This Document is the property of OKLNG Free Zone Enterprise (OKLNG FZE) and shall not
under any circumstances be totally or partially, transferred, reproduced, copied, disclosed or
used without the prior written consent of OKLNG FZE, for any purpose and in any way other
than for which it is specifically furnished or outside the extent of the agreed upon right of use.
Doc No.
1036-RS-0072-CI-DB-0001
February 2009
Job title Detailed Design of OKLNG Resettlement Site Olokola Free Trade Job number
Zone
N4400
OOT/BUN
Document ref
Signature
Signature
Signature
Filename
Description
Name
Signature
J:\Technical\N4000\N4400\Design\Design report CTR 4C\Jetty Performance Ove Arup & Partners Nigeria
Specification 2009 Jun 01 OOT.doc January 2008
rePlan Incorporated Detailed Design of OKLNG Resettlement Site Olokola Free Trade Zone
Jetty Performance Specification
Contents
Page
1 INTRODUCTION 1
1.1 Scope of Document 1
1.2 System of Units 1
1.3 List of Parties 1
1.4 Site Location 1
2 JETTY PERFORMANCE SPECIFICATION 2
2.1 General Description 2
2.2 Clients Requirements for Jetty 2
2.3 Occupational Health and Safety 2
3 DESIGN PARAMETERS FOR JETTY 2
3.1 Standards and References 2
3.2 Design Vessel data 3
3.3 Design Life 3
3.4 Structural Loads 3
3.5 Jetty Structure 3
Appendices
Appendix A
Site Location
Appendix B
Jetty Sketches
J:\Technical\N4000\N4400\Design\Design report CTR 4C\Jetty Performance Ove Arup & Partners Nigeria
Specification 2009 Feb 20 BUN (2).doc January 2008
rePlan Incorporated Detailed Design of OKLNG Resettlement Site Olokola Free Trade Zone
Basis of Design Report for CTR No.4C
1 INTRODUCTION
This Jetty Performance Specification Report defines the design criteria, philosophies
assumptions and specifications to be used in the design of the Proposed Jetty at the
Shoreline of Omu Creek for the OKLNG Resettlement Site, Olokola Free Trade Zone.
The specification covers the basic information, criteria and minimum standards that shall be
employed for the design of the Jetty.
The S.I (System International & Units) System of Units shall be used throughout the design.
The Resettlement site is located approximately 8 kilometres to the East of the OKLNG Plant
Site and 5 kilometres inland from the Coast.
The predominant occupation of the settlers at the riverine communities is fishing and the
mode of transportation is by water. A jetty is therefore proposed for the Resettlement site at
the shore of Omu Creek.
A location map with approximate situation of the jetty and distances are provided in
appendix A. However, this location is subject to further studies and available data.
J:\Technical\N4000\N4400\Design\Design report CTR 4C\Jetty Performance Ove Arup & Partners Nigeria Ltd
Specification 2009 Feb 20 BUN (2).doc Page 1
February 2009
rePlan Incorporated Detailed Design of OKLNG Resettlement Site Olokola Free Trade Zone
Basis of Design Report for CTR No.4C
It is anticipated that the resettlement site preparation contractor shall construct a jetty for
use in handling his construction equipment and materials and following the conclusion of the
construction of the resettlement site, hand this over to the community. Thus, the significant
loading conditions shall be those to meet the minimum construction loading criteria.
This performance specification defines the design criteria, philosophy, operation
specification and any assumptions that will be required for the design of the new jetty.
All information will be in accordance with Standard Guidelines, Procedures and Codes of
Practice.
The design will take into account the specific requirement of the principal users. The surface
of the deck will be concrete and will be trowelled finish and non slip. A 1% cross falls will be
provided on the deck for drainage of rainfall. Handrails or similar approved safety measures
should be provided on both sides of the jetty head including the access way up to the
shoreline.
The design for the Resettlement Area jetty will generally comply with guidelines as laid
down in the Code of Practice for Maritime Structures-Part 2: Design of Quay walls, Jetties
and Dolphin-BS 6349-2 :1988, BS 8110-1: 1997, BS8110 and 8007 and BS 54002: Steel,
concrete and composite bridges : Specification for load. 2: Load specification for steel,
concrete and composite bridges.
The design, construction and testing shall be in accordance with the following standards:
- Federal and State Environmental Protection Standards
- Inland Waterways Department Guidelines
J:\Technical\N4000\N4400\Design\Design report CTR 4C\Jetty Performance Ove Arup & Partners Nigeria Ltd
Specification 2009 Feb 20 BUN (2).doc Page 2
February 2009
rePlan Incorporated Detailed Design of OKLNG Resettlement Site Olokola Free Trade Zone
Basis of Design Report for CTR No.4C
For the basis of design, the option design vessel data shall be as follows:
Construction Community
should be incorporated in the design at design stage. Service Life of jetty should be
50years.
Durability of the jetty is an important serviceability requirement of the jetty; hence to ensure
that a design life of minimum of 50 years is attained, the following performance
requirements criteria should be satisfied by the materials to be adopted. This will ensure
that the durability requirements which include concrete cover to reinforcement maximum
permitted crack widths and minimum specified cement contents are satisfied.
Concrete grade: C30,
Minimum Cement Content : 325kg/m³
Cube Compressive Strength, fcu: 30N/mm²
Tensile Strength fy, min: 2.31 N/mm²
Young Modules, Short term (Ecs): 21,000 N/mm²
Young Modulus, Long term (Ecl): 13,500 N/mm²
Coefficient of Thermal Expansion: 12 x 10-6/oC N/mm²
Cover (topside): 40mm
Cover (soffits): 50mm
Density (Un-reinforced Concrete): 2,400kg/m³
Density (Reinforced Concrete): 2,600kg/m³
Maximum Water Cement Ratio: 0.55
Maximum aggregate size: 20mm
Compressive strength at 28 day: not < 30N/mm2
Compressive strength at 7 days: greater than or equal to 70% of 28 day strength
Curing requirement (Wet curing): strength greater than or equal to 7day strength
Cementitiious binder materials: Portland cement with 25% FA
Approved trial mix at 28 days: < 470 Microstrain
In-situ concrete at 28 days: < 500 Microstrain
Chloride permeability at 7 days < 2000 coulomb
Chloride permeability at 28 days < 1500 coulomb
Chloride diffusion coefficient after 28 days exposure: 1 x 10^-12m2/s
Curing requirement should be wet curing and strength to be is greater than or equal to the
nominated 7 day strength.
If precast concrete elements are used as planks and formwork, they should be ‘sacrificial ‘
and not term part of the deck.
J:\Technical\N4000\N4400\Design\Design report CTR 4C\Jetty Performance Ove Arup & Partners Nigeria Ltd
Specification 2009 Feb 20 BUN (2).doc Page 4
February 2009
rePlan Incorporated Detailed Design of OKLNG Resettlement Site Olokola Free Trade Zone
Basis of Design Report for CTR No.4C
Appendix A
Site Location
J:\Technical\N4000\N4400\Design\Design report CTR 4C\Jetty Performance Ove Arup & Partners Nigeria Ltd
Specification 2009 Feb 20 BUN (2).doc Page 5
February 2009
212000 214000 216000 218000 220000 222000 224000 226000 228000
268000
268000
Ebute Okun Opaola
Awodikora Agbanijowo
Ebute Olomu
Aba Okuneye
Ebute Enilari
Awodikora Sarumi
Ode Omi
Ogboro Ekun
Awodikora Igi-nla
Aba Elero
266000
266000
!
! Pioneer Dock
! ! ! !
Omu Creek
!
Associated Facilities
Erido
Pioneer Camp
! !
!
Environmental Zone !
Eba
264000
264000
Ode Omi, !
Eba Quarters
(Resettlement Site)
PLANT SITE
Okun Igbeki
Isekun
Okun Ilete
Oke Eso
Oka
262000
262000
!
!
Olosumeta
Ira Awodikora
!
!
Ijegbe
Igbosere
!
Akade Nla
!
!
Bolorunduro
!
!
Elefon
!
Enuwaya
260000
260000
Mosafejo
! !
!
!
Legend
Project Footprint ! Communities Existing Track Proposed Fish Processing Centre
: 0 1 2 4
Kilometers Nigeria West Belt Projection
LOCATION PLAN
Sketch GEN - 01
rePlan Incorporated Detailed Design of OKLNG Resettlement Site Olokola Free Trade Zone
Basis of Design Report for CTR No.4C
Appendix B
Jetty sketches
J:\Technical\N4000\N4400\Design\Design report CTR 4C\Jetty Performance Ove Arup & Partners Nigeria Ltd
Specification 2009 Feb 20 BUN (2).doc Page 6