Proportions
2530552
2.33
1.58
0.14
0.12
0.49
21.03
1239970.48
0.64
-0.15
-6.44
-379582.8
High Steel:
Machine Coil
2530552
2.33
1.58
0.14
0.12
0.49
21.03
1239970.48
0.64
-0.15
-6.44
-379582.8
Driver Driver Volume
A
Production
Melting Depreciation Melt Machine Minutes 5145632
Maintenance Melt Machine Minutes 5145632
Utilities Melt Machine Minutes 5145632
2139865 0.42
975130 0.19
2036477 0.40
1711892 0.30
780104 0.14
1745551 0.31
427973 0.10
390052 0.09
290925 0.07
2995811 0.36
975130 0.12
872776 0.11
1283919 0.32
780104 0.19
872776 0.22
5400955 0.11
4936068 86.37
3953709 68.86
3339500 58.44
5766579 868.20
ACTIVITY BASED COSTING FOR 5 PRODUCTS O
A
Production
Number of SKUs
Number of Orders
Melting-Electric Arc Furnace
Refining (VOD)
Molding/Breakdown (Ingot/PFF)
Rolling (CRM)
Finishing (Multiple)
Melting Depreciation Melt Machine Minutes 5145632
Maintenance Melt Machine Minutes 5145632
Utilities Melt Machine Minutes 5145632
Conversion: Round
Alloy Condition Round Wire
Process Driver
Melt Machine
Melting Depreciation Minutes
Melt Machine
Maintenance Minutes
Melt Machine
Utilities Minutes
F LEHIGH STEEL
A B C=B/A
0.1 0.1
0.08 0.07
0.09 0.03
0.08 0.05
0.44 0.34
0.1 0.1
30942.9 361467.6
7.2 7.5
THROUGHPUT CALCULATIONS FOR LEHIGH STEEL AS PER TOC PRINCIPLES
Alloy: Die Steel: Die Steel:
Condition Conversion:-
Roller Wire Chipper Round bar
Round Knife
A Price ($ per lb) 2.31 0.77 1.02 0.93
B Material Cost ($ per lb) 0.54 0 0.12 0.21
C=A-B Throughput 1.77 0.77 0.9 0.72
High Speed
Machine Coil
2.33
1.58
0.75
0.03
25.00