40
Add 100% extra 800.40
Total for 1 sq.m. 1600.80
(or) Total for 1 sq.m. 1600.80

e Centering for curved surfaces of all RCC items of work


1.00 sq.m. Centering for slabs beams etc., as per (a) 667.00 sq.m. 667.00
Add 50% extra 333.50
Total for 1 sq.m. 1000.50
(or) Total for 1 sq.m. 1000.50

Page 9
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
20 Providing additional strutting to centering of RCC slabs of plain surface
for every additional 1.0 metre height or part thereof but not less than 30
cm, over the initial 3.00 metre height from floor level using casurina props
of 10cm to 13cm dia including cross bracing etc., complete complying with
standard specification and as directed by the department officers.

98.50 RM Cost of casurina props for 5 uses 25.20 RM 2482.20


Cost of materials for one use for 5 496.44
0.30 Nos. Carpenter I Class 638.00 Each 191.40
0.30 Nos. Mazdoor I Class 426.00 Each 127.80
Add for nails, coirs, etc., 8.65
Total for 10 sq.m. 824.29
Rate for 1 sq.m. per 3m height 82.43
Rate for 1 sq.m. / 1m height 27.50

21 Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken
stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC
items of works excluding cost of reinforcement grill and fabricating
charges, centering and shuttering but including laying, vibrating with
mechanical vibrators, finishing, curing, etc. and providing fixtures like fan
clamps in the RCC floor / roof slabs wherever necessary and bearing
surfaces of walls, beams etc. shall be finished smooth with Cement Mortar
1:3 (One Cement and Three Sand) and kraft paper laid over it without
claiming extra, etc., complete complying with standard specification and
as directed by the departmental officers

9.00 cu.m. 20mm Machine Crushed Stone Jelly 1583.28 cu.m. 14249.52
4.50 cu.m. Sand 733.96 cu.m. 3302.82
3231.00 kg Cement 5769.14 MT 18640.09
3.50 Nos. Mason II Class 609.00 Each 2131.50
21.20 Nos. Mazdoor I Class 426.00 Each 9031.20
35.30 Nos. Mazdoor II Class 368.00 Each 12990.40
Total for 10 cu.m. 60345.53
6034.60
Add for vibration charges 61.50
Rate for 1 cu.m. 6096.10
Rate for 1 cu.m.:
a Foundation and Basement 6096.10
b For Ground floor 6096.10 78.20 6174.30
c For First floor 6174.30 154.00 6328.30
d For Second floor 6328.30 154.00 6482.30
e For Third floor 6482.30 154.00 6636.30
f For Fourth floor 6636.30 154.00 6790.30
g For Fifth floor 6790.30 154.00 6944.30

22 Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and
Three hard broken stone jelly) using 20 mm gauge hard broken granite
stone jelly for all RCC items of works excluding cost of reinforcement grill
and fabricating charges centering and shuttering but including laying,
vibrating with mechanical vibrators, finishing, curing, etc. and providing
fixtures like fan clamps in the RCC floor / roof slabs wherever necessary
and bearing surfaces of walls, beams etc. shall be finished smooth with
Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid
over it without claiming extra, etc., complete complying with standard
specification and as directed by the departmental officers

9.00 cu.m. 20mm Machine Crushed Stone Jelly 1583.28 cu.m. 14249.52
4.50 cu.m. Sand 733.96 cu.m. 3302.82

Page 10
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
4308.00 kg Cement 5769.14 MT 24853.46
3.50 Nos. Mason II Class 609.00 Each 2131.50
21.20 Nos. Mazdoor I Class 426.00 Each 9031.20
35.30 Nos. Mazdoor II Class 368.00 Each 12990.40
Total for 10 cu.m. 66558.90
6655.89
Add for vibration charges 61.50
Rate for 1 cu.m. 6717.39
Rate for 1 cu.m.:
a Foundation and Basement 6717.39
b For Ground floor 6717.39 78.20 6795.59
c For First floor 6795.59 154.00 6949.59
d For Second floor 6949.59 154.00 7103.59
e For Third floor 7103.59 154.00 7257.59
f For Fourth floor 7257.59 154.00 7411.59
g For Fifth floor 7411.59 154.00 7565.59

23 Supplying, fabricating and placing in position Mild Steel / Ribbed


Tor Steel grills for all RCC works as per design given including cost of
steel and G.I. binding wire in all floors etc. complete complying with
standard specification. (Contractor has to make his own arrangements for
the supply of steel and binding wire)
MS (or) RTS rods
1.00 Qtl Cost of steel 45019.14 MT 4501.91
0.01 Qtl Binding wire 43.75 Kg 43.75
3.50 Nos. Fitter I Class 566.00 Each 1981.00
Rate for 1 Quintal 6526.66

country bricks of size 8-3/4" x 4-1/4" x 2-1/4"


24 Brick work in following Cement Mortar using best quality of country
bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement
including curing, etc., complete complying with standard specifiction.

A In Cement Mortar 1:6


1700.00 Nos. Country bricks of size 8.75" x 4.25" x 2.25" 4303.88 1000 Nos. 7316.60
0.793 cu.m. Cement mortar 1:6 2194.25 cu.m. 1740.04
1.00 Nos. Mason I Class 652.00 Each 652.00
2.00 Nos. Mason II Class 609.00 Each 1218.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
4.00 Nos. Mazdoor II Class 368.00 Each 1472.00
Total for 100 cft (or) 2.83168 cu.m. 13250.64
Rate for 1 cu.m. 4679.45
Rate for 1 cu.m.:
a For foundation & basement 4679.45 4679.45
b In Ground floor 4679.45 51.50 4730.95
c In First floor 4730.95 103.80 4834.75
d In Second floor 4834.75 103.80 4938.55
e In Third floor 4938.55 103.80 5042.35
f In Fourth floor 5042.35 103.80 5146.15
g In Fifth floor 5146.15 103.80 5249.95
B In Cement Mortar 1:5

Page 11
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1700.00 Nos. Country bricks of size 8.75" x 4.25" x 2.25" 4303.88 1000 Nos. 7316.60
0.793 cu.m. Cement mortar 1:5 2471.17 cu.m. 1959.64
1.00 Nos. Mason I Class 652.00 Each 652.00
2.00 Nos. Mason II Class 609.00 Each 1218.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
4.00 Nos. Mazdoor II Class 368.00 Each 1472.00
Total for 100 cft (or) 2.83168 cu.m. 13470.24
Rate for 1 cu.m. 4757.00
Rate for 1 cu.m.:
a For foundation & basement 4757.00 4757.00
b In Ground floor 4757.00 51.50 4808.50
c In First floor 4808.50 103.80 4912.30
d In Second floor 4912.30 103.80 5016.10
e In Third floor 5016.10 103.80 5119.90
f In Fourth floor 5119.90 103.80 5223.70

C In Cement Mortar 1:3


1700.00 Nos. Country bricks of size 8.75" x 4.25" x 2.25" 4303.88 1000 Nos. 7316.60
0.793 cu.m. Cement mortar 1:3 3578.85 cu.m. 2838.03
1.00 Nos. Mason I Class 652.00 Each 652.00
2.00 Nos. Mason II Class 609.00 Each 1218.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
4.00 Nos. Mazdoor II Class 368.00 Each 1472.00
Total for 100 cft (or) 2.83168 cu.m. 14348.62
Rate for 1 cu.m. 5067.20
Rate for 1 cu.m.:
a For foundation & basement 5067.20 5067.20
b In Ground floor 5067.20 51.50 5118.70
c In First floor 5118.70 103.80 5222.50
d In Second floor 5222.50 103.80 5326.30
e In Third floor 5326.30 103.80 5430.10
f In Fourth floor 5430.10 103.80 5533.90

Country Bricks of size 8-3/4" x 4-1/4" X2-3/4""

Page 12
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
a Brick work using using Country Bricks of size 8-3/4" x 4-1/4" X2-
3/4" in Cement Mortar 1:6 (One cement and six sand) including
curing neat finishing, etc., complete complying with standard specifiction.

* In Cement Mortar 1:6


M 1300.00 Nos. using Country Bricks of size 5453.88 1000 Nos. 7090.04
8-3/4" x 4-1/4" X2-3/4"
0.708 cu.m. Cement mortar 1:6 2194.25 cu.m. 1553.53
1.00 Nos. Mason I Class 652.00 Each 652.00
2.00 Nos. Mason II Class 609.00 Each 1218.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
4.00 Nos. Mazdoor II Class 368.00 Each 1472.00
Total for 100 cft (or) 2.83168 cu.m. 12837.58
Rate for 1 cu.m. 4533.60
a Rate for 1 cu.m.:
b For foundation & basement 4533.60 4533.60
c In Ground floor 4533.60 51.50 4585.10
In First floor 4585.10 103.80 4688.90
In Second floor 4688.90 103.80 4792.70
In Third floor 4792.70 103.80 4896.50
In Fourth floor 4896.50 103.80 5000.30
In Fifth floor 5000.30 103.80 5104.10

Page 13
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
b Brick work using Country Bricks of size 8-3/4" x 4-1/4" X2-3/4"" in
Cement Mortar 1:5 (One cement and five sand) including curing neat
finishing, etc., complete complying with standard specifiction.
* In Cement Mortar 1:5
M 1300.00 Nos. using Country Bricks of size 5453.88 1000 Nos. 7090.04
8-3/4" x 4-1/4" X2-3/4"
0.708 cu.m. Cement mortar 1:5 2471.17 cu.m. 1749.59
1.00 Nos. Mason I Class 652.00 Each 652.00
2.00 Nos. Mason II Class 609.00 Each 1218.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
4.00 Nos. Mazdoor II Class 368.00 Each 1472.00
Total for 100 cft (or) 2.83168 cu.m. 13033.63
Rate for 1 cu.m. 4602.80
a Rate for 1 cu.m.:
b For foundation & basement 4602.80 4602.80
In Ground floor 4602.80 51.50 4654.30
In First floor 4654.30 103.80 4758.10
In Second floor 4758.10 103.80 4861.90

25 Brick work in following Cement Mortar using best quality II class table
moulded chamber burnt bricks of size 9" x 4-1/2" x 3" for
foundation and basement including curing, etc., complete complying with
standard specifiction.

A In Cement Mortar 1:6


1160.00 Nos. II class table moulded bricks 9" x 4-1/2" x 3" 7549.64 1000 Nos. 8757.58
0.623 cu.m. Cement mortar 1:6 2194.25 cu.m. 1367.02
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 15663.60
Rate for 1 cu.m. 5531.60
Rate for 1 cu.m.:
a For foundation & basement 5531.60 5531.60
b In Ground floor 5531.60 51.50 5583.10
c In First floor 5583.10 103.80 5686.90
d In Second floor 5686.90 103.80 5790.70
e In Third floor 5790.70 103.80 5894.50
f In Fourth floor 5894.50 103.80 5998.30
g In Fifth floor 5998.30 103.80 6102.10
B In Cement Mortar 1:5
1160.00 Nos. II class table moulded bricks 9" x 4-1/2" x 3" 7549.64 1000 Nos. 8757.58
0.623 cu.m. Cement mortar 1:5 2471.17 cu.m. 1539.54
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 15836.12
Rate for 1 cu.m. 5592.50
Rate for 1 cu.m.:
a For foundation & basement 5592.50 5592.50
b In Ground floor 5592.50 51.50 5644.00
c In First floor 5644.00 103.80 5747.80
d In Second floor 5747.80 103.80 5851.60
e In Third floor 5851.60 103.80 5955.40

Page 14
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
f In Fourth floor 5955.40 103.80 6059.20
C In Cement Mortar 1:3
1160.00 Nos. II class table moulded bricks 9" x 4-1/2" x 3" 7549.64 1000 Nos. 8757.58
0.623 cu.m. Cement mortar 1:3 3578.85 cu.m. 2229.62
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 16526.20
Rate for 1 cu.m. 5836.20
Rate for 1 cu.m.:
a For foundation & basement 5836.20 5836.20
b In Ground floor 5836.20 51.50 5887.70
c In First floor 5887.70 103.80 5991.50
d In Second floor 5991.50 103.80 6095.30
e In Third floor 6095.30 103.80 6199.10
f In Fourth floor 6199.10 103.80 6302.90

26 Brick work in following Cement Mortar using best quality II class table
moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" for
foundation and basement including curing, etc., complete complying with
standard specifiction.
A In Cement Mortar 1:6
1300.00 Nos. II class table moulded bricks 9"x4-3/8"x2-3/4" 7264.64 1000 Nos. 9444.03
0.708 cu.m. Cement mortar 1:6 2194.25 cu.m. 1553.53
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 16536.56
Rate for 1 cu.m. 5839.85
Rate for 1 cu.m.:
a For foundation & basement 5839.85 5839.85
b In Ground floor 5839.85 51.50 5891.35
c In First floor 5891.35 103.80 5995.15
d In Second floor 5995.15 103.80 6098.95
e In Third floor 6098.95 103.80 6202.75
f In Fourth floor 6202.75 103.80 6306.55
g In Fifth floor 6306.55 103.80 6410.35

B In Cement Mortar 1:5


1300.00 Nos. II class table moulded bricks 9"x4-3/8"x2-3/4" 7264.64 1000 Nos. 9444.03
0.708 cu.m. Cement mortar 1:5 2471.17 cu.m. 1749.59
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 16732.62
Rate for 1 cu.m. 5909.10
Rate for 1 cu.m.:
a For foundation & basement 5909.10 5909.10
b In Ground floor 5909.10 51.50 5960.60
c In First floor 5960.60 103.80 6064.40

Page 15
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
d In Second floor 6064.40 103.80 6168.20
e In Third floor 6168.20 103.80 6272.00
f In Fourth floor 6272.00 103.80 6375.80

C In Cement Mortar 1:3


1300.00 Nos. II class table moulded bricks 9"x4-3/8"x2-3/4" 7264.64 1000 9444.03
0.708 cu.m. Cement mortar 1:3 3578.85 cu.m. 2533.82
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 17516.86
Rate for 1 cu.m. 6186.05
Rate for 1 cu.m.:
a For foundation & basement 6186.05 6186.05
b In Ground floor 6186.05 51.50 6237.55
c In First floor 6237.55 103.80 6341.35
d In Second floor 6341.35 103.80 6445.15
e In Third floor 6445.15 103.80 6548.95
f In Fourth floor 6548.95 103.80 6652.75

27 Brick work in following Cement Mortar using best quality II class Ground
moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" for
foundation and basement including curing, etc., complete complying with
standard specifiction.
A In Cement Mortar 1:6
* 1300.00 Nos. II class Ground moulded bricks 9"x4-3/8"x2-3/4" 6334.64 1000 Nos. 8235.03
J 0.708 cu.m. Cement mortar 1:6 2194.25 cu.m. 1553.53
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 15327.56
Rate for 1 cu.m. 5412.90
Rate for 1 cu.m.:
a For foundation & basement 5412.90 5412.90
b In Ground floor 5412.90 51.50 5464.40
c In First floor 5464.40 103.80 5568.20
d In Second floor 5568.20 103.80 5672.00
e In Third floor 5672.00 103.80 5775.80
f In Fourth floor 5775.80 103.80 5879.60
g In Fifth floor 5879.60 103.80 5983.40

B In Cement Mortar 1:5


1300.00 Nos. II class Ground moulded bricks 9"x4-3/8"x2-3/4" 6334.64 1000 Nos. 8235.03
0.708 cu.m. Cement mortar 1:5 2471.17 cu.m. 1749.59
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 15523.62
Rate for 1 cu.m. 5482.15
Rate for 1 cu.m.:
a For foundation & basement 5482.15 5482.15
b In Ground floor 5482.15 51.50 5533.65

Page 16
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
c In First floor 5533.65 103.80 5637.45
d In Second floor 5637.45 103.80 5741.25
e In Third floor 5741.25 103.80 5845.05
f In Fourth floor 5845.05 103.80 5948.85

28 Brick work in following Cement Mortar using best quality II class Ground
moulded chamber burnt bricks of size 9" x 4-1/2" x 3" for
foundation and basement including curing, etc., complete complying with
standard specifiction.

A In Cement Mortar 1:6

* Nos. II class Ground moulded chamber burnt bricks of 6519.64 1000 Nos. 7562.78
1160.00 size 9" x 4-1/2" x 3"

M 0.623 cu.m. Cement mortar 1:6 2194.25 cu.m. 1367.02


1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 14468.80
Rate for 1 cu.m. 5109.65

Rate for 1 cu.m.:


a For foundation & basement 5109.65 5109.65
b In Ground floor 5109.65 51.50 5161.15
c In First floor 5161.15 103.80 5264.95
d In Second floor 5264.95 103.80 5368.75
e In Third floor 5368.75 103.80 5472.55
f In Fourth floor 5472.55 103.80 5576.35
g In Fifth floor 5576.35 103.80 5680.15

B In Cement Mortar 1:5


1160.00 Nos. II class Ground moulded bricks 9" x 4-1/2" x 3" 6519.64 1000 Nos. 7562.78
0.623 cu.m. Cement mortar 1:5 2471.17 cu.m. 1539.54
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 14641.32
Rate for 1 cu.m. 5170.55
Rate for 1 cu.m.:
a For foundation & basement 5170.55 5170.55
b In Ground floor 5170.55 51.50 5222.05
c In First floor 5222.05 103.80 5325.85
d In Second floor 5325.85 103.80 5429.65
e In Third floor 5429.65 103.80 5533.45
f In Fourth floor 5533.45 103.80 5637.25

C In Cement Mortar 1:3


1160.00 Nos. II class Ground moulded bricks 9" x 4-1/2" x 3" 6519.64 1000 Nos. 7562.78
0.623 cu.m. Cement mortar 1:3 3578.85 cu.m. 2229.62
1.00 Nos. Mason I Class 652.00 Each 652.00

Page 17
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 15331.40
Rate for 1 cu.m. 5414.25
Rate for 1 cu.m.:
a For foundation & basement 5414.25 5414.25
b In Ground floor 5414.25 51.50 5465.75
c In First floor 5465.75 103.80 5569.55
d In Second floor 5569.55 103.80 5673.35
e In Third floor 5673.35 103.80 5777.15
f In Fourth floor 5777.15 103.80 5880.95

Brick partition walls of 10.80cm- country bricks of size


8-3/4" x 4-1/4" x 2-1/4"
29 Brick partition walls of 10.80cm thickness using best quality country
bricks of size 8-3/4" x 4-1/4" x 2-1/4" in Cement Mortar 1:3 (One
Cement and Three Sand) using hoop iron reinforcement if found
necessary including curing etc. complete and as directed by the
departmental officers. (Hoop iron reinforcement will be measured and
paid for separately)

a Foundation and basement


1.08 cu.m. Brick work in C.M.1:3 in F & B 5067.20 cu.m. 5472.58
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6124.58
Rate for 1 sq.m. 612.50

b Ground Floor
1.08 cu.m. Brick Work in C.M.1:3 in Ground floor 5118.70 cu.m. 5528.20
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6180.20
Rate for 1 sq.m. 618.05
c First Floor
1.08 cu.m. Brick Work in C.M.1:3 in First Floor 5222.50 cu.m. 5640.30
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6292.30
Rate for 1 sq.m. 629.25

d Second Floor
1.08 cu.m. Brick Work in C.M.1:3 in Second Floor 5326.30 cu.m. 5752.40
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6404.40
Rate for 1 sq.m. 640.45

e Third Floor
1.08 cu.m. Brick Work in C.M.1:3 in Third Floor 5430.10 cu.m. 5864.51
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6516.51
Rate for 1 sq.m. 651.70

f Fourth Floor
1.08 cu.m. Brick Work in C.M.1:3 in Fourth Floor 5533.90 cu.m. 5976.61
1.00 No. Extra Mason I Class 652.00 Each 652.00

Page 18
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Total for 10 sq.m. 6628.61
Rate for 1 sq.m. 662.90

Page 19
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Brick partition walls of 10.80cm- country bricks of size
8-3/4" x 4-1/4" X2-3/4"
30 Brick partition walls using best quality using Country Bricks of
size 8-3/4" x 4-1/4" X2-3/4" in Cement Mortar 1:3 (One Cement and
Three Sand) using hoop iron reinforcement if found necessary including
curing etc. complete and as directed by the departmental officers. (Hoop
iron reinforcement will be measured and paid for separately)

* In Cement Mortar 1:3


M Nos. using Country Bricks of size 5453.88 1000 7090.04
1300.00
8-3/4" x 4-1/4" X2-3/4"
0.708 cu.m. Cement mortar 1:3 3578.85 cu.m. 2533.82
1.00 Nos. Mason I Class 652.00 Each 652.00
2.00 Nos. Mason II Class 609.00 Each 1218.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
4.00 Nos. Mazdoor II Class 368.00 Each 1472.00
Total for 100 cft (or) 2.83168 cu.m. 13817.87
Rate for 1 cu.m. 4879.75
a Rate for 1 cu.m.:
b For foundation & basement 4879.75 4879.75
c In Ground floor 4879.75 51.50 4931.25
In First floor 4931.25 103.80 5035.05
In Second floor 5035.05 103.80 5138.85
In Third floor 5138.85 103.80 5242.65
In Forth floor 5242.65 103.80 5346.45

a Foundation and basement


1.08 cu.m. Brick work in C.M.1:3 in F & B 4879.75 cu.m. 5270.13
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 5922.13
Rate for 1 sq.m. 592.25

b Ground Floor
1.08 cu.m. Brick Work in C.M.1:3 in Ground floor 4931.25 cu.m. 5325.75
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 5977.75
Rate for 1 sq.m. 597.80

b First Floor
1.08 cu.m. Brick Work in C.M.1:3 in FF 5035.05 cu.m. 5437.85
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6089.85
Rate for 1 sq.m. 609.00
b II Floor
1.08 cu.m. Brick Work in C.M.1:3 in SF 5138.85 cu.m. 5549.96
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6201.96
Rate for 1 sq.m. 620.20
e Third Floor
1.08 cu.m. Brick Work in C.M.1:3 in Third Floor 5242.65 cu.m. 5662.06
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6314.06
Rate for 1 sq.m. 631.45

Page 20
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
f Fourth Floor
1.08 cu.m. Brick Work in C.M.1:3 in Fourth Floor 5346.45 cu.m. 5774.17
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6426.17
Rate for 1 sq.m. 642.65

31 Brick partition walls of 11.50cm thickness using best quality II class


table moulded chamber burnt bricks of size 9" x 4-1/2" x 3" in
Cement Mortar 1:3 (One Cement and Three Sand) using hoop iron
reinforcement if found necessary including curing etc. complete and as
directed by the departmental officers. (Hoop iron reinforcement will be
measured and paid for separately)

a Foundation and basement


1.15 cu.m. Brick work in C.M.1:3 in F & B 5836.20 cu.m. 6711.63
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7363.63
Rate for 1 sq.m. 736.40

b Ground Floor
1.15 cu.m. Brick Work in C.M.1:3 in Ground floor 5887.70 cu.m. 6770.86
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7422.86
Rate for 1 sq.m. 742.30

c First Floor
1.15 cu.m. Brick Work in C.M.1:3 in first Floor 5991.50 cu.m. 6890.23
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7542.23
Rate for 1 sq.m. 754.25

d Second Floor
1.15 cu.m. Brick Work in C.M.1:3 in Second Floor 6095.30 cu.m. 7009.60
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7661.60
Rate for 1 sq.m. 766.20
e Third Floor
1.15 cu.m. Brick Work in C.M.1:3 in Third Floor 6199.10 cu.m. 7128.97
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7780.97
Rate for 1 sq.m. 778.10
f Fourth Floor
1.15 cu.m. Brick Work in C.M.1:3 in Fourth Floor 6302.90 cu.m. 7248.34
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7900.34
Rate for 1 sq.m. 790.05

32 Brick partition walls of 11.50cm thickness using best quality II class


table moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4"
in Cement Mortar 1:3 (One Cement and Three Sand) using hoop iron
reinforcement if found necessary including curing etc. complete and as
directed by the departmental officers. (Hoop iron reinforcement will be
measured and paid for separately)

a Foundation and basement

Page 21
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.15 cu.m. Brick work in C.M.1:3 in F & B 6186.05 cu.m. 7113.96
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7765.96
Rate for 1 sq.m. 776.60
b Ground Floor
1.15 cu.m. Brick Work in C.M.1:3 in Ground floor 6237.55 cu.m. 7173.18
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7825.18
Rate for 1 sq.m. 782.55

c First Floor
1.15 cu.m. Brick Work in C.M.1:3 in First Floor 6341.35 cu.m. 7292.55
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7944.55
Rate for 1 sq.m. 794.50

d Second Floor
1.15 cu.m. Brick Work in C.M.1:3 in Second Floor 6445.15 cu.m. 7411.92
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 8063.92
Rate for 1 sq.m. 806.40

e Third Floor
1.15 cu.m. Brick Work in C.M.1:3 in Third Floor 6548.95 cu.m. 7531.29
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 8183.29
Rate for 1 sq.m. 818.35
f Fourth Floor
1.15 cu.m. Brick Work in C.M.1:3 in Fourth Floor 6652.75 cu.m. 7650.66
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 8302.66
Rate for 1 sq.m. 830.30

33 Brick partition walls of 11.50cm thickness using best quality II class


Ground moulded chamber burnt bricks of size 9" x 4-3/8" x 2-
3/4" in Cement Mortar 1:3 (One Cement and Three Sand) using hoop
iron reinforcement if found necessary including curing etc. complete and
as directed by the departmental officers. (Hoop iron reinforcement will be
measured and paid for separately)
C In Cement Mortar 1:3
* 1300.00 Nos. II class Ground moulded bricks 9"x4-3/8"x2-3/4" 6334.64 1000 8235.03
J 0.708 cu.m. Cement mortar 1:3 3578.85 cu.m. 2533.82
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 16307.86
Rate for 1 cu.m. 5759.10
Rate for 1 cu.m.:
a For foundation & basement 5759.10 5759.10
b In Ground floor 5759.10 51.50 5810.60
c In First floor 5810.60 103.80 5914.40

Page 22
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
d In Second floor 5914.40 103.80 6018.20
e In Third floor 6018.20 103.80 6122.00
f In Fourth floor 6122.00 103.80 6225.80
a Foundation and basement
1.15 cu.m. Brick work in C.M.1:3 in F & B 5759.10 cu.m. 6622.97
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7274.97
Rate for 1 sq.m. 727.50
b Ground Floor
1.15 cu.m. Brick Work in C.M.1:3 in Ground floor 5810.60 cu.m. 6682.19
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7334.19
Rate for 1 sq.m. 733.45

c First Floor
1.15 cu.m. Brick Work in C.M.1:3 in First Floor 5914.40 cu.m. 6801.56
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7453.56
Rate for 1 sq.m. 745.40

d Second Floor
1.15 cu.m. Brick Work in C.M.1:3 in Second Floor 6018.20 cu.m. 6920.93
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7572.93
Rate for 1 sq.m. 757.30

e Third Floor
1.15 cu.m. Brick Work in C.M.1:3 in Third Floor 6122.00 cu.m. 7040.30
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7692.30
Rate for 1 sq.m. 769.25
f Fourth Floor
1.15 cu.m. Brick Work in C.M.1:3 in Fourth Floor 6225.80 cu.m. 7159.67
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7811.67
Rate for 1 sq.m. 781.20

34 Brick partition walls of 11.50cm thickness using best qualityII class


Ground moulded chamber burnt bricks of size 9" x 4-1/2" x 3" in
Cement Mortar 1:3 (One Cement and Three Sand) using hoop iron
reinforcement if found necessary including curing etc. complete and as
directed by the departmental officers. (Hoop iron reinforcement will be
measured and paid for separately)
C In Cement Mortar 1:3
M 1160.00 Nos. II class Ground moulded chamber burnt bricks of 6519.64 1000 7562.78
size 9" x 4-1/2" x 3"
0.623 cu.m. Cement mortar 1:3 3578.85 cu.m. 2229.62
1.00 Nos. Mason I Class 652.00 Each 652.00
3.00 Nos. Mason II Class 609.00 Each 1827.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
6.00 Nos. Mazdoor II Class 368.00 Each 2208.00
Total for 100 cft (or) 2.83168 cu.m. 15331.40
Rate for 1 cu.m. 5414.25
Rate for 1 cu.m.:
a For foundation & basement 5414.25 5414.25

Page 23
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
b In Ground floor 5414.25 51.50 5465.75
c In First floor 5465.75 103.80 5569.55
d In Second floor 5569.55 103.80 5673.35
e In Third floor 5673.35 103.80 5777.15
f In Fourth floor 5777.15 103.80 5880.95
a Foundation and basement
1.15 cu.m. Brick work in C.M.1:3 in F & B 5414.25 cu.m. 6226.39
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6878.39
Rate for 1 sq.m. 687.85
b Ground Floor
1.15 cu.m. Brick Work in C.M.1:3 in Ground floor 5465.75 cu.m. 6285.61
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 6937.61
Rate for 1 sq.m. 693.80

c First Floor
1.15 cu.m. Brick Work in C.M.1:3 in First Floor 5569.55 cu.m. 6404.98
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7056.98
Rate for 1 sq.m. 705.70

d Second Floor
1.15 cu.m. Brick Work in C.M.1:3 in Second Floor 5673.35 cu.m. 6524.35
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7176.35
Rate for 1 sq.m. 717.65

e Third Floor
1.15 cu.m. Brick Work in C.M.1:3 in Third Floor 5777.15 cu.m. 6643.72
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7295.72
Rate for 1 sq.m. 729.60
f Fourth Floor
1.15 cu.m. Brick Work in C.M.1:3 in Fourth Floor 5880.95 cu.m. 6763.09
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7415.09
Rate for 1 sq.m. 741.55

35 Providing granolithic floor finish of the following thickness with plain


cement concrete 1:2:4 (One Cement, Two sand and Four aggregate)
using 10 to 12mm gauge hard broken stone jelly including laying,
finishing and the top rubbed smooth with power trawl, thread lining,
curing etc. complete complying with standard specification and as directed
by the departmental officers. (The rate is inclusive of necessary planking
for panelling wherever necessary and as directed by the departmental
officers)

SUB DATA-PCC 1:2:4


9.00 cu.m. 10 to 12.50mm HBGS Jelly 1317.78 cu.m. 11860.02
4.50 cu.m. Cement Mortar 1:2 4963.44 cu.m. 22335.48
1.80 Each Mason II Class 609.00 Each 1096.20
17.70 Each Mazdoor I Class 426.00 Each 7540.20

Page 24
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
14.10 Each Mazdoor II Class 368.00 Each 5188.80
Total for 10 cu.m. 48020.70
Rate for 1 cu.m. 4802.07
MAIN DATA
a For 20mm thick
0.20 cu.m. Cement Concrete 1:2:4 4802.07 cu.m. 96.04
LS Add for top rubbed smooth with power trawl, LS 4.80
thread lining, curing etc.,
Rate for 1 sq.m. 100.84
Rate for 1 sq.m. 100.85
b For 25mm thick
0.25 cu.m. Cement Concrete 1:2:4 4802.07 cu.m. 120.05
LS Add for top rubbed smooth with power trawl, LS 6.00
thread lining, curing etc.,

Rate for 1 sq.m. 126.05


Rate for 1 sq.m. 126.10

c For 40mm thick


0.40 cu.m. Cement concrete 1:2:4 4802.07 cu.m. 192.08
LS Add for top rubbed smooth with power trawl, LS 9.60
thread lining, curing etc.,

Rate for 1 sq.m. 201.69


Rate for 1 sq.m. 201.70
36 Flooring with Snow White Marble Slab (Adanga) 18mm to 20mm
thick and above free from all defects in all floors over a base layer of CM
1:3, 20mm thick. The marble slab shall be laid over the cement mortar by
applying white cement slurry in between base mortar and marble slab and
pointed with white cement neatly including polishing with polishing stone
and oxalic acid etc. so as to perfectly smooth and glossy and including
hire charges for polishing machine and power consumption charges etc.
The marble slabs and other materials to be used shall be got approved by
the Executive Engineer concerned before use on work, etc., complete.

A Using Marble Slabs of size 4'0'' x 2'0'' and above


(Observed Data)
10.00 sq.m. Marble Slabs of size 4'0'' x 2'0'' and above 1365.00 sq.m. 13650.00
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
18.00 Kg White Cement 22.00 Kg 396.00
3.00 Nos. Mason I Class 652.00 Each 1956.00
1.25 Nos. Mason II Class 609.00 Each 761.25
0.50 Nos. Stone Cutter I Class 501.00 Each 250.50
8.00 Nos. Mazdoor I Class 426.00 Each 3408.00
7.00 Nos. Mazdoor II class 368.00 Each 2576.00
LS Cutting Blades at 12% of Labour Charges LS 1074.21
1.25 Nos. Polishing stone, Rough (80) 65.20 Nos. 81.50
0.75 Nos. Medium (200) 87.10 Nos. 65.33
0.30 Nos. Nice (300) 99.70 Nos. 29.91
1.00 Kg Oxalic Acid 37.80 Kg 37.80
0.25 Kg Tin Oxide (Mansion polish) 144.90 400g 99.38
1.00 Kg Marble Powder 4.45 Kg 4.45
0.50 Kg Cotton Waste 10.10 Kg 5.05
1.00 sq.m. Kithan Bag 11.50 sq.m. 11.50
1.00 Day Hire Charges for Polishing Machinary 222.00 Day 222.00

Page 25
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
2.00 Units Electricity charges 11.60 Unit 23.20
Total for 10 sq.m. 25403.63
Rate for 1 sq.m. 2540.40
B Using Marble Slabs of size 2'0'' x 2.0" and below
(Observed Data)

10.00 sq.m. Marble Slabs of size 4'0'' x 2'0'' and above 682.00 sq.m. 6820.00
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
18.00 Kg White Cement 22.00 Kg 396.00
3.00 Nos. Mason I Class 652.00 Each 1956.00
1.25 Nos. Mason II Class 609.00 Each 761.25
0.50 Nos. Stone Cutter I Class 501.00 Each 250.50
8.00 Nos. Mazdoor I Class 426.00 Each 3408.00
7.00 Nos. Mazdoor II class 368.00 Each 2576.00
LS Cutting Blades at 12% of Labour Charges LS 1074.21
1.25 Nos. Polishing stone, Rough (80) 65.20 Nos. 81.50
0.75 Nos. Medium (200) 87.10 Nos. 65.33
0.30 Nos. Nice (300) 99.70 Nos. 29.91
1.00 Kg Oxalic Acid 37.80 Kg 37.80
0.25 Kg Tin Oxide 144.90 Kg 90.56
1.00 Kg Marble Powder 4.45 Kg 4.45
0.50 Kg Cotton Waste 10.10 Kg 5.05
1.00 sq.m. Kithan Bag 11.50 sq.m. 11.50
1.00 Day Hire Charges for Polishing Machinary 222.00 Day 222.00
2.00 Units Electricity charges 11.60 Unit 23.20
Total for 10 sq.m. 18564.82
Rate for 1 sq.m. 1856.50

37 Paving the floor with best approved quality fine polished Kota stone slabs of
size 600 x 600 of 18 / 20mm with machine cut edges and matching marble
slab not less than 100mm width other than Adanga Marbles as border laid over a
cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and
three sand) fixing the slabs in true right angles with minimum possible width of
joints and pointing the joints with white cement mixed with mathcing colouring
pigments and polishing with floor polisher to a high degree of finish etc., The kota
stone slabs and other materials to be used shall be got approved by the Executive
Engineer concerned before use on work, etc., complete as per standard
speicification.

A Using Fine polished Kota Stone Slab above 600 x


600 of 18 / 20mm size (Observed Data)
10.00 sq.m. Fine polished Kota Stone Slab above 600 x 600 of 472.00 sq.m. 4720.00
18 / 20mm size
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
1.10 Nos. Mason I Class 652.00 Each 717.20
2.70 Nos. Mason II Class 609.00 Each 1644.30
2.70 Nos. Mazdoor I Class 426.00 Each 1150.20
3.30 Nos. Mazdoor II Class 368.00 Each 1214.40
LS Cement slurry LS 75.16
4.00 Kg Colour cement 26.60 Kg 106.40
Total for 10 sq.m. 10379.21
M Rate for 1 sq.m. 1038.00
B Using Fine polished Kota Stone Slab below 600 x
600 of 18 / 20mm size (Observed Data)
sq.m. Fine polished Kota Stone Slab below 600 x 600 of 535.00 sq.m. 5350.00
10.00 18 / 20mm size

Page 26
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
1.10 Nos. Mason I Class 652.00 Each 717.20
2.70 Nos. Mason II Class 609.00 Each 1644.30
2.70 Nos. Mazdoor I Class 426.00 Each 1150.20
3.30 Nos. Mazdoor II Class 368.00 Each 1214.40
LS Cement slurry LS 75.16
4.00 Kg Colour cement 26.60 Kg 106.40
Total for 10 sq.m. 11009.21
Rate for 1 sq.m. 1101.00

38 Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm
(un-polished) in all floors laid in of cement mortor 1:3 (one cement three
sand), 20mm thick and pointed with colour cement neatly including
polishing with polishing stone and oxalic acid etc., so as to perfectly
smooth and glossy and including hire charges for polishing machine and
power consumption charges etc. The kota stone slabs and other materials
to be used shall be got approved by the Executive Engineer concerned
before use on work, etc., complete as per standard speicification.

Using Kota Stone Slab (Observed Data)


sq.m. Kotta stone 600 x 600 of 18 / 20mm 236.00 sq.m. 2478.00
10.50
(un-polished)
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
64.00 Kg Cement slurry 5769.14 MT 369.22
3.00 Nos. Mason I Class 652.00 Each 1956.00
1.25 Nos. Mason II Class 609.00 Each 761.25
5.00 Nos. Mazdoor I Class 426.00 Each 2130.00
4.00 Nos. Mazdoor II Class 368.00 Each 1472.00
1.00 Day Hire charges for polishing machinery 222.00 Each 222.00
1.10 Nos. Floor Polisher 502.00 Each 552.20
2.00 Units Electricity 11.60 Units 23.20
0.50 Kg Cotton waste 10.10 Kg 5.05
Sundrise for polish stone (20% of polisher) 110.44
Total for 10 sq.m. 10830.92
Rate for 1 sq.m. 1083.10

39 Paving the floor with best approved quality fine polished Granite Stone
Slabs of size 1200 x 600 of 18 / 20mm thick of Synthetic Grey, Paradise
and similar varieties with machine cut edges laid over a cement mortar bed
of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing
the slabs with required cement slurry and laid in true right angles with
minimum possible width of joints and pointing the joints with white cement
mixed with mathcing colouring pigments etc., The granite stone slabs and
other materials to be used shall be got approved by the Executive Engineer
concerned before use on work, etc., complete as per standard speicification.

sq.m. Fine Polished Granite Slab 1200 x 600 of 18 / 1420.00 sq.m. 14200.00
10.00 20mm thick of Synthetic Grey, Paradise and
similar varieties
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
1.10 Nos. Mason I Class 652.00 Each 717.20
2.70 Nos. Mason II Class 609.00 Each 1644.30
2.70 Nos. Mazdoor I Class 426.00 Each 1150.20
3.30 Nos. Mazdoor II Class 368.00 Each 1214.40
0.50 Nos. Stone Cutter I Class 501.00 Each 250.50
14.00 Kg Cement slurry 5769.14 MT 80.77

Page 27
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
0.50 Kg Cotton Waste 10.10 Kg 5.05
4.00 Kg Colour cement 26.60 1 Kg 106.40
Total for 10 sq.m. 20120.38
Rate for 1 sq.m. 2012.10
39a Paving the floor with fine polished cuddapah stone slab of following
thickness over Cement Mortar 1:3 (One Cement and Three Sand) 20mm
thick over the existing bed of Cement Concrete 1:5:10, (One Cement,
Five Sand and Ten aggregate) and pointing the joints to full depth of slabs
with same mortar mixed with black oxide and the top surface rendered
smooth, curing, etc., The cuddapah stone slabs and other materials to be
used shall be got approved by the Executive Engineer concerned before
use on work, etc., complete complying with standard specification.

Sub-Data for Pointing


0.01 cu.m. Cement mortar 1:3 3578.85 cu.m. 35.79
1.60 Nos. Mason II Class 609.00 Each 974.40
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
LS Add for black oxide LS 3.58
Total for 10 sq.m. 1631.57
Rate for 1 sq.m. 163.20
MAIN DATA
10.50 sq.m. Cuddapah Slab 20 / 30mm thick 363.00 sq.m. 3811.50
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
10.00 sq.m. Pointing with CM 1:3 163.20 sq.m. 1632.00
1.10 Nos. Mason I Class 652.00 Each 717.20
2.10 Nos. Mason II Class 609.00 Each 1278.90
2.20 Nos. Mazdoor I Class 426.00 Each 937.20
1.10 Nos. Mazdoor II class 368.00 Each 404.80
Total for 10 sq.m. 9533.16
Rate for 1 sq.m. 953.40
MAIN DATA
10.50 sq.m. Cuddapah Slab 38 / 40mm thick 394.00 sq.m. 4137.00
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
10.00 sq.m. Pointing with CM 1:3 163.20 sq.m. 1632.00
1.10 Nos. Mason I Class 652.00 Each 717.20
2.10 Nos. Mason II Class 609.00 Each 1278.90
2.20 Nos. Mazdoor I Class 426.00 Each 937.20
1.10 Nos. Mazdoor II class 368.00 Each 404.80
Total for 10 sq.m. 9858.66
Rate for 1 sq.m. 985.90
MAIN DATA
* 10.50 sq.m. Cuddapah Slab 50mm thick 409.00 sq.m. 4294.50
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
10.00 sq.m. Pointing with CM 1:3 163.20 sq.m. 1632.00
1.10 Nos. Mason I Class 652.00 Each 717.20
2.10 Nos. Mason II Class 609.00 Each 1278.90
2.20 Nos. Mazdoor I Class 426.00 Each 937.20
1.10 Nos. Mazdoor II class 368.00 Each 404.80
Total for 10 sq.m. 10016.16
Rate for 1 sq.m. 1001.70

Page 28
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
40 Paving the floor with best quality Vertified Tiles of size 600 x 600 x
8mm of approved colour, shade and quality laid in cement mortar 1:3
(one cement and three sand) 20mm thick in all floors and the top pointed
with the white cement mixed same colour pigments etc., complete
complying with standard specification. (The make and brand of the tiles
should be got approved by Executive Engineer before use on works)

Using Marbonite Tiles (Observed Data)


10.00 sq.m. Marbonite Tiles 600 x 600 x 8mm 597.00 sq.m. 5970.00
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
4.00 Kg White Cement mixed with colour pigments 26.60 Kg 106.40
1.20 Nos. Mason I Class 652.00 Each 782.40
1.00 Nos. Mason II Class 609.00 Each 609.00
0.50 Nos. Stone Cutter I Class 501.00 Each 250.50
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
1.00 Nos. Mazdoor II Class 368.00 Each 368.00
0.50 Kg Cotton Waste 10.10 Kg 5.05
M Total for 10 sq.m. 9268.91
Rate for 1 sq.m. 926.90

41 Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid


over 20 mm thick cement mortar 1:3 (One Cement and Three Sand)
base mortar over the existing slab / floor including cutting the tiles to the
required size with special cutter wherever necessary, laying in position
and pointing with white cement mixed with colouring pigment at the rate
of 0.3 Kg. / sq.m. etc., complete complying with standard specification.
(The make and brand of the tiles should be got approved by Executive
Engineer before use on works)
a Self Designed Colour Ceramic Tiles of size 305 x
305 x 6mm (Observed Data)
108.00 Nos. Cost of Tiles 45.00 Each 4860.00
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
3.00 Kg White Cement mixed with colour pigments 26.60 Kg 79.80
1.20 Nos. Mason I Class 652.00 Each 782.40
1.00 Nos. Mason II Class 609.00 Each 609.00
0.50 Nos. Stone Cutter I Class 501.00 Each 250.50
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
1.00 Nos. Mazdoor II Class 368.00 Each 368.00
0.50 Kg Cotton Waste 10.10 Kg 5.05
Total for 10 sq.m. 8132.31
Rate for 1 sq.m. 813.30
b Plain Ceramic Tiles of size 305 x 305 x 6mm
(Observed Data)
108.00 Nos. Cost of Tiles 32.20 Each 3477.60
10.00 sq.m. Cost of cement mortar, labour, etc., as above 3272.31
Total for 10 sq.m. 6749.91
Rate for 1 sq.m. 675.00

c Plain Ceramic Tiles of size 200x 200 x 6mm


* 250.00 Nos. (Observed Data)
Cost of Tiles 14.40 Each 3600.00
10.00 sq.m. Cost of cement mortar, labour, etc., as above 3272.31
Total for 10 sq.m. 6872.31
Rate for 1 sq.m. 687.30

Page 29
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
d Designed Ceramic Tiles of size 200x 200 x
6mm
(Observed Data)
* 250.00 Nos. Cost of Tiles 19.80 Each 4950.00
10.00 sq.m. Cost of cement mortar, labour, etc., as above 3272.31
Total for 10 sq.m. 8222.31
Rate for 1 sq.m. 822.30
e
* Plain Ceramic Tiles of size 200x 100 x 6mm
(Observed Data)

500.00 Nos. Cost of Tiles 7.40 Each 3700.00


10.00 sq.m. Cost of cement mortar, labour, etc., as above 3272.31
Total for 10 sq.m. 6972.31
Rate for 1 sq.m. 697.30

f Designed Ceramic Tiles of size 200x 100 x


6mm (Observed Data)
* 500.00 Nos. Cost of Tiles 10.70 Each 5350.00
10.00 sq.m. Cost of cement mortar, labour, etc., as above 3272.31
Total for 10 sq.m. 8622.31
Rate for 1 sq.m. 862.30

42 Paving the floor with pre-polished concrete anti-skid tiles (Required


shape and design) of 20mm thick of approved quality and colour laid in
Cement Mortar 1:3 (One Cement and Three sand) 20mm thick and
pointed with white cement mixed with colouring pigment at the rate of
0.40 Kg. / sq.m., curing, etc., complete complying with standard
specification and as directed by the departmental officers. (The make and
brand of the tiles should be got approved by Executive Engineer before
use on works)
Using anti-skid tiles (Observed Data)
10.00 sq.m. Pre-polished concrete anti-skid tiles 496.00 sq.m. 4960.00
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
1.10 Nos. Mason I st Class 652.00 Nos. 717.20
2.70 Nos. Mason II Class 609.00 Nos. 1644.30
2.70 Nos. Mazdoor I Class 426.00 Nos. 1150.20
3.30 Nos. Mazdoor II Class 368.00 Nos. 1214.40
4.00 Kg Colour Cement 26.60 Kg 106.40
Rate for 10 sq.m. 10544.06
Rate for 1 sq.m. 1054.50

43 Paving the floor with pre-polished concrete anti-skid step tiles


(Required shape and design) of 20mm thick of approved quality and
colour laid in Cement Mortar 1:3 (One Cement and Three sand) 20mm
thick and pointed with white cement mixed with colouring pigment at the
rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard
specification and as directed by the departmental officers. (The make and
brand of the tiles should be got approved by Executive Engineer before
use on works)

Using anti-skid step tiles (Observed Data)


10.00 sq.m. Pre-polished concrete anti-skid step tiles 599.00 sq.m. 5990.00
0.21 cu.m. Cement Mortar 1:3 3578.85 cu.m. 751.56
1.10 Nos. Mason I st Class 652.00 Nos. 717.20
2.70 Nos. Mason II Class 609.00 Nos. 1644.30

Page 30
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
2.70 Nos. Mazdoor I Class 426.00 Nos. 1150.20
3.30 Nos. Mazdoor II Class 368.00 Nos. 1214.40
4.00 Kg Colour Cement 26.60 Kg 106.40
Rate for 10 sq.m. 11574.06
Rate for 1 sq.m. 1157.50

44 Dadooing walls with following best approved quality, white / colour


glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and
Two sand) 10mm thick and pointing the joints with white cement mixed
with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors,
curing, etc., complying with standard specification and as directed by the
departmental officers.
1a Dadooing with white glazed tiles of size 150mm
x 150mm x 6mm
450.00 Nos. Cost of Tiles 7.70 Each 3465.00
0.10 cu.m. Cement mortar 1:2 4963.44 cu.m. 496.34
4.00 Kg White cement 22.00 Kg 88.00
1.10 Nos. Mason I Class 652.00 Each 717.20
4.10 Nos. Mason II Class 609.00 Each 2496.90
2.70 Nos. Mazdoor I Class 426.00 Each 1150.20
3.30 Nos. Mazdoor II Class 368.00 Each 1214.40
Total for 10 sq.m. 9628.04
Rate for 1 sq.m. 962.90

1b Dadooing with plain colour glazed tiles of size


150mm x 150mm x 6mm
450.00 Nos. Cost of Tiles 8.90 Each 4005.00
sq.m. Cost of cement mortar, labour, etc., as above 6075.04
10.00 (excluding white cement)

4.00 Kg White cement mixed with colouring pigments 26.60 Kg 106.40


Total for 10 sq.m. 10186.44
Rate for 1 sq.m. 1018.70

c Dadooing with printed design colour glazed


tiles of size 150mm x 150mm x 6mm
450.00 Nos. Cost of Tiles 10.50 Each 4725.00
sq.m. Cost of cement mortar, labour, etc., as above 6075.04
10.00 (excluding white cement)

4.00 Kg White cement mixed with colouring pigments 26.60 Kg 106.40


Total for 10 sq.m. 10906.44
Rate for 1 sq.m. 1090.70

1d Dadooing with granite tiles of synthetic grey,


paradise, and similar varieties of suitable sizes
10.00 sq.m. Cost of Granite Tiles 714.00 sq.m. 7140.00
sq.m. Cost of cement mortar, labour, etc., as above 6075.04
10.00 (excluding white cement)

4.00 Kg White cement mixed with colouring pigments 26.60 Kg 106.40


Total for 10 sq.m. 13321.44
Rate for 1 sq.m. 1332.20

Page 31
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
2a Dadooing with printed design colour glazed
tiles of size 300 x 200 x 6mm

167.00 Nos. Cost of Tiles 28.30 Each 4726.10


0.10 cu.m. Cement mortar 1:2 4963.44 cu.m. 496.34
4.00 Kg color cement 26.60 Kg 106.40
1.10 Nos. Mason I Class 652.00 Each 717.20
4.10 Nos. Mason II Class 609.00 Each 2496.90
2.70 Nos. Mazdoor I Class 426.00 Each 1150.20
3.30 Nos. Mazdoor II Class 368.00 Each 1214.40
Total for 10 sq.m. 10907.54
Rate for 1 sq.m. 1090.80

Page 32
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
2a Dadooing with printed design colour glazed
tiles of size 300 x 450 x 8mm

75.00 Nos. Cost of Tiles 57.20 Each 4290.00


0.10 cu.m. Cement mortar 1:2 4963.44 cu.m. 496.34
4.00 Kg color cement 26.60 Kg 106.40
1.10 Nos. Mason I Class 652.00 Each 717.20
4.10 Nos. Mason II Class 609.00 Each 2496.90
2.70 Nos. Mazdoor I Class 426.00 Each 1150.20
3.30 Nos. Mazdoor II Class 368.00 Each 1214.40
Total for 10 sq.m. 10471.44
Rate for 1 sq.m. 1047.20

Page 33
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
45 Weathering course in brick jelly lime concrete using broken brick jelly of
size 20mm uniform gauge in pure slaked lime (no sand to be used) to the
proportion of brick jelly to lime being 32:12.5 by volume and laid over the
RCC roof slab in a single layer of required slope and finished by beating
the concrete with wooden beaters of approved pattern, keeping the
surface constantly wet by sprinkling lime jaggery water, etc., complete as
per standard specification and as directed by the deparmental officers.

12.80 cu.m. Brick Jelly (20mm gauge) 798.00 cu.m. 10214.40


5.00 cu.m. Slaked lime 937.00 cu.m. 4685.00
1.80 Nos. Mason I Class 652.00 Each 1173.60
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
LS Sundries for wooden beaters, lime jaggery water LS 46.85
Total for 10 cu.m. 28848.85
a Rate for 1 cu.m. 2884.90
b In foundation & basement 2884.90
c For Ground floor 2884.90 78.20 2963.10
d For First floor 2963.10 154.00 3117.10
e For Second floor 3117.10 154.00 3271.10
f For Third floor 3271.10 154.00 3425.10
g For Fourth floor 3425.10 154.00 3579.10
For Fifth floor 3579.10 154.00 3733.10

46 Finishing the top of roof with one course of machine pressed tiles of
size 230mm x 230mm x 20mm of approved quality set in Cement Mortar
1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing
compound conforming to ISS at 2% by weight of cement used and the
joints pointed neatly to full depth of tiles with the same cement mortar
mixed with red oxide and water proofing compound including curing etc.,
complete complying with standard specification and as directed by the
departmental officers
Sub-Data for Pointing with Cement Mortar 1:3
0.04 cu.m. Cement Mortar 1:3 3578.85 cu.m. 143.15
0.384 Kg Water Proofing Compound 41.50 Kg 15.94
2.20 Nos. Mason II Class 609.00 Each 1339.80
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
LS Add for red oxide etc., 7.16
Total for 10 sq.m. 2123.85
Rate for 1 sq.m. 212.38

Main Data
189.00 Nos. Pressed Tiles of 230mm x 230mm x 20mm 15564.01 1000 2941.60
0.12 cu.m. Cement Mortar 1:3 3578.85 cu.m. 429.46
10.00 sq.m. Pointing with Cement Mortar 1:3 212.38 sq.m. 2123.85
1.152 Kg Water Proofing Compound 41.50 Kg 47.81
1.10 Nos. Mason I Class 652.00 Each 717.20
2.10 Nos. Mason II Class 609.00 Each 1278.90
2.20 Nos. Mazdoor I Class 426.00 Each 937.20
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
Total for 10 sq.m. 8880.82
Rate for 1 sq.m. 888.10

Page 34
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Therefore rate for 1m2

Page 35
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
250.00 Nos. Pressed Tiles of 200mm x 200mm x 20mm 10997.01 1000 2749.25
* 10.00 sq.m. Labour & Mortor 5939.22 sq.m. 5939.22
8688.47
868.90
Paving the Top of roof with Solar refelective ceramic tiles of size 305 x
305 x 7mm thick of approved quality and colour laid in Cement mortar
1:3 (One cement and three sand) 12mm thick and pointed with tile grout
(Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint,
curing etc., complete complying with standard specification and as
directed by the departmental officers. (The make and brand of the tiles
should be got approved by the Executive Engineer before use on works)

Solar refelective ceramic tiles of size 305 x 305 x 464.00 4640.00


10.00 sq.m 7mm thick sq.m
0.14 cu.m Cement Mortar 1:3 3578.85 cu.m 501.04
1.10 Nos. Mason I Class 652.00 Nos. 717.20
2.70 Nos. Mason II Class 609.00 Nos. 1644.30
2.70 Nos. Mazdoor I Class 426.00 Nos. 1150.20
3.30 Nos. Mazdoor II Class 368.00 Nos. 1214.40
4.00 Kg Epoxy packing for Joint 500.00 Kg 2000.00
TOTAL 11867.14
Rate for 1 sq.m. 1186.80

47 Finishing the top of slopped roof, sun-shade with Machine Pressed


Ornamental Tiles of approved quality laid in cement mortar 1:3 20mm
thick mixed with WPC at 2% by weight of cement used and top pointed
with the same red oxide mixed mortar etc complete, complying with
standard specifications
Using Ornamental Tiles (Observed Data)
Main Data
10.00 sq.m. Cost of tiles 522.50 sq.m. 5225.00
0.25 cu.m. Cement Mortar 1:3 3578.85 cu.m. 894.71
10.00 sq.m. Pointing with Cement Mortar 1:3 212.38 sq.m. 2123.85
2.40 Kg Water Proofing Compound 41.50 Kg 99.60
3.50 Nos. Mason I Class 652.00 Each 2282.00
2.50 Nos. Mazdoor I Class 426.00 Each 1065.00
2.25 Nos. Mazdoor II Class 368.00 Each 828.00
Total for 10 sq.m. 12518.16
Rate for 1 sq.m. 1251.90

48 Supplying and fixing fine polished cuddapah slab of following


thickness for cup-board arrangements including laying to correct
alignment with necessary cement mortar and black powder etc, complete
complying with standard specification and as direct.
a 20 / 30mm thick
1.00 sq.m. Cost of 20 / 30mm thick cuddapah slab 363.00 1sq.m. 363.00
1.00 sq.m. Labour for fixing 44.70 1sq.m. 44.70
LS Add for Cement Mortar, Black Oxide, etc. LS 20.00
Rate for 1 sq.m. 427.70

b 38 / 40mm thick
1.00 sq.m. Cost of 38 / 40mm thick cuddapah slab 394.00 1sq.m. 394.00
1.00 sq.m. Labour for fixing 44.70 1sq.m. 44.70
LS Add for Cement Mortar, Black Oxide, etc. LS 20.00

Page 36
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Rate for 1 sq.m. 458.70

Page 37
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
* Supplying and fixing in position best approved of BIS quality PVC rain
water down fall pipes having a pressure of 4 kg. / sq.cm including
cost of necessry PVC shoe, PVC bend, cast iron gratings of required
diameter and special clamps, brass screws, nails, etc., and fixing of cast
iron gratings at junction of parapet and the RCC roof slab including
finishing neatly etc., complete. The rate shall be inclusive of cast of
removable cast iron grating. The PVC pipe shall be fixed in wall with
special type of "U" clamp at the centre of the pipe line in addition to those
for more than 3.0 metre pipe length, etc., complete complying with
standard specification.

b 110mm dia PVC Pipe


3.00 RM Cost of PVC Pipe 172.80 RM 518.40
1.00 No. PVC Shoe 110mm dia 71.00 Each 71.00
1.00 No. PVC Bend 110mm dia 88.60 Each 88.60
2.00 Nos. Cost of brackets for PVC pipes 19.50 Each 39.00
4.00 Nos. Cost of teak wood plugs 1.05 Each 4.20
1.00 No. Cost of cast iron gratings 31.20 Each 31.20
1.00 No. Plumber I Class 566.00 Each 566.00
Sundries for nails and screws 13.18
Total for 3 RM 1331.58
Rate for 1 RM 443.90

Rate for 1 RM / One Floor 443.90

Rate for 1 RM / Two Floors


Nos. Rate as above excluding shoe, bend, gratings and 561.60 Each 1123.20
2.00 labour Floor

Rate for shoe, bend, gratings and labour 756.80


Sundries for nails and screws 18.80
Total for 6 RM 1898.80
Rate for 1 RM 316.50

Rate for 1 RM / Three Floors


Nos. Rate as above excluding shoe, bend, gratings and 561.60 Each 1684.80
3.00 labour Floor

Rate for shoe, bend, gratings and labour 756.80


Sundries for nails and screws 24.42
Total for 9 RM 2466.02
Rate for 1 RM 274.10

Page 38
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
50 Supplying and fixing teak wood hand rails with an over all finsihed
size of 50 x 150mm with architectural designs as directed and fixing in
position etc., including polishing two coats with french (LAC) polish over a
coat of bee's waxing complying with standard specification etc., complete.
The wooden hand rails shall have 12mm groove on both faces at 50mm
from top polished and the groove should be painted with black paint. The
bottom of hand rails should be grooved to receive the MS flats 40 x 6mm
welded with square rods of balustrades

Quantity of teak wood required


3 x 0.15 x 0.065 = 0.03 cu.m.
Sub-Data for Lac Polish
1.60 Litre Lac Polish 257.00 Litre 411.20
0.70 Nos. Painter I Class 522.00 Each 365.40
1.10 Nos. Mazdoor I Class 426.00 Each 468.60
Sundries including brushes, sand paper, glue, 4.11
bee's wax, turpentine, etc.

Rate for 10 sq.m. 1249.31

Sub-Data for Labour Wrought and Put-up


(SI No. 402)

4.50 Nos. Carpenter I Class 638.00 Litre 2871.00


13.20 Nos. Carpenter II Class 609.00 Each 8038.80
8.80 Nos. Mazdoor I Class 426.00 Each 3748.80
Sundries for nails, screws, etc. 146.59
Rate for 1 cu.m. 14805.19

MAIN DATA
0.03 cu.m. Cost of teak wood scantlings above 2m long 111600.00 cu.m. 3264.30
0.03 cu.m. Labour wrought and put up 14805.19 cu.m. 433.05
LS Add 50% extra labour for architectural finishing LS 216.53
3.90 sq.m. Lac Polish 1249.31 10 sq.m. 487.23
LS Sundries for bolts, screws, etc., 41.85
Total for 3 RM 4442.96
Rate for 1 RM 1481.00
51 Supplying and fixing in position steel balustrades using 20mm square
rods spaced at 150mm centre to centre so that the two balustrades in
each step shall be placed centrally and the top of balustrades connected
with the hand rails (cost of hand rail shall be measured and paid
separately) by means of MS flats of size 40mm x 6mm in the groove
40mm x 6mm provided at the bottom of hand rail; the bottom of
balustrades shall be fixed on to the top of step concrete. An additional MS
flat of size 50mm x 6mm shall be provided at the centre of balustrades
connecting all square rods to the entire length including cost of square
rods, flat and applying one coat of red oxide primer to the iron surfaces,
etc., complete complying with standard specification and as directed by
the departmental officers.

Consider a balustrade of size


1.80 x 0.70 metre using 20mm square rod

Area 1.26 sq.m.


Weight of 20mm rod required 28.64 Kg
= 1.80 / 0.15 x (0.70 + 0.06) @ 3.14

Page 39
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
40 x 6mm flat = 1.80 m x 1.90 Kg / RM 3.42 Kg
50 x 6mm flat = 1.80 m x 2.40 Kg / RM 4.32 Kg
MS rod required 28.64 Kg
MS flat required 7.74 Kg
Total 36.38 Kg

DATA
28.64 kg Cost of MS square rod 40.45 Kg 1158.49
7.74 kg Cost of MS flat 40.45 Kg 313.08
36.38 kg Labour charges 19.40 Kg 705.77
Welding charges
75.00 Nos. 40mm flat 1.60 Each 120.00
120.00 Nos. 50mm flat 2.05 Each 246.00
1.26 sq.m. Red oxide primer 54.50 sq.m. 68.67
LS Sundries for dismantling, redoing, fixing with LS 29.43
concrete etc.

Total for 1.26 sq.m. 2641.44


Rate for 1 sq.m. 2096.40

52 Supplying and fixing 40mm dia GI pipe for staircase hand rail
including labour charges for cutting, welding and fixing with MS flats
(excluding cost of flat), etc., as directed by the departmental officers
Consider a length hand rail = 3 metres
DATA
3.00 RM 40mm dia GI pipe 161.60 RM 484.80
LS Labour for cutting, welding and fixing LS 48.48
Rate for 3 RM 533.28
Rate for 1 RM 177.76

53 Supplying and fixing GI pipe handrails for handicapped persons using


50mm dia GI pipe double handrail at a height of 800mm and 900mm from
floor level with 25mm thick MS square rods as balusters embedded in the
concrete and welded with pipe at 60cm centre to centre as shown in CA
Job No. 9123 / 1 including cutting, welding, bending and fixing charges
and applying one coat of red oxide primer for MS members as directed by
the departmental officers

Consider a length hand rail = 3 metres


DATA
6.00 RM 50mm dia GI pipe 207.00 RM 1242.00
32.41 Kg 25mm MS square rod 40.45 Kg 1310.98
32.41 Kg Fabrication charges for MS square rod 33.40 Kg 1082.49
LS Labour charges for cutting, welding GI pipe LS 124.20
LS Red Oxide Primer LS 25.53
LS Dismantling the concrete and re-doing to the LS 20.00
original condition
Rate for 3 RM 3805.21
Rate for 1 RM 1268.45
54 Plastering with Cement Mortar 1:5 (One cement and Five sand),
12mm thick in all floors including curing etc. complete complying with
standard specification and as directed by the departmental officers.

0.14 cu.m. Cement mortar 1:5 2471.17 cu.m. 345.96


1.10 Nos. Mason I Class 652.00 Each 717.20
0.50 Nos. Mazdoor I Class 426.00 Each 213.00

Page 40
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
Total for 10 sq.m. 1680.96
Rate for 1 sq.m. 168.10

55 Plastering with Cement Mortar 1:5 (One cement and Five sand),
20mm thick in all floors including curing etc. complete complying with
standard specification and as directed by the departmental officers.

0.22 cu.m. Cement mortar 1:5 2471.17 cu.m. 543.66


2.20 Nos. Mason I Class 652.00 Each 1434.40
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
3.20 Nos. Mazdoor II Class 368.00 Each 1177.60
Total for 10 sq.m. 3368.66
Rate for 1 sq.m. 336.90

56 Special ceiling plastering and finishing the exposed surface of all RCC
items of work such as slabs, beams, sunshades, facia, canopy slab,
staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One
Cement and Three Sand) 10mm thick including hacking the surfaces,
providing cement mortar nosing, beading for sunshades, staircases, steps,
landing slabs and curing, etc., in all floors complying with standard
specification and as directed by the departmental officers

0.10 cu.m. Cement mortar 1:3 3578.85 cu.m. 357.88


1.10 Nos. Mason I Class 652.00 Each 717.20
1.10 Nos. Mazdoor I Class 426.00 Each 468.60
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
Total for 10 sq.m. 1948.48
Rate for 1 sq.m. 194.85

57 Plastering the surface of walls with Cement Mortar 1:3 (One cement and
Three sand), 12mm thick in all floors including curing etc., complete
complying with standard specification and as directed by the departmental
officers.
0.14 cu.m. Cement mortar 1:3 3578.85 cu.m. 501.04
1.10 Nos. Mason I Class 652.00 Each 717.20
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
Total for 10 sq.m. 1836.04
Rate for 1 sq.m. 183.65

58 Plastering the surface of walls with Cement Mortar 1:3 (One cement and
Three sand), 20mm thick in all floors including curing etc., complete
complying with standard specification and as directed by the departmental
officers.

0.22 cu.m. Cement mortar 1:3 3578.85 cu.m. 787.35


2.20 Nos. Mason I Class 652.00 Each 1434.40
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
3.20 Nos. Mazdoor II Class 368.00 Each 1177.60
Total for 10 sq.m. 3612.35
Rate for 1 sq.m. 361.25

59 Plastering with Cement Mortar 1:3 (One Cement and Three Sand) 12mm
thick mixed with water proofing compound conforming to BIS at 2%
by weight of cement used including finsihing, curing, etc., complete in all
floors complying with standard specification and as directed by the
departmental officers.

Page 41
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
* 0.14 cu.m. Cement mortar 1:3 3578.85 cu.m. 501.04
M 1.34 Kg Water proofing compound 41.50 Kg 55.78
1.10 Nos. Mason I Class 652.00 Each 717.20
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
Total for 10 sq.m. 1891.81
M Rate for 1 sq.m. 189.20

60 Plastering with Cement Mortar 1:3 (One Cement and Three Sand)
20mm thick mixed with water proofing compound conforming to BIS
at 2% by weight of cement used including finsihing, curing, etc., complete
in all floors complying with standard specification and as directed by the
departmental officers.

0.22 cu.m. Cement mortar 1:3 3578.85 cu.m. 787.35


2.11 Kg Water proofing compound 41.50 Kg 87.57
2.20 Nos. Mason I Class 652.00 Each 1434.40
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
3.20 Nos. Mazdoor II Class 368.00 Each 1177.60
Total for 10 sq.m. 3699.91
Rate for 1 sq.m. 370.00

61 Stucco plastering 12mm thick using blue granite chips of size


10mm and below over the existing base plastering with cement mortar
1:5, 12mm thick, etc., complete complying with standard specifications
(SI 314)
10.00 sq.m. Plastering with cement mortar 1:5, 12mm thick 168.10 sq.m. 1681.00
0.15 cu.m. Blue granite chips 6 - 10 mm thick 999.78 cu.m. 149.97
72.00 Kgs Cement 5769.14 MT 415.38
14.50 Kgs Cement for slurry 5769.14 MT 83.65
1.60 Nos. Mason I Class 652.00 Each 1043.20
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
1.10 Nos. Mazdoor II Class 368.00 Each 404.80
Total for 10 sq.m. 3991.00
Rate for 1 sq.m. 399.10

62 White washing one coat with freshly burnt white shell lime in all floors
including cost of lime, blue powder, fevicol type gum, brushes, scaffolding
charges, etc., complete complying with standard specification and as
directed by the departmental officers.
0.05 cu.m. Fine screened shell lime 1272.00 cu.m. 63.60
1.10 Nos. Mason II Class 609.00 Each 669.90
0.30 Nos. Mazdoor I Class 426.00 Each 127.80
1.90 Nos. Mazdoor II Class 368.00 Each 699.20
LS Gum, conjee water or prickly pear juice including LS 6.36
necessary fire wood and brushes

Rate for 100 sq.m. 1566.86


Rate for 1 sq.m. 15.70

63 White washing two coats with freshly burnt white shell lime in all floors
including cost of lime, blue powder fevicol type gum, brushes, scaffolding
charges, etc., complete complying with standard specification and as
directed.
0.07 cu.m. Fine screened shell lime 1272.00 cu.m. 89.04

Page 42
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.60 Nos. Mason II Class 609.00 Each 974.40
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
2.70 Nos. Mazdoor II Class 368.00 Each 993.60
LS Gum, conjee water or prickly pear juice including LS 8.90
necessary firewood and brushes

Rate for 100 sq.m. 2278.94


Rate for 1 sq.m. 22.80

64 Colour washing two coats in all floors using best freshly burnt white shell lime
and best quality of approved variety of colouring pigment including cost of lime,
colouring pigments, fevicol type gum, brushes, scaffolding charges etc., complete
complying with standard specification. Mineral colouring pigments not affected by
lime should only be used (stainers and colour solutions should not be used.)

For one Coat


1.00 sq.m. Rate as per white washing one coats 15.70 sq.m. 15.70
1.00 sq.m. Add 50% etc., for colouring pigment 7.85 sq.m. 7.85
23.55
Rate for 1 sq.m. 23.55

For Two Coat


1.00 sq.m. Rate as per white washing two coats 22.80 sq.m. 22.80
1.00 sq.m. Add 50% etc., for colouring pigment 11.40 sq.m. 11.40
Rate for 1 sq.m. 34.20

65 Supplying and painting the walls with two coats of cement paint over one
coat of cement primer as instructed by the departmental officers including
preparation of surface curing, etc., complete in all floors complying with standard
specifications (The colour and shade of the cement paint shall be got approved by
the Executive Engineer before use of work).

For basic one coat of primer with cement paint


10.00 sq.m. Cleaning the plastered surface 3.50 sq.m. 35.00
1.80 Kg Cement Paint 48.50 Kg 87.30
0.25 Nos. Painter I Class 522.00 Each 130.50
0.25 Nos. Mazdoor I Class 426.00 Each 106.50
0.40 Nos. Mazdoor II Class 368.00 Each 147.20
LS Sundries for brushes, etc. LS 4.37
Rate for 10 sq.m. 510.87
Rate for 1 sq.m. 51.10
For finishing two coats
3.00 Kg Cement Paint 48.50 Kg 145.50
0.50 Nos. Painter I Class 522.00 Each 261.00
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
0.80 Nos. Mazdoor II Class 368.00 Each 294.40
LS Sundries for brushes, etc. LS 14.55
Rate per 10 sq.m. 928.45
Rate per 1 sq.m. 92.85

Main Data
1.00 sq.m. Basic one coat of primer with cement paint 51.10 51.10
1.00 sq.m. For finishing two coats with cement paint 92.85 92.85
Rate per 1 sq.m. 143.95

Page 43
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
66 Supplying and painting the walls with two coats of cement paint as
instructed by the departmental officers including preparation of surface
curing, etc., complete in all floors complying with standard specifications
(The colour and shade of the cement paint shall be got approved by the
Executive Engineer before use of work).
10.00 sq.m. Cleaning the plastered surface 3.50 sq.m. 35.00
3.23 Kg Cement Paint 48.50 Kg 156.66
0.50 Nos. Painter I Class 522.00 Each 261.00
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
0.80 Nos. Mazdoor II Class 368.00 Each 294.40
LS Sundries for brushes, etc. LS 15.67
Rate per 10 sq.m. 975.72
Rate per 1 sq.m. 97.60

67 Supplying and painting the walls with two coats of oil bound distemper
over one coat of water based cement primer including cost for
distemper, primer, cleaning and scrapping the walls, rendering the walls
smooth with necessary putty, brushes, scaffolding arrangements, labour
charges, etc., as per standard specification. (The colour and shade of the
distemper shall be got approved by the Executive Engineer before use of
work).
10.00 sq.m. Basic one coat of primer with cement paint 51.10 sq.m. 511.00
1.34 Kg Distemper 71.70 Kg 96.08
0.50 Nos. Painter I Class 522.00 Each 261.00
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
0.80 Nos. Mazdoor II Class 368.00 Each 294.40
L.s Sundries for brushes etc. LS 4.80
Total for 10 sq.m. 1380.28
Rate for 1 sq.m. 138.05

68 Distempering the old wall and ceiling one coat with best oil bound
distember of approved quality including preparation of surface, the rate
includes cost of brushes, high scaffolding arrangements, neat finishes,
etc., complete complying with standard specification and as directed by
the departmental officers.
For one coat
0.70 m3 oil bound distember 71.70 Kg 50.19
0.25 Nos. Painter I Class 522.00 Each 130.50
0.25 Nos. Mazdoor I Class 426.00 Each 106.50
0.40 Nos. Mazdoor II Class 368.00 Each 147.20
L.s Sundries for brushes etc. LS 2.51
Total for 10 sq.m. 436.90
Rate for 1 sq.m. 43.70

For two coat including scaping


10.00 sq.m. Cleaning the plastered surface 3.50 sq.m. 35.00
1.34 m3 oil bound distember 71.70 Kg 96.08
0.50 Nos. Painter I Class 522.00 Each 261.00
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
0.80 Nos. Mazdoor II Class 368.00 Each 294.40
L.s Sundries for brushes etc. LS 4.80
Total for 10 sq.m. 904.28
Rate for 1 sq.m. 90.45

Page 44
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
69 Painting two coats of newly plastered wall surface with ready mixed
plastic emulsion paint of first class quality and of approved colour over
a priming coat including thorough scrapping, clean removal of dirt, and
including necessary plaster of paris putty, wherever required etc.,
complete complying with standard specification.

10.00 sq.m. Cleaning the plastered surface 3.50 sq.m. 35.00


1.40 Litre Plastic emulsion paint 287.00 Litre 401.80
0.98 Litre Primer 143.30 Litre 140.43
2.20 Nos. Painter I Class 522.00 Each 1148.40
LS Sundries for brushes, sand paper, plaster of paris LS 5.42
putty, etc.

Total for 10 sq.m. 1731.06


Rate for 1 sq.m. 173.15

70 Painting new wood work with two finishing coats of synthetic


enamel ready mixed paint of approved quality and colour over one coat
priming coat in all floors including the cost of primer etc., complete
complying with standard specification. (The make, quality and colour of
paint should be got approved by the Executive Engineer before use on
works.)
For priming coat
1.44 Litre Ready mixed primer 143.30 Litre 206.35
0.70 Nos. Painter I Class 522.00 Each 365.40

For finishing coat


2.55 Litre Ready mixed paint 232.00 Litre 591.60
1.20 Nos. Painter I Class 522.00 Each 626.40
L.s Sundries for brushes, soap, putty etc. 7.98
Total for 10 sq.m. 1797.73
Rate for 1 sq.m. 179.80

71 Painting new iron works such as steel doors, windows, ventilators,


window bars, balustrades etc., with two coats of best approved first
quality and colour of synthetic enamel paint over the existing red oxide
priming coat in all floors excluding cost of priming coat etc., complete
complying with standard specification. (The make, quality and colour of
paint should be got approved by the Executive Engineer before use on
works.)
Primer coat
1.33 Litre Red oxide primer 133.00 Litre 176.89
* 0.70 Nos. Painter I Class 522.00 Each 365.40
l.s Sundries for brushes, soap, putty, etc. 1.77
Total for 10 sq.m. 544.06
Rate for 1 sq.m. 54.45

Two coat

2.22 Litre Ready mixed enamel paint 221.00 Litre 490.62


1.10 Nos. Painter I Class 522.00 Each 574.20
l.s Sundries for brushes, soap, putty, etc. 4.91
Total for 10 sq.m. 1069.73
Rate for 1 sq.m. 107.00

Page 45
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
72 Painting new iron works such as steel doors, windows, ventilators,
window bars, balustrades etc., with two coats of best approved first
quality and colour of synthetic enamel paint over one coat of red oxide
priming coat in all floors including cost of priming coat etc., complete
complying with standard specification. (The make, quality and colour of
paint should be got approved by the Executive Engineer before use on
works.)
Two coat with Primer
1.00 sq.m. One coat of red oxide primer 54.50 sq.m. 54.50
1.00 sq.m. Finishing two coats of synthetic enamel paint 107.00 sq.m. 107.00
Rate for 1 sq.m. 161.50

73 Polishing the teak wood door with two coats of best French (Lac)
polish with approved quality and brand over a coat of bee's waxing
including preparing the wooden surface to receive polishing, etc.,
complete complying as per the standard specifications. (The make, quality
and colour of french polish, bees vax should be got approved by the
Executive Engineer before use on works.)

1.60 Litre Lac Polish 257.00 Litre 411.20


0.70 Nos. Painter I Class 522.00 Each 365.40
1.10 Nos. Mazdoor I Class 426.00 Each 468.60
Sundries including brushes, sand paper, glue, 4.11
bee's wax, turpentine, etc.

Rate for 10 sq.m. 1249.31


Rate for 1 sq.m. 124.95

74 Providing expansion joint in RCC floor slab for 12.5mm width using
polysulphide as sealent on the top and bottom for a depth of 7.5mm
each and packing the inner space using compressible non-absorbent filler
materials including cost of labour for cutting and fixing filler materials and
laying polysulphide sealent with necessary spatula etc., complete
complying with standard specifications and as directed

Sub-Data
8.70 Kg Polysulphide 171.90 Kg 1495.53
0.40 Kg Primer 147.90 Kg 59.16
2.10 sq.m. Filler material 141.00 sq.m. 296.10
60.00 RM Bond breaker 3.65 RM 219.00
8.00 Nos. Mazdoor I Class 426.00 Nos. 3408.00
Rate for 30 RM / 3 sq.m. (A) 5477.79

Main Data
30.00 RM Rate as above (A) 5477.79 30 RM 5477.79
30.00 RM PVC water bar 280.00 RM 8400.00
2.00 Nos. Mazdoor I Class 426.00 Nos. 852.00
LS Sundries for brushes, spatula, etc. LS 84.00
Total for 30 RM 14813.79
Rate for 1 RM (B) 493.80
Rate for 1 sq.m. 4937.93

Page 46
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
75 Providing expansion joint 12.5mm width in RCC roof slabs between
RCC twin beams using PVC water bar of 150mm wide centre bulb
of 4mm to 6mm thickness of approved quality and brand and including
filling the inner space with suitable non-absorbent flexible and well
compressible filler materials of approved quality and covering the top
surface with GI sheet 30cm wide and 1.6mm thick using phill plugs, GI
screws, limpet cup washers, bitumen washers, etc., complete complying
with standard specifications and as directed

30.00 RM Rate as per expansion joint in floor slab 493.80 RM 14814.00


ADD
9.00 sq.m. GI sheet 22 gauge, 30cm width 304.00 sq.m. 2736.00
60.00 Nos. Phill plugs 40mm length 4.90 Each 294.00
60.00 Nos. GI screws 32mm length 1.25 Each 75.00
60.00 Nos. GI limpet cup washers 1.84 Each 110.40
60.00 Nos. Bitumen washers 1.10 Each 66.00
2.00 Nos. Fitter II Class 560.00 Each 1120.00
2.00 Nos. Mazdoor I Class 426.00 Each 852.00
0.30 cu.m. Brick jelly lime concrete 1:2:5 2731.12 cu.m. 819.34
Total for 30 RM 20886.74
Rate for 1 RM 696.30

76 Providing expansion joint of 12.5mm wide in between RCC twin


columns from top of pedastal to full height including filling the
inner space with suitable non-absorbent, flexible and well
compressible filler materials of approved quality and brand; finishing
the sides of RCC columns with polysulphide sealents for a depth of 7.5mm
on either side covering the inner space filled with filler materials as above
etc., complete complying with standard specifications and as directed.

Considering an area in between twin columns


= 30 RM x 400mm (average) = Area = 12.00 sq.m.

30.00 RM Rate as per Floor Slab Expansion Joint (A) 5477.79 30 RM 5477.79
sq.m. Add for extra quantity of filler material required 141.00 sq.m. 1332.45
9.45 for filling the inner space in between twin columns

LS Add for labour for providing addional quantity of LS 66.62


filler materials, brush, spatula, etc.,

Total for 12 sq.m. 6876.86


Rate for 1 sq.m. 573.10

Sub-Data for Brick Jelly Lime Concrete 1:2:5


9.50 cu.m. Broken Brick Jelly (20mm size ) 798.00 cu.m. 7581.00
3.80 cu.m. Lime Mortar 1:2 1553.96 cu.m. 5905.05
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Total for 10 cu.m. 27311.25

Rate for 1 cu.m. in F & B 2731.12


a For Ground floor 2731.12 78.20 2809.32
b For First floor 2809.32 154.00 2963.32
c For Second floor 2963.32 154.00 3117.32

Page 47
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
d For Third floor 3117.32 154.00 3271.32

Page 48
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
77 Manufacturing, supplying and fixing Precast Reinforced Cement
Concrete slabs of following thickness in RCC 1:2:4 (one cement, two
sand and four aggregates), using following HBGS jelly excluding cost of
reinforcement steel in position but including cost of moulding charges,
casting of slab, finishing, curing and fixing in position in all floors etc.,
complete complying with standard specification and as directed.

b 50mm thick slab (using 20mm HBGS Jelly)


Consider a slab of size = 1.00 x 0.45m
Area = 1 x 1.00 x 0.45 0.45 sq.m.

Mould:
Country wood of size 2.20 RM
0.025 x 0.05 required = 2 x 1.10 =

2 x 0.55 1.10 RM
Total 3.30 RM
(or) 3.30 x 0.050 x 0.025 = 0.004125 (or) 0.00 cum

CC 1:2:4
1.00 x 0.45 x 0.05 = 0.02 cu.m.

Sub-Data for Mould


0.0041 cu.m. Cost of country wood 34300.00 cu.m. 140.63
0.0041 cu.m. Labour wrought put up 14805.19 cu.m. 60.70
LS Sundries for nails, oiling the mould etc. LS 6.07
Cost for mould for 5 uses 207.40
Cost for 1 use 41.48

DATA
0.0225 cu.m. CC 1:2:4 using 20mm HBGS Jelly 6034.60 cu.m. 135.78
1.00 use Cost of mould 41.48 1 use 41.48
LS Add for finishing, curing, lifting and placing in LS 13.58
position

Rate for 0.45 sq.m. 190.84


Rate for 1 sq.m. 424.10

c 75mm thick slab (using 20mm HBGS Jelly)


Consider a slab of size = 1.00 x 0.45m
Area = 1 x 1.00 x 0.45 0.45 sq.m.
Mould:
Country wood of size 2.20 RM
0.025 x 0.075 required = 2 x 1.10 =

2 x 0.55 1.10 RM
Total 3.30 RM
(or) 3.30 x 0.075 x 0.025 = 0.0061875 (or) 0.01 cum
CC 1:2:4
1.00 x 0.45 x 0.075 = 0.03 cu.m.

Page 49
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Sub-Data for Mould
0.0062 cu.m. Cost of country wood 34300.00 cu.m. 212.66
0.0062 cu.m. Labour wrought put up 14805.19 cu.m. 91.79
LS Sundries for nails, oiling the mould etc. LS 9.18
Cost for mould for 5 uses 313.63
Cost for 1 use 62.73
DATA
0.0338 cu.m. CC 1:2:4 using 20mm HBGS Jelly 6034.60 cu.m. 203.67
1.00 use Cost of mould 62.73 1 use 62.73
LS Add for finishing, curing, lifting and placing in LS 20.37
position

Rate for 0.45 sq.m. 286.76


Rate for 1 sq.m. 637.25

Sub-Data-RCC 1:2:4 in 10-12mm HBGS Jelly


9.00 cu.m. Hard broken stones 10-12mm gauge 1317.78 cu.m. 11860.02
4.50 cu.m. Sand 733.96 cu.m. 3302.82
3231.00 kg Cement 5769.14 M.T 18640.09
3.50 Nos. Mason II Class 609.00 Each 2131.50
21.20 Nos. Mazdoor I Class 426.00 Each 9031.20
35.30 Nos. Mazdoor II Class 368.00 Each 12990.40
Total for 10 cu.m. 57956.03
Rate for 1 cu.m. 5795.65

Page 50
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
78 Manufacturing, supplying and fixing in position plain cement concrete
precast pavement slab of size 450mm x 450mm of 50mm thick in
Cement Concrete 1:2:4 (One cement, Two sand and Four jelly) using
20mm HBG stone jelly including cost of moulding charges, casting of slab,
finishing, curing, fixing and pointing the slab with CM 1:3 (One Cement
and Three Sand) to full depth of slab etc., complete complying with
standard specification and as directed

Pavement slab size = 0.45 x 0.45 x 0.05m


Area = 1 x 0.45 x 0.45 0.20 sq.m.

Mould:
Country wood of size 1.10 RM
0.025 x 0.05 required = 2 x 0.55 =

2 x 0.55 1.10 RM
Total 2.20 RM
(or) 2.20 x 0.050 x 0.025 = 0.00 cum
CC 1:2:4
1 x 0.45 x 0.45 x 0.05 = 0.01 cu.m.

Sub-Data for Mould


0.00275 cu.m. Cost of country wood 34300.00 cu.m. 94.33
0.00275 cu.m. Labour wrought put up 14805.19 cu.m. 40.71
LS Sundries for nails, oiling the mould etc. LS 4.07
Cost for mould for 5 uses 139.11
Cost for 1 use 27.82
Main Data
0.0101 cu.m. PCC 1:2:4 4515.90 cu.m. 45.72
1.00 use Cost of mould 27.82 use 27.82
0.20 sq.m. Pointing with CM 1:3 163.20 sq.m. 33.05
LS Sundries for conveying, fixing, etc., LS 4.57
Rate for 0.2025 sq.m. 111.17
Rate for 1 sq.m. 549.00

79 Manufacturing, supplying and fixing in position plain cement concrete


precast kerb slab of size 600mm x 600mm x 100mm in Cement
Concrete 1:2:4 (One cement, Two sand and Four jelly) using 20mm HBG
stone jelly including cost of moulding charges, casting of slab, finishing,
curing, fixing and pointing the slab with CM 1:3 (One Cement and Three
Sand) to full depth of slab etc., complete complying with standard
specification and as directed

Kerb slab size = 0.60 x 0.60 x 0.10m


Area = 1 x 0.60 x 0.60 0.36 sq.m.

Mould:
Country wood scantling below 4 metre long 0.01 cu.m
= 1 x 4 x 0.70 x 0.10 x 0.025

Country wood reepers 50mm x 25mm

CC 1:2:4
1 x 0.60 x 0.60 x 0.10 = 0.04 cu.m.

Sub-Data for Mould

Page 51
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
0.007 cu.m. Cost of country wood scantling 34300.00 cu.m. 240.10
0.007 cu.m. Labour wrought put up 14805.19 cu.m. 103.64
LS Sundries for nails, oiling the mould etc. LS 10.36
Cost for mould for 5 uses 114.00
Cost for 1 use 22.80

Main Data
0.036 cu.m. PCC 1:2:4 4515.90 cu.m. 162.57
1.00 use Cost of mould 22.80 use 22.80
0.36 sq.m. Pointing with CM 1:3 163.20 sq.m. 58.75
LS Sundries for conveying, fixing, etc., LS 16.26
Rate for 0.36 sq.m. 260.38
Rate for 1 sq.m. 723.30

80 Manufacturing, supplying and fixing in positon of RCC Jally of 5cm thick


in cement concrete 1:2:4 using 20mm machine crushed stone jelly
(excluding cost of reinforcement steel) including cost of mould, finishing,
curing, lifting, fixing in position etc., complete complying with standard
specification and as directed
Consider a jally of size of 1.20 x 0.60m
Area = 1 x 1.20 x 0.60 = 0.72 sq.m.
Mould:
Country wood scantling of size 50mm x 25mm
required
Assuming 60% of volume for design
Outer frame = 2 x 1.30 2.60 RM
= 2 x 0.60 1.20 RM
Total 3.80 RM
3.8 x 0.05 x 0.25 = 0.00
Country wood scantling required
Inner solid wood 0.04
= 1 x 1.20 x 0.60 x 0.05 =
Total 0.04 cu.m.
Concrete (assuming 60% of volume for concrete)
= 1 x 1.20 x 0.60 x 0.05 x 0.60 0.02 cu.m.
Country wood reeper required 3.50 RM
1.20 + 0.55 x 2.00

Sub-Data for Mould


0.0408 cu.m. Country wood scantling 34300.00 cu.m. 1397.73
3.50 RM Country wood reeper 50mm x 25mm 34.60 RM 121.10
0.0408 cu.m. Labour wrought put up 14805.19 cu.m. 603.31
cu.m. Add extra 100% for skilled work for making 14805.19 cu.m. 603.31
0.0408 mould to the required design

LS Sundries for nails, etc., LS 30.38


Cost of mould for 5 uses 2755.82
Cost for 1 use 551.16
MAIN DATA
0.0216 cu.m. RCC 1:2:4 6034.60 cu.m. 130.35
1.00 use Cost of mould 551.16 1 use 551.16
LS Sundries for finishing, curing, lifting, fixing in LS 13.03
position, etc.

Rate for 0.72 sq.m. 694.55

Page 52
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Rate for 1 sq.m. 964.65
81 Supplying and fixing AC sheet roofing with 6mm thick asbestos
cement sheets of fully corrugated (grey colour) of approved quality by
drilling holes (and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts
of 8mm dia of suitable length and providing one set of bitumen washers of
25mm dia and 1.60mm thick for each bolt including protruding portion of
bolts in roof shall be covered with bitumen compound etc., complete
complying with standard specification and as directed.

11.00 sq.m. AC Sheet (corrugated) 6mm thick 184.20 sq.m. 2026.20


30.00 Nos. U / J bolts, Nuts 3.80 Each 114.00
30.00 Nos. Bitumen washers 1.10 Each 33.00
2.20 Nos. Fitter II Class 560.00 Each 1232.00
1.10 Nos. Carpentor I Class 638.00 Each 701.80
3.20 Nos. Mazdoor I Class 426.00 Each 1363.20
LS Sundries for white lead, etc. 60.79
Total for 10 sq.m. 5530.99
Rate for 1 sq.m. 553.10

Water Supply and Sanitary Item of works

Internal / External water supply arrangements

82 Supplying, laying and jointing G.I. Pipes of approved quality and best
variety of "B" class pipe of the following dia including labour fixing G.I.
Specials, (excluding charges for cutting and threading of pipes, cost of
such specials) to wall with necessary teak wood plugs, clamps, screws,
thread balls, shellac, etc., making holes on the walls (or) drilling holes in
roof and making good the dismantled portions to original condition with
necessray brick work / concrete and plastering wherever necessry with
necessary scaffolding charges. The pipes are to be painted with the 2
coats of good variety and approved best quality of synthetic enamel paint
over a priming coat of red oxide etc., complete in all floors complying with
standard specification. G.I. pipes shall be got approved by the Executive
Engineer before use on works.
Above ground level.

I Internal Water Supply - Above Ground Level


A Laying pipe line of dia 15mm, 20mm and
25mm

Sub-Data
Labour Charges 10 RM
0.30 Nos. Stone Cutter I Class 501.00 Each 150.30
0.75 Nos. Plumber I Class 566.00 Each 424.50
0.10 Nos. Plumber II Class 549.00 Each 54.90
0.60 Nos. Mazdoor I Class 426.00 Each 255.60
Total for 10 RM 885.30
Labour for 1 RM 88.53

Sub-Data
Sundries for 1 RM
8.33 gram Shellac 18.00 100 gms. 1.50
1.66 Nos. Clamps, plugs and screws 11.90 set 19.75
1.66 Nos. Thread Balls 3.50 Each 5.81
Sundries for 1 RM 27.06

Page 53
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

Sub-Data
Painting 15mm 20mm 25mm
Painting area 0.05 0.063 0.08
161.50 sq.m. Cost of painting 7.61 10.15 12.69

Main Data
For laying GI pipe line of dia 15mm 20mm 25mm
Cost of GI Pipe per RM 69.20 97.70 126.80
Labour Charges 88.53 88.53 88.53
Sundries 27.06 27.06 27.06
Add for painting 7.61 10.15 12.69
Total per 1 RM 192.41 223.44 255.08
or say 192.45 223.45 255.10

B Laying pipe line of dia 32mm and 40mm


Sub-Data
Labour Charges 10 RM
0.45 Nos. Stone Cutter I Class 501.00 Each 225.45
1.15 Nos. Plumber I Class 566.00 Each 650.90
0.15 Nos. Plumber II Class 549.00 Each 82.35
0.90 Nos. Mazdoor I Class 426.00 Each 383.40
0.45 Nos. Mazdoor II Class 368.00 Each 165.60
Total for 10 RM 1507.70
Labour for 1 RM 150.77
Sub-Data
Sundries for 1 RM
10.00 gram Shellac 18.00 100 gms. 1.80
1.00 Nos. Clamps, plugs and screws 11.90 set 11.90
0.50 Nos. Thread Balls 3.50 Each 1.75
Sundries for 1 RM 15.45

Sub-Data
Painting 32mm 40mm
Painting area 0.10 0.126
161.50 sq.m. Cost of painting 16.24 20.30

Main Data
For laying GI pipe line of dia 32mm 40mm
Cost of GI Pipe per RM 149.90 161.60
Labour Charges 150.77 150.77
Sundries 15.45 15.45
Add for painting 16.24 20.30
Total per 1 RM 332.36 348.12
or say 332.40 348.15

C Laying pipe line of dia 50mm and 65mm


Sub-Data
Labour Charges 10 RM
0.60 Nos. Stone Cutter I Class 501.00 Each 300.60
1.50 Nos. Plumber I Class 566.00 Each 849.00
0.20 Nos. Plumber II Class 549.00 Each 109.80
1.20 Nos. Mazdoor I Class 426.00 Each 511.20
0.60 Nos. Mazdoor II Class 368.00 Each 220.80
Total for 10 RM 1991.40

Page 54
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Labour for 1 RM 199.14

Sub-Data
Sundries for 1 RM
15.00 gram Shellac 18.00 100 gms. 2.70
1.00 Nos. Clamps, plugs and screws 11.90 set 11.90
0.75 Nos. Thread Balls 3.50 Each 2.63
Sundries for 1 RM 17.23
Sub-Data
Painting 50mm 65mm
Painting area 0.16 0.204
161.50 sq.m. Cost of painting 25.38 32.99

Main Data
For laying GI pipe line of dia 50mm 65mm
Cost of GI Pipe per RM 207.00 242.00
Labour Charges 199.14 199.14
Sundries 17.23 17.23
Add for painting 25.38 32.99
Total per 1 RM 448.74 491.36
or say 448.75 491.40

II External Water Supply - Above Ground Level


A Laying pipe line of dia 15mm, 20mm and
25mm

Sub-Data
Labour Charges 10 RM
0.35 Nos. Stone Cutter I Class 501.00 Each 175.35
0.85 Nos. Plumber I Class 566.00 Each 481.10
0.10 Nos. Plumber II Class 549.00 Each 54.90
0.70 Nos. Mazdoor I Class 426.00 Each 298.20
0.35 Nos. Mazdoor II Class 368.00 Each 128.80
Total for 10 RM 1138.35
Labour for 1 RM 113.84

Sub-Data
Sundries for 1 RM
8.33 gram Shellac 18.00 100 gms. 1.50
1.00 Nos. Clamps, plugs and screws 11.90 set 11.90
1.11 Nos. Thread Balls 3.50 Each 3.89
Sundries for 1 RM 17.28

Main Data
For laying GI pipe line of dia 15mm 20mm 25mm
Cost of GI Pipe per RM 69.20 97.70 126.80
Labour Charges 113.84 113.84 113.84
Sundries 17.28 17.28 17.28
Add for painting 7.61 10.15 12.69
Total per 1 RM 207.93 238.97 270.61
or say 207.95 239.00 270.65

Page 55
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
B Laying pipe line of dia 32mm and 40mm

Sub-Data
Labour Charges 10 RM
0.55 Nos. Stone Cutter I Class 501.00 Each 275.55
1.30 Nos. Plumber I Class 566.00 Each 735.80
0.15 Nos. Plumber II Class 549.00 Each 82.35
1.05 Nos. Mazdoor I Class 426.00 Each 447.30
0.55 Nos. Mazdoor II Class 368.00 Each 202.40
Total for 10 RM 1743.40
Labour for 1 RM 174.34

Sub-Data
Sundries for 1 RM
10.00 gram Shellac 18.00 100 gms. 1.80
1.11 Nos. Clamps, plugs and screws 11.90 set 13.21
1.50 Nos. Thread Balls 3.50 Each 5.25
Sundries for 1 RM 20.26

Main Data
For laying GI pipe line of dia 32mm 40mm
Cost of GI Pipe per RM 149.90 161.60
Labour Charges 174.34 174.34
Sundries 20.26 20.26
Add for painting 16.24 20.30
Total per 1 RM 360.74 376.50
or say 360.75 376.55

C Laying pipe line of dia 50mm and 65mm


Sub-Data
Labour Charges 10 RM
0.70 Nos. Stone Cutter I Class 501.00 Each 350.70
1.70 Nos. Plumber I Class 566.00 Each 962.20
0.20 Nos. Plumber II Class 549.00 Each 109.80
1.40 Nos. Mazdoor I Class 426.00 Each 596.40
0.70 Nos. Mazdoor II Class 368.00 Each 257.60
Total for 10 RM 2276.70
Labour for 1 RM 227.67
Sub-Data
Sundries for 1 RM
15.00 gram Shellac 18.00 100 gms. 2.70
1.50 Nos. Clamps, plugs and screws 11.90 set 17.85
2.00 Nos. Thread Balls 3.50 Each 7.00
Sundries for 1 RM 27.55

Main Data
For laying GI pipe line of dia 50mm 65mm
Cost of GI Pipe per RM 207.00 242.00
Labour Charges 227.67 227.67
Sundries 27.55 27.55
Add for painting 25.38 32.99
Total per 1 RM 487.60 530.21
or say 487.60 530.25

Page 56
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

Note: For every additional floor (not less than 3 metre height) upto 3rd floor
level, the labour component is to be increased by 30% for each floor

83 Supplying, laying and jointing GI pipes of approved quality and best


variety of B Class pipes of the following dia including labour for fixing GI
Specials (excluding charges for cutting and threading and cost of such
specials) with necessary shellac, thread ball, etc., and making holes on
the wall / concrete and making good the dismantled portion to the original
condition with necessary brick work / concrete. The pipes are to be
painted with one coat of tar and tightly pastened with tar dipped gunny
tape, etc., complete complying with standard specification. The G.I. pipes
shall be got approved by the Executive Engineer before use on work. (The
earth work excavation, re-filling the trench with excavated earth, sand
filling, etc., shall be measured and paid separately under respective
items). Below ground level

External Water Supply - Below Ground Level


A Laying pipe line of dia 15mm, 20mm and
25mm

Sub-Data
Labour Charges 10 RM
0.85 Nos. Plumber I Class 566.00 Each 481.10
0.70 Nos. Mazdoor I Class 426.00 Each 298.20
0.35 Nos. Mazdoor II Class 368.00 Each 128.80
0.25 Nos. Painter II Class 505.00 Each 126.25
Total for 10 RM 1034.35
Labour for 1 RM 103.44

Sub-Data
Sundries for 1 RM
8.33 gram Shellac 18.00 100 gms. 1.50
0.50 Nos. Thread Balls 3.50 Each 1.75
1.20 sq.m. Gunny Tape 11.50 sq.m. 13.80
2.50 Kg. Tar 39.90 Kg. 99.75
Sundries for 1 RM 116.80

Main Data
For laying GI pipe line of dia 15mm 20mm 25mm
Cost of GI Pipe per RM 69.20 97.70 126.80
Labour Charges 103.44 103.44 103.44
Sundries 116.80 116.80 116.80
Total per 1 RM 289.43 317.93 347.03
or say 289.45 317.95 347.05

B Laying pipe line of dia 32mm and 40mm


Sub-Data
Labour Charges 10 RM
1.30 Nos. Plumber I Class 566.00 Each 735.80
1.05 Nos. Mazdoor I Class 426.00 Each 447.30
0.55 Nos. Mazdoor II Class 368.00 Each 202.40
0.30 Nos. Painter II Class 505.00 Each 151.50
Total for 10 RM 1537.00

Page 57
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Labour for 1 RM 153.70
Sub-Data

Sundries for 1 RM
10.00 gram Shellac 18.00 100 gms. 1.80
1.50 Nos. Thread Balls 3.50 Each 5.25
1.80 sq.m. Gunny Tape 11.50 sq.m. 20.70
4.00 Kg. Tar 39.90 Kg. 159.60
Sundries for 1 RM 187.35

Main Data
For laying GI pipe line of dia 32mm 40mm
Cost of GI Pipe per RM 149.90 161.60
Labour Charges 153.70 153.70
Sundries 187.35 187.35
Total per 1 RM 490.95 502.65
or say 490.95 502.65

C Laying pipe line of dia 50mm and 65mm


Sub-Data
Labour Charges 10 RM
1.70 Nos. Plumber I Class 566.00 Each 962.20
1.40 Nos. Mazdoor I Class 426.00 Each 596.40
0.70 Nos. Mazdoor II Class 368.00 Each 257.60
0.40 Nos. Painter II Class 505.00 Each 202.00
Total for 10 RM 2018.20
Labour for 1 RM 201.82

Sub-Data
Sundries for 1 RM
15.00 gram Shellac 18.00 100 gms. 2.70
2.00 Nos. Thread Balls 3.50 Each 7.00
3.00 sq.m. Gunny Tape 11.50 sq.m. 34.50
6.00 Kg. Tar 39.90 Kg. 239.40
Sundries for 1 RM 283.60

Main Data
For laying GI pipe line of dia 50mm 65mm
Cost of GI Pipe per RM 207.00 242.00
Labour Charges 201.82 201.82
Sundries 283.60 283.60
Total per 1 RM 692.42 727.42
or say 692.45 727.45

84 Supplying and fixing in position first quality and approved variety of Gun
metal Gate Valve / Wheel Valve with BIS make of the following dia
including cost of shellac, thread balls, etc., complete complying with
standard specifications (for both internal and external water supply
arrangements). The valves to be used on work shall be got approved by
the Executive Engineer before use on work.

I Gate Valve

Page 58
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
A Fixing Gun Metal Gate Valve of dia 20mm
and 25mm

Sub-Data
Labour Charges
0.25 Nos. Fitter I Class 566.00 Each 141.50
0.25 Nos. Mazdoor I Class 426.00 Each 106.50
10.00 gram Shellac 18.00 100 gms. 1.80
0.30 Nos. Thread ball 3.50 Each 1.05
Total / 1 No. 250.85

Main Data
Gun Metal Gate Valve 20mm 25mm
Cost of Gun Metal Gate Valve 341.00 577.00
Labour Charges 250.85 250.85
Total / 1 No. 591.85 827.85
or say 591.85 827.85

B Fixing Gun Metal Gate Valve of dia 32mm


and 40mm

Sub-Data
Labour Charges
0.33 Nos. Fitter I Class 566.00 Each 186.78
0.33 Nos. Mazdoor I Class 426.00 Each 140.58
18.00 gram Shellac 18.00 100 gms. 3.24
0.70 Nos. Thread ball 3.50 Each 2.45
Total / 1 No. 333.05

Main Data
Gun Metal Gate Valve 32mm 40mm
Cost of Gun Metal Gate Valve 739.00 950.00
Labour Charges 333.05 333.05
Total / 1 No. 1072.05 1283.05
or say 1072.05 1283.05

C Fixing Gun Metal Gate Valve of dia 50mm


and 65mm

Sub-Data
Labour Charges
0.50 Nos. Fitter I Class 566.00 Each 283.00
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
30.00 gram Shellac 18.00 100 gms. 5.40
1.00 Nos. Thread ball 3.50 Each 3.50
Total / 1 No. 504.90

Main Data
Gun Metal Gate Valve 50mm 65mm
Cost of Gun Metal Gate Valve 1205.00 1480.00
Labour Charges 504.90 504.90
Total / 1 No. 1709.90 1984.90
or say 1709.90 1984.90
II Wheel Valve

Page 59
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
A Fixing Gun Metal Wheel Valve of dia 15mm,
20mm and 25mm

Sub-Data
Labour Charges
0.25 Nos. Fitter I Class 566.00 Each 141.50
0.25 Nos. Mazdoor I Class 426.00 Each 106.50
10.00 gram Shellac 18.00 100 gms. 1.80
0.30 Nos. Thread ball 3.50 Each 1.05
Total / 1 No. 250.85

Main Data
Gun Metal Wheel Valve 15mm 20mm 25mm
Cost of Gun Metal Wheel Valve 166.00 235.00 342.00
Labour Charges 250.85 250.85 250.85
Total / 1 No. 416.85 485.85 592.85
or say 416.85 485.85 592.85

B Fixing Gun Metal Wheel Valve of dia 32mm


and 40mm

Sub-Data
Labour Charges
0.33 Nos. Fitter I Class 566.00 Each 186.78
0.33 Nos. Mazdoor I Class 426.00 Each 140.58
18.00 gram Shellac 18.00 100 gms. 3.24
0.70 Nos. Thread ball 3.50 Each 2.45
Total / 1 No. 333.05

Main Data
Gun Metal Wheel Valve 32mm 40mm
Cost of Gun Metal Wheel Valve 499.00 634.00
Labour Charges 333.05 333.05
Total / 1 No. 832.05 967.05
or say 832.05 967.05

85 Supplying and fixing in position 15mm dia brass CP screw down tap /
Pillar tap (heavy duty) of approved make conforming to BIS
specifications and quality including cost of shellac, thread, etc., complete
complying with standard specification and including cutting and threading
wherever necessary. (Taps should be got approved by the Executive
Engineer before use on the works)

Sub-Data
Labour Charges
0.10 Nos. Fitter I Class 566.00 Each 56.60
0.10 Nos. Mazdoor I Class 426.00 Each 42.60
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 101.90

Main Data
Swan Neck
SD Tap Pillar Tap
Tap
Cost of Tap 200.00 263.00 246.00

Page 60
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Labour charges 101.90 101.90 101.90
Total / 1 No. 301.90 364.90 347.90
or say 301.90 364.90 347.90

86 Supplying and fixing in position Indian make bevelled edge mirror of


approved quality and brand PVC / Fibre Glass framed 600 x 450 x 5.5mm
thick mirror, shelf type with hard board backing of approved colour fixed
with brass screws, rawl plug, etc., complete complying with standard
specification. (The mirror should be got approved by the Executive
Engineer before use on woks)

600x45omm

1.00 No. Cost of Mirror 462.00 Each 462.00


0.33 Nos. Carpenter II Class 609.00 Each 200.97
0.33 Nos. Mazdoor I Class 426.00 Each 140.58
3.00 Nos. Rawl Plugs 9.35 Each 28.05
3.00 Nos. Brass CP Screws (30 x 6mm) 2.35 Each 7.05
Total / 1 No. 838.65
or say 838.65

500x45omm

1.00 No. Cost of Mirror 372.00 Each 372.00


0.33 Nos. Carpenter II Class 609.00 Each 200.97
0.33 Nos. Mazdoor I Class 426.00 Each 140.58
3.00 Nos. Rawl Plugs 9.35 Each 28.05
3.00 Nos. Brass CP Screws (30 x 6mm) 2.35 Each 7.05
Total / 1 No. 748.65
or say 748.65

87 Supplying and fixing approved best quality brass CP towel rail 600mm
long and 20mm dia with brackets of same materials including cost of
teak wood plugs and CP screws, etc., complete complying with standard
specifications. (The tower rail should be got approved by Executive
Engineer before use on works).

1.00 Nos. Cost of Brass CP Towel Rail 261.20 Each 261.20


0.15 Nos. Fitter I Class 566.00 Each 84.90
0.15 Nos. Mazdoor I Class 426.00 Each 63.90
6.00 Nos. Teak wood plugs 1.05 Each 6.30
6.00 Nos. Brass CP Screws (30 x 6mm) 2.35 Each 14.10
Total / 1 No. 430.40
or say 430.40

88 Supplying and fixing approved best quality aluminium anodised towel


rail 600mm long and 20mm dia with brackets of same materials
including cost of teak wood plugs and CP screws, etc., complete complying
with standard specifications. (The tower rail should be got approved by
Executive Engineer before use on works).

1.00 Nos. Cost of aluminium anodisied towel rail 128.00 Each 128.00
0.15 Nos. Fitter I Class 566.00 Each 84.90
0.15 Nos. Mazdoor I Class 426.00 Each 63.90
6.00 Nos. Teak wood plugs 1.05 Each 6.30
6.00 Nos. Brass CP Screws (30 x 6mm) 2.35 Each 14.10

Page 61
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Total / 1 No. 297.20
or say 297.20
89 Supplying and fixing best approved best quality brass CP soap tray of
size 150 x 100mm including cost of teak wood plugs, brass screws, etc.,
complete complying with standard specifications. (The soap tray should
be got approved by Executive Engineer before use on works).

1.00 Nos. Cost of Brass CP Soap Tray 160.30 Each 160.30


0.10 Nos. Carpenter II Class 609.00 Each 60.90
0.10 Nos. Mazdoor II Class 368.00 Each 36.80
2.00 Nos. Teak wood plugs 1.05 Each 2.10
2.00 Nos. Brass CP Screws (30 x 6mm) 1.25 Each 2.50
Total / 1 No. 262.60
or say 262.60

90 Supplying and fixing in position GI unions of heavy duty of approved quality and
good variety of various sizes inluding necessary cutting and threading of GI pipes
for jointing the union and providing two coats of painting with good variety and
approved quality of synthetic enamel paint over one coat of primer in case of pipe
line above ground level / one coat of tar in case of below ground level for both
internal and external water supply arrangements, etc., complete complying with
standard specifications. (The GI unions should be got approved by Executive
Engineer before use on works).

Sub-Data
Labour Charges
0.20 Nos. Fitter I Class 566.00 Each 113.20
0.20 Nos. Mazdoor I Class 426.00 Each 85.20
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 201.10
Main Data
Dia of GI Union 15mm 20mm 25mm
Cost of GI Union 57.60 69.20 97.70
Labour Charges 201.10 201.10 201.10
Total / 1 No. 258.70 270.30 298.80
or say 258.70 270.30 298.80

Main Data
Dia of GI Union 32mm 40mm 50mm
Cost of GI Union 126.30 195.60 263.70
Labour Charges 201.10 201.10 201.10
Total / 1 No. 327.40 396.70 464.80
or say 327.40 396.70 464.80

91 Supplying and fixing in position the following GI Specials of heavy type


and approved quality and good variety excluding fixing charges but
including necessary cutting and threading of GI pipes, jointing the GI
specials and painting with two coats with good variety and best quality
synthetic enamel paint over a coat of red oxide primer and jointing the
specials with pipe line using shellac etc., complete complying with
standard specification. (The GI specials should be got approved by the
Executive Engineer concerned before use on works.)

I GI Elbow
a 50 mm dia

Page 62
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 No. Cost of Elbow 126.80 Each 126.80
1.00 No. Cutting 15.40 Each 15.40
2.00 No. Threading 31.00 Each 62.00
LS Sundries for painting / shellac LS 3.87
Total / 1 No. 208.07
or say 208.10
b 40 mm dia
1.00 No. Cost of Elbow 97.70 Each 97.70
1.00 No. Cutting 12.00 Each 12.00
2.00 No. Threading 27.90 Each 55.80
LS Sundries for painting / shellac LS 3.39
Total / 1 No. 168.89
or say 168.90
c 32 mm dia
1.00 No. Cost of Elbow 86.20 Each 86.20
1.00 No. Cutting 8.90 Each 8.90
2.00 No. Threading 24.80 Each 49.60
LS Sundries for painting / shellac LS 2.93
Total / 1 No. 147.63
or say 147.65
d 25 mm dia
1.00 No. Cost of Elbow 57.60 Each 57.60
1.00 No. Cutting 7.40 Each 7.40
2.00 No. Threading 18.40 Each 36.80
LS Sundries for painting / shellac LS 2.21
Total / 1 No. 104.01
or say 104.05
e 20 mm dia
1.00 No. Cost of Elbow 25.20 Each 25.20
1.00 No. Cutting 6.20 Each 6.20
2.00 No. Threading 8.90 Each 17.80
LS Sundries for painting / shellac LS 1.20
Total / 1 No. 50.40
or say 50.40
f 15 mm dia
1.00 No. Cost of Elbow 15.80 Each 15.80
1.00 No. Cutting 6.20 Each 6.20
2.00 No. Threading 8.70 Each 17.40
LS Sundries for painting / shellac LS 1.18
Total / 1 No. 40.58
or say 40.60

II GI Bend
a 50 mm dia
1.00 No. Cost of Bend 115.20 Each 115.20
1.00 No. Cutting 15.40 Each 15.40
2.00 No. Threading 31.00 Each 62.00
LS Sundries for painting / shellac LS 3.87
Total / 1 No. 196.47
or say 196.50
b 40 mm dia

Page 63
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 No. Cost of Bend 86.20 Each 86.20
1.00 No. Cutting 12.00 Each 12.00
2.00 No. Threading 27.90 Each 55.80
LS Sundries for painting / shellac LS 3.39
Total / 1 No. 157.39
or say 157.40
c 32 mm dia
1.00 No. Cost of Bend 69.20 Each 69.20
1.00 No. Cutting 8.90 Each 8.90
2.00 No. Threading 24.80 Each 49.60
LS Sundries for painting / shellac LS 2.93
Total / 1 No. 130.63
or say 130.65
d 25 mm dia
1.00 No. Cost of Bend 51.50 Each 51.50
1.00 No. Cutting 7.40 Each 7.40
2.00 No. Threading 18.40 Each 36.80
LS Sundries for painting / shellac LS 2.21
Total / 1 No. 97.91
or say 97.95
e 20 mm dia
1.00 No. Cost of Bend 23.00 Each 23.00
1.00 No. Cutting 6.20 Each 6.20
2.00 No. Threading 8.90 Each 17.80
LS Sundries for painting / shellac LS 1.20
Total / 1 No. 48.20
or say 48.20
f 15 mm dia
1.00 No. Cost of Bend 13.50 Each 13.50
1.00 No. Cutting 6.20 Each 6.20
2.00 No. Threading 8.70 Each 17.40
LS Sundries for painting / shellac LS 1.18
Total / 1 No. 38.28
or say 38.30
III GI Tee
a 50 mm dia
1.00 No. Cost of Tee 138.50 Each 138.50
2.00 No. Cutting 15.40 Each 30.80
3.00 No. Threading 31.00 Each 93.00
LS Sundries for painting / shellac LS 6.19
Total / 1 No. 268.49
or say 268.50

b 40 mm dia
1.00 No. Cost of Tee 109.20 Each 109.20
2.00 No. Cutting 12.00 Each 24.00
3.00 No. Threading 27.90 Each 83.70
LS Sundries for painting / shellac LS 5.39
Total / 1 No. 222.29
or say 222.30
c 32 mm dia

Page 64
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 No. Cost of Tee 97.70 Each 97.70
2.00 No. Cutting 8.90 Each 17.80
3.00 No. Threading 24.80 Each 74.40
LS Sundries for painting / shellac LS 4.61
Total / 1 No. 194.51
or say 194.55
d 25 mm dia
1.00 No. Cost of Tee 80.60 Each 80.60
2.00 No. Cutting 7.40 Each 14.80
3.00 No. Threading 18.40 Each 55.20
LS Sundries for painting / shellac LS 3.50
Total / 1 No. 154.10
or say 154.10
e 20 mm dia
1.00 No. Cost of Tee 34.40 Each 34.40
2.00 No. Cutting 6.20 Each 12.40
3.00 No. Threading 8.90 Each 26.70
LS Sundries for painting / shellac LS 1.96
Total / 1 No. 75.46
or say 75.50
f 15 mm dia
1.00 No. Cost of Tee 28.40 Each 28.40
2.00 No. Cutting 6.20 Each 12.40
3.00 No. Threading 8.70 Each 26.10
LS Sundries for painting / shellac LS 1.93
Total / 1 No. 68.83
or say 68.85
IV GI Coupling
a 50 mm dia
1.00 No. Cost of Coupling 69.20 Each 69.20
1.00 No. Cutting 15.40 Each 15.40
2.00 No. Threading 31.00 Each 62.00
LS Sundries for painting / shellac LS 3.87
Total / 1 No. 150.47
or say 150.50
b 40 mm dia
1.00 No. Cost of Coupling 57.60 Each 57.60
1.00 No. Cutting 12.00 Each 12.00
2.00 No. Threading 27.90 Each 55.80
LS Sundries for painting / shellac LS 3.39
Total / 1 No. 128.79
or say 128.80

c 32 mm dia
1.00 No. Cost of Coupling 46.10 Each 46.10
1.00 No. Cutting 8.90 Each 8.90
2.00 No. Threading 24.80 Each 49.60
LS Sundries for painting / shellac LS 2.93
Total / 1 No. 107.53
or say 107.55
d 25 mm dia
1.00 No. Cost of Coupling 28.40 Each 28.40

Page 65
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 No. Cutting 7.40 Each 7.40
2.00 No. Threading 18.40 Each 36.80
LS Sundries for painting / shellac LS 2.21
Total / 1 No. 74.81
or say 74.85
e 20 mm dia
1.00 No. Cost of Coupling 15.80 Each 15.80
1.00 No. Cutting 6.20 Each 6.20
2.00 No. Threading 8.90 Each 17.80
LS Sundries for painting / shellac LS 1.20
Total / 1 No. 41.00
or say 41.00
f 15 mm dia
1.00 No. Cost of Coupling 13.50 Each 13.50
1.00 No. Cutting 6.20 Each 6.20
2.00 No. Threading 8.70 Each 17.40
LS Sundries for painting / shellac LS 1.18
Total / 1 No. 38.28
or say 38.30
V GI Reducer

a 50 x 40 mm dia
1.00 No. Cost of Reducer 92.30 Each 92.30
1.00 No. Cutting 13.70 Each 13.70
2.00 No. Threading 29.45 Each 58.90
LS Sundries for painting / shellac LS 3.63
Total / 1 No. 168.53
or say 168.55
b 40 x 32 mm dia
1.00 No. Cost of Reducer 69.20 Each 69.20
1.00 No. Cutting 10.45 Each 10.45
2.00 No. Threading 26.35 Each 52.70
LS Sundries for painting / shellac LS 3.16
Total / 1 No. 135.51
or say 135.55
c 32 x 25 mm dia
1.00 No. Cost of Reducer 51.50 Each 51.50
1.00 No. Cutting 8.15 Each 8.15
2.00 No. Threading 21.60 Each 43.20
LS Sundries for painting / shellac LS 2.57
Total / 1 No. 105.42
or say 105.45

d 25 x 20 mm dia
1.00 No. Cost of Reducer 28.40 Each 28.40
1.00 No. Cutting 6.80 Each 6.80
2.00 No. Threading 13.65 Each 27.30
LS Sundries for painting / shellac LS 1.71
Total / 1 No. 64.21
or say 64.25

e 20 x 15 mm dia

Page 66
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 No. Cost of Reducer 20.10 Each 20.10
1.00 No. Cutting 6.20 Each 6.20
2.00 No. Threading 8.80 Each 17.60
LS Sundries for painting / shellac LS 1.19
Total / 1 No. 45.09
or say 45.10
f 40 x 25 mm dia
1.00 No. Cost of Reducer 51.50 Each 51.50
1.00 No. Cutting 9.70 Each 9.70
2.00 No. Threading 23.15 Each 46.30
LS Sundries for painting / shellac LS 2.80
Total / 1 No. 110.30
or say 110.30
g 32 x 20 mm dia
1.00 No. Cost of Reducer 40.00 Each 40.00
1.00 No. Cutting 7.55 Each 7.55
2.00 No. Threading 16.85 Each 33.70
LS Sundries for painting / shellac LS 2.06
Total / 1 No. 83.31
or say 83.35
VI GI Reducer Elbow
a 50 x 40 mm dia
1.00 No. Cost of Reducer Elbow 109.20 Each 109.20
1.00 No. Cutting 13.70 Each 13.70
2.00 No. Threading 29.45 Each 58.90
LS Sundries for painting / shellac LS 3.63
Total / 1 No. 185.43
or say 185.45
b 40 x 32 mm dia
1.00 No. Cost of Reducer Elbow 92.30 Each 92.30
1.00 No. Cutting 10.45 Each 10.45
2.00 No. Threading 26.35 Each 52.70
LS Sundries for painting / shellac LS 3.16
Total / 1 No. 158.61
or say 158.65

c 32 x 25 mm dia
1.00 No. Cost of Reducer Elbow 69.20 Each 69.20
1.00 No. Cutting 8.15 Each 8.15
2.00 No. Threading 21.60 Each 43.20
LS Sundries for painting / shellac LS 2.57
Total / 1 No. 123.12
or say 123.15
d 25 x 20 mm dia
1.00 No. Cost of Reducer Elbow 51.50 Each 51.50
1.00 No. Cutting 6.80 Each 6.80
2.00 No. Threading 13.65 Each 27.30
LS Sundries for painting / shellac LS 1.71
Total / 1 No. 87.31
or say 87.35
e 20 x 15 mm dia

Page 67
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 No. Cost of Reducer Elbow 40.00 Each 40.00
1.00 No. Cutting 6.20 Each 6.20
2.00 No. Threading 8.80 Each 17.60
LS Sundries for painting / shellac LS 1.19
Total / 1 No. 64.99
or say 65.00
f 40 x 25 mm dia
1.00 No. Cost of Reducer Elbow 72.00 Each 72.00
1.00 No. Cutting 9.70 Each 9.70
2.00 No. Threading 23.15 Each 46.30
LS Sundries for painting / shellac LS 2.80
Total / 1 No. 130.80
or say 130.80
g 32 x 20 mm dia
1.00 No. Cost of Reducer Elbow 57.10 Each 57.10
1.00 No. Cutting 7.55 Each 7.55
2.00 No. Threading 16.85 Each 33.70
LS Sundries for painting / shellac LS 2.06
Total / 1 No. 100.41
or say 100.45
VII GI Reducer Tee
a 50 x 40 mm dia
1.00 No. Cost of Reducer Tee 138.50 Each 138.50
2.00 No. Cutting 13.70 Each 27.40
3.00 No. Threading 29.45 Each 88.35
LS Sundries for painting / shellac LS 5.79
Total / 1 No. 260.04
or say 260.05
b 40 x 32 mm dia
1.00 No. Cost of Reducer Tee 115.20 Each 115.20
2.00 No. Cutting 10.45 Each 20.90
3.00 No. Threading 26.35 Each 79.05
LS Sundries for painting / shellac LS 5.00
Total / 1 No. 220.15
or say 220.15
c 32 x 25 mm dia
1.00 No. Cost of Reducer Tee 97.70 Each 97.70
2.00 No. Cutting 8.15 Each 16.30
3.00 No. Threading 21.60 Each 64.80
LS Sundries for painting / shellac LS 4.06
Total / 1 No. 182.86
or say 182.90

d 25 x 20 mm dia
1.00 No. Cost of Reducer Tee 74.60 Each 74.60
2.00 No. Cutting 6.80 Each 13.60
3.00 No. Threading 13.65 Each 40.95
LS Sundries for painting / shellac LS 2.73
Total / 1 No. 131.88
or say 131.90

Page 68
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
e 20 x 15 mm dia
1.00 No. Cost of Reducer Tee 69.20 Each 69.20
2.00 No. Cutting 6.20 Each 12.40
3.00 No. Threading 8.80 Each 26.40
LS Sundries for painting / shellac LS 1.94
Total / 1 No. 109.94
or say 109.95
f 40 x 25 mm dia
1.00 No. Cost of Reducer Tee 103.70 Each 103.70
2.00 No. Cutting 9.70 Each 19.40
3.00 No. Threading 23.15 Each 69.45
LS Sundries for painting / shellac LS 4.44
Total / 1 No. 196.99
or say 197.00
g 32 x 20 mm dia
1.00 No. Cost of Reducer Tee 80.60 Each 80.60
2.00 No. Cutting 7.55 Each 15.10
3.00 No. Threading 16.85 Each 50.55
LS Sundries for painting / shellac LS 3.28
Total / 1 No. 149.53
or say 149.55
VIII GI Hex Nipple
a 50 mm dia
1.00 No. Cost of GI Hex Nipple 86.20 Each 86.20
1.00 No. Add for painting / shellac 2.75 Each 2.75
Total / 1 No. 88.95
or say 88.95
b 40 mm dia
1.00 No. Cost of GI Hex Nipple 69.20 Each 69.20
1.00 No. Add for painting / shellac 2.75 Each 2.75
Total / 1 No. 71.95
or say 71.95
c 32 mm dia
1.00 No. Cost of GI Hex Nipple 57.60 Each 57.60
1.00 No. Add for painting / shellac 2.75 Each 2.75
Total / 1 No. 60.35
or say 60.35
d 25 mm dia
1.00 No. Cost of GI Hex Nipple 43.30 Each 43.30
1.00 No. Add for painting / shellac 2.75 Each 2.75
Total / 1 No. 46.05
or say 46.05
e 20 mm dia
1.00 No. Cost of GI Hex Nipple 34.40 Each 34.40
1.00 No. Add for painting / shellac 2.75 Each 2.75
Total / 1 No. 37.15
or say 37.15

f 15 mm dia
1.00 No. Cost of GI Hex Nipple 23.00 Each 23.00
1.00 No. Add for painting / shellac 2.75 Each 2.75
Total / 1 No. 25.75
or say 25.75

Page 69
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

92 Supplying and fixing in position best quality and approved make Indian
made white / colour glazed earthernware wash hand basin of size 550
x 400mm (with pedestal / without pedestal) with a pair of cast iron
brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class
GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve,
15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass
waste coupling including fixing of wash basin using CI brackets on to the
wall in position with TW plugs and screws, rubber washers, white lead and
giving necessary water supply connection and painting the brackets with
two coat of painting over a priming coat of anti-corrosive paint including
testing for leakages etc., complete complying with standard specification
and as directed by the departmental officers. (The wash hand basin and
specials should be got approved by the Executive Engineer before use on
works).

i White Glazed Wash Hand Basin


a Without Pedestal
Set Cost of white glazed earthernware wash hand 1625.00 Set 1625.00
basin without pedestal,
One pair of cast iron brackets,
One No. 15mm dia brass CP pillar tap,
One No. 32mm dia "B" class GI waste pipe with
1.00 rubber plug and chain,
One No. 15mm dia GM wheel valve,
One No. 15mm brass nipple,
One No. 15mm dia nylone connection,
One No. 32mm dia CP brass waste coupling

1.00 Nos. Plumber I Class 566.00 Each 566.00


0.10 Nos. Plumber II Class 549.00 Each 54.90
0.50 Nos. Mason I Class 652.00 Each 326.00
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
6.00 Nos. Teak wood plugs 1.05 Each 6.30
6.00 Nos. 38mm Brass screws 2.35 Each 14.10
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 3020.98
or say 3021.00
b With Pedestal

Set Cost of white glazed earthernware wash hand 1955.00 Set 1955.00
basin without pedestal,
One pair of cast iron brackets,
One No. 15mm dia brass CP pillar tap,
One No. 32mm dia "B" class GI waste pipe with
1.00 rubber plug and chain,
One No. 15mm dia GM wheel valve,
One No. 15mm brass nipple,
One No. 15mm dia nylone connection,
One No. 32mm dia CP brass waste coupling

1.00 Nos. Plumber I Class 566.00 Each 566.00


0.10 Nos. Plumber II Class 549.00 Each 54.90
0.50 Nos. Mason I Class 652.00 Each 326.00
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
6.00 Nos. Teak wood plugs 1.05 Each 6.30
6.00 Nos. 38mm Brass screws 2.35 Each 14.10
10.00 gram Shellac 18.00 100 gms. 1.80

Page 70
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 3350.98
or say 3351.00

ii Colour Glazed Wash Hand Basin


a Without Pedestal
Set Cost of colour glazed earthernware wash hand 2175.00 Set 2175.00
basin without pedestal,
One pair of cast iron brackets,
One No. 15mm dia brass CP pillar tap,
One No. 32mm dia "B" class GI waste pipe with
1.00 rubber plug and chain,
One No. 15mm dia GM wheel valve,
One No. 15mm brass nipple,
One No. 15mm dia nylone connection,
One No. 32mm dia CP brass waste coupling

1.00 Nos. Plumber I Class 566.00 Each 566.00


0.10 Nos. Plumber II Class 549.00 Each 54.90
0.50 Nos. Mason I Class 652.00 Each 326.00
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
6.00 Nos. Teak wood plugs 1.05 Each 6.30
6.00 Nos. 38mm Brass screws 2.35 Each 14.10
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 3570.98
or say 3571.00

b Without Pedestal
Set Cost of colour glazed earthernware wash hand 2405.00 Set 2405.00
basin without pedestal,
One pair of cast iron brackets,
One No. 15mm dia brass CP pillar tap,
One No. 32mm dia "B" class GI waste pipe with
1.00 rubber plug and chain,
One No. 15mm dia GM wheel valve,
One No. 15mm brass nipple,
One No. 15mm dia nylone connection,
One No. 32mm dia CP brass waste coupling
1.00 Nos. Plumber I Class 566.00 Each 566.00
0.10 Nos. Plumber II Class 549.00 Each 54.90
0.50 Nos. Mason I Class 652.00 Each 326.00
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
6.00 Nos. Teak wood plugs 1.05 Each 6.30
6.00 Nos. 38mm Brass screws 2.35 Each 14.10
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 3800.98
or say 3801.00

Page 71
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
93 Supplying and fixing in position best quality approved make white glazed
earthernwere sink of size of 600 x 450 x 200mm including cost of
32mm dia CP waste coupling, 32mm dia PVC waste pipe with rubber plug
and chain, 15mm dia brass nipple including fixing the sink in position and
testing for leakages etc., complete complying with standard specifications
excluding CI brackets. [The sink and specials should be got approved by
the Executive Engineer before use on works]

Set Cost of sink including 2085.00 Set 2085.00


One No. 32mm dia CP waste coupling,
1.00 One No. 32mm dia PVC waste pipe with rubber
plug and chain,
One No. 15mm dia brass nipple

1.00 Nos. Plumber I Class 566.00 Each 566.00


0.10 Nos. Plumber II Class 549.00 Each 54.90
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 3134.58
or say 3135.00

For fixing the sink with CI bracket


1.00 set CI bracket 104.90 set 104.90
0.50 Nos. Stone Cutter I Class 501.00 Each 250.50
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
2.00 Kgs. Cement 5769.14 1MT 11.54
Total / 1 No. 579.94
or say 580.00

94 Supplying and fixing in position best quality cuddapah sink of following


sizes including cost of 32mm dia CP waste coupling, 32mm dia PVC waste
pipe with rubber plug and chain, 15mm dia brass nipple including fixing
the sink in position and testing for leakages etc., complete complying with
standard specifications excluding CI brackets. [The sink and specials
should be got approved by the Executive Engineer before use on works]

a Cuddapah sink of 600 x 450 x 200mm

Set Cost of sink including 748.00 Set 748.00


One No. 32mm dia CP waste coupling,
One No. 32mm dia PVC waste pipe with rubber
1.00 plug and chain,
One No. 15mm dia brass nipple

1.00 Nos. Plumber I Class 566.00 Each 566.00


0.10 Nos. Plumber II Class 549.00 Each 54.90
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 1797.58
or say 1798.00

Page 72
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
b Cuddapah sink of 600 x 600 x 200mm
Set Cost of sink including 991.00 Set 991.00
One No. 32mm dia CP waste coupling,
1.00 One No. 32mm dia PVC waste pipe with rubber
plug and chain,
One No. 15mm dia brass nipple

1.00 Nos. Plumber I Class 566.00 Each 566.00


0.10 Nos. Plumber II Class 549.00 Each 54.90
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 2040.58
or say 2041.00

95 Supplying and fixing in positon Indian Water Closet (Oriya type) of


size 580 x 440mm white glazed earthern ware of approved quality
and brand with "P" or "S" trap conforming to BIS with sand cushion and
forming flooring alround the closet using 40mm broken brick jelly in lime
concrete 1:2:5 (One lime, Two sand and Five brick jelly) 100mm thick and
finishing the top to the required slope and including giving necessary
connection to CI soil pipes (including the cost of 100mm dia CI pipe
for a length of 600mm) by dismantling brick masonry wall / reinforced
cement concrete roof / floor slab and making good the dismantled portion
to the original condition with leakages etc., complete complying with
standard specifications and as directed by the departmental officers. (The
water closet should be got approved by the Executive Engineer before use
on works).

1.00 Set Cost of IWC (Oriya Type) with 'P' or 'S' trap 1170.00 set 1170.00
0.60 RM 100mm dia CI pipe of 0.60m long 594.00 RM 356.40
0.45 cu.m. Sand for filling 733.96 cu.m. 330.28
0.11 cu.m. Brick jelly lime concrete 1:2:5 2595.30 cu.m. 285.48
1.00 Nos. Plumber I Class 566.00 Each 566.00
1.00 Nos. Mason I Class 652.00 Each 652.00
0.25 Nos. Plumber II class 549.00 Each 137.25
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
1.00 Kg. White cement 22.00 Kg. 22.00
6.00 Kgs. Cement 5769.14 MT 34.61
400.00 gram Spun yarn 12.80 Kg 5.12
Total / 1 No. 3985.15
or say 3986.00

Page 73
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
96 Supplying and fixing in positon Indian Water Closet (Oriya type) of
size 580 x 440mm colour glazed earthern ware of approved quality
and brand with "P" or "S" trap conforming to BIS with sand cushion and
forming flooring alround the closet using 40mm broken brick jelly in lime
concrete 1:2:5 (One lime, Two sand and Five brick jelly) 100mm thick and
finishing the top to the required slope and including giving necessary
connection to CI soil pipes (including the cost of 100mm dia CI pipe
for a length of 600mm) by dismantling brick masonry wall / reinforced
cement concrete roof / floor slab and making good the dismantled portion
to the original condition with leakages etc., complete complying with
standard specifications and as directed by the departmental officers. (The
water closet should be got approved by the Executive Engineer before use
on works).

1.00 Set Cost of IWC (Oriya Type) with 'P' or 'S' trap 1490.00 set 1490.00
0.60 RM 100mm dia CI pipe of 0.60m long 594.00 RM 356.40
0.45 cu.m. Sand for filling 733.96 cu.m. 330.28
0.11 cu.m. Brick jelly lime concrete 1:2:5 2595.30 cu.m. 285.48
1.00 Nos. Plumber I Class 566.00 Each 566.00
1.00 Nos. Mason I Class 652.00 Each 652.00
0.25 Nos. Plumber II class 549.00 Each 137.25
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
1.00 Kg. White cement 22.00 Kg. 22.00
6.00 Kgs. Cement 5769.14 MT 34.61
400.00 gram Spun yarn 12.80 Kg 5.12
Total / 1 No. 4305.15
or say 4306.00

97 Supplying and fixing in positon Indian Water Closet (Oriya type) of


size 580 x 440mm white glazed earthern ware of approved quality
and brand with "P" or "S" trap conforming to BIS with sand cushion and
forming flooring alround the closet using 40mm broken brick jelly in lime
concrete 1:2:5 (One lime, Two sand and Five brick jelly) 100mm thick and
finishing the top to the required slope and including giving necessary
connection to PVC pipes (including the cost of 110mm dia PVC pipe
for a length of 600mm) by dismantling brick masonry wall / reinforced
cement concrete roof / floor slab and making good the dismantled portion
to the original condition with leakages etc., complete complying with
standard specifications and as directed by the departmental officers. (The
water closet should be got approved by the Executive Engineer before use
on works).

1.00 Set Cost of IWC (Oriya Type) with 'P' or 'S' trap 1170.00 set 1170.00
0.60 RM 110mm dia PVC pipe of 0.60m long 259.30 RM 155.58
0.45 cu.m. Sand for filling 733.96 cu.m. 330.28
0.11 cu.m. Brick jelly lime concrete 1:2:5 2595.30 cu.m. 285.48
1.00 Nos. Plumber I Class 566.00 Each 566.00
1.00 Nos. Mason I Class 652.00 Each 652.00
0.25 Nos. Plumber II class 549.00 Each 137.25
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
1.00 Kg. White cement 22.00 Kg. 22.00
6.00 Kgs. Cement 5769.14 MT 34.61
400.00 gram Spun yarn 12.80 Kg 5.12
Total / 1 No. 3784.33
or say 3785.00

Page 74
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
98 Supplying and fixing in positon Indian Water Closet (Oriya type) of size 580
x 440mm colour glazed earthern ware of approved quality and brand with "P"
or "S" trap conforming to BIS with sand cushion and forming flooring alround the
closet using 40mm broken brick jelly in lime concrete 1:2:5 (One lime, Two sand
and Five brick jelly) 100mm thick and finishing the top to the required slope and
including giving necessary connection to PVC pipes (including the cost of
110mm dia PVC pipe for a length of 600mm) by dismantling brick masonry
wall / reinforced cement concrete roof / floor slab and making good the
dismantled portion to the original condition with leakages etc., complete
complying with standard specifications and as directed by the departmental
officers. (The water closet should be got approved by the Executive Engineer
before use on works).

1.00 Set Cost of IWC (Oriya Type) with 'P' or 'S' trap 1490.00 set 1490.00
0.60 RM 110mm dia PVC pipe of 0.60m long 259.30 RM 155.58
0.45 cu.m. Sand for filling 733.96 cu.m. 330.28
0.11 cu.m. Brick jelly lime concrete 1:2:5 2595.30 cu.m. 285.48
1.00 Nos. Plumber I Class 566.00 Each 566.00
1.00 Nos. Mason I Class 652.00 Each 652.00
0.25 Nos. Plumber II class 549.00 Each 137.25
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
1.00 Kg. White cement 22.00 Kg. 22.00
6.00 Kgs. Cement 5769.14 MT 34.61
400.00 gram Spun yarn 12.80 Kg 5.12
Total / 1 No. 4104.33
or say 4105.00

99 Supplying and fixing in position white / colour glazed European Water Closet
of best quality and approved make with 100 mm "P" or "S" trap connecting with
CI pipe of 100mm dia / PVC pipe of 110mm dia, double flapped rigid PVC black
seat and seat cover with CP brass hinges including cost of white cement, cement
for packing, spun yarn, teak wood plugs, brass screws, etc., including supplying
and fixing 10 litres capacity PVC / 12.5 litres capacity porcelin low level flushing
tank with a pair of CI brackets, etc., complete with all fittings such as 15mm
brass ball valve with polythene float with brass handle, union, coupling connected
by means of 40mm white PVC flush hand using Indian adopter joint including all
internal fittings.....

such as 15mm brass connections, 15mm GM wheel valve, 15mm brass nipple (2
Nos.), 15mm nylon connection, TW plugs, screws and also giving necessary
connection to the PVC pipe including cost of 600mm length of 110mm dia PVC
pipe and painting the CI brackets with 2 coats of approved paint over one coat of
red oxide primer, dismantling the masonry and re-doing the dismantled masonry
to original condition etc. complete complying with standard specifications. (The
EWC and flushing tank wiht all accessories should be got approved by the
Executive Enginer before use on works)

Sub-Data
Set Cost of white glazed European Water Closet with 10 3000.00 Nos. 3000.00
1.00 litres capacity PVC flushing tank with all accessories

0.50 Nos. Mason II Class 609.00 Each 304.50


0.50 Nos. Plumber I Class 566.00 Each 283.00
0.10 Nos. Plumber II Class 549.00 Each 54.90
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
0.50 Nos. Mazdoor II Class 368.00 Each 184.00
1.00 Kg. White cement 22.00 Kg. 22.00
6.00 Kgs. Cement 5769.14 Kgs. 34.61
400.00 gram Spun yarn 12.80 kg 5.12
4.00 Nos. TW plugs (50 x 50 x 100mm) 5.25 Each 21.00
4.00 Nos. Brass screws (75 x 10mm) 4.75 Each 19.00
Total (A) 4354.13

Page 75
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

a White glazed European Water Closet with 10 litre


capacity PVC flushing tank fixed on to wall

1.00 Set Rate as above (A) 4354.13 Set 4354.13


Fixing charges for flushing tank
0.30 Nos. Plumber I class 566.00 Each 169.80
0.30 Nos. Mason II Class 609.00 Each 182.70
0.60 Nos. Mazdoor I Class 426.00 Each 255.60
2.00 Nos. TW plugs 5.25 Each 10.50
2.00 Nos. Brass screws 4.75 Each 9.50
2.00 Kg. White cement 22.00 Kg. 44.00
10.00 gram Shellac 18.00 100 gms. 1.80
0.50 Nos. Thread ball 3.50 Each 1.75
Total / 1 No. 5029.78
or say (B) 5030.00

b White glazed European Water Closet with 10 litre


capacity PVC flushing tank fixed with CI brackets

1.00 Set Rate as above (B) 5030.00 Set 5030.00


Supplying and fixing charges for CI brackets
1.00 Set Cost of CI brackets 104.90 Set 104.90
0.50 Nos. Plumber I class 566.00 Each 283.00
0.50 Nos. Mason II Class 609.00 Each 304.50
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
0.50 Nos. Stone Cutter I Class 501.00 Each 250.50
2.00 Kg. Cement 5769.14 Kg. 11.54
2.00 Kg. White cement 22.00 Kg. 44.00
10.00 gram Shellac 18.00 100 gms. 1.80
0.50 Nos. Thread ball 3.50 Each 1.75
200.00 gram Spun yarn 12.80 kg 2.56
Total / 1 No. 6460.55
or say (C) 6461.00

c Colour glazed European Water Closet with 10 litre


capacity PVC flushing tank fixed on to wall

1.00 Set Rate as above in (B) 5030.00 Set 5030.00


1.00 Set Add difference in cost of colour glazed EWC 390.00 Set 390.00
Total / 1 No. 5420.00
or say (D) 5420.00

d Colour glazed European Water Closet with 10 litre


capacity PVC flushing tank fixed with CI brackets

1.00 Set Rate as above in (C) 6461.00 Set 6461.00


1.00 Set Add difference in cost of colour glazed EWC 390.00 Set 390.00
Total / 1 No. 6851.00
or say (E) 6851.00

Page 76
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
e White glazed European Water Closet with 12.5
litre capacity porcelin flushing tank fixed on to
wall

Sub-Data
Fixing charges for porcelin flushing tank
0.50 Nos. Plumber I class 566.00 Each 283.00
0.50 Nos. Mason II Class 609.00 Each 304.50
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
2.00 Nos. TW plugs 5.25 Each 10.50
2.00 Nos. Brass screws 4.75 Each 9.50
2.00 Kg. White cement 22.00 Kg. 44.00
10.00 gram Shellac 18.00 100 gms. 1.80
0.50 Nos. Thread ball 3.50 Each 1.75
200.00 gram Spun yarn 12.80 kg 2.56
Total / 1 No. 1083.61
or say (F) 1084.00

1.00 Set Rate as above in (A) 4354.13 Set 4354.13


1.00 Set Rate as above in (F) 1084.00 Set 1084.00
1.00 Set Add difference in cost of porcelin flushing tank 1230.00 Set 1230.00
Total / 1 No. 6668.13
or say (G) 6669.00

f White glazed European Water Closet with 12.5


litre capacity procelin flushing tank fixed with CI
brackets

1.00 Set Rate as above in (A) 4354.13 Set 4354.13


1.00 Set Rate as above in (F) 1084.00 Set 1084.00
1.00 Set Rate as above in (C-B) 1431.00 Set 1431.00
1.00 Set Add difference in cost of porcelin flushing tank 1230.00 Set 1230.00
Total / 1 No. 8099.13
or say (H) 8100.00

g Colour glazed European Water Closet with 12.5


litre capacity porcelin flushing tank fixed on to
wall

1.00 Set Rate as above in (G) 6669.00 Set 6669.00


1.00 Set Add difference in cost of porcelin flushing tank 1700.00 Set 1700.00
Total / 1 No. 8369.00
or say (I) 8369.00

h Colour glazed European Water Closet with 12.5


litre capacity procelin flushing tank fixed with CI
brackets

1.00 Set Rate as above in (G) 6669.00 Set 6669.00


1.00 Set Rate as above in (C-B) 1431.00 Set 1431.00
1.00 Set Add difference in cost of porcelin flushing tank 1700.00 Set 1700.00
Total / 1 No. 9800.00
or say 9800.00

Page 77
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
100 Supply and fixing in position of best Indian make white / colour glazed
earthernware lipped mouth flat back urinal of best quality and approved
make of size 430mm x 260mm x 350mm with GI pipe, 32mm dia bell
mouth PVC connection and waste pipe, 15mm dia GI pipe of required
length, 15mm dia GM wheel valve, 15mm dia brass nipple 2 Nos., and
fixing the urinals in position with necessary TW plugs, clamps, screws,
etc., including dismantling masnory and re-doing the same to the original
condition, etc., including painting the pipe with two coats of best quality
approved synthetic enamel paint over one coat of red oxide primer and
checked without any leakage etc. complete complying with standard
specifications and as directed by the departmental officers. (The urinal
should be got approved by the Executive Engineer before use on works.)

a White glazed earthernwere lipped mouth flat


back urinal

Set Cost of urinal, 913.00 Set 913.00


32mm dia bell mouth PVC connection and waste
pipe,
1.00 15mm dia GI pipe of required length,
15mm dia GM wheel valve,
15mm dia brass nipple 2 Nos.

0.50 Nos. Plumber I class 566.00 Each 283.00


0.50 Nos. Mason I Class 652.00 Each 326.00
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
2.00 sets TW plugs, clamps and screws 11.90 set 23.80
10.00 gram Shellac 18.00 100 gms 1.80
0.50 Nos. Thread balls 3.50 Each 1.75
1.00 set Special clamp for waste pipe, TW plugs and 21.00 set 21.00
screws Total / 1 No. 1783.35
or say (A) 1783.50

b Colour glazed earthernwere lipped mouth flat


back urinal
1.00 set Rate as above in (A) 1783.50 set 1783.50
1.00 set Add difference in cost of colour urinal 132.00 set 132.00
Total / 1 No. 1915.50
or say 1915.50
101 Supplying and fixing in position Indian make white glazed earthenware
squating type urinal of best quality and approved make including
dismantling masonry, if necessary and re-doing the same to original
condition, etc., complete complying with standard specification. (The
squatting urinal should be got approved by the Executive Engineer before
use on works).

1.00 Set Cost of squatting urinal 442.00 Set 442.00


0.50 Nos. Plumber I class 566.00 Each 283.00
0.50 Nos. Mason II Class 609.00 Each 304.50
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
0.002 cu.m. Cement mortar 1:3 3578.85 cu.m. 7.16
Total / 1 No. 1249.66
or say (A) 1250.00

Page 78
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
102 Supplying and fixing position CI Nahani Trap / Floor Trap of the
following sizes with best stainless steel gratings of approved brand and
quality, fixed over a bed of brick jelly lime concrete 1:2:5 (One part of
lime, two part of sand and five part of 40mm gauge brick jelly) and
finished with Cement Mortar 1:3 (One Cement, Three sand) including
dismantling masonry works wherever found necessary and making good
the dismantled portions to the original condition and giving connection to
the CI / PVC pipes, etc., complete complying with standard specification.
(The Nahani Trap should be got approved by the Executive Engineer
before use on works)

a Nahani Trap of size 100 x 75mm with stainless


steel gratings
1.00 set Cost of Nahini Trap with stainless steel grating 271.50 Each 271.50
0.20 Nos. Plumber I Class 566.00 Each 113.20
0.20 Nos. Stone Cutter I Class 501.00 Each 100.20
0.20 Nos. Mason II Class 609.00 Each 121.80
cu.m Brick jelly lime concrete 1:2:5 using 40mm size 2595.30 cu.m 12.98
0.005
brick jelly
0.002 cu.m Cement mortar 1:3 3578.85 cu.m 7.16
Total / 1 No. 626.83
or say (A) 627.00
a Nahani Trap of size 100 x 75mm with pvc
gratings
1.00 set Cost of Nahini Trap with pvcl grating 150.00 Each 150.00
0.15 Nos. Plumber I Class 566.00 Each 84.90
0.15 Nos. Stone Cutter I Class 501.00 Each 75.15
0.15 Nos. Mason II Class 609.00 Each 91.35
cu.m Brick jelly lime concrete 1:2:5 using 40mm size 2595.30 cu.m 12.98
0.005
brick jelly
0.002 cu.m Cement mortar 1:3 3578.85 cu.m 7.16
Total / 1 No. 421.53
or say (A) 422.00
b Nahani Trap of size 75 x 50mm with stainless
steel gratings
1.00 set Cost of Nahini Trap with stainless steel grating 212.70 Each 212.70
0.20 Nos. Plumber I Class 566.00 Each 113.20
0.20 Nos. Stone Cutter I Class 501.00 Each 100.20
0.20 Nos. Mason II Class 609.00 Each 121.80
cu.m Brick jelly lime concrete 1:2:5 using 40mm size 2595.30 cu.m 12.98
0.005
brick jelly
0.002 cu.m Cement mortar 1:3 3578.85 cu.m 7.16
Total / 1 No. 568.03
or say (A) 568.50
b Nahani Trap of size 75x 50mm with PVC gratings

1.00 set Cost of Nahini Trap with stainless steel grating 131.40 Each 131.40
0.15 Nos. Plumber I Class 566.00 Each 84.90
0.15 Nos. Stone Cutter I Class 501.00 Each 75.15
0.15 Nos. Mason II Class 609.00 Each 91.35
0.005 cu.m Brick jelly lime concrete 1:2:5 using 40mm size 2595.30 cu.m 12.98
0.002 cu.m brick
Cementjelly
mortar 1:3 3578.85 cu.m 7.16
Total / 1 No. 402.93
or say (A) 403.00

Page 79
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
103 Supplying, laying and jointing glazed stone ware pipes of the following
dia of approved quality with spigot and socket ends and fixing them in dry
condition using spun yarn and cement including petty masonry shoring
and strutting wherever found necessary and laying the pipe line in the
alignment at the specified gradient and testing with necessary tools and
plants, etc., and re-filling the trench with excavated earth and levelling
the ground etc., complete complying with standard specifications. (Earth
work excavation, re-filling with excavated earth will be measured and paid
separately).

a 100mm dia stoneware pipe (cement joint)


50.00 Nos. Cost of pipes (each of length 0.60 metre) 61.60 Each 3080.00
1.00 No. Plumber I class 566.00 Each 566.00
5.00 Nos. Mazdoor I Class 426.00 Each 2130.00
2.00 Nos. Mazdoor II Class 368.00 Each 736.00
1 30.00 Kg Cement 5769.14 MT 173.07
7.50 Kg Spun yarn 12.80 Kg 96.00
Total for 30 RM 6781.07
Rate for 1 RM 226.05

b 150mm dia stoneware pipe (cement joint)


50.00 Nos. Cost of pipes (each of length 0.60 metre) 99.20 Each 4960.00
2.00 Nos. Plumber I class 566.00 Each 1132.00
6.00 Nos. Mazdoor I Class 426.00 Each 2556.00
3.00 Nos. Mazdoor II Class 368.00 Each 1104.00
30.00 Kg Cement 5769.14 MT 173.07
7.50 Kg Spun yarn 12.80 Kg 96.00
Total for 30 RM 10021.07
Rate for 1 RM 334.05

104 Supplying, laying and jointing glazed stoneware pipes of following dia
of approved best quality with spigot and socket ends (in reverse direction)
in dry condition and laid in loose joints (i.e.) without cement and spun
yarn, so that the waste water can be drained to the trenches already
available, excluding cost of earth work excavation, cost of re-filling with
sand / earth, but including laying the pipe in true alignment and gradient
and conducting required water supply test for draining with necessary
tools and plants, etc., complete complying with standard specifications.

Sub-Data
Labour for laying for 30m length (loose
joint)
1.00 Nos. Plumber II Class 549.00 Each 549.00
3.00 Nos. Mazdoor I Class 426.00 Each 1278.00
1.00 Nos. Mazdoor II Class 368.00 Each 368.00
Total for 30 RM 2195.00
Rate / 1 RM 73.17

Main Data
100 mm 150 mm
1.00 RM Cost of pipes (each of length 0.60 metre) 102.67 165.33
Labour Charges 73.17 73.17
Rate for 1 RM 175.83 238.50
or say 175.85 238.50

Page 80
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
105 Supplying and fixing in position 150mm dia stoneware tee of approved
best quality and provding leak proof joints with cement, spun yarn, etc.,
including dismantling the brick work and re-doing the dismantled portion
to the original condition, etc., complete complying with standard
specifications (The stoneware tee shall be got approved by the Executive
Engineer before use on work)

1.00 No. Cost of 150mm stoneware tee 161.30 Each 161.30


0.25 Nos. Plumber I Class 566.00 Each 141.50
1.00 Kg. Cement 5769.14 MT 5.77
0.125 Kg. Spun yarn 12.80 Kg 1.60
Rate per 1 No. 310.17
or say 310.20

106 Supplying and fixing in position 150 x 100mm "P" or "S" stoneware gully
trap 'A' grade with CI double gratings of size 150 x 150mm and 230 x
230mm at bottom and top respectively with necessary earth work
excavation laid over a bed of brick jelly cement concrete 1:3:6 (One
cement, Three sand and Six broken brick jelly) 150mm thick using 40mm
size broken brick jelly including necessary brick work and plastering
including dismantling masonry wherever necessary and re-doing the
damaged portions to the original conditions using cement concrete 1:3:6
using 20mm stone jelly for fixing the gully trap and giving connections to
stoneware sewer line etc., complete complying with standard
specifications. [Earth work excavation, brick work, plastering shall be
measured and paid separately]. The stoneware gully trap should be got
approved by the Executive Engineer before use on works.

Main Data
1.00 No. Cost of Gully Trap with CI double gratings 165.50 Each 165.50
0.25 Nos. Mason I Class 652.00 Each 163.00
0.25 Nos. Mazdoor I Class 426.00 Each 106.50
0.03 cu.m CC 1:3:6 using 20mm stone jelly 4418.00 cu.m 132.54
0.05 cu.m Brick jelly cement concrete 1:3:6 using 40mm 3642.85 cu.m 182.14
brick jelly Total / 1 No. 749.68
or say (A) 750.00
Sub-Data brick jelly cement concrete 1:3:6
9.00 cu.m. Brick jelly 40mm thick 722.00 cu.m. 6498.00
4.50 cu.m. Cement Mortar 1:3 3578.85 cu.m. 16104.81
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Rate for 10 cu.m. 36428.01
Rate for 1 cu.m. 3642.85

Sub-Data plain cement concrete 1:3:6


9.00 cu.m. Stone jelly 20mm thick 1583.28 cu.m. 14249.52
4.50 cu.m. Cement Mortar 1:3 3578.85 cu.m. 16104.81
1.80 Nos. Mason II Class 609.00 Each 1096.20
17.70 Nos. Mazdoor I Class 426.00 Each 7540.20
14.10 Nos. Mazdoor II Class 368.00 Each 5188.80
Rate for 10 cu.m. 44179.53
Rate for 1 cu.m. 4418.00

Page 81
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
107 Supplying and fixing AC ventilating shaft of 100mm dia with 3 metre
height including cost of 100mm dia AC cylindrical cowl of best approved
quality etc., complete complying with standard specifications and as
directed by the departmental officers

3.00 RM Cost of 3 metre height AC pipe 139.90 3 RM 139.90


0.30 Nos. Plumber I Class 566.00 Each 169.80
0.30 Nos. Mazdoor I Class 426.00 Each 127.80
1.00 Nos. AC cowl 76.30 Each 76.30
Rate per 1 No. 513.80
or say 513.80

108 Supplying and fixing PVC ventilating shaft of 110mm dia (having
working pressure 4 kg. / sq.cm) with 3 metre height including cost of PVC
cylindrical cowl of best approved quality etc., complete complying with
standard specifications and as directed by the departmental officers

3.00 RM Cost of 3 metre height PVC pipe 172.80 RM 518.40


0.30 Nos. Plumber I Class 566.00 Each 169.80
0.30 Nos. Mazdoor I Class 426.00 Each 127.80
1.00 Nos. PVC cowl 70.00 Each 70.00
20.00 gram PVC adhesive 32.10 100 gram 6.42
Rate per 1 No. 892.42
or say 892.45

109 Supplying and fixing in position CI manhole covers with CI frames (Heavy
duty) of size 60cm x 60cm of best approved quality as per standard
specification etc., complete compying with standard specifications

Sub-Data
Labour for fixing 3 Nos. of CI Manhole Cover
1.00 Nos. Mason I Class 652.00 Each 652.00
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
Total for fixing 3 Nos. 1078.00
For fixing 1 No. 359.33

Main Data
1.00 Nos. Cost of CI Manhole Cover (Heavy Duty) 1810.00 Each 1810.00
1.00 Nos. Labour charges 359.33 Each 359.33
0.004 cu.m Cement Mortar 1:3 3578.85 cu.m 14.32
Rate per 1 No. 2183.65
or say 2184.00

Page 82
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
110 Supplying, laying and position best quality Indian cast iron soil / waste
pipes of following dia of approved brand and quality conforming to BIS
and providing leak proof joints with spun yarn and making connection to
all sanitary fittings with required number of special, clamps, cement and
spun yarn, dismantling the masonry / RCC wherever necessary and
making good the dismanlted portion to the original condition including
painting the cast iron pipes and fittings with two coats of anti corrosive
paint of approved quality and colour and the pipes fixed in postion in true
alignment, etc., complete complying with standard specifications (The CI
pipes shall be got approved by the Executive Engineer before use on
work)

Sub-Data
Labour for laying CI pipe line for 1.83 metre
long
0.50 Nos. Plumber I Class 566.00 Each 283.00
0.25 Nos. Stone Cutter II Class 483.00 Each 120.75
1.00 Nos. Mazdoor I Class 426.00 Each 426.00
Total for 1.83 RM 829.75
Rate / 1 RM 453.42

Sub-Data for anti-corrosive paint two coats


2.22 litre Anti-corrosive paint 221.00 litre 490.62
1.10 Nos. Painter I Class 522.00 Each 574.20
LS Sundries for brushes, etc. LS 4.91
Total for 10 sq.m. 1064.82
Rate per 1 sq.m. 106.48

Sub-Data for painting


150 mm 100mm 75mm
Painting area 0.47 0.314 0.24
106.48 sq.m. Cost of painting 50.20 33.47 25.10

Main Data
150 mm 100mm 75mm
1.00 RM Cost of pipes (each of length 1.83 metre) 985.00 594.00 474.00
Labour Charges 453.42 453.42 453.42
2.00 Nos. Special clamp 21.00 21.00 21.00
1.00 Kg. Cement 5.77 5.77 5.77
250.00 grams Spun yarn 3.20 3.20 3.20
Two coats of anti corrosive paint 50.20 33.47 25.10
Rate for 1 RM 1518.58 1110.85 982.48
or say 1518.60 1110.90 982.50

111 Supplying and fixing in position following CI specials of various dia of


approved quality conforming to BIS and providing leak proof joints with
cement, spun yarn, etc., including fixing to wall and giving connections to
the CI soil stacks, dismantling the brick work / RCC floor or roof slab and
re-doing the dismantled portion to the original condition including the CI
specials with two coats of anti corrosive paint of approved quality and
colour etc., complete complying with standard specifications (The CI
specials shall be got approved by the Executive Engineer before use on
work)

Sub-Data
Labour for fixing CI specials 4 Nos.

Page 83
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 Nos. Plumber I class 566.00 Each 566.00
1.00 No. Mazdor I class 426.00 Each 426.00
0.80 Nos. Plumber II Class 549.00 Each 439.20
Total for fixing 4 Nos. 1431.20
Rate for 1 No. 357.80

Sundries for 1 No.


2.00 Kgs. Cement 5769.14 MT 11.54
500.00 gram Spun yarn 12.80 Kg. 6.40
LS Anti-corrosive paint LS 1.79
Total 19.73

A CI Plain Bend 150mm 100mm 75mm


1.00 No. Cost 533.00 260.00 200.00
1.00 No. Labour for fixing 357.80 357.80 357.80
1.00 No. Sundries 19.73 19.73 19.73
Rate for 1 No. 910.53 637.53 577.53
or say 910.55 637.55 577.55

B CI Bend with Door 150mm 100mm 75mm


1.00 No. Cost 617.00 312.00 260.00
1.00 No. Labour for fixing 357.80 357.80 357.80
1.00 No. Sundries 19.73 19.73 19.73
Rate for 1 No. 994.53 689.53 637.53
or say 994.55 689.55 637.55

C CI Plain Tee 150mm 100mm 75mm


1.00 No. Cost 1068.00 474.00 324.00
1.00 No. Labour for fixing 357.80 357.80 357.80
1.00 No. Sundries 19.73 19.73 19.73
Rate for 1 No. 1445.53 851.53 701.53
or say 1445.55 851.55 701.55

D CI Tee with Door 150mm 100mm 75mm


1.00 No. Cost 1128.00 546.00 379.00
1.00 No. Labour for fixing 357.80 357.80 357.80
1.00 No. Sundries 19.73 19.73 19.73
Rate for 1 No. 1505.53 923.53 756.53
or say 1505.55 923.55 756.55

E CI "Y" Junction with Door (single) 150mm 100mm 75mm


1.00 No. Cost 1186.00 594.00 414.00
1.00 No. Labour for fixing 357.80 357.80 357.80
1.00 No. Sundries 19.73 19.73 19.73
Rate for 1 No. 1563.53 971.53 791.53
or say 1563.55 971.55 791.55

F CI "Y" Junction with Door (Double) 150mm 100mm 75mm


1.00 No. Cost 1307.00 664.00 498.00
1.00 No. Labour for fixing 357.80 357.80 357.80
1.00 No. Sundries 19.73 19.73 19.73
Rate for 1 No. 1684.53 1041.53 875.53
or say 1684.55 1041.55 875.55

Page 84
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

Sub-Data
Labour for fixing CI Cowl
0.25 Nos. Plumber I class 566.00 Each 141.50
1.00 Kg. Cement 5769.14 MT 5.77
125.00 gram Spun yarn 12.80 Kg. 1.60
LS Add for anti-corrosive painting LS 1.50
Rate for 1 No. 150.37

G CI Cowl 150mm 100mm 75mm


1.00 No. Cost 324.00 195.00 130.00
1.00 No. Labour for fixing 150.37 150.37 150.37
Rate for 1 No. 474.37 345.37 280.37
or say 474.40 345.40 280.40

112 Supplying and fixing in position best quality PVC soil / waste pipes of
various dia having 6 kg / sq.cm. pressure BIS mark and providing leak
proof joints using PVC adhesives including fixing to the wall with special
PVC / MS clamp, teak wood plugs, brass screws, etc., and making
connection to all sanitary fittings, dismantling masonry / RCC works
wherever found necessary and making the good dismantled portion to the
original condition, including testing for any leakages, etc., complete
complying with standard specifications. (The PVC pipes should be got
approved by the Executive Engineer before use on works). The rate for
earth work excavation will be measured and paid separately in the cases
where the pipe lines are proposed to laid below ground level

Sub-Data
Labour for 6.10 RM (one length)
0.40 Nos. Plumber I Class 566.00 Each 226.40
0.25 Nos. Stone Cutter II Class 483.00 Each 120.75
0.75 Nos. Mazdoor I Class 426.00 Each 319.50
6.00 set PVC / MS special clamp, TW plugs and screws 11.90 set 71.40
20.00 gram PVC adhesive 32.10 100 gram 6.42
Total for 6.10 RM (one length) 744.47
Rate for 1 RM 122.04

Main Data
Dia of pipe 75mm 110mm 160mm
Cost of PVC pipe per RM 166.30 259.30 506.00
Labour charges 122.04 122.04 122.04
Total / 1 RM 288.34 381.34 628.04
or say 288.35 381.35 628.05

113 Supplying and fixing in position PVC specials of the following dia and types
of approved quality confirming to BIS and providing leak proof joints
including fixing to the walls and giving connection to the PVC soil stacks,
dismantling the masonry or RCC works and re-doing the dismantled
portion to original condition etc., complete complying with standard
specifications. (The PVC specials should be got approved by the Executive
Engineer before use on works).

Sub-Data
Labour for fixing 4 Nos.

Page 85
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
0.60 Nos. Plumber I Class 566.00 Each 339.60
0.60 Nos. Mazdoor I Class 426.00 Each 255.60
0.50 Nos. Plumber II Class 549.00 Each 274.50
Total for fixing 4 Nos. 869.70
Rate for 1 No. 217.43

Sundries for 1 No.


20.00 gram PVC adhesive 32.10 100 gram. 6.42
Rate for 1 No. 6.42
Main Data
A PVC Elbow 160mm 110mm 75mm
1.00 Nos. Cost of special 94.80 82.80 52.90
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 318.65 306.65 276.75
or say 318.65 306.65 276.75

B PVC Elbow with Door 160mm 110mm 75mm


1.00 Nos. Cost of special 130.40 112.30 59.20
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 354.25 336.15 283.05
or say 354.25 336.15 283.05

C PVC Tee 160mm 110mm 75mm


1.00 Nos. Cost of special 147.10 136.00 82.80
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 370.95 359.85 306.65
or say 370.95 359.85 306.65

D PVC Tee with Single Door 160mm 110mm 75mm


1.00 Nos. Cost of special 189.80 159.80 106.60
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 413.65 383.65 330.45
or say 413.65 383.65 330.45

E PVC Tee with Double Door 160mm 110mm 75mm


1.00 Nos. Cost of special 241.50 224.70 136.00
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 465.35 448.55 359.85
or say 465.35 448.55 359.85

F PVC Bend 160mm 110mm 75mm


1.00 Nos. Cost of special 100.40 88.60 59.20
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 324.25 312.45 283.05
or say 324.25 312.45 283.05

Page 86
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

G PVC "Y" 160mm 110mm 75mm


1.00 Nos. Cost of special 154.10 142.20 88.60
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 377.95 366.05 312.45
or say 377.95 366.05 312.45

H PVC "Y" with Single Door 160mm 110mm 75mm


1.00 Nos. Cost of special 193.00 166.00 106.60
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 416.85 389.85 330.45
or say 416.85 389.85 330.45

I PVC "Y" with Double Door 160mm 110mm 75mm


1.00 Nos. Cost of special 271.00 236.20 147.80
1.00 Nos. Labour for fixing 217.43 217.43 217.43
1.00 Nos. Sundries for 1 No. 6.42 6.42 6.42
Total / 1 No. 494.85 460.05 371.65
or say 494.85 460.05 371.65

114 Supplying and fixing in position PVC 4 way junction plain or with door of
various dia of best approved quality confirming to BIS and providing leak
proof joints including fixing to the walls and giving connection to the PVC
soil stacks, dismantling the masonry or RCC works and re-doing the
dismantled portion to original condition etc., complete complying with
standard specifications. (The PVC specials should be got approved by the
Executive Engineer before use on works).

Sub-Data
Labour for fixing 2 Nos.
0.60 Nos. Plumber I Class 566.00 Each 339.60
0.60 Nos. Mazdoor I Class 426.00 Each 255.60
0.25 Nos. Plumber II Class 549.00 Each 137.25
Total for fixing 2 Nos. 732.45
Rate for 1 No. 366.23

Sundries for 1 No.


30.00 gram PVC adhesive 32.10 100 gram. 9.63
Rate for 1 No. 9.63

Main Data

A PVC Double Tee with Single Door 160mm 110mm 75mm


(4 way junction)

1.00 Nos. Cost of special 260.00 231.00 159.80


1.00 Nos. Labour for fixing 366.23 366.23 366.23
1.00 Nos. Sundries for 1 No. 9.63 9.63 9.63
Total / 1 No. 635.86 606.86 535.66
or say 635.90 606.90 535.70

Page 87
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
B PVC Double "Y" with Single Door 160mm 110mm 75mm
(4 way junction)

1.00 Nos. Cost of special 296.00 254.00 177.00


1.00 Nos. Labour for fixing 366.23 366.23 366.23
1.00 Nos. Sundries for 1 No. 9.63 9.63 9.63
Total / 1 No. 671.86 629.86 552.86
or say 671.90 629.90 552.90

115 Supplying and fixing in position PVC cowls of following dia of best
approved quality conforming to BIS, etc., complete complying with
standard specifications. (The PVC cowl should be got approved by the
Executive Engineer before use on works).

Sub-Data
Labour Charges PVC Cowl
0.20 Nos. Plumber I Class 566.00 Each 113.20
20.00 gram PVC adhesive 32.10 100 gram. 6.42
Total for 1 No. 119.62

Main Data
PVC Cowl 110mm 75mm 50mm
1.00 Nos. Cost of cowl 70.00 47.30 29.30
1.00 Nos. Labour charges 119.62 119.62 119.62
Total / 1 No. 189.65 166.95 148.95
or say 189.65 166.95 148.95

116 Supplying and fixing in position CP shower rose with CP stop cock
arrangement of size 15mm dia inlet and 100mm outlet to the pipe line
with necessary cutting, threading and jointing using shellac etc., complete
complying with standard specification and as directed by the departmental
officers (The CP shower rose should be got approved by the Executive
Engineer before use on works).

1.00 Nos. Cost of CP Shower Rose 189.00 Each 189.00


1.00 Nos. Cost of CP stop cock 147.00 Each 147.00
0.10 Nos. Plumber I Class 566.00 Each 56.60
0.10 Nos. Mazdoor I Class 426.00 Each 42.60
10.00 gram Shellac 18.00 100 gms. 1.80
0.25 Nos. Thread ball 3.50 Each 0.88
Total / 1 No. 437.88
or say 438.00

Page 88
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Internal Water Supply Arrangements using
PVC pipes and PVC specials

117 Supplying, laying and jointing PVC pipes (having working pressure 10
kg. / sq.cm) of approved quality and best variety conforming to BIS of the
following dia including cutting, threading and fixing PVC specials using PVC
adhesives (but excluding cost of such specials) and fixing into wall with
teak wood plugs, PVC clamps and screws making holes on the wall (or)
drilling holes in the roof and making good the dismantled portion to
original condition with necessary brick work / cement concrete and
plastering neatly wherever necessary with necessary scaffolding charges,
etc., complete complying with standard specifications. The PVC pipes
shall be got approved by Executive Engineer before use on works.

A For laying PVC pipes of dia 15mm, 20mm


and 25mm

Sub-Data
Labour for 10 RM
0.30 Nos. Stone Cutter I Class 501.00 Each 150.30
0.45 Nos. Plumber I Class 566.00 Each 254.70
0.10 Nos. Plumber II Class 549.00 Each 54.90
0.40 Nos. Mazdoor I Class 426.00 Each 170.40
0.30 Nos. Mazdoor II Class 368.00 Each 110.40
Total for 10 RM 740.70
Total for 1 RM 74.07

Sundries for 1 RM
8.33 gram PVC adhesive 32.10 100 gram. 2.67
1.66 Set PVC clamps, TW plugs and screws 8.30 Set 13.78
Total for 1 RM 16.45

Main Data
For laying PVC pipe line of dia 15mm 20mm 25mm
Cost of PVC pipe per RM 14.60 91.70 133.20
Labour Charges 74.07 74.07 74.07
Sundries 16.45 16.45 16.45
Total per 1 RM 105.12 182.22 223.72
or say 105.15 182.25 223.75
B For laying PVC pipes of dia 32mm & 40mm

Sub-Data
Labour for 10 RM
0.45 Nos. Stone Cutter I Class 501.00 Each 225.45
0.70 Nos. Plumber I Class 566.00 Each 396.20
0.15 Nos. Plumber II Class 549.00 Each 82.35
0.60 Nos. Mazdoor I Class 426.00 Each 255.60
0.45 Nos. Mazdoor II Class 368.00 Each 165.60
Total for 10 RM 1125.20
Total for 1 RM 112.52

Sundries for 1 RM
10.00 gram PVC adhesive 32.10 100 gram. 3.21
1.00 Set PVC clamps, TW plugs and screws 8.30 Set 8.30
Total for 1 RM 11.51

Page 89
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

Main Data
For laying PVC pipe line of dia 32mm 40mm
Cost of PVC pipe per RM 55.10 86.30
Labour Charges 112.52 112.52
Sundries 11.51 11.51
Total per 1 RM 179.13 210.33
or say 179.15 210.35

C For laying PVC pipes of dia 50mm

Sub-Data
Labour for 10 RM
0.60 Nos. Stone Cutter I Class 501.00 Each 300.60
0.90 Nos. Plumber I Class 566.00 Each 509.40
0.20 Nos. Plumber II Class 549.00 Each 109.80
0.75 Nos. Mazdoor I Class 426.00 Each 319.50
0.60 Nos. Mazdoor II Class 368.00 Each 220.80
Total for 10 RM 1460.10
Total for 1 RM 146.01

Sundries for 1 RM
15.00 gram PVC adhesive 32.10 100 gram. 4.82
1.00 Set PVC clamps, TW plugs and screws 8.30 Set 8.30
Total for 1 RM 13.12

Main Data
For laying PVC pipe line of dia 50mm
Cost of PVC pipe per RM 129.00
Labour Charges 146.01
Sundries 13.12
Total per 1 RM 288.13
or say 288.15

External Water Supply Arrangements using


PVC pipes and PVC specials
118 Supplying, laying and jointing PVC pipes (having working pressure 10
kg. / sq.cm) of approved quality and best variety conforming to BIS of the
following dia including cutting, threading and fixing PVC specials using PVC
adhesives (but excluding cost of such specials) and fixing into wall with
teak wood plugs, PVC clamps and screws making holes on the wall (or)
drilling holes in the roof and making good the dismantled portion to
original condition with necessary brick work / cement concrete and
plastering neatly wherever necessary with necessary scaffolding charges
upto 4 metre height above ground level, etc., complete complying with
standard specifications. The PVC pipes shall be got approved by Executive
Engineer before use on works.

I Above Ground Level


A For laying PVC pipes of dia 15mm, 20mm
and 25mm

Sub-Data
Labour for 10 RM

Page 90
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
0.35 Nos. Stone Cutter I Class 501.00 Each 175.35
0.55 Nos. Plumber I Class 566.00 Each 311.30
0.10 Nos. Plumber II Class 549.00 Each 54.90
0.45 Nos. Mazdoor I Class 426.00 Each 191.70
0.35 Nos. Mazdoor II Class 368.00 Each 128.80
Total for 10 RM 862.05
Total for 1 RM 86.21

Sundries for 1 RM
8.33 gram PVC adhesive 32.10 100 gram. 2.67
1.11 Set PVC clamps, TW plugs and screws 8.30 Set 9.21
Total for 1 RM 11.89
Main Data
For laying PVC pipe line of dia 15mm 20mm 25mm
Cost of PVC pipe per RM 14.60 91.70 133.20
Labour Charges 86.21 86.21 86.21
Sundries 11.89 11.89 11.89
Total per 1 RM 112.69 189.79 231.29
or say 112.70 189.80 231.30

B For laying PVC pipes of dia 32mm & 40mm


Sub-Data
Labour for 10 RM
0.55 Nos. Stone Cutter I Class 501.00 Each 275.55
0.80 Nos. Plumber I Class 566.00 Each 452.80
0.15 Nos. Plumber II Class 549.00 Each 82.35
0.65 Nos. Mazdoor I Class 426.00 Each 276.90
0.55 Nos. Mazdoor II Class 368.00 Each 202.40
Total for 10 RM 1290.00
Total for 1 RM 129.00
Sundries for 1 RM
10.00 gram PVC adhesive 32.10 100 gram. 3.21
1.00 Set PVC clamps, TW plugs and screws 8.30 Set 8.30
Total for 1 RM 11.51

Main Data
For laying PVC pipe line of dia 32mm 40mm
Cost of PVC pipe per RM 202.00 86.30
Labour Charges 129.00 129.00
Sundries 11.51 11.51
Total per 1 RM 342.51 226.81
or say 342.55 226.85

C For laying PVC pipes of dia 50mm


Sub-Data
Labour for 10 RM
0.70 Nos. Stone Cutter I Class 501.00 Each 350.70
1.05 Nos. Plumber I Class 566.00 Each 594.30
0.20 Nos. Plumber II Class 549.00 Each 109.80
0.85 Nos. Mazdoor I Class 426.00 Each 362.10
0.70 Nos. Mazdoor II Class 368.00 Each 257.60
Total for 10 RM 1674.50
Total for 1 RM 167.45

Page 91
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Sundries for 1 RM
15.00 gram PVC adhesive 32.10 100 gram. 4.82
1.50 Set PVC clamps, TW plugs and screws 8.30 Set 12.45
Total for 1 RM 17.27

Main Data
For laying PVC pipe line of dia 50mm
Cost of PVC pipe per RM 129.00
Labour Charges 167.45
Sundries 17.27
Total per 1 RM 313.72
or say 313.75
II Below Ground Level
A For laying PVC pipes of dia 15mm, 20mm
and 25mm

Sub-Data
Labour for 10 RM
0.55 Nos. Plumber I Class 566.00 Each 311.30
0.45 Nos. Mazdoor I Class 426.00 Each 191.70
0.35 Nos. Mazdoor II Class 368.00 Each 128.80
Total for 10 RM 631.80
Total for 1 RM 63.18
Sundries for 1 RM
8.33 gram PVC adhesive 32.10 100 gram. 2.67
Total for 1 RM 2.67
Main Data
For laying PVC pipe line of dia 15mm 20mm 25mm
Cost of PVC pipe per RM 14.60 91.70 133.20
Labour Charges 63.18 63.18 63.18
Sundries 2.67 2.67 2.67
Total per 1 RM 80.45 157.55 199.05
or say 80.50 157.60 199.10

B For laying PVC pipes of dia 32mm & 40mm


Sub-Data
Labour for 10 RM
1.30 0.80 Nos. Plumber I Class 566.00 Each 452.80
1.05 0.65 Nos. Mazdoor I Class 426.00 Each 276.90
0.55 0.55 Nos. Mazdoor II Class 368.00 Each 202.40
Total for 10 RM 932.10
Total for 1 RM 93.21

Sundries for 1 RM
10.00 gram PVC adhesive 32.10 100 gram. 3.21
Total for 1 RM 3.21
Main Data
For laying PVC pipe line of dia 32mm 40mm
Cost of PVC pipe per RM 202.00 113.80
Labour Charges 93.21 93.21
Sundries 3.21 3.21
Total per 1 RM 298.42 210.22
or say 298.45 210.25

Page 92
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

C For laying PVC pipes of dia 50mm

Sub-Data
Labour for 10 RM
1.05 Nos. Plumber I Class 566.00 Each 594.30
0.85 Nos. Mazdoor I Class 426.00 Each 362.10
0.70 Nos. Mazdoor II Class 368.00 Each 257.60
Total for 10 RM 1214.00
Total for 1 RM 121.40

Sundries for 1 RM
15.00 gram PVC adhesive 32.10 100 gram. 4.82
Total for 1 RM 4.82

Main Data
For laying PVC pipe line of dia 50mm
Cost of PVC pipe per RM 129.00
Labour Charges 121.40
Sundries 4.82
Total per 1 RM 255.22
or say 255.25
119 Supplying PVC Specials (with working pressure 10 kg. / sq.cm.) in water
supply arrangements (both in internal and external water supply
arrangements

Note: Since the labour for cutting, threading / pasting, sundries have already
been included under pipe line item of works, no separate provision for
fixing PVC specials needs to be allowed

A Coupler
a 1.00 No. 15 mm Dia 3.50 Each 3.50
b 1.00 No. 20 mm Dia 4.10 Each 4.10
c 1.00 No. 25 mm Dia 4.80 Each 4.80
d 1.00 No. 32 mm Dia 6.00 Each 6.00
e 1.00 No. 40 mm Dia 9.00 Each 9.00
f 1.00 No. 50 mm Dia 12.20 Each 12.20

B Elbow
a 1.00 No. 15 mm Dia 5.30 Each 5.30
b 1.00 No. 20 mm Dia 6.00 Each 6.00
c 1.00 No. 25 mm Dia 8.50 Each 8.50
d 1.00 No. 32 mm Dia 12.20 Each 12.20
e 1.00 No. 40 mm Dia 17.20 Each 17.20
f 1.00 No. 50 mm Dia 24.50 Each 24.50

C BEND
a 1.00 No. 15 mm Dia 6.00 Each 6.00
b 1.00 No. 20 mm Dia 7.30 Each 7.30
c 1.00 No. 25 mm Dia 9.70 Each 9.70
d 1.00 No. 32 mm Dia 14.60 Each 14.60
e 1.00 No. 40 mm Dia 19.60 Each 19.60
f 1.00 No. 50 mm Dia 30.70 Each 30.70

Page 93
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

D Tee
a 1.00 No. 15 mm Dia 7.30 Each 7.30
b 1.00 No. 20 mm Dia 8.50 Each 8.50
c 1.00 No. 25 mm Dia 12.20 Each 12.20
d 1.00 No. 32 mm Dia 14.70 Each 14.70
e 1.00 No. 40 mm Dia 23.40 Each 23.40
f 1.00 No. 50 mm Dia 36.80 Each 36.80

E End Cap
a 1.00 No. 15 mm Dia 3.50 Each 3.50
b 1.00 No. 20 mm Dia 4.80 Each 4.80
c 1.00 No. 25 mm Dia 6.00 Each 6.00
d 1.00 No. 32 mm Dia 7.30 Each 7.30
e 1.00 No. 40 mm Dia 11.40 Each 11.40
f 1.00 No. 50 mm Dia 15.80 Each 15.80

F Reducer
a 1.00 No. 20 mm x 15 mm 4.80 Each 4.80
b 1.00 No. 25 mm x 20 mm 5.30 Each 5.30
c 1.00 No. 32 mm x 25 mm 8.50 Each 8.50
d 1.00 No. 40 mm x 32 mm 11.40 Each 11.40
e 1.00 No. 50 mm x 40 mm 19.60 Each 19.60
G Reducer Tee
a 1.00 No. 20 mm x 15 mm 7.30 Each 7.30
b 1.00 No. 25 mm x 20 mm 8.50 Each 8.50
c 1.00 No. 32 mm x 25 mm 12.20 Each 12.20
d 1.00 No. 40 mm x 32 mm 14.70 Each 14.70
e 1.00 No. 50 mm x 40 mm 24.50 Each 24.50

H Reducer Elbow
a 1.00 No. 20 mm x 15 mm 6.00 Each 6.00
b 1.00 No. 25 mm x 20 mm 7.30 Each 7.30
c 1.00 No. 32 mm x 25 mm 9.70 Each 9.70
d 1.00 No. 40 mm x 32 mm 12.20 Each 12.20
e 1.00 No. 50 mm x 40 mm 18.30 Each 18.30

J Jet Nipple
a 1.00 No. 25 mm Dia 15.80 Each 15.80
b 1.00 No. 32 mm Dia 20.70 Each 20.70

120 Providing Anti-termite treatment to soil adjecent and under building 95.00
foundation, plinth periphery of the building by application of chemicals of IS
63613 part I to IV in stages to suit the progress of work consist as per the
detailed specification as below. Including breaking of termite mounds, making
holes with crow bar, closing the holes after the treatment and including cost of
chemicals, labour charges, transport and storing etc., complete and as directed by
the departmental officers.

121 supplying and fixing of Hallow pressed steel door frames for single leaf and double leaved door using
pressed steel frame of size 105x60mm using mild sheet of 1.25mm thick (18gauge) special profile
extruded section.The pressed steel frame should be as per IS4351/1976.The rate in inclusive of bottom
thehold fasts and provision to aldrip tower bolt hinges and lock plate etc,with one coat of zinc chnomate
yellow primer and filling the inside hallow portion with cement concrete 1:2:4 using 20mm HBG stone jelly
etc,complete complying with standard specification.

Page 94
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 Rm Labour steel frame 892.00 cu.m 892.00
0.0063 cu.m PCC 1:2:4 4515.90 cu.m 28.45
920.45
Rate for 1 Rm 920.50

122 R.R Masonary in cement mortar1:5(one cement,and five sand) for foundation and basement including
simultaneously pointing above ground level with the same mortar etc.,complete
10.00 m3 Rough stone for masonary 652.28 cu.m 6522.80
1.00 m3 Bond stone 843.28 cu.m 843.28
3.40 m3 Cement Mortar 1:5 2471.17 cu.m 8401.99
7.10 nos Mason I class 652.00 nos 4629.20
10.60 nos Mason II class 609.00 nos 6455.40
14.10 nos Mazdoor I class 426.00 nos 6006.60
14.10 nos Mazdoor II class 368.00 nos 5188.80
Rate as per 10m2 38048.07
Rate as per 1m2 3804.80

123 Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for
foundation and basement including curing etc.,complete complying with standard specification.
In Cement Mortar 1:3
1300.00 nos Fly ash bricks of size 23x11x7cm 6334.64 1000No 8235.03
0.708 m3 Cement Mortar 1:3 3578.85 cu.m 2533.82
1.00 nos Mason I class 652.00 nos 652.00
3.00 nos Mason II class 609.00 nos 1827.00
2.00 nos Mazdoor I class 426.00 nos 852.00
6.00 nos Mazdoor II class 368.00 nos 2208.00
Total for 100 cft (or) 2.83168 cu.m 16307.86
Rate for 1 cu.m 5759.10
Rate for 1 cu.m:.
For foundation and basfement 5759.10 5759.10
In ground floor 5759.10 51.50 5810.60
In first floor 5810.60 103.80 5914.40
In second floor 5914.40 103.80 6018.20
In Third floor 6018.20 103.80 6122.00
In fourth floor 6122.00 103.80 6225.80
In fifth floor 6225.80 103.80 6329.60

In Cement Mortar 1:5


1300.00 nos Fly ash bricks of size 23x11x7cm 6334.64 1000no 8235.03
0.708 m3 Cement Mortar 1:5 2471.17 cu.m 1749.59
1.00 nos Mason I class 652.00 nos 652.00
3.00 nos Mason II class 609.00 nos 1827.00
2.00 nos Mazdoor I class 426.00 nos 852.00
6.00 nos Mazdoor II class 368.00 nos 2208.00
Total for 100 cft (or) 2.83168 cu.m 15523.62
Rate for 1 cu.m 5482.10
Rate for 1 cu.m:.
For foundation and basfement 5482.10 5482.10
In ground floor 5482.10 51.50 5533.60
In first floor 5533.60 103.80 5637.40
In second floor 5637.40 103.80 5741.20
In Third floor 5741.20 103.80 5845.00
In fourth floor 5845.00 103.80 5948.80
In fifth floor 5948.80 103.80 6052.60

In Cement Mortar 1:6


1300.00 nos Fly ash bricks of size 23x11x7cm 6334.64 1000no 8235.03
0.708 m3 Cement Mortar 1:6 2194.25 cum 1553.53
1.00 nos Mason I class 652.00 nos 652.00
3.00 nos Mason II class 609.00 nos 1827.00

Page 95
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
2.00 nos Mazdoor I class 426.00 nos 852.00
6.00 nos Mazdoor II class 368.00 nos 2208.00
Total for 100 cft (or) 2.83168 cu.m 15327.56
Rate for 1 cu.m 5412.90
Rate for 1 cu.m:.
For foundation and basfement 5412.90 5412.90
In ground floor 5412.90 51.50 5464.40
In first floor 5464.40 103.80 5568.20
In second floor 5568.20 103.80 5672.00
In Third floor 5672.00 103.80 5775.80
In fourth floor 5775.80 103.80 5879.60
In fifth floor 5879.60 103.80 5983.40

32 Brick partition walls of 11.50cm thickness using best quality Fly Ash
Bricks of size 23 x 11 x 7 cm in Cement Mortar 1:3 (One Cement and
Three Sand) using hoop iron reinforcement if found necessary including
curing etc. complete and as directed by the departmental officers. (Hoop
iron reinforcement will be measured and paid for separately)

a Foundation and basement


1.15 cu.m. Brick work in C.M.1:3 in F & B 5759.10 cu.m. 6622.97
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7274.97
Rate for 1 sq.m. 727.50
b Ground Floor
1.15 cu.m. Brick Work in C.M.1:3 in Ground floor 5810.60 cu.m. 6682.19
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7334.19
Rate for 1 sq.m. 733.45

c First Floor
1.15 cu.m. Brick Work in C.M.1:3 in First Floor 5914.40 cu.m. 6801.56
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7453.56
Rate for 1 sq.m. 745.40

d Second Floor
1.15 cu.m. Brick Work in C.M.1:3 in Second Floor 6018.20 cu.m. 6920.93
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7572.93
Rate for 1 sq.m. 757.30

e Third Floor
1.15 cu.m. Brick Work in C.M.1:3 in Third Floor 6122.00 cu.m. 7040.30
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7692.30
Rate for 1 sq.m. 769.25
f Fourth Floor
1.15 cu.m. Brick Work in C.M.1:3 in Fourth Floor 6225.80 cu.m. 7159.67
1.00 No. Extra Mason I Class 652.00 Each 652.00
Total for 10 sq.m. 7811.67
Rate for 1 sq.m. 781.20

124 Supplying and Fixing MS Ladder width 45cm using 50x50x6mm MS Angle.

50x50x6mm Angle required.


side= 1x2x3 6m
6.00x4.42 Kg/m 26.52
Step = 1x10x0.40 4m

Page 96
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
4.00x3.48 Kg/m 13.92
40.44 kg
Primer area
50x50x6mm Angle = 6x0.20 1.20
0.64
1.84 sq.m
Main Data
40.44 kg Cost of M.S.Angle (quotation rate) 41.20 kg 1666.13
40.44 kg Labour chargess 33.40 kg 1350.70
1.84 sq.m Priming one coat 54.50 sq.m 100.28
L.S Conveyance 2.79
Rate for 3 RM 3119.89
Rate for 1 RM 1039.96
Say 1040.00
125
Providing two legged scaffolding using 15cm diameter blue-gum posts or casuarina posts or best quality
bamboo posts of 4m over all length (3m+0.5m projection+0.5m into the ground) the distance between
the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts
with 0.5m overlap on either side and braces at2m c/c including longitudinal and transverse middle braces
to step up and providing a platform with country wood planks of 40mm thick and 1m width etc.,in a
complete form using coir and nails 1m run.

Rate for 6 run.m


70.00 13cm to15cm.diameter posts (Casuarina or
run.m bamboo posts ) 33.00 1run.m 2310.00
0.30 m3 Country wood planks(upto 30cm wide-40mm tk) 39400.00 m3 11820.00
Total cost of materials 14130.00
Materials can be used for 10 times 14130.00
Cost per operation 1413.00

Detailed data
Cost of materials for one operation 1413.00
2.00 nos Mazdoor I class 426.00 Each 852.00
LS Coir, nails etc., 70.65
Total for 6 run.m 2335.65
Rate for 1 run.m 389.30

supplying and fixing if marble of 0.61*1.22m.,18/20mm thick in all floors


for urinal partition including for labour charges for fixing and polishing
127 etc.,
0.74 sq.m. Cost of marble slab 1365.00 sq.m 1010.10
2.00 Nos Clamp with bolds&nuts 21.00 nos 42.00
L.S Labour for fixing L.S 93.50

Page 97
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Cement mortar & dismantling and redoing the
L.S same L.S 19.40
L.S Nozing edges and polishing L.S 46.75
Rate for 0.74 sq.m 1211.75
Rate for 1 sq.m 1637.50

129
Manufacturing supplying and fixing in position of teracotta jally 20x20x5cm thick approved quality and
design in cement slurry including cost of materials labour curing lifting fixing in position etc, complete
complying with standard specification and as directed by the departmental officers in all floors.
Consider a size 3.00x3.00m
Area 9.00 sq.m
No.of tiles required
3.00x3.00/0.20x0.20 225.00 nos
Wastage 5% 11.25 nos
Total 236.25 nos
236.25 Cost of teracotta tiles 20x20x5cm(quotation nos 7087.50
nos Rate) 30.00

50.00 kg Cement 5769.14 1000kg 288.46


3.00 nos Mason I class 652.00 Each 1956.00
2.00 nos Mazdoor I class 426.00 Each 852.00
2.00 nos Mazdoor II class 368.00 Each 736.00
Sundries for red oxide 10.00
Total for 9 sq.m 10929.96
Rate for 1 sq.m. 1214.40

Page 98
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Providing Blockboard in two layers with first layer in cement mortar 1:5 (one cement and five
130
sand )20mm thick and the second layer in Combination mortar 1:1:6(one cement one lime and six sand)
20mm thick and providing band all round the block board in c.m 1:5 (one cement and five sand) for
20mm thick and 50mm width including cost of one coat of block oxide paint of approved quality complying
with standard specification.
plastering with CM 1:5,20mm thick-10sq.m
0.22 cu.m. Cement mortar 1:5 2471.17 cu.m. 543.66
2.20 Nos. Mason I Class 652.00 Each 1434.40
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
3.20 Nos. Mazdoor II Class 368.00 Each 1177.60
Total for 10 sq.m. 3368.66
Rate for 1 sq.m. 336.87
Say Rate for 1 sq.m 336.87
Combination mortar 1:1:6-20mm thick 10sq.m
53.00 kg Cost of cement 5769.14 1000kg 305.76
0.03 cu.m Slacked lime 937.00 cu.m. 28.11
0.22 cu.m Cost of sand 733.96 cu.m. 161.47
0.22 cu.m Mixing charges 75.70 cu.m. 16.65
2.20 nos Mason I class 652.00 Each 1434.40
0.50 nos Mazdoor I class 426.00 Each 213.00
3.20 nos Mazdoor II class 368.00 Each 1177.60
Total for 10 sq.m 3337.00
Rate for 1 sq.m 333.70
Black board painting -10 sq.m
1.44 lit Black oxide paint 200.00 lit 288.00
0.70 nos Painter I class 522.00 Each 365.40
Total for 10 sq.m 653.40
Rate for 1 sq.m 65.34
MAIN DATA
Consider a black board of size 2.2mx1.0m
2.20 sq.m plastering with CM 1:5,20mm thick 336.87 sq.m 741.10
2.00 sq.m Combination mortar 1:1:6 333.70 sq.m 667.40
1.71 sq.m Black oxide paint 65.34 sq.m 111.73
Total for 2.20 sq.m 1520.24
Rate for 1 sq.m 691.02
Say 691.00

Page 99
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
132 Providing Ferrocement architectural structures like column sunshade etc,for appearance purpose
in c.m 1:2 -5mm thick reinforced with 6mm rods and stirupps covered with chicken mesh plastered and
painted to finish.
0.05 cu.m C.M 1:2 4963.44 cu.m 248.17
3.30 kg Cost of steel 45019.14 1000kg 148.56
2.50 sq.m Chicken mesh 31.65 sq.m 79.13
0.04 nos Mason I class 652.00 nos 26.08
0.08 nos Mazdoor I class 426.00 nos 34.08
LS Sundries LS 23.10
Rate for 1 sq.m 559.12

133 Supplying and fixing colour galvanum sheet roof of 0.47mm thickand steel tubular box section of
100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories
complete complying with standard specification and as directed by the departmental officers.

11.00 Colour galvanum sheet roof of 0.47mm


sq.m thick(quotation) 805.00 sq.m 8855.00
2.20 nos Fitter II class 560.00 Each 1232.00
1.10 nos Carpener I class 638.00 Each 701.80
3.20 nos Mazdoor I class 426.00 Each 1363.20

13.84 steel tubular box section of


Rm 100x50x3mm(Quotation) 500.00 Rm 6920.00
LS U or J bolt with Bitumen washer LS 50.00
LS Conveyance charges LS 19.00
LS Priming coat charges LS 10.80
Rate for 10 sq.m 19151.80
Rate for 1 sq.m 1915.20

134 Supplying and fixing best approved best quality porcelin soap dish of
size 150 x 150 x 50mm (white/colour) including cost of teak wood
plugs, brass screws, etc., complete complying with standard
specifications. (The soap tray should be got approved by Executive
Engineer before use on works).

1.00 Nos. porcelin soap dish of size 150 x 150 x 50mm 190.50 Each 190.50
(white)
0.10 Nos. Carpenter II Class 609.00 Each 60.90
0.10 Nos. Mazdoor II Class 368.00 Each 36.80
2.00 Nos. Teak wood plugs 1.05 Each 2.10
2.00 Nos. Brass CP Screws (30 x 6mm) 2.35 Each 4.70
Total / 1 No. 295.00
or say 295.00

1.00 Nos. porcelin soap dish of size 150 x 150 x 50mm 261.00 Each 261.00
(colour)
0.10 Nos. Carpenter II Class 609.00 Each 60.90
0.10 Nos. Mazdoor II Class 368.00 Each 36.80
2.00 Nos. Teak wood plugs 1.05 Each 2.10
2.00 Nos. Brass CP Screws (30 x 6mm) 2.35 Each 4.70
Total / 1 No. 365.50
or say 365.50

Painting the wall two coats with approved weather proof Exterior
Emulsion paint over one primer coat of over cement plastered wall
surface ect., complete complying with standard specification.
10.00 M2 Cleaning the plastered surface 3.50 M2 35.00
0.98 sq.m. Primer Alkalic resistance 147.00 sq.m. 144.06
3.00 Litre Exterior Emulsion 287.00 Litre 861.00
0.50 Litre Painter I Class 522.00 Each 261.00

Page 100
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
0.50 Nos. Mazdoor Grade I 426.00 Each 213.00
0.80 Nos. Mazdoor Grade II 368.00 Each 294.40
Sundries for brushes, sand paper, plaster of paris
LS LS 8.61
putty, etc.
Total for 10 sq.m. 1817.07
Rate for 1 sq.m. 181.70

58 Construction of INSPECTION CHAMBER following clear sizes including


earth work excavation, CC 1:5:10 of 10 cm thick and brick work in
Cement Mortar 1:5 [One cement and Five sand] using best quality of
second class Table Mould Bricks of size 9" x 43/8" x 23/4" with Plastering
with Cement Mortar 1:3 [One Cement and Three Sand] 12 mm thick to
inner and outer sides and wearing coat 1:3:6 [One Cement, Three Sand
and Six Aggregate] 15 cm thick and covered with precast slab 5 cm thick
etc., complete complying as directed by the departmental officers as per
standard specification.
Sub Data C.C. 1:3:6 using 20mm jelly.
9.00 M3 Broken stone jelly 20mm gauge 1,583.28 M3 14,249.52
4.50 M3 Cement mortar 1:3 3,578.85 M3 16,104.81
1.80 Nos Mason II Class 609.00 Each 1,096.20
17.70 Nos Mazdoor I category 426.00 Each 7,540.20
14.10 Nos Mazdoor II category 368.00 Each 5,188.80
Total for 10m2 44,179.53
Rate for 1m2 4,417.95 /M3
CLEAR SIZE 0.45 X 0.45
Earth work 1.11 X 1.11 X 0.60 = 0.74M3
C.C.1:5:10 1.11 x 1.11 x 0.10 = 0.12M3
B.W. in C.M.1:5 2.72 x 0.23 x 0.53 = 0.33M3
Plastering C.M.1:3,12MMTk.
Inside alround 1.80 X 0.53 = 0.954M2
Outer alround 3.64 X 0.30 = 1.092M2
Top 2.72 X 0.23 = 0.626M2
MAIN DATA.
0.74 M3 Earth work 60.95 M3 45.10
0.12 M3 C.C.1:5:10 3,573.90 M3 428.87
0.33 M3 B.W. C.M.1:5 Ground moulded champer Bricks 5,482.15 M3 1,809.11
2.672 M2 Plastering C.M.1:3 12mm Tk WPC 189.20 M2 505.54
0.83 M 2
Precast slab 50mm Thk 424.10 M2
352.00
0.03 M3 P.C.C.1:3:6 4,417.95 M3 132.54
TOTAL FOR 1 NO 3,273.16
Rate FOR 1 NO 3,273.00
CLEAR SIZE 0.60 X 0.60
Earth work 1.26 X 1.26 X 0.60 = 0.95 M3
C.C.1:5:10 1.26 x 1.26 x 0.10 = 0.16 M3
B.W. in C.M.1:5 3.32 x 0.23 x 0.60 = 0.46 M3
Plastering C.M.1:3,12MMTk.
Inside alround 2.40 X 0.60 = 1.44 M2
Outer alround 4.24 X 0.30 = 1.27 M2
Top 3.32 X 0.23 = 0.76 M2
3.47 M2
MAIN DATA.
0.95 m3 Earth work 60.95 m3 57.90
0.16 m 3
C.C.1:5:10 3,573.90 m3
571.82
0.46 m3 B.W. C.M.1:5Ground moulded champer Bricks 5,482.15 m3 2,521.79
3.47 m2 Plastering C.M.1:3 12mm Tk WPC 189.20 m2 656.52
1.12 m2 Precast slab 50mm Thk 424.10 m2 474.99
0.054 m3 P.C.C.1:3:6 4,417.95 m3 238.57
TOTAL FOR 1 NO 4,521.60

Page 101
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Rate FOR 1 NO 4,522.00
CLEAR SIZE 0.90 X 0.90
Earth work 1.56 X 1.56 X 0.60 = 1.46 M3
C.C.1:5:10 1.56 x 1.56 x 0.10 = 0.24 M3
B.W. in C.M.1:5 4.52 x 0.23 x 0.60 = 0.62 M3
Plastering C.M. 1:5, 12 mm Tk.
Inside alround 3.60 X 0.60 = 2.16 M2
Outer alround 4.52 X 0.23 = 1.04 M2
Top 5.44 X 0.30 = 1.63 M2
4.83 M2
MAIN DATA.
1.46 M3 Earth work 60.95 M3 88.99
0.24 M3 C.C.1:5:10 3,573.90 M3 857.74
0.62 M3 B.W. C.M.1:5 Ground moulded champer Bricks 5,482.15 M3 3,398.93
4.83 M2 Plastering C.M.1:3 12mm Tk WPC 189.20 M2 913.84
1.85 M2 Precast slab 50mm Thk 424.10 M2 784.59
0.12 M3 P.C.C.1:3:6 4,417.95 M3 530.15
TOTAL FOR 1 NO 6,574.23
Rate FOR 1 NO 6,574.00

Supplying and laying of Interlocking Paver Block Stone 60mm thk.


Over a base layer of sand filling incl. Cost of materials laying and Labour
charges etc.,
10.00 M2 Interlocking Paver block stone 60mm thk. 537.00 M2 5370.00
1.80 Nos. Mason I Class 652.00 Each 1173.60
3.60 Nos. Mason II Class 609.00 Each 2192.40
2.20 Nos. Mazdoor I Class 426.00 Each 937.20
2.20 Nos. Mazdoor II Class 368.00 Each 809.60
0.50 No. Stone cutter I class 501.00 Each 250.50
0.08 m3 Sand filling 733.96 m3 58.72
Total for 10 sq.m. 10792.02
Rate for 1 sq.m. 1079.00
Supplying and painting the walls with two coats of wall putty as instructed by the
departmental officers including preparation of surface curing, etc., complete in all
floors complying with standard specifications (The wall putty shall be got approved by
the Executive Engineer before use of work).
For finishing Two coat of wall Putty
10.00 sq.m. Cleaning the plastered surface 3.50 sq.m. 35.00
15.37 Kg altech wallputty (quotation) 32.50 Kg 499.53
0.50 Nos. Painter I Class 522.00 Each 261.00
0.50 Nos. Mazdoor I Class 426.00 Each 213.00
0.80 Nos. Mazdoor II Class 368.00 Each 294.40
LS Sundries for brushes, etc. LS 4.97
Rate for 10 sq.m. 1307.90
Rate for 1 sq.m. 130.80

Skirting the wall with fine polished Granite Stone Slabs of size 1200 x 600 of 18 /
20mm thick of Jet black best quality in Cement mortar 1:2 in all floors etc., complete
1
complying with standard specifications and as directed by the departmental officers.

Sub-data for Flooring tiles


Fine Polished Granite Slab 1200 x 600 of 18 /
10.00 m2 1690.00 m2 16900.00
20mm thick of Jet black
0.14 m3 Cement mortar 1:2 4963.44 1m3 694.88
5.00 Kg Colour Cement 26.60 1 kg 133.00
5.00 Kg Cement slurry 5769.14 1 MT 28.85
7.00 No Mason 1 class 652.00 each 4564.00
7.00 No Mazdoor Category 1 426.00 each 2982.00
1.00 No Mazdoor Category 2 368.00 each 368.00

Page 102
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
1.00 No Stone cutter 1 class 501.00 each 501.00
0.50 Kg Cotton waste 10.10 1 kg 5.05
Rate for 10 sq.m. 26176.78
Rate for 1 sq.m. 2617.70
54.50
Supplying and fixing mild steel grills for windows,
ventilators, rtc., including priming coat
20.90
75.40

Page 103
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees

Providing and laying in position, standardised concrete Mix M-2o Grade in accordance with IS 456 using
20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement
content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super
plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve
workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine
crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and
with about (4.79 cu.m) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges,
centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing,
etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without
claiming extra, etc., complete complying with standard specification and as directed by the departmental
officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards.
(No separate payment will be made by the Department for the excess usage of materials).

M 20 CONCRETE
5.00 cu.m 20mm Machine Crushed Stone Jelly 1583.28 cu.m 7916.40
3.30 cu.m 10-12mm Machine Crushed Stone Jelly 1317.78 cu.m 4348.67
4.79 cu.m Sand 733.96 cu.m 3515.67
3250.00 kg Cement 5769.14 MT 18749.71

19.50 Plasticiser/Super Plasticiser @0.60% of cement


kg 42.00 kg 819.00
3.50 Nos MasonII Class 609.00 Nos 2131.50
21.20 Nos Mazdoor I Class 426.00 Nos 9031.20
35.30 Nos Mazdoor II Class 368.00 Nos 12990.40
Total for 10 cu.m 59502.55
For 1cu.m 5950.30
Add for Vibration charge cu.m 61.50
Sub-Total 6011.80
Add for water charges&other sundries(0.5%of
Sub-Total) 30.06
Rate for 1 cu.m 6041.86
Foundation and Basement 6041.86
For Ground floor 6041.86 78.20 6120.06
For First floor 6120.06 154.00 6274.06
For Second floor 6274.06 154.00 6428.06
For Third floor 6428.06 154.00 6582.06
For Fourth floor 6582.06 154.00 6736.06
For Fifth floor 6736.06 154.00 6890.06

Page 104
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
Providing and laying in position, Standardised Concrete Mix M-3O Grade in accordance with IS:456-2000
using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum
cementcontent of 400 kglms and maximum water cement ratio of 0.45, including admixture (plasticiser /
superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete,
improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm
machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly
and with about (4.79 cu.m') 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating
charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing,
curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without
claiming extra, etc., complete complying with standard specification and as directed by the departmental
officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards.
(No separate payment will be made by the Department for the excess usage of materials).

M 30 CONCRETE
5.00 cu.m 20mm Machine Crushed Stone Jelly 1583.28 cu.m 7916.40
3.30 cu.m 10-12mm Machine Crushed Stone Jelly 1317.78 cu.m 4348.67
4.79 cu.m Sand 733.96 cu.m 3515.67
4000.00 kg Cement 5769.14 MT 23076.56

40.00 Plasticiser/Super Plasticiser @0.60% of cement


kg 42.00 kg 1680.00
3.50 Nos MasonII Class 609.00 Nos 2131.50
21.20 Nos Mazdoor I Class 426.00 Nos 9031.20
35.30 Nos Mazdoor II Class 368.00 Nos 12990.40
Total for 10 cu.m 64690.40
For 1cu.m 6469.00
Add for Vibration charge cu.m 61.50
Sub-Total 6530.50
Add for water charges&other sundries(0.5%of
Sub-Total) 32.65
Rate for 1 cu.m 6563.15
Foundation and Basement 6563.15 6563.15
For Ground floor 6563.15 78.20 6641.35
For First floor 6641.35 154.00 6795.35
For Second floor 6795.35 154.00 6949.35
For Third floor 6949.35 154.00 7103.35
For Fourth floor 7103.35 154.00 7257.35
For Fifth floor 7257.35 154.00 7411.35

Page 105
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
NEW ITEMS
178 Supplying and fixing in position White / Colour Each
Glazed Model Floor Mounted European Water
Closet of best quality and approved make with
100mm “P” or “S” trap connecting with CI pipe of
100mm dia / PVC pipe of 110mm dia, double
flapped rigid PVC black seat and seat cover with
CP brass hinges including cost of white cement,
cement for packing, spun yarn, teak wood plugs,
brass screws, etc., including supplying and fixing
10 litres capacity PVC / 12.5 litres capacity
porcelin low level flushing tank with a pair of CI
brackets, etc., complete with all fittings, such
as, 15mm brass ball valve with polythene float
with brass handle, union coupling connected by
means of 40mm white PVC flush hand using
indian adopter joint including all internal fittings,
such as, 15mm bras connections, 15mm GM
wheel valve, 15mm brass nipple (2 Nos.), 15mm
nylon connection, TW plugs, screws and also
giving necessary connection to the PVC pipe and
painting the CI brackets with 2 coats of approved
paint over one coat of red oxide primer,
dismantling the masonry and re-doing the
dismantled masonry to original condition, etc.,
complete complying with standard specifications.
(The EWC and flushing tank with all accessories

179 Supplying and fixing in position White / Colour Special Each


Delux Model Glazed Cascade Type Parryware /
Hindware / Equivalent Wall Mounted European Water
Closet of best quality and approved make with
100mm “P” or “S” trap connecting with CI pipe of
100mm dia / PVC pipe of 110mm dia, double flapped
rigid PVC black seat and seat cover with CP brass
hinges including cost of white cement, cement for
packing, spun yarn, teak wood plugs, brass screws,
etc., including supplying and fixing 10 litres capacity
PVC / 12.5 litres capacity porcelin low level flushing
tank with a pair of CI brackets, etc., complete with all
fittings, such as, 15mm brass ball valve with polythene
float with brass handle, union coupling connected by
means of 40mm white PVC flush hand using indian
adopter joint including all internal fittings, such as,
15mm bras connections, 15mm GM wheel valve, 15mm
brass nipple (2 Nos.), 15mm nylon connection, TW
plugs, screws and also giving necessary connection to
the PVC pipe and painting the CI brackets with 2 coats
of approved paint over one coat of red oxide primer,
dismantling the masonry and re-doing the dismantled
masonry to original condition, etc., complete complying
with standard specifications. (The EWC and flushing
180 Vinyl Flooring 2mm thick sqm.

Page 106
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
181 Manufacturing, Supplying and Fixing of Stainless Steel sqm.
Hand rails for staircase using 50mm dia 304L Grade
Stainless Steel pipe of 1.60mm thick at required
locations to a height of
900mm from finished floor level welded to 38mm
dia
Stainless Steel pipe post of 1.00mm thick as
vertical at
900mm centre with 2 Nos. of 25mm dia intermediate
horizontal stainless steel pipe of 1.60mm thick in
between. The vertical pipe has to be welded to the 100
X 100 X 6mm MS base plate encased in the base
concrete. The rate is inclusive of the charges for
cutting, bending, welding, grinding, polishing,
conveyance, electrical charges, etc. complete

182 Manufacturing, Supplying and Fixing of Stainless Steel RM


Hand rails for staircase near wet riser using 50mm dia
304L Grade Stainless Steel pipe of 1.60mm thick will
be provided with tubular supports made of 304L Grade
Stainless Steel pipe of
25mm dia of 1.60mm thick welded to the railing.
The
supports will be grouted into the wall and provided
with
93.00mm thick Stainless Steel circular base plate of
304
Grade. The rate shall included for grouting into
concrete with necessary supporting arrangements the
hand rail in floor polishing buffing, bonding, cutting,
grinding, conveyance, welding charges, electrical
charges, etc. complete

183 PVC mould CI Steps for Sump Each


184 Vertical Blinds
a Ordinary sqm.
b Premium sqm.
185 Stainless Steel Health Faucet Each
186 High Density Fibre (HDF) Board sqm.
187 Providing and fixing of Aluminium Composite Panel sqm.
(ACP) 4 sided having 50 x 25 x 1.50mm frame work
vertical and horizontals out of specially designed
extruded sections withstand wind pressure of 180
Kg/sq.m and fabricated fixed at all level elevation
and heights. The extruded section cutting and fixing
required space extruded section shall be of
6063 and alloy of BSH 9 confirming T is – 63400 rate
shall included to fix the main frame with necessary
clamps, fasteners, bolt nuts etc. The main frame of
extruded section shall be of 22843 & 22739 (H9) grade
conforming to BS 4174 (or) IS 8147. Rate shall
included 4mm thick ACP sheet (0.25
+ 3.5 + 0.25) alstrong or equivalent fixing with spacer
tape and the ACP sheet bounded with special type
structural sealant of dow corning 789 or equivalent in
dust free conditions the gaps between ACP sheet to be
filed with whether sealant and backer rod or 12mm
foam sheet to ensure water and air tightness in all
complete complying with standard specification as
directed by the departmental officer

Page 107
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
188 Designing the Semi Unitised Structural Glazing System sqm.
with open groove joint as per design intent,
preparation of shop drawings for approval, supply,
fabricate, erect as per approved shop drawings at all
floor levels and all floor heights including
conducting field test as per the test criteria set out in
the particular specification (Metholodgy should be got
approved by the Dept. Officials.) Design the framing
system (i.e. male & Female frame) to support vision
panels, spandrel panels either with glass or aluminium
composite panel, openable, window panels on a
continuous framing supported between floors. Also
design the split framing unutilized glazing system in
case of strip or punched windows with vision panel
proposed with either insulated / Monolithic glass,
groove width in the system both in horizontal and
vertical shall not be more than 20mm. Glazing of panel
shall be done only at factory at the controlled
atmosphere

189 Bitumen Pad


a 12mm thick sqm.
b 20mm thick sqm.
190 Pre-Painted Galvanized Iron Window (Airtight Model) sqm.
with
Grill
Specification:
Providing and fixing for Pre-Painted GI Window
fabricated from roll formed sections made of
Galvanized Iron Color Coated / Powder Coated (Base
steel as per IS 513 „D‟ quality, galvanized as per IS
277 with zinc of 120 GSM / sqm.) with total coated
thickness of 0.6mm. Coated Sections should be with
Primer Coat of Epoxy Primer of 5-7 microns thick,
finished paint with a polyester paint of 12-16 microns
thich and back coated with alkyd backer of 5-7 microns
or powder coated with pure polyester powder upto 50-
60 microns thick. Sections for shutter shuld be of 46 x
46mm and external frame should be of 46 x 52mm.
Section for glass beading should be of 18 x 25mm and
centre mullion should be of 46 x
70mm. The frame and shutter sections should be cut
to length and miter joined with corner bracket made of
glass filled Nylon.
Mullion Section should be joined with Frame / Mullion
using
Nylon Mullion Cap Ethyl Propylene Diamine Monomer
(EPDM) Gasket should be used all around glass in
shutter between frame and galzed shutter and both
sides of fixed glass. Handle made of high grade
Aluminum Powder coated and with nylon receiver–1
each shutter. Friction hinge-1 set for each shutter.
Glass shutter and fixing glass portions should be

Page 108
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
191 UPVC Window sqm.
Specification:
Supplying and fixing UPVC (Un-Plasticized
Polyvinyl Chloride) Windows of casement type
(open) from the profile the size of outer
frame 60mm x 58mm and shutter profile are
reinforcement with GI/1mm 125GSM and 100%
corrosion free, the profiles are multi chambered
sections with wall thick of 2mm. The EPDM rubber
(black colour) covered with over all the edges of
frame and shutter the shutter will be provided
with Espag multi power point locks and also it
operates as handle. The corners and joints
should be welded and cleaned. Radiations free
pin headed plain or brown colour glass 4mm thick
should be provided to the shutter and it should
not allow leakage of water even at most ranging
storms and should have key lockable action,
security protective hinges, strong locking
systems and as per size for arresting noise and
energy loss.The connecting mechanism between
sash and outer frame that enables opening of the
window. The window should be fixed to the wall
with 100% packing with screws and silicon
packing all round the frames. The window should
be got approved from the Executive Engineer
before use on work

192 UPVC Ventilator sqm.


Specification:
Supplying and fixing UPVC (Un-Plasticized
Polyvinyl Chloride) Louvered Ventilators of from
the profile the size of outer frame 60mm x 58mm
and shutter profile size of 60 x 78mm both
profiles are reinforced with GI/1mm 125GSM
and 100% corrosion free, the profile are multi
chambered sections with wall thick of 2mm. The
EPDM rubber (black colour) covered with all over
the edges of frame and shutter. The corners and
joints should be welded and cleaned. Radiations
pin headed glass 4mm thick should be provided in
the louvers. The window should be fixed to the
wall with 100% packing with screws and silicon
packing all round the frames. The ventilator
should be got approved from the Executive
Engineer before use on work

193 RM

Page 109
Sl. Amount in
Qty. Unit Description Rate in rupees Per
No. rupees
FOAMED PVC DOOR FRAME
Specification:
Providing factory made pre-laminated FPVC
(Formed Polyvinyl Chloride) Door Frame of the
size 105 x 40mm witha wall thickness of 10mm
made out of extruded rigid FPVC profile mitre
joined with 6 Nos. of 5mm long screw. The door
frame shall be fixed to the wall by using 80mm
long screws through the frame with the help of
PVC fasteners of 3 Nos. to be provided for each
vertical member, GI stiffeners of ('U' channel of
size 29 x 9, 1mm, 150mm long) - 3 Nos. at hinge
point, frame reinforcement of ('U' GI channel of
size 46 x 22 x 0.6mm), bottom tie rod of ('U' GI
channel size of 15 x 15 x 1mm), etc., complete
complying with the standard specification. The
door frame should be got approved from the
Executive Engineer before use on work

193 ABS DOOR Specification:


Providing and fixing of ABS (Acrolynitrile Butadiene
Styrene)
Door using factory made plain FPVC (Foamed Polyvinyl
Chloride) door frame of the size 105 x 40mm with a
wall thickness of 10mm made out of extruded rigid
FPVC profile mitre joined with 10 Nos. of 50mm long
screw. The door frame shall be fixed to the wall by
using 80mm long screws through the frame with the
help of PVC fasteners to be provided for each vertical
member, stiffeners of („U‟ Channel of size 29 x 9 x
1mm, 150mm long) 3 Nos. at hinge point, frame
reinforcement of („U‟ GI Channel of size 46 x 22 x
0.06mm), bottom tie rod of („U‟ GI Channel size of 15
x 15 x
1mm), the ABS Shutter of 35mm thick factory made
plain pre-laminated. ABS (Acrolynitrile Butadiene
Styrene) door shutter moulded in different designs,
consisting of all round Frame made out of water proof
solid foam PVC bar of size
20x32mm, reinforced by 32 x 32mm - 2 Nos. for
vertical made out of LVL (Laminated Veneer Lumber),
core material of 32mm thick high density craft paper
honey comb board, sandwiched on both sides with pre-
laminated ABS sheet thickness of 1.5mm. PVC edge
banding of size 0.45mm on the vertical sides.
Hardware made out of ball bearing butterfly hinges
a Plain Pre-laminated Door sqm.
b Design Pre-laminated Door sqm.
194 Rubber Moulded Hydraulic Pressed Paver Block sqm.
195 TAMIN Paver Block of size – Supply at site
a 60mm thick sft.
b 80mm thick sft.
196 Solar Reflective Ceramic Tiles of size sqm.
305mm x 305mm x 7mm thick
197 Aerated Auto Claved Cellur Concrete Block Each
60cm x 20cm x 10-30cm
198 Plasticizer / Super Plasticizer Kg.

Page 110
ABSTRACT ESTIMATE
Rate in Unit
Sl. rupees Page
Description
No. No.

1 Earth work excavation for foundation in all soils and sub-soils and to 130.40 cu.m
full depth as may be directed except in rock requiring blasting inclusive of
shoring shuttering, bailing out water wherever necessary and depositing the
surplus earth within the compound in places shown by the departmental
officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing
and levelling the site, etc., complete complying with standard specification.

2 Earth work open excavation in all soils and sub-soils and to full depth as 60.95 cu.m
may be directed except in rock requiring blasting inclusive of shoring
shuttering, bailing out water wherever necessary and depositing the
excavated earth with a lead of 10 mts. within the compound in places shown
by the departmental officers and clearing and levelling the site, etc.,
complete complying with standard specification.

3 Supplying and filling in foundation, basement, etc with filling sand in layers 756.36 cu.m
of not more than 15 cm thick well watered, rammed and consolidated etc.
complete complying with standard specification and as directed by the
departmental officers.

4 Refilling with excavated earth other than sand with an initial head load 25.50 cu.m
of 100 mts. and depositing the earth as shown by the departmental officers
in layers of not more than 15 cm thick well rammed, watered and
consolidated etc. complete complying with standard specification
5 Supplying and filling basement with conveyed earth from 10 km 194.80 cu.m

6 Supplying and filling GRAVEL in 'foundation and basement with filling sand 317.10 cu.m
in layers of not more than 15cm.thick well rammed watered and compacted
-1m3 etc., complete complying with standard specification.

7 Supplying and filling 40mm guauge HBGS stone jelly for dispersion 1224.80 cu.m
trench including loading conveying and unloading and as directed by the
departmental officers etc. complete complying with standard specification.

8 Supplying and filling 25mm guauge HBGS stone jelly for dispersion 1086.80 cu.m
trench including loading conveying and unloading and as directed by the
departmental officers etc. complete complying with standard specification.

9 Supplying and filling 20mm guauge HBGS stone jelly for dispersion 1608.80 cu.m
trench including loading conveying and unloading and as directed by the
departmental officers etc. complete complying with standard specification.

10 Supplying and filling in basement with sand gravel mix in the ratio of 612.40 cu.m
1:1with 0.685 Cu.m of sand and 0.667 Cu.m gravel in layers of not more
than 15cm thick, well rammed, watered and consolidated etc., complete
complying with standard specification.

11 Providing and laying sand gravel mix (1:1) at the rate of 0.62 cu.m of 716.60 cu.m
filling sand and 0.66 cu .m of gravel to consolidated 1hide of 150mm
designed to attain a CBR value of not less than 20 including cost and
conveyance of sand gravel from approved sources to work site and stacking
them to the departmental gauge for premeasurement including labour
charges labour charges for power roller watering and all other tools and
plants employed including all other incidental charges etc., complete (For
road works)
Rate in Unit
Sl. rupees Page
Description
No. No.

12 Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken 3573.90 cu.m
stone jelly) using 40 mm gauge hard broken granite stone jelly for
foundation including dewatering wherever necessary and laid in layers of
not more than 15 cm thick well rammed, consolidated and curing etc.
complete complying with standard specification
13 Cement Concrete 1:5:10 (One cement, Five sand and Ten hard broken 3573.90 cu.m
stone) using 40 mm gauge hard broken jelly for flooring including laying,
consolidating, finishing, rendering the top surface rough to receive the floor,
curing, etc. complete complying with standard specification. (The rate is
inclusive of necessary planking for panelling wherever necessary and as
directed by the departmental officers

14 Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken 3760.80 cu.m
stone jelly) using 40 mm gauge hard broken granite stone jelly for
foundation including dewatering wherever necessary and laid in layers of
not more than 15 cm thick, well rammed, consolidated and curing etc.
complete complying with standard specification

15 Cement Concrete 1:3:6 (One Cement, Three sand and Six broken stone
jelly) using 40mm size hard broken stone jelly for dummy columns,
excluding cost of centering shuttering reinforcement grills and fabrication
charges but including curing etc. complete. (Reinforced Cement Concrete
1:2:4 for slab to be extended upto top of splashing with pressed tiles and
future extension rods to be embedded in CC 1:3:6 (One Cement, Three
Sand and Six hard broken stone jelly). Dummy columns should be at least
1 metre height)

For foundation & basement 4072.40 cu.m.


For Ground floor 4150.60 cu.m.
For First floor 4304.60 cu.m.
For Second floor 4458.60 cu.m.
For Third floor 4612.60 cu.m.
For Fourth floor 4766.60 cu.m.
16 Plain Cement Concrete 1:2:4 (one cement, two sand and four hard 4515.90 cu.m.
broken stone jelly) using 20mm jelly for wearing coat including laying,
compacting, finishing and curing, etc., complete as per standard
specificatins and as directed by the departmental officers.

17 Damp proof course with Cement Mortar 1:4 (One Cement and Four 178.10 sq.m.
sand) 12mm thick mixed with best approved quality water proofing
compound conforming to Indian Standard specification as specified by the
departmental officers at 2% by weight of cement used, finishing and curing
etc. complete complying with standard specification.

18 Supplying and erecting steel centering including necessary supports for 584.55 sq.m.
plane surfaces for Reinforced Cement Concrete works such as column
footings, column pedestals, plinth beams, grade beams, staircase
steps, etc. which require only nominal strutting using mild steel sheets of
size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size
25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size
10cm x 6.5cm spaced at about 75cm centre to centre or at suitable
intervals etc. complete in all floors complying with standard specifcation.
(Payment for centering shall be given after the concrete is laid)
Rate in Unit
Sl. rupees Page
Description
No. No.

19 Supplying and erecting centering for sides and soffits including necessary
supports and strutting upto 3.29 M height for plane surfaces as detailed
below in all floors with all cross bracings using Mild Steel sheets of size 90 x
60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x
25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50
cm spaced at abote 90 cm centre to centre and supported by casurina props
of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc.
complete complying with the standard specificaiton. (Payment for centering
shall be given after the concrete is laid)

a For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed 667.00 sq.m.
blocks, landing slab, waist slab, portico slabs and beams, etc.
b For plane surfaces such as vertical slab, side slabs of boxing, vertical drops, 733.70 sq.m.
facia, vertical wall, etc.

c For plane surfaces such as rectangular or square RCC columns, sunshades, 800.40 sq.m.
top and bottom slab of RCC boxing, etc.

d For circular columns 1600.80 sq.m.

e Centering for curved surfaces of all RCC items of work 1000.50 sq.m.
20 Providing additional strutting to centering of RCC slabs of plain surface 27.50 sq.m.
for every additional 1.0 metre height or part thereof but not less than 30
cm, over the initial 3.00 metre height from floor level using casurina props
of 10cm to 13cm dia including cross bracing etc., complete complying with
standard specification and as directed by the department officers.

21 Cement Concrete 1:2:4 (One Cement, Two sand and Four hard broken
stone jelly) using 20 mm gauge hard broken granite stone jelly for all
RCC items of works excluding cost of reinforcement grill and fabricating
charges, centering and shuttering but including laying, vibrating with
mechanical vibrators, finishing, curing, etc. and providing fixtures like fan
clamps in the RCC floor / roof slabs wherever necessary and bearing
surfaces of walls, beams etc. shall be finished smooth with Cement Mortar
1:3 (One Cement and Three Sand) and kraft paper laid over it without
claiming extra, etc., complete complying with standard specification and as
directed by the departmental officers
a In foundation and basement 6096.10 cu.m
b In Ground floor 6174.30 cu.m
c In First floor 6328.30 cu.m
d In Second Floor 6482.30 cu.m
e In Third floor 6636.30 cu.m
f In Fourth floor 6790.30 cu.m
g In Fifth floor 6944.30 cu.m
Rate in Unit
Sl. rupees Page
Description
No. No.

22 Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and
Three hard broken stone jelly) using 20 mm gauge hard broken granite
stone jelly for all RCC items of works excluding cost of reinforcement grill
and fabricating charges centering and shuttering but including laying,
vibrating with mechanical vibrators, finishing, curing, etc. and providing
fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and
bearing surfaces of walls, beams etc. shall be finished smooth with Cement
Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it
without claiming extra, etc., complete complying with standard specification
and as directed by the departmental officers
a In foundation and basement 6717.39 cu.m
b In Ground floor 6795.59 cu.m
c In First floor 6949.59 cu.m
d In Second Floor 7103.59 cu.m
e In Third floor 7257.59 cu.m
f In Fourth floor 7411.59 cu.m
g In Fifth floor 7565.59 cu.m
23 Supplying, fabricating and placing in position Mild Steel / Ribbed Tor 6526.66 Qtl
Steel grills for all RCC works as per design given including cost of steel
and G.I. binding wire in all floors etc. complete complying with standard
specification. (Contractor has to make his own arrangements for the supply
of steel and binding wire)

24 Brick work in following Cement Mortar using best quality of country bricks
of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including
curing, etc., complete complying with standard specifiction.

A In Cement Mortar 1:6 (one cement and six sand)


For foundation & basement 4679.45 cu.m
In Ground floor 4730.95 cu.m
In First floor 4834.75 cu.m
In Second floor 4938.55 cu.m
In Third floor 5042.35 cu.m
In Fourth floor 5146.15 cu.m
In Fifth floor 5249.95 cu.m
B In Cement Mortar 1:5 (one cement and five sand)
For foundation & basement 4757.00 cu.m
In Ground floor 4730.95 cu.m
In First floor 4834.75 cu.m
In Second floor 4938.55 cu.m
In Third floor 5042.35 cu.m
In Fourth floor 5146.15 cu.m
In Fifth floor 5249.95 cu.m
c In Cement Mortar 1:3 (one cement and three sand)
For foundation & basement 5067.20 cu.m
In Ground floor 5118.70 cu.m
In First floor 5222.50 cu.m
In Second floor 5326.30 cu.m
In Third floor 5430.10 cu.m
In Fourth floor 5533.90 cu.m
Rate in Unit
Sl. rupees Page
Description
No. No.

24a Brick work in following Cement Mortar using best quality of country bricks
of size 8-3/4" x 4-1/4" x 2-3/4" for foundation and basement including
curing, etc., complete complying with standard specifiction.

A In Cement Mortar 1:6 (one cement and six sand)


For foundation & basement 4533.60 cu.m
In Ground floor 4585.10 cu.m
In First floor 4688.90 cu.m
In Second floor 4792.70 cu.m
In Third floor 4896.50 cu.m
In Fourth floor 5000.30 cu.m
In Fifth floor 5104.10 cu.m
B In Cement Mortar 1:5 (one cement and five sand)
For foundation & basement 4602.80 cu.m
In Ground floor 4654.30 cu.m
In First floor 4758.10 cu.m
In Second floor 4861.90 cu.m

25 Brick work in following Cement Mortar using best quality II class table
moulded chamber burnt bricks of size 9" x 4-1/2" x 3" for foundation
and basement including curing, etc., complete complying with standard
specifiction.
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 5531.60 cu.m
In Ground floor 5583.10 cu.m
In First floor 5686.90 cu.m
In Second floor 5790.70 cu.m
In Third floor 5894.50 cu.m
In Fourth floor 5998.30 cu.m
In Fifth floor 6102.10 cu.m
B In Cement Mortar 1:5 (one cement and five sand)

For foundation & basement 5592.50 cu.m


In Ground floor 5644.00 cu.m
In First floor 5747.80 cu.m
In Second floor 5851.60 cu.m
In Third floor 5955.40 cu.m
In Fourth floor 6059.20 cu.m
C In Cement Mortar 1:3
For foundation & basement 5836.20 cu.m
In Ground floor 5887.70 cu.m
In First floor 5991.50 cu.m
In Second floor 6095.30 cu.m
In Third floor 6199.10 cu.m
In Fourth floor 6302.90 cu.m
26 Brick work in following Cement Mortar using best quality II class table
moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" for
foundation and basement including curing, etc., complete complying with
standard specifiction.
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 5839.85 cu.m
In Ground floor 5891.35 cu.m
Rate in Unit
Sl. rupees Page
Description
No. No.

In First floor 5995.15 cu.m


In Second floor 6098.95 cu.m
In Third floor 6202.75 cu.m
In Fourth floor 6306.55 cu.m
In Fifth floor 6410.35 cu.m

B In Cement Mortar 1:5 (one cement and five sand)


For foundation & basement 5909.10 cu.m
In Ground floor 5960.60 cu.m
In First floor 6064.40 cu.m
In Second floor 6168.20 cu.m
In Third floor 6272.00 cu.m
In Fourth floor 6375.80 cu.m
In Cement Mortar 1:3
For foundation & basement 6186.05 cu.m
In Ground floor 6237.55 cu.m
In First floor 6341.35 cu.m
In Second floor 6445.15 cu.m
In Third floor 6548.95 cu.m
In Fourth floor 6652.75 cu.m

27 Brick work in following Cement Mortar using best quality II class Ground
moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" for
foundation and basement including curing, etc., complete complying with
standard specifiction.
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 5412.90 cu.m
In Ground floor 5464.40 cu.m
In First floor 5568.20 cu.m
In Second floor 5672.00 cu.m
In Third floor 5775.80 cu.m
In Fourth floor 5879.60 cu.m
In Fifth floor 5983.40 cu.m

B In Cement Mortar 1:5 (one cement and five sand)


For foundation & basement 5482.15 cu.m
In Ground floor 5533.65 cu.m
In First floor 5637.45 cu.m
In Second floor 5741.25 cu.m
In Third floor 5845.05 cu.m
In Fourth floor 5948.85 cu.m

28 Brick work in following Cement Mortar using best quality II class Ground
moulded chamber burnt bricks of size 9" x 4-1/2" x 3" for foundation
and basement including curing, etc., complete complying with standard
specifiction.
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 5109.65 cu.m
In Ground floor 5161.15 cu.m
In First floor 5264.95 cu.m
In Second floor 5368.75 cu.m
Rate in Unit
Sl. rupees Page
Description
No. No.

In Third floor 5472.55 cu.m


In Fourth floor 5576.35 cu.m
In Fifth floor 5680.15 cu.m

B In Cement Mortar 1:5 (one cement and five sand)


For foundation & basement 5170.55 cu.m
In Ground floor 5222.05 cu.m
In First floor 5325.85 cu.m
In Second floor 5429.65 cu.m
In Third floor 5533.45 cu.m
In Fourth floor 5637.25 cu.m
In Cement Mortar 1:3 (one cement and three sand)
For foundation & basement 5414.25 cu.m
In Ground floor 5465.75 cu.m
In First floor 5569.55 cu.m
In Second floor 5673.35 cu.m
In Third floor 5777.15 cu.m
In Fourth floor 5880.95 cu.m

29 Brick partition walls


Brick partition walls of 10.80cm thickness using best quality country bricks
of size 8-3/4" x 4-1/4" x 2-1/4" in Cement Mortar 1:3 (One Cement
and Three Sand) using hoop iron reinforcement if found necessary including
curing etc. complete and as directed by the departmental officers. (Hoop
iron reinforcement will be measured and paid for separately)

a In Foundation and basement 612.50 Sqm


b In Ground Floor 618.05 Sqm
c In First Floor 629.25 Sqm
d In Second Floor 640.45 Sqm
e In Third Floor 651.70 Sqm
f In Fourth Floor 662.90 Sqm
30 Brick partition walls using best quality using Country Bricks of size 8-
3/4" x 4-1/4" X2-3/4" in Cement Mortar 1:3 (One Cement and Three
Sand) using hoop iron reinforcement if found necessary including curing etc.
complete and as directed by the departmental officers. (Hoop iron
reinforcement will be measured and paid for separately)
a In Foundation and basement 592.25 Sqm
b In Ground Floor 597.80 Sqm
c In First Floor 609.00 Sqm
d In Second Floor 620.20 Sqm
e In Third Floor 631.45 Sqm
f In Fourth Floor 642.65 Sqm
Rate in Unit
Sl. rupees Page
Description
No. No.

31 Brick partition walls of 11.50cm thickness using best quality II class table
moulded chamber burnt bricks of size 9" x 4-1/2" x 3" in Cement
Mortar 1:3 (One Cement and Three Sand) using hoop iron reinforcement if
found necessary including curing etc. complete and as directed by the
departmental officers. (Hoop iron reinforcement will be measured and paid
for separately)

a In Foundation and basement 736.40 Sqm


b In Ground Floor 742.30 Sqm
c In First Floor 754.25 Sqm
d In Second Floor 766.20 Sqm
e In Third Floor 778.10 Sqm
f In Fourth Floor 790.05 Sqm
32 Brick partition walls of 11.50cm thickness using best quality II class table
moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" in
Cement Mortar 1:3 (One Cement and Three Sand) using hoop iron
reinforcement if found necessary including curing etc. complete and as
directed by the departmental officers. (Hoop iron reinforcement will be
measured and paid for separately)
a In Foundation and basement 776.60 Sqm
b In Ground Floor 782.55 Sqm
c In First Floor 782.55 Sqm
d In Second Floor 794.50 Sqm
e In Third Floor 818.35 Sqm
f In Fourth Floor 830.30 Sqm

33 Brick partition walls of 11.50cm thickness using best quality II class


Ground moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4"
in Cement Mortar 1:3 (One Cement and Three Sand) using hoop iron
reinforcement if found necessary including curing etc. complete and as
directed by the departmental officers. (Hoop iron reinforcement will be
measured and paid for separately)

a In Foundation and basement 727.50 Sqm


b In Ground Floor 733.45 Sqm
c In First Floor 745.40 Sqm
d In Second Floor 757.30 Sqm
e In Third Floor 769.25 Sqm
f In Fourth Floor 781.20 Sqm

34 Brick partition walls of 11.50cm thickness using best quality II class


Ground moulded chamber burnt bricks of size 9" x 4-1/2" x 3" in
Cement Mortar 1:3 (One Cement and Three Sand) using hoop iron
reinforcement if found necessary including curing etc. complete and as
directed by the departmental officers. (Hoop iron reinforcement will be
measured and paid for separately)

a In Foundation and basement 687.85 Sqm


b In Ground Floor 693.80 Sqm
c In First Floor 705.70 Sqm
Rate in Unit
Sl. rupees Page
Description
No. No.

d In Second Floor 717.65 Sqm


e In Third Floor 729.60 Sqm
f In Fourth Floor 741.55 Sqm

35 Providing granolithic floor finish of the following thickness with plain


cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using
10 to 12mm gauge hard broken stone jelly including laying, finishing
and the top rubbed smooth with power trawl, thread lining, curing etc.
complete complying with standard specification and as directed by the
departmental officers. (The rate is inclusive of necessary planking for
panelling wherever necessary and as directed by the departmental officers)

a 20mm thick 100.85 Sqm


b 25mm thick 126.10 Sqm
c 40mm thick 201.70 Sqm
36 Flooring with Snow White Marble Slab (Adanga) 18mm to 20mm thick
and above free from all defects in all floors over a base layer of CM 1:3,
20mm thick. The marble slab shall be laid over the cement mortar by
applying white cement slurry in between base mortar and marble slab and
pointed with white cement neatly including polishing with polishing stone
and oxalic acid etc. so as to perfectly smooth and glossy and including hire
charges for polishing machine and power consumption charges etc. The
marble slabs and other materials to be used shall be got approved by the
Executive Engineer concerned before use on work, etc., complete.

a Using Marble Slabs of size 4'0'' x 2'0'' and above 2540.40 Sqm
b Using Marble Slabs of size 2'0'' x 2.0" and below 1856.50 Sqm
37 Paving the floor with best approved quality fine polished Kota stone
slabs of size 600 x 600 of 18 / 20mm with machine cut edges and
matching marble slab not less than 100mm width other than Adanga
Marbles as border laid over a cement mortar bed of 20mm thick using
cement mortar 1:3 (One cement and three sand) fixing the slabs in true
right angles with minimum possible width of joints and pointing the joints
with white cement mixed with mathcing colouring pigments and polishing
with floor polisher to a high degree of finish etc., The kota stone slabs and
other materials to be used shall be got approved by the Executive Engineer
concerned before use on work, etc., complete as per standard speicification.

A Fine polished Kota Stone Slab above 600 x 600 of 18 / 20mm size 1038.00 Sq.m

B Fine polished Kota Stone Slab below 600 x 600 of 18 / 20mm size 1101.00 Sq.m

38 Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm 1083.10 Sq.m
(un-polished) in all floors laid in of cement mortor 1:3 (one cement three
sand), 20mm thick and pointed with colour cement neatly including
polishing with polishing stone and oxalic acid etc., so as to perfectly smooth
and glossy and including hire charges for polishing machine and power
consumption charges etc. The kota stone slabs and other materials to be
used shall be got approved by the Executive Engineer concerned before use
on work, etc., complete as per standard speicification.
Rate in Unit
Sl. rupees Page
Description
No. No.

39 Paving the floor with best approved quality fine polished Granite Stone 2012.10 Sq.m
Slabs of size 1200 x 600 of 18 / 20mm thick of Synthetic Grey,
Paradise and similar varieties with machine cut edges laid over a cement
mortar bed of 20mm thick using cement mortar 1:3 (One cement and three
sand) fixing the slabs with required cement slurry and laid in true right
angles with minimum possible width of joints and pointing the joints with
white cement mixed with mathcing colouring pigments etc., The granite
stone slabs and other materials to be used shall be got approved by the
Executive Engineer concerned before use on work, etc., complete as per
standard speicification.

39a Paving the floor with fine polished cuddapah stone slab of 38 / 40mm 985.90 Sq.m
thick laid over Cement Mortar 1:3 (One Cement and Three Sand) 20mm
thick over the existing bed of Cement Concrete 1:5:10, (One Cement, Five
Sand and Ten aggregate) and pointing the joints to full depth of slabs with
same mortar mixed with black oxide and the top surface rendered smooth,
curing, etc., The cuddapah stone slabs and other materials to be used shall
be got approved by the Executive Engineer concerned before use on work,
etc., complete complying with standard specification.

i Cuddapah Slab 20 / 30mm thick 953.40 Sq.m

ii Cuddapah Slab 38 / 40mm thick 985.90 Sq.m

iii Cuddapah Slab 50mm thick 1001.70 Sq.m

40 Paving the floor with best quality Vertified Tiles of size 600 x 600 x 926.90 Sq.m
8mm of approved colour, shade and quality laid in cement mortar 1:3 (one
cement and three sand) 20mm thick in all floors and the top pointed with
the white cement mixed same colour pigments etc., complete complying
with standard specification. (The make and brand of the tiles should be got
approved by Executive Engineer before use on works)

41 Flooring with following ceramic tiles of following size laid over 20 mm


thick cement mortar 1:3 (One Cement and Three Sand) base mortar over
the existing slab / floor including cutting the tiles to the required size with
special cutter wherever necessary, laying in position and pointing with white
cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc.,
complete complying with standard specification. (The make and brand of
the tiles should be got approved by Executive Engineer before use on
works)

a Self Designed Colour Ceramic Tiles- 305 x 305 x 6 mm 813.30 Sq.m

b Plain Ceramic Tiles- 305 x 305 x 6 mm 675.00 Sq.m

c Plain Ceramic Tiles of size 200x 200 x 6mm 687.30 Sq.m

d Designed Ceramic Tiles of size 200x 200 x 6mm 822.30 Sq.m

e Plain Ceramic Tiles of size 200x 100 x 6mm 697.30 Sq.m

f Designed Ceramic Tiles of size 200x 100 x 6mm 862.30 Sq.m


Rate in Unit
Sl. rupees Page
Description
No. No.

42 Paving the floor with pre-polished concrete anti-skid tiles (Required 1054.50 Sq.m
shape and design) of 20mm thick of approved quality and colour laid in
Cement Mortar 1:3 (One Cement and Three sand) 20mm thick and pointed
with white cement mixed with colouring pigment at the rate of 0.40 Kg. /
sq.m., curing, etc., complete complying with standard specification and as
directed by the departmental officers. (The make and brand of the tiles
should be got approved by Executive Engineer before use on works)

43 Paving the floor with pre-polished concrete anti-skid step tiles (Required 1157.50 Sq.m
shape and design) of 20mm thick of approved quality and colour laid in
Cement Mortar 1:3 (One Cement and Three sand) 20mm thick and pointed
with white cement mixed with colouring pigment at the rate of 0.40 Kg. /
sq.m., curing, etc., complete complying with standard specification and as
directed by the departmental officers. (The make and brand of the tiles
should be got approved by Executive Engineer before use on works)

44 Dadooing walls with following best approved quality, white / colour glazed
tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two
sand) 10mm thick and pointing the joints with white cement mixed with
colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing,
etc., complying with standard specification and as directed by the
departmental officers.
a Dadooing with white glazed tiles of size 150mm x 150mm x 6mm 962.90 Sq.m

b Dadooing with plain colour glazed tiles of size 150mm x 150mm x 6mm 1018.70 Sq.m

c Dadooing with printed design colour glazed tiles of size 150mm x 150mm x 1090.70 Sq.m
6mm
d Dadooing with granite tiles of synthetic grey, paradise, and similar varieties 1332.20 Sq.m
of suitable sizes
e Dadooing with printed design colour glazed tiles of size 300mm x 200mm x 1047.20 Sq.m
6mm
45 Weathering course in brick jelly lime concrete using broken brick jelly
of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the
proportion of brick jelly to lime being 32:12.5 by volume and laid over the
RCC roof slab in a single layer of required slope and finished by beating the
concrete with wooden beaters of approved pattern, keeping the surface
constantly wet by sprinkling lime jaggery water, etc., complete as per
standard specification and as directed by the deparmental officers.

a In Ground Floor 2963.10 cu.m


b In First Floor 3117.10 cu.m
c In Second Floor 3271.10 cu.m
d In Third Floor 3425.10 cu.m
e In Fourth Floor 3579.10 cu.m
f In Fifth Floor 3733.10 cu.m
Rate in Unit
Sl. rupees Page
Description
No. No.

46 Finishing the top of roof with one course of machine pressed tiles
following size of size of approved quality set in Cement Mortar 1:3 (One
Cement and Three Sand) 12mm thick mixed with water proofing compound
conforming to ISS at 2% by weight of cement used and the joints pointed
neatly to full depth of tiles with the same cement mortar mixed with red
oxide and water proofing compound including curing etc., complete
complying with standard specification and as directed by the departmental
officers
Pressed Tiles of 230mm x 230mm x 20mm 868.90 Sq.m
Pressed Tiles of 200mm x 200mm x 20mm 888.10 Sq.m
47 Finishing the top of slopped roof, sun-shade with Machine Pressed 1251.90 Sq.m
Ornamental Tiles of approved quality laid in cement mortar 1:3 20mm
thick mixed with WPC at 2% by weight of cement used and top pointed with
the same red oxide mixed mortar etc complete, complying with standard
specifications
48 Supplying and fixing fine polished cuddapah slab of following thickness for
cup-board arrangements including laying to correct alignment with
necessary cement mortar and black powder etc, complete complying with
standard specification and as direct.
a 20 / 30mm thick 427.70 Sq.m
b 38 / 40mm thick 458.70 Sq.m
49 Supplying and fixing in position best approved of BIS quality PVC rain
water down fall pipes having a pressure of 4 kg. / sq.cm including cost of
necessry PVC shoe, PVC bend, cast iron gratings of required diameter and
special clamps, brass screws, nails, etc., and fixing of cast iron gratings at
junction of parapet and the RCC roof slab including finishing neatly etc.,
complete. The rate shall be inclusive of cast of removable cast iron grating.
The PVC pipe shall be fixed in wall with special type of "U" clamp at the
centre of the pipe line in addition to those for more than 3.0 metre pipe
length, etc., complete complying with standard specification.

a 160 mm dia (In building with ground floor only) 651.10 Rm


b 160 mm dia (In building with Two floor only) 513.10 Rm
c 160 mm dia (In building with Three floor only) 467.20 Rm
a 110 mm dia (In building with ground floor only) 443.90 Rm
b 110 mm dia (In building with Two floor only) 316.50 Rm
c 110 mm dia (In building with Three floor only) 274.10 Rm
50 Supplying and fixing teak wood hand rails with an over all finsihed size of 1481.00 Rm
50 x 150mm with architectural designs as directed and fixing in position
etc., including polishing two coats with french (LAC) polish over a coat of
bee's waxing complying with standard specification etc., complete. The
wooden hand rails shall have 12mm groove on both faces at 50mm from top
polished and the groove should be painted with black paint. The bottom of
hand rails should be grooved to receive the MS flats 40 x 6mm welded with
square rods of balustrades
Rate in Unit
Sl. rupees Page
Description
No. No.

51 Supplying and fixing in position steel balustrades using 20mm square 2096.40 Sq.m
rods spaced at 150mm centre to centre so that the two balustrades in
each step shall be placed centrally and the top of balustrades connected
with the hand rails (cost of hand rail shall be measured and paid separately)
by means of MS flats of size 40mm x 6mm in the groove 40mm x 6mm
provided at the bottom of hand rail; the bottom of balustrades shall be fixed
on to the top of step concrete. An additional MS flat of size 50mm x 6mm
shall be provided at the centre of balustrades connecting all square rods to
the entire length including cost of square rods, flat and applying one coat of
red oxide primer to the iron surfaces, etc., complete complying with
standard specification and as directed by the departmental officers.

52 Supplying and fixing 40mm dia GI pipe for staircase hand rail including 177.76 Rm
labour charges for cutting, welding and fixing with MS flats (excluding cost
of flat), etc., as directed by the departmental officers
53 Supplying and fixing GI pipe handrails for handicapped persons using 1268.45 Sq.m
50mm dia GI pipe double handrail at a height of 800mm and 900mm from
floor level with 25mm thick MS square rods as balusters embedded in the
concrete and welded with pipe at 60cm centre to centre as shown in CA Job
No. 9123 / 1 including cutting, welding, bending and fixing charges and
applying one coat of red oxide primer for MS members as directed by the
departmental officers

54 Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm 168.10 Sq.m
thick in all floors including curing etc. complete complying with standard
specification and as directed by the departmental officers.

55 Plastering with Cement Mortar 1:5 (One cement and Five sand), 20mm 336.90 Sq.m
thick in all floors including curing etc. complete complying with standard
specification and as directed by the departmental officers.
56 Special ceiling plastering and finishing the exposed surface of all RCC 194.85 Sq.m
items of work such as slabs, beams, sunshades, facia, canopy slab,
staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement
and Three Sand) 10mm thick including hacking the surfaces, providing
cement mortar nosing, beading for sunshades, staircases, steps, landing
slabs and curing, etc., in all floors complying with standard specification and
as directed by the departmental officers
57 Plastering the surface of walls with Cement Mortar 1:3 (One cement 183.65 Sq.m
and Three sand), 12mm thick in all floors including curing etc., complete
complying with standard specification and as directed by the departmental
officers.
58 Plastering the surface of walls with Cement Mortar 1:3 (One cement 361.25 Sq.m
and Three sand), 20mm thick in all floors including curing etc., complete
complying with standard specification and as directed by the departmental
officers.
59 Plastering with Cement Mortar 1:3 (One Cement and Three Sand) 189.20 Sq.m
12mm thick mixed with water proofing compound conforming to BIS
at 2% by weight of cement used including finsihing, curing, etc., complete in
all floors complying with standard specification and as directed by the
departmental officers.
60 Plastering with Cement Mortar 1:3 (One Cement and Three Sand) 370.00 Sq.m
20mm thick mixed with water proofing compound conforming to BIS
at 2% by weight of cement used including finsihing, curing, etc., complete in
all floors complying with standard specification and as directed by the
departmental officers.
Rate in Unit
Sl. rupees Page
Description
No. No.

61 Stucco plastering 12mm thick using blue granite chips of size 10mm 399.10 Sq.m
and below over the existing base plastering with cement mortar 1:5, 12mm
thick, etc., complete complying with standard specifications (SI 314)

62 White washing one coat with freshly burnt white shell lime in all floors 15.70 Sq.m
including cost of lime, blue powder, fevicol type gum, brushes, scaffolding
charges, etc., complete complying with standard specification and as
directed by the departmental officers.
63 White washing two coats with freshly burnt white shell lime in all floors 22.80 Sq.m
including cost of lime, blue powder fevicol type gum, brushes, scaffolding
charges, etc., complete complying with standard specification and as
directed.
64 Colour washing two coats in all floors using best freshly burnt white shell
lime and best quality of approved variety of colouring pigment including cost
of lime, colouring pigments, fevicol type gum, brushes, scaffolding charges
etc., complete complying with standard specification. Mineral colouring
pigments not affected by lime should only be used (stainers and colour
solutions should not be used.)
a For one Coat 23.55 Sq.m

b For Two Coat 34.20 Sq.m

65 Supplying and painting the walls with two coats of cement paint over 143.95 Sq.m
one coat of cement primer as instructed by the departmental officers
including preparation of surface curing, etc., complete in all floors complying
with standard specifications (The colour and shade of the cement paint shall
be got approved by the Executive Engineer before use of work).

For basic one coat of primer with cement paint 51.10 Sq.m
For finishing two coats 92.85 Sq.m
66 Supplying and painting the walls with two coats of cement paint as 97.60 Sq.m
instructed by the departmental officers including preparation of surface
curing, etc., complete in all floors complying with standard specifications
(The colour and shade of the cement paint shall be got approved by the
Executive Engineer before use of work).

67 Supplying and painting the walls with two coats of oil bound distemper 138.05 Sq.m
over one coat of water based cement primer including cost for
distemper, primer, cleaning and scrapping the walls, rendering the walls
smooth with necessary putty, brushes, scaffolding arrangements, labour
charges, etc., as per standard specification. (The colour and shade of the
distemper shall be got approved by the Executive Engineer before use of
work).

68 Distempering the old wall and ceiling one coat with best oil bound
distember of approved quality including preparation of surface, the rate
includes cost of brushes, high scaffolding arrangements, neat finishes, etc.,
complete complying with standard specification and as directed by the
departmental officers.
a For one coat 43.70 Sq.m

b For two coat including scaping 90.45 Sq.m

69 Painting two coats of newly plastered wall surface with ready mixed 173.15 Sq.m
plastic emulsion paint of first class quality and of approved colour over a
priming coat including thorough scrapping, clean removal of dirt, and
including necessary plaster of paris putty, wherever required etc., complete
complying with standard specification.
Rate in Unit
Sl. rupees Page
Description
No. No.

70 Painting new wood work with two finishing coats of synthetic enamel 179.80 Sq.m
ready mixed paint of approved quality and colour over one coat
priming coat in all floors including the cost of primer etc., complete
complying with standard specification. (The make, quality and colour of
paint should be got approved by the Executive Engineer before use on
works.)
71 Painting new iron works such as steel doors, windows, ventilators, window
bars, balustrades etc., with two coats of best approved first quality and
colour of synthetic enamel paint over the existing red oxide priming coat in
all floors excluding cost of priming coat etc., complete complying with
standard specification. (The make, quality and colour of paint should be got
approved by the Executive Engineer before use on works.)

a Primer coat 54.45 Sq.m

b Two coat 107.00 Sq.m

72 Two coat with primer 161.50 Sq.m


73 Polishing the teak wood door with two coats of best French (Lac) polish 124.95 Sq.m
with approved quality and brand over a coat of bee's waxing including
preparing the wooden surface to receive polishing, etc., complete
complying as per the standard specifications. (The make, quality and colour
of french polish, bees vax should be got approved by the Executive Engineer
before use on works.)

74 Providing expansion joint in RCC floor slab for 12.5mm width using 493.80 Rm
polysulphide as sealent on the top and bottom for a depth of 7.5mm each
and packing the inner space using compressible non-absorbent filler
materials including cost of labour for cutting and fixing filler materials and
laying polysulphide sealent with necessary spatula etc., complete complying
with standard specifications and as directed
75 Providing expansion joint 12.5mm width in RCC roof slabs between 696.30 Rm
RCC twin beams using PVC water bar of 150mm wide centre bulb of
4mm to 6mm thickness of approved quality and brand and including filling
the inner space with suitable non-absorbent flexible and well compressible
filler materials of approved quality and covering the top surface with GI
sheet 30cm wide and 1.6mm thick using phill plugs, GI screws, limpet cup
washers, bitumen washers, etc., complete complying with standard
specifications and as directed
76 Providing expansion joint of 12.5mm wide in between RCC twin 573.10 Sq.m
columns from top of pedastal to full height including filling the inner space
with suitable non-absorbent, flexible and well compressible filler materials of
approved quality and brand; finishing the sides of RCC columns with
polysulphide sealents for a depth of 7.5mm on either side covering the inner
space filled with filler materials as above etc., complete complying with
standard specifications and as directed.
77 Manufacturing, supplying and fixing Precast Reinforced Cement
Concrete slabs of following thickness in RCC 1:2:4 (one cement, two
sand and four aggregates), using following HBGS jelly excluding cost of
reinforcement steel in position but including cost of moulding charges,
casting of slab, finishing, curing and fixing in position in all floors etc.,
complete complying with standard specification and as directed.

a 25mm thick precast slab using 10mm HBGS jelly 206.60 Sq.m
b 50mm thick precast slab using 20mm HBGS jelly 424.10 Sq.m
c 75mm thick slab (using 20mm HBGS Jelly) 637.25 Sq.m
Rate in Unit
Sl. rupees Page
Description
No. No.

78 Manufacturing, supplying and fixing in position plain cement concrete 549.00 Sq.m
precast pavement slab of size 450mm x 450mm of 50mm thick in
Cement Concrete 1:2:4 (One cement, Two sand and Four jelly) using 20mm
HBG stone jelly including cost of moulding charges, casting of slab, finishing,
curing, fixing and pointing the slab with CM 1:3 (One Cement and Three
Sand) to full depth of slab etc., complete complying with standard
specification and as directed
79 Manufacturing, supplying and fixing in position plain cement concrete 723.30 Sq.m
precast kerb slab of size 600mm x 600mm x 100mm in Cement
Concrete 1:2:4 (One cement, Two sand and Four jelly) using 20mm HBG
stone jelly including cost of moulding charges, casting of slab, finishing,
curing, fixing and pointing the slab with CM 1:3 (One Cement and Three
Sand) to full depth of slab etc., complete complying with standard
specification and as directed
80 Manufacturing, supplying and fixing in positon of RCC Jally of 5cm thick in 964.65 Sq.m
cement concrete 1:2:4 using 20mm machine crushed stone jelly (excluding
cost of reinforcement steel) including cost of mould, finishing, curing, lifting,
fixing in position etc., complete complying with standard specification and as
directed

81 Supplying and fixing AC sheet roofing with 6mm thick asbestos cement 553.10 Sq.m
sheets of fully corrugated (grey colour) of approved quality by drilling holes
(and not by punching) with necessary ‘J’ / ‘U’ bolts and nuts of 8mm dia of
suitable length and providing one set of bitumen washers of 25mm dia and
1.60mm thick for each bolt including protruding portion of bolts in roof shall
be covered with bitumen compound etc., complete complying with standard
specification and as directed.
WATER SUPPLY AND SANITARY ARRANGEMENT ITEMS OF WORK
Internal / External water supply arrangements
82 Supplying, laying and jointing G.I. Pipes of approved quality and best
variety of "B" class pipe of the following dia including labour fixing G.I.
Specials, (excluding charges for cutting and threading of pipes, cost of such
specials) to wall with necessary teak wood plugs, clamps, screws, thread
balls, shellac, etc., making holes on the walls (or) drilling holes in roof and
making good the dismantled portions to original condition with necessray
brick work / concrete and plastering wherever necessry with necessary
scaffolding charges. The pipes are to be painted with the 2 coats of good
variety and approved best quality of synthetic enamel paint over a priming
coat of red oxide etc., complete in all floors complying with standard
specification. G.I. pipes shall be got approved by the Executive Engineer
before use on works.
Above ground level.

I Internal Water Supply - Above Ground Level


a 15 mm dia G.I. Pipe 192.45 Rm
b 20 mm dia G.I. Pipe 223.45 Rm
c 25 mm dia G.I. Pipe 255.10 Rm
d 32 mm dia G.I. Pipe 332.40 Rm
e 40 mm dia G.I. Pipe 348.15 Rm
f 50 mm dia G.I. Pipe 448.75 Rm
h 65 mm dia G.I. Pipe 491.40 Rm
II External Water Supply - Above Ground Level

a 15 mm dia G.I. Pipe 207.95 Rm


Rate in Unit
Sl. rupees Page
Description
No. No.

b 20 mm dia G.I. Pipe 239.00 Rm


c 25 mm dia G.I. Pipe 270.65 Rm
d 32 mm dia G.I. Pipe 360.75 Rm
e 40 mm dia G.I. Pipe 376.55 Rm
f 50 mm dia G.I. Pipe 487.60 Rm
h 65 mm dia G.I. Pipe 530.25 Rm
83 Supplying, laying and jointing GI pipes of approved quality and best variety
of B Class pipes of the following dia including labour for fixing GI Specials
(excluding charges for cutting and threading and cost of such specials) with
necessary shellac, thread ball, etc., and making holes on the wall / concrete
and making good the dismantled portion to the original condition with
necessary brick work / concrete. The pipes are to be painted with one coat
of tar and tightly pastened with tar dipped gunny tape, etc., complete
complying with standard specification. The G.I. pipes shall be got approved
by the Executive Engineer before use on work. (The earth work excavation,
re-filling the trench with excavated earth, sand filling, etc., shall be
measured and paid separately under respective items).
Below ground level

External Water Supply - Below Ground Level

a 15 mm dia G.I. Pipe 289.45 Rm

b 20 mm dia G.I. Pipe 317.95 Rm

c 25 mm dia G.I. Pipe 347.05 Rm

d 32 mm dia G.I. Pipe 490.95 Rm

e 40 mm dia G.I. Pipe 502.65 Rm

f 50 mm dia G.I. Pipe 692.45 Rm

h 65 mm dia G.I. Pipe 727.45 Rm

84 Supplying and fixing in position first quality and approved variety of Gun
metal Gate Valve / Wheel Valve with BIS make of the following dia
including cost of shellac, thread balls, etc., complete complying with
standard specifications (for both internal and external water supply
arrangements). The valves to be used on work shall be got approved by the
Executive Engineer before use on work.
I Gate Valve

a 20 mm dia G.M. Gate Valve 591.85 Each

b 25 mm dia G.M. Gate Valve 827.85 Each

c 32 mm dia G.M. Gate Valve 1072.05 Each

d 40 mm dia G.M. Gate Valve 1283.05 Each

e 50 mm dia G.M. Gate Valve 1709.90 Each

f 65 mm dia G.M. Gate Valve 1984.90 Each

II Wheel Valve
Rate in Unit
Sl. rupees Page
Description
No. No.

a 15 mm dia G.M. Wheel Valve 416.85 Each

b 20 mm dia G.M. Wheel Valve 485.85 Each

c 25 mm dia G.M. Wheel Valve 592.85 Each

d 32 mm dia G.M. Wheel Valve 832.05 Each

e 40 mm dia G.M. Wheel Valve 967.05 Each

85 Supplying and fixing in position 15mm dia brass CP screw down tap /
Pillar tap (heavy duty) of approved make conforming to BIS specifications
and quality including cost of shellac, thread, etc., complete complying with
standard specification and including cutting and threading wherever
necessary. (Taps should be got approved by the Executive Engineer before
use on the works)
a 15mm dia CP Screw Down Tap 301.90 Each

b 15mm dia CP Pillar Tap 364.90 Each

c 15mm dia Swan Neck Tap 347.90 Each

86 Supplying and fixing in position Indian make bevelled edge mirror of


approved quality and brand PVC / Fibre Glass framed 600 x 450 x 5.5mm
thick mirror, shelf type with hard board backing of approved colour fixed
with brass screws, rawl plug, etc., complete complying with standard
specification. (The mirror should be got approved by the Executive Engineer
before use on woks)
600x450mm 838.65 Each

500x450 mm 748.65 Each

87 Supplying and fixing approved best quality brass CP towel rail 600mm long 430.40 Each
and 20mm dia with brackets of same materials including cost of teak wood
plugs and CP screws, etc., complete complying with standard specifications.
(The tower rail should be got approved by Executive Engineer before use on
works).

88 Supplying and fixing approved best quality aluminium anodised towel 297.20 Each
rail 600mm long and 20mm dia with brackets of same materials including
cost of teak wood plugs and CP screws, etc., complete complying with
standard specifications. (The tower rail should be got approved by Executive
Engineer before use on works).
89 Supplying and fixing best approved best quality brass CP soap tray of size 262.60 Each
150 x 150mm including cost of teak wood plugs, brass screws, etc.,
complete complying with standard specifications. (The soap tray should be
got approved by Executive Engineer before use on works).

90 Supplying and fixing in position GI unions of heavy duty of approved


quality and good variety of various sizes inluding necessary cutting and
threading of GI pipes for jointing the union and providing two coats of
painting with good variety and approved quality of synthetic enamel paint
over one coat of primer in case of pipe line above ground level / one coat of
tar in case of below ground level for both internal and external water supply
arrangements, etc., complete complying with standard specifications. (The
GI unions should be got approved by Executive Engineer before use on
works).
Rate in Unit
Sl. rupees Page
Description
No. No.

a 15 mm dia union 258.70 Each


b 20 mm dia union 270.30 Each
c 25 mm dia union 298.80 Each
d 32 mm dia union 327.40 Each
e 40 mm dia union 396.70 Each
f 50 mm dia union 464.80 Each
91 Supplying and fixing in position the following GI Specials of heavy type and
approved quality and good variety excluding fixing charges but including
necessary cutting and threading of GI pipes, jointing the GI specials and
painting with two coats with good variety and best quality synthetic enamel
paint over a coat of red oxide primer and jointing the specials with pipe line
using shellac etc., complete complying with standard specification. (The GI
specials should be got approved by the Executive Engineer concerned before
use on works.)
I GI Elbow
a 50 mm dia 208.10 Each
b 40 mm dia 168.90 Each
c 32 mm dia 147.65 Each
d 25 mm dia 104.05 Each
e 20 mm dia 50.40 Each
f 15 mm dia 40.60 Each
II GI Bend
a 50 mm dia 196.50 Each
b 40 mm dia 157.40 Each
c 32 mm dia 130.65 Each
d 25 mm dia 97.95 Each
e 20 mm dia 48.20 Each
f 15 mm dia 38.30 Each
III GI Tee
a 50 mm dia 268.50 Each
b 40 mm dia 222.30 Each
c 32 mm dia 194.55 Each
d 25 mm dia 154.10 Each
e 20 mm dia 75.50 Each
f 15 mm dia 68.85 Each
IV GI Coupling
a 50 mm dia 150.50 Each
b 40 mm dia 128.80 Each
c 32 mm dia 107.55 Each
d 25 mm dia 74.85 Each
e 20 mm dia 41.00 Each
f 15 mm dia 38.30 Each
Rate in Unit
Sl. rupees Page
Description
No. No.

V GI Reducer
a 50 x 40 mm dia 168.55 Each
b 40 x 32 mm dia 135.55 Each
c 32 x 25 mm dia 105.45 Each
d 25 x 20 mm dia 64.25 Each
e 20 x 15 mm dia 45.10 Each
f 40 x 25 mm dia 110.30 Each
g 32 x 20 mm dia 83.35 Each
VI GI Reducer Elbow
a 50 x 40 mm dia 185.45 Each
b 40 x 32 mm dia 158.65 Each
c 32 x 25 mm dia 123.15 Each
d 25 x 20 mm dia 87.35 Each
e 20 x 15 mm dia 65.00 Each
f 40 x 25 mm dia 130.80 Each
g 32 x 20 mm dia 100.45 Each
VII GI Reducer Tee
a 50 x 40 mm dia 260.05 Each
b 40 x 32 mm dia 220.15 Each
c 32 x 25 mm dia 182.90 Each
d 25 x 20 mm dia 131.90 Each
e 20 x 15 mm dia 109.95 Each
f 40 x 25 mm dia 197.00 Each
g 32 x 20 mm dia 149.55 Each
VII GI Hex Nipple
I
a 50 mm dia 88.95 Each
b 40 mm dia 71.95 Each
c 32 mm dia 60.35 Each
d 25 mm dia 46.05 Each
e 20 mm dia 37.15 Each
f 15 mm dia 25.75 Each
Rate in Unit
Sl. rupees Page
Description
No. No.

92 Supplying and fixing in position best quality and approved make Indian
made white / colour glazed earthernware wash hand basin of size
550 x 400mm (with pedestal / without pedestal) with a pair of cast iron
brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class
GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve,
15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste
coupling including fixing of wash basin using CI brackets on to the wall in
position with TW plugs and screws, rubber washers, white lead and giving
necessary water supply connection and painting the brackets with two coat
of painting over a priming coat of anti-corrosive paint including testing for
leakages etc., complete complying with standard specification and as
directed by the departmental officers. (The wash hand basin and specials
should be got approved by the Executive Engineer before use on works).

a White Glazed Wash Hand Basin

i Without Pedestal 3021.00 Each

ii With Pedestal 3351.00 Each

b Colour Glazed Wash Hand Basin

i Without Pedestal 3571.00 Each

ii With Pedestal 3801.00 Each

93 Supplying and fixing in position best quality approved make white glazed 3135.00 Each
earthernwere sink of size of 600 x 450 x 200mm including cost of
32mm dia CP waste coupling, 32mm dia PVC waste pipe with rubber plug
and chain, 15mm dia brass nipple including fixing the sink in position and
testing for leakages etc., complete complying with standard specifications
excluding CI brackets. [The sink and specials should be got approved by
the Executive Engineer before use on works]

94 Supplying and fixing in position best quality cuddapah sink of following


sizes including cost of 32mm dia CP waste coupling, 32mm dia PVC waste
pipe with rubber plug and chain, 15mm dia brass nipple including fixing the
sink in position and testing for leakages etc., complete complying with
standard specifications excluding CI brackets. [The sink and specials should
be got approved by the Executive Engineer before use on works]

a Cuddapah sink of 600 x 450 x 200mm 1798.00 Each

b Cuddapha sink of 600 x 600 x 200mm 2041.00 Each

95 Supplying and fixing in positon Indian Water Closet (Oriya type) of size 3986.00 Each
580 x 440mm white glazed earthern ware of approved quality and
brand with "P" or "S" trap conforming to BIS with sand cushion and forming
flooring alround the closet using 40mm broken brick jelly in lime concrete
1:2:5 (One lime, Two sand and Five brick jelly) 100mm thick and finishing
the top to the required slope and including giving necessary connection to
CI soil pipes (including the cost of 100mm dia CI pipe for a length of
600mm) by dismantling brick masonry wall / reinforced cement concrete
roof / floor slab and making good the dismantled portion to the original
condition with leakages etc., complete complying with standard
specifications and as directed by the departmental officers. (The water
closet should be got approved by the Executive Engineer before use on
works).
Rate in Unit
Sl. rupees Page
Description
No. No.

96 Supplying and fixing in positon Indian Water Closet (Oriya type) of size 4306.00 Each
580 x 440mm colour glazed earthern ware of approved quality and
brand with "P" or "S" trap conforming to BIS with sand cushion and forming
flooring alround the closet using 40mm broken brick jelly in lime concrete
1:2:5 (One lime, Two sand and Five brick jelly) 100mm thick and finishing
the top to the required slope and including giving necessary connection to
CI soil pipes (including the cost of 100mm dia CI pipe for a length of
600mm) by dismantling brick masonry wall / reinforced cement concrete
roof / floor slab and making good the dismantled portion to the original
condition with leakages etc., complete complying with standard
specifications and as directed by the departmental officers. (The water
closet should be got approved by the Executive Engineer before use on
works).

97 Supplying and fixing in positon Indian Water Closet (Oriya type) of size 3785.00 Each
580 x 440mm white glazed earthern ware of approved quality and brand
with "P" or "S" trap conforming to BIS with sand cushion and forming
flooring alround the closet using 40mm broken brick jelly in lime concrete
1:2:5 (One lime, Two sand and Five brick jelly) 100mm thick and finishing
the top to the required slope and including giving necessary connection to
PVC pipes (including the cost of 110mm dia PVC pipe for a length of
600mm) by dismantling brick masonry wall / reinforced cement concrete
roof / floor slab and making good the dismantled portion to the original
condition with leakages etc., complete complying with standard
specifications and as directed by the departmental officers. (The water
closet should be got approved by the Executive Engineer before use on
98 works).
Supplying and fixing in positon Indian Water Closet (Oriya type) of size 4105.00 Each
580 x 440mm colour glazed earthern ware of approved quality and brand
with "P" or "S" trap conforming to BIS with sand cushion and forming
flooring alround the closet using 40mm broken brick jelly in lime concrete
1:2:5 (One lime, Two sand and Five brick jelly) 100mm thick and finishing
the top to the required slope and including giving necessary connection to
PVC pipes (including the cost of 110mm dia PVC pipe for a length of
600mm) by dismantling brick masonry wall / reinforced cement concrete
roof / floor slab and making good the dismantled portion to the original
condition with leakages etc., complete complying with standard
specifications and as directed by the departmental officers. (The water
closet should be got approved by the Executive Engineer before use on
works).
Rate in Unit
Sl. rupees Page
Description
No. No.

99 Supplying and fixing in position white / colour glazed European Water


Closet of best quality and approved make with 100 mm "P" or "S" trap
connecting with CI pipe of 100mm dia / PVC pipe of 110mm dia, double
flapped rigid PVC black seat and seat cover with CP brass hinges including
cost of white cement, cement for packing, spun yarn, teak wood plugs,
brass screws, etc., including supplying and fixing 10 litres capacity PVC /
12.5 litres capacity porcelin low level flushing tank with a pair of CI
brackets, etc., complete with all fittings such as 15mm brass ball valve with
polythene float with brass handle, union, coupling connected by means of
40mm white PVC flush hand using Indian adopter joint including all internal
fittings such as 15mm brass connections, 15mm GM wheel valve, 15mm
brass nipple (2 Nos.), 15mm nylon connection, TW plugs, screws and also
giving necessary connection to the PVC pipe including cost of 600mm length
of 110mm dia PVC pipe and painting the CI brackets with 2 coats of
approved paint over one coat of red oxide primer, dismantling the masonry
and re-doing the dismantled masonry to original condition etc. complete
complying with standard specifications. (The EWC and flushing tank wiht all
accessories should be got approved by the Executive Enginer before use on
works)

a White glazed European Water Closet with 10 litre capacity PVC flushing 5030.00 Each
tank fixed on to wall
b White glazed European Water Closet with 10 litre capacity PVC flushing 6461.00 Each
tank fixed with CI brackets
c Colour glazed European Water Closet with 10 litre capacity PVC 5420.00 Each
flushing tank fixed on to wall
d Colour glazed European Water Closet with 10 litre capacity PVC 6851.00 Each
flushing tank fixed with CI brackets
e White glazed European Water Closet with 12.5 litre capacity porcelin 6669.00 Each
flushing tank fixed on to wall
f White glazed European Water Closet with 12.5 litre capacity procelin 8100.00 Each
flushing tank fixed with CI brackets
g Colour glazed European Water Closet with 12.5 litre capacity porcelin 8369.00 Each
flushing tank fixed on to wall
h Colour glazed European Water Closet with 12.5 litre capacity procelin 9800.00 Each
flushing tank fixed with CI brackets

100 Supply and fixing in position of best Indian make white / colour glazed
earthernware lipped mouth flat back urinal of best quality and
approved make of size 430mm x 260mm x 350mm with GI pipe, 32mm dia
bell mouth PVC connection and waste pipe, 15mm dia GI pipe of required
length, 15mm dia GM wheel valve, 15mm dia brass nipple 2 Nos., and fixing
the urinals in position with necessary TW plugs, clamps, screws, etc.,
including dismantling masnory and re-doing the same to the original
condition, etc., including painting the pipe with two coats of best quality
approved synthetic enamel paint over one coat of red oxide primer and
checked without any leakage etc. complete complying with standard
specifications and as directed by the departmental officers. (The urinal
should be got approved by the Executive Engineer before use on works.)

a White glazed earthernwere lipped mouth flat back urinal 1783.50 Each

b Colour glazed earthernwere lipped mouth flat back urinal 1915.50 Each
Rate in Unit
Sl. rupees Page
Description
No. No.

101 Supplying and fixing in position Indian make white glazed earthenware 1250.00 Each
squating type urinal of best quality and approved make including
dismantling masonry, if necessary and re-doing the same to original
condition, etc., complete complying with standard specification. (The
squatting urinal should be got approved by the Executive Engineer before
use on works).
102 Supplying and fixing position CI Nahani Trap / Floor Trap of the following
sizes with best stainless steel gratings of approved brand and quality, fixed
over a bed of brick jelly lime concrete 1:2:5 (One part of lime, two part of
sand and five part of 40mm gauge brick jelly) and finished with Cement
Mortar 1:3 (One Cement, Three sand) including dismantling masonry works
wherever found necessary and making good the dismantled portions to the
original condition and giving connection to the CI / PVC pipes, etc., complete
complying with standard specification. (The Nahani Trap should be got
approved by the Executive Engineer before use on works)

a Nahani Trap of size 100 x 75mm with stainless steel gratings 627.00 Each

b Nahani Trap of size 75 x 50mm with stainless steel gratings 568.50 Each

103 Supplying, laying and jointing glazed stone ware pipes of the following
dia of approved quality with spigot and socket ends and fixing them in dry
condition using spun yarn and cement including petty masonry shoring
and strutting wherever found necessary and laying the pipe line in the
alignment at the specified gradient and testing with necessary tools and
plants, etc., and re-filling the trench with excavated earth and levelling the
ground etc., complete complying with standard specifications. (Earth work
excavation, re-filling with excavated earth will be measured and paid
separately).

a 100mm dia stoneware pipe (cement joint) 226.05 Rm

b 150mm dia stoneware pipe (cement joint) 334.05 Rm

104 Supplying, laying and jointing glazed stoneware pipes of following dia of
approved best quality with spigot and socket ends (in reverse direction) in
dry condition and laid in loose joints (i.e.) without cement and spun yarn,
so that the waste water can be drained to the trenches already available,
excluding cost of earth work excavation, cost of re-filling with sand / earth,
but including laying the pipe in true alignment and gradient and conducting
required water supply test for draining with necessary tools and plants, etc.,
complete complying with standard specifications.
a 100mm dia stoneware pipe ( loose joints) 175.85 Rm
b 150mm dia stoneware pipe ( loose joints) 238.50 Rm
105 Supplying and fixing in position 150mm dia stoneware tee of approved 310.20 Each
best quality and provding leak proof joints with cement, spun yarn, etc.,
including dismantling the brick work and re-doing the dismantled portion to
the original condition, etc., complete complying with standard specifications
(The stoneware tee shall be got approved by the Executive Engineer before
use on work)
Rate in Unit
Sl. rupees Page
Description
No. No.

106 Supplying and fixing in position 150 x 100mm "P" or "S" stoneware gully 750.00 Each
trap 'A' grade with CI double gratings of size 150 x 150mm and 230 x
230mm at bottom and top respectively with necessary earth work
excavation laid over a bed of brick jelly cement concrete 1:3:6 (One
cement, Three sand and Six broken brick jelly) 150mm thick using 40mm
size broken brick jelly including necessary brick work and plastering
including dismantling masonry wherever necessary and re-doing the
damaged portions to the original conditions using cement concrete 1:3:6
using 20mm stone jelly for fixing the gully trap and giving connections to
stoneware sewer line etc., complete complying with standard specifications.
[Earth work excavation, brick work, plastering shall be measured and paid
separately]. The stoneware gully trap should be got approved by the
Executive Engineer before use on works.

107 Supplying and fixing AC ventilating shaft of 100mm dia with 3 metre 513.80 Each
height including cost of 100mm dia AC cylindrical cowl of best approved
quality etc., complete complying with standard specifications and as directed
by the departmental officers

108 Supplying and fixing PVC ventilating shaft of 110mm dia (having 892.45 Each
working pressure 4 kg. / sq.cm) with 3 metre height including cost of PVC
cylindrical cowl of best approved quality etc., complete complying with
standard specifications and as directed by the departmental officers

109 Supplying and fixing in position CI manhole covers with CI frames 2184.00 Each
(Heavy duty) of size 60cm x 60cm of best approved quality as per standard
specification etc., complete compying with standard specifications

110 Supplying, laying and position best quality Indian cast iron soil / waste
pipes of following dia of approved brand and quality conforming to BIS and
providing leak proof joints with spun yarn and making connection to all
sanitary fittings with required number of special, clamps, cement and spun
yarn, dismantling the masonry / RCC wherever necessary and making good
the dismanlted portion to the original condition including painting the cast
iron pipes and fittings with two coats of anti corrosive paint of approved
quality and colour and the pipes fixed in postion in true alignment, etc.,
complete complying with standard specifications (The CI pipes shall be got
approved by the Executive Engineer before use on work)

a 150mm dia CI Pipe 1518.60 Rm


b 100mm dia CI Pipe 1110.90 Rm
c 75mm dia CI Pipe 982.50 Rm
111 Supplying and fixing in position following CI specials of various dia of
approved quality conforming to BIS and providing leak proof joints with
cement, spun yarn, etc., including fixing to wall and giving connections to
the CI soil stacks, dismantling the brick work / RCC floor or roof slab and re-
doing the dismantled portion to the original condition including the CI
specials with two coats of anti corrosive paint of approved quality and colour
etc., complete complying with standard specifications (The CI specials shall
be got approved by the Executive Engineer before use on work)

A Plain Bend

i 150mm Dia 910.55 Each

ii 100mm Dia 637.55 Each


Rate in Unit
Sl. rupees Page
Description
No. No.

iii 75mm Dia 577.55 Each

B Bend with Door

i 150mm Dia 994.55 Each

ii 100mm Dia 689.55 Each

iii 75mm Dia 637.55 Each

C Plain TEE

i 150mm Dia 1445.55 Each

ii 100mm Dia 851.55 Each

iii 75mm Dia 701.55 Each

D TEE with Door

i 150mm Dia 1505.55 Each

ii 100mm Dia 923.55 Each

iii 75mm Dia 756.55 Each

E "Y" Junction with Door (single)

i 150mm Dia 1563.55 Each

ii 100mm Dia 971.55 Each

iii 75mm Dia 791.55 Each

F "Y" Junction with Door (Double)

i 150mm Dia 1684.55 Each

ii 100mm Dia 1041.55 Each

iii 75mm Dia 875.55 Each

G COWL

i 150mm Dia 474.40 Each

ii 100mm Dia 345.40 Each

iii 75mm Dia 280.40 Each

112 Supplying and fixing in position best quality PVC soil / waste pipes of
various dia having 6 kg / sq.cm. pressure BIS mark and providing leak proof
joints using PVC adhesives including fixing to the wall with special PVC / MS
clamp, teak wood plugs, brass screws, etc., and making connection to all
sanitary fittings, dismantling masonry / RCC works wherever found
necessary and making the good dismantled portion to the original condition,
including testing for any leakages, etc., complete complying with standard
specifications. (The PVC pipes should be got approved by the Executive
Engineer before use on works). The rate for earth work excavation will be
measured and paid separately in the cases where the pipe lines are
proposed to laid below ground level
a 75mm dia PVC soil / waste pipe 288.35 Rm
b 110mm dia PVC soil / waste pipe 381.35 Rm
c 160mm dia PVC soil / waste pipe 628.05 Rm
Rate in Unit
Sl. rupees Page
Description
No. No.

113 Supplying and fixing in position PVC specials of the following dia and types
of approved quality confirming to BIS and providing leak proof joints
including fixing to the walls and giving connection to the PVC soil stacks,
dismantling the masonry or RCC works and re-doing the dismantled portion
to original condition etc., complete complying with standard specifications.
(The PVC specials should be got approved by the Executive Engineer before
use on works).
A PVC Elbow
1 160mm dia 318.65 Each
2 110mm dia 306.65 Each
3 75mm dia 276.75 Each
B PVC Elbow with Door
1 160mm dia 354.25 Each
2 110mm dia 336.15 Each
3 75mm dia 283.05 Each
C PVC Tee
1 160mm dia 370.95 Each
2 110mm dia 359.85 Each
3 75mm dia 306.65 Each
D PVC Tee with Single Door
1 160mm dia 413.65 Each
2 110mm dia 383.65 Each
3 75mm dia 330.45 Each
E PVC Tee with Double Door
1 160mm dia 465.35 Each
2 110mm dia 448.55 Each
3 75mm dia 359.85 Each
F PVC Bend
1 160mm dia 324.25 Each
2 110mm dia 312.45 Each
3 75mm dia 283.05 Each
G PVC "Y"
1 160mm dia 377.95 Each
2 110mm dia 366.05 Each
3 75mm dia 312.45 Each
H PVC "Y" with Single Door
1 160mm dia 416.85 Each
2 110mm dia 389.85 Each
3 75mm dia 330.45 Each
Rate in Unit
Sl. rupees Page
Description
No. No.

I PVC "Y" with Double Door


1 160mm dia 494.85 Each
2 110mm dia 460.05 Each
3 75mm dia 371.65 Each
114 Supplying and fixing in position PVC 4 way junction plain or with door of
various dia of best approved quality confirming to BIS and providing leak
proof joints including fixing to the walls and giving connection to the PVC
soil stacks, dismantling the masonry or RCC works and re-doing the
dismantled portion to original condition etc., complete complying with
standard specifications. (The PVC specials should be got approved by the
Executive Engineer before use on works).

A PVC Double Tee with Single Door


(4 way junction)
1 160mm dia 635.90 Each

2 110mm dia 606.90 Each

3 75mm dia 535.70 Each

B PVC Double "Y" with Single Door


(4 way junction)
1 160mm dia 671.90 Each
2 110mm dia 629.90 Each
3 75mm dia 552.90 Each
115 Supplying and fixing in position PVC cowls of following dia of best approved
quality conforming to BIS, etc., complete complying with standard
specifications. (The PVC cowl should be got approved by the Executive
Engineer before use on works).
A PVC Cowl

1 110mm dia 189.65 Each

2 75mm dia 166.95 Each

3 50mm dia 148.95 Each

116 Supplying and fixing in position CP shower rose with CP stop cock 438.00 Each
arrangement of size 15mm dia inlet and 100mm outlet to the pipe line with
necessary cutting, threading and jointing using shellac etc., complete
complying with standard specification and as directed by the departmental
officers (The CP shower rose should be got approved by the Executive
Engineer before use on works).
Internal Water Supply Arrangements using PVC pipes and PVC
specials
Rate in Unit
Sl. rupees Page
Description
No. No.

117 Supplying, laying and jointing PVC pipes (having working pressure 10 kg. /
sq.cm) of approved quality and best variety conforming to BIS of the
following dia including cutting, threading and fixing PVC specials using PVC
adhesives (but excluding cost of such specials) and fixing into wall with teak
wood plugs, PVC clamps and screws making holes on the wall (or) drilling
holes in the roof and making good the dismantled portion to original
condition with necessary brick work / cement concrete and plastering neatly
wherever necessary with necessary scaffolding charges, etc., complete
complying with standard specifications. The PVC pipes shall be got
approved by Executive Engineer before use on works.

a 15 mm dia PVC Pipe 105.15 Rm

b 20 mm dia PVC Pipe 182.25 Rm

c 25 mm dia PVC Pipe 223.75 Rm

d 32 mm dia PVC Pipe 179.15 Rm

e 40 mm dia PVC Pipe 210.35 Rm

f 50 mm dia PVC Pipe 288.15 Rm

External Water Supply Arrangements using PVC pipes and PVC


specials

118 Supplying, laying and jointing PVC pipes (having working pressure 10 kg. /
sq.cm) of approved quality and best variety conforming to BIS of the
following dia including cutting, threading and fixing PVC specials using PVC
adhesives (but excluding cost of such specials) and fixing into wall with teak
wood plugs, PVC clamps and screws making holes on the wall (or) drilling
holes in the roof and making good the dismantled portion to original
condition with necessary brick work / cement concrete and plastering neatly
wherever necessary with necessary scaffolding charges upto 4 metre height
above ground level, etc., complete complying with standard specifications.
The PVC pipes shall be got approved by Executive Engineer before use on
works.
I Above Ground Level

a 15 mm dia PVC Pipe 112.70 Rm


b 20 mm dia PVC Pipe 189.80 Rm
c 25 mm dia PVC Pipe 231.30 Rm
d 32 mm dia PVC Pipe 342.55 Rm
e 40 mm dia PVC Pipe 226.85 Rm
f 50 mm dia PVC Pipe 313.75 Rm
II Below Ground Level

a 15 mm dia PVC Pipe 80.50 Rm


b 20 mm dia PVC Pipe 157.60 Rm
c 25 mm dia PVC Pipe 199.10 Rm
d 32 mm dia PVC Pipe 298.45 Rm
e 40 mm dia PVC Pipe 210.25 Rm
f 50 mm dia PVC Pipe 255.25 Rm
Rate in Unit
Sl. rupees Page
Description
No. No.

119 Supplying PVC Specials (with working pressure 10 kg. / sq.cm.) in


water supply arrangements (both in internal and external water
supply arrangements
A Coupler
a 15 mm Dia 3.50 Each
b 20 mm Dia 4.10 Each
c 25 mm Dia 4.80 Each
d 32 mm Dia 6.00 Each
e 40 mm Dia 9.00 Each
f 50 mm Dia 12.20 Each
B Elbow
a 15 mm Dia 5.30 Each
b 20 mm Dia 6.00 Each
c 25 mm Dia 8.50 Each
d 32 mm Dia 12.20 Each
e 40 mm Dia 17.20 Each
f 50 mm Dia 24.50 Each
C BEND
a 15 mm Dia 6.00 Each
b 20 mm Dia 7.30 Each
c 25 mm Dia 9.70 Each
d 32 mm Dia 14.60 Each
e 40 mm Dia 19.60 Each
f 50 mm Dia 30.70 Each
D Tee
a 15 mm Dia 7.30 Each
b 20 mm Dia 8.50 Each
c 25 mm Dia 12.20 Each
d 32 mm Dia 14.70 Each
e 40 mm Dia 23.40 Each
f 50 mm Dia 36.80 Each
E End Cap
a 15 mm Dia 3.50 Each
b 20 mm Dia 4.80 Each
c 25 mm Dia 6.00 Each
d 32 mm Dia 7.30 Each
e 40 mm Dia 11.40 Each
f 50 mm Dia 15.80 Each
F Reducer
a 20 mm x 15 mm 4.80 Each
b 25 mm x 20 mm 5.30 Each
Rate in Unit
Sl. rupees Page
Description
No. No.

c 32 mm x 25 mm 8.50 Each
d 40 mm x 32 mm 11.40 Each
e 50 mm x 40 mm 19.60 Each
G Reducer Tee
a 20 mm x 15 mm 7.30 Each
b 25 mm x 20 mm 8.50 Each
c 32 mm x 25 mm 12.20 Each
d 40 mm x 32 mm 14.70 Each
e 50 mm x 40 mm 24.50 Each
H Reducer Elbow
a 20 mm x 15 mm 6.00 Each
b 25 mm x 20 mm 7.30 Each
c 32 mm x 25 mm 9.70 Each
d 40 mm x 32 mm 12.20 Each
e 50 mm x 40 mm 18.30 Each
J Jet Nipple
a 25 mm Dia 15.80 Each
b 32 mm Dia 20.70 Each
120 Providing Anti-termite treatment to soil adjecent and under building 95.00 Sqm
foundation, plinth periphery of the building by application of chemicals of IS
63613 part I to IV in stages to suit the progress of work consist as per the
detailed specification as below. Including breaking of termite mounds,
making holes with crow bar, closing the holes after the treatment and
including cost of chemicals, labour charges, transport and storing etc.,
complete and as directed by the departmental officers.
PUBLIC WORKS DEPARTMENT
BUILDING ORGANISATION
DATA FOR THE YEAR 2019-2020
Sl. Rate in
Description Unit
No. rupees
LEAD STATEMENT
Mortar
1 Earth work excavation for foundation 130.40 cu.m
2 Earth work open excavation in all soils 60.95 cu.m
3 Supplying and filling in foundation, basement, etc with filling sand 756.36 cu.m
4 Refilling with excavated earth other than sand 25.50 cu.m
5 Supplying and filling basement with conveyed earth from 10 km 194.80 cu.m
6 Supplying and filling GRAVEL in 'foundation and basement 317.10 cu.m
7 S&F 40mm guauge HBGS stone jelly for dispersion trench 1224.80 cu.m
8 S&F 25mm guauge HBGS stone jelly for dispersion trench 1086.80 cu.m
9 S&F 20mm guauge HBGS stone jelly for dispersion trench 1608.80 cu.m
10 Supplying and filling in basement with sand gravel mix 612.40 cu.m
11 Providing and laying sand gravel mix (1:1) (For road works) 716.60 cu.m
12 Cement Concrete 1:5:10 using 40 mm stone jelly for foundation 3573.90 cu.m
13 Cement Concrete 1:5:10 using 40 mm stone jelly for flooring 3573.90 cu.m
14 Cement Concrete 1:4:8 using 40 mm stone jelly for foundation 3760.80 cu.m
15 Cement Concrete 1:3:6 using 40mm size stone jelly for dummy columns
For foundation & basement 4072.40 cu.m.
For Ground floor 4150.60 cu.m.
For First floor 4304.60 cu.m.
For Second floor 4458.60 cu.m.
For Third floor 4612.60 cu.m.
For Fourth floor 4766.60 cu.m.
16 PCC- 1:2:4 using 20mm jelly for wearing coat 4515.90 cu.m.
17 Damp proof course with Cement Mortar 1:4 -12mm thick 178.10 sq.m.
18 Supplying and erecting steel centering 584.55 sq.m.
19 Supplying and erecting centering for sides
a For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, 667.00 sq.m.
landing slab, waist slab, portico slabs and beams, etc.
b For plane surfaces such as vertical slab, side slabs of boxing, vertical drops, facia, 733.70 sq.m.
vertical wall, etc.
c For plane surfaces such as rectangular or square RCC columns, sunshades, top 800.40 sq.m.
and bottom slab of RCC boxing, etc.
d For circular columns 1600.80 sq.m.
e Centering for curved surfaces of all RCC items of work 1000.50 sq.m.
20 Providing additional strutting to centering of RCC slabs 27.50 sq.m.
21 CC 1:2:4 -20 mm gauge hard broken granite stone jelly
a In foundation and basement 6096.10 cu.m
b In Ground floor 6174.30 cu.m
c In First floor 6328.30 cu.m
d In Second Floor 6482.30 cu.m
e In Third floor 6636.30 cu.m
f In Fourth floor 6790.30 cu.m
g In Fifth floor 6944.30 cu.m
22 Cement Concrete 1:1-1/2:3
a In foundation and basement 6717.39 cu.m
b In Ground floor 6795.59 cu.m
c In First floor 6949.59 cu.m
d In Second Floor 7103.59 cu.m
e In Third floor 7257.59 cu.m
f In Fourth floor 7411.59 cu.m
g In Fifth floor 7565.59 cu.m
Sl. Rate in
Description Unit
No. rupees

23 Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills 6526.66 Qtl
for all RCC works
24 BRICK WORK FOR 230mm Thick wall
Country bricks of size 8-3/4" x 4-1/4" x 2-1/4"
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 4679.45 cu.m
In Ground floor 4730.95 cu.m
In First floor 4834.75 cu.m
In Second floor 4938.55 cu.m
In Third floor 5042.35 cu.m
In Fourth floor 5146.15 cu.m
In Fifth floor 5249.95 cu.m
B In Cement Mortar 1:5 (one cement and five sand)
For foundation & basement 4757.00 cu.m
In Ground floor 4730.95 cu.m
In First floor 4834.75 cu.m
In Second floor 4938.55 cu.m
In Third floor 5042.35 cu.m
In Fourth floor 5146.15 cu.m
In Fifth floor 5249.95 cu.m
c In Cement Mortar 1:3 (one cement and three sand)
For foundation & basement 5067.20 cu.m
In Ground floor 5118.70 cu.m
In First floor 5222.50 cu.m
In Second floor 5326.30 cu.m
In Third floor 5430.10 cu.m
In Fourth floor 5533.90 cu.m
24a Country bricks of size 8-3/4" x 4-1/4" x 2-3/4"
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 4533.60 cu.m
In Ground floor 4585.10 cu.m
In First floor 4688.90 cu.m
In Second floor 4792.70 cu.m
In Third floor 4896.50 cu.m
In Fourth floor 5000.30 cu.m
In Fifth floor 5104.10 cu.m
B In Cement Mortar 1:5 (one cement and five sand)
For foundation & basement 4602.80 cu.m
In Ground floor 4654.30 cu.m
In First floor 4758.10 cu.m
In Second floor 4861.90 cu.m
25 II class table moulded chamber burnt bricks of size
9" x 4-1/2" x 3"
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 5531.60 cu.m
In Ground floor 5583.10 cu.m
In First floor 5686.90 cu.m
In Second floor 5790.70 cu.m
In Third floor 5894.50 cu.m
In Fourth floor 5998.30 cu.m
In Fifth floor 6102.10 cu.m
B In Cement Mortar 1:5 (one cement and five sand)
For foundation & basement 5592.50 cu.m
In Ground floor 5644.00 cu.m
In First floor 5747.80 cu.m
In Second floor 5851.60 cu.m
Sl. Rate in
Description Unit
No. rupees

In Third floor 5955.40 cu.m


In Fourth floor 6059.20 cu.m

C In Cement Mortar 1:3


For foundation & basement 5836.20 cu.m
In Ground floor 5887.70 cu.m
In First floor 5991.50 cu.m
In Second floor 6095.30 cu.m
In Third floor 6199.10 cu.m
In Fourth floor 6302.90 cu.m
26 II class table moulded chamber burnt bricks of size
9" x 4-3/8" x 2-3/4"
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 5839.85 cu.m
In Ground floor 5891.35 cu.m
In First floor 5995.15 cu.m
In Second floor 6098.95 cu.m
In Third floor 6202.75 cu.m
In Fourth floor 6306.55 cu.m
In Fifth floor 6410.35 cu.m
B In Cement Mortar 1:5 (one cement and five sand)
For foundation & basement 5909.10 cu.m
In Ground floor 5960.60 cu.m
In First floor 6064.40 cu.m
In Second floor 6168.20 cu.m
In Third floor 6272.00 cu.m
In Fourth floor 6375.80 cu.m
In Cement Mortar 1:3
For foundation & basement 6186.05 cu.m
In Ground floor 6237.55 cu.m
In First floor 6341.35 cu.m
In Second floor 6445.15 cu.m
In Third floor 6548.95 cu.m
In Fourth floor 6652.75 cu.m
27 II class Ground moulded chamber burnt bricks -
9" x 4-3/8" x 2-3/4"
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 5412.90 cu.m
In Ground floor 5464.40 cu.m
In First floor 5568.20 cu.m
In Second floor 5672.00 cu.m
In Third floor 5775.80 cu.m
In Fourth floor 5879.60 cu.m
In Fifth floor 5983.40 cu.m
B In Cement Mortar 1:5 (one cement and five sand)
For foundation & basement 5482.15 cu.m
In Ground floor 5533.65 cu.m
In First floor 5637.45 cu.m
In Second floor 5741.25 cu.m
In Third floor 5845.05 cu.m
In Fourth floor 5948.85 cu.m

28 II class Ground moulded chamber burnt bricks of size


9" x 4-1/2" x 3"
A In Cement Mortar 1:6 (one cement and six sand)
For foundation & basement 5109.65 cu.m
In Ground floor 5161.15 cu.m
In First floor 5264.95 cu.m
Sl. Rate in
Description Unit
No. rupees

In Second floor 5368.75 cu.m


In Third floor 5472.55 cu.m
In Fourth floor 5576.35 cu.m
In Fifth floor 5680.15 cu.m
B In Cement Mortar 1:5 (one cement and five sand)
For foundation & basement 5170.55 cu.m
In Ground floor 5222.05 cu.m
In First floor 5325.85 cu.m
In Second floor 5429.65 cu.m
In Third floor 5533.45 cu.m
In Fourth floor 5637.25 cu.m
In Cement Mortar 1:3 (one cement and three sand)
For foundation & basement 5414.25 cu.m
In Ground floor 5465.75 cu.m
In First floor 5569.55 cu.m
In Second floor 5673.35 cu.m
In Third floor 5777.15 cu.m
In Fourth floor 5880.95 cu.m
29 Brick partition walls
Country bricks of size 8-3/4" x 4-1/4" x 2-1/4"
a In Foundation and basement 612.50 Sqm
b In Ground Floor 618.05 Sqm
c In First Floor 629.25 Sqm
d In Second Floor 640.45 Sqm
e In Third Floor 651.70 Sqm
f In Fourth Floor 662.90 Sqm
30 Country Bricks of size 8-3/4" x 4-1/4" X2-3/4"
a In Foundation and basement 592.25 Sqm
b In Ground Floor 597.80 Sqm
c In First Floor 609.00 Sqm
d In Second Floor 620.20 Sqm
e In Third Floor 631.45 Sqm
f In Fourth Floor 642.65 Sqm

31 II class table moulded chamber burnt bricks of size


9" x 4-1/2" x 3"
a In Foundation and basement 736.40 Sqm
b In Ground Floor 742.30 Sqm
c In First Floor 754.25 Sqm
d In Second Floor 766.20 Sqm
e In Third Floor 778.10 Sqm
f In Fourth Floor 790.05 Sqm
32 II class table moulded chamber burnt bricks of size
9" x 4-3/8" x 2-3/4"
a In Foundation and basement 776.60 Sqm
b In Ground Floor 782.55 Sqm
c In First Floor 782.55 Sqm
d In Second Floor 794.50 Sqm
e In Third Floor 818.35 Sqm
f In Fourth Floor 830.30 Sqm

33 II class Ground moulded chamber burnt bricks of size


9" x 4-3/8" x 2-3/4"
a In Foundation and basement 727.50 Sqm
b In Ground Floor 733.45 Sqm
c In First Floor 745.40 Sqm
Sl. Rate in
Description Unit
No. rupees

d In Second Floor 757.30 Sqm


e In Third Floor 769.25 Sqm
f In Fourth Floor 781.20 Sqm
34 II class Ground moulded chamber burnt bricks of size
9" x 4-1/2" x 3"
a In Foundation and basement 687.85 Sqm
b In Ground Floor 693.80 Sqm
c In First Floor 705.70 Sqm
d In Second Floor 717.65 Sqm
e In Third Floor 729.60 Sqm
f In Fourth Floor 741.55 Sqm

35 Providing granolithic floor finish


a 20mm thick 100.85 Sqm
b 25mm thick 126.10 Sqm
c 40mm thick 201.70 Sqm
36 Flooring with Snow White Marble Slab (Adanga) 18mm to 20mm thick
a Using Marble Slabs of size 4'0'' x 2'0'' and above 2540.40 Sqm
b Using Marble Slabs of size 2'0'' x 2.0" and below 1856.50 Sqm
37 Paving the floor with fine polished Kota stone slabs of size
600 x 600 of 18 / 20mm with machine cut edges
A Fine polished Kota Stone Slab above 600 x 600 of 18 / 20mm size 1038.00 Sq.m
B Fine polished Kota Stone Slab below 600 x 600 of 18 / 20mm size 1101.00 Sq.m
38 Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un- 1083.10 Sq.m
polished)
39 Paving the floor with fine polished Granite Stone Slabs of size 1200 x 600 of 2012.10 Sq.m
18 / 20mm thick
39a Paving the floor with fine polished cuddapah stone slab of 38 / 40mm thick Sq.m
laid over Cement Mortar 1:3
i Cuddapah Slab 20 / 30mm thick 953.40 Sq.m
ii Cuddapah Slab 38 / 40mm thick 985.90 Sq.m
iii Cuddapah Slab 50mm thick 1001.70 Sq.m
40 Paving the floor with Vertified tiles 600 x 600 x 8mm 926.90 Sq.m
41 Flooring with ceramic tiles laid over 20 mm thick cement mortar 1:3
a Self Designed Colour Ceramic Tiles of size 305 x 305 x 6mm 813.30 Sq.m
b Plain Ceramic Tiles- 305 x 305 x 6 mm 675.00 Sq.m
c Plain Ceramic Tiles of size 200x 200 x 6mm 687.30 Sq.m
d Designed Ceramic Tiles of size 200x 200 x 6mm 822.30 Sq.m
e Plain Ceramic Tiles of size 200x 100 x 6mm 697.30 Sq.m
f Designed Ceramic Tiles of size 200x 100 x 6mm 862.30 Sq.m
42 Paving the floor with pre-polished concrete anti-skid tiles (Required shape and 1054.50 Sq.m
design) of 20mm thick
43 Paving the floor with pre-polished concrete anti-skid step tiles (Required shape 1157.50 Sq.m
and design) of 20mm thick
44 Dadooing walls with best approved quality, white / colour glazed tiles
a Dadooing with white glazed tiles of size 150mm x 150mm x 6mm 962.90 Sq.m

b Dadooing with plain colour glazed tiles of size 150mm x 150mm x 6mm 1018.70 Sq.m

c Dadooing with printed design colour glazed tiles - 150mm x 150mm x 6mm 1090.70 Sq.m

d Dadooing with granite tiles of synthetic grey, paradise, and similar varieties of 1332.20 Sq.m
suitable sizes
e Dadooing with printed design colour glazed tiles of size 300 x 200 x 6mm 1090.80 Sq.m

f Dadooing with printed design colour glazed tiles of size 300 x 450 x 8mm 1047.20 Sq.m

45 Weathering course in brick jelly lime concrete


Sl. Rate in
Description Unit
No. rupees

a In Ground Floor 2963.10 cu.m


b In First Floor 3117.10 cu.m
c In Second Floor 3271.10 cu.m
d In Third Floor 3425.10 cu.m
e In Fourth Floor 3579.10 cu.m
f In Fifth Floor 3733.10 cu.m
46 Finishing the top of roof with one course of machine pressed tiles
Pressed Tiles of 200mm x 200mm x 20mm 868.90 Sq.m
Pressed Tiles of 230mm x 230mm x 20mm 888.10 Sq.m
Solar Reflective tiles of 305mm x 305mm x 7mm 1186.80 Sq.m
47 Finishing the top of slopped roof, sun-shade with Machine Pressed 1251.90 Sq.m
Ornamental Tiles
48 Supplying and fixing fine polished cuddapah slab
a 20 / 30mm thick 427.70 Sq.m
b 38 / 40mm thick 458.70 Sq.m
49 Supplying and fixing in position best approved of BIS quality PVC rain water
down fall pipes
a 160 mm dia (In building with ground floor only) 651.10 Rm
b 160 mm dia (In building with Two floor only) 513.10 Rm
c 160 mm dia (In building with Three floor only) 467.20 Rm
a 110 mm dia (In building with ground floor only) 443.90 Rm
b 110 mm dia (In building with Two floor only) 316.50 Rm
c 110 mm dia (In building with Three floor only) 274.10 Rm
50 Supplying and fixing teak wood hand rails 1481.00 Rm
51 Supplying and fixing in position steel balustrades using 20mm square rods 2096.40 Sq.m
spaced at 150mm centre to centre
52 Supplying and fixing 40mm dia GI pipe for staircase hand rail 177.76 Rm
53 Supplying and fixing GI pipe handrails for handicapped persons 1268.45 Sq.m
54 Plastering with Cement Mortar 1:5-12mm thick 168.10 Sq.m
55 Plastering with Cement Mortar 1:5 - 20mm thick 336.90 Sq.m
56 Special ceiling plastering- 10mm thick 194.85 Sq.m
57 Plastering with Cement Mortar 1:3-12mm thick 183.65 Sq.m
58 Plastering - with Cement Mortar 1:3 - 20mm thick 361.25 Sq.m
59 Plastering with Cement Mortar 1:3- 12mm thick mixed with water proofing 189.20 Sq.m
compound conforming
60 Plastering with Cement Mortar 1:3 -20mm thick mixed with water proofing 370.00 Sq.m
compound conforming
61 Stucco plastering 12mm thick 399.10 Sq.m
62 White washing one coat 15.70 Sq.m
63 White washing two coats 22.80 Sq.m
64 Colour washing two coats
a For one Coat 23.55 Sq.m
b For Two Coat 34.20 Sq.m
65 Supplying and painting the walls with two coats of cement paint over one 143.95 Sq.m
coat of cement primer
For basic one coat of primer with cement paint 51.10 Sq.m
For finishing two coats 92.85 Sq.m
66 Supplying and painting the walls with two coats of cement paint 97.60 Sq.m
67 Supplying and painting the walls with two coats of oil bound distemper over 138.05 Sq.m
one coat of water based cement primer
68 Distempering the old wall and ceiling one coat with best oil bound distember

a For one coat 43.70 Sq.m


b For two coat including scaping 90.45 Sq.m
69 Painting two coats of newly plastered wall surface with ready mixed 173.15 Sq.m
plastic emulsion paint
Sl. Rate in
Description Unit
No. rupees

70 Painting new wood work with two finishing coats of synthetic enamel ready 179.80 Sq.m
mixed paint of approved quality and colour over one coat priming coat
71 Painting new iron works
a Primer coat 54.45 Sq.m
b Two coat 107.00 Sq.m
72 Two coat with primer 161.50 Sq.m
73 Polishing the teak wood door with two coats of best French (Lac) 124.95 Sq.m
74 Providing expansion joint in RCC floor slab for 12.5mm width 493.80 Rm
75 Providing expansion joint 12.5mm width in RCC roof slabs between RCC 696.30 Rm
twin beams using PVC water bar of 150mm wide centre bulb of 4mm to
6mm thickness
76 Expansion joint of 12.5mm wide in between RCC twin columns 573.10 Sq.m
77 Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs
of following thickness in RCC 1:2:4
a 25mm thick precast slab using 10mm HBGS jelly 206.60 Sq.m
b 50mm thick precast slab using 20mm HBGS jelly 424.10 Sq.m
c 75mm thick slab (using 20mm HBGS Jelly) 637.25 Sq.m
78 Manufacturing, supplying and fixing in position plain cement concrete precast 549.00 Sq.m
pavement slab of size 450mm x 450mm of 50mm thick
79 Manufacturing, supplying and fixing in position plain cement concrete precast 723.30 Sq.m
kerb slab of size 600mm x 600mm x 100mm
80 Manufacturing, S &F in positon of RCC Jally of 5cm thick 964.65 Sq.m
81 S&F AC sheet roofing with 6mm thick asbestos cement sheets 553.10 Sq.m
82 WATER SUPPLY AND SANITARY ARRANGEMENT ITEMS OF WORK
Supplying, laying and jointing GI pipes of approved quality
I Internal Water Supply - Above Ground Level
a 15 mm dia G.I. Pipe 192.45 Rm
b 20 mm dia G.I. Pipe 223.45 Rm
c 25 mm dia G.I. Pipe 255.10 Rm
d 32 mm dia G.I. Pipe 332.40 Rm
e 40 mm dia G.I. Pipe 348.15 Rm
f 50 mm dia G.I. Pipe 448.75 Rm
h 65 mm dia G.I. Pipe 491.40 Rm
II External Water Supply - Above Ground Level
a 15 mm dia G.I. Pipe 207.95 Rm
b 20 mm dia G.I. Pipe 239.00 Rm
c 25 mm dia G.I. Pipe 270.65 Rm
d 32 mm dia G.I. Pipe 360.75 Rm
e 40 mm dia G.I. Pipe 376.55 Rm
f 50 mm dia G.I. Pipe 487.60 Rm
h 65 mm dia G.I. Pipe 530.25 Rm
External Water Supply - Below Ground Level
a 15 mm dia G.I. Pipe 289.45 Rm
b 20 mm dia G.I. Pipe 317.95 Rm
c 25 mm dia G.I. Pipe 347.05 Rm
d 32 mm dia G.I. Pipe 490.95 Rm
e 40 mm dia G.I. Pipe 502.65 Rm
f 50 mm dia G.I. Pipe 692.45 Rm
h 65 mm dia G.I. Pipe 727.45 Rm
84 Supplying and fixing- of Gun metal Gate Valve / Wheel Valve
I Gate Valve
a 20 mm dia G.M. Gate Valve 591.85 Each
b 25 mm dia G.M. Gate Valve 827.85 Each
c 32 mm dia G.M. Gate Valve 1072.05 Each
d 40 mm dia G.M. Gate Valve 1283.05 Each
e 50 mm dia G.M. Gate Valve 1709.90 Each
f 65 mm dia G.M. Gate Valve 1984.90 Each
II Wheel Valve
Sl. Rate in
Description Unit
No. rupees

a 15 mm dia G.M. Wheel Valve 416.85 Each


b 20 mm dia G.M. Wheel Valve 485.85 Each
c 25 mm dia G.M. Wheel Valve 592.85 Each
d 32 mm dia G.M. Wheel Valve 832.05 Each
e 40 mm dia G.M. Wheel Valve 967.05 Each
85 S&F 15mm dia brass CP screw down tap / Pillar tap
a 15mm dia CP Screw Down Tap 301.90 Each
b 15mm dia CP Pillar Tap 364.90 Each
c 15mm dia Swan Neck Tap 347.90 Each
86 Indian make bevelled edge mirror
600x450mm 838.65 Each
500x450 mm 748.65 Each
87 CP towel rail 600mm long and 20mm dia with brackets 430.40 Each
88 Aluminium anodised towel rail 600mm long and 20mm dia 297.20 Each
89 S&F CP soap tray of size 150 x 150mm 262.60 Each
90 GI unions
a 15 mm dia union 258.70 Each
b 20 mm dia union 270.30 Each
c 25 mm dia union 298.80 Each
d 32 mm dia union 327.40 Each
e 40 mm dia union 396.70 Each
f 50 mm dia union 464.80 Each
91 Supplying and fixing in position the following GI Specials
I GI Elbow
a 50 mm dia 208.10 Each
b 40 mm dia 168.90 Each
c 32 mm dia 147.65 Each
d 25 mm dia 104.05 Each
e 20 mm dia 50.40 Each
f 15 mm dia 40.60 Each
II GI Bend
a 50 mm dia 196.50 Each
b 40 mm dia 157.40 Each
c 32 mm dia 130.65 Each
d 25 mm dia 97.95 Each
e 20 mm dia 48.20 Each
f 15 mm dia 38.30 Each
III GI Tee
a 50 mm dia 268.50 Each
b 40 mm dia 222.30 Each
c 32 mm dia 194.55 Each
d 25 mm dia 154.10 Each
e 20 mm dia 75.50 Each
f 15 mm dia 68.85 Each
IV GI Coupling
a 50 mm dia 150.50 Each
b 40 mm dia 128.80 Each
c 32 mm dia 107.55 Each
d 25 mm dia 74.85 Each
e 20 mm dia 41.00 Each
f 15 mm dia 38.30 Each
V GI Reducer
a 50 x 40 mm dia 168.55 Each
b 40 x 32 mm dia 135.55 Each
c 32 x 25 mm dia 105.45 Each
d 25 x 20 mm dia 64.25 Each
Sl. Rate in
Description Unit
No. rupees

e 20 x 15 mm dia 45.10 Each


f 40 x 25 mm dia 110.30 Each
g 32 x 20 mm dia 83.35 Each
VI GI Reducer Elbow
a 50 x 40 mm dia 185.45 Each
b 40 x 32 mm dia 158.65 Each
c 32 x 25 mm dia 123.15 Each
d 25 x 20 mm dia 87.35 Each
e 20 x 15 mm dia 65.00 Each
f 40 x 25 mm dia 130.80 Each
g 32 x 20 mm dia 100.45 Each
VII GI Reducer Tee
a 50 x 40 mm dia 260.05 Each
b 40 x 32 mm dia 220.15 Each
c 32 x 25 mm dia 182.90 Each
d 25 x 20 mm dia 131.90 Each
e 20 x 15 mm dia 109.95 Each
f 40 x 25 mm dia 197.00 Each
g 32 x 20 mm dia 149.55 Each
VII GI Hex Nipple
I 50 mm dia
a 88.95 Each
b 40 mm dia 71.95 Each
c 32 mm dia 60.35 Each
d 25 mm dia 46.05 Each
e 20 mm dia 37.15 Each
f 15 mm dia 25.75 Each
92 Supplying and fixing white / colour glazed Earthernware wash hand basin of
size 550 x 400mm (with pedestal / without pedestal)
a White Glazed Wash Hand Basin
i Without Pedestal 3021.00 Each
ii With Pedestal 3351.00 Each
b Colour Glazed Wash Hand Basin
i Without Pedestal 3571.00 Each
ii With Pedestal 3801.00 Each
93 Supplying and fixing white glazed earthernwere sink of size of 600 x 450 x 3135.00 Each
200mm
94 Supplying and fixing in position best quality cuddapah sink
a Cuddapah sink of 600 x 450 x 200mm 1798.00 Each
b Cuddapha sink of 600 x 600 x 200mm 2041.00 Each
Supplying and fixing in positon Indian Water Closet (Oriya type) of size 580 x
440mm
95 white glazed earthern ware (including the cost of 100mm dia CI pipe for a 3986.00 Each
length of 600mm)
96 colour glazed earthern ware (including the cost of 100mm dia CI pipe for a 4306.00 Each
length of 600mm)
97 White glazed earthern ware (including the cost of 110mm dia PVC pipe for a 3785.00 Each
length of 600mm)
98 Colour glazed earthern ware (including the cost of 110mm dia PVC pipe for a 4105.00 Each
length of 600mm)
99 Supplying and fixing in position white / colour glazed European Water Closet

a White glazed European Water Closet with 10 litre capacity PVC flushing tank 5030.00 Each
fixed on to wall
b White glazed European Water Closet with 10 litre capacity PVC flushing tank 6461.00 Each
fixed with CI brackets
Sl. Rate in
Description Unit
No. rupees

c Colour glazed European Water Closet with 10 litre capacity PVC flushing tank 5420.00 Each
fixed on to wall
d Colour glazed European Water Closet with 10 litre capacity PVC flushing tank 6851.00 Each
fixed with CI brackets
e White glazed European Water Closet with 12.5 litre capacity porcelin flushing 6669.00 Each
tank fixed on to wall
f White glazed European Water Closet with 12.5 litre capacity procelin flushing 8100.00 Each
tank fixed with CI brackets
g Colour glazed European Water Closet with 12.5 litre capacity porcelin 8369.00 Each
flushing tank fixed on to wall
h Colour glazed European Water Closet with 12.5 litre capacity procelin 9800.00 Each
flushing tank fixed with CI brackets

100 Supply and fixing in position of best Indian make white / colour glazed
earthernware lipped mouth flat back urinal
a White glazed earthernwere lipped mouth flat back urinal 1783.50 Each
b Colour glazed earthernwere lipped mouth flat back urinal 1915.50 Each
101 Supplying and fixing in position Indian make white glazed earthenware 1250.00 Each
squating type urinal
102 Supplying and fixing position CI Nahani Trap / Floor Trap
a Nahani Trap of size 100 x 75mm with stainless steel gratings 627.00 Each
Nahani Trap of size 100 x 75mm with pvc gratings 422.00 Each
Nahani Trap of size 75 x 50mm with stainless steel gratings 568.50 Each
b Nahani Trap of size 75 x 50mm with pvc gratings 403.00 Each
103 Supplying, laying and jointing glazed stone ware pipes - using spun yarn and
cement
a 100mm dia stoneware pipe (cement joint) 226.05 Rm
b 150mm dia stoneware pipe (cement joint) 334.05 Rm
104 Supplying, laying and jointing glazed stoneware pipes
a 100mm dia stoneware pipe ( loose joints) 175.85 Rm
b 150mm dia stoneware pipe ( loose joints) 238.50 Rm
105 Supplying and fixing in position 150mm dia stoneware tee 310.20 Each
106 S&F in position 150 x 100mm "P" or "S" stoneware gully trap 750.00 Each
107 Supplying and fixing AC ventilating shaft of 100mm dia 513.80 Each
108 Supplying and fixing PVC ventilating shaft of 110mm dia 892.45 Each
109 Supplying and fixing in position CI manhole covers with CI frames 2184.00 Each
110 Supplying, laying and position best quality Indian cast iron soil / waste pipes
a 150mm dia CI Pipe 1518.60 Rm
b 100mm dia CI Pipe 1110.90 Rm
c 75mm dia CI Pipe 982.50 Rm
111 Supplying and fixing in position following CI specials
A Plain Bend
i 150mm Dia 910.55 Each
ii 100mm Dia 637.55 Each
iii 75mm Dia 577.55 Each
B Bend with Door
i 150mm Dia 994.55 Each
ii 100mm Dia 689.55 Each
iii 75mm Dia 637.55 Each
C Plain TEE
i 150mm Dia 1445.55 Each
ii 100mm Dia 851.55 Each
iii 75mm Dia 701.55 Each
D TEE with Door
i 150mm Dia 1505.55 Each
ii 100mm Dia 923.55 Each
iii 75mm Dia 756.55 Each
Sl. Rate in
Description Unit
No. rupees

E "Y" Junction with Door (single)


i 150mm Dia 1563.55 Each
ii 100mm Dia 971.55 Each
iii 75mm Dia 791.55 Each
F "Y" Junction with Door (Double)
i 150mm Dia 1684.55 Each
ii 100mm Dia 1041.55 Each
iii 75mm Dia 875.55 Each
G COWL
i 150mm Dia 474.40 Each
ii 100mm Dia 345.40 Each
iii 75mm Dia 280.40 Each

112 Supplying and fixing in position best quality PVC soil / waste pipes
a 75mm dia PVC soil / waste pipe 288.35 Rm
b 110mm dia PVC soil / waste pipe 381.35 Rm
c 160mm dia PVC soil / waste pipe 628.05 Rm
113 Supplying and fixing in position PVC specials
A PVC Elbow
1 160mm dia 318.65 Each
2 110mm dia 306.65 Each
3 75mm dia 276.75 Each
B PVC Elbow with Door
1 160mm dia 354.25 Each
2 110mm dia 336.15 Each
3 75mm dia 283.05 Each
C PVC Tee
1 160mm dia 370.95 Each
2 110mm dia 359.85 Each
3 75mm dia 306.65 Each
D PVC Tee with Single Door
1 160mm dia 413.65 Each
2 110mm dia 383.65 Each
3 75mm dia 330.45 Each
E PVC Tee with Double Door
1 160mm dia 465.35 Each
2 110mm dia 448.55 Each
3 75mm dia 359.85 Each
F PVC Bend
1 160mm dia 324.25 Each
2 110mm dia 312.45 Each
3 75mm dia 283.05 Each
G PVC "Y"
1 160mm dia 377.95 Each
2 110mm dia 366.05 Each
3 75mm dia 312.45 Each
H PVC "Y" with Single Door
1 160mm dia 416.85 Each
2 110mm dia 389.85 Each
3 75mm dia 330.45 Each
I PVC "Y" with Double Door
1 160mm dia 494.85 Each
2 110mm dia 460.05 Each
3 75mm dia 371.65 Each
114 S &F PVC 4 way junction plain or with door
Sl. Rate in
Description Unit
No. rupees

A PVC Double Tee with Single Door (4 way junction)


1 160mm dia 635.90 Each
2 110mm dia 606.90 Each
3 75mm dia 535.70 Each
B PVC Double "Y" with Single Door (4 way junction)
1 160mm dia 671.90 Each
2 110mm dia 629.90 Each
3 75mm dia 552.90 Each
115 Supplying and fixing in position PVC cowls
1 110mm dia 189.65 Each
2 75mm dia 166.95 Each
3 50mm dia 148.95 Each
116 Supplying and fixing in position CP shower rose with CP stop cock 438.00 Each
Internal Water Supply Arrangements using PVC pipes and PVC specials

117 Supplying, laying and jointing PVC pipes


a 15 mm dia PVC Pipe 105.15 Rm
b 20 mm dia CPVC Pipe 182.25 Rm
c 25 mm dia CPVC Pipe 223.75 Rm
d 32 mm dia PVC Pipe 179.15 Rm
e 40 mm dia PVC Pipe 210.35 Rm
f 50 mm dia PVC Pipe 288.15 Rm
External Water Supply Arrangements using PVC pipes and PVC specials

118 Supplying, laying and jointing PVC pipes


I Above Ground Level
a 15 mm dia PVC Pipe 112.70 Rm
b 20 mm dia CPVC Pipe 189.80 Rm
c 25 mm dia CPVC Pipe 231.30 Rm
d 32 mm dia CPVC Pipe 342.55 Rm
e 40 mm dia PVC Pipe 226.85 Rm
f 50 mm dia PVC Pipe 313.75 Rm
II Below Ground Level
a 15 mm dia PVC Pipe 80.50 Rm
b 20 mm dia CPVC Pipe 157.60 Rm
c 25 mm dia CPVC Pipe 199.10 Rm
d 32 mm dia CPVC Pipe 298.45 Rm
e 40 mm dia PVC Pipe 210.25 Rm
f 50 mm dia PVC Pipe 255.25 Rm
119 Supplying PVC Specials (with working pressure 10 kg. / sq.cm.) in water
supply arrangements (both in internal and external water supply
arrangements
A Coupler
a 15 mm Dia 3.50 Each
b 20 mm Dia 4.10 Each
c 25 mm Dia 4.80 Each
d 32 mm Dia 6.00 Each
e 40 mm Dia 9.00 Each
f 50 mm Dia 12.20 Each
B Elbow
a 15 mm Dia 5.30 Each
b 20 mm Dia 6.00 Each
c 25 mm Dia 8.50 Each
d 32 mm Dia 12.20 Each
e 40 mm Dia 17.20 Each
f 50 mm Dia 24.50 Each
C BEND
Sl. Rate in
Description Unit
No. rupees

a 15 mm Dia 6.00 Each


b 20 mm Dia 7.30 Each
c 25 mm Dia 9.70 Each
d 32 mm Dia 14.60 Each
e 40 mm Dia 19.60 Each
f 50 mm Dia 30.70 Each
D Tee
a 15 mm Dia 7.30 Each
b 20 mm Dia 8.50 Each
c 25 mm Dia 12.20 Each
d 32 mm Dia 14.70 Each
e 40 mm Dia 23.40 Each
f 50 mm Dia 36.80 Each

E End Cap
a 15 mm Dia 3.50 Each
b 20 mm Dia 4.80 Each
c 25 mm Dia 6.00 Each
d 32 mm Dia 7.30 Each
e 40 mm Dia 11.40 Each
f 50 mm Dia 15.80 Each
F Reducer
a 20 mm x 15 mm 4.80 Each
b 25 mm x 20 mm 5.30 Each
c 32 mm x 25 mm 8.50 Each
d 40 mm x 32 mm 11.40 Each
e 50 mm x 40 mm 19.60 Each
G Reducer Tee
a 20 mm x 15 mm 7.30 Each
b 25 mm x 20 mm 8.50 Each
c 32 mm x 25 mm 12.20 Each
d 40 mm x 32 mm 14.70 Each
e 50 mm x 40 mm 24.50 Each
H Reducer Elbow
a 20 mm x 15 mm 6.00 Each
b 25 mm x 20 mm 7.30 Each
c 32 mm x 25 mm 9.70 Each
d 40 mm x 32 mm 12.20 Each
e 50 mm x 40 mm 18.30 Each
J Jet Nipple
a 25 mm Dia 15.80 Each
b 32 mm Dia 20.70 Each
120 Providing Anti-termite treatment to soil adjecent and under building 95.00 Sqm
DATA
Sl. Qty Description of work Rate Per Amount
No
1 2 3 4 5 6
1 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of single leaf
door with half panelled with 12mm thick both side laminated particle board at bottom and half glazed
using 5.50mm thick Plain glass at top.The outer frame shall be with aluminium box section
101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section Vertical & Top rail: 50x44.45x2.50mm
@ 1.292 kg/m ,Bottom rail: 100 x44.45 x 2.50mm@ 1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/m,
Alu Clips: 17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 Kg/m and necessary
accessories such as aluminium clips, rubber beading, PVC felt, handle for a length of shutter (both sides),
locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - 1 No., aluminium tower
bolt 200x12mm - 1No., aluminium Hydraulic door closer - 1No ., lock-1No., Door stopper with rubber bush
including cost of materials labour charges and power consumption charges required for fabrication including
chipping, dismantling and making hole to the required extent in RCC column, beams, masonry with power
drill wherever necessary and redoing the damaged portion to the original condition after fixing etc., complete.
All the Alu. Section are to be anodised with matt finish under electricaly controlled conditions in accordance
with IS 1868/1962 for an average anatic film thickness of 15 microns etc., complete.Aluminium sections,and
furniture fittings shall be got approved by the Executive Engineer incharge.

1/2 panelled&1/2 glazed


Assume a size of Door : 1.00x2.10mm = 2.10m2
Door outer frame
vertical 1 x 2 x 2.10 4.20
Horizontal 1 x 1 x 0.91 0.91
Total 5.11 Rm
5.11 Rm x 2.319 kg/m 11.85 Kg
Shutter frame:
vertical 1x2x2.056 4.112 Rm
Top 1x1x0.824 0.824
Total 4.936
4.936 Rm x 1.292 kg/m 6.38 Kg
Lock rail 1x1x0.824 = 0.824x1.292 kg/m 1.06 Kg
Bottom rail 1x1x0.824 = 0.824 x 1.974 kg/m 1.63 Kg
Alu.handle 1x2x0.85 = 1.70x0.988 1.68 Kg
Alu. Clips:
Shutter for bottom panel =2x2x 0.824+0.88) 6.82
Shutter for top panel = 2x2x(0.824+0.98) 7.22
Total 14.04
14.04 Rm X 0.176 Kg/m 2.47 Kg
Total weight of Aluminium 25.07 Kg
Wastage at 10% 2.51
Total 27.58 Kg
5.50 mm thick glass.
Shutter top panel = 1x1x0.824x0.98 0.81 M2
Wastage at 20% 0.16
Total 0.97 M2
12mm thick prelaminated both side particle board
Bottom panel = 1x1x0.824x0.88 0.73 M2
Wastage at 10% 0.07
Total 0.80 M2
PVC felt: 1x2x2.056 4.11 Rm
Rubber beading:1x2(0.824+0.98) 3.61 Rm
Main Data
27.58 Kgs Aluminium Section including anodizing Charges 287.00 1 kgs 7915.46
0.97 M2 5.50 mm thick glass. 352.00 1 M2 341.44
0.8 M2 12mm thick PLB 1020.00 1 M2 816.00
4.11 Rm PVC felt 7.50 1 Rm 30.83
3.61 Rm Rubber beading 37.25 1 Rm 134.47
1 Set Pivot 146.00 1 set 146.00
1 No. Hydraulic Door closer 890.00 1 No 890.00
1 No. Nautel locks 251.00 1 No 251.00
1 No. Door stopper 43.80 1 No 43.80
1 No. Alu. Tower bolt 250x12mm 85.50 1 No 85.50
1 No. Alu. Tower bolt 200x12mm 71.90 1 No 71.90
2.10 M2 Labour charges 478.00 1 M2 1003.80
LS For angles, screw, power supply, LS 140.00
dismantling & dadooing.
For Rs. 2.10 / M2 11870.20
Rate Rs. 5652.48 /M2
Say Rate Rs. 5652.00 /M2
Without Automatic Door closure and Pivot but with hinges
Rate as above 11870.20
Deduct for Doorclosure -890.00
Deduct for Pivot -146.00
Add for hinges 100x30m (3Nos. X 60.00) 188.70
for 2.10 M2 11022.90
Rate Rs. 5249.00 /1 M2
Say Rs. 5249.00 /1 M2
With Automatic Door closure and Hinges
Rate as above 11870.20
Deduct for Pivot -146.00
Add for hinges 100x30m (3Nos. X 60.00) 188.70
Rate for 2.10 M2 11912.90
Rate Rs. 5672.81 /1 M2
Say Rs. 5673.00 /1 M2
With Floor spring and Hinges
Rate as above 11870.20
Deduct for Pivot -146.00
Deduct for Doorclosure -890.00
Add for hinges 100x30m (3Nos. X 60.00) 188.70
Add for Floor spring (1x2120) 2035.00
Rate for 2.10 M2 13057.90
Rate Rs. 6218.05 /1 M2
Say Rs. 6218.00 /1 M2
2 Supplying, fabricating and fixing in position of Aluminium anodised natural colour matt finish of double
leaves door with half panelled with 12mm thick bothside prelaminated partile board at bottom and
half glazed using 5.50mm thick Plain glass at top.The outer frame shall be with aluminium box
section 101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section-Vertical &Top rail:
50x44.45x2.50mm @ 1.292 kg/m and Bottom rail : 100 x 44.45 x 2.50mm @ 1.974 kg /m , Lock rail :
50x44.45x2.5mm @ 1.292 kg/m,Alu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/m Alu. Handle:
100x30mm @ 0.988 kg/m and necessary accessories such as aluminium clips, rubber beading, PVC felt,
handle for a length of shutter (both sides), locking arrangements, furniture fittings such as aluminium
tower bolts-250x12mm - 2 Nos., aluminium tower bolt 200x12mm - 1No., aluminium Hydraulic door
closer - 2Nos ., lock-1No., Door stopper with rubber bush including cost of materials, labour charges and
power consumption charges required for fabrication including chipping, dismantling and making hole to
the required extent in RCC column, beam masonry with power drill wherever necessary and redoing the
damaged portion to the original condition afterfixing etc. complete. All the Alu. sections are to be
anodised with matt finish under electically contolled condition in accordance with IS 1868/1962 for an
average anodic film thickness of 15 microns etc., complete.Aluminium sections,and furniture fittings
shall be got approved by the Executive Engineer incharge.

1/2 panelled&1/2 glazed


Assume a size of Door : 1200x2100mm
Door outer frame
vertical 1 x 2 x 2.10 4.20
Horizontal 1 x 1 x 1.11 1.11
Total 5.31 Rm
5.31 x 2.319 Kg/m 12.31 Kg
Shutter Frame vertical 2x2x2.056 8.22
Horizontal top 1x2x0.467 0.93
Total 9.15 Rm
9.15x1.292 g/m 11.82 Kg
Lock rail 1x2x0.47 = 0.94 x 1.292 Kg/m 1.21 Kg
Bottom rail 1x2x0.47 =0.94 x 1.974 g/m 1.86 Kg
Alu.handle 2x2x0.505= 2.02 x0.988 Kg/m 2.00 Kg
Alu. Clips:Shutter for bottom panel = 2x2x2(0.47+0.88) 10.80 Rm
Alu. Clips:Shutter for top panel = 2x2x2(0.47+0.88) 11.60 Rm
Total 22.40 Rm
22.40 Rm x 0.176 Kg/m 3.94 Kg
33.14
Wastage at 10% 3.23
Total 36.37 Kg
5.50 mm thick glass.
Shutter top panel = 1x2x0.47x0.98 0.92 M2
Glass5.50 mm thick 0.18
Total 1.10 M2
12mm thick prelaminated both side particle board
Bottom panel = 1x2x0.47x0.88 0.83 M2
Wastage at 10% 0.08
Total 0.91 M2
PVC felt: 2x2x2.056 8.22 Rm
Rubber beading: 2x2(0.47+0.98) 5.80 Rm
Main Data
36.37 Kgs Aluminium Section including anodizing Charges 287.00 1 kgs 10438.19
1.1 M2 Glass5.50 mm thick 352.00 1 M2 387.20
0.91 M2 12mm thick PLB 1020.00 1 M2 928.20
8.22 Rm PVC felt 7.50 1 Rm 61.65
5.8 Rm Rubber beading 37.25 1 Rm 216.05
2 Sets Pivot 146.00 1 set 292.00
2 Nos Hydraulic Door closer 890.00 1 No 1780.00
1 No. Navtal locks 251.00 1 No 251.00
2 Nos Door stopper 43.80 1 No 87.60
2 Nos Alu. Tower bolt 250x12mm 85.50 1 No 171.00
1 No. Alu. Tower bolt 200x12mm 71.90 1 No 71.90
2.52 M2 Labour charges 478.00 1 M2 1204.56
LS For angles, screw, power supply, LS 162.00
dismantling & redoing.
Rate for 2.52 m2 Rs. 16051.35
Rate Rs. 6369.58 /1 M2
SAY Rate Rs. 6370.00 /1 M2
Without Door closure and pivot but with hinges
Rate as above 16051.35
Deduct for Doorclosure -1780.00

Deduct for Pivot -292.00

Add for hinges 100mm x 30mm 6x60.00 377.40


Rate 2.52 m2 Rs. 14356.75
Rate /m2 Rs. 5697.12 /1 M2

Rate Rs. 5697.00 /1 M2


With Automatic Door closure and Hinges
Rate as above 16051.35
Deduct for Pivot -292.00
Add for hinges 100x30m (6Nos. X 60.00) 377.40
Rate for 2.52 M2 16136.75
Rate Rs. 6403.47 /1 M2
Say Rs. 6403.00 /1 M2
With Floor spring and Hinges
Rate as above 16051.35
Deduct for Pivot -292.00
Deduct for Doorclosure -1780.00
Add for hinges 100x30m (6Nos. X 60.00) 377.40
Add for Floor spring (2x2120) 4070.00
Rate for 2.52 M2 18426.75
Rate Rs. 7312.20 /1 M2
Say Rs. 7312.00 /1 M2
3 Fabricating Supplying and fixing in position of Aluminium anodised Powder Coated of single leaf door with
half panelled with 12mm thick both side laminated particle board at bottom and half glazed using
5.50mm thick Plain glass at top.The outer frame shall be with aluminium box section 101.60x44.45x3.18m
at 2.319kg/m and Shutter frame made of section Vertical & Top rail: 50x44.45x2.50mm@1.292 kg/m and
Bottom rail: 100x44.45x2.50mm@ 1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/m,Alu. Clips:
17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 kg/m and necessary accessories such
as aluminium clips, rubber beading, PVC felt, handle for a length of shutter (both sides), locking
arrangements, furniture fittings such as aluminium tower bolts-250x12mm - 1 Nos., aluminium tower bolt
200x12mm - 1No., aluminium Hydraulic door closer - 1No ., lock-1No., Door stopper with rubber
bushincluding cost of materials labour charges and power consumption charges required for fabrication
including chipping, dismantling and making hole to the required extent in RCC column, beams, masonry with
power drill wherever necessary and redoing the damaged portion to the original condition after fixing etc.,
complete. All the Alu. Section are to be anodised with matt finish under electricaly controlled conditions in
accordance with IS 1868/1962 for an average anatic film thickness of 15 microns etc., complete.Aluminium
sections,and furniture fittings shall be got approved by the Executive Engineer incharge.

1/2 panelled&1/2 glazed Powder coated


Assume a size of Door : 1.00x2.10mm = 2.10m2
Door outer frame
vertical 1 x 2 x 2.10 4.20
Horizontal 1 x 1 x 0.91 0.91
Total 5.11 Rm
5.11 Rm x 2.319 kg/m 11.85 Kg
Shutter frame:
vertical 1x2x2.056 4.112 Rm
Top 1x1x0.824 0.824
Total 4.936
4.936 Rm x 1.292 kg/m 6.38 Kg
Lock rail 1x1x0.824 = 0.824x1.292 kg/m 1.06 Kg
Bottom rail 1x1x0.824 = 0.824 x 1.974 kg/m 1.63 Kg
Alu.handle 1x2x0.85 = 1.70x0.988 1.68 Kg
Alu. Clips:
Shutter for bottom panel =2x2x 0.824+0.88) 6.82
Shutter for top panel = 2x2x(0.824+0.98) 7.22
Total 14.04
14.04 Rm X 0.176 Kg/m 2.47 Kg
Total weight of Aluminium 25.07 Kg
Wastage at 10% 2.51
Total 27.58 Kg
5.50 mm thick glass.
Shutter top panel = 1x1x0.824x0.98 0.81 M2
Wastage at 20% 0.16
Total 0.97 M2
12mm thick prelaminated both side particle board
Bottom panel = 1x1x0.824x0.88 0.73 M2
Wastage at 10% 0.07
Total 0.80 M2
PVC felt: 1x2x2.056 4.11 Rm
Rubber beading:1x2(0.824+0.98) 3.61 Rm

Main Data
27.58 Kgs Alu. Powder coated Section including anodising 307.00 1 kgs 8467.06
charges
0.97 M2 5.50 mm thick glass. 352.00 1 M2 341.44
0.8 M2 12mm thick PLB 1020.00 1 M2 816.00
4.11 Rm PVC felt 7.50 1 Rm 30.83
3.61 Rm Rubber beading 37.25 1 Rm 134.47
1 Set Pivot 146.00 1 set 146.00
1 No. Hydraulic pressed Automatic Door closer 890.00 1 No 890.00
1 No. Nautel locks 251.00 1 No 251.00
1 No. Door stopper 43.80 1 No 43.80
1 No. Alu. Tower bolt 250x12mm 85.50 1 No 85.50
1 No. Alu. Tower bolt 200x12mm 71.90 1 No 71.90
2.10 M2 Labour charges 478.00 1 M2 1003.80
LS For angles, screw, power supply, LS 140.00
dismantling & dadooing.
For Rs. 2.10 / M2 12421.80
Rate Rs. 5915.14 /M2
Say Rate Rs. 5915.00 /M2
Without Automatic Door closure and Pivot but with hinges
Rate as above 12421.80
Deduct for Doorclosure -890.00
Deduct for Pivot -146.00
Add for hinges 100x30m (3Nos. X 58.90) 188.70
for 2.10 M2 11574.50
Rate Rs. 5511.67 /1 M2
Say Rs. 5512.00 /1 M2
With Automatic Door closure and Hinges
Rate as above 12421.80
Deduct for Pivot -146.00
Add for hinges 100x30m (3Nos. X 60.00) 188.70
Rate for 2.10 M2 12464.50
Rate Rs. 5935.48 /1 M2
Say Rs. 5935.00 /1 M2
With Floor spring and Hinges
Rate as above 12421.80
Deduct for Pivot -146.00
Deduct for Doorclosure -890.00
Add for hinges 100x30m (3Nos. X 60.00) 188.70
Add for Floor spring (1x2102) 2035.00
Rate for 2.10 M2 13609.50
Rate Rs. 6480.71 /1 M2
Say Rs. 6481.00 /1 M2
4 Supplying, fabricating and fixing in position of Aluminium anodised Powder Coated of double leaves
door with half panelled with 12mm thick bothside prelaminated partile board at bottom and half
glazed using 5.50mm thick Plain glass at top. The outer frame shall be with aluminium box section
101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section with Vertical & Top rail:
50x44.45x2.50mm@1.292 kg/m Bottom rail: 100x44.45x2.50mm@ 1.974 kg/mLocal rail :
50x44.45x2.5mm @ 1.292 kg/mAlu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/mAlu. Handle: 100x30mm
@ 0.988 kg/m the and necessary accessories such as aluminium clips, rubber beading, PVC felt, handle
for a length of shutter (both sides), locking arrangements, furniture fittings such as aluminium tower
bolts-250x12mm - 2 Nos., aluminium tower bolt 200x12mm - 1No., aluminium Hydraulic door closer -
2Nos ., lock-1No., Door stopper with rubber bush including cost of materials, labour charges and power
consumption charges required for fabrication including chipping, dismantling and making hole to the
required extent in RCC column, beam masonry with power drill wherever necessary and redoing the
damaged portion to the original condition after fixing etc. complete.All the Alu. Section are to be
anodised with matt finish under electricaly controlled condition in accordance with IS 1868/1962 for an
average anodic film thickness of 15 microns etc., complete.Aluminium sections,and furniture fittings
shall be got approved by the Executive Engineer incharge.

1/2 panelled&1/2 glazed Powder coated


Assume a size of Door : 1200x2100mm
Door outer frame
vertical 1 x 2 x 2.10 4.20
Horizontal 1 x 1 x 1.11 1.11
Total 5.31 Rm
5.31 x 2.319 Kg/m 12.31 Kg
Shutter Frame
vertical 2x2x2.056 8.22
Horizontal top 1x2x0.467 0.93
Total 9.15 Rm
9.15x1.292 g/m 11.82 Kg
Lock rail 1x2x0.47 = 0.94 x 1.292 Kg/m 1.21 Kg
Bottom rail 1x2x0.47 =0.94 x 1.974 g/m 1.86 Kg
Alu.handle 2x2x0.505= 2.02 x0.988 Kg/m 2.00 Kg
Alu. Clips:Shutter for bottom panel = 2x2x2(0.47+0.88) 10.80 Rm
Alu. Clips:Shutter for top panel = 2x2x2(0.47+0.88) 11.60 Rm
Total 22.40 Rm
22.40 Rm x 0.176 Kg/m 3.94 Kg
33.14
Wastage at 10% 3.31
Total 36.46 Kg
5.50 mm thick glass.
Shutter top panel = 1x2x0.47x0.98 0.92 M2
Wastage at 20% 0.18
Total 1.10 M2
12mm thick prelaminated both side particle board
Bottom panel = 1x2x0.47x0.88 0.83 M2
Wastage at 10% 0.08
Total 0.91 M2
PVC felt: 2x2x2.056 8.22 Rm
Rubber beading: 2x2(0.47+0.98) 5.80 Rm
Main Data
36.46 Kgs Alu. Powder coated Section including anodising 307.00 1 kgs 11193.22
charges
1.1 M2 Glass5.50 mm thick 352.00 1 M2 387.20
0.91 M2 12mm thick PLB 1020.00 1 M2 928.20
8.22 Rm PVC felt 7.50 1 Rm 61.65
5.8 Rm Rubber beading 37.25 1 Rm 216.05
2 Sets Pivot 146.00 1 set 292.00
2 Nos Hydraulic pressed Automatic Door closer 890.00 1 No 1780.00
1 No. Navtal locks 251.00 1 No 251.00
2 Nos Door stopper 43.80 1 No 87.60
2 Nos Alu. Tower bolt 250x12mm 85.50 1 No 171.00
1 No. Alu. Tower bolt 200x12mm 71.90 1 No 71.90
2.52 M2 Labour charges 478.00 1 M2 1204.56
LS For angles, screw, power supply, LS 162.00
dismantling & dadooing.
Rate for 2.52 m2 Rs. 16806.38
Rate Rs. 6669.20 /1 M2
SAY Rate Rs. 6669.00 /1 M2
Without Door closure and pivot but with hinges
Rate as above 16806.38
Deduct for Doorclosure -1780.00
Deduct for Pivot -292.00
Add for hinges 6x60.00 377.40
Rate 2.52 m2 Rs. 15111.78
Rate /m2 Rs. 5996.74 /1 M2
Rate Rs. 5997.00 /1 M2
With Automatic Door closure and Hinges
Rate as above 16806.38
Deduct for Pivot -292.00
Add for hinges 100x30m (6Nos. X 58.90) 377.40
Rate for 2.52 M2 16891.78
Rate Rs. 6703.09 /1 M2
Say Rs. 6703.00 /1 M2
With Floor spring and Hinges
Rate as above 16806.38
Deduct for Pivot -292.00
Deduct for Doorclosure -1780.00
Add for hinges 100x30m (6Nos. X 58.90) 353.40
Add for Floor spring (2x2079) 4070.00
Rate for 2.52 M2 19157.78
Rate Rs. 7602.29 /1 M2
Say Rs. 7602.00 /1 M2
5 Fabricating Spplying and fixing in position of aluminium anodised natural colour matt finish half panelled
with 12mm thick bothside prelaminated partile board at bottom and half glazed using 5.50mm thick
Plain glass at top. The outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319 kg/m
and Shutter frame made of section bottom rail 100x44.45x2.50mm @ 1.974 kg/m,Top&Vertical rail :
50x44.45x2.50mm @ 1.292kg/m,Lock rail: 50x44.45x2.50mm @ 1.292kg/m, Alu.clips:17.15x17.27x1.50mm
@ 0.176kg/m,Aluminium Handle : 100x30mm @ 0.988kg/m and necessary accessories such as aluminium
clips, rubber beading, PVC felt, handle for a length of shutter (both sides), locking arrangements, furniture
fittings such as aluminium tower bolts-250x12mm - 2 Nos., aluminium tower bolt 200x12mm - 1No.,
aluminium Hydraulic door closser - 2Nos ., lock-1No., Door stopper with rubber bush as per BIS standards
including cost of all materials, labour charges and power consumption charges required for fabrication
including chipping dismantling and making holes to the required extent in RCC in column/beam/masonry with
power drill wherever neccessary and redoing the demaged portion to the original condition after fixing etc.
complete.Alu. Section are to be anodised with matt finish under electricaly controlled condition in accordance
with IS 1868/1962 for an average anodic film thickness of 15 microns etc., complete.Aluminium sections,and
furniture fittings shall be got approved by the Executive Engineer incharge.

1/2 panelled&1/2 glazed


Aluminium door of size 1.50mx2.10m
Outer frame :
Horizontal 1x1.411 1.41 m
Vertical =2x2.10 4.20 m
Total 5.61
Weight 5.61 x 2.319 Kg/m 13.01 Kg
Shutter frame
Vertical 2x2x2.056x1.292 Kg/m 10.63 Kg
Top rail 1x2x0.606x1.292 Kg/m 1.57 Kg
Lock rail 1x2x0.606x1.292 Kg/m 1.57 Kg
Bottom rail 1x2x0.606x1.974 Kg/m 2.39 Kg
Handle 2x2x0.645x0.988 2.55 Kg
Aluminium clips
Shutter panel section 2x2x2x(0.606+0.88) 11.89
Glass portion 2x2x2x(0.606+0.98) 12.69
Total 24.58 Rm
Weight 24.58 x 0.176 Kg/m 4.33 Kg
Total weight of aluminium shutter 36.03 Kg
Add 10% wastage 3.60
39.64 Kg
PLD Board 12mm thick
Bottom 2x0.606x0.88 1.07
Add 10% wastage 0.11
1.18 M2
Glass 5.50mm thick plain
Shutter Top 2x0.606x0.98 1.19
Add 20% wastage 0.24
1.43 M2
Rubber beading ShutterTop 2 x2x(0.606+0.98) 6.34 Rm
PVC felt : Shutter both side 2x2x2.056 8.22 Rm

MAIN DATA

39.64 Kg Aluminium Section including anodizing Charges 287.00 Kg 11376.68

1.18 M2 Prelaminated MDF board 12mm tk 1020.00 M2 1203.60

1.43 M2 Glass 5.50mm thick plain 352.00 M2 503.36

6.34 Rm Rubber beading 37.25 Rm 236.17

8.22 Rm PVC Felt 6mm thick 7.50 Rm 61.65

3.15 M2 Labour Charges 478.00 M2 1505.70

1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00

2.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 171.00

1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90

2.00 Nos Alu. Door stopper 43.80 Each 87.60

2.00 Nos Hydralic Door closer 890.00 Each 1780.00

6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40

Sundries for T.W.plugs screws dismantling redoing to


LS 162.00
good condition including Power supply etc.
for 3.15 M2 17788.06

Rate/m2 5647.00 /M2


Say Rs. 5647.00 /M2

With Floor spring and Hinges


Rate as above 17788.06
Deduct for Doorclosure -1780.00
Add for Floor spring (2x2079) 4070.00
Rate for 3.15 M2 20078.06
Rate Rs. 6373.99 /1 M2
Say Rs. 6374.00 /1 M2
6 Fabricating Spplying and fixing in position of aluminium anodised Powder Coated half panelled with 12mm
thick bothside prelaminated partile board at bottom and half glazed using 5.50mm thick Plain glass at top
.The outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m and with Shutter section
bottom rail 100x44.45x2.50mm @ 1.974 kg/m,Top&Vertical rail : 50x44.45x2.50mm @ 1.292kg/m,Lock rail:
50x44.45x2.50mm @ 1.292kg/m, Alu.clips:17.15x17.27x1.50mm @ 0.176kg/m,Aluminium Handle : 100x30mm @
0.988kg/m the following shutter frames and necessary accessories such as aluminium clips, rubber beading PVC
felt, handle for a length of shutter (both sides), locking arrangements, furniture fittings such as aluminium tower
bolts-250x12mm - 2 Nos., aluminium tower bolt 200x12mm - 1No., aluminium Hydraulic door closser - 2Nos .,
lock-1No., Door stopper with rubber bush as per BIS standards including cost of all materials, labour charges and
power consumption charges required for fabrication including chipping dismantling and making holes to the
required extent in RCC in column/beam/masonry with power drill wherever neccessary and redoing the demaged
portion to the original condition after fixing etc. complete.Alu. Section are to be anodised with matt finish under
electricaly controlled condition in accordance with IS 1868/1962 for an average anodic film thickness of 15 microns
etc., complete.Aluminium sections,and furniture fittings shall be got approved by the Executive Engineer incharge.

1/2 panelled&1/2 glazed Powder coated


Aluminium door of size 1.50mx2.10m
Outer frame :
Horizontal 1x1.411 1.41 m
Vertical =2x2.10 4.20 m
Total 5.61
Weight 5.61 x 2.319 Kg/m 13.01 Kg
Shutter frame

Vertical 2x2x2.056x1.292 Kg/m 10.63 Kg


Top rail 1x2x0.606x1.292 Kg/m 1.57 Kg
Lock rail 1x2x0.606x1.292 Kg/m 1.57 Kg
Bottom rail 1x2x0.606x1.974 Kg/m 2.39 Kg
Handle 2x2x0.645x0.988 2.55 Kg
Aluminium clips
Shutter panel section 2x2x2x(0.606+0.88) 11.89
Glass portion 2x2x2x(0.606+0.98) 12.69
Total 24.58 Rm
Weight 24.58 x 0.176 Kg/m 4.33 Kg
Total weight of aluminium shutter 36.03 Kg
Add 10% wastage 3.60
39.64 Kg
PLMDF Board 12mm thick
Bottom 2x0.606x0.88 1.07
Add 10% wastage 0.11
1.18 M2
Glass 5.50mm thick plain
Shutter Top 2x0.606x0.98 1.19
Add 20% wastage 0.24
1.43 M2
Rubber beading
Shutter Top 2x2x(0.606+0.98) 6.34
6.34 Rm
PVC felt
Shutter both side 2x2x2.056 8.22 Rm

MAIN DATA

39.64 Kg Aluminium Section powder coated 307.00 Kg 12169.48

1.18 M2 Prelaminated MDF board 12mm tk 1020.00 M2 1203.60

1.43 M2 Glass 5.50mm thick plain 352.00 M2 503.36

6.34 Rm Rubber beading 37.25 Rm 236.17

8.22 Rm PVC Felt 6mm thick 7.50 Rm 61.65

3.15 M2 Labour Charges 478.00 M2 1505.70

1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00

2.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 171.00

1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90

2.00 Nos Alu. Door stopper 43.80 Each 87.60

2.00 Nos Hydralic Door closer 890.00 Each 1780.00

6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40

Sundries for T.W.plugs screws dismantling Redoing to


LS 162.00
good condition including Power supply etc.

for 3.15 M2 18580.86

Rate/m2 5898.68 /M2

Say Rs. 5899.00 /M2

With Floor spring and Hinges

Rate as above 18580.86

Deduct for Doorclosure -1780.00

Add for Floor spring (2x2079) 4070.00

Rate for 3.15 M2 20870.86

Rate Rs. 6625.67 /1 M2

Say Rs. 6626.00 /1 M2


7 Spplying and fabricating and fixing in position of aluminium anodised natural colour matt finish half panelled with
12mm thick bothside prelaminated partile board at bottom and half glazed using 5.50mm thick Plain glass at
top double leaves door with 10 mm thick Aluminium grill.The outer frame shall be with aluminium box section
101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section with Vertical & Top rail:
50x44.45x2.50mm@1.292 kg/m Bottom rail: 100x44.45x2.50mm@ 1.974 kg/m,Lock rail: 50x44.45x2.5mm @
1.292 kg/mAlu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/mAlu. Handle: 100x30mm @ 0.988 kg/m the and
necessary accessories such as aluminium clips, rubber beading, PVC felt, handle for a length of shutter (both sides),
locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - 2 Nos., aluminium tower bolt
200x12mm - 1No., aluminium Hydraulic door closer - 2Nos ., lock-1No., Door stopper with rubber bush including
cost of materials, labour charges and power consumption charges required for fabrication including chipping,
dismantling and making hole to the required extent in RCC column, beam masonry with power drill wherever
necessary and redoing the damaged portion to the original condition after fixing etc. complete.All the Alu. Section
are to be anodised with matt finish under electricaly controlled condition in accordance with IS 1868/1962 for an
average anodic film thickness of 15 microns etc., complete.All condition in accordance with ISI specification
1868/1962 foranodic film thickness of not less than 15 microns. Aluminium sections, and furniture fittings shallbe
got approved by the Executive Engineer incharge.

Aluminium door of size 1.80mx2.10m With 10mm


size Grill =3.78m2.
Outer frame :
Horizontal = 1x1.80 1.71
Vertical =2x2.10 4.20
Total 5.91 Rm
Wieght 5.91 x 2.319 kg/m 13.71 Kg
Shutter frame
Vertical 2x2x2.056x1.292 kg/m 10.63 Kg
Top rail 1x2x0.76x1.292 kg/m 1.96 Kg
Lock rail 1x2x0.76x1.292 kg/m 1.97 Kg
Bottom rail 1x2x0.76x1.974 kg/m 3.00 Kg
Handle 2x2x0.645x0.988 kg/m 2.55 Kg
Aluminium clips
Shutter panel section 2x2x2x(0.76+0.88) 13.12
Glass portion 2x2x2x(0.76+0.98) 13.92
Total 27.04 Rm
Wieght 27.04 x 0.176 kg/m 4.76 Kg
Total weight of aluminium shutter 38.57 Kg
Add 10% wastage 3.86
Total 42.43 Kg
Aluminium Grill 10mm size
2(0.76x0.98) 1.49 M2
Add 10% wastage 0.15
1.64 M2
PLMDF Board 12mm thick
Bottom 2x(0.76x0.88) 1.34
Add 10% wastage 0.13
Total 1.47 M2
Glass 5.50mm thick plain
Shutter Top 2x0.76x0.98 1.49
Add 20% wastage 0.30
Total 1.79 M2
Rubber beading
Shutter Top 2x2x(0.76+0.98) 6.96
6.96 Rm
PVC felt: Shutter both side 2x2x2.056 8.22 Rm
MAIN DATA
42.43 Kg Aluminium Section including anodizing Charges 287.00 Kg 12177.41

1.47 M2 Prelaminated MDF board 12mm tk 1020.00 M2 1499.40

1.79 M2 Glass 5.50mm thick plain 352.00 M2 630.08

1.64 M2 Aluminium Grill 10mm thick 1835.00 M2 3009.40

6.96 Rm Rubber beading 37.25 Rm 259.26

8.22 Rm PVC Felt 6mm thick 7.50 Rm 61.65

3.78 M2 Labour Charges 478.00 M2 1806.84

1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00

2.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 171.00

1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90

2.00 Nos Alu. Hydralic Door closer 890.00 Each 1780.00

2.00 Nos Door stopper with rubber bush 43.80 Each 87.60

6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40

LS Sundries for T.W.plugs screws angles dismantling 142.00


Redoing to good condition including Power supply etc.

for 3.78 M2 22324.94

Rate/m2 5906.07 /M2

Say Rs. 5906.00 /M2


8 Spplying and fabricating and fixing in position of aluminium anodised Powder Coated half panelled with 12mm thick
bothside prelaminated partile board at bottom and half glazed using 5.50mm thick Plain glass at topdouble leaves door
with 10 mm thick Aluminium grill.The outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m
and Shutter frame made of section with Vertical & Top rail: 50x44.45x2.50mm@1.292 kg/m Bottom rail: 100x44.45x2.50mm@
1.974 kg/m,Lock rail : 50x44.45x2.5mm @ 1.292 kg/mAlu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/mAlu. Handle: 100x30mm
@ 0.988 kg/m outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m and with the following
shutter frames and necessary accessories such as aluminium clips, rubber beading PVC felt, handle for a length of shutter (both
sides), locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - 1No, aluminium tower bolt
200x12mm - 2Nos., aluminium door stopper with rubber bush - 2Nos ., lock-1No.,Hydraulic Door closer as per BIS standards
including cost of all materials, labour charges and power consumption charges required for fabrication including chipping
dismantling and making holes to the required extent in RCC in column/beam/masonry with power drill wherever neccessary and
redoing the demaged portion to the original condition after fixing etc. complete.12mm thick best quality both sides prelaminated
particle board and 5.5mm thick plain glass shall be used for panelling. 10mm thick aluminium grill of approved pattern and
design including F or H section shall be used in glazed portion.All condition in accordance with ISI specification 1868/1962
foranodic film thickness of not less than 15 microns. Aluminium sections, and furniture fittings shallbe got approved by the
Executive Engineer incharge.

1/2panelled & 1/2 glazed with grillPowder Coated


Aluminium door of size 1.80mx2.10m With 10mm
size Grill =3.78m2.
Outer frame :
Horizontal = 1x1.80 1.71
Vertical =2x2.10 4.20
Total 5.91 Rm
Wieght 5.91 x 2.319 kg/m 13.71 Kg
Shutter frame
Vertical 2x2x2.056x1.292 kg/m 10.63 Kg
Top rail 1x2x0.76x1.292 kg/m 1.96 Kg
Lock rail 1x2x0.76x1.292 kg/m 1.97 Kg
Bottom rail 1x2x0.76x1.974 kg/m 3.00 Kg
Handle 2x2x0.645x0.988 kg/m 2.55 Kg
Aluminium clips
Shutter panel section 2x2x2x(0.76+0.88) 13.12
Glass portion 2x2x2x(0.76+0.98) 13.92
Total 27.04 Rm
Wieght 27.04 x 0.176 kg/m 4.76 Kg
Total weight of aluminium shutter 38.57 Kg
Add 10% wastage 3.86
Total 42.43 Kg
Aluminium Grill 10mm size
2(0.76x0.98) 1.49 M2
Add 10% wastage 0.15
1.64 M2
PLMDF Board 12mm thick
Bottom 2x(0.76x0.88) 1.34
Add 10% wastage 0.13
Total 1.47 M2
Glass 5.50mm thick plain
Shutter Top 2x0.76x0.98 1.49
Add 20% wastage 0.30
Total 1.79 M2
Rubber beading
Shutter Top 2x2x(0.76+0.98) 6.96
6.96 Rm
PVC felt
Shutter both side 2x2x2.056 8.22 Rm
MAIN DATA

42.43 Kg Aluminium Section powder coated 307.00 Kg 13026.01

1020.00
1.47 M2 Prelaminated MDF board 12mm tk M2 1499.40

352.00
1.79 M2 Glass 5.50mm thick plain M2 630.08

1835.00
1.64 M2 Aluminium Grill 10mm thick M2 3009.40

37.25
6.96 Rm Rubber beading Rm 259.26

7.50
8.22 Rm PVC Felt 6mm thick Rm 61.65

478.00
3.78 M2 Labour Charges M2 1806.84

251.00
1.00 No Lock Novtal for Aluminium door M2 251.00

85.50
2.00 Nos Alu. Tower Bolt 250mmx12mm Each 171.00

71.90
1.00 No Alu. Tower Bolt 200mmx12mm Each 71.90

890.00
2.00 Nos Alu. Hydralic Door closer Each 1780.00

43.80
2.00 Nos Door stopper with rubber bush Each 87.60

62.90
6.00 Nos Alu. Hinges 100x30 Each 377.40

Sundries for T.W.plugs screws angles dismantling


LS 162.00
Redoing to good condition including Power supply etc.

for 3.78 M2 23193.54

Rate/m2 6135.86 /M2

Say Rs. 6136.00 /M2


9 Supplying fabricating and fixing in position of aluminium anodised powder coated colour matt finish entrance door of 2.70 x
2.40 m size with fixed ventilator at top of size 2.70x0.30m lly glazed and fixed glzing at side of door and double leaves door
of size 1.80 m x 2.10 m with half panelled with 12mm thick bothside prelaminated partile board at bottom and half
glazed using 5.50mm thick Plain glass at topdouble leaves door with 10 mm thick Aluminium grill .The outer frame shall
be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section with Vertical & Top rail:
50x44.45x2.50mm@1.292 kg/m, Bottom rail: 100x44.45x2.50mm@ 1.974 kg/m,Lock rail : 50x44.45x2.50 mm @ 1.292
kg/m,Alu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 kg/m and Inner Frame of
section 63.50x38x3 mm @1.72 kg/m and necessary accessories such as rubber beading PVC felt, handle for a length of shutter
(both sides),Floor spring -2 Nos., locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - 2 No,
aluminium tower bolt 200x12mm - 1No.,Rubber bush - 2Nos ., lock-1No., including cost of all materials, labour charges and
power consumption charges required for fabrication including chipping dismantling and making holes to the required extent in
RCC in column/beam/masonry with power drill wherever neccessary and redoing the demaged portion to the original condition
after fixing etc. omplete.All condition in accordance with ISI ification 1868 / 1962 anodic film thickness of not less than 15
microns. Aluminium sections andfurniture fittings shall be got approved by the xecutive Engineer incharge..

1/2panelled & 1/2 glazed &fixed glazing at one side with top grill
Consider size: 2.70x2.40 m =6.48 m2with fixed
glazing at one side & top and with 10mm thick grill.

Outer frame : 101.60x44.45x3.18mm @ 2.319kg/m


Horizontal 1 x 2.61 2.61
Vertical 2 x 2.40 4.80
Vertical 1 x 2.056 2.06
Ventilator bottom 1x2.61 2.61
12.08 x 2.31 28.01
Inner frame 63.50x38x3mm @ 1.72kg/m
Fixed Glazing Vertical = 1 x 2.056 2.06
Hotizantal =2 x 2 x 0.387 1.55
Fixed ventilator vertical = 2x0.212 0.42
4.03 x 1.72 6.93
Shutter frame : 50x44.45x2.50mm @ 1.292 kg/m
Vertical 2 x 2 x 2.055 8.22
Hotizantal 2 x 0.79 1.58
9.80 x 1.29212.66
Lock rail: 50 x 44.45 x 2.50 @ 1.292 kg/m
Horizontal 2 x 0.79x1.292 2.04 Kg
Bottom rail 100 x 44.45 x 2.50 mm @ 1.974 kg/m
Horizontal 2 x 0.79 x1.974 3.12 Kg
Handle section @ 0.988 kg/m
2 x 2 x 0.645 2.58 x 0.9882.55
Aluminium clips: 17.15 x17.27 x 1.50 mm @0.176Kg/m
Door shutter portion panneled 13.57
2x2x2x(0.79 + 0.906)
2x2x2x(0.79
Door glazing +portion
0.906) 2x2x2x(0.79 + 1.006) 14.37
Fixed glazing bottom2x2x2x(0.39+ 0.99) 11.04
Fixed glazing top2x2x2x(0.39 + 0.99) 11.04
Ventilator portion3x2x2x(0.85 + 0.212) 12.74
62.76 Rm
62.76 x 0.176 11.05 Kg
Total Aluminium section requir 66.36 Kg
Add 10% wastage 6.64 Kg
73.00 Kg
Rubber beading
Shutter glazing 2x2x(0.79+0.906) 6.78
Fixed glazing bottom 2x2(0.39 + 0.99) 5.52
Fixed glazing at top 2x2(0.39 + 0.99) 5.52
Ventilator portion 3x2(0.85 + 0.212) 6.37
24.19 RM
PVC Felt
Shutter vertical 2x2x2.055 8.22 RM
Alu. Grill
Door glazing 2x0.79 x 1.006 1.59
Fixed glazing Top & bottom 2x2(0.39x0.99) 1.54
F.G. Ventilator 3x(0.85x0.212) 0.54
3.67 M2
Add 10% wastage 0.37
4.04 M2
12mm PLMDF Board
Door shutter 2x0.79x0.906 1.43
Add 10% wastage 0.14
1.57 M2
5.50 mm thick glass
Shutter 2x0.79x1.006 1.59
Fixed Glazing Top & bottom 2x2(0.39x0.99) 1.54
Ventilator 3x0.85x0.212 0.54
3.67 M2
Add 20% wastage 0.73
4.40 M2
MAIN DATA
73.00 Kg Aluminium Section 307.00 Kg 22411.00
24.19 Rm Rubber beading 37.25 Rm 901.08
8.22 Rm PVC Felt 7.50 Rm 61.65
4.04 M2 Aluminium Grill 10mm size 1835.00 M2 7413.40
1.57 M2 12mm PLMDF Board 1020.00 M2 1601.40
4.40 M2 5.50mm thick plain glass 352.00 M2 1548.80
2.00 Nos Floor spring 2035.00 M2 4070.00
2.00 Nos 250mm Alu. Tower bolt 85.50 Each 171.00
1.00 No 200mm Alu. Tower bolt 71.90 Each 71.90
1.00 No Lock Novtal for Aluminium door 251.00 Each 251.00
2.00 Nos Alu. Door stopper 43.80 Each 87.60
6.00 Nos Alu. Hinges 100 x 30 62.90 Each 377.40
6.48 M2 Labour Charges 478.00 M2 3097.44
LS Sundries for T.W.plugs screws dismantling Redoing to 162.00
good condition including Power supply etc.
for 6.48 M2 42225.67
Rate/m2 6516.31
Say Rs. 6516.00 M2
Without floor spring & but with Hydraulic Door closer
Rate as above 42225.67
Deduct for floor spring -4070.00
Add for door closer 1780.00
for 6.48 M2 Rate Rs. 39935.67
Rs. 6162.91 /M2
Say Rs. 6163.00 /M2
10 Fabricating Supplying and fixing in position of aluminium anodised natural colour matt finish entrance door of
2.77 x 2.10 m size with fixed glazing at one side of door and double leaves door of size 1.80 m x 2.10m with half
panelled with 12mm thick bothside prelaminated partile board at bottom and half glazed using 5.50mm thick
Plain glass at top double leaves door with10mm size aluminium grill. The outer frame shall be with aluminium
box section 101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section with Vertical & Top rail: 50x
44.45x 2.50mm @1.292 kg/m, Bottom rail: 100x44.45x2.50mm@ 1.974 kg/m,Lock rail : 50x44.45x2.5mm @ 1.292
kg/m,Alu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 kg/m and Inner Frame of
section 63.50x38x3 mm @1.72 kg/m and necessary accessories such as rubber beading PVC felt, handle for a
length of shutter (both sides), locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm - 2
No, aluminium tower bolt 200x12mm - 1No., aluminium door stopper with rubber bush - 2Nos ., lock-1No.,floor
spring as per BIS standards including cost of all materials, labour charges and power consumption charges required
for fabrication including chipping dismantling and making holes to the required extent in RCC in
column/beam/masonry with power drill wherever neccessary and redoing thedemaged portion to the original
condition after fixing etc. omplete. All condition in accordance with ISI specification 1868 / 1962 oranodic film
thickness of not less than 15 microns. .Aluminium sections and furniture fittings shallbe got approved by the
Executive Engineer incharge.

1/2 panelled&1/2 glazed with grill


Consider door size : 2.77x2.10 = 5.82 M2
Outer frame :
101.60 x 44.50 x 3.18 mm @ 2.319 kg/m
Horizontal = 1 x 2.77 2.77 Rm
Vertical 2 x 2.056 4.11 Rm
Vertical 1 x 2.056 2.06 Rm
8.94Rmx2.319 kg/m 20.73 Kg
Inner frame 63.50x38x3mm @ 1.72kg/m
Horizontal 2 x0.882 1.76 Rm
1.76 Rmx1.72 kg/m 3.03 Kg
Shutter frame
50 x 44.50 x 2.50mm @ 1.292 kg/m
Vertical 2 x 2 x 2.056 8.22 Rm
Top - Horizontal 2 x0.79 3.16
11.38
11.38Rmx1.292 Kg/m 14.70 Kg
Lock rail: 50 x 44.50 x 2.50 @ 1.292 kg/m
Horizontal 2 x 0.79 = 1.58x1.974 kg/m 2.04 kg
Bottom rail 100 x 44.50 x 2.50 mm @ 1.974 kg/m
Horizontal 2 x 0.79 = 1.38x1.974 kg/m 3.12 Kg
Handle section @ 0.988 kg/m
2 x 2 x 0.645 = 2.58x 1x0.988 kg/m 2.55 Kg
Aluminium clips 17.15 x 17.15 x 1.50 mm @0.176Kg/m
Door shutter portion panelled 2x2x2x(0.79 + 0.98) 13.36
Door glazing portion 2x2x2x(0.79 + 0.98) 14.16
Fixed glazing bottom 2x2x2x(0.882 + 0.99) 14.98
42.50 Rm
42.50 x 0.176 Kg/m 7.48 Kg
Total Aluminium section required 53.65 Kg
Add 10% wastage 5.37
59.02 Kg
Rubber beading
Shutter glazing 2x2x(0.702+0.892) 6.38 Rm
Fixed glazing Top & Bottom 2x2(0.882+0.99) 7.49
13.87 RM
PVC Felt
Shutter vertical 2x2x2.056 8.22 RM
Alu. Grill
Door glazing 2x(0.702 x 0.892) 1.25
Fixed glazing Top & Bottom 2x(0.882x0.99) 1.75
3.00 M2
Add 10% wastage 0.30
3.30 M2
12mm PLMDF Board
Door shutter 2x (0.702x0.85) 1.19
Add 10% wastage 0.11
1.30 M2
5.50 mm thick glass
Shutter 2x0.702x0.892 1.25
Fixed Glazing Top & Bottom 2x0.882x0.99 1.75
3.00 M2
Add 20% wastage 0.60 0.60
3.60 M2
MAIN DATA
59.02 Kg Aluminium Section 287.00 Kg 16938.74
13.87 Rm Rubber beading 37.25 Rm 516.66
8.22 Rm PVC Felt 7.50 Rm 61.65
3.30 M2 Aluminium Grill 10mm size 1835.00 M2 6055.50
1.30 M2 12mm PLMDF Board 1020.00 M2 1326.00
3.60 M2 5.50mm thick plain glass 352.00 M2 1267.20
2.00 Nos Floor spring 2035.00 M2 4070.00
2.00 Nos 250mm Alu. Tower bolt 85.50 Each 171.00
1.00 No 200mm Alu. Tower bolt 71.90 Each 71.90
1.00 No Lock Novtal for Aluminium door 251.00 Each 251.00
2.00 Nos Alu. Door stopper 43.80 Each 87.60
6.00 Nos Alu. Hinges 100x30mm 62.90 Each 377.40
5.82 M2 Labour Charges 478.00 M2 2781.96
LS Sundries for angles screws dismantling Redoing to 162.00
good condition including Power supply etc.
for 5.82 M2 34138.61
Rate/m2 5865.74 /M2
Say Rs. 5866.00 /M2
Without floor spring but with Automatic Door closer
Rate as above 34138.61
Deduct for floor spring -4070.00
Add for Automatic Doorclosure 1780.00
for 5.82 M2 Rate Rs. 31848.61
Rs. 5472.27
Say Rs. 5472.00
Without floor spring & Automatic Door closer
Rate as above 34138.61
Deduct for floor spring 4070.00
Deduct for Automatic Doorclosure -1780.00
for 5.82 M2 Rate Rs. 36428.61
Rate Rs. 6259.21
Say Rs. 6259.00 /1 M2
11 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of single leaf fully panelled
openable shutters with 12mm thick bothside prelaminated partile board. The outer frame shall be with aluminium box section
101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section with Vertical & Top rail: 50x44.45x2.50mm@1.292 kg/m,
Bottom rail: 100x44.45x2.50mm@ 1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/mAlu. Clips: 17.15x17.27x1.50mm @
0.176 kg/mAlu. Handle: 100x30mm @ 0.988 kg/m and necessary accessories such as Alu. clips rubber beading, full length of
handles on both sides, lock, furniture fittings such as, Hinges, Automatic door closer, rubber bush, stopper including cost of
materials, labour charges and power consumption charges required for fabrication including chipping, dismantling and making
hole to the reuired extent in RCC column, beam masonry with power drill wherever necessary and redoing the damaged portion
to the original condition after fixing etc. complete. All the Alu. Section are to be anodised with matt finish under electically
contolled condition in accordance with IS 1868/1962 for an average anodic film thickness of 15 microns etc., complete.

Fully paneled
Consider door size : 1.00x2.10 = 2.10 M2
Outer frame
Horizontal 1x1.00 = 0.912
Verticle 2x2.10 = 4.20
11.86 Kg
5.112 x 2.319 kg/m
Shutter frame
Vertical 1x2x2.056x1.292 kg/m 5.31 Kg
Top rail 1x1x0.824x1.292 kg/m 1.06 Kg
Lock rail 1x1x0.824x1.292 kg/m 1.06 Kg
Bottom rail 1x1x0.824x1.974 kg/m 1.63 Kg
Handle 2x0.85x0.988 kg/m 1.68 Kg
Aluminium clips 0.176Kg/m
Shutter Portion (0.824+0.934)2x2x2 14.06 Rm
14.06x0.176 kg/m 2.47 Kg
Total weight of Aluminium 25.08 Kg
Add 10% wastage 2.51 Kg
27.59 Kg
MDF Board 12mm thick
shutter 2x0.824x0.94 1.55 M2
Add 10% wastage 0.16 M2
1.71 M2
PVC felt Shutter both side 2x1x2.056 4.11 Rm
MAIN DATA
27.59 Kg Aluminium Section including anodizing Charges 287.00 Kg 7918.33
1.71 M2 Prelaminated MDF board 12mm tk 1020.00 M2 1744.20
4.11 Rm PVC Felt 6mm thick 7.50 Rm 30.83
2.10 M2 Labour Charges 478.00 M2 1003.80
1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00
1.00 No Alu. Tower Bolt 250mmx12mm 85.50 Each 85.50
1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90
1.00 No Alu. Door stopper 43.80 Each 43.80
3.00 Nos Alu. Hinges 100x30 62.90 Each 188.70
1.00 No Automatic Door closer 890.00 Each 890.00
LS Sundries for T.W.plugs screws dismantling Redoing to good 140.00
condition including Power supply etc.
for 2.10 M2 12368.06
Rate/m2 5889.55 /M2
SAY Rs. 5890.00
Without Automatic Door closure
Rate as above 12368.06
Deduct for Doorclosure -890.00
for 2.10 M2 11478.06
Rate Rs. 5465.74 /1 M2
SAY Rs. 5466.00 /1 M2
12 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of double leaves
door with fully panelled with 12mm thick bothside prelaminated partile board The outer frame shall be with
aluminium box section 101.60x44.45x3.18m at 2.319kg/m and Shutter frame made of section with Vertical & Top
rail: 50x44.45x2.50mm@1.292 kg/m, Bottom rail: 100x44.45x2.50mm@ 1.974 kg/mLock rail : 50x44.45x2.5mm
@ 1.292 kg/mAlu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/mAlu. Handle: 100x30mm @ 0.988 kg/m and
necessary accessories such as Alu. clips rubber beading, full length of handles on both sides, lock, furniture fittings
such as, Hinges, Automatic door closer, rubber bush, stopper including cost of materials, labour charges and power
consumption charges required for fabrication including chipping, dismantling and waking hole to the reuired extent
in RCC column, beam masonry with power drill wherever necessary and redoing the damaged portion to the original
condition after fixing etc. complete. All the Alu. sectionare to be anodised with matt finish under electically
contolled condition in accordance with IS 1868/1962 for an average anodic film thickness of 15 microns etc.,
complete.

Fully paneled
Consider door size : 1.20x2.10 = 2.52 M2
Outer frame
Horizontal 1x1.112 = 1.112
Verticle 2x2.10 = 4.20 12.32 Kg
5.312 Rm x 2.319 kg/m
Shutter frame
Vertical 2x2x2.056x1.292 kg/m 10.63 Kg
Top rail 1x2x0.468x1.292 kg/m 1.21 Kg
Lock rail 1x2x0.468x1.292 kg/m 1.21 Kg
Bottom rail 1x2x0.468x1.974 kg/m 1.85 Kg
Handle 2x2x0.505x0.988 kg/m 2.00 Kg
Aluminium clips 0.176Kg/m
Shutter Portion 2x4x2x(0.468+0.934) 22.43 Rm
22.43 x 0.176 Kg/m 3.95 Kg
Total weight of Aluminium 33.16 Kg
Add 10% wastage 3.24 Kg
36.40 Kg
MDF Board 12mm thick shutter B1175 1.76 M2
Add 10% wastage 0.18 M2
1.94 M2
PVC felt Shutter both side 2x2x2.056 8.22 Rm
MAIN DATA
36.40 Kg Aluminium Section including anodizing Charges 287.00 Kg 10446.80
1.94 M2 Prelaminated MDF board 12mm thick 1020.00 M2 1978.80
8.22 Rm PVC Felt 6mm thick 7.50 Rm 61.65
2.52 M2 Labour Charges 478.00 M2 1204.56
1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00
2.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 171.00
1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90
2.00 Nos Alu. Door stopper 43.80 Each 87.60
6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40
2.00 Nos Automatic Door closer 890.00 Each 1780.00
LS Sundries for angles screws dismantling Redoing to good 162.00
condition including Power supply etc.
for 2.52 M2 16592.71
Rate/m2 6584.41 /M2
Say Rs. 6584.00 /M2
Without Automatic Door closer
Rate as above 16592.71
Deduct for Doorclosure -1780.00
for 2.52 M2 14812.71
Rate Rs. 5878.06 /1 M2
Rate Rs. 5878.00 /1 M2
13 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of single leaf fully glazed Door
shutters with 5.50 mm thick glass. The outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m
and Shutter frame made of section with Vertical & Top rail: 50x44.45x2.50mm@1.292 kg/m, Bottom rail: 100x44.45x2.50mm@
1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/mAlu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/mAlu. Handle:
100x30mm @ 0.988 kg/m and necessary accessories such as Alu. clips rubber beading, full length of handles on both sides,
lock, furniture fittings such as, Hinges, Automatic door closer, rubber bush, stopper including cost of materials, labour charges
and power consumption charges required for fabrication including chipping, dismantling and making hole to the reuired extent in
RCC column, beam masonry with power drill wherever necessary and redoing the damaged portion to the original condition after
fixing etc. complete. All the Alu. Section are to be anodised with matt finish under electically contolled condition in accordance
with IS 1868/1962 for an average anodic film thickness of 15 microns etc., complete.

Fully glazed
Consider door size : 1.00x2.10 = 2.10 M2
Outer frame
Horizontal 1x1.00 = 0.912
Verticle 2x2.10 = 4.20 11.86 Kg
5.112 x 2.319 kg/m
Shutter frame
Vertical 1x2x2.056x1.292 kg/m 5.31 Kg
Top rail 1x1x0.824x1.292 kg/m 1.06 Kg
Lock rail 1x1x0.824x1.292 kg/m 1.06 Kg
Bottom rail 1x1x0.824x1.974 kg/m 1.63 Kg
Handle 2 x0.85x0.988 kg/m 1.68 Kg
Aluminium clips 0.176Kg/m
Shutter Portion (0.824+0.934) 2x2x2 14.06 Rm
14.06x0.176 kg/m 2.47 Kg
Total weight of Aluminium 25.08 Kg
Add 10% wastage 2.51 Kg
27.59 Kg
Glass 3 mm thick
shutter 2x0.824x0.94 1.55 M2
Add 20% wastage 0.31 M2
1.86 M2
Rubber beading (0.824+0.934)x2x2 7.03 Rm
PVC felt Shutter both side 2x1x2.056 4.11 Rm
MAIN DATA
27.59 Kg Aluminium Section including anodizing Charges 287.00 Kg 7918.33
1.86 M2 5.50 mm thick glass 352.00 M2 654.72
7.03 Rm Rubber beading 37.25 Rm 261.87
4.11 Rm PVC Felt 6mm thick 7.50 Rm 30.83
2.10 M2 Labour Charges 478.00 M2 1003.80
1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00
1.00 No Alu. Tower Bolt 250mmx12mm 85.50 Each 85.50
1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90
1.00 No Alu. Door stopper 43.80 Each 43.80
3.00 Nos Alu. Hinges 100x30 62.90 Each 188.70
1.00 No Automatic Door closer 890.00 Each 890.00
LS Sundries for T.W.plugs screws dismantling Redoing to good 140.00
condition including Power supply etc.
for 2.10 M2 11540.44
Rate/m2 5495.45 /M2
SAY Rs. 5495.00 /M2
Without Automatic Door closure
Rate as above 11540.44
Deduct for Doorclosure -890.00
for 2.10 M2 10650.44
Rate Rs. 5071.64 /1 M2
Rate Rs. 5072.00 /1 M2
14 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish of Double leaf fully glazed Door
shutters with 5.50 mm thick glass.The outer frame shall be with aluminium box section 101.60x44.45x3.18m at 2.319kg/m
and Shutter frame made of section with Vertical & Top rail: 50x44.45x2.50mm@1.292 kg/m, Bottom rail: 100x44.45x2.50mm@
1.974 kg/m, Lock rail : 50x44.45x2.5mm @ 1.292 kg/mAlu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/mAlu. Handle:
100x30mm @ 0.988 kg/m and necessary accessories such as Alu. clips rubber beading, full length of handles on both sides,
lock, furniture fittings such as, Hinges, Automatic door closer, rubber bush, stopper including cost of materials, labour charges
and power consumption charges required for fabrication including chipping, dismantling and making hole to the reuired extent in
RCC column, beam masonry with power drill wherever necessary and redoing the damaged portion to the original condition after
fixing etc. complete. All the Alu. Section are to be anodised with matt finish under electically contolled condition in accordance
with IS 1868/1962 for an average anodic film thickness of 15 microns etc., complete. Fully
Glazed

Consider door size : 1.20x2.10 = 2.52 M2


Outer frame
Horizontal 1x1.112 = 1.112
Verticle 2x2.10 = 4.20 12.32 Kg
5.312 Rm x 2.319 kg/m
Shutter frame
Vertical 2x2x2.056x1.292 kg/m 10.63 Kg
Top rail 1x2x0.468x1.292 kg/m 1.21 Kg
Lock rail 1x2x0.468x1.292 kg/m 1.21 Kg
Bottom rail 1x2x0.468x1.974 kg/m 1.85 Kg
Handle 2x2x0.505x0.988 kg/m 2.00 Kg
Aluminium clips 0.176Kg/m
Shutter Portion 2x4x2x(0.468+0.934) 22.43 Rm
22.43 x 0.176 Kg/m 3.95 Kg
Total weight of Aluminium 33.16 Kg
Add 10% wastage 3.24 Kg
36.40 Kg
Glass 5.50 mm thick
shutter 4x0.468x0.934 1.75 M2
Add 20% wastage 0.35 M2
2.10 M2
Rubber beading (0.468+0.934)x2x2x2 11.22 Rm
PVC felt Shutter both side 2x2x2.056 8.22 Rm
MAIN DATA
36.40 Kg Aluminium Section including anodizing Charges 287.00 Kg 10446.80
2.10 M2 5.50 mm thick glass 352.00 M2 739.20
11.22 Rm Rubber beading 37.25 Rm 417.95
8.22 Rm PVC Felt 6mm thick 7.50 Rm 61.65
2.52 M2 Labour Charges 478.00 M2 1204.56
1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00
2.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 171.00
1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90
2.00 Nos Alu. Door stopper 43.80 Each 87.60
6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40
2.00 Nos Automatic Door closer 890.00 Each 1780.00
LS Sundries for angles screws dismantling Redoing to good 162.00
condition including Power supply etc.
for 2.52 M2 15771.06
Rate/m2 6258.36 /M2
Say Rs. 6258.00 /M2
Without Automatic Door closer
Rate as above 15771.06
Deduct for Doorclosure -1780.00
for 2.52 M2 13991.06
Rate Rs. 5552.01 /1 M2
Rate Rs. 5552.00 /1 M2
15 Fabricting Supplying and fixing in position Aluminium door Poweder Coated of size 1.00mx2.10m having Single
leaf openable shutter 1/3 panelled & 2/3 glazed with 10 mm thick aluminium grill of approved pattern and
design and 12mm thick best quality both sides prelaminated particle board and 5.5mm thick plain glass shall be used
for panelling withAluminium section of Outer Frame :101.60x44.45x3.18mm @ 2.319kg/m and Shutter frame of
bottom rail : 100x44.45x2.50mm @ 1.974 kg/m,Top & Vertical rail : 50x44.45x2.50mm @ 1.292kg/m,Lock rail:
50x44.45x2.50mm @ 1.292kg/m,Aluminium clips:17.15x17.27x1.50mm @ 0.176kg/m and with required
aluminum hinges, door stopper, rubber beading, PVC felt, handle for a length of shutter (both sides) of section:
100x30mm @ 0.988kg/m, locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm -
1No., aluminium tower bolt 200x12mm - 1No., aluminium door stopper with rubber bush - 2Nos ., lock-1No.,Floor
Spring - 1 No.,as per BIS standards including cost of all materials, labour charges and power consumption charges
required for fabrication including chipping dismantling and making holes to the required extent in RCC in
column/beam/masonry with power drill wherever neccessary and redoing the damaged portion to the original
condition after fixing etc. complete. All Aluminium section shall be used in electrically controlled condition in
accordance with IS 1868/1962 for an average anodic film
thickness of 15 microns etc., complete.

1/3panelled & 2/3 glazed with grill Powder Coated


Door size : 1.00mx2.10m = 2.10M2
Outer frame :
Horizontal 1x0.912 0.912 m
Vertical 2x2.10 4.20 m
5.112 Rm
Wieght 5.112x 2.319 kg/m 11.85 Kg
vertical 1x2x2.056 4.112 Rm
Top 1x1x0.824 0.824
4.936
4.936x1.292 kg/m 6.38 Kg
Lock rail 1x1x0.824 = 0.824x1.292 kg/m 1.06 Kg
Bottom rail 1x1x0.824 = 0.824 x 1.974 kg/m 1.63 Kg
Alu.handle 1x2x0.85 = 1.70x0.988 1.68 Kg
Aluminium clips @ 0 .176 kg/m
Shutter panel section 1x2x2x(0.618+0.622) 4.96
Glass portion 1x2x2x(0.618+1.29) 7.63
12.59 Rm
Wieght 12.59 x 0.176 kg/m 2.22 Kg
Total weight of aluminium shutter 24.82 Kg
Add 10% wastage 2.48
27.30 Kg
PLMDF Board 12mm thick
Bottom 1/3portion 1x0.618x0.622 0.38
Add 10% wastage 0.04
0.42 M2
Glass 5.50mm thick plain
Shutter Top 1x0.618x1.29 0.80
Add 20% wastage 0.16
0.96 M2
Aluminium Grill 10mm size 0.80 M2
Add 10% wastage 0.08
0.88 M2
Rubber beading
Shutter Top 1x2x(0.618+1.29) 3.82 M
3.82 Rm
PVC felt
Shutter both side 1x2x2.056 4.11 Rm
MAIN DATA
27.30 Kg Aluminium Section including anodizing Charges 307.00 Kg 8381.10

0.42 M2 Prelaminated MDF board 12mm tk 1020.00 M2 428.40

0.96 M2 Glass 5.50mm thick plain 352.00 M2 337.92

0.88 M2 Aluminium Grill 10mm size 1835.00 M2 1614.80

3.82 Rm Rubber beading 37.25 Rm 142.30

4.11 Rm PVC Felt 6mm thick 7.50 Rm 30.83

2.10 M2 Labour Charges 478.00 M2 1003.80

1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00

1.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 85.50

1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90

1.00 Nos Aluminium door stopper 43.80 Each 43.80

1.00 Nos Hyd. Floor spring 2035.00 Each 2035.00

3.00 Nos Alu. Hinges 100x30 62.90 Each 188.70

LS Sundries for Angles T.W.plugs screws dismantling 140.00


Redoing to good condition including Power supply etc.
for 2.10 M2 14755.04
Rate/m2 7026.21 /M2
Say Rs. 7026.00 /M2
Without Hydraulic Floor spring
Rate as above 14755.04
Deduct Hydralic Floor spring -2035.00
for 2.10 M2 Rate Rs. 12720.04
Rs. 6057.16 /M2
Say Rs. 6057.00 /M2
Rate without Alu.Grill 13140.24 /2.10 M2
For single leaf 6257.26
Say Rs. 6257.00 /M2
16 Fabricting Supplying and fixing in position Aluminium anodised Natural color matt finish door of size
1.50mx2.40m having fixed ventilator at top of size 1.50x0.30m with 1/3 panelled with 12mm thick bothside
prelaminated particle board at bottom w& 2/3 glazed using 5.50mm thick Plain glass at top with aluminium
grill 10mm thick double leaves door. The outer frame shall be with aluminium box section 101.60x44.45x3.18m
at 2.319kg/m and Shutter frame made of section with Vertical & Top rail: 50x44.45x2.50mm@1.292 kg/m, Bottom
rail: 100x44.45x2.50mm@ 1.974 kg/m,Lock rail : 50x44.45x2.5mm @ 1.292 kg/m,Alu. Clips:
17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 kg/m and Fixed ventilator Inner frame of
section @ 63.50x38x3mm @ 1.72kg/m and necessary accessories such as rubber beading PVC felt, handle for a
length of shutter (both sides), locking arrangements, furniture fittings such as aluminium tower bolts-250x12mm -
2Nos, aluminium tower bolt 200x12mm - 1No, aluminium door stopper with rubber bush - 2Nos ., lock-
1No.,Hydraulic Door closer as per BIS standards including cost of all materials, labour charges and power
consumption charges required for fabrication including chipping dismantling and making holes to the required extent
in RCC in column/beam/masonry with power drill wherever neccessary and redoing the damaged portion to the
original condition after fixing etc. complete.. All Aluminium section shall be used in electrically controlled condition
in accordance with IS 1868/1962 for an average anodic film thickness of 15 microns etc., complete.

1/3panelled & 2/3 glazed with grill


Door size : 1.50mx2.40m = 3.60M2 with fixed top
glazing and aluminium grill 10mm thick
Outer frame :
Horizontal 2x1.412 2.824 m
Vertical 2x2.40 4.80 m
7.624 Rm
Wieght 7.624x 2.319 kg/m 17.68 Kg
Fixed ventilator @ 63.50x38x3mm @ 1.72kg/m
Inner frame V = 0.212x1.72 kg/m 0.37 kg
Shutter frame
Vertical 2x2x2.10x1.292 kg/m 10.85 Kg
Top rail 1x2x0.618x1.292 kg/m 1.60 Kg
Lock rail 1x2x0.618x1.292 kg/m 1.60 Kg
Bottom rail 1x2x0.618x1.974 kg/m 2.44 Kg
Handle 2x2x0.645x0.988 kg/m 2.55 Kg
Aluminium clips @ .176 kg/m
Shutter panel section 2x2x2x(0.618+0.622) 9.92
Glass portion 2x2x2x(0.618+1.29) 15.264
Fixed ventilator 2x2x2x(0.684+0.212) 7.168
32.35 Rm
Wieght 32.352 x 0.176 kg/m 5.69 Kg
Total weight of aluminium shutter 42.78 Kg
Add 10% wastage 4.28
47.06 Kg
PLMDF Board 12mm thick
Bottom 1/3portion 2x0.618x0.622 0.77
Add 10% wastage 0.08
0.85 M2
Glass 5.50mm thick plain
Shutter Top 2x0.618x1.29 1.59
Fixed ventilator 2x0.684x0.212 0.29
1.88 M2
Add 20% wastage 0.38
2.26 M2
Aluminium Grill 10mm size (1.59+0.29) 1.88 M2
Add 10% wastage 0.19
2.07 M2
Rubber beading
Shutter Top 2x2x(0.618+1.29) 7.63 M
Fixed ventilator 2x2x(0.684+0.212) 3.58 M
11.22 Rm
PVC felt
Shutter both side 2x2x2.056 8.22 Rm

MAIN DATA
47.06 Kg Aluminium Section including anodizing Charges 287.00 Kg 13506.22
0.85 M2 Prelaminated MDF board 12mm tk 1020.00 M2 867.00
1.88 M2 Glass 5.50mm thick plain 352.00 M2 661.76
2.07 M2 Aluminium 10mm Grill of size 1835.00 M2 3798.45
11.22 Rm Rubber beading 37.25 Rm 417.95
8.22 Rm PVC Felt 6mm thick 7.50 Rm 61.65
3.60 M2 Labour Charges 478.00 M2 1720.80
1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00
2.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 171.00
1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90
2.00 Nos Aluminium door stopper 43.80 Each 87.60
2.00 Nos Hyd. Door closer 890.00 Each 1780.00
6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40
LS Sundries for Angles T.W.plugs screws dismantling 162.00
Redoing to good condition including Power supply etc.

for 3.60 M2 23934.73


Rate/m2 6648.53 /M2
Say Rs. 6649.00 /M2
Without Hydraulic Door closer and with Floor spring
Rate as above 23934.73
Deduct Hydralic Door closer -1780.00
Add for Floor spring 4070.00
for 3.60 M2 Rate Rs. 26224.73
Rs. 7284.65 /M2
Say Rs. 7285.00 /M2
17 Fabricating supplying and fixing in position of aluminium anodised natural colour matt finish half panelled
with 12mm thick bothside prelaminated partile board at bottom and half glazed using 5.50mm thick
Plain glass at top double leaves door with 0.3m fixed ventilator at top. The outer frame shall be with
aluminium box section 101.60x44.45x3.18m at 2.319kg/m and with the Shutter frame made of section with
Vertical & Top rail: 50x44.45x2.50mm@1.292 kg/m Bottom rail: 100x44.45x2.50mm@ 1.974 kg/m,Lock rail :
50x44.45x2.5mm @ 1.292 kg/m,Alu. Clips: 17.15x17.27x1.50mm @ 0.176 kg/m,Alu. Handle: 100x30mm @
0.988 kg/m and Inner Frame of section 63.50x38x3 mm@1.72 kg/m and necessary accessories such as
aluminium clips, rubber beading PVC felt, handle for a length of shutter (both sides), locking arrangements,
furniture fittings such as aluminium tower bolts-250x12mm - 2Nos, aluminium tower bolt 200x12mm - 1No,
aluminium door stopper with rubber bush - 2Nos ., lock-1No.,Hydraulic Door closer as per BIS standards
including cost of all materials, labour charges and power consumption charges required for fabrication including
chipping dismantling and making holes to the required extent in RCC in column/beam/masonry with power drill
wherever neccessary and redoing the demaged portion to the original condition after fixing etc. complete.All
Aluminium section shall be used in electrically controlled condition in accordance with ISI specification
1868/1962 for anodic film thickness of not less than 15 microns for glazing portion Aluminium sections and
furniture fittings shall be got approved by the Executive Engineer incharge.

1/2 panelled 1/2 glazed with top fixed glazing with grill
Consider door size : 1.50x2.40 = 3.60m2 with top
fixed glazing & Aluminium grill.

Outer frame :
Horizontal 2x1.412 2.824 m
Vertical 2x2.40 4.80 m
7.624
Weight 7.624m x 2.319 kg/m 17.68 Kg
Fixed ventilator @ 63.50x38x3mm @ 1.72kg/m
Inner frame V = 0.212x1.72 kg/m 0.37 kg
Shutter frame
Vertical 2x2x2.10x1.292 kg/m 10.85 kg
Top rail 1x2x0.618x1.292 kg/m 1.60 kg
Lock rail 1x2x0.618x1.292 kg/m 1.60 kg
Bottom rail 1x2x0.618x1.974 kg/m 2.44 kg
Handle 2x2x0.645x0.988 kg/m 2.55 Kg
Aluminium clips
Shutter panel section 2x2x2x(0.618+0.97) 12.70
Glass portion 2x2x2x(0.618+0.99) 12.86
Fixed ventilator 2x2x2x(0.684+0.212) 7.17
32.73 Rm
Weight 32.73 x 0.176 kg/m 5.76 Kg
Total weight of aluminium shutter 42.85 Kg
Add 10% wastage 4.29
47.14 Kg
PLMDF Board 12mm thick
Bottom 2x0.618x0.97 1.20
Add 10% wastage 0.12
1.32 M2
Aluminium Grill
Shutter glazing 2x0.618x0.99 1.22
For Fixed ventilator 2x0.684x0.212 0.29
1.51 M2
Add 10% wastage 0.15
1.66 M2
Glass 5.50mm thick plain
Shutter Top 2x0.618x0.99 1.22
Fixed ventilator 2x0.684x0.212 0.29
1.51
Add 20% wastage 0.30
1.81 M2
Rubber beading
Shutter Top 2x2x(0.618+0.99) 6.43 Rm
Fixed ventilator 2x2x(0.684+0.212) 3.58 Rm
10.01 Rm
PVC felt
Shutter both side 2x2x2.056 8.22 Rm
MAIN DATA
47.14 Kg Aluminium Section including anodizing Charges 287.00 Kg 13529.18

1.32 M2 Prelaminated MDF board 12mm tk 1020.00 M2 1346.40

1.81 M2 Glass 5.50mm thick plain 352.00 M2 637.12

1.66 M2 Aluminium Grill 10mm thick 1835.00 M2 3046.10

10.01 Rm Rubber beading 37.25 Rm 372.87

8.22 Rm PVC Felt 6mm thick 7.50 Rm 61.65

3.60 M2 Labour Charges 478.00 M2 1720.80

1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00

2.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 171.00

1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90

2.00 Nos Alu. Hydralic Door closer 890.00 Each 1780.00

6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40

2.00 Nos Door stopper 43.80 Each 87.60

LS Sundries for angles T.W.plugs screws dismantling Redoing to good condition 162.00
including Power supply etc.
for 3.60 M2 23615.02
Rate/m2 6559.73 /M2
Say Rs. 6560.00 /M2
18 Fabricting Supplying and fixing in position Aluminium anodised Natural color Matt finish door of size
1.80mx2.40m having fixed ventilator at top of size 1.80x0.30m double leaves openable shutter 1/3 panelled
with12mm thick best quality both sides prelaminated particle board& 2/3 glazed with 5.5mm thick plain glass
with 10mm thick aluminium grill. The outer frame shall be with aluminium box section 101.60x44.45x3.18m at
2.319kg/m and with the Shutter frame made of Vertical & Top rail: 50x44.45x2.50mm@1.292 kg/m, Bottom rail:
100x44.45x2.50mm@ 1.974 kg/m,Lock rail : 50x44.45x2.5mm @ 1.292 kg/m,Alu. Clips: 17.15x17.27x1.50mm @
0.176 kg/m,Alu. Handle: 100x30mm @ 0.988 kg/m and Inner Frame of section 63.50x38x3 mm@1.72 kg/m and
necessary accessories such as rubber beading, PVC felt, handle for a length of shutter (both sides), locking
arrangements, furniture fittings such as aluminium tower bolts-250x12mm - 2Nos, aluminium tower bolt 200x12mm
- 1No, aluminium door stopper with rubber bush - 2Nos ., lock-1No.,Hydraulic floor spring as per BIS standards
including cost of all materials, labour charges and power consumption charges with required aluminum hinges, door
stopper with following sectional specifications and the following shutter frames and necessary accessories such as
aluminium clips, rubber beading PVC felt, handle for a length of shutter (both sides), locking arrangements,
furniture fittings such as aluminium tower bolts-250x12mm - 2Nos, aluminium tower bolt 200x12mm - 1No,
aluminium door stopper with rubber bush - 2Nos ., lock-1No.,Hydraulic Floor spring as per BIS standards including
cost of all materials, labour charges and power consumption charges required for fabrication including chipping
dismantling and making holes to the required extent in RCC in column/beam/masonry with power drill wherever
neccessary and redoing the damaged portion to the original condition after fixing etc. complete. All Aluminium
section shall be used in electrically ontrolled condition in accordance with IS 1868/1962 for an average anodic film
thickness of 15 microns etc., complete.

1/3 panelled 2/3 glazed with top fixed glazing with grill
Door size : 1.80mx2.40m = 4.32M2 with top ventilator
fixed glazing and aluminium grill.
Outer Frame :101.60x44.50x3.18mm @ 2.319kg/m
Outer frame :
Horizontal 2x1.712 3.424 m
Vertical 2x2.40 4.80 m
8.224 Rm
Wieght 8.224x 2.319 kg/m 19.07 Kg
Fixed ventilator @ 63.50x38x3mm @ 1.72kg/m
Inner frame V = 0.212x1.72 kg/m 0.36 kg
Shutter frame
Vertical 2x2x2.10x1.292 kg/m 10.85 Kg
Top rail 1x2x0.768x1.292 kg/m 1.98 Kg
Lock rail 1x2x0768x1.292 kg/m 1.98 Kg
Bottom rail 1x2x0.768x1.974 kg/m 3.03 Kg
Handle 2x2x0.645x0.988 kg/m 2.55 Kg
Aluminium clips @ .176 kg/m
Shutter panel section 2x2x2x(0.768+0.622) 11.12
Glass portion 2x2x2x(0.768+1.29) 16.46
Fixed ventilator 2x2x2x(0.818+0.212) 8.24
35.82 Rm
Wieght 35.82 x 0.176 kg/m 6.30 Kg
Total weight of aluminium shutter 46.14 Kg
Add 10% wastage 4.61
50.75 Kg
PLMDF Board 12mm thick
Bottom 1/3portion 2x0.768x0.622 0.96
Add 10% wastage 0.10
1.06 M2
Glass 5.50mm thick plain

Shutter Top 2x0.768x1.29 1.98

Fixed ventilator 2x0.818x0.212 0.35

2.33 M2

Add 20% wastage 0.47

2.80 M2

Aluminium Grill 10mm size M2

Shutter Top 2x0.768x1.29 1.98

Fixed ventilator 2x0.818x0.212 0.35

2.33

Add 10% wastage 0.23

2.56 M2

Rubber beading

Shutter Top 2x2x(0.768+1.29) 8.23 M

Fixed ventilator 2x2x(0.818+0.212) 4.12 M

12.35 Rm
PVC felt
Shutter both side 2x2x2.056 8.22 Rm

MAIN DATA

50.75 Kg Aluminium Section including anodizing Charges 287.00 Kg 14565.25


1.06 M2 Prelaminated MDF board 12mm tk 1020.00 M2 1081.20
2.80 M2 Glass 5.50mm thick plain 352.00 M2 985.60
2.56 M2 Aluminium Grill 10mm size 1835.00 M2 4697.60
12.35 Rm Rubber beading 37.25 Rm 460.04
8.22 Rm PVC Felt 6mm thick 7.50 Rm 61.65
4.32 M2 Labour Charges 478.00 M2 2064.96
1.00 No Lock Novtal for Aluminium door 251.00 M2 251.00
2.00 Nos Alu. Tower Bolt 250mmx12mm 85.50 Each 171.00
1.00 No Alu. Tower Bolt 200mmx12mm 71.90 Each 71.90
2.00 Nos Aluminium door stopper 43.80 Each 87.60
2.00 Nos Hyd.Floor spring 2035.00 Each 4070.00
6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40
LS Sundries for Angles T.W.plugs screws dismantling 162.00
Redoing to good condition including Power supply etc.
for 4.32 M2 29107.20
Rate/m2 6737.78 /M2
Say Rs. 6738.00 /M2
19 Supplying, fabricating and fixing in position of Aluminium anodised natural colour matt finish of single leaf
fully panelled sliding door with 12mm thick bothside prelaminated partile board at the Shutter bottom
rail:100x44.45x2.50mm@1.974 kg/m,Top & Verticle 50x44.45x2.50mm @ 1.292 kg/m,Lock rail
50x44.45x2.50mm @ 1.292 g/m, Running channel section:50x44.45x2.50mm@1.292 kg/m, and necessary
accessories such as Alu.clips 17.15x17.27x1.50mm @ 0.176 kg, Alu handle 100x30mm @ 0.988 kg/mfull
length of handles on both sides, lock, roller, including cost of materials, labour charges and power
consumption charges required for fabrication including chipping, dismantling and waking hole to the required
extent in RCC column, beam masonry with power drill wherever necessary and redoing the damaged portion
to the original condition afterfixing etc. complete. All the Alu. sections are to be anodised.with matt finish
under electically contolled condition in accordance with IS 1868/1962 for an average anodic film thickness of
15 microns etc.,

Fully panelled sliding door


Consider a size of door :1.00mx2.10m

Shutter frame

Vertical 1x2x2.10x1.292 kg/m 5.43


Top rail 1x1x1.00x1.292 kg/m 1.29
Lock rail 1x1x0.911x1.292 kg/m 1.18
Bottom rail 1x1x1x1.974 kg/m 1.97
Running channel : 1x2x1x1.292 kg/m 2.58
Handle 2x0.85x0.988 kg/m 1.68
Total 14.13 Kg
Aluminium clips
Shutter portion(0.911+0.983)x2x2x2=15.152x0.176kg/m 2.67 Kg
Total weight of Aluminium 16.80 Kg
Add 10% wastage 1.68
18.48 Kg
MDF Board
shutter 2x0.911x0.983 1.79
Add 10% wastage 0.18
1.97 M2
PVC felt
Shutter both side 2x2.056 4.11 Rm
MAIN DATA
18.48 Kg Aluminium Section including anodizing Charges 287.00 Kg 5303.76
1.97 M2 Prelaminated MDF board 12mm tk 1020.00 M2 2009.40
4.11 Rm PVC Felt 6mm thick 7.50 Rm 30.83
2.10 M2 Labour Charges 478.00 M2 1003.80
4.00 Nos Roller 13.75 Nos 100.00
1.00 No Lock 251.00 Nos 251.00
LS Sundries for Lock screws conveyance Power supply LS 130.00
etc.
for 2.10 M2 8828.79

Rate/m2 4204.18

Say Rs. 4204.00 /M2


ALUMINIUM WINDOW
1 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt
finish Two panels openable type window in all floors with aluminium sections of the Outer
frame: 37.70x33x2mm @ 0.50 kg/m,Centre mullions:59x33x2.50mm @0.936 kg/m,Shutter
frame : Z section 24.50x33x3mm @ 0.525kg/m,Aluminium clips:0.109 kg/m with neccessary
accssories such as rubber beadings, special hinges, handle including supplying and fixing 4mm
thick plain glass including cost of all materials, labours, power consumption required for
fabrication, drilling holes in RCC column slab, masonry walls wherever necessary with power
drills to the required extent and make good to the original conditons after fixing and also as
directed. All the Aluminium sections are to the anodised with matt finish under electrically
controlled conditons in accordance with Is 1868/1962 for an average anodic film thickness of 15
microns etc.Complete.

Assume a size 1.20x1.30 m = 1.56 m2


Outer frame
Vertical : 1x2x1.30 = 2.60
Horizontal : 1x2x1.20 = 2.40
5.00 x0.50kg/m 2.50 Kg
Centre mullians: 1x1x1.225=1.225x0.936 kg/m 1.15 Kg

Shutter :
Vertical : 2x2x1.225 4.90
Horizontal : 2x2x0.533 2.13
7.03 Rm
7.02Rmx0.525kg/m 3.69 Kg
Aluminium clips =
2x2x2(0.533+1.225)=14.06Rmx0.109 Kg/m 1.53 Kg

Total 8.87 Kg
Add 10% wastage 0.90 Kg
9.77 Kg
4mm thick Plain Glass
1x2(0.53x1.225) 1.31 M2
Add 20% wastage 0.26 M2
1.57 M2
Rubber beading
2x1x2(0.53+1.225) 7.03 Rm
MAIN DATA
9.77 Kg Aluminium Section including anodizing Charges 287.00 Kg 2803.99
1.57 M2 4mm thick Glass required 298.00 M2 467.86
7.03 Rm Rubber beading 28.40 Rm 199.65
1.56 M2 Labour Charges 478.00 M2 745.68
4.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 199.20
2.00 Nos Alu. Handle 100mm long 30.90 Each 61.80
4.00 Nos Special Hinges 100x30 62.90 Each 251.60
LS Sundries for angles screws dismantling Redoing to 110.00
good condition including Power supply etc.
for 1.56 M2 4839.78
Rate/m2 3102.42
Say Rs. 3102.00 M2
2 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish two panels
openable type window with Aluminium grill of 10mm thick in all floors with aluminium sections of Outer
frame: 37.70x33x2mm @ 0.50 kg/m,Centre mullions:59x33x2.50mm @0.936 kg/m,Shutter frame : Z section
24.50x33x3mm @ 0.525kg/m,Aluminium clips:0.109 kg/m and with neccessary accssories such as rubber
beadings, special hinges, handle including supplying and fixing 4mm thick plain glass including cost of all
materials, labours, power consumption required for fabrication, drilling holes in RCC column slab, masonry
walls wherever necessary with power drills to the required extent and make good to the original conditons
after fixing and also as directed. All the Aluminium sections are to the anodised with matt finish under
electrically controlled conditons in accordance with Is 1868/1962 for an average anodic film thickness of 15
microns etc.Complete.

Two panels with Aluminium grill of 10mm thick


Assume a size 1.20x1.30 m = 1.56 m2
Vertical : 1x2x1.30 = 2.60
Horizontal: 1x2x1.20 = 2.40
5.00 Rmx0.50kg/m 2.50 Kg
Centre mullians: 1x1x1.25=1.225x0.936 kg/m 1.15 Kg
Shutter :
Vertical : 2x2x1.225 4.90
Horizontal : 2x2x0.533 2.13
7.03 Rm
7.02Rmx0.525kg/m 3.69 Kg
Aluminium clips =
2x2x2(0.53+1.225)=14.04Rmx0.109 Kg/m 1.53 Kg

Total 8.87 Kg
Add 10% wastage 0.90 Kg
9.77 Kg
4mm thick Plain Glass
1x2(0.53x1.225) 1.31 M2
Add 20% wastage 0.26 M2
1.57 M2
Rubber beading
2x1x2(0.53+1.225) 7.03 Rm
Alu. Grill of 10mm thick
2x0.533x1.225 1.31 M2
Add 10% wastage 0.13 M2
1.44 M2
MAIN DATA
9.77 Kg Aluminium Section including anodizing Charges 287.00 Kg 2803.99
1.57 M2 4mm thick Glass required 298.00 M2 467.86
7.03 Rm Rubber beading 28.40 Rm 199.65
1.56 M2 Labour Charges 478.00 M2 745.68
4.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 199.20
2.00 Nos Alu. Handle 100mm long 30.90 Each 61.80
4.00 Nos Special Hinges 100x30 62.90 Each 251.60
1.44 M2 Aluminium grill 10mm thick 1835.00 M2 2642.40
LS Sundries for angles screws dismantling Redoing to 120.00
good condition including Power supply etc.for 1.56 M2 7492.18
Rate/m2 4802.68
Say Rs. 4803.00 M2
3 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish Two Panels
openable type window with fixed Ventilator at Top at 0.30 m height in all floors with aluminium sections of
Outer frame: 37.70x33x2mm @ 0.50 kg/m,Centre mullions: 59x33x2.50mm @0.936 kg/m,Shutter frame : Z section
24.50x33x3mm @ 0.525kg/m,Aluminium clips:0.109 kg/m and with neccessary accssories such as rubber beadings,
special hinges, handle including supplying and fixing 4mm thick plain glass including cost of all materials, labours,
power consumption required for fabrication, drilling holes in RCC column slab, masonry walls wherever necessary
with power drills to the required extent and make good to the original conditons after fixing and also as directed. All
the Aluminium sections are to the anodised with matt finish under electrically controlled conditons in accordance
with Is 1868/1962 for an average anodic film thickness of 15 microns etc complete.

Two Panels with fixed glazing ventilator of 0.30m ht at top


Size of window : 1.20x1.60 = 1.92m2
Outer frame
Vertical : 1x2x1.60 = 3.20
Horizontal : 1x2x1.20 = 2.40
5.60Rmx0.50kg/m 2.80 Kg
Centre mullians: 1x1.225 1.225
Fixed Glazing
Vertical : 1x0.267 0.267
Horizontal : 1x1.125 1.125
1.392 Rm
1.392x0.936 kg/m Kg
Shutter :
Vertical : 2x2x1.225 4.90
Horizontal : 2x2x0.533 2.13
7.03 Rm
7.03Rmx0.525kg/m 3.70 Kg
Aluminium clips =
shutter:2x2x2(0.533+1.229)=14.10Rmx0.109 Kg/m 1.54 Kg
Fixed glazing 2x2x2(0.533+0.267)=6.40Rmx0.109 Kg/m 0.70 Kg
Total 11.18 Kg
Add 10% wastage 1.12 Kg
12.30 Kg
4mm thick Plain Glass
For shutter 1x2(0.533x1.229) 1.31 M2
Fixed glazing 1x2(0.533x1.267) 0.28
1.59 M2
Add 20% wastage 0.31 M2
1.90 M2
Rubber beading
For shutter 2x2(0.533+1.229) 7.05
Fixed glazing 2x2(0.533+0.267) 3.20
10.25 Rm
MAIN DATA
12.30 Kg Aluminium Section including anodizing 287.00 Kg 3530.10
1.90 M2 4mm thick Glass required 298.00 M2 566.20
10.25 Rm Rubber beading 28.40 Rm 291.10
1.92 M2 Labour Charges 478.00 M2 917.76
4.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 199.20
2.00 Nos Alu. Handle 100mm long 30.90 Each 61.80
4.00 Nos Special Hinges 100x30 62.90 Each 251.60
LS Sundries for T.W.plugs screws dismantling Redoing to good condition including 140.00
Power supply etc.
for 1.92 M2 5957.76
Rate/m2 3103.00
Say Rs. 3103.00 M2
4 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish Two Panels with
fixed glazing ventilator of 0.30m ht at top with alu. Grill of 10 mm thick openable type window in all floors
with aluminium sections of Outer frame: 37.70x33x2mm @ 0.50 kg/m,Centre mullions:59x33x2.50mm @0.936
kg/m,Shutter frame : Z section 24.50x33x3mm @ 0.525kg/m,Aluminium clips:0.109 kg/m and with neccessary
accssories such as rubber beadings, special hinges, handle including supplying and fixing 4mm thick plain glass
including cost of all materials, labours, power consumption required for fabrication, drilling holes in RCC colun
slab, masonry walls sherever necessary with power drills to the required extent and make good to the original
conditons after fixing and also as directed. All the Aluminium sections are to the anodised with matt finish under
electrically controlled conditons in accordance with Is 1868/1962 for an average anodic film thickness of 15 microns
etc.Complete.

Size of window : 1.20x1.60 = 1.92m2


Outer frame
Vertical : 1x2x1.60 = 3.20

Horizontal : 1x2x1.20 = 2.40


=5.60m 5.60Rmx0.50kg/m
5.60x0.50 kg/m 2.80 Kg
Centre mullians: 1x1.225 =1.225 1.225
Fixed Glazing
Vertical : 1x0.267 =0.267 0.267
Horizontal : 1x1.125 =1.125 1.125
2.617 Kg
2.617x0.936 kg/m 2.450 Kg
Shutter :
Vertical : 2x2x1.225 =4.90 4.90
Horizontal : 2x2x0.533 =2.13 2.13
7.03 Rm
7.03Rmx0.525kg/m 3.69 Kg
Aluminium clips =shutter: 2x2x2(0.533+1.225)=14.06Rm
1.53 Kg
x 0.109 Kg/m
Fixed glazing 2x2x2(0.533+0.267)=6.40Rmx0.109 Kg/m 0.70 Kg
Total 11.18 Kg
Add 10% wastage 1.12 Kg
12.30 Kg
4mm thick Plain Glass
For shutter 1x2(0.533x1.225) 1.31 M2
Fixed glazing 1x2(0.533x0.267) 0.28
1.59 M2
Add 20% wastage 0.31 M2
1.90 M2
Rubber beading
` 7.05
Fixed glazing 2x2(0.533+0.267) 3.20
10.25 Rm
Alu.Grill of 10mm thick
For shutter 2x0.5333x1.225 1.31 M2
Fixed grill 2x0.5333x0.267 0.28 M2
1.59 M2
Add 10% wastage 0.16 M2
1.75 M2

MAIN DATA

12.30 Kg Aluminium Section including anodizing 287.00 Kg 3530.10

1.90 M2 4mm thick Glass required 298.00 M2 566.20

10.25 Rm Rubber beading 28.40 Rm 291.10

1.92 M2 Labour Charges 478.00 M2 917.76

4.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 199.20

2.00 Nos Alu. Handle 100mm long 30.90 Each 61.80

4.00 Nos Special Hinges 100x30 62.90 Each 251.60

1.75 M2 Aluminium grill 10mm thick 1835.00 M2 3211.25

Alu.screws dismantling Redoing to good condition


LS 170.00
including Power supply etc.

for 1.92 M2 9199.01

Rate/m2 4791.15

Say Rs. 4791.00 /M2


5 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish Three panels
openable type window wth Aluminium Grill 10 mm thick in all floors with aluminium sections ofOuter frame:
37.70x33x2mm @ 0.50 kg/m, Centre mullions:59x33x2.50mm @0.936 kg/m,Shutter frame : Z section
24.50x33x3mm @ 0.525kg/m,Aluminium clips:0.109 kg/m with neccessary accssories such as rubber beadings,
special hinges, handle including supplying and fixing 4mm thick plain glass including cost of all materials, labours,
power consumption required for fabrication, drilling holes in RCC column slab, masonry walls wherever necessary
with power drills to the required extent and make good to the original conditons after fixing and also as directed. All
the Aluminium sections are to the anodised with matt finish under electrically controlled conditons in accordance
with Is 1868/1962 for an average anodic film thickness of 15 microns etc.Complete.

Assume a size 1.50x1.30 m ==1.95 m2

H-section for outer frame 37.70x33x2mm@ 0.50kg/m

Vertical 2x1.30 2.60

Horizontal 2x1.50 3.00

5.60x0.50 2.80 Kg

Centre mullion 59x33x2.50mm @ 0.936kg/m

1x2x1.225 2.45

2.45x0.936kg/m 2.29 Kg

Z-section for shutter :24.5x33x2.50mm@0.525kg/m

Shutter vertical 3x2x1.225 7.35

Horizontal 3x2x0.409 2.45

9.80x0.525 kg/m 5.15 Kg

Aluminium clips required

Shutter 2x3x2 (1.225+0.409) 19.61

19.61x0.109 kg/m 2.14 Kg

Total 12.38 Kg

Add 10% wastage 1.24 Kg

13.62 Kg

4mm thick Glass required

Shutter 1x3x1.225x0.409 1.50

Add 20% wastage 0.30 M2

1.80 M2
Rubber beading

Shutter 2x3(1.225+0.409) 9.80 Rm

Alu.Grill of 10mm thick

For shutter 1x3x1.225x0.409 1.50

Add 10% wastage 0.15 M2

1.65 M2

MAIN DATA

13.62 Kg Aluminium Section including anodizingCharges 287.00 Kg 3908.94

1.80 M2 4mm thick Glass required 298.00 M2 536.40

9.80 Rm Rubber beading 28.40 Rm 278.32

1.95 M2 Labour Charges 478.00 M2 932.10

6.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 298.80

6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40

3.00 Nos Alu. Handle 100mm long 30.90 Each 92.70

1.65 M2 Aluminium grill 10mm thick 1835.00 Each 3027.75

LS Alu. Angles, screws, dismandling and making good 130.00


condition

for 1.95 M2 9582.41

Rate/m2 4914.06

Say Rs. 4914.00 /M2

Without Aluminium Grill

Rate as above : 9582.41

Deduct Alu.Grill 3027.75

for 1.95 M2 6554.66

Rate as above for 1.95 m2 9582.41 /M2

After Deduct Rate for alu.grill for 1.95 m2 -3027.75

Rate Rs. 6554.66 /M2

Rate/m2 3361.36
Say Rs. 3361.00 /M2
6 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish Openable type glass
window (3 leaves) with fixed glazing at top to a height of 0.3m with alminium grill for glazed portion in all
floors having the Aluminium section such as outer frame of section (418/code) of 37.70x33mmx2mm @ 0.50kg/m,
center mullions of (code 9153,2.50mm thick) 59x33x2.5mm @ 0.936kg/m,Z section of having 24.00mm vertical
and width of 33mm @2.50mm thick.Confirming to code No 4152@0.525kg/m Aluminium clips of 3.60 length
having total weight of 0.40kg or 0.109kg/m with neccessary accssories such as rubber beadings, special hinges,
handle including supplying and fixing 4mm thick plain glass including cost of all materials, labours, power
consumption required for fabrication, drilling holes in RCC column slab, masonry walls wherever necessary with
power drills to the required extent and make good to the original conditons after fixing and also as directed. All the
Aluminium sections are to the anodised with matt finish under electrically controlled conditons in accordance with Is
1868/1962 for an average anodic film thickness of 15 microns etc.Complete.

Adopting a window of 1.50x1.30m with 0.3m top glazing.


Area = 1.50x1.60 = 2.40 M2
H- section for outer frame 37.70x33x2mm@0.50kg/m
Vertical 2x1.60 3.20 Rm
Horizontal 2x1.50 3.00 Rm
6.20x0.50 kg/m 3.10 Kg
Centre mullion 59x33x2.50mm @ 0.936kg/m
Shutter 2x1.229 2.458 m
Fixed grill Horizontal 1x1.425 1.425 m
Vertical 2x0.267 0.534 m
4.417x0.936 kg/m 4.13 Kg
Z-section for shutter :24.5x33x2.50mm@0.525kg/m
Shutter vertical 3x2x1.229 7.37
Horizontal 3x2x0.409 2.45
9.82x0.525 kg/m 5.16 Kg
Aluminium clips required
Shutter 2x3x2 (1.229+0.409) 19.66
Fixed grill 2x3x2 (0.409+0.267) 8.11
27.77x0.109 kg/m 3.03 Kg
Total 15.42 Kg
Add 10% wastage 1.54 Kg
16.96 Kg
4mm thick Glass required
Shutter 1x3x1.229x0.409 1.51
Fixed grill 2x3x0.409x0.267 0.33
1.84 M2
Add 20% wastage 0.37 M2
2.21 M2
Rubber beading
Shutter 2x3(1.229+0.409) 9.83
Fixed grill 1x3(0.409+0.267) 4.06
13.89 Rm
Alu.Grill of 10mm thick
For shutter 1x3x1.229x0.409 1.51 M2
Fixed gril 1x3x0.409x0.267 0.33
1.84
Add 10% wastage 0.18 M2
2.02 M2
MAIN DATA
16.96 Kg Aluminium Section including anodizing Charges 287.00 Kg 4867.52

2.20 M2 4mm thick Glass required 298.00 M2 655.60

13.89 Rm Rubber beading 28.40 Rm 394.48

2.40 M2 Labour Charges 478.00 M2 1147.20

6.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 298.80

6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40

3.00 Nos Alu. Handle 100mm long 30.90 Each 92.70

2.02 M2 Aluminium grill 1835.00 M2 3706.70

LS Alu. Angles, screws, dismantling and redoing the same in 150.00


good condition

for 2.40 M2 11690.40

Rate/m2 4871.00

Say Rs. 4871.00 /M2

Without Aluminium Grill

Rate as above : 11690.40

for 2.40 Deduct Alu.Grill -3706.70

for 1 M2 7983.70

Rate/m2 3326.54

Say Rs. 3327.00 /M2


7 Supplying fabricating and fixing in position of Aluminium anodized natural colour matt finish openable type glass
window Four leaves in all floors having the following Aluminium section such as outer frame of section (418/code)
of 37.70x33mmx2mm @ 0.50kg/m, central mullions of (code 9153,2.50mm thick) 59x33x2.5mm @ 0.936kg/m,Z
section of having 21mm 24.50mm vertical and width of 33mm @2.50mm thick.Confirming to code No
4152@0.525kg/m Aluminium clips of 3.60 length having total weight of 0.40kg or 0.109kg/m.with neccessary
accssories such as rubber beadings, special hinges, handle including supplying and fixing 4mm thick plain glass
including cost of all materials, labours, power consumption required for fabrication, drilling holes in RCC column
slab, masonry walls wherever necessary with power drills to the required extent and make good to the original
conditons after fixing and also as directed. All the Aluminium sections are to the anodised with matt finish under
electrically controlled conditons in accordance with Is 1868/1962 for an average anodic film thickness of 15 microns
etc.Complete.

Aluminium glazed openable windows (4 leaves)

Area : 1.80x1.30 =2.34 M2

Outer frame

Vertical 2x1.30 2.60

Horizontal 2x1.80 3.60

6.20x0.50kg/m 3.10 Kg

Centre mullion 59x33x2.50mm @ 0.936kg/m

1x3x1.225 kg/m

3.675x0.936 kg/m 3.44 Kg

Z-section for shutter : 24.50x33x2.50mm @ 0.525kg/m

Shutter vertical 2x4x1.225 9.80

Shutter Horizontal 2x4x0.365 2.92

12.72x0.525 kg/m 6.68 Kg

Aluminium clips required

Shutter 2x4x2(1.225+0.365) 25.44

25.44x0.109 kg/m 2.77 Kg

Total 15.99 Kg

Add 10% wastage 1.60 Kg

17.59 Kg

4mm thick Glass required


Shutter 1x4x1.225x0.365 1.79
Add 20% wastage 0.36
2.15 M2
Rubber beading
Shutter 2x4(1.225+0.365) 12.72 Rm
Alu.Grill of 10mm thick
For shutter 1x4x1.225x0.365 1.79 M2
Add 10% wastage 0.18 M2
1.97 M2
MAIN DATA

17.59 Kg Aluminium Section including anodizing Charges 287.00 Kg 5048.33

2.15 M2 4mm thick Glass required 298.00 M2 640.70

12.72 Rm Rubber beading 28.40 Rm 361.25

2.34 M2 Labour Charges 478.00 M2 1118.52

8.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 398.40

8.00 Nos Alu. Hinges 100x30 62.90 Each 503.20

4.00 Nos Alu. Handle 100mm long 30.90 Each 123.60

1.97 M2 Aluminium grill 10mm 1835.00 M2 3614.95

LS Sundries for T.W.plugs screws dismantling Redoing to good 150.00


condition including Power supply etc.
for 2.34 M2 11958.95

Rate/m2 5110.66

Say Rs. 5111.00 M2

Without Aluminium Grill

Rate as above : 11958.95

for 2.34 M2 Deduct Alu.Grill -3614.95

for 1 M2 8344.00

Rate/m2 3565.81

Say Rs. 3566.00 /M2


8 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish Openable type
glass window with fixed glazing at top to a height of 0.3m (4 leaves) Aluminium grill of 10mm thick for
glazed portion in all floors having the following Aluminium section such as outer frame of section (418/code)
of 37.70x33mmx2mm @ 0.50kg/m, central mullions of (code 9153,2.50mm thick) 59x33x2.5mm @
0.936kg/m,Z section of having 21mm 24.50mm vertical and width of 33mm @2.50mm thick.Confirming to
code No 4152@0.525kg/m Aluminium clips of 3.60 length having total weight of 0.40kg or 0.109kg/m with
neccessary accssories such as rubber beadings, special hinges, handle including supplying and fixing 4mm
thick plain glass including cost of all materials, labours, power consumption required for fabrication, drilling
holes in RCC column slab, masonry walls wherever necessary with power drills to the required extent and
make good to the original conditons after fixing and also as directed. All the Aluminium sections are to the
anodised with matt finish under electrically controlled conditons in accordance with Is 1868/1962 for an
average anodic film thickness of 15 microns etc.Complete. and Aluminium grilll of 10mm thick for glazed
portion to be used.

Aluminium glazed openable windows (4 leaves) withTop fixed


glazing 0.30 m height with Aluminium Grill
Area 1.80x1.60 =2.88M2
H- section for outer frame 37.70x33x2mm @
0.50kg/m
Vertical 2x1.60 3.20
Horizontal 2x1.80 3.60
6.80x0.50 kg/m 3.40 kg
Centre mullion 59x33x2.50mm @ 0.936kg/m
Shutter 3x1.229 3.687
Horizontal 1x1.725 1.725
Vertical 3x0.267 0.801
6.213
6.213x0.936 kg/m 5.82 Kg
Z-section for shutter : 21x33x2.50mm @ 0.525kg/m
Shutter vertical 4x2x1.229 9.83
Shutter Horizontal 4x2x0.365 2.92
12.75x0.525 kg/m 6.69 Kg
Aluminium clips required
Shutter 2x4x2(1.229+0.365) 25.50
FG 2x4x2(0.365+0.267) 10.11
35.61 M
35.61x0.109 kg/m 3.88 Kg
Total 19.79 Kg
Add 10% wastage 1.98 Kg
21.77 Kg
4mm thick Glass required
Shutter 1x4x1.229x0.365 1.79
FG 1x4x0.335x0.267 0.39
2.18 M2
Add 20% wastage 0.44 M2
2.62 M2
Rubber beading
Shutter 2x4(1.229+0.365) 12.75
FG 2x4(0.365+0.267) 5.06
17.81 Rm
Alu.Grill of 10mm thick
For shutter 4x1.229x0.365 1.79 M2

Fixed gril 4x0.365x0.267 0.39 M2

2.18 M2

Add 10% wastage 0.22 M2


2.40 M2

MAIN DATA

21.77 Kg Aluminium Section including anodizing 287.00 Kg 6247.99


Charges

2.58 M2 4mm thick Glass required 298.00 M2 768.84

17.81 Rm Rubber beading 28.40 Rm 505.80

2.88 M2 Labour Charges 478.00 M2 1376.64

8.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 398.40

8.00 Nos Alu. Hinges 100x30 62.90 Each 503.20

4.00 Nos Alu. Handle 100mm long 30.90 Each 123.60

2.40 M2 Aluminium grill 1835.00 M2 4404.00

LS Sundries for angle, window saty screws dismantling 170.00


Redoing to good condition including Power supply etc.

for 2.88 M2 14498.47

Rate/m2 5034.19

Say Rs. 5034.00 M2

Without Aluminium Grill

Rate as above : 14498.47

Deduct Alu.Grill -4404.00

for 2.88 M2 10094.47

Rate Rs. 3505.03 /M2

Say Rs. 3505.00 /M2


9 Fabricating Supplying and fixing inposition Aluminium anodised natural colour matt finish Two track sliding hatch
window in all floors with Alu. Section of Outer Vertical frame : 62x31.50x1.50mm @0.875 kg/m,Outer top &
bottom gutter frame: 61.98 x 39.30 x 1.50mm @ 0.778kg/m,shutter vertical: 36.60x18x1.50mm@ 0.439kg/m,
Shutter horizontal: 39x20x1.50mm@0.493kg/m with necessary accessories such as Lock, handle, wheel
arrangements including supplying and fixing 8mm thick both side prelaminated partical board including cost of all
materials, labours, power consumption required for fabrication, drilling holes in RCC column slab, masonry walls
wherever necessary with power drills to the required extent and make good to the original condition after fixing and
also as directed. All the Aluminium sections are to be anodised with matt finishunder electrically controlled
condtions in accordancewith IS 1868/1962 for an average anodic film thickness of 15 microns etc. complete.

Assume a size 0.90mmx0.70m=0.63M2


Outer Vertical: 1x2x0.70 = 1.40mx0.875 kg/m 1.23 Kg
Outer horizontal:1x2x0.90 = 1.80x0.778kg/m 1.40 Kg
shutter vertical: 2x2x0.622 = 2.488m x 0.439 1.09 Kg
Shutter horizontal:2x2x0.419=1.676x0.493 0.83 Kg

4.55 Kg
Wastage @ 10% 0.46 Kg
5.01 Kg
8mm thick PLB = (0.419x0.622)x2 0.52 M2
Wastage @ 10% 0.05 M2
0.57 M2
Main Data
5.01 Kgs Alu. Section 287.00 1 kgs 1437.87

0.57 M2 12mm thick PLB. 1020.00 1 M2 581.40

4.00 Nos Roller 13.75 1 No 55.00

2.00 Nos Handle 100 mm long 30.90 1 No 61.80

1.00 No Lock 62.80 1 No 62.80

0.63 M2 Labour charges 478.00 1 M2 301.14

LS For angles, screw, power supply,dismantling & dadooing. LS 96.00

For Rs.0.63 M2 2596.01

Rate Rs. 4120.65 /1 M2

Say Rs. 4121.00 /1 M2


10 Supplying , fabricating and fixing in position Aluminium Anodised natural colour mat finish Two track
sliding window in all floors with Aluminium sections of outer Frame bottom 62x37mmx1.50mm at 1.218
kg/m,the Side & Top 62x31.50x1.50mm at 0.778 kg/m,Shutter Top 40x18x1.5 at 0.38 kg/m,Bottom
40x18x1.5 at 0.38kg/m, Side Vertical 40x18x1.50mm at 0.493 kg/m, Vertical locking section 40x29x1.5mm at
0.632 kg/m, with necessary accessories such as rubber beadings, special hinges, lock, handle including
supplying and fixing 4mm thick plain glass including cost of all materials , labours, power consumption
required for fabrication , drilling holes in RCC colunm, slab, masonry walls wherever necessary with power
drills to the required extent and make good to the original condition after fixing and also as directed.The
aluminium sections are to be anodised with matt finish under electrically controlled in accordance with IS
1868 / 1962 for an average anodic film thickness 15 microns etc., complete.

Two track sliding window


Assume a size window size 1.0x1.3 =1.30M2
Materials required
Frame bottom track 1.0x1.218 Kg/m 1.22 Kg
Top track 1.0x0.778 Kg/m 0.78 Kg
sides 2x1.3x0.778 Kg/m 2.02 Kg
Shutter bottom 1x2x0.48x0.38 Kg/m 0.365 Kg
Shutter top 1x2x0.48x0.38 Kg/m 0.365 Kg
Sides 2x2x1.264x0.493 Kg/m 2.493 Kg
Locking Section 2x1.264x0.632 Kg/m 1.60 Kg
8.84 Kg
Add 10% wastage 0.88
9.72 Kg
Rubber beading 2x2(0.48+1.264) 6.98 Rm
4 mm thick glass
Shutter : 1x2x0.48x1.264 1.21
Add 20% wastage 0.24
1.45 M2
MAIN DATA
9.72 Kg Cost of Alu, Section including anodised 287.00 Kg 2789.64
6.98 Rm Rubber Beading 28.40 Rm 198.23
1.45 M2 Glass 4mm thick plain 298.00 M2 432.10
1.30 M2 Labour charges 478.00 M2 621.40
4 Nos. Roller 13.75 No. 55.00
1 No. Lock 62.80 No. 62.80
2 Nos. Handle 100 mm long 30.90 No. 61.80
LS Sundries for angels, screws, power charges, LS 90.00
dismantling and redoing etc.
for 1.30 M2 4310.97
Rate/m2 3316.13 /M2
Say Rs. 3316.00 /M2
11 Supplying , fabricating and fixing in position Aluminium Anodised natural colour mat finish Three track
sliding window in all floors with Aluminium sections of Outer Frame bottom 92.34x46.00x1.50@1.637
kg/m,Top & vertical 92.34x29.70x1.50 at 1.066 kg/m, Shutter vertical 39x20x1.50 at 0.493 kg/m,Top &
Bottom 18x36.6x1.50 at 0.439 kg/m,Vertical locking arrangement 28.94x39x1.50at0.632 kg/m, the follwing
sizes with necessary accessories such as rubber beadings, special hinges, lock, handle including supplying and
fixing 4mm thick plain glass including cost of all materials , labours, power consumption required for
fabrication , drilling holes in RCC colunm, slab, masonry walls wherever necessary with power drills to the
required extent and make good to the original condition after fixing and also as directed.The aluminium
sections are to be anodised with matt finish under electrically controlled in accordance with IS 1868 / 1962 for
an average anodic film thickness 15 microns etc., complete.

Three track sliding window


Consider a window size 1.5x1.3 = 1.95m2
Material required
Frame Top 1x1.50x1.066kg/m 1.60 Kg
Bottom 1x1.50x1.637kg/m 2.46 Kg
side Vertical 2x1.3x1.066kg/m 2.77 Kg
Shutter Bottom 1x3x0.475x0.439kg/m 0.625 Kg
Shutter top1x3x0.475x0.439kg/m 0.625 Kg
side vertical 2x3x1.264x0.493kg/m 3.74 Kg
Vertical locking section 2x1.264x0.632kg/m 1.60 Kg
Total 13.42 Kg
Add 10% 1.34 Kg
14.76 Kg
Glass Area 1x3x0.475x1.264 1.80
Add 20% wastage 0.36
2.16 M2
Rubber beading 3x2(0.475+1.264) 10.43 Rm

MAIN DATA
14.76 Kg Cost of Alu, Section including anodised 287.00 Kg 4236.12
10.43 Rm Rubber Beading 28.40 Rm 296.21
2.16 M2 Glass 4mm thick plain 298.00 M2 643.68
1.95 M2 Labour charges 478.00 Rm 932.10
6 Nos Roller 13.75 Nos 82.50
2 Nos Lock 62.80 Nos 125.60
3 Nos Handle 100 mm long 30.90 92.70
LS Screws Rayal Plugs and stopper etc. LS 110.00
for 1.95 M2 6518.91
Rate/m2 3343.03 /M2
Say Rs. 3343.00 /M2
12 Supplying , fabricating and fixing in position Aluminium Anodised natural colour mat finish Four track
sliding window in all floors with Aluminium sections of outer frame Bottom Track 92.34x46.00x1.50@1.637
kg/m,Top & vertical 92.34x29.70x1.50 at 1.066 kg/m,and Shutter Vertical 39x20x1.50 at 0.493 kg/m,
Top&Bottom 18x36.6x1.50at0.439 kg/m, Vertical locking arrangement 28.94x39x1.50at0.632 kg/m with
necessary accessories such as rubber beadings, special hinges, lock, handle including supplying and fixing
4mm thick plain glass including cost of all materials , labours, power consumption required for fabrication ,
drilling holes in RCC colunm, slab, masonry walls wherever necessary with power drills to the required extent
and make good to the original condition after fixing and also as directed.The aluminium sections are to be
anodised with matt finish under electrically controlled in accordance with IS 1868 / 1962 for an average
anodic film thickness 15 microns etc., complete.

Four track sliding window


Consider a window size 1.80x1.3 m = 2.34 m2
Material required
Frame Top 1x1.80x1.066 kg/m 1.92 Kg
Bottom 1x1.80x1.637 kg/m 2.95 Kg
Vertical 1x2x1.30x1.066 kg/m 2.77 Kg
Shutter Bottom 1x4x0.431x0.439 kg/m 0.76 Kg
Shutter top1x4x0.431x0.439 kg/m 0.76 Kg
Side vertical 2x4x1.264x0.493 kg/m 4.98 Kg
Vertical locking section 2x1.264x0.632 kg/m 1.60 Kg
Total 15.74 Kg
Add 10% 1.57 Kg
17.31 Kg
Glass Area 1x4x0.431x1.264 2.18
Add 20% wastage 0.44
2.62 M2
Rubber beading 4x2(0.431+1.264) 13.56 Rm
MAIN DATA
17.31 Kg Cost of Alu, Section including anodised 287.00 Kg 4967.97
13.56 Rm Rubber Beading 28.40 Rm 385.10
2.62 M2 Glass 4mm thick plain 298.00 M2 780.76
2.34 M2 Labour charges 478.00 M2 1118.52
8 Nos Roller 13.75 No. 110.00
3 Nos Lock 62.80 No. 188.40
4 Nos Handle 100 mm long 30.90 No. 123.60
LS Screws Rayal Plugs and stopper etc. LS 130.00
for 2.34 M2 7804.35
Rate/m2 3335.19 /M2

Say Rs. 3335.00 /M2


1 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish 1/3rd fixed
glazing 2/3rd prelaminated board of Aluminium partition. The outer frames Outer frame:
63.50x38x3mm@ 1.72 kg/m,Centre mullions: 63.50x38x3mm@ 1.55 kg/m,Alu. Clips: 17.27x17.15x1.50mm
@ 0.175kg/mg/m for intermediate vertical mullion 90cm c/c. Horizontal mullion at 1.00m 2.10m covered with
5.5mm thick plain glass with neccessary aluminium clips of size 17.27x17.15 x1.50mm @ 0.176kg/m and
with required rubber beading etc., including necessary dismantling holes in RCC column,masonry wherever
in necessary with power drills to the extent required and made good the damaged portion in good condition
after fixing as directed by the departmental officers. All the aluminium sections should be anodised not less
than 15 microns as ISI specification1868/1962 / and should be gotapproved by Executive Engineer before
use.

Size of Partition : 3.50 x 2.88 = 10.08m2


Outer frame :
Vertical 2x2.88 5.76
Horizontal =2x3.50 7.00
12.76 Rm
12.76x1.72 kg/m 21.95 kg
Inner frame 63.50x38x3mm @ 1.55 kg/m
Intermediate section Vertical: 3x2.804 8.41
Intermediate section Horizontal : 2x3.31 6.62
15.03 Rm
15.03x1.55 kg/m 23.30 kg
clips : @ 1m ht:4x2x2(0.83+0.943) 28.37
2.1m ht:4x2x2(0.83+1.062) 30.270
2.88m ht:4x2x2(0.83+0.723) 24.85
83.49 Rm
83.49x0.175 kg/m 14.61 kg
Total Aluminium section 59.86 kg
Add 10% wastage 5.99 kg
65.85 kg
Rubber beading
4x2(0.83+0.723) 12.42 Rm
Glass 5.5mm thick
1/3rd portion at top : 4x0.83x0.723 2.40
Add 20% wastage 0.48
2.88 M2
Prelaminated board
2/3rd portion bottom 4x0.83x0.943 3.13 M2
2/3rd portion bottom 4x0.83x1.062 3.53 M2
6.66 M2
Add 10% wastage 0.67 kg
7.33
Main Data
65.85 Kgs Alu. Section 287.00 1 kgs 18898.95
2.88 M2 5.5mm thick plain glass. 352.00 1 M2 1013.76
12.42 Rm Rubber beading 37.25 1 Rm 462.65
7.33 M2 Prelaminated board 12mm 1020.00 1 No 7476.60
10.08 M2 Labour charges 478.00 1 M2 4818.24
LS For angles, screw, power supply, LS 150.00
dismantling & dadooing.
For Rs.10.08 M2 32820.20
Rate Rs. 3255.97 /1 M2
Say Rate 3256.00 /1 M2
2 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish 1/3rd fixed
glazing 2/3rd prelaminated board of Aluminium partition of size 2.70 mx 2.10 m.The outer frames
Outer frame: 63.50x38x3mm@ 1.72 kg/m,Centre mullions: 63.50x38x3mm@ 1.55 kg/m,Alu. Clips:
17.27x17.15x1.50mm @ 0.175kg/mg/m for intermediate vertical mullion 90cm c/c. Horizontal mullion at
1.00m 2.10m covered with 4 mm thick plain glass with neccessary aluminium clips of size 17.27x17.15
x1.50mm @ 0.176kg/m and with required rubber beading etc., including necessary dismantling holes in RCC
column,masonry wherever in necessary with power drills to the extent required and made good the damaged
portion in good condition after fixing as directed by the departmental officers. All the aluminium sections
should be anodised not less than 15 microns as ISI specification1868/1962 / and should be gotapproved by
Executive Engineer before use.

Size of Partition : 2.70mx2.10m = 5.67 m2


Outer frame :
Vertical = 1x 2x2.10 4.20
Horizontal = 1x2x2.624 5.25
9.45 Rm
9.45x1.72 kg/m 16.25 kg
Inner frame : 63.50 x 38 x 3mm @ 1.55 kg/m
Intermediate mullion Vertical : 1x2x2.024 4.05
Intermediate mullion Horizontal : 1x1x2.624 2.62
6.67 Rm
6.67x1.55 kg/m 10.34 kg
clips : 17.15x17.27x1.40@0.175 kg/m
2x2x(2.624+0.643) x 0.175 2.287
Total Aluminium section 28.88 kg
Add 10% wastage 2.89 kg
31.76 kg
Rubber beading
2x3(0.85+0.643) 8.96 Rm
Glass 5.5mm thick
1/3rd portion at top : 1x3x0.85x0.643 1.64
Add 20% wastage 0.33
1.97 m2
Prelaminated board
2/3rd portion bottom :1x3x0.85x1.343 3.42 M2
Add 10% wastage 0.34
3.77 M2
Main Data
31.76 Kgs Alu. Section 287.00 1 kgs 9115.12
1.97 M2 5.5mm thick plain glass. 352.00 1 M2 693.44
8.96 Rm Rubber beading 37.25 1 Rm 333.76
3.77 M2 Prelaminated board 12mm 1020.00 1 No 3845.40
5.67 M2 Labour charges 478.00 1 M2 2710.26
LS For angles, screw, power supply, LS 96.00
dismantling & dadooing.
For 5.67 M2 16793.98
Rate Rs. 2961.90 /1 M2
Say Rate 2962.00 /1 M2
6 Supplying , fabricating and fixing in position Aluminium Anodised natural colour mat finish Two track
sliding window in all floors with Aluminium sections of outer Frame bottom 62x37mmx1.50mm at 1.218
kg/m,the Side & Top 62x31.50x1.50mm at 0.778 kg/m,Shutter Top 40x18x1.5 at 0.38 kg/m,Bottom
40x18x1.5 at 0.38kg/m, Side Vertical 40x18x1.50mm at 0.493 kg/m, Vertical locking section 40x29x1.5mm at
0.632 kg/m, with necessary accessories such as rubber beadings, special hinges, lock, handle including
supplying and fixing 4mm thick plain glass including cost of all materials , labours, power consumption
required for fabrication , drilling holes in RCC colunm, slab, masonry walls wherever necessary with power
drills to the required extent and make good to the original condition after fixing and also as directed.The
aluminium sections are to be anodised with matt finish under electrically controlled in accordance with IS
1868 / 1962 for an average anodic film thickness 15 microns etc., complete.

Two track sliding window


Assume a size window size 1.0x1.3 =1.30M2
Materials required
Frame bottom track 1.0x1.218 Kg/m 1.22 Kg
Top track 1.0x0.778 Kg/m 0.78 Kg
sides 2x1.3x0.778 Kg/m 2.02 Kg
Shutter bottom 1x2x0.48x0.38 Kg/m 0.365 Kg
Shutter top 1x2x0.48x0.38 Kg/m 0.365 Kg
Sides 2x2x1.264x0.493 Kg/m 2.493 Kg
Locking Section 2x1.264x0.632 Kg/m 1.60 Kg
8.84 Kg
Add 10% wastage 0.88
9.72 Kg
Rubber beading 2x2(0.48+1.264) 6.98 Rm
4 mm thick glass
Shutter : 1x2x0.48x1.264 1.21
Add 20% wastage 0.24
1.45 M2
MAIN DATA
9.72 Kg Cost of Alu, Section including anodised 287.00 Kg 2789.64
6.98 Rm Rubber Beading 28.40 Rm 198.23
1.45 M2 Glass 4mm thick plain 298.00 M2 432.10
1.30 M2 Labour charges 478.00 M2 621.40
4 Nos. Roller 13.75 No. 55.00
1 No. Lock 62.80 No. 62.80
2 Nos. Handle 100 mm long 30.90 No. 61.80
LS Sundries for angels, screws, power charges, LS 90.00
dismantling and redoing etc.
for 1.30 M2 4310.97
Rate/m2 3316.13 /M2
Say Rs. 3316.00 /M2
7 Supplying , fabricating and fixing in position Aluminium Anodised natural colour mat finish Three track
sliding window in all floors with Aluminium sections of Outer Frame bottom 92.34x46.00x1.50@1.637
kg/m,Top & vertical 92.34x29.70x1.50 at 1.066 kg/m, Shutter vertical 39x20x1.50 at 0.493 kg/m,Top &
Bottom 18x36.6x1.50 at 0.439 kg/m,Vertical locking arrangement 28.94x39x1.50at0.632 kg/m, the follwing
sizes with necessary accessories such as rubber beadings, special hinges, lock, handle including supplying and
fixing 4mm thick plain glass including cost of all materials , labours, power consumption required for
fabrication , drilling holes in RCC colunm, slab, masonry walls wherever necessary with power drills to the
required extent and make good to the original condition after fixing and also as directed.The aluminium
sections are to be anodised with matt finish under electrically controlled in accordance with IS 1868 / 1962 for
an average anodic film thickness 15 microns etc., complete.

Three track sliding window


Consider a window size 1.5x1.3 = 1.95m2
Material required
Frame Top 1x1.50x1.066kg/m 1.60 Kg
Bottom 1x1.50x1.637kg/m 2.46 Kg
side Vertical 2x1.3x1.066kg/m 2.77 Kg
Shutter Bottom 1x3x0.475x0.439kg/m 0.625 Kg
Shutter top1x3x0.475x0.439kg/m 0.625 Kg
side vertical 2x3x1.264x0.493kg/m 3.74 Kg
Vertical locking section 2x1.264x0.632kg/m 1.60 Kg
Total 13.42 Kg
Add 10% 1.34 Kg
14.76 Kg
Glass Area 1x3x0.475x1.264 1.80
Add 20% wastage 0.36
2.16 M2
Rubber beading 3x2(0.475+1.264) 10.43 Rm

MAIN DATA
14.76 Kg Cost of Alu, Section including anodised 287.00 Kg 4236.12
10.43 Rm Rubber Beading 28.40 Rm 296.21
2.16 M2 Glass 4mm thick plain 298.00 M2 643.68
1.95 M2 Labour charges 478.00 Rm 932.10
6 Nos Roller 13.75 Nos 82.50
2 Nos Lock 62.80 Nos 125.60
3 Nos Handle 100 mm long 30.90 Nos 92.70
LS Screws Rayal Plugs and stopper etc. LS 110.00
for 1.95 M2 6518.91
Rate/m2 3343.03 /M2
Say Rs. 3343.00 /M2
8 Supplying , fabricating and fixing in position Aluminium Anodised natural colour mat finish Four track
sliding window in all floors with Aluminium sections of outer frame Bottom Track 92.34x46.00x1.50@1.637
kg/m,Top & vertical 92.34x29.70x1.50 at 1.066 kg/m,and Shutter Vertical 39x20x1.50 at 0.493 kg/m,
Top&Bottom 18x36.6x1.50at0.439 kg/m, Vertical locking arrangement 28.94x39x1.50at0.632 kg/m with
necessary accessories such as rubber beadings, special hinges, lock, handle including supplying and fixing
4mm thick plain glass including cost of all materials , labours, power consumption required for fabrication ,
drilling holes in RCC colunm, slab, masonry walls wherever necessary with power drills to the required extent
and make good to the original condition after fixing and also as directed.The aluminium sections are to be
anodised with matt finish under electrically controlled in accordance with IS 1868 / 1962 for an average
anodic film thickness 15 microns etc., complete.

Four track sliding window


Consider a window size 1.80x1.3 m = 2.34 m2
Material required
Frame Top 1x1.80x1.066 kg/m 1.92 Kg
Bottom 1x1.80x1.637 kg/m 2.95 Kg
Vertical 1x2x1.30x1.066 kg/m 2.77 Kg
Shutter Bottom 1x4x0.431x0.439 kg/m 0.76 Kg
Shutter top1x4x0.431x0.439 kg/m 0.76 Kg
Side vertical 2x4x1.264x0.493 kg/m 4.98 Kg
Vertical locking section 2x1.264x0.632 kg/m 1.60 Kg
Total 15.74 Kg
Add 10% 1.57 Kg
17.31 Kg
Glass Area 1x4x0.431x1.264 2.18
Add 20% wastage 0.44
2.62 M2
Rubber beading 4x2(0.431+1.264) 13.56 Rm
MAIN DATA
17.31 Kg Cost of Alu, Section including anodised 287.00 Kg 4967.97
13.56 Rm Rubber Beading 28.40 Rm 385.10
2.62 M2 Glass 4mm thick plain 298.00 M2 780.76
2.34 M2 Labour charges 478.00 M2 1118.52
8 Nos Roller 13.75 No. 110.00
3 Nos Lock 62.80 No. 188.40
4 Nos Handle 100 mm long 30.90 No. 123.60
LS Screws Rayal Plugs and stopper etc. LS 130.00
for 2.34 M2 7804.35
Rate/m2 3335.19 /M2
Say Rs. 3335.00 /M2
9 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish openable type
window Three Panels with fixed glazing ventilator of 0.30m ht at top with aluminium grill 10 mm thickin all
floors with aluminium sections of Outer frame: 37.70x33x2mm @ 0.50 kg/m,Centre mullians: 59x33x2.50mm @
0.936 kg/m,Shutter frame :Z section 24.50x33x3mm@0.525kg/m,Aluminium clips : 0.109 kg/m with neccessary
accssories such as rubber beadings, special hinges, handle including supplying and fixing 4mm thick plain glass
including cost of all materials, labours, power consumption required for fabrication, drilling holes in RCC colun
slab, masonry walls sherever necessary with power drills to the required extent and make good to the original
conditons after fixing and also as directed. All the Aluminium sections are to the anodised with matt finish under
electrically controlled conditons in accordance with Is 1868/1962 for an average anodic film thickness of 15 microns
etc. complete.

Assume a size : 1.50x1.60 = 2.40 M2


H- section for outer frame 37.70x33x2mm@0.50kg/m
Vertical 2x1.60 3.20 Rm
Horizontal 2x1.50 3.00 Rm
6.20x0.50 kg/m 3.10 Kg
Centre mullion 59x33x2.50mm @ 0.936kg/m
Shutter 2x1.225 2.450 m
Fixed grill Horizontal 1x1.425 1.425 m
Vertical 2x0.267 0.534 m
4.409 m
4.409 x 0.936 kg/m 4.13 Kg
Z-section for shutter :24.5x33x2.50mm@0.525kg/m
Shutter vertical 3x2x1.225 7.35
Horizontal 3x2x0.409 2.46
9.81
9.81x0.525 kg/m 5.16 Kg
Aluminium clips required
Shutter 2x3x2 (1.225+0.409) 19.61
Fixed grill 2x3x2 (0.409+0.267) 8.11
27.72
27.72x0.109 kg/m 3.03 Kg
Total 15.42 Kg
Add 10% wastage 1.54 Kg
16.96 Kg
4mm thick Glass required
Shutter 1x3x1.225x0.409 1.51
Fixed grill 2x3x0.409x0.267 0.33
1.84 M2
Add 20% wastage 0.37 M2
2.21 M2
Rubber beading
Shutter 2x3(1.225+0.409) 9.83
Fixed grill 1x3(0.409+0.267) 4.06
13.89 Rm
Alu.Grill of 10mm thick
For shutter 1x3x1.225x0.409 1.51 M2
Fixed gril 1x3x0.409x0.267 0.33
1.84
Add 10% wastage 0.18 M2
2.02 M2
MAIN DATA
16.96 Kg Aluminium Section including anodizing Charges 287.00 Kg 4867.52

2.20 M2 4mm thick Glass required 298.00 M2 655.60

13.89 Rm Rubber beading 28.40 Rm 394.48

2.40 M2 Labour Charges 478.00 M2 1147.20

6.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 298.80

6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40

3.00 Nos Alu. Handle 100mm long 30.90 Each 92.70

2.02 M2 Aluminium grill 10mm thick 1835.00 M2 3706.70

LS Angles, screws dismantling Redoing to good condition 150.00


including Power supply etc.

for 2.40 M2 11690.40

Rate/m2 4871.00

Say Rs. 4871.00 /M2

Without Aluminium Grill

Rate as above : 11690.40

Deduct Alu.Grill 3706.70

for 2.40 M2 7983.70

Rate Rs. 3326.54 /M2

Say Rs. /M2

Rate as above : 11690.40

Deduct Alu.Grill -3706.70

For 2.40 m2 7983.70

For 1 m2 3326.54

Rate/m2 3327.00
10 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish Three panels
openable type window wth Aluminium Grill 10 mm thick in all floors with aluminium sections ofOuter frame:
37.70x33x2mm @ 0.50 kg/m, Centre mullions:59x33x2.50mm @0.936 kg/m,Shutter frame : Z section
24.50x33x3mm @ 0.525kg/m,Aluminium clips:0.109 kg/m with neccessary accssories such as rubber beadings,
special hinges, handle including supplying and fixing 4mm thick plain glass including cost of all materials, labours,
power consumption required for fabrication, drilling holes in RCC column slab, masonry walls wherever necessary
with power drills to the required extent and make good to the original conditons after fixing and also as directed. All
the Aluminium sections are to the anodised with matt finish under electrically controlled conditons in accordance
with Is 1868/1962 for an average anodic film thickness of 15 microns etc.Complete.

Assume a size 1.50x1.30 m ==1.95 m2


H-section for outer frame 37.70x33x2mm@ 0.50kg/m

Vertical 2x1.30 2.60

Horizontal 2x1.50 3.00

5.60x0.50 2.80 Kg

Centre mullion 59x33x2.50mm @ 0.936kg/m

1x2x1.225 2.45

2.45x0.936kg/m 2.29 Kg

Z-section for shutter :24.5x33x2.50mm@0.525kg/m

Shutter vertical 3x2x1.225 7.35

Horizontal 3x2x0.409 2.45

9.80x0.525 kg/m 5.15 Kg

Aluminium clips required

Shutter 2x3x2 (1.225+0.409) 19.61

19.61x0.109 kg/m 2.14 Kg

Total 12.38 Kg

Add 10% wastage 1.24 Kg

13.62 Kg

4mm thick Glass required

Shutter 1x3x1.225x0.409 1.50

Add 20% wastage 0.30 M2

1.80 M2
Rubber beading

Shutter 2x3(1.225+0.409) 9.80 Rm

Alu.Grill of 10mm thick

For shutter 1x3x1.225x0.409 1.50

Add 10% wastage 0.15 M2

1.65 M2

MAIN DATA

13.62 Kg Aluminium Section including anodizingCharges 287.00 Kg 3908.94

1.80 M2 4mm thick Glass required 298.00 M2 536.40

9.80 Rm Rubber beading 28.40 Rm 278.32

1.95 M2 Labour Charges 478.00 M2 932.10

6.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 298.80

6.00 Nos Alu. Hinges 100x30 62.90 Each 377.40

3.00 Nos Alu. Handle 100mm long 30.90 Each 92.70

1.65 M2 Aluminium grill 10mm thick 1835.00 Each 3027.75

LS Alu. Angles, screws, dismandling and making good 130.00


condition
for 1.95 M2 9582.41
Rate/m2 4914.06
Say Rs. 4914.00 /M2
Without Aluminium Grill
Rate as above for 1.95 m2 9582.41 /M2
After Deduct Rate for alu.grill for 1.95 m2 -3027.75 3085.50
Rate Rs. 6554.66 /M2 6062.84
Rate/m2 3361.36
Say Rs. 3361.00 M2
11 Fabricating Supplying and fixing in position of Aluminium anodized natural colour matt finish openable type
glass window Four leaves with fixed glazing at top to a height of 0.3m in all floors having the following
Aluminium section such as outer frame of section (418/code) of 37.70x33mmx2mm @ 0.50kg/m, central
mullions of (code 9153,2.50mm thick) 59x33x2.5mm @ 0.936kg/m,Z section of having 21mm 24.50mm
vertical and width of 33mm @2.50mm thick.Confirming to code No 4152@0.525kg/m Aluminium clips of
3.60 length having total weight of 0.40kg or 0.109kg/m and Aluminium grilll of 10mm thick for glazed
portion to be used.with neccessary accssories such as rubber beadings, special hinges, handle including
supplying and fixing 4mm thick plain glass including cost of all materials, labours, power consumption
required for fabrication, drilling holes in RCC column slab, masonry walls wherever necessary with power
drills to the required extent and make good to the original conditons after fixing and also as directed. All the
Aluminium sections are to the anodised with matt finish under electrically controlled conditons in accordance
with Is 1868/1962 for an average anodic film thickness of 15 microns etc.Complete.

Adopting a window size 1.80x1.30m


Top fixed glazing 1.80x0.30m with Aluminium Grill
Area 1.80x1.60 =2.88M2

H- section for outer frame 37.70x33x2mm @ 0.50kg/m

Vertical 2x1.60 3.20

Horizontal 2x1.80 3.60

6.80

6.80x0.50 kg/m 3.40 kg

Centre mullion 59x33x2.50mm @ 0.936kg/m

Shutter 3x1.225 3.687

Horizontal 1x1.725 1.725

Vertical 3x0.267 0.801

6.213

6.213x0.936 kg/m 5.82 Kg

Z-section for shutter : 21x33x2.50mm @ 0.525kg/m

Shutter vertical 4x2x1.225 9.83

Shutter Horizontal 4x2x0.365 2.92

12.75

12.75x0.525 kg/m 6.69 Kg


Aluminium clips required

Shutter 2x4x2(1.225+0.365) 25.50

FG 2x4x2(0.365+0.267) 10.11

35.61 M

35.61x0.109 kg/m 3.88 Kg

Total 19.79 Kg

Add 10% wastage 1.98 Kg


21.77 Kg
4mm thick Glass required

Shutter 1x4x1.225x0.365 1.79

FG 1x4x0.335x0.267 0.39

2.18 M2

Add 20% wastage 0.44 M2

2.62 M2
Rubber beading
Shutter 2x4(1.225+0.365) 12.75
FG 2x4(0.365+0.267) 5.06
17.81 Rm
Alu.Grill of 10mm thick
For shutter : 4x1.225x0.365 1.79 M2
Fixed grill : 4x0.365x0.267 0.39 M2
2.18 M2
Add 10% wastage 0.22 M2
2.40 M2
MAIN DATA

21.77 Kg Aluminium Section including anodizing 287.00 Kg 6247.99


Charges
2.58 M2 4mm thick Glass required 298.00 M2 768.84

17.81 Rm Rubber beading 28.40 Rm 505.80

2.88 M2 Labour Charges 478.00 M2 1376.64

8.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 398.40

8.00 Nos Alu. Hinges 100x30 62.90 Each 503.20

4.00 Nos Alu. Handle 100mm long 30.90 Each 123.60

2.40 M2 Aluminium grill 1835.00 M2 4404.00

LS Sundries for angle, window saty screws dismantling 170.00


Redoing to good condition including Power supply etc.

for 2.88 M2 14498.47

Rate/m2 5034.19

Say Rs. 5034.00 M2

Without Aluminium Grill : 10094.47

Rate/m2 3505.03
Say Rs. 3505.00 /M2
12 Supplying fabricating and fixing in position of Aluminium anodized natural colour matt finish openable
type glass window Four leaves in all floors having the following Aluminium section such as outer
frame of section (418/code) of 37.70x33mmx2mm @ 0.50kg/m, central mullions of (code 9153,2.50mm
thick) 59x33x2.5mm @ 0.936kg/m,Z section of having 21mm 24.50mm vertical and width of 33mm
@2.50mm thick.Confirming to code No 4152@0.525kg/m Aluminium clips of 3.60 length having total
weight of 0.40kg or 0.109kg/m.with neccessary accssories such as rubber beadings, special hinges,
handle including supplying and fixing 4mm thick plain glass including cost of all materials, labours,
power consumption required for fabrication, drilling holes in RCC column slab, masonry walls wherever
necessary with power drills to the required extent and make good to the original conditons after fixing
and also as directed. All the Aluminium sections are to the anodised with matt finish under electrically
controlled conditons in accordance with Is 1868/1962 for an average anodic film thickness of 15 microns
etc.Complete.

Aluminium glazed openable windows (4 leaves)

Area : 1.80x1.30 =2.34 M2

Outer frame

Vertical 2x1.30 2.60

Horizontal 2x1.80 3.60

6.20x0.50kg/m 3.10 Kg

Centre mullion 59x33x2.50mm @ 0.936kg/m


1x3x1.225 kg/m

3.675x0.936 kg/m 3.44 Kg

Z-section for shutter : 24.50x33x2.50mm @


0.525kg/m
Shutter vertical 2x4x1.225 9.80

Shutter Horizontal 2x4x0.365 2.92

12.72x0.525 kg/m 6.68 Kg

Aluminium clips required

Shutter 2x4x2(1.225+0.365) 25.44

25.44x0.109 kg/m 2.77 Kg

Total 15.99 Kg

Add 10% wastage 1.60 Kg

17.59 Kg

4mm thick Glass required

Shutter 1x4x1.225x0.365 1.79


Add 20% wastage 0.36

2.15 M2

Rubber beading

Shutter 2x4(1.225+0.365) 12.72 Rm

Alu.Grill of 10mm thick

For shutter 1x4x1.225x0.365 1.79 M2

Add 10% wastage 0.18 M2

1.97 M2

MAIN DATA
17.59 Kg Aluminium Section including anodizing Charges 287.00 Kg 5048.33

2.15 M2 4mm thick Glass required 298.00 M2 640.70

12.72 Rm Rubber beading 28.40 Rm 361.25

2.34 M2 Labour Charges 478.00 M2 1118.52

8.00 Nos Alu. Tower Bolt 100mmx10mm 49.80 Each 398.40

8.00 Nos Alu. Hinges 100x30 62.90 Each 503.20

4.00 Nos Alu. Handle 100mm long 30.90 Each 123.60

1.97 M2 Aluminium grill 10mm 1835.00 M2 3614.95

LS Sundries for T.W.plugs screws dismantling Redoing 150.00


to good condition including Power supply etc.

for 2.34 M2 11958.95

Rate/m2 5110.66

Say Rs. 5111.00 M2

Without Aluminium Grill

Rate as above : 11958.95

for 2.34 M2 Deduct Alu.Grill -3614.95

for 1 M2 8344.00

Rate/m2 3565.81
Say Rs. 3566.00 /1 M2

ALUMINIUM VENTILATOR

1 Supplying, fabricating and fixing inposition Aluminium anodised natural colour matt finish louvered
ventilator size 600mm x 600 mmof with outer frame section with 62x38x2mm at 1.174 kg/m and the
louvered with moving arrangements made with aluminium channel of size 60x30x4mm @ 1.274 kg/m
ALuminium clips 19.05x17.27/ 11.05x0.075mm @ 0.169kg/m with necessary 4mm thick plain glass
panel for louvers including cost of all materials, labour and power required for fabrications, chipping
dismantling making holes in RCC, masonry and made good to the original condition after fixing etc.,
complete. The Aluminium surface is to be anodised with matt finish under electrically controlled
condition in accordance with ISI specification 1868/1962 for anodic film thickness of notless than 15
Microns,etc., complete.

Assume a size 600 x 600 mm=0.36M2


outer frame
vertical 1 x 2 x 0.60 = 1.20 M2
Horizontal 1x2x0.5240 = 1.048 M2
2.248 M2x1.174 kg/m2 2.64 Kg
Louvered section
vertical 1x2x0.524 = 1.05M2 X1.274 Kg/m 1.34 Kg
Clips:

1x2x 0.524 =1.05 m


1.05 x 0.169kg/m 0.18 kg
4.160 kg
Wastage at 10% 0.416
Total 4.576 kg
4mm thick plain glass.
0.524x0.524 0.27 M2
Wastage at 20% 0.05
0.32 M2
Main Data
4.58 Kgs Alu. Section 287.00 1 kgs 1314.46
0.32 M2 4 mm thick plain glass. 298.00 1 M2 95.36
0.36 M2 Labour charges 478.00 1 M2 172.08
LS For angles, screw, power supply, LS 96.00
dismantling & dadooing.
for 0.36 M2 1677.90
Rate/m2 4660.83
Say Rs. 4661.00 /1 M2
2 Supplying, fabricating and fixing inposition Aluminium anodised natural colour matt finish louvered
ventilator of size 900x600mm with outer frame section with 62x38x2mm at 1.174 kg/m and the louvered
with moving arrangements made with aluminium channel of size 60x30x4mm @ 1.274 kg/m ALuminium
clips 19.05x17.27/ 11.05x0.075mm @ 0.169kg/m with necessary 4mm thick plain glass panel for louvers
including cost of all materials, labour and power required for fabrications, chipping dismantling making
holes in RCC, masonry and made good to the original condition after fixing etc., complete. The
Aluminium surface is to be anodised with matt finish under electrically controlled condition in
accordance with ISI specification 1868/1962 for anodic film thickness of notless than 15 Microns,etc.,
complete.

Assume a size 900x600mm =0.54M2

outer frame

vertical 1 x 2 x 0.60 = 1.20 M2

Horizontal 1x2x0.824 = 1.65 M2

3.37 M2x1.174 kg/m2 3.96 Kg

Louvered section

vertical section = 30 x 30 x4mm @ 1.274 Kg/m 1.34 Kg

2x2x0.524 = 2.100 x 1.274 = 2.68

Inner Louver Verticle clip

19.05 x 10.27 x 11.05 x 1.20 @ 0.169 kg/m

2x2x0.524 = 2.100 x 0.169 = 0.35

add 10% wastage = 0.70

4mm Plain Glass = 0.90 x 0.60 = 0.54 m2

Main Data

7.69 Kgs Alu. Section incl. anodising charges 287.00 1 kgs 2207.03

0.54 M2 4mm thick plain glass. 298.00 1 M2 160.92

0.54 M2 Labour charges 478.00 1 M2 258.12

LS Sundries for L angles, screws, electric power LS 96.00

for 0.54 M2 2722.07

Rate/m2 5040.87

Say Rs. 5041.00 /1 M2


3 Supplying, fabricating and fixing inposition Aluminium anodised natural colour matt finish fixed
ventilator of size 1.80mx0.60m in all floors with Aluminium section of Outer frame: 24x33x3mm
@0.546kg/m,Centre mullion :59x33x2.50mm@0.936 kg/m,Alu. Clips: 17.27x17.15x1.40mm
@0.175kg/m and with necessary accessaries such as rubber beading and fixing 4mm thick plain glass
including cost of all materials, labours, power consumptions required for fabrication, drilling holes in
RCC column, slab, masonry walls wherever necessary with power drills to the required extent and work
good to be original condition after fixing and also as directed.All the Aluminium section are to be
anodised with matt finish under electrically controlled conditions in accordance with IS 1868/1962 for an
average anodic film thickness of 15 microns etc. complete.

Two panels:Assume a size :1.80x0.60m=1.08M2


outer frame
vertical 1 x 2 x 0.60 1.20
Horizontal 2(0.85+0.85) 3.40
4.60
4.60 Rmx0.546 kg/m 2.512 kg
Centre mullion
1x1x0.552 = 0.552Mx0.936 kg/m 0.52 kg
Alu. Clips:
2x2x2(0.85+0.552) = 11.22X0.175 1.96 kg
4.99 kg
Wastage at 10% 0.50
5.49 kg
4mm thick plain glass.
1x2x0.85x0.552 0.94 M2
Wastage at 20% 0.19
1.13 M2
Main Data
5.46 Kgs Alu. Section 287.00 1 kgs 1567.02
1.13 M2 4mm thick plain glass. 298.00 1 M2 336.74
1.08 M2 Labour charges 478.00 1 M2 516.24
LS For angles, screw, power supply,dismantling & redoing. 96.00
For 1.08 M2 2516.00
Rate Rs. 2329.63 /1 M2
Say Rs. 2330.00 /1 M2
4 Manufacturing Supplying and fixing in position of Aluminium anodized natural colour matt finish
openable type glazed ventilator of 900 mmx600mm with extruded Aluminium section of Outer frame
H-section 37.70x33x2mm @ 0.50kg/m,Shutter Z- section 21/24.50x33x2.50mm @ 0.525 Kg/m and the
with 4 mm thick glass with necessary accessories such as rubber beading best quality of lock handle and
fixing wherever necessary with power drill to the extent required and mae good to the original conditions
after fixing as directed by the departmental officers. The Aluminium surfaces is to be anodized with matt
finish is to be anodoized with matt finish used electrically condition in accordance with ISI 1868/1962
specification for an average anodic film thick of not less than 15microns. All sections and furniture
fittings should be got approved by Executive Engineer incharge.

Aluminium glazed ventilator without grill size


0.90x0.60m =0.54 M2
Outer frame: H-section =37.70x33x2mm @ 0.50kg/m
Horizontal = 1x2x0.90x0.50 0.90 Kg
Vertical = 1x2x0.53 X0.50 0.53 Kg
Mullion 59x33x2.50mm @ 0.936kg/m
1x0.525x0.936 0.49 Kg
Shutter Z- section 21/24.50x33x2.50mm @ 0.525 Kg/m
Vertical 2x2x0.53 2.12
Horizontal 2x2x.38 1.52
3.64 Rm
3.64x0.525 kg/m 1.91 kg
Aluminium clips 2x2x2(0.53+0.38) ==7.28 RM
7.28 x0.109 kg/m 0.79 Kg
Total 4.62 Kg
Add 10% wastage 0.46 Kg
5.08 Kg
Pin Headed Glass 3mm thick
1x2x0.53x0.38 0.40
Add 20% wastage 0.08
0.48 M2
Rubber beading 2x2(0.53+.0.38) 3.64 Rm
MAIN DATA
5.08 Kg Aluminium Section including anodizingCharges 287.00 Kg 1457.96
0.48 M2 Pin Head Glass 3mm tk 220.00 M2 105.60
3.64 Rm Rubber beading 37.25 Rm 135.59
4.00 Nos Alu. Hinges 75x30mm 43.20 Each 172.80
2.00 Nos Alu. Handle 100mm long 30.90 Each 61.80
0.54 M2 Labour Charges 478.00 M2 258.12
LS Alu. screws dismantling Redoing to good condition including Power supply 96.00
etc.
for 0.54 M2 2287.87
Rate/m2 4236.80
Say Rs. 4237.00 /M2

ALUMINIUM PARTITION

1 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish 1/3rd fixed
glazing 2/3rd prelaminated board of Aluminium partition. The outer frames Outer frame:
63.50x38x3mm@ 1.72 kg/m,Centre mullions: 63.50x38x3mm@ 1.55 kg/m,Alu. Clips: 17.27x17.15x1.50mm
@ 0.175kg/mg/m for intermediate vertical mullion 90cm c/c. Horizontal mullion at 1.00m 2.10m covered with
5.5mm thick plain glass with neccessary aluminium clips of size 17.27x17.15 x1.50mm @ 0.176kg/m and
with required rubber beading etc., including necessary dismantling holes in RCC column,masonry wherever
in necessary with power drills to the extent required and made good the damaged portion in good condition
after fixing as directed by the departmental officers. All the aluminium sections should be anodised not less
than 15 microns as ISI specification1868/1962 / and should be gotapproved by Executive Engineer before
use.

Size of Partition : 3.50 x 2.88 = 10.08m2


Outer frame :
Vertical 2x2.88 5.76
Horizontal =2x3.50 7.00
12.76 Rm
12.76x1.72 kg/m 21.95 kg
Inner frame 63.50x38x3mm @ 1.55 kg/m
Intermediate section Vertical: 3x2.804 8.41
Intermediate section Horizontal : 2x3.31 6.62
15.03 Rm
15.03x1.55 kg/m 23.30 kg
clips : @ 1m ht:4x2x2(0.83+0.943) 28.37
2.1m ht:4x2x2(0.83+1.062) 30.270
2.88m ht:4x2x2(0.83+0.723) 24.85
83.49 Rm
83.49x0.175 kg/m 14.61 kg
Total Aluminium section 59.86 kg
Add 10% wastage 5.99 kg
65.85 kg
Rubber beading
4x2(0.83+0.723) 12.42 Rm
Glass 5.5mm thick
1/3rd portion at top : 4x0.83x0.723 2.40
Add 20% wastage 0.48
2.88 M2
Prelaminated board
2/3rd portion bottom 4x0.83x0.943 3.13 M2
2/3rd portion bottom 4x0.83x1.062 3.53 M2
6.66 M2
Add 10% wastage 0.67 kg
7.33
Main Data
65.85 Kgs Alu. Section 287.00 1 kgs 18898.95
2.88 M2 5.5mm thick plain glass. 352.00 1 M2 1013.76
12.42 Rm Rubber beading 37.25 1 Rm 462.65
7.33 M2 Prelaminated board 12mm 1020.00 1 No 7476.60
10.08 M2 Labour charges 478.00 1 M2 4818.24
LS For angles, screw, power supply, LS 130.00
dismantling & dadooing. For Rs.10.08 M2 32800.20
Rate Rs. 3253.99 /1 M2
Say Rate 2995.00 /1 M2
2 Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish 1/3rd fixed
glazing 2/3rd prelaminated board of Aluminium partition of size
2.70 mx 2.10 m.The outer frames Outer frame: 63.50x38x3mm@ 1.72 kg/m,Centre mullions:
63.50x38x3mm@ 1.55 kg/m,Alu. Clips: 17.27x17.15x1.50mm @ 0.175kg/mg/m for intermediate vertical
mullion 90cm c/c. Horizontal mullion at 1.00m 2.10m covered with 4 mm thick plain glass with neccessary
aluminium clips of size 17.27x17.15 x1.50mm @ 0.176kg/m and with required rubber beading etc., including
necessary dismantling holes in RCC column,masonry wherever in necessary with power drills to the extent
required and made good the damaged portion in good condition after fixing as directed by the departmental
officers. All the aluminium sections should be anodised not less than 15 microns as ISI specification1868/1962
/ and should be gotapproved by Executive Engineer before use.

Size of Partition : 2.70mx2.10m = 5.67 m2


Outer frame :
Vertical = 1x 2x2.10 4.20
Horizontal = 1x2x2.624 5.25
9.45 Rm
9.45x1.72 kg/m 16.25 kg
Inner frame : 63.50 x 38 x 3mm @ 1.55 kg/m
Intermediate mullion Vertical : 1x2x2.024 4.05
Intermediate mullion Horizontal : 1x1x2.624 2.62
6.67 Rm
6.67x1.55 kg/m 10.34 kg
clips : 17.15x17.27x1.40@0.175 kg/m
2x2x(2.624+0.643) x 0.175 2.287
Total Aluminium section 28.88 kg
Add 10% wastage 2.89 kg
31.76 kg
Rubber beading
2x3(0.85+0.643) 8.96 Rm
Glass 5.5mm thick
1/3rd portion at top : 1x3x0.85x0.643 1.64
Add 20% wastage 0.33
1.97 m2
Prelaminated board
2/3rd portion bottom :1x3x0.85x1.343 3.42 M2
Add 10% wastage 0.34
3.77 M2
Main Data
31.76 Kgs Alu. Section 287.00 1 kgs 9115.12
1.97 M2 5.5mm thick plain glass. 352.00 1 M2 693.44
8.96 Rm Rubber beading 37.25 1 Rm 333.76
3.77 M2 Prelaminated board 12mm 1020.00 1 No 3845.40
5.67 M2 Labour charges 478.00 1 M2 2710.26
LS For angles, screw, power supply, LS 130.00
dismantling & dadooing.
For 5.67 M2 16827.98
Rate Rs. 2967.90 /1 M2
Say Rate 2968.00 /1 M2
3 .Supplying, fabricating and fixing inposition Aluminium glazed fixed partition using 63.50x38.10x2mm
@1.127 kg/m Alu.section at 900mm C/C in vertical direction and 1300mm @ C/C at horizontal direction
with necessary rubber beadings Alu. clips, of size 17.27x17.15x1.40mm@ 0.175 kg/m and using 4mm
thick plain glass including cost of all materilas, labours, power consumptions required for fabrications,
drilling holes in RCC column, slab, masonry walls wherever necessary with powerdrills to the required
extent and make good to the original condition after fixing and also as directed . All the aluminium
sections are to be anodised with matt finish under electrically controlled conditions in accordance with IS
1868/1962 for an avereage abiduc film thickness of 15 microns etc. complete.

Assume a size 1.50mx1.30m=1.95 M2

outer frame

vertical 1x3 x1.30 = 3.90mx1.127kg/m 4.40 kg

Horizontal 1x2x1.50= 3.00 mx1.127kg/m 3.38 kg

Alu. Clips: 2x2(1.386+1.224)x0.175 1.82

9.60

Wastage at 10% 0.96

10.56 kg

4mm thick plain glass 1.386 x1.224 1.70 m2

Add Wastage at 20% 0.34

2.04 m2

Rubber beading 2(1.386 + 1.224) 5.22 Rm

Main Data

10.56 Kgs Alu. Section 287.00 1 kgs 3030.72

2.04 M2 4mm thick plain glass. 298.00 1 M2 607.92

5.22 M Rubber beading 37.25 1 Rm 194.45

1.95 M2 Labour charges 478.00 1 M2 932.10

LS For angles, screw, power supply, LS 100.00


dismantling & dadooing.
For 1.95 m2 4865.19
Rate Rs. 2494.97 /1 M2

Say Rs. 2495.00

4 Supplying, fabricating and fixing inposition Aluminium glazed fixed partition using 63.50x38.10x2mm
@1.127 kg/m Alu.section at 900mm C/C in vertical direction and 1300mm @ C/C at horizontal direction
with necessary rubber beadings Alu. clips, of size 17.27x17.15x1.40mm@ 0.175 kg/m and using 4mm
thick plain glass including cost of all materilas, labours, power consumptions required for fabrications,
drilling holes in RCC column, slab, masonry walls wherever necessary with powerdrills to the required
extent and make good to the original condition after fixing and also as directed . All the aluminium
sections are to be anodised with matt finish under electrically controlled conditions in accordance with IS
1868/1962 for an avereage abiduc film thickness of 15 microns etc. complete.

Assume a size 2.70mx1.30m=3.51M2

outer frame

vertical 1x4x1.30 = 5.20mx1.127kg/m 5.86 kg

Horizontal 1x2x2.70=5.40mx1.127kg/m 6.09 kg

Alu. Clips: 3x2(1.22+0.845)x2 = 24.78 4.34

16.29

Wastage at 10% 1.63

17.92 kg

4mm thick plain glass 1x3x0.845x1.22 3.09 m2

Wastage at 20% 0.62

3.71

Rubber beading 1x3x2(0.845x1.22) 12.39 m2

Main Data

17.92 Kgs Alu. Section 287.00 1 kgs 5143.04

3.71 M2 4mm thick plain glass. 298.00 1 M2 1105.58

12.39 M Rubber beading 37.25 1 Rm 461.53

3.51 M2 Labour charges 478.00 1 M2 1677.78

LS For angles, screw, power supply, LS 130.00


dismantling & dadooing.

For 3.51 m2 8517.93


Rate Rs. 2426.76 /1 M2

Say Rs. 2427.00


FIXED GLAZING

1 Supplying, fabricating and fixing in position of Aluminium Natural Colour Mat finilsh Fixed Glazing the
glass used shall be of 5 mm thickness. The Aluminium Section are to be anodised under electrically
controlled condition as per IS 1868/1962 for an anodic film thickness of 15 microns. All the materials
should be got approved by got approved by the Executive Engineer before execution of works.

Fixed glazing @ fixed door for entrance lobby

Glazing Size 1.50x2.10

Outer Frame:

Horizontal 2x1.50 3.00

Vertical=1x2.10 2.10

5.10

5.10x2.319 kg/m 11.83 kg

inner Frame:

Horizontal 4x0.405 1.62

Vertical=2x2.056 4.11

5.73

5.73x1.72 9.86kg

Alu. Clips:

2x2x2(0.405+0.928) 10.66

10.664x0.176 1.88kg

Total 23.57kg

ADD Wastage 10% 2.36 kg

25.93 kg

5.50mm thick plain glass.

2x(0.405x0.928) 0.75 M2

ADD 20% Wastage 0.15 M2


0.90 M2

10 mm thick grill

2x(0.405x0.928) 0.75 M2

ADD 10% Wastage 0.08 M2

0.83 M2

Rubber beading:

Shutter Top 2x2(0.405+0.928) 5.33

5.33

Main Data

25.93 Kg Alu. Section inclluding anodizing charges 287.00 1 kgs 7441.91

0.9 M2 Glass 5.50mm thick(palin) 352.00 1 M2 316.80

0.83 M2 Aluminium grill 10mm thick 1835.00 1 M2 1523.05

5.33 Rm Rubber beading 28.40 1 Rm 151.37

3.15 M2 Labour charges 478.00 1 M2 1505.70

LS Sundries for T.W. plugs, angles, screws, LS 100.00


dismantling, Redoing to good condition includilng
power supply etc.

11038.83
For 3.15M2 3504.39

Rate /m2 3504.00


ALUMINIUM HANDRAIL

1 Supplying and fixing in position of aluminium handrails anodised matt natural finish c type section of
size 70x30x3 mm thick at 1.527 kg/m with all alu. Strip section No.5126 of 37 mm with 0.227 kg/m
inclulding balustrades square section of size 25.40x25.40x1.50mm thick at 0.442 kg/m to a height
800mm from the finish floor level at step nesing fixed at 150mm intervals iln the two numbers for each
step with necessary screws plugs etc. including providing holes iln the RCC masonry steps landing or
floor and also fixing the aluminium depth and grouted with cement and redoing the damaged portion as
original condition.

Aluminium hand rails


Consider for 1.01m length
C' type hand rail
1.01 x 1.527 kg/Rm 1.542 kg
Strip connection

1.01 x 0.227 kg/m 0.229 kg


Balustrades
0.80 x 4 x 0.442 kg/RM 1.414 kg

0.90 x 3 x 0.442 kg/RM 1.193 kg


4.378 kg
M.S. square rods 20 x 20mm
1x6x0.40x3.4 8.16 kg
Main Data

4.38 Kg Alu. Section inclluding anodizing charges 287.00 1 kgs 1257.06

8.8 kg M.S. square rods 20mm 40.45 1 M2 355.96

2.5 Nos Fitter I Class 576.00 1 Rm 1440.00

LS Wastage in Alu. Section 10 % LS 125.71

LS Sundries for T.W. plugs, angles, Cement slurry, LS 96.00


dismantling Redoing charges, scafolding and
strutting inclusive of power supply

3274.73

Rate Rs. 3275.00 /1 M2


13.992
0.051042
14.256
13.464

0.0510424155

13.475198
13.464
19.5915492958

0.1
10

0.053788
25.7164 14.256

13.91
9.737
11.128
12.519

168.3

51

9322.45
9364.45
9517.45
LS 0.00
23.24
`
3.15
3.6
4.32
8.1095
239.8
261.648

252.912
239.8095
DATA
Sl. Qty Description of work
No Rate Per Amount
1 2 3 4 5 6
1 Manufacturing supplying and fixing of steel door with the following specification MS angels of size 40x40x6mm are
used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32 x 6mm M.S flat
is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact.
M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners
with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter, 3nos. of hinges in case of single leaf and
6nos. of hinges in double leaves shutter to be provided 6nos. of holdfasts 120 mm in length made of angle section
spliced at the ends are welded to the outer frames of the door. Tower bolts 2nos. one at the top and the other at the
bottom are provided 1no. Aldrop is provided incase of double leaf door at lock rail section in the door in single leaf
door, one more aldrop is provided in the inner lock rail section of the door One rotaing locking arrangements for the
inner side of the door and additional provision for locking arrangements for lock is provided on the rear side of the
door at an appropriate place. Incase of double leaf door M.S.Flat 32 x 3mm at 1.1Kg/m is provided on the one shutter
t conceal the gap between the two shutters.at an appropriate place in the door. A tie bar is provided at the bottom of the
frame to prevent twisting of frame during transportation and fixing. All members are given a coat of red oxide primer
as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation to site of
work, loading, un loading and all other incidental charges etc., complete.

a. Single Leaf 1.00x2.10m (Fully panneled)


Meterials required

Outer frame

Horizotal 1X1.00 =1.00 M

Vertical 2X2.10 =4.20 M

5.20 M

5.20mx3.50 kg/m 18.20 kg

Shutter frame

Vertical 2 x 2.088 = 4.18 M

Horizotal 1 X 0.988 =1.98 M

6.16 M

6.16mx2.60 kg 16.02 kg

Tie bar by using 32x6mm flat

1.50 kg
1No.x1.00x1.50kg/m
Lock rail for fixing aldrop in MS flat 32x6mm

1x0.988x1.50kg 1.482 kg

Stiffeners at rear side Horizontal

1x0.988x3x0.70kg 2.08 kg

Diagonal

1x1.21x6x0.70kg 5.08 kg

32x3mm in one side Total Weight 44.36 kg

Add 5% wastage 2.22 kg

46.58 kg

Area CR sheet required

1x0988x2.088x9.80kg
20.22 kg
Add 5% wastage 1.01 kg

21.23 kg

Painting area =1x2.10x1.00x2.20


4.62 m2

Main Data
46.58 kg Ms Angle & Flats 41.20 Each 1919.10

21.23 kg 18GCRS 41.20 Each 874.72

64.58 kg Labour for cutting sheets, angles fabrication & finishing 33.40 Each 2156.97

4.62 M2 Priming Coat 54.50 Each 251.79

6.00 Nos Hold Fasts 200mm length 67.30 Each 403.80

3.00 Nos Hinges 125mmx30mm 78.40 Each 235.20

1.00 Nos Tower Bolt250mm long 12mm dia 85.50 Each 85.50

1.00 Nos Tower Bolt200mm long 12mm dia 71.90 Each 71.90

1.00 No Aldrop 250mm long 16mm dia 158.20 Each 158.20

1.00 Nos Ms Handle 200mm long 56.20 Each 56.20

2.10 Labour for fixing the Door & furniture fittings 149.00 Each 312.90
M2
L.S. Conveyance, Handling, Scaffolding, Chipping/Masonary concerete & making
good the damaged portion L.S. 210.00

For 2.10M2 3207.75 6736.28

Rate Rs. 3208.00

2 Manufacturing supplying and fixing of steel door with the following specification MS angels of size 40x40x6mm are
used for the outer frames and M.S. angles of size 35x35x6mm for the shutter frames stiffeners with 32 x 6mm M.S flat
is provided at required intervals in the shutter frame. 18-gauge C.R. sheet laid as panel in the shutter and welded intact.
M.S. flat 18x5mm is welded over the 32 x 6mm M.S. flat sandwitching the C.R. sheet in between additional stiffeners
with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter, 3nos. of hinges in case of single leaf and
6nos. of hinges in double leaves shutter to be provided 6nos. of holdfasts 120 mm in length made of angle section
spliced at the ends are welded to the outer frames of the door. Tower bolts 2nos. one at the top and the other at the
bottom are provided 1no. Aldrop is provided incase of double leaf door at lock rail section in the door in single leaf
door, one more aldrop is provided in the inner lock rail section of the door One rotaing locking arrangements for the
inner side of the door and additional provision for locking arrangements for lock is provided on the rear side of the
door at an appropriate place. Incase of double leaf door M.S.Flat 32 x 3mm at 1.1Kg/m is provided on the one shutter
t conceal the gap between the two shutters.at an appropriate place in the door. A tie bar is provided at the bottom of the
frame to prevent twisting of frame during transportation and fixing. All members are given a coat of red oxide primer
as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation to site of
work, loading, un loading and all other incidental charges etc., complete.

b, Double Leaf 1.20x2.10m (Fully panneled)


Area 2.52 m2 m2
Door outer frame 40x40x6 (2.10x2)+(1.20x1)=5.40x3.50kg/m 18.90 kg
shutter frame 35x35x6/2(2x2.088)+2x0.594)
=10.728x2.60kg/m 27.89 kg
Tie bar1x1.2=1.2x1.5 1.80
Vertical rod 1 x 2.10 x 1.10 kg/m 2.31
Stiffeners with MS flats of 32x6mm
6Nosx2x0.594x0.70kg/m 4.99 kg
Diagonal flats 2x2x0.688x1.5kg/m 4.13 kg
60.02 kg
Add 5% wastage 3.00 kg
Total steel weight 63.02 kg
CR sheet 18G=2X0.594X2.088X9.80kg 24.31kg/m 24.31
Add 5% wastage 1.22
25.53
Painting priming coat=2x0.6x2.10x2.20 5.54
Main Data
63.02 kg Ms Angle & Flats 41.20 2596.42
25.53 kg 18GCRS 41.20 1051.84
84.33 kg Labour for cutting sheets, anglesfabrication & finishing 33.40 2816.62
5.54 M2 Priming Coat 54.50 301.93
6.00 Nos Hold Fasts 200mm length 67.30 403.80
4.00 Nos Hinges 125mmx30mm 78.40 313.60
2.00 Nos Tower Bolt250mm long 12mm dia 85.50 171.00
1.00 Nos Tower Bolt200mm long 12mm dia 71.90 71.90
1.00 No Aldrop 250mm long 16mm dia 158.20 158.20
2.00 Nos Ms Handle 200mm long 56.20 112.40
2.52 M2 Labour for fixing the Door & 149.00 375.48
furniture fittings
L.S. Conveyance, Handling, Scaffolding, Chipping/Masonary concerete & making
good the damaged portion L.S. 240.00
For 2.52M2 8613.19
Rate Rs. 3417.93
Say Rs. 3418.00
3 Manufacturing, supplying and fixing of steel doors with the following specification M.S angles of a size 40x40x6mm
are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S.
flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded
intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sandwitching the
CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter.
The balance 2/3 portion at top is provided with grill at an average weight of 20kg/sq.m and 6 Nos hinges for double
leaves shutter to be provided 6nos of holdfasts 120mm in length made of angle section spliced at the ends are welded
to the outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom arte provided one aldrop is
provided at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent twisting
of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by the
departmental officers. The rate includes cost of all meterials, labour charges, taxes, transportation to site of work,
loading, unloading and all other
incidental charges etc., complete.

Single Leaf 1.00x2.10m ( 1/3 panneled& 2/3 grilled)


Door outer frame 40x40x3
(2.10x2)+(1.00x1)x3.50kg/m 18.20 Kg
Shutter frame 35x35x6(2x2.088)+2x0.988)
x2.60kg/m 16.00 Kg
Stiffners with MS flatsof 32x6mm
1Nox0.988x1.50kg/m 1.482 Kg
Diagonal flats 1x0.60x1.50kg 0.90 Kg
36.582 Kg
Add 5% for wastage 1.829
Total steel weight 38.41 Kg
CRC Sheet 18G=0.988x2.088/3x9.80kg 6.74 Kg
Add 5% for wastage 0.37
Total 7.11 Kg
M.S.Grill 0.988x2.088x2/3x20kg 27.51 Kg
Add 5% for wastage 1.38
28.89 Kg
Painting Priming coat
(2.10-1.38x2.20) 1.59 M2
Main Data
38.41 kg Ms Angle & Flats 41.20 1582.54
7.11 kg 18GCRS 41.20 292.93
28.89 kg MS Grill with fixing 75.40 2178.31
43.32 kg Labour for cutting sheets, angles 33.40 1446.89
fabrication & finishing
1.59 M2 Priming Coat 54.50 86.66
6.00 Nos Hold Fasts 200mm length 67.30 403.80
2.00 Nos Hinges 125mmx30mm 78.40 156.80
1.00 Nos Tower Bolt250mm long 12mm dia 85.50 85.50
1.00 Nos Tower Bolt200mm long 12mm dia 71.90 71.90
1.00 No Aldrop 250mm long 16mm dia 158.20 158.20
1.00 Nos Ms Handle 200mm long 56.20 56.20
2.1 M2 Labour charges for fixing the door and furniture fittings 149.00 312.90
L.S. Conveyance, Handling, Scaffolding, Chipping/Masonary concerete & making
good the damaged portion L.S. 210.00
For 2.10M2 7042.62
Rate Rs. 3353.63 M2
Say Rs. 3354.00 M2
4 Manufacturing, supplying and fixing of steel doors with the following specification M.S angles of a size 40x40x6mm
are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S.
flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded
intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sand witching the
CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter.
The balance 2/3 portion at top is provided with grill at an average weight of 20kg/sq.m and 6 Nos hinges for double
leaves shutter to be provided 6nos of holdfasts 120mm in length made of angle section spliced at the ends are welded
to the outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom arte provided one aldrop is
provided at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent twisting
of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by the
departmental officers. The rate includes cost of all meterials, labour ,charges, taxes, ransportation to site of work,
loading, unloading and all other incidental charges etc., complete.

Double Leaf 1.20x2.10m ( 1/3 panneled& 2/3 grilled)


Door of size 1.20x2.10m 2.52 M2
Area
Door outer frame 40x40x3
(2.10x2)+(1.20x1)=5.40x3.50kg/m 18.90 Kg
Shutter frame 35x35x5(2x2.088)+2x0.594)2
27.89 Kg
=10.728x2.60kg/m
Die bar : 1 x 1.2 x 1.5 kg/m 1.80 Kg
Stiffners with MS flatsof 32x6mm
2Nosx2x0.594x1.50kg/m 3.56 Kg
Vertical bar 1 x 2.10 x 1.10 kg/m 2.31 Kg
Diagonal flats 2x2x0.688x1.50kg 4.13 Kg
58.59 Kg
Add 5% for wastage 2.93
Total steel weight 61.52 Kg
CRC Sheet 18G=2x0.594x2.088/3x9.80kg 8.10 Kg
Add 5% for wastage 0.40
Total 8.50 Kg
Grill 2x0.594x2.088x2/3kg
1.65x20 33.07 Kg
Add 5% for wastage 1.65 Kg
34.72 Kg
18.90+27.89+3.56.4.13
Painting Priming coat 1.914 M2
2.524-1.65=0.87m2x2.2=1.914M2
Main Data
61.52 kg Ms Angle & Flats 41.20 Kg 2534.62
8.50 kg 18GCRS 41.20 Kg 350.20
34.72 kg MS Grill 75.40 Kg 2617.89
66.69 kg Labour for cutting sheets, angles fabrication & finishing 33.40 Kg 2227.45
1.914 M2 Priming Coat 54.50 M2 104.31
6.00 Nos Hold Fasts 200mm length 67.30 No. 403.80
4.00 Nos Hinges 125mmx30mm 78.40 No. 313.60
2.00 Nos Tower Bolt250mm long 12mm dia 85.50 No. 171.00
1.00 Nos Tower Bolt200mm long 12mm dia 71.90 No. 71.90
1.00 No Aldrop 250mm long 16mm dia 158.20 No. 158.20
2.00 Nos Ms Handle 200mm long 56.20 No. 112.40
2.52 M2 Labour for fixing the Door &furniture fittings 149.00 M2 375.48
Conveyance, Handling, Scaffolding, Chipping/Masonary concerete & making
L.S. L.S. 250.00
good the damaged portion
For 2.52M2 9690.85
Rate Rs. 3845.58
SAY Rate Rs. 3846.00
5 Manufacturing, supplying and fixing of steel doors with the following specification M.S angles of a size 40x40x6mm
are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S.
flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded
intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sand witching
the CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the
shutter. The balance 2/3 portion at top is provided with grill at an average weight of 20kg/sq.m and 6 Nos hinges for
double leaves shutter to be provided 6nos of holdfasts 120mm in length made of angle section spliced at the ends are
welded to the outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom arte provided one aldrop
is provided at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent
twisting of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by
the departmental officers. The rate includes cost of all meterials, labour charges,taxes, transportation to site of work ,
loading, unloading and all other incidental charges etc.,complete.

Double leaf Door size 1.5 X 2.1M ( 1/3 panneled& 2/3 grilled) 3.15 m2
Materials required
Outer frame 40x40x6mm
Vertical 1x2x2.1 4.20 m
Horizontal 1x1x1.50 1.50
5.7x3.5Kg/m 19.95 Kg
Shutter frame 35x35x5mm
Vertical 1x2x2x2.088 = 8.35 Kg
Horizontal 2x2x0.744 2.98 Kg
11.33x2.6Kg/m 29.46 Kg
Intermediate J Section in betn Grill & CR sheet 2x0.744x2.28Kg 3.39 Kg
Tie bar 32x6mm flat 1x1.5x1.5Kg 2.25 Kg
Stiffeners 18x 5 mm MS flat at rear side Kg
Horizontal 2x1x0.744x0.7 Kg 1.04 Kg
Diagonal 2x2x0.821x0.7 Kg 2.30 Kg
MS flat 32x3mm@ edge of CR Sheet 1x.7x1.1KG 0.77 Kg
Total 59.16 Kg
Add 5% wastage 2.96 Kg
62.12
CR Sheet reqd. 1x2x0.74x0.7x9.8 Kg/m2 10.19 kg
Add 5% wastage 0.51 kg
10.70 kg
MS grill of 20kg/m2 1x2x0.744x1.4x20kg/m2 41.60 kg
Add 5% wastage 2.08 kg
43.68 kg
Painting Red oxide primer 1.5x2.1=3.15m2-2.08m2 1.07 M2
1.07x2.2 2.35 M2
Main Data
62.12 kg MS angles & Flats 41.20 kg 2559.34
10.70 kg CR sheet18 gauge 41.20 kg 440.84
43.68 kg MS grill of appd design 20kg/m2 includingfabrication charges 75.40 kg 3293.47
69.35 Kg Labour charges for cutting welding and fabrication
of angles sheets in position & fixing 33.40 kg 2316.29
2.35 M2 Priming coat 54.50 M2 128.08
6 Nos Hold Fasts 200mm length 67.30 Each 403.80
4 Nos Hinges 125mmx30mm 78.40 Each 313.60
2 Nos Tower Bolt250mm long 12mm dia 85.50 Each 171.00
1 Nos Tower Bolt200mm long 12mm dia 71.90 Each 71.90
1 No Aldrop 250mm long 16mm dia 158.20 Each 158.20
2 Nos Ms Handle 200mm long 56.20 Each 112.40
3.15 M2 labour charges for fixing door 149.00 M2 469.35
LS Conveyance,Handling,Scaffolding,Chipping
masonry,concrete etc& redoing the same LS LS 140.00
For 3.15M2 10578.27
Rate Rs. 3358.18 /M2
SAY Rate Rs. 3358.00
5 Manufacturing, supplying and fixing of steel doors with the following specification M.S angles of a size 40x40x6mm
are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S.
flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded
intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sand witching
the CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the
shutter. The balance 2/3 portion at top is provided with grill at an average weight of 20kg/sq.m with 3mm pin
headed glass used for glazing and fixed with 15x12 mm teakwood beeding and 6 Nos hinges for double leaves
shutter to be provided 6nos of oldfasts 120mm in length made of angle section spliced at the ends are welded to the
outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom arte provided one aldrop is provided
at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent twisting of frame
during transportation or fixing. All members are given one coat of red oxide primer as directed by the departmental
officers. The rate includes cost of all meterials, labour charges,taxes, transportation to site of work , loading,
unloading and all other incidental charges etc.,complete.

Double leaf Door size 1.5 X 2.1M (1/3 panneled& 2/3 grilled with glazing) 3.15 m2

Materials required

Outer frame 40x40x6mm

Vertical 1x2x2.1 4.20 m

Horizontal 1x1x1.50 1.50

5.7x3.5Kg/m 19.95 Kg
Shutter frame 35x35x5mm

Vertical 1x2x2x2.088 =
8.35 M
Horizontal 2x2x0.744
2.98 M

11.33x2.6Kg/m 29.46 Kg
Intermediate J Section in betn Grill & CR sheet
2x0.744x2.28Kg 3.39 Kg
Tie bar 32x6mm flat 1x1.5x1.5Kg
2.25 Kg
Stiffeners 18x 5 mm MS flat at rear side

Horizontal 2x1x0.744x0.7 Kg 1.04 Kg

Diagonal 2x2x0.821x0.7 Kg 2.30 Kg


MS flat 32x3mm@ edge of CR Sheet 1x.7x1.1KG
0.77 Kg

Total 59.16 Kg

Add 5% wastage 2.96 Kg

62.12 Kg
CR Sheet reqd. 1x2x0.74x0.7x9.8 Kg/m2
10.19 kg

Add 5% wastage 0.51 kg

10.70 kg
MS grill of 20kg/m2 1x2x0.744x1.4x20kg/m2 41.60 kg

Add 5% wastage 2.08 kg

43.68 kg
Painting Red oxide primer 1.5x2.1=3.15m2-2.08m2 1.07 M2

1.07x2.2 2.35 M2

3mm tk pin headed glass 1x2x0.744x1.40 2.08 M2

Add 10% wastage 0.21 M2

2.29 M2

Teak wood beading 2x2(0.744+1.40) 8.58 Rm


Main Data

62.12 kg MS angles & Flats


41.20 kg 2559.34
10.70 kg CR sheet18 gauge
41.20 kg 440.84
43.68 kg MS grill of appd design 20kg/m2 includingfabrication charges
75.40 kg 3293.47
2.29 M2 3mm thick Pinheaded glass
220.00 M2 503.80
8.58 Rm Teakwood Beading 15mm x 12mm
15.00 Rm 128.70
69.35 Kg Labour charges for cutting welding and fabrication
of angles sheets in position & fixing
33.40 kg 2316.29
2.35 M2 Priming coat
54.50 M2 128.075
6 Nos Hold Fasts 200mm length
67.30 Each 403.80
4 Nos Hinges 125mmx30mm
78.40 Each 313.60
2 Nos Tower Bolt250mm long 12mm dia
85.50 Each 171.00
1 Nos Tower Bolt200mm long 12mm dia
71.90 Each 71.90
1 No Aldrop 250mm long 16mm dia
158.20 Each 158.20
2 Nos Ms Handle 200mm long
56.20 Each 112.40
3.15 M2 labour charges for fixing door
149.00 M2 469.35
LS Conveyance,Handling,Scaffolding,Chipping

masonry,concrete etc& redoing the same


LS LS 250.00
For 3.15M2
11320.77
Rate Rs. 3593.90 /M2

SAY Rate Rs. 3594.00


Manufacturing, supplying and fixing of Entrance steel door Single leaf coverd with the following specification.
M.S angles of a size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter
frames stiffeners with 32x6mm M.S. flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is
laid as panel in the shutter and welded intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over
the 32x6mm M.S. flat sand witching the CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided
diagonally at the rear side of the shutter. The balance 2/3 portion at top is provided with grill at an average weight of
20 kg/sq.m with 300mm hieght of fixed glazing at top with 3mm thick Pin Headed glass including 3 Nos hinges
for single leaf shutter to be provided 3 nos of holdfasts 120mm in length made of angle section spliced at the ends are
welded to the outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom are provided one aldrop
is provided at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent
twisting of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by
the departmental officer. The rate includes cost of all meterials, labour, charges,taxes, transportation to site of work,
loading, unloading and all other incidental charges etc., complete.

Single leaf: (1/3 panneled & 2/3 grilledwith top ventilator glazing))

Area 1.00 x 2.40 = 2.40 M2


Door size 1.00 X 2.10 =2.10M
Fixed glazing at top 1.00 x 0.3m
Vertical 2x2.40 4.80 Kg
Horizontal 1x1.0 1.00 Kg
Materials required
Outer frame 40x40x6mm MS Angle at 3.50 kg/m

Vertical 2x2.4 4.80 m


Horizontal 1x1 1.00 m
5.80 m
5.80x3.5Kg/m 20.30 Kg
Shutter frame 35x35mm at 2.60kg/m

Vertical 2x2.06 4.12


Horizontal 2x0.96 1.92
6.04
6.04x2.6Kg/m 15.70 Kg
For fixed portion (0.26+0.92)x2.60kg/m 3.07 Kg
MS flat 1No x 0.96x1.50 kg/m 1.44 Kg
Stiffeners at rear side
Horizontal 0.92x2x0.70 Kg/m 1.29 Kg
Diagonal 1.16x2x0.70 Kg 1.62 Kg
Total weight of MS flats and angles 43.42 Kg
Add 5% wastage 2.17 Kg
45.59 Kg
CR Sheet 18G reqd. 0.92x0.70x9.8 Kg/m2 6.31 Kg
Add 5% wastage 0.32 Kg
6.63 Kg
MS grill of 9kg/m2 0.92x2.06x2/3= 1.26 M2
1.26x9Kg/m2 = 11.34 Kg
Add 5% wastage 0.57 Kg
11.91 Kg
Glazing for fixed portion 0.26x0.92= 0.24 M2
Add 10% wastage 0.02 M2
0.26 M2
Teakwood beading for glazing area
2x(0.26+0.92) 2.36 Rm
Painting Red oxide primer
Total area 2.40M2

Deduct glzed area and Grill area 0.24+1.26= 1.50 M2


(2.40-1.50)x2 = 1.80 M2
Main Data
45.59 kg MS angles & Flats
41.20 kg 1878.31
6.63 kg CR sheet18 gauge
41.20 kg 273.16
11.91 kg MS grill of appd design 20kg/m2
75.40 kg 898.01
0.26 M2 3mm thick Pinheaded glass
220.00 M2 57.20
2.36 Rm Teakwood Beading 15mm x 12mm
15.00 Rm 35.40
49.73 kg Labour charges for cutting welding and fabrication
of angles sheets in position & fixing 33.40 Each 1660.98
1.80 M2 Red oxide primer
47.80 M2 86.04
3 Nos Hold Fasts 200mm length
67.30 201.90
3 Nos Hinges 125mmx30mm
78.40 235.20
2 Nos Tower Bolt250mm long 12mm dia
85.50 171.00
1 Nos Aldrop 250mm long 16mm dia
71.90 71.90
1 Nos Ms Handle 200mm long
56.20 56.20
1 Nos Door stopper with bush
43.80 Each 43.80
2.40 m2 labour charges for fixing door
149.00 m2 357.60
LS Conveyance,Handling,Scaffolding,Chipping
masonry,concrete etc& redoing the same Ls 240.00
For 2.40 M2 6266.70

Rate Rs. 2611.13


Say Rs. 2611.00 /M2
6 Manufacturing, supplying and fixing of Entrance steel doors with the following specification M.S angles of a size
40x40x6mm are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with
32x6mm M.S. flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the
shutter and welded intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S.
flat sand witching the CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at
the rear side of the shutter. The balance 2/3 portion at top is provided with grill at an average weight of 20
kg/sq.m with 300mm hieght of fixed glazing at top with 3mm thick Pin Headed glass including6 Nos hinges for
double leaves shutter to be provided 6nos of holdfasts 120mm in length made of angle section spliced at the ends are
welded to the outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom are provided one aldrop
is provided at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent
twisting of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by
the departmental officers. The rate includes cost of all meterials, labour charges, taxes, transportation to site of work,
loading, unloading and all other incidental charges etc., complete.

Area 1.50 x 2.40 = 3.60 M2(1/3 panneled& 2/3 grilled with top ventilator glazing)

Door size 1.5 X 2.1M

Fixed glazing at top 1.5 x 0.3m


Materials required

Outer frame 40x40x6mm

Vertical 2x2.4 4.80 m

Horizontal 1x1.50 1.50 m


6.30 m

6.30x3.5Kg/m 22.05 Kg
Shutter frame 35x35x5mm
Vertical 2x2x2.06 8.24

Horizontal 2x2x0.71 2.84


11.08x2.6Kg/m 28.81 Kg

For fixed portion (0.26+1.42)x2.60kg/m 4.37 Kg


Stiffeners 18x 5 mm MS flat at rear side

Horizontal 2x2x0.71x1.50 Kg/m


4.26 Kg
Diagonal 2x2x0.98x1.50 Kg
5.88 Kg

Tie bar 30x6mm 2x0.71x1.50 Kg/m 2.13 Kg


Total weight of MS flats and angles 67.50 Kg
Add 5% wastage 3.37 Kg

70.87 Kg
CR Sheet 18G reqd. 1x2x0.71x0.7x9.8 Kg/m2
9.74 Kg

Add 5% wastage 0.49 Kg


10.23 Kg
MS grill of 20 kg/m2 2x0.72x2.06x2/3=
1.98 M2
1.98x20 Kg/m2 =
39.6 Kg
Add 5% wastage 1.98 Kg
41.58 Kg
3mm tk pin headed glass

Glazing for fixed portion 1.42x0.26= 0.37 M2


Add 10% wastage 0.04 M2
0.41 M2

Teakwood beading for glazing area


2x(0.26+1.40) 3.32 Rm

Painting Red oxide primer


Total area 3.60M2

Deduct glazed area and Grill area


3.6-(0.37+1.98)x2 = 1.25x2 2.50 M2
Main Data

Main Data

70.87 kg MS angles & Flats


41.20 kg 2919.84
10.23 kg CR sheet18 gauge
41.20 kg 421.48
41.58 kg MS grill of appd design 20kg/m2 includingfabrication charges
75.40 kg 3135.13
0.41 M2 3mm thick Pinheaded glass
220.00 M2 90.20
3.32 Rm Teakwood Beading 15mm x 12mm
15.00 Rm 49.80
77.24 Kg Labour charges for cutting welding and fabrication
of angles sheets in position & fixing
33.40 kg 2579.82
2.50 M2 Priming coat 54.50 M2 136.25
6 Nos Hold Fasts 200mm length 67.30 Each 403.80
6 Nos Hinges 125mmx30mm 78.40 Each 470.40
2 Nos Tower Bolt250mm long 12mm dia 85.50 Each 171.00
1 Nos Tower Bolt200mm long 12mm dia 71.90 Each 71.90
1 No Aldrop 250mm long 16mm dia 158.20 Each 158.20
2 Nos Ms Handle 200mm long 56.20 Each 112.40
3.60 M2 labour charges for fixing door 149.00 M2 536.40
LS Conveyance,Handling,Scaffolding,Chipping
masonry,concrete etc& redoing the same LS 240.00

For 3.60M2 11496.62


Rate Rs. 3193.51 /M2

Say Rs. 3194.00 /M2

7 Fabricating, supplying and fixing of steel Emergency exitdoor cum, emergency window with the following
specification. M.S. angle in size 40x40x6mm are used for the outer frames and M.S. angle of sie 35x35x5mm for the
shutter frame, stiffners with 32x6mm M.S. flats provided at required intervals in the shutter frames 18 guage CR sheet
is laid as panel and welded instant for 1/3 bottom portion of the shutter, M.S. flat 18x5mm is welded over the 32x6mm
M.S flat sandwitching the CR sheet in between additional stiffner with 18x5mm M.S. flat is provided diagonally at the
rear-side of the shutter. The balance 2/3 portion at top is provided with grill at an average weight of 15kg/m2 and the
top portion of operation emergency window is to be made of 25x25x3mm M.S. angle welded intact with CR sheet and
25x3mm M.S. flat at diagonally at the near side of the window at required interwals 6 Nos. of hinges to be provided,6
Nos of holdfast 100mm in length made of angle section spliced at the ends are welded to the outer frame of the door.
Tower bolts 2 Nos. one at top and the other at the bottom are to be provided one aldrop is provided at an appropriate
place in the door 2 Nos. of 'D' type handle for emergency window and 2 Nos of handle for door is to be provided at
appropriate places. A tie bar is provided at the bottom of the outer frame to prevent twisting of frame during
transportation of fixing. All members are given one coat of red oxide primer as directed by the departmental officers.
The rate includes cost of materials, labour transportation to side of works, loading, unloading and all other incidental
charges etc., complete.

Double leaf door


Consider a door size 1.20x2.10 Area = 2.52 M2
Door Outer frame 40x40x6mm
Vertical 2x2.10 4.20
Top Horizontal 2x1.20 2.40
6.60
6.60x3.50kg/m 23.10 kg
Shutter frame 35x35x5
Vertical 2x2x2.088x2.60 kg/m 21.72
Horizontal 2x2x0.584x2.60 kg/m 6.07
27.79 kg
tie bar at bottom of door 32x6mm of 1.50kg
1.20x1.50 kg/m 1.80 kg
For locking rail using 32x6mm flat
2x0.584x1.50 kg/m 1.75 kg
Stiffners at rear side
Horizontal 2x3x0.584x0.70 kg/m 2.45 kg
Vertical 2x4x0.91x0.70 kg/m 5.10 kg
Stiffners at door joining using 32x3mm flat in door side
1x2.10x1.10 kg/m 2.31 kg
For openable window 25x25x3mm angle
Horizontal 2x2x0.584x1.10 kg/m 2.57 kg
Vertical 2x2x1.30x1.10 kg/m 5.72 kg
Stiffners for window 25x3mm flat
2x2x1.43x0.59 3.37 kg
Total 75.96 kg
Add 5% for wastage 3.80
79.76
M.Sgrill 2x0.584x1.288x15 22.57 Kg
Add 5% for wastage 1.13
23.70 kg
18 gauge CR sheet
For door 2x0.584x0.80x9.80 kg 9.16
For window 2x0.584x1.288x9.80 kg 14.74
23.90 kg
Add 5% for wastage 1.20 kg
25.10 kg
Painting area
1x1x1.20x2.10x2.20 5.54 M2
Main data
79.76 Kg M.S Angle &flat
41.20 Kg 3286.11
25.10 Kg C.R.Sheets 18G
41.20 Kg 1034.12
23.70 Kg M.S.Grill With primer
75.40 Kg 1786.98
5.54 M2 Priming coat
54.50 M2 302.15
99.86 Kg Labour for cutting & welding
33.40 Kg 3335.32
6 Nos Hold fast 120mm thick
67.30 No 403.80
6 Nos Hinges heavy type125x30mm
78.40 No 470.40
2 Nos Tower bolt 250mm long 12mm dia
85.50 No 171.00
1 No Aldrops 250mm long 16mm dia
158.20 No 158.20
4 Nos M.S.Handles 200mm long
56.20 No 224.80
2.52 M2 Labour charges for fixing door & Furniture fittings
149.00 M2 375.48
L.S Fixing furnitures cost of conveyance loading & unloading
erection,assumbling cost of concrete etc
230.00
Rate/2.52M2 11778.36
Rate/1M2 4673.95
SAY Rate/1M2 4674.00
8 Manufacturing, supplying and fixing fixed grills made out of 40x40x6mm at 3.5 Kg/m are used as the outer frames.
MS Angles of size 40x40x6mm at 2.6Kg/m is welded intact withouter frame from 1/3 bottom portion for fixing CR
sheet & MS grill 18 GCR sheet is laid as panel & welded intact for 1/3 bottom portion. MS Flat are provided as per
design 2/3 top Portion is provided with MS grill of 15Kg/M2 as panel. The design & style for the upper grill work
should be approved by the departmental Officers. MS Flat 18 x 5mm at 0.7 Kg/m is welded as additional stiffeners at
the rear side of the CR sheet panel. 2Nos of hold fasts of 120mm in length made out of 40x40x6mm MS Angle spliced
at the ends are welded to one side of the outer frame & the other side of the outer frame suitable arrangements should
be made to be fixed rigidily with adjoining door/ window outer frame. All members are given one coat of red oxide
primer as directed by the departmental officers. The rate includes cost of materials, labour charges, transportation,
taxes & all other incidental charges etc., complete.

Consider a size of 1.27x2.10m area = 2.67 M2


Top Vertical : 2x2.10 4.20
Top & bottom Horizontal:2x1.27 2.54
6.74 Rm
Wt.of angle : 6.74x3.5 kg/m 23.59 kg
Angle of size 35x35x5mm angle at 1/3 ht. from bottom
Horizontal 1x1x1.27 1.27m
Wt.of angle : 1.27x2.6 kg/m 3.30 kg
26.89 kg
Add 5% for wastage 1.34
28.23 kg
Shutter panel 1/3 bottom portion 18GCR sheet
1x1.259x0.688=0.867m2
Wt.of C.R.Sheet 0.867x9.80kg/m2 8.49 kg
Add 5% for wastage 0.42
8.91 kg
Shutter panel 2/3 Grill portion
Area of grill 1x1.259 x 1.389 1.75 m2
Wt. of Grill 1.75 x15kg/m2 26.25 kg
Add 5% for wastage 1.31 kg
27.56 kg
Painting area (2.667-1.75)x2.20 2.02 M2
Main Data
28.23 kg M.S. Angle
41.20 kg 1163.08
8.91 kg C.R. Sheet
41.20 kg 367.09
27.56 kg Grill
75.40 kg 2078.02
2.02 M2 Priming Coat
54.50 m2 110.09
35.38 kg Labour for cutting, welding & finishing
33.40 kg 1181.69
Eac
2.00 Nos Hold fast
67.30 h 134.60
2.67 M2 Labour charge for fixing
149.00 M2 397.83
L.S. Conveyance, Handling, Scaffolding, Chipping/Masonary concerete & making
L.S. 160.00
good the damaged portion
For 2.67M2
5592.40
Rate Rs. 2094.53

B 2095.00
9 Supplying and fixing solid core particle board flush shutter of nominal thick of 35 mm with necessary T.W.
internal lipping conforming to IS 2302 with both sides alround commercial ply 35mm thick including supplying
and fixing cost of wind appliances and furniture fittings such as 1no .200x12mm aluminium tower bolt 2nos.
150x12mm aluminium tower bolts 1no. 250x16mm aluminium aldrops, 3 nos. 200mm ‘D’ type aluminium door
handle and door stopper with bush etc., complete as directed by the departmental officers.

a) Single leaf:

Consider a door of size 1.00m x 2.10m 2.10 m2

Shutter size 0.91x2.05 1.87 m2

M.D.F Board = 0.91 x 2.05 1.87 m2

Add 10% Wastage 0.19 m2

2.06 m2

solid core particle board flush door shutters with both sides 3mm
2.06 m2 thick commercial ply of 35mm thick with T.W. internal lipping 1650.00 m2 3399.00
(internal alround)

Alu. Furniture

3 Nos Alu. Hinges (125mmx30mm) 78.40 Each 235.20

1 No 300x12mm tower bolt 114.10 Each 114.10

1 No 200x12 tower bolt 71.90 Each 71.90

1 No Alu. 250x16mm aldrop 158.20 Each 158.20

2 No 200 mm 'D' type handle 56.20 Each 112.40

1 Nos Door stopper with Rubber bush 43.80 Each 43.80

1.87 m2 Labour charges for making the flush door/single 140.00 m2 261.80

1.87 m2 Labour charges for fixing doors with frames 149.00 m2 278.63

Conveyance charges, dismantling and redooing to original


LS LS 160.00
position

For 1.87M2 4835.03

Rate Rs. 2585.58

Say Rs. 2586.00


10 Supplying and fixing solid core particle board flush shutter of nominal thick of 35 mm with necessary T.W.
internal lipping conforming to IS 2302 with both sides alround commercial ply 35mm thick including supplying
and fixing cost of wind appliances and furniture fittings such as 1no .200x12mm aluminium tower bolt 2nos.
150x12mm aluminium tower bolts 1no. 250x16mm aluminium aldrops, 3 nos. 200mm ‘D’ type aluminium door
handle and door stopper with bush etc., complete as directed by the departmental officers.

Double leaf:

Consider a door of size 1.50 x 2.10 M 3.15 m2

Shutter size 2x0.705x2.05 2.89 m2

M.D.F Board = 2x0.705x2.05 2.89 m2

Add 10% Wastage 0.29 m2

3.18 m2

Main data

solid core particle board flush door shutters with both sides 3mm
3.18 m2 thick commercial ply of 35mm thick with T.W. internal lipping 1650.00 m2 5247.00
(internal alround)

Alu. Furniture

6 Nos Alu. Hinges (125mm) 78.40 Each 470.40

2 No 300x12mm tower bolt 114.10 Each 228.20

1 Nos 200x12 tower bolt 71.90 Each 71.90

1 No Alu. 250x16mm aldrop 158.20 Each 158.20

3 Nos 200 mm 'D' type handle 56.20 Each 168.60

2 Nos Door stopper with Rubber bush 43.80 Each 87.60

2.89 m2 Labour charges for making the flush door/Double 216.00 m2 624.24

2.89 m2 Labour charges for fixing doors with frames 149.00 m2 430.61

Conveyance charges, dismantling and redooing to original


LS LS 190.00
position

For 2.89M2 7676.75

Rate Rs. 2656.31

Say Rs. 2656.00 /M2

11 Supplying and fixing Solid core Particle board flush shutter of nominal thick of 35 mm with Teak ply on both
sides and with T.W. lipping alround conforming to IS 2302 including supplying and fixing cost of wind
appliances and furniture fittings such as 1no .300 x 12 mm aluminium tower bolt 2 nos. 200x12 mm aluminium tower
bolts 1no. 250 x 16 mm aluminium aldrops, 2 nos. 200mm ‘D’ type aluminium door handle and door stopper with
bush etc., complete as directed by the departmental officers.

Single leaf:

Consider a door of size 1.00m x 2.10m 2.10 m2

Shutter size 0.91x2.05 1.87 m2

M.D.F Board = 0.91 x 2.05 1.87 m2


Add 10% Wastage 0.19 m2

2.06 m2
solid core particle board flush door shutters with both sides 3mm
2.06 m2 thick Teak ply of 35mm thick with T.W. internal lipping (internal 1925.00 m2 3965.50
alround)
Alu. Furniture

3 Nos Alu. Hinges (125mmx30mm) 78.40 Each 235.20

1 No 300x12mm tower bolt 114.10 Each 114.10

1 No 200x12 tower bolt 71.90 Each 71.90

1 No Alu. 250x16mm aldrop 158.20 Each 158.20

2 No 200 mm 'D' type handle 56.20 Each 112.40

1 Nos Door stopper with Rubber bush 43.80 Each 43.80

1.87 m2 Labour charges for making the flush door/single 140.00 m2 261.80

1.87 m2 Labour charges for fixing doors with frames 149.00 m2 278.63

Conveyance charges, dismantling and redooing to original


LS LS 160.00
position

For 1.87M2 5401.53

Rate Rs. 2888.52

Say Rs. 2889.00

12 Supplying and fixing solid core particle board flush shutter of nominal thick of 35 mm with necessary T.W.
internal lipping conforming to IS 2302 with both sides alround Teak ply 3mm thick including supplying and
fixing cost of wind appliances and furniture fittings such as 1no .300x12mm aluminium tower bolt 2nos. 200x12mm
aluminium tower bolts 1no. 250x16mm aluminium aldrops, 3 nos. 200mm ‘D’ type aluminium door handle and door
stopper with bush etc., complete as directed by the departmental officers.

Double leaf:

Consider a door of size 1.50 x 2.10 M 3.15 m2

Shutter size 2x0.705x2.05 2.89 m2

M.D.F Board = 2x0.705x2.05 2.89 m2

Add 10% Wastage 0.29 m2

3.18 m2

Main data
solid core particle board flush door shutters with both sides 3mm
3.18 m2 thick Teak ply of 35mm thick with T.W. internal lipping (internal 1925.00 m2 6121.50
alround)
Alu. Furniture

6 Nos Alu. Hinges (125mm) 78.40 Each 470.40

2 No 300x12mm tower bolt 114.10 Each 228.20

1 Nos 200x12 tower bolt 71.90 Each 71.90

1 No Alu. 250x16mm aldrop 158.20 Each 158.20

3 Nos 200 mm 'D' type handle 56.20 Each 168.60


2 Nos Door stopper with Rubber bush 43.80 Each 87.60

2.89 m2 Labour charges for making the flush door/double 216.00 m2 624.24

2.89 m2 Labour charges for fixing doors with frames 149.00 m2 430.61
Conveyance charges, dismantling and redooing to original
LS LS 190.00
position
For 2.89M2 8551.25

Rate Rs. 2958.91

Say Rs. 2959.00 /M2


13 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Both side Pre laminated
including external lipping with Kiln dried soft wood of 35mm thick conforming to IS 12406 / 1989 with necessary
adhesive and C.P. screws, including fixing of aldrops, tower bolts, hinges and lock strike plates, putty, fevical, varnish
for T.W. lipping with thinner colouring agent etc., The rate includes cost of materials and cost for aluminium furniture
fittings such as 3 nos Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 1no Alu. tower bolt of 300x12mm and 1 no
Alu. tower bolt of 200x12mm, 2 Nos Alu. Handles, 1 no door stopper with rubber bush incase of Single leaf door
inclusive of labour charges for fixing in position etc., complete. All Aluminium furniture fittings are to be anodised
with matt finish under electrically controlled condition in accordance with ISI specification 1868/1968 for anodic film
thickness of not less than 15 microns, The rate is inclusive cost of fevical and fixing charges, transportation, loading,
unloading and all other incidential charges, handling charges etc., complete complying with standard specification.

Single leaf:

Consider a door of size 1.00m x 2.10m 2.10 m2

Shutter size 0.91x2.05 1.87 m2

M.D.F Board = 0.91 x 2.05 1.87 m2

Add 10% Wastage 0.19 m2

2.06 m2

Requirement on lipping =2(0.91+2.05)= 5.92 RM

Main data

2.06 m2 MDF Board 35mm thickof Kiln dried soft wood 2120.00 m2 4367.20

Alu. Furniture

3 Nos Alu. Hinges (125mmx30mm) 78.40 Each 235.20

1 No 300x12mm tower bolt 114.10 Each 114.10

1 Nos 200x12 tower bolt 71.90 Each 71.90

1 No Alu. 250x16mm aldrop 158.20 Each 158.20

2 No 200 mm 'D' type handle 56.20 Each 112.40

1 No Door stopper with Rubber bush 43.80 Each 43.80

1.87 m2 Labour charges for making the flush door/single 140.00 m2 261.80

1.87 m2 Labour charges for fixing with frames 149.00 m2 278.63

LS LS for Screws, nails, Dismantling, redoing etc LS 160.00

For 1.87M2 5803.23

Rate Rs. 3103.33

Say Rs. 3103.00


14 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Both side Pre laminated
including external lipping with Kiln dried soft wood of 35mm thick conforming to IS 12406 / 1989 with 35 x
12mm T.W. on all edges with necessary adhesive and C.P. screws, including fixing of aldrops, tower bolts, hinges and
lock strike plates, putty, fevical, varnish for T.W. lipping with thinner colouring agent etc., The rate includes cost of
materials and cost for aluminium furniture fittings such as 6 nos Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm,
2nos Alu. tower bolt of 300x12mm and 1 no Alu. tower bolt of 200x12mm, 3 Nos Alu. Handles, 2 nos door stopper
with rubber bush incase of Single leaf door inclusive of labour charges for fixing in position etc., complete. All
Aluminium furniture fittings are to be anodised with matt finish under electrically controlled condition in accordance
with ISI specification 1868/1968 for anodic film thickness of not less than 15 microns, The rate is inclusive cost of
fevical and fixing charges, transportation, loading, unloading and all other incidential charges, handling charges etc.,
complete complying with standard specification.

Double leaf:

Consider a door of size 1.50 x 2.10 M


3.15 m2
Shutter size 2x0.705x2.05
2.89 m2
M.D.F Board = 2.00x0.705x2.05
2.89 m2
Add 10% Wastage
0.29 m2

3.18 m2
Requirement for lipping =
11.02 RM
2(2(0.705+2.05))=
Main data

3.18 m2 MDF Board 35mm thick of Kiln dried soft wood


2120.00 m2 6741.60
Alu. Ane. Furniture

6 Nos Alu. Hinges (125mm)


78.40 Each 470.40
2 No s 300x12mm tower bolt
114.10 Each 228.20
1 Nos 200x12 tower bolt
71.90 Each 71.90
1 No Alu. 250x16mm aldrop
158.20 Each 158.20
3 Nos 200 mm 'D' type handle
56.20 Each 168.60
2 No Door stopper with Rubber bush
43.80 Each 87.60
2.89 m2 Labour charges for making the flush door/Double
216.00 m2 624.24
2.89 m2 Labour charges for fixing with frames
149.00 m2 430.61
LS LS for Screws, nails, Dismantling, redoing etc
LS 190.00
For 2.89M2
9171.35
Rate Rs. 3173.48

Say Rs. 3173.00


15 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Plain including external
lipping with Kiln dried soft wood of 35mm thick conforming to IS 12406 / 1989 with necessary adhesive and C.P.
screws, including fixing of aldrops, tower bolts, hinges and lock strike plates, putty, fevical, varnish for T.W. lipping
with thinner colouring agent etc., The rate includes cost of materials and cost for aluminium furniture fittings such as
3 nos Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 1no Alu. tower bolt of 300x12mm and 1 no Alu. tower bolt
of 200x12mm, 2 Nos Alu. Handles, 1 no door stopper with rubber bush incase of Single leaf door inclusive of labour
charges for fixing in position etc., complete. All Aluminium furniture fittings are to be anodised with matt finish under
electrically controlled condition in accordance with ISI specification 1868/1968 for anodic film thickness of not less
than 15 microns, The rate is inclusive cost of fevical and fixing charges, transportation, loading, unloading and all
other incidential charges, handling charges etc., complete complying with standard specification.

Single leaf:

Consider a door of size 1.00m x 2.10m


2.10 m2
Shutter size 0.91x2.05
1.87 m2
M.D.F Board = 0.91 x 2.05
1.87 m2
Add 10% Wastage
0.19 m2

2.06 m2
Requirement on lipping =2(0.91+2.05)=
5.92 RM
Main data
2.06 m2 MDF Board 35mm thick of Plain Kiln dried soft wood 1730.00 m2 3563.80
Alu. Furniture
3 Nos Alu. Hinges (125mmx30mm)
78.40 Each 235.20
1 No 300x12mm tower bolt
114.10 Each 114.10
1 Nos 200x12 tower bolt
71.90 Each 71.90
1 No Alu. 250x16mm aldrop
158.20 Each 158.20
2 No 200 mm 'D' type handle
56.20 Each 112.40
1 No Door stopper with Rubber bush
43.80 Each 43.80
1.87 m2 Labour charges for making the flush door/single
140.00 m2 261.80
1.87 m2 Labour charges for fixing with frames
149.00 m2 278.63
LS LS for Screws, nails, Dismantling, redoing etc
LS 160.00
For 1.87M2
4999.83
Rate Rs. 2673.71
Say Rs. 2674.00
16 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Plain including external
lipping with Kiln dried soft wood of 35mm thick conforming to IS 12406 / 1989 with 35 x 12mm T.W. on all edges
with necessary adhesive and C.P. screws, including fixing of aldrops, tower bolts, hinges and lock strike plates, putty,
fevical, varnish for T.W. lipping with thinner colouring agent etc., The rate includes cost of materials and cost for
aluminium furniture fittings such as 6 nos Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 2nos Alu. tower bolt of
300x12mm and 1 no Alu. tower bolt of 200x12mm, 3 Nos Alu. Handles, 2 nos door stopper with rubber bush incase
of Single leaf door inclusive of labour charges for fixing in position etc., complete. All Aluminium furniture fittings
are to be anodised with matt finish under electrically controlled condition in accordance with ISI specification
1868/1968 for anodic film thickness of not less than 15 microns, The rate is inclusive cost of fevical and fixing
charges, transportation, loading, unloading and all other incidential charges, handling charges etc., complete
complying with standard specification.

Double leaf:

Consider a door of size 1.50 x 2.10 M


3.15 m2
Shutter size 2x0.705x2.05
2.89 m2
M.D.F Board = 2.00x0.705x2.05
2.89 m2
Add 10% Wastage
0.29 m2

3.18 m2
Requirement for lipping =
2(2(0.705+2.05))= 11.02 RM
Main data
3.18 m2 MDF Board 35mm thick of Plain Kiln dried soft wood 1730.00 m2 5501.40
Alu. Ane. Furniture
6 Nos Alu. Hinges (125mm) 78.40 Each 470.40
2 No s 300x12mm tower bolt 114.10 Each 228.20
1 Nos 200x12 tower bolt 71.90 Each 71.90
1 No Alu. 250x16mm aldrop 158.20 Each 158.20
3 Nos 200 mm 'D' type handle 56.20 Each 168.60
2 No Door stopper with Rubber bush 43.80 Each 87.60
2.89 m2 Labour charges for making the flush door/Double 216.00 m2 624.24
2.89 m2 Labour charges for fixing with frames 149.00 m2 430.61
LS LS for Screws, nails, Dismantling, redoing etc LS 190.00
For 2.89M2 7931.15
Rate Rs. 2744.34
Say Rs. 2744.00
17 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Plain including external
lipping with Kiln dried soft wood of 30 mm thick conforming to IS 12406 / 1989 with necessary adhesive and C.P.
screws, including fixing of aldrops, tower bolts, hinges and lock strike plates, putty, fevical, varnish for T.W. lipping
with thinner colouring agent etc., The rate includes cost of materials and cost for aluminium furniture fittings such as
3 nos Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 1no Alu. tower bolt of 300x12mm and 1 no Alu. tower bolt
of 200x12mm, 2 Nos Alu. Handles, 1 no door stopper with rubber bush incase of Single leaf door inclusive of labour
charges for fixing in position etc., complete. All Aluminium furniture fittings are to be anodised with matt finish under
electrically controlled condition in accordance with ISI specification 1868/1968 for anodic film thickness of not less
than 15 microns, The rate is inclusive cost of fevical and fixing charges, transportation, loading, unloading and all
other incidential charges, handling charges etc., complete complying with standard specification.

Single leaf:
Consider a door of size 1.00m x 2.10m 2.10 m2
Shutter size 0.91x2.05 1.87 m2
M.D.F Board = 0.91 x 2.05 1.87 m2
Add 10% Wastage 0.19 m2
2.06 m2
Requirement on lipping =2(0.91+2.05)= 5.92 RM
Main data

2.06 m2 MDF Board 30 mm thick of Plain Kiln dried soft wood


1595.00 m2 3285.70
Alu. Furniture
3 Nos Alu. Hinges (125mmx30mm)
78.40 Each 235.20
1 No 300x12mm tower bolt
114.10 Each 114.10
1 Nos 200x12 tower bolt
71.90 Each 71.90
1 No Alu. 250x16mm aldrop
158.20 Each 158.20
2 No 200 mm 'D' type handle
56.20 Each 112.40
1 No Door stopper with Rubber bush
43.80 Each 43.80
1.87 m2 Labour charges for making the flush door/single
140.00 m2 261.80
1.87 m2 Labour charges for fixing with frames
149.00 m2 278.63
LS LS for Screws, nails, Dismantling, redoing etc
LS 160.00
For 1.87M2
4721.73
Rate Rs. 2524.99
Say Rs. 2525.00
18 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Pre laminated Kiln dried
soft wood of 30 mm thick conforming to IS 12406 / 1989 with 35 x 12mm T.W. on all edges with necessary adhesive
and C.P. screws, including fixing of aldrops, tower bolts, hinges and lock strike plates, putty, fevical, varnish for T.W.
lipping with thinner colouring agent etc., The rate includes cost of materials and cost for aluminium furniture fittings
such as 6 nos Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 2nos Alu. tower bolt of 300x12mm and 1 no Alu.
tower bolt of 200x12mm, 3 Nos Alu. Handles, 2 nos door stopper with rubber bush incase of Single leaf door
inclusive of labour charges for fixing in position etc., complete. All Aluminium furniture fittings are to be anodised
with matt finish under electrically controlled condition in accordance with ISI specification 1868/1968 for anodic film
thickness of not less than 15 microns, The rate is inclusive cost of fevical and fixing charges, transportation, loading,
unloading and all other incidential charges, handling charges etc., complete complying with standard specification.

Double leaf:

Consider a door of size 1.50 x 2.10 M


3.15 m2
Shutter size 2x0.705x2.05
2.89 m2
M.D.F Board = 2.00x0.705x2.05
2.89 m2
Add 10% Wastage
0.29 m2

3.18 m2
Requirement for lipping =
2(2(0.705+2.05))= 11.02 RM
Main data

3.18 m2 MDF Board 30 mm thick of Plain Kiln dried soft wood


1595.00 m2 5072.10
Alu. Ane. Furniture
6 Nos Alu. Hinges (125mm)
78.40 Each 470.40
2 No s 300x12mm tower bolt
114.10 Each 228.20
1 Nos 200x12 tower bolt
71.90 Each 71.90
1 No Alu. 250x16mm aldrop
158.20 Each 158.20
3 Nos 200 mm 'D' type handle
56.20 Each 168.60
2 No Door stopper with Rubber bush
43.80 Each 87.60
2.89 m2 Labour charges for making the flush door/Double
216.00 m2 624.24
2.89 m2 Labour charges for fixing with frames
149.00 m2 430.61
LS LS for Screws, nails, Dismantling, redoing etc
LS 190.00
For 2.89M2 7501.85
Rate Rs. 2595.80
Say Rs. 2596.00
19 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Plain with Teakwood
external lipping alround of 35 mm thick conforming to IS 12406 / 1989 with necessary adhesive and C.P. screws,
including fixing of aldrops, tower bolts, hinges and lock strike plates, putty, fevical, varnish for T.W. lipping with
thinner colouring agent etc., The rate includes cost of materials and cost for aluminium furniture fittings such as 3 nos
Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 1no Alu. tower bolt of 300x12mm and 1 no Alu. tower bolt of
200x12mm, 2 Nos Alu. Handles, 1 no door stopper with rubber bush incase of Single leaf door inclusive of labour
charges for fixing in position etc., complete. All Aluminium furniture fittings are to be anodised with matt finish under
electrically controlled condition in accordance with ISI specification 1868/1968 for anodic film thickness of not less
than 15 microns, The rate is inclusive cost of fevical and fixing charges, transportation, loading, unloading and all
other incidential charges, handling charges etc., complete complying with standard specification.

Single leaf:

Consider a door of size 1.00m x 2.10m


2.10 m2
Shutter size 0.91x2.05
1.87 m2
M.D.F Board = 0.91 x 2.05
1.87 m2
Add 10% Wastage
0.19 m2

2.06 m2
Requirement on lipping =2(0.91+2.05)=
5.92 RM
Main data
2.06 m2 MDF Board 35mm thick Plain with Teakwood lipping 1860.00 m2 3831.60
Alu. Furniture
3 Nos Alu. Hinges (125mmx30mm)
78.40 Each 235.20
1 No 300x12mm tower bolt
114.10 Each 114.10
1 Nos 200x12 tower bolt
71.90 Each 71.90
1 No Alu. 250x16mm aldrop
158.20 Each 158.20
2 No 200 mm 'D' type handle
56.20 Each 112.40
1 No Door stopper with Rubber bush
43.80 Each 43.80
1.87 m2 Labour charges for making the flush door/single
140.00 m2 261.80
1.87 m2 Labour charges for fixing with frames
149.00 m2 278.63
LS LS for Screws, nails, Dismantling, redoing etc
LS 160.00
For 1.87M2
5267.63
Rate Rs. 2816.91
Say Rs. 2817.00
20 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Plain with Teakwood
external lipping alround of 35 mm thick conforming to IS 12406 / 1989 with 35 x 12mm T.W. on all edges with
necessary adhesive and C.P. screws, including fixing of aldrops, tower bolts, hinges and lock strike plates, putty,
fevical, varnish for T.W. lipping with thinner colouring agent etc., The rate includes cost of materials and cost for
aluminium furniture fittings such as 6 nos Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 2nos Alu. tower bolt of
300x12mm and 1 no Alu. tower bolt of 200x12mm, 3 Nos Alu. Handles, 2 nos door stopper with rubber bush incase
of Single leaf door inclusive of labour charges for fixing in position etc., complete. All Aluminium furniture fittings
are to be anodised with matt finish under electrically controlled condition in accordance with ISI specification
1868/1968 for anodic film thickness of not less than 15 microns, The rate is inclusive cost of fevical and fixing
charges, transportation, loading, unloading and all other incidential charges, handling charges etc., complete
complying with standard specification.

Double leaf:

Consider a door of size 1.50 x 2.10 M


3.15 m2
Shutter size 2x0.705x2.05
2.89 m2
M.D.F Board = 2.00x0.705x2.05
2.89 m2
Add 10% Wastage
0.29 m2

3.18 m2
Requirement for lipping =
2(2(0.705+2.05))= 11.02 RM
Main data
3.18 m2 MDF Board 35mm thick Plain with Teakwood lipping
1860.00 m2 5914.80
Alu. Ane. Furniture
6 Nos Alu. Hinges (125mm)
78.40 Each 470.40
2 No s 300x12mm tower bolt
114.10 Each 228.20
1 Nos 200x12 tower bolt
71.90 Each 71.90
1 No Alu. 250x16mm aldrop
158.20 Each 158.20
3 Nos 200 mm 'D' type handle
56.20 Each 168.60
2 No Door stopper with Rubber bush
43.80 Each 87.60
2.89 m2 Labour charges for making the flush door/Double
216.00 m2 624.24
2.89 m2 Labour charges for fixing with frames
149.00 m2 430.61
LS LS for Screws, nails, Dismantling, redoing etc LS 190.00
For 2.89M2 8344.55
Rate Rs. 2887.39
Say Rs. 2887.00
21 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Plain with Teakwood
external lipping alround of 30 mm thick conforming to IS 12406 / 1989 with necessary adhesive and C.P. screws,
including fixing of aldrops, tower bolts, hinges and lock strike plates, putty, fevical, varnish for T.W. lipping with
thinner colouring agent etc., The rate includes cost of materials and cost for aluminium furniture fittings such as 3 nos
Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 1no Alu. tower bolt of 300x12mm and 1 no Alu. tower bolt of
200x12mm, 2 Nos Alu. Handles, 1 no door stopper with rubber bush incase of Single leaf door inclusive of labour
charges for fixing in position etc., complete. All Aluminium furniture fittings are to be anodised with matt finish under
electrically controlled condition in accordance with ISI specification 1868/1968 for anodic film thickness of not less
than 15 microns, The rate is inclusive cost of fevical and fixing charges, transportation, loading, unloading and all
other incidential charges, handling charges etc., complete complying with standard specification.

Single leaf:
Consider a door of size 1.00m x 2.10m
2.10 m2
Shutter size 0.91x2.05
1.87 m2
M.D.F Board = 0.91 x 2.05
1.87 m2
Add 10% Wastage
0.19 m2
2.06 m2
Requirement on lipping =2(0.91+2.05)=
5.92 RM
Main data
2.06 m2 MDF Board 30 mm thick Plain with Teakwood lipping
1650.00 m2 3399.00
Alu. Furniture
3 Nos Alu. Hinges (125mmx30mm) 78.40 Each 235.20
1 No 300x12mm tower bolt 114.10 Each 114.10
1 Nos 200x12 tower bolt 71.90 Each 71.90
1 No Alu. 250x16mm aldrop 158.20 Each 158.20
2 No 200 mm 'D' type handle 56.20 Each 112.40
1 No Door stopper with Rubber bush 43.80 Each 43.80
1.87 m2 Labour charges for making the flush door/single 140.00 m2 261.80
1.87 m2 Labour charges for fixing with frames 149.00 m2 278.63
LS LS for Screws, nails, Dismantling, redoing etc
LS 175.00
For 1.87M2
4850.03
Rate Rs. 2593.60
Say Rs. 2594.00
22 Supplying and fixing door shutters for Medium Density Fibre board of exterior grade, Plain with Teakwood
external lipping alround of 30 mm thick conforming to IS 12406 / 1989 with 35 x 12mm T.W. on all edges with
necessary adhesive and C.P. screws, including fixing of aldrops, tower bolts, hinges and lock strike plates, putty,
fevical, varnish for T.W. lipping with thinner colouring agent etc., The rate includes cost of materials and cost for
aluminium furniture fittings such as 6 nos Alu. hinges 125mm, 1 no Alu. aldrop 250 x 16mm, 2nos Alu. tower bolt of
300x12mm and 1 no Alu. tower bolt of 200x12mm, 3 Nos Alu. Handles, 2 nos door stopper with rubber bush incase
of Single leaf door inclusive of labour charges for fixing in position etc., complete. All Aluminium furniture fittings
are to be anodised with matt finish under electrically controlled condition in accordance with ISI specification
1868/1968 for anodic film thickness of not less than 15 microns, The rate is inclusive cost of fevical and fixing
charges, transportation, loading, unloading and all other incidential charges, handling charges etc., complete
complying with standard specification.

Double leaf:

Consider a door of size 1.50 x 2.10 M


3.15 m2
Shutter size 2x0.705x2.05
2.89 m2
M.D.F Board = 2.00x0.705x2.05
2.89 m2
Add 10% Wastage
0.29 m2

3.18 m2
Requirement for lipping =
2(2(0.705+2.05))= 11.02 RM
Main data
3.18 m2 MDF Board 30 mm thick Plain with Teakwood lipping 1650.00 m2 5247.00
Alu. Furniture
6 Nos Alu. Hinges (125mm) 78.40 Each 470.40
2 No s 300x12mm tower bolt 114.10 Each 228.20
1 Nos 200x12 tower bolt 71.90 Each 71.90
1 No Alu. 250x16mm aldrop 158.20 Each 158.20
3 Nos 200 mm 'D' type handle 56.20 Each 168.60
2 No Door stopper with Rubber bush 43.80 Each 87.60
2.89 m2 Labour charges for making the flush door/Double 216.00 m2 624.24
2.89 m2 Labour charges for fixing with frames 149.00 m2 430.61
LS LS for Screws, nails, Dismantling, redoing etc LS 200.00
For 2.89M2 7686.75
Rate Rs. 2659.78
Say Rs. 2660.00
23 Supplying and fixing PVC sliding door for Disabled persons toilet in with Solid
PVC door shutters using 19 Gauge 19mm MS square tubes for styles and outer
frames, 15mm MS square tubes for top, lock and bottom rails. The steel tubes shall be
covered with 5mm thick solid PVC sheets. Shutter using 5mm thick solid PVC sheets
for panelling shall rigidly fixed in position including necessary furniture and fittings.
The over all size of styles shall be 50mm x 30mm. The over all size of top rail, Lock
rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm
x 45mm, with suitable rabate for housing the shutter including slidng arrangements.

Size of Door : 0.75x2.10=1.575m2

PVC shutter area 0.65x1.90


1.24 m2
Main data

1.24 m2 PVC shutters without frame

2360.00 m2 2926.40
2 Nos PVC Roller

13.75 Each 27.50


1 Nos Lock

62.80 Each 62.80


2 Nos D Type Handle(100mm long)

30.90 Each 61.80


LS Labour charges for fixing, Screws, nails dismantling and redoing
extra
LS 300.00
For 1.575 m2

3378.50
Rate Rs.
2145.08
Say Rs.
2145.00
/M2
24 Supplying and fixing PVC sliding door with Solid PVC door shutters using 19 Gauge
19mm MS square tubes for styles and outer frames, 15mm MS square tubes for top,
lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC
sheets. Shutter using 5mm thick solid PVC sheets for panelling shall rigidly fixed in
position including necessary furniture and fittings. The over all size of styles shall be
50mm x 30mm. The over all size of top rail, Lock rail and bottom rail shall be 75mm
x 30mm. The over all size of frames shall be 50mm x 45mm, with suitable rabate for
housing the shutter including slidng arrangements.

Size of Door : 0.75x2.10=1.575m2


Main data
1.575 m3 PVC shutters with frame 2800.00 m3 4410.00
2 Nos PVC Roller 13.75 Each 27.50
1 Nos Lock 62.80 Each 62.80
2 Nos D Type Handle 30.90 Each 61.80
LS Labour charges for fixing, Screws, nails dismantling and redoing
extra LS 300.00
For 1.575 m2 4862.10
Rate Rs. 3087.05
Say Rs. 3087.00 /M2
Manufacturing, supplying and fixing of cupboard shutter using
country wood (kongu) frame of 100 m x 32 mm thick for outer frame
horizontal and vertical memebers. The shutter frame of size 75 x 32
mm of country wood scantling (Horizontal 3 nos., Vertical 2 nos., of
reach shutter) with 12 mm thick both side prelaminated particle
board (exterior grade) shutter.The shutter are fixed to the frame
with requied 6 nos., o alumium hings 100 x 30 mm 2 nos., 'D' type
alumium hadle 100 mm 2 nos., of aluminum tower bolts 75 x 10 mm
2 nos., of cupboard lock etc., the country wood frame shall be
painted two coats with synthetic enamel paint over one coat of wood
primer. The prelaminated particle board and furniture fittings used
should be got approved by the Executive Engineer before use on 0
works. The cost is inclusive of alumnum handle. tower bolts, piano
type Consider
hingers,size
screws, 2.52
nails, and required further fittings and painting
of 1.20x2.10 M2
the frame and inner side of prelaminate shutter etc., complete
Outer Frame
complying
Verticalwith
1 x 2 standard specification.
x 2.10 x 0.10 x 0.035 0.015 M3
Horizontal 1 x 2 x 1.20 x 0.10 x 0.035 0.0084 M3
0.0234 M3
Shutter frame
Vertical 2 x 2 x 1.90 x 0.075 x 0.032 0.0182 M3
Horizontal 2 x3x 0.50 x 0.075 x 0.032 0.0072 M3
0.0254 M3
Total 0.0488
Shutter - Prelaminated Board

2 x 2 x 0.875 x 0.50 1.75 M2


Add 10% wastage 0.18
1.93
Main Data

0.0488 M3 C.W. scantling over 2.00 m in length 34300.00 M3 1673.84


0.0488 M3 Labour for Wrought & put up 14805.19 M3 722.49
1.93 M2 MDF 12mm prelaminated both side
1020.00 M2 1968.60
1.75 M 2
Labour charges Wrought& put up
165.00 M 2
288.75
6 Nos Aluminium Hinges 100x30
62.90 Each 377.40
2 Nos Aluminium Handles 100mm 30.90 Each 61.80
2 Nos Aluminium Tower bolt 75x10mm 34.80 Each 69.60
1 No Cup board lock 62.80 Each 62.80
LS Screws, nails, dismandling and redoing incidental charges and
other charges including painting LS 200.00
Rate for 2.52 5425.28
Rate Rs. 2152.89 1/M2
Say Rs. 2153.00
5 Manufacturing, supplying and fixing of Steel doors with the following specification M.S angles of a size 40x40x6mm
are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S.
flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded
intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sand witching the
CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter.
The balance 2/3 portion at top is provided with grill at an average weight of 20kg/sq.m and 6 Nos hinges for double
leaves shutter to be provided 6nos of holdfasts 120mm in length made of angle section spliced at the ends are welded
to the outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom arte provided one aldrop is
provided at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent twisting
of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by the
departmental officers. The rate includes cost of all meterials, labour charges, taxes, transportation to site of work,
loading, unloading and all other incidental charges etc., complete.

Double leaf Door size 1.8 X 2.1M (1/3 panneled&2/3 grilled) 3.78 m2
Materials required
Outer frame 40x40x6mm
Vertical 1x2x2.1 4.20 m
Horizontal 1x1x1.80 1.80
6x3.5Kg/m 21.00 Kg
Shutter frame 35x35x5mm
Vertical 1x2x2x2.088 = 8.35 m
Horizontal 2x2x0.894 3.58 m
11.93
11.93x2.60Kg/m 31.02 Kg
Intermediate J Section in between Grill & CR sheet
2x0.894x2.28Kg 4.08 Kg
Tie bar 32x6mm flat 1x1.8x1.5Kg 2.70 Kg
Stiffeners 18x 5 mm MS flat at rear side
Horizontal 2x1x0.894x0.7 Kg 1.25 Kg
Diagonal 2x2x1.273x0.7 Kg 3.56 Kg
MS flat 32x3mm@ edge of CR Sheet 1x0.7x1.1KG 0.77 Kg
Total 64.38 Kg
Add 5% wastage 3.22 Kg
67.60 Kg
CR Sheet reqd. 1x2x0.894x0.7x9.8 Kg/m2 12.27 kg
Add 5% wastage 0.61 kg
12.88 kg
MS grill of 20kg/m2 1x2x0.894x1.4x20kg/m2 50.06 kg
Add 5% wastage 2.50 kg
52.56 kg
Painting Red oxide primer 1.8x2.1=3.78m2-2.50m2 1.28 M2
1.28x2.2 2.82 M2
Main Data
67.60 kg MS angles & Flats 41.20 kg 2785.12
12.88 kg CR sheet18 gauge 41.20 kg 530.66
52.56 kg MS grill includingfabrication charges 75.40 kg 3963.02
76.64 Kg Labour charges for cutting welding and fabrication
of angles sheets in position & fixing 33.40 kg 2559.78
2.82 M2 Priming coat 54.50 M2 153.69
6 Nos Hold Fasts 200mm length 67.30 Each 403.80
4 Nos Hinges 125mmx30mm 78.40 Each 313.60
2 Nos Tower Bolt250mm long 12mm dia 85.50 Each 171.00
1 Nos Tower Bolt 200 mm long 12mm dia 71.90 Each 71.90
1 No Aldrop 250mm long 16mm dia 158.20 Each 158.20
2 Nos Ms Handle 200mm long 56.20 Each 112.40
3.78 M2 labour charges for fixing door 149.00 M2 563.22
LS Conveyance,Handling,Scaffolding,Chipping
masonry,concrete etc& redoing the same LS LS 240.00
12026.39
3181.58
For 3.78M2 3181.58
Rate Rs. 3182.00 /M2
5 Manufacturing, supplying and fixing of Steel doors with the following specification M.S angles of a size 40x40x6mm
are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S.
flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded
intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sand witching
the CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the
shutter. The balance 2/3 portion at top is provided with grill at an average weight of 20kg/sq.m with 3mm pin
headed glass used for glazing and fixed with 15x12 mm teakwood beeding and 6 Nos hinges for double leaves
shutter to be provided 6nos of holdfasts 120mm in length made of angle section spliced at the ends are welded to the
outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom arte provided one aldrop is provided
at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent twisting of frame
during transportation or fixing. All members are given one coat of red oxide primer as directed by the departmental
officers.
Double The rate
leaf includes
Door costXof2.1M(1/3
size 1.8 all meterials, labour charges,
panneled&2/3 taxes,
grilled withtransportation
glazing)) to site of3.78
work, m2
loading, unloading
and all other incidental charges etc., complete.
Materials required
Outer frame 40x40x6mm
Vertical 1x2x2.1 4.20 m
Horizontal 1x1x1.80 1.80
6x3.5Kg/m 21.00 Kg
Shutter frame 35x35x5mm
Vertical 1x2x2x2.088 = 8.35 m
Horizontal 2x2x0.894 3.58 m
11.93
11.93x2.60Kg/m 31.02 Kg
Intermediate J Section in betn Grill & CR sheet
2x0.894x2.28Kg 4.08 Kg
Tie bar 32x6mm flat 1x1.8x1.5Kg 2.70 Kg
Stiffeners 18x 5 mm MS flat at rear side
Horizontal 2x1x0.894x0.7 Kg 1.25 Kg
Diagonal 2x2x1.273x0.7 Kg 3.56 Kg
MS flat 32x3mm@ edge of CR Sheet 1x0.7x1.1KG 0.77 Kg
Total 64.38 Kg
Add 5% wastage 3.22 Kg
67.60 Kg
CR Sheet reqd. 1x2x0.894x0.7x9.8 Kg/m2 12.27 kg
Add 5% wastage 0.61 kg
12.88 kg
MS grill of 20kg/m2 1x2x0.894x1.4x20kg/m2 50.06 kg
Add 5% wastage 2.50 kg
52.56 kg
3 mm Pin headed glass : 1X2X0.894X1.40 2.50
Add 10% wastage 0.25
2.75
Teakwood Beeding :2x2(0.894+1.40) 9.18
Painting Red oxide primer 1.8x2.1=3.78m2-2.50m2 1.28 M2
1.28x2.2 2.82 M2
Main Data
67.60 kg MS angles & Flats 41.20 kg 2785.12
12.88 kg CR sheet18 gauge 41.20 kg 530.66
52.56 kg MS grill includingfabrication charges 75.40 kg 3963.02
2.75 M2 3 mm Pin headed glass 220.00 M2 605.00
9.18 Rm Teakwood Beeding 15.00 Rm 137.70
76.64 Kg Labour charges for cutting welding and fabrication
of angles sheets in position & fixing 33.40 kg 2559.78
2.82 M2 Priming coat 54.50 M2 153.69
6 Nos Hold Fasts 200mm length 67.30 Each 403.80
4 Nos Hinges 125mmx30mm 78.40 Each 313.60
2 Nos Tower Bolt250mm long 12mm dia 85.50 Each 171.00
1 Nos Tower Bolt 200 mm long 12mm dia 71.90 Each 71.90
1 No Aldrop 250mm long 16mm dia 158.20 Each 158.20
2 Nos Ms Handle 200mm long 56.20 Each 112.40
3.78 M2 labour charges for fixing door 149.00 M2 563.22
LS Conveyance,Handling,Scaffolding,Chippingmasonry ,concrete etc & redoing the sam 240.00
12769.09
3378.07
For 3.78M2 3378.07
Rate Rs. 3378.00 /M2
26 Supplying ,fabricating and fixing in position of steel frame without
bottom frame, of size 100X60mm rectangular section with necessary
rebate 30mmX15mm, to host the shutter,using 1.25mm thick (18
guage) CRCA cold rolled frame steel plate confirming to ISI
specified ensured of right butt joint riveted hold assembly with nylon
insert,not be welded with special purpose hard ware.Proclaimed
including phopating as per ISI with rust preventive primer ready to
assemble condition for easy installation at site including
dismantling,making necessary chipping and holes in RCC columns,
walls with power drills to the extent required ,including providing
concrete 1:2:4 inside the box curing etc complete.The cost includes
the cost of hold fast ,plastic bush, insert receiver,rubber
bottom,shock absorber etc complete as directed by the departmental
officers in all floors.

1.00 Rm Cost of Door frame


350.00 Rm 350.00
### P.C.C 1:2:4 Using 20mm HBGS Jelly
M3 4515.90 M3 28.45
Rate per RM Rs.
378.45

378.50
"N "TYPE VENTILATOR
8 Fabrication, supply and fixing in position of 'N' type ventilators using M.S. angle of size 25 x 25 x5 mm for frame
and M.S. Flat of size 20 x 3 mm for fixing the weld mesh and using 25 x 22 x3 mm 'T' section for frame glass. Special
type of Hold fast welded to the frame of 45 degree inclined towards centre for wall and fxing the weldmesh 25mm
square including cost of 3mm thick pinheaded glass panes for all panels and fixing the glass panels with necessary
clips & putties with required bolts, nuts and washers and one coat of red oxide primer etc. including necessary
dismantling, making holes in RCC columns, beams, masonry wherever necessary with power drill to the extend
required and made good to the original conditions after fising as directed by the departmental officers.
Consider a size of ventilator 2.5 x 0.6 1.50 M2
L Angle 25x25x5mm
Horizontal member 4.00 2.5 10.00
Vertical 4.00 0.35 1.40
Hold fast 4.00 0.15 0.60
Subtotal 12.00
Total weight of 'L' Angle @ 1.8 kg/rm 21.6 Kg
25 x 22 x 3 mm 'T' section @ 1.03 kg/rm 2.00 0.35 2.80
Weight of' T' section @ 1.03 kg/rm 2.884 Kg
Subtotal
M.S. Flat @ 0.5 kg/m 2.00 4 0.20
2(2.50 - 2x.0.025)4 nos. 1.96
Weight of' M.S. Flat @ 0.5 kg/mtotal 0.98 Kg
Alround @ 0.5 kg/rm 2.50 2 5.00
0.50 Kg
Total weight of 'L' Angle,T section,M.S.Flat 21.6+2.884+0.+2.50 27.96
Add 5% for wastage 1.40
29.36Kg
0.20 Weld mesh 2.50 m2 0.50
Glass 10x0.5x0.30 m2 1.50
Add 10 % for wastage 0.15
1.65
Primer ( 1.96+5)x0.025=0.174m2
14.80x.025 =0.37m2
0.544m2
29.36 Kg MS angles & Flats 41.20 Kg 1209.63
0.50 m2 Weld mesh 75x25mm 295.00 m2 147.50
1.65 m2 3mm thick pin headed Glass 220.00 m2 363.00
0.54 m2 Priming coat 54.50 m2 21.68
27.960 Kg Labour charges 33.40 Kg 933.86
LS Dismantling, red oxide charge etc. & LS 150.00
glass pin etc
Total for 1.50m2 2825.68
Rate per 1 m2 1883.78
Say per m2 Rs. 1884.00
1 Supplying and fixing Teakwood frame with scantling above 2m for doors including labour charges for wrought
and putup in possible and for fixing holdfast in frame and necessary etc., complete.

T.W.Scantling upto 3m m3
1 m3 Cost of T.W. Scantlings 111600.00 111600.00
1 m3 labour charges for wrought and putup 8935.00 m3 8935.00

120535.00
Rate Rs. 120535.00 m3

2 Supplying and fixing Teakwood fully panelled shutters for using Teakwood scantlings upto 4m length and
teakwood 40mm thick for styles and rails and 22mm thick for planks and panels including cost of wind
appliances and labour charges for fixing the furniture fittings in position but excluding cost of furniture fittings
complete as directed by the Departmental officers.

Consider a door size of 0.90m x 2.10m


Shutter size - 0.80 x 2.045 = 1.636 m2
T.W. Scantlings above 2m long for styles
2x2.045x0.10x0.04 0.01636 m3
T.W. Scantlings below 2m long for rails :-
Top rail :- 1x0.80x0.10x0.04 0.0032
Intermediate rail :- 3.00x0.77x0.10x0.04 0.00924 cum
Lock rail :- 1x0.77x0.18x0.04 0.005544
Bottom rail :- 1x0.80x0.15x0.04 0.0048
Sub Total 0.02278 cum

Teak wood planks :- 5x0.624x0.29x0.022 0.199056


0.199100
Main Data
0.01636 m3 T.W. Scantlings above 2m long 111600.00 cum 1825.78
0.02278 m3 T.W. Scantlings below 2m long 99400.00 cum 2264.33
0.01991 m3 T.W. planks 22mm tk below 300mm wide 93100.00 cum 1853.62
1.636 m2 Labours wrought and putup (S.R. item no. 144) 767.00 1254.81
LS Wind appliance & Sand paper etc.,and fixing charges L.S. 190.00
Total for 17.96 m2 Rs. 7388.54

Rate per 1.636 m2 Rs.


4516.22
Say Rs. 4516.00 / M2
1 Fabricating, Supplying and fixng in position of steel sheeted windows ( Two Leaves) with the following
specifications. Outer frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J'
section (F4B) of size 46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as
2 numbers of sturdy hinges and one number of handle-cum-latch of special type made with 18x5mm MS flats are
specified in IS 7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations
revetted to the shutters at an appropriate height in window. suitable opening is left for its easy operation. a stopper
and easy maintenance. The panel of the shutters to be covered with 18 gauge cold rolled sheet of superior quality and
square rod for handle is provided in the mullion section at suitable place to catch the window handle. each window
welded intact with shutter frames. Horizontal stiffeners using 18x5mm MS Flat at 0.70kg/m at 3 Nos. for each shutter
shutter having an adustable stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable
and additional diagonal stiffners of the same MS flats at all the four corners of each shutters to the suitable length
position. A matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm
welded to the shutters, for holding the CR Sheets in position firmly.
length spliced at the ends are welded to the outer frame of the window by using MS flat of 18x5mm at 0.70kg/m,
welded to the shutter at two place equivalent from each from top and bottom of the shutter.
An MS square bar of 12mm size is welded to the inner face of the window at an equal interval not exceeding 100mm
edge between them. All members are painted with one coat of anti-corrosive red oxide primer as directed by the
departmental officers.All sections should be in confirmed with IS 7452/1990.The cost includes cost of all materials,
labour charges and other incidental charges, etc., complete
Two Leaves - 1.20x1.30m
Area of window 1.56 M2
Outer frame F7D section 33x25x3mm
Horizontal : 1x2x1.20x1.419 kg/m 3.41 kg
Vertical : 1x2x1.30x1.419 Kg/m 3.70 kg
Shutter frame F7D section 33x25x3mm
Horizontal : 2x2x0.56 kg/m 3.18 kg
Vertical : 2x2x1.26x1.419 Kg/m 7.15 kg
J' Section centre Mullion F4 'B' section
1x1.26x2.28 kg/m 2.87 kg
20.31 kg
Add 5% wastage 1.01 kg
21.32 kg
MS flats for stiffeners 18mmx5mm
Horizontal stiffeners = 2x3x0.54x0.70kg/m 2.27 kg
Vertical stiffeners 2x4x0.08x0.70 kg/m 0.45 kg
2.72 kg
Add 5% wastage 0.14 kg
2.86 kg
CR sheet of 18kg @ 9.80 kg/m2
1x1x1.15x1.25x9.80 14.11 kg
Add 5% wastage 0.71 kg
14.82 kg
Protective MS rods 12mm square
12x1.20x1.13 kg/m 16.27 kg
Add 5% wastage 0.81 kg
17.08 kg
Area of priming coat
For window 1x1x1.20x1.30x2.20 3.43 M2
For MS rods 12x0.048x1.20 0.69 M2
4.12 M2
Main data
21.32 kg Special Steel Section including fabrication charges 60.90 kg 1298.39
2.86 kg MS Flats and Angles 41.20 kg 117.83
14.82 kg CRS 18G 41.20 kg 610.58
17.08 kg MS Rod 12mm dia 41.20 kg 703.70
16.27 kg Fixing MS rod 19.40 kg 315.64
16.83 kg Labour for cutting angles,CRS,Welding & fabrication with special 33.40 kg 562.12
1.56 M2 angles
Labour for fixing windows & furniture 187.00 m2 291.72
2.00 Nos Window Stay 51.00 E 102.00
4.00 Nos Hold Fasts 67.30 E 269.20
4.00 Nos Hinges 100mmx30mm 62.90 E 251.60
2.00 Nos Handles 150mm long 50.40 E 100.80
4.12 M2 Priming Coat 54.50 m2 224.54
L.S Conveyance, Handling, Scaffolding, Chipping Masonary
concerete & making good the damaged portion 190.00
For 1.56M2 5038.12
Rate Rs. 3229.56
Say Rs. 3230.00
2 Fabricating, Supplying and fixng in position of steel sheeted windows ( Three Leaves) with the following
specifications. Outer frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J'
section (F4B) of size 46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as
specified in IS 7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations
and easy maintenance. The panel of the shutters to be covered with 18 gauge cold rolled sheet of superior quality and
welded intact with shutter frames. Horizontal stiffeners using 18x5mm MS Flat at 0.70kg/m at 3 Nos. for each shutter
and additional diagonal stiffners of the same MS flats at all the four corners of each shutters to the suitable length
welded to the shutters, for holding the CR Sheets in position firmly.
2 numbers of sturdy hinges and one number of handle-cum-latch of special type made with 18x5mm MS flats are
revetted to the shutters at an appropriate height in window. suitable opening is left for its easy operation. a stopper
square rod for handle is provided in the mullion section at suitable place to catch the window handle. each window
shutter having an adustable stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable
position. A matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm
length
An MSspliced
square at
bartheofends
12mm aresize
welded to the to
is welded outer
the frame of the
inner face of window by using
the window at an MS flatinterval
equal of 18x5mm at 0.70kg/m,
not exceeding 100mm
welded to the shutter
edge between them. All at two place are
members equivalent
painted from eachcoat
with one fromoftop and bottom red
anti-corrosive of the shutter.
oxide primer as directed by the
departmental officers.All sections should be in confirmed with IS 7452/1990.The cost includes cost of all materials,
labour charges and other incidental charges, etc., complete
Three Leaves - 1.50x1.30m
Area of window 1.95 M2
Outer frame F7D section 33x25x3mm
Horizontal : 1x2x1.50x1.419 kg/m 4.26 kg
Vertical : 1x2x1.30x1.419 Kg/m 3.69 kg
Shutter frame F7D section 33x25x3mm
Horizontal : 3x2x0.46x1.419 kg/m 3.92 kg
Vertical : 3x2x1.26x1.419 Kg/m 10.73 kg
J' Section centre Mullion F4 'B' section
1x2x1.26x2.28 kg/m 5.75 kg
28.35 kg
Add 5% wastage 1.42 kg
29.77 kg
MS flats for stiffeners 18mmx5mm size at 0.70kg/m
Horizontal stiffeners = 3x3x0.44x0.70kg/m 2.77 kg
Diagonal 3x4x0.08x0.70 kg/m 0.67 kg
3.44 kg
Add 5% wastage 0.17 kg
3.61 kg
MS bar 12Nos (12mm dia)
1x12x1.50x1.13kg/m 20.34 kg
Add 5% wastage 1.02 kg
21.36 kg
CR sheet of 18kg @ 9.80 kg/m2
1.45x1.25x9.80 17.76 kg
Add 5% wastage 0.89 kg
18.65 kg
Area of priming coat
For window 1.50x1.30x2.20 4.29 M2
For MS rods 12x0.048x1.50 0.86 M2
5.15 M2
Main data
29.77 kg Special Steel Section including fabrication charges 60.90 kg 1812.99
3.61 kg MS Flats and Angles 41.20 kg 148.73
18.65 kg CRS 18G 41.20 kg 768.38
21.36 kg MS Rod 12mm dia 41.20 kg 880.03
20.34 kg Fixing MS rod 19.40 kg 394.60
21.2 kg Labour for cutting angles,CRS,Welding 33.40 kg 708.08
1.95 M2 Labour for fixing windows & furniture 187.00 m2 364.65
3.00 Nos Window Stay 51.00 E 153.00
4.00 Nos Hold Fasts 67.30 E 269.20
6.00 Nos Hinges 100mmx30mm 62.90 E 377.40
3.00 Nos Handles 150mm long 50.40 E 151.20
5.15 M2 Priming Coat 54.50 m2 280.68
L.S Conveyance, Handling, Scaffolding, Chipping Masonary 200.00
concerete & making good the damaged portion For 1.95M2 6508.94
Rate Rs. 3337.92 M2
Rate Rs. 3337.92
Say Rs. 3338.00 M2
3 Manufacturing, supplying and fixing in position of MS steel windows (Three
Leaves)with 4mm FRP transparent sheets instead of glass panes with the
following specifications. Outer frames of windows made of 'Z' section F7D of size
33 x 25 x 3 mm at 1.419 Kg/m and mullion ' O ' section (F4B) of size 46 x 25 x 3
mm at 2.28 Kg/m and shutter section made of F7D of 33 x 25 x 3 mm at 1.419
Kg/m as specified in IS 7452/1990. Each openeble shutter should not exceed a
width of 600 mm to enable separate operations and easy maintenance. The panel
of the shutter to be covered with 18 Gauge cold rolled sheet of superior quality
and welded intact with shutter frames. horizontal stiffeners using 18 x 5 mm MS
Flat at all four corners of each shutters to the suitable length welded to the
shutters for holding the CR sheets in position firmly. Two numbers of sturdy
hinges and one number of handle-cum-latch of special type made with 18 x 5mm
MS Flats are rivetted to the shutters at an appropriate height in window. Suitable
opening in left for its easy operation. A stopper square rod for handle is provided
in the mullionsection at suitable place to catch the window handle. Each window
shutter having an adjustable position. a matching peg is provided in the outer
frame of the
Four nos windowof
of holdfast at10mm
suitable place.
length spliced at the the ends are welded to the
outer frame of the window by using MS Flat of 18 x 5 mm at 0.70 Kg/m, welded
to the shutter at two place equivalent from each other from top and bottom of
the shutter. An MS square bar of 12mm size is welded to the inner face of the
window at an equal intervaal not exceeding 100mm edge to edge between them.
All members are painted with one coat of anti corrossive red oxide primer as
directed by the department officers. All sections should be in confirmed with IS
7452/1990. The cost includes cost of all materials, labour charges and other
incidental charges, etc., complete.
Three Leaves - 1.50x1.30m
Area of window 1.95 M2
Outer frame F7D section 33x25x3mm
Horizontal : 1x2x1.50x1.419 kg/m 4.26 kg
Vertical : 1x2x1.30x1.419 Kg/m 3.69 kg
Shutter frame F7D section 33x25x3mm
Horizontal : 3x2x0.46x1.419 kg/m 3.92 kg
Vertical : 3x2x1.26x1.419 Kg/m 10.73 kg
J' Section centre Mullion F4 'B' section
1x2x1.256x2.28 kg/m 5.73 kg
28.33 kg
Add 5% wastage 1.42 kg
29.75 kg
MS flats for stiffeners 4Nos.of 18mmx5mm size at 0.70kg/m
Horizontal stiffeners = 4x1.5 -- 4.030 kg
(0.022x2)+(2x.025)+(2x3x.025)*0.7
Add 5% wastage 0.20 kg
4.23 kg
MS bar 12Nos (12mm dia)
1x12x1.50x1.13kg/m 20.34 kg
Add 5% wastage 1.02 kg
21.36 kg
FRP transparent sheet 4mm thick
(1.50x1.30)--(2x1.256)+6(0.46+1.256)*0.025+(5.756*0.018) 1.896 m2
Area of priming coat
For window 1.50x1.30--1.59=0.36x2.20 0.792 M2
For MS rods 12x0.048x1.50 0.864 M2
1.656 M2
Main data
29.75 kg Special Steel Section including fabrication charges 60.90 kg 1811.78
4.23 kg MS Flats and Angles 41.20 kg 174.28
1.896 m2 FRP transparent sheet 4mm thick 270.00 m2 511.92
21.36 kg MS Rod 12mm dia 41.20 kg 880.03
20.34 kg Fixing MS rod 19.40 kg 394.60
4.03 kg Labour for cutting angles, CRS, Welding & fabrication with 33.40 kg 134.60
1.95 M2 special
Labour angles
for fixing windows & furniture 187.00 m2 364.65
3.00 Nos Window Stay 51.00 E 153.00
4.00 Nos Hold Fasts 67.30 E 269.20
6.00 Nos Hinges 100mmx30mm 62.90 E 377.40
3.00 Nos Handles 150mm long 50.40 E 151.20
1.66 M2 Priming Coat 54.50 m2 66.65
L.S Conveyance, Handling, Scaffolding,Chipping Masonary
concerete & making good the damaged portion 200.00
For 1.95M2 5489.30
Rate Rs. 2815.03 M2
Say Rs. 2815.00 M2
4 Fabricating, Supplying and fixng in position of steel windows (Four Leaves) with the following specifications.
Outer frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J' section (F4B)
of size 46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as specified in IS
7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations and easy
maintenance. The panel of the shutters to be covered with 18 gauge cold rolled sheet of superior quality and welded
intact with shutter frames. Horizontal stiffeners using 18x5mm MS Flat at 0.70kg/m at 3 Nos. for each shutter and
additional diagonal stiffners of the same MS flats at all the four corners of each shutters to the suitable length welded
to the shutters, for holding the CR Sheets in position firmly.
2 numbers of sturdy hinges and one number of handle-cum-latch of special type made with 18x5mm MS flats are
revetted to the shutters at an appropriate height in window. suitable opening is left for its easy operation. a stopper
square rod for handle is provided in the mullion section at suitable place to catch the window handle. each window
shutter having an adustable stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable
position. A matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm
length spliced at the ends are welded to the outer frame of the window by using MS flat of 18x5mm at 0.70kg/m,
welded to the shutter at two place equivalent from each from top and bottom of the shutter.An MS square bar of 12mm
size is welded to the inner face
of the window at an equal interval not exceeding 100mm edge between them. All members are painted with one coat
of anti-corrosive red oxide primer as directed by the departmental officers.All sections should be in confirmed with IS
7452/1990.The cost includes cost of all materials, labour charges and other incidental charges, etc., complete

Four Leaves - 1.80x1.30m


Area = 2.34 M2
Outer frame F7D section 33x25x3mm
Horizontal : 1x2x1.80x1.419 kg/m 5.11 kg
Vertical : 1x2x1.30x1.419 Kg/m 3.69 kg
Shutter frame F7D section 33x25x3mm
Horizontal : 4x2x0.42x1.419 kg/m 4.77 kg
Vertical : 4x2x1.26x1.419 Kg/m 14.30 kg
J' Section centre Mullion F4 'B' section 1x3x1.26x2.28 kg/m 8.62 kg
36.49 kg
Add 5% wastage 1.82 kg
38.31 kg
MS flats for stiffeners 18mmx5mm size at 0.70kg/m
Horizontal stiffeners = 4x3x0.40x0.70kg/m 3.36 kg
Diagonal 4x4x0.08x0.70 kg/m 0.90 kg
4.26 kg
Add 5% wastage 0.21 kg
4.47 kg
CR sheet of 18kg @ 9.80 kg/m2:1.75x1.25x9.80 21.44 kg
Add 5% wastage 1.07
22.51 kg
12mm square MS rod 1x12x1.80x1.13kg/m 24.41 kg
Add 5% wastage 1.22 kg
25.63 kg
Area of priming coat
For window 1.80x1.30x2.20 5.15 M2
For MS rods 12x0.048x1.80 1.04 M2
6.19 M2
Main data
38.31 kg Special Steel Section including fabrication charges 60.90 kg 2333.08
4.47 kg MS Flats and Angles 41.20 kg 184.16
22.51 kg CRS 18G 41.20 kg 927.41
25.63 kg MS Rod 12mm dia 41.20 kg 1055.96
24.41 kg Fixing MS rod 19.40 kg 473.55
25.7 kg Labour for cutting angles, CRS, Welding & fabrication with
special angles 33.40 kg 858.38
2.34 M2 Labour for fixing windows & furniture 187.00 m2 437.58
4.00 Nos Window Stay 51.00 E 204.00
4.00 Nos Hold Fasts 67.30 E 269.20
8.00 Nos Hinges 100mmx30mm 62.90 E 503.20
4.00 Nos Handles 150mm long 50.40 E 201.60
6.19 M2 Priming Coat 54.50 m2 337.36
L.S Conveyance, Handling, Scaffolding, Chipping Masonary concerete & making good the
damaged portion 220.00
For 2.34M2 8005.48
Rate Rs. 3421.15
Say Rs. 3421.00
6 Fabricating ,Supplying and fixng in position of steel windows( Five Leaves) with the following specifications. Outer
frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J' section (F4B) of size
46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as specified in IS
7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations and easy
maintenance. The panel of the shutters to be covered with 18 gauge cold rolled sheet of superior quality and welded
intact with shutter frames. Horizontal stiffeners using 18x5mm MS Flat at 0.70kg/m at 3 Nos. for each shutter and
additional diagonal stiffners of the same MS flats at all the four corners of each shutters to the suitable length welded
to the shutters, for holding the CR Sheets in position firmly.2 numbers of sturdy hinges and one number of handle-
cum-latch of special type made
with 18x5mm MS flats are revetted to the shutters at an appropriate height in window. suitable opening is left for its
easy operation. a stopper square rod for handle is provided in the mullion section at suitable place to catch the window
handle. each window shutter having an adustable stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm
with three adjustable position. A matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of
hold fasts of 120mm length spliced at the ends are welded to the outer frame of the window by using MS flat of
18x5mm at 0.70kg/m, welded to the shutter at two place equivalent from each from top and bottom of the shutter.An
MS square bar of 12mm size is welded to the inner face of the window at an equal interval not exceeding 100mm
edge between them. All members are painted with one coat of anti-corrosive red oxide primer as directed by the
departmental officers.All sections should be in confirmed with IS 7452/1990.The cost includes cost of all materials,
labour charges and other incidental charges, etc., complete

Five Leaves - 1.80x1.30m


Area = 2.34 M2
Outer frame F7D section 33x25x3mm
Vertical : 1x2x1.30x1.419 kg/m 3.69 kg
Horizontal : 1x2x1.80x1.419 kg/m 5.11 kg

Shutter frame Horizontal: 5x2x0.32x1.419 kg/m 4.54


Shutter frame Vertical : 5x2x1.26x1.419 kg/m 17.88
J' Section centre Mullion 1x4x1.26x2.28 kg/m 11.49 kg
33.91 kg
Add 5% wastage 1.70 kg
35.61 kg
Stiffners using 18x5mm MS flat
5x3x0.30x0.70 kg/m 3.15 kg
5x4x0.08x0.70 kg/m 1.12 kg
4.27 kg
Add 5% wastage 0.21 kg
4.48 kg
CR sheet required 1.75x1.25x9.80 21.44 kg
Add 5% wastage 1.07 kg
22.51 kg
12mm M.S Square rod 12 Nosx1.80x1.13 kg/m 24.41 kg
Add 5% wastage 1.22 kg
25.63 kg
Area of priming coat (1.80x1.30x2.20) = 5.15 M2
For MS rods = 12x0.048x1.80 1.04
6.19 M2
Main data
35.61 kg Special section 60.90 kg 2168.65
4.48 kg MS Flats and Angles 41.20 kg 184.58
22.51 kg CR sheet 41.20 kg 927.41
25.63 kg 12mm MS Square rod 41.20 kg 1055.96
24.41 kg Fixing MS rod 19.40 kg 473.55
25.71 kg Labour charges for cutting, welding and fabrication 33.40 kg 858.71
5 Nos Window Stay 51.00 Each 255.00
4 Nos Hold Fasts 67.30 Each 269.20
10 Nos Hinges 100 mmx30mm 62.90 Each 629.00
5 Nos Handels with stopper 150mm long 50.40 Each 252.00
6.19 M2 Priming coat with red oxide 54.50 M2 337.36
2.34 M2 Labour charges for fixing window furniture fittings 187.00 M2 437.58
L.S Conveyance, Handling, Scaffolding, Chipping/Masonary concerete & making good the
damaged portion 240.00
For 2.34M2 8089.00
Rate for 1M2 3456.84 M2
SAY Rate for 1M2 3457.00 M2
7 Fabricating, Supplying and fixng in position of steel windows (Five Leaves) with the following specifications. Outer
frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J' section (F4B) of size
46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as specified in IS
7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations and easy
maintenance. The panel of the shutters to be covered with 18 gauge cold rolled sheet of superior quality and welded
intact with shutter frames. Horizontal stiffeners using 18x5mm MS Flat at 0.70kg/m at 3 Nos. for each shutter and
additional diagonal stiffners of the same MS flats at all the four corners of each shutters to the suitable length welded
to the shutters, for holding the CR Sheets in position firmly.2 numbers of sturdy hinges and one number of handle-
cum-latch of special type made with 18x5mm
18x5mm MS flats are revetted to the shutters at an appropriate height in window. suitable opening is left for its easy
operation. a stopper square rod for handle is provided in the mullion section at suitable place to catch the window
handle. each window shutter having an adustable stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm
with three adjustable position. A matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of
hold fasts of 120mm length spliced at the ends are welded to the outer frame of the window by using MS flat of
18x5mm at 0.70kg/m, welded to the shutter at two place equivalent from each from top and bottom of the shutter.An
MS square bar of 12mm size
iswelded to the inner face of the window at an equal interval not exceeding 100mm edge between them. All members
is welded to the inner face of the window at an equal interval not exceeding 100mm edge between them. All members
are painted with one coat of anti-corrosive red oxide primer as directed by the departmental officers.All sections
should be in confirmed with IS 7452/1990.The cost includes cost of all materials, labour charges and other incidental
charges, etc., complete
Five Leaves - 2.10x1.30m
Area = 2.73 M2
\ Outer frame F7D section 33x25x3mm
Vertical : 2x1.30x1.419 kg/m 3.69 kg
Horizontal : 2x2.10x1.419 kg/m 5.96 kg
Shutter frame Vertical: 2x5x1.26x1.419 kg/m 17.88 kg
Shutter frame Horizontal : 2x5x0.40x1.419 kg/m 5.68 kg
J' Section centre Mullion 1x4x1.26x2.28 kg/m 11.49 kg
44.70 kg
Add 5% wastage 2.23 kg
46.93 kg
Stiffners using 18x5mm MS flat
5x3x0.38x0.70 kg/m 3.99 kg
5x4x0.08x0.70 kg/m 1.12 kg
5.11 kg
Add 5% wastage 0.26 kg
5.37 kg
CR sheet required 2.05x1.25x9.80 kg/m2 25.11 kg
Add 5% wastage 1.26 kg
26.37 kg
12mm M.S Square rod: 12 Nosx2.10x1.13 kg/m 28.48 kg
Add 5% wastage 1.42 kg
29.90 kg
Area of priming coat 2.10x1.30x2.20 6.01 M2
For MS rods = 12x0.048x2.10 1.21 1.21
7.22 M2
Main data
46.93 kg Special section including fabrication charges 60.90 kg 2858.04
5.37 kg MS Flats and Angles 41.20 kg 221.24
26.37 kg CR sheet 41.20 kg 1086.44
29.90 kg 12mm MS Square rod 41.20 kg 1231.88
28.48 kg Fixing MS rod 19.40 kg 552.51
30.22 kg Labour charges for cutting, welding and fabrication 33.40 kg 1009.35
5 Nos Window Stay 51.00 Each 255.00
4 Nos Hold Fasts 67.30 Each 269.20
10 Nos Hinges 100 mmx30mm 62.90 Each 629.00
5 Nos Handels with stopper 150mm long 50.40 Each 252.00
7.22 M2 Priming coat with red oxide 54.50 M2 393.49
2.73 M2 Labour charges for fixing window furniture fittings 187.00 M2 510.51
L.S Conveyance, Handling, Scaffolding, Chipping/Masonary
concerete & making good the damaged portion 230.00
For 2.73M2 9498.67
Rate for 1M2 3479.36 M2
SAY Rate for 1M2 3479.00 M2
8 Fabricating, Supplying and fixng in position of steel glazed window (Two Leaves )with the following
specifications. Outer frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J'
section (F4B) of size 46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as
specified in IS 7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations
and easy maintenance. The panel of the shutters to be covered with 3mm thick pin headed glass and fixed with
15x12mm teakwood beading of superior quality and fixed with shutter frames.2 numbers of sturdy hinges and one
number of handle to be fixed to each shutter
at an appropriate height in window. suitable opening is left for its easy operation. a stopper square rod for handle is
provided in the mullion section at suitable place to catch the window handle. each window shutter having an adustable
stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable position. A matching peg is
provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm length spliced at the ends
are welded to the outer frame of the window.An MS square bar of 12mm size is welded to the inner face of the
windowat an equal interva
interval not exceeding 100mm edge between them. All members are painted with one coat of anti-corrosive red oxide
primer as directed by the departmental officers.All sections should be in confirmed with IS 7452/1990.The cost
includes cost of all materials, labour charges and other incidental charges, etc., complete

Two Leaves - 1.20x1.30m


Area of window 1.56 M2
Outer frame F7D section 33x25x3mm
Horizontal : 1x2x1.20x1.419 kg/m 3.41 kg
Vertical : 1x2x1.30x1.419 Kg/m 3.69 kg
Shutter frame F7D section 33x25x3mm
Horizontal : 2x2x0.56 kg/m 2.24 kg
Vertical : 2x2x1.26x1.419 Kg/m 7.15 kg
J' Section centre Mullion F4 'B' section
1x1.26x2.28 kg/m 2.87 kg
19.36 kg
Add 5% wastage 0.97 kg
20.33 kg
Glazing area 3mm pin headed
1x1x1.15x1.25 1.44 kg
Add 10% wastage 0.14 kg
1.58 kg
Protective MS rods 12mm square
12x1.20x1.13 kg/m 16.27 kg
Add 5% wastage 0.81 kg
17.08 kg
TW beading 1x2x2x(0.56+1.26) 7.28 RM
Area of priming coat
For window (1.56-1.44)x2.20 0.26 M2
For MS rods 12x0.048x1.20 0.69 M2
0.95 M2
Main data
20.33 kg Special Steel Section including fabrication charges 60.90 kg 1238.10
17.08 kg MS Rod 12mm dia 41.20 kg 703.70
16.27 kg Fixing MS rod 41.20 kg 670.32
1.58 M2 Glazing 3mm pin headed 220.00 m2 347.60
1.56 M2 Labour for fixing windows & furniture 187.00 m2 291.72
2.00 Nos Window Stay 51.00 E 102.00
4.00 Nos Hold Fasts 67.30 E 269.20
4.00 Nos Hinges 100mmx30mm 62.90 E 251.60
2.00 Nos Handles 150mm long 50.40 E 100.80
0.95 M2 Priming Coat 54.50 m2 51.78
7.28 RM Teak wood beading 15x12mm 15.00 RM 109.20
L.S Conveyance, Handling, Scaffolding, Chipping Masonary concerete &
making good the damaged portion 160.00
For 1.56M2 4296.01
Rate Rs. 2753.85
Say Rs. 2754.00
9 Fabricating, Supplying and fixng in position of steel glazed window (Three Leaves )with the following
specifications. Outer frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J'
section (F4B) of size 46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as
specified in IS 7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations
and easy maintenance. The panel of the shutters to be covered with 3mm thick pin headed glass and fixed with
15x12mm teakwood beading of superior quality and fixed with shutter frames.2 numbers of sturdy hinges and one
number of handle to be fixed to each shutter at an
appropriate height in window. suitable opening is left for its easy operation. a stopper square rod for handle is
provided in the mullion section at suitable place to catch the window handle. each window shutter having an adustable
stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable position. A matching peg is
provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm length spliced at the ends
are welded to the outer frame of the window.An MS square bar of 12mm size is welded to the inner face of the window
at an equal interval
not exceeding 100mm edge between them. All members are painted with one coat of anti-corrosive red oxide primer
as directed by the departmental officers.All sections should be in confirmed with IS 7452/1990.The cost includes cost
of all materials, labour charges and other incidental charges, etc., complete

Three Leaves - 1.20x1.50m


Area of window 1.95 M2
Outer frame F7D section 33x25x3mm
Horizontal : 1x2x1.50x1.419 kg/m 4.26 kg
Vertical : 1x2x1.30x1.419 Kg/m 3.69 kg
Shutter frame F7D section 33x25x3mm
Horizontal : 3x2x0.46x1.419 kg/m 3.92 kg
Vertical : 3x2x1.26x1.419 Kg/m 10.73 kg
J' Section centre Mullion F4 'B' section
1x1.26x2.28 kg/m 2.87 kg
25.47 kg
Add 5% wastage 1.27 kg
26.74 kg
MS bar 12Nos 12mm square
1x12x1.50x1.13kg/m 20.34 kg
Add 5% wastage 1.02 kg
21.36 kg
3mm Pin headed glass 1.45x1.25 1.81
Add 10% wastage 0.18 kg
0.18 kg
TW beading 1x3x2(0.46+1.26) 10.32 Rm
Area of priming coat
For window (1.95-1.81)2.20 0.31 M2
For MS rods 12x0.048x1.50 0.86 M2
1.17 M2
Main data
26.74 kg Special Steel Section including fabrication charges 60.90 kg 1628.68
21.36 kg MS Rod 12mm dia 41.20 kg 880.03
20.34 kg Fixing MS rod 41.20 kg 838.01
1.99 M2 3mm Pin headed glass 220.00 m2 437.80
10.32 RM Teak wood beading 15x12mm 15.00 Rm 154.80
1.95 M2 Labour for fixing windows & furniture 187.00 m2 364.65
3.00 Nos Window Stay 51.00 E 153.00
4.00 Nos Hold Fasts 67.30 E 269.20
6.00 Nos Hinges 100mmx30mm 62.90 E 377.40
3.00 Nos Handles 150mm long 50.40 E 151.20
1.17 M2 Priming Coat 54.50 m2 63.77
L.S Conveyance, Handling, Scaffolding, Chipping Masonary concerete & making
good the damaged portion 190.00
For 1.95M2 5508.53
Rate Rs. 2824.89
Say Rs. 2825.00
10 Fabricating, Supplying and fixng in position of steel glazed window (Four Leaves )with the following
specifications. Outer frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J'
section (F4B) of size 46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as
specified in IS 7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations
and easy maintenance. The panel of the shutters to be covered with 3mm thick pin headed glass and fixed with
15x12mm teakwood beading of superior quality and fixed with shutter frames.2 numbers of sturdy hinges and one
number of handle to be fixed each shutter at an appropriate height in window. suitable opening is left for its easy
is provided
operation. in the mullion
a stopper section
square rod at suitable place to catch the window handle. each window shutter having an
for handle
adustable stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable position. A
matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm length
spliced at the ends are welded to the outer frame of the window.
An MS square bar of 12mm size is welded to the inner face of the window at an equal interval not exceeding 100mm
edge between them. All members are painted with one coat of anti-corrosive red oxide primer as directed by the
departmental officers.All sections should be in confirmed with IS 7452/1990.The cost includes cost of all materials,
labour charges and other incidental charges, etc., complete

Four Leaves - 1.80x1.30m


Area = 2.34 M2
Outer frame F7D section 33x25x3mm
Horizontal : 1x2x1.80x1.419 kg/m 5.11 kg
Vertical : 1x2x1.30x1.419 Kg/m 3.69 kg
Shutter frame F7D section 33x25x3mm
Horizontal : 4x2x0.42x1.419 kg/m 4.77 kg
Vertical : 4x2x1.26x1.419 Kg/m 14.30 kg
J' Section centre Mullion F4 'B' section
1x3x1.26x2.28 kg/m 8.62 kg
36.49 kg
Add 5% wastage 1.82 kg
38.31 kg
Glazing area 3mm pin headed
1x1.75x1.25 2.19 M2
Add 10% wastage 0.22 M2
2.41 M2
TW beading 2x4x(0.42+1.26) 13.44 RM
12mm square MS rod
1x12x1.80x1.13kg/m 24.41 kg
Add 5% wastage 1.22 kg
25.63 kg
Area of priming coat
For window (2.34-2.19)x2.20 0.33 M2
For MS rods 12x0.048x1.80 1.04 M2
1.37 M2
Main data
38.31 kg Special Steel Section 60.90 kg 2333.08
25.63 kg MS Rod 12mm dia 41.20 kg 1055.96
24.41 kg Fixing MS rod 41.20 kg 1005.69
2.41 M2 Glazing 3mm pin headed 220.00 m2 530.20
13.44 RM TW beading 15sx12mm 15.00 RM 201.60
2.34 M2 Labour for fixing windows & furniture 187.00 m2 437.58
4.00 Nos Window Stay 51.00 E 204.00
4.00 Nos Hold Fasts 67.30 E 269.20
8.00 Nos Hinges 100mmx30mm 62.90 E 503.20
4.00 Nos Handles 150mm long 50.40 E 201.60
1.37 M2 Priming Coat 54.50 m2 74.67
L.S Conveyance, Handling, Scaffolding, Chipping Masonary concerete & making good the
damaged portion 210.00
For 2.34M2 7026.77
Rate Rs. 3002.89 M2
Say Rs. 3003.00 M2
11 Fabricating, Supplying and fixng in position of steel glazed window (Five Leaves) with the following
specifications. Outer frames of windows made of 'Z' section F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion 'J'
section (F4B) of size 46x25x3mm at 2.28kg/m and shutter section of made of F7D of 33x25x3mm at 1.419 kg/m as
specified in IS 7452/1990. Each openable shutter should not exceed a width of 600mm to enable separate operations
and easy maintenance. The panel of the shutters to be covered with 3mm thick pin headed glass and fixed with
15x12mm teakwood beading of superior quality and fixed with shutter frames.2 numbers of sturdy hinges and one
number of handle to be fixed to each shutter at an appropriate height in window. suitable opening is left for its easy
handle is provided
operation. a stopperinsquare
the mullion
rod forsection at suitable place to catch the window handle. each window shutter having an
adustable stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable position. A
matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm length
spliced at the ends are welded to the outer frame of the window.
An MS square bar of 12mm size is welded to the inner face of the window at an equal interval not exceeding 100mm
edge between them. All members are painted with one coat of anti-corrosive red oxide primer as directed by the
departmental officers.All sections should be in confirmed with IS 7452/1990.The cost includes cost of all materials,
labour charges and other incidental charges, etc., complete

Five Leaves - 2.10x1.30m


Area = 2.73 M2
Outer frame F7D section 33x25x3mm
Vertical : 2x1.30x1.419 kg/m 3.69 kg
Horizontal : 2x2.10x1.419 kg/m 5.96 kg
Shutter frame Vertical: 2x5x1.26x1.419 kg/m 17.88 kg
Shutter frame Horizontal : 2x5x0.40x1.419 kg/m 5.68 kg
J' Section centre Mullion 1x4x1.26x2.28 kg/m 11.49 kg
44.70 kg
Add 5% wastage 2.23 kg
46.93 kg
Glazing area 3mm pin headed
1x2.05x1.25 2.56 M2
Add 10% wastage 0.26 M2
2.82 M2
TW beading 1x2x5(0.40+1.26) 16.60 Rm
12mm M.S Square rod 12 Nosx2.10x1.13 kg/m 28.48 kg
Add 5% wastage 1.42 kg
29.90 kg
Area of priming coat (2.73-2.56)x2.20 0.37 M2
For MS rods = 12x0.048x2.10 1.21 M2 1.21
1.58 M2
Main data
46.93 kg Special section 60.90 kg 2858.04
29.90 kg 12mm MS Square rod 41.20 kg 1231.88
28.48 kg Fixing MS rod 41.20 kg 1173.38
2.82 M2 Glazing area 3mm pin headed 220.00 M2 620.40
16.60 RM TW beading 15.00 Rm 249.00
5 Nos Window Stay 51.00 Each 255.00
4 Nos Hold Fasts 67.30 Each 269.20
10 Nos Hinges 100 mmx30mm 62.90 Each 629.00
5 Nos Handels with stopper 150mm long 50.40 Each 252.00
1.58 M2 Priming coat with red oxide 54.50 M2 86.11
2.73 M2 Labour charges for fixing window furniture fittings 187.00 M2 510.51
L.S Conveyance, Handling, Scaffolding, Chipping/Masonary concerete & making good the
damaged portion 230.00
For 2.73M2 8364.51
Rate for 1M2 3063.92 M2
SAY Rate for 1M2 3064.00 M2
Manufacturing, Supplying and fixng in position of steel glazed Arch window (Three leaves) with the following
specifications.The Outer frames of windows made out of F7D of size 33 x 25 x 3mm at 1.419 kg/ m and mullion of
F4B section of size 46x25x3mm at 2.28kg/m. Each openable shutter having a overall width of 450mm. 2Nos of sturdy
hings and one number of handle cum latch of special type made with 18x5mm M.S flat are rivetted in th shutters at
appropriate height in the window. suitable opening is left for its easy operation. a stopper square rod for handle is
provided in the mullion section at suitable place to catch the window handle. each shutter having one adjustable
window stay made out of 18 x 5mm at 0.70 kg/ m MS flat of lenght 320mm with three adjustable position. A matching
peg is provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm length spliced at the
ends are welded to the outer frame of the window.18x3mm at 0.42kg/m. M.S.flat is welded to the shutter at the two
place equdistant from each other from top and bottom of the shutter is made up of 3mm pin headed glass of superior
quality is laid as panel in the shutter frames and fixed intact. M.S.square intervals not exceeding 100mm, centre andthe
top portion0.30m height with fixed glazing. All memebers are painted with one coat of anticorrosive red oxide
primer as directed by the departmental officer .All sections should be in confirmed with IS 7452/1990.The cost
includes cost of all materials, labour charges, transportation, taxes and other incidental charges, etc., complete

Area of window 1.50x1.30 M2(Three leaves) 1.95 M2


size of Arch : 1.50x0.30 0.45 M2
Outer frame F7D section 33x25x3mm @ 1.419kg
Horizontal : 1x2x1.50x1.419 kg/m 4.26 kg
Vertical : 1x2x1.30x1.419 Kg/m 3.69 kg
Arch portion 1x1x1.89x1.419 kg/m 2.68
Shutter frame F7D section 33x25x3mm
Horizontal : 3x2x0.46x1.419 kg/m 3.92 kg
Vertical : 3x2x1.24x1.419 Kg/m 10.58 kg
For Arch : 1x(1.44+1.89)x1.419 4.73 kg
J' Section centre Mullion F4 'B' section
1x2x1.27x2.28 kg/m 5.79 kg
Fixed Arch portion: 1x2x0.27x2.28 1.23 kg
Hinges : 3x2x0.42x0.7 kg/m 1.76 kg
window stay : 3x2x0.32x0.7 kg/m 1.34 kg
M.S flat : 3x2x0.42x0.42 kg/m 1.06 kg
41.04 kg
Add 5% wastage 2.05 kg
43.09 kg
MS bar 12Nos 12mm square
1x12x1.50x1.13 kg/m 20.34 kg
Add 5% wastage 1.02 kg
21.36 kg
3mm pin headed glass
1x3x1.24x0.46 1.71 M2
For glazing : 1x1.50x0.30 0.45 M2
2.16 M2
Add 10% wastage 0.22 M2
2.38 M2
T.W Beading for glazing : 1x2(1.50+0.30) 3.60 Rm
T.W beading 1x3x2x(0.46+1.24) 10.20 Rm
13.80 Rm
Area of priming coat
For window [2.40-(1.71+0.45)]2.20 0.53 M2
For MS rods 12x0.048x1.50 0.86 M2
1.39 M2
Main data
43.09 kg Special Steel Section 60.90 kg 2624.18
21.36 kg MS Rod 12mm dia 41.20 kg 880.03
20.34 kg Fixing MS rod 41.20 kg 838.01
2.38 kg 3mm pin headed glass 220.00 m2 523.60
13.8 Rm Teak wood beading 15.00 Rm 207.00
2.40 M2 Labour for fixing windows & furniture 187.00 m2 448.80
4.00 Nos Hold Fasts 67.30 E 269.20
3.00 Nos Handles 150mm long 50.40 E 151.20
1.39 M2 Priming Coat 54.50 m2 75.76
L.S Conveyance, Handling, Scaffolding, Chipping Masonary
concerete & making good the damaged portion
150.00
For 2.40M2 6167.78
Rate Rs. 2569.91 M2
Say Rs. 2570.00 M2
12 supplying and fixing in position Glazed steel ventilator with Side/Central hung shutters( Two Leaves) frames and
made shutter frame made out of steel section conforming to IS 7452 /1990.The outer frame made out of z section
(F7D) of size 33 x22 x3 mm conforming to IS 7452/1990.The mullions are made out of (F4B) section of size 46x25x3
mm and conforming to IS7452/1990.The shutters are individual and each of them can be operated separately.Sash bars
are made of T section (T2) of size 25 x 22 x 3mm 2 nos of sturdy hinges and one number of handle cum latch of
special type are fixed are each openable shutter with suitable opening in left for its easy operation, one member of
adjustable strings with fixing brackets of sufficient length are provided for each shutter 4 nos of 40 x 40 x 3 mm
angle hold fast 230mm length are welded with the frame at appropriate point M.S Square bars of 12 mm dia is welded
to the inner face of the ventilator at equal intervals not exceeding 10 cm spacing 3mm pin headed glass is used for
Glazing with good quality anf fixed with 15 x 12 mm teak wood beadings with screws for fixing .The shutters are to
open outside.
All the section are given with one coat of red oxide primeretc., complete complying with standard specification.The
sample of materials and fittings shall be got approved by the departmental officers before use on work. ( The rate shall
inclusive of cost all materials labour charges one coat of primer,weld charges, including cost of welding
electrodes,transportation to site work, loading,unloading and incidental charges etc., complete complying with
standard specification.

Two Leaves
Size of ventilator of size=0.9mx0.6m 0.54 m2
Outer frame H=2x0.9x1.419 = 2.554 kg
Outer frame V=2x0.6x1.419 = 1.703 kg
Internal Mullion 1x0.6x2.28 kg 1.368 kg
Shutter Top & Bottom H=2x2x 0.42x1.419 = 2.380 kg
Vertical = 2x2x0.56x1.419 = 3.178 kg
Glazing bar section = 2x1x0.38x1.036 = 0.787 kg
11.97 kg
Add 5% wastage 0.60 kg
12.57 kg
Glazed panel area = (2x0.42)x0.56 0.47 m2
Add 10% wastage 0.05 m2
0.52 m2
TW Beading = 2x2x2x(0.38+0.55) 7.44 RM
12mm sq. rods=4x0.90x1.13kg/m 4.07 kg
Add 5% wastage 0.20 kg
4.27 kg
Primer
(0.54-0.47)x2.20 0.15 m2
MS rod 4x0.048x0.90 0.17 m2
0.32 m2
Main data
12.57 kg Special Steel section CF7D & F4B 60.90 kg 765.51
4.27 kg 12mm Sq. rods 41.20 kg 175.92
4.07 m2 Labour charges for fixing M.S.rods 19.40 Kg 78.96
0.52 m2 Pin headed 3mm thick glass 220.00 m2 114.40
7.44 RM TW Beading 15x12mm 15.00 RM 111.60
0.54 m2 Labour for fixing ventilator 187.00 m2 100.98
0.32 m2 Primer 47.80 m2 15.30
2.00 Nos Hold Fasts 67.30 E 134.60
4.00 Nos Hinges 100mmx30mm 62.90 E 251.60
LS Conveyance, Handling, Scaffolding, Chipping/Masonary
concerete & making good the damaged portion
LS 130.00
For 0.54M2 1878.87
Rate Rs. 3479.39 M2
Say Rs. 3479.00 M2
13 supplying and fixing in position Glazed steel ventilator with Side/Central hung shutters (Three Leaves) frames and
made shutter frame made out of steel section conforming to IS 7452 /1990.The outer frame made out of z section
(F7D) of size 33 x22 x3 mm conforming to IS 7452/1990.The mullions are made out of (F4B) section of size 46x25x3
mm and conforming to IS7452/1990.The shutters are individual and each of them can be operated separately.Sash bars
are made of T section (T2) of size 25 x 22 x 3mm 2 nos of sturdy hinges and one number of handle cum latch of
special type are fixed are each openable shutter with suitable opening in left for its easy operation, one member of
adjustable strings with fixing brackets of sufficient length are provided for each shutter 4 nos of 40 x 40 x 3 mm
angle hold fast 230mm length are welded with the frame at appropriate point M.S Square bars of 12 mm dia is welded
to the inner face of the ventilator at equal intervals not exceeding 10 cm spacing 3mm pin headed glass is used for
Glazing with good quality anf fixed with 15 x 12 mm teak wood beadings with screws for fixing .The shutters are
to open outside.All the section are given with one coat of red oxide primer etc. complete complying with standard
specification
.The sample of materials and fittings shall be got approved by the departmental officers before use on work. ( The rate
shall inclusive of cost all materials labour charges one coat of primer,weld charges, including cost of welding
electrodes,transportation to site work, loading,unloading and incidental charges etc., complete complying with
standard specification.
Three Leaves
Size of ventilator of size=0.9mx0.6m 0.54 m2
Outer frame H=2x0.9x1.419 = 2.55 kg
Outer frame V=2x0.6x1.419 = 1.70 kg
Internal Mullion 2x0.6x2.28 kg 2.73 kg
Shutter Top & Bottom H=2x3x 0.27x1.419 = 2.30 kg
Vertical = 2x3x0.57x1.419 = 4.85 kg
Glazing bar section = 3x1x0.24x1.036 = 0.75 kg
14.89 kg
Add 5% wastage 0.74 kg
15.63 kg
Glazed panel area = (3x0.27)x0.54 0.44 m2
Add 10% wastage 0.04 m2
0.48 m2
TW Beading = 2x3x2x(0.27+0.54) 9.72 RM
12mm sq. rods=4x0.90x1.13kg/m 4.07 kg
Add 5% wastage 0.20 kg
4.27 kg
Primer
(0.54-0.44)x2.20 0.22 m2
MS rod 4x0.048x0.90 0.17 m2
0.39 m2
Main data
15.64 kg Special Steel section CF7D & F4B 60.90 kg 952.48
4.27 kg 12mm Sq. rods 41.20 kg 175.92
4.07 m2 Labour charges for fixing M.S.rods 19.40 m2 78.96
0.48 m2 Pin headed 3mm thick glass 220.00 m2 105.60
9.72 RM TW Beading 15x12mm 15.00 RM 145.80
0.54 m2 Labour for fixing ventilator 187.00 m2 100.98
0.39 m2 Primer 47.80 m2 18.64
2.00 Nos Hold Fasts 67.30 E 134.60
6.00 Nos Hinges 100mmx30mm 62.90 E 377.40
LS Conveyance, Handling, Scaffolding, Chipping/Masonary
concerete & making good the damaged portion
LS 130.00
For 0.54M2 2220.38
Rate Rs. 4111.81 M2
Say Rs. 4112.00 M2
14 Supplying and Fixing in position steel glazed Ventilators with central hung swing shutter using F7D section of size
30x25x3mm for inner outer froames with 4 Nos. Of 12mm dia MS sq.bars for protection and 2 Numbers of clamps
welded with outer frame and using 3mm thick pin headed glass for panel including painting with one coat of Red
Oxide Primer dismantling the masonry wherever necessary for fixing the ventilator and redoing the same to the
original condition fixing the ventilator and redoing the same to the original condition fixing the ventilator in position
etc.,

Single a ventilator of size=0.6mx0.6m 0.36 m2


Consider a ventilator of size = 0.6x0.6 area 0.36 m2
Outer frame H=2x0.6x1.419 = 1.70 kg
Outer frame V=2x0.6x1.419 = 1.70 kg
Shutter Top & Bottom H=2x1x 0.57x1.419 = 1.62 kg
Vertical = 2x1x0.56x1.419 = 1.59 kg
Glazed bar = 1x1x0.53x0.889 = 0.47 kg
7.08
Glass = 2x1x0.60x0.30 0.36 m2
TW Beadins = 2x1x2x(0.60+0.30) 3.60 RM
12mm sq. rods=4x0.60x1.13kg/m 2.71 kg
Primer = 0.36x1 0.36 m2
Main data
7.08 kg Steel section CF7D & F4B 60.90 kg 431.17
2.71 kg 12mm Sq. rods 41.20 kg 111.65
0.36 m2 Pin headed 3mm thick 220.00 m2 79.20
3.60 RM TW Beading 15.00 RM 54.00
2 Nos Hold fast 67.30 Each 134.60
0.36 m2 Labour charges 187.00 m2 67.32
2.71 kg Labour for providing bars by welding 19.40 kg 52.57
0.36 m2 Primer 47.80 m2 17.21
4 Nos Hinges 100x30 62.90 Each 251.60
Sundries for Conveyance LS 100.00
For 0.36M2 1299.33
Rate Rs. 3609.24
Say Rs. 3609.00 /M2
1 Fabricating supplying and fixing in position M.S Steel framed door with weldmesh
and fine wire mesh netting etc. with necessary locking facilities and hinges including
cost of red oxide primer.

Consider a door of size 0.75m x 1.80m

Area = 1.35 m2
Outer frame
M.S. angle 40x40x6 mm
(2x1.80) + 0.75 4.35
Hold fasts 6 Nos 6x0.15 0.9
5.25 RM
Weight of M.S. angle = 5.25x3.50kg/m
18.375 kg
Stiffener rod 0.75m = 0.75x0.60kg/m
0.450 kg
Shutter frame

Frame MS angle 35x35x5mm= 2(1.76+0.73)


4.98 RM
Weight of angle 4.98x2.60
12.948 kg
Stiffener 32x6mm flat

Horizontal 3x0.73= 2.19 RM


Weight of stiffener 2.19x1.50 kg
3.285
Weight of 18x5mm stiffener= 3x0.73x0.70
1.533 kg
Tower bolt 6mm rod 2x0.46x1.58
1.454 kg
Locking arrangements
1.488 kg
39.50 kg
Area of weldmesh
7.5 x 2.5 cm 10gauge =
1.76x0.71
1.214 m2
Fine wire mesh (fly proof mesh)
area 1.214 m2
MAIN DATA

39.50 kg Ms angle flats rods etc


41.20 kg 1627.40
1.214 m2 Weldmesh 7.5x2.5cm
295.00 m2 358.13
1.214 m2 Fly proof mesh (as per SR)
91.00 m2 110.47
1 No. Door Handle 150 mm dia
50.40 Each 50.40
1.35 m2 Primer 54.50 m2 73.58
39.5 m2 Labour charges for welding M.S Angles with weld mesh
25.50 m2 1007.25
1.35 m2 Labour charges for fixing doors
149.00 m2 201.15
For 1.35M2
3428.38
Rate/ 1M2 Rs.
2539.54
Say Rs.
2540.00
2 Fabrication, Supply and fixing in position fine wiremesh netting inclusive of cost of
red oxide primer etc.
Area 0.375 m2
Outer frame : M.S. angle 35x35x5
mm = 2(0.50+0.75) 2.50 RM
Hold fasts 4 Nos 4x0.15
0.60 RM
Weight of angle 3.10 RMx2.60 8.06 kg
Stiffoner rod (0.5+0.75)x0.60 1.50 kg

9.56 kg
Area of wire mesh (f1/proof mesh)

0.48x0.75
0.350 m2
Main data

9.56 kg M.S angle flat etc


40.45 386.70
0.350 m2 Fly proof mesh (as per SR)
91.00 31.85
0.375 m2 Red oxide primer
47.80 17.93
LS Labour for fixing mesh with angle
80.00
For 0.375M2
516.48
Rate Rs.
1377.27
Say Rs.
1377.00 /M2
0.02

110

56.1

11.2 67.3

12.6

33650.4

8057 30139

42463.6 8057

8057.4 763 7766


75.85
543.20

180.14

199.86
136.62

94.88
6
12769.09

19.5

22

9
27.964
1.3982

27.96

21.68
50.95

45.8595

16.83

45.9

5038.12
93.3333

89.7435897436 89.7436

96.1538461538
90.252
8005.48
9498.67
`
2824.8893076923
3883.93
p
25.71

S-ar putea să vă placă și