Sunteți pe pagina 1din 1

PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY

TRAVELLING ALLOWANCE BILL


Name M.Yousuf Designation ASSA Division P&I Multan Headquarter P&I M/Garh Pay BPS- 9 Date; - Vr.No:- -
Particulars of journey and hault Kind Journey by Railway Journey by Road Daily Allowance
Date Date of No of No. of No. of Total Remarks
Departure Arrival Class Amount Rate Amount Rate Amount
Hour Hour journey fares Miles day
M/Garh
03-07-2019 Gujrat South and 03-07-2019
By DGB 733 --- 80 --- --- 01 312/= 312-00 312-00
To attend the Commissioning of Power Transformer T-3.
10:00hrs then back to Hq. 20:00 hrs
06-07-2019 Kot Addu and then 06-07-2019 To replace the defective distance relay of KAD-5 Line Bay and defective KWh
M/Garh By DGB 733 --- 130 --- --- 01 312/= 312-00 312-00
06:00hrs back to Hq. 14:30 hrs energy meter of KAD-2 Line Bay.
10-07-2019 Mahra Khas and 10-07-2019 To attend the Fault of closing circuit of incoming No 2 also set right the tripping
M/Garh By DGB 733 --- 100 --- --- 01 312/= 312-00 312-00
11:00hrs then back to Hq. 20:15 hrs circuit fault of Alodey wali 11kV Outgoing feeder
11-07-2019 Kot Addu and then 11-07-2019 To Perform the C&DF Test of Power Transformer T-3 and attend fault of Tube well
M/Garh By DGB 733 ---- 130 --- ---- 01 312/= 312-00 312-00
06:00 hrs back to Hq 14:30 hrs No 04 outgoing Feeder
12-07-2019 Kot Addu and then 12-07-2019 To attend Six Monthly shutdown for testing Protection System of Power
M/Garh By DGB 733 ---- 130 --- ---- 01 312/= 312-00 312-00
06:00 hrs back to Hq 15:00 hrs Transformer T-1 and its allied Equipments, also performed its C&DF test
15-07-2019 Kot Addu and then 15-07-2019 To attend Six Monthly shutdown for testing Protection System of Power
M/Garh By DGB 733 ---- 130 --- ---- 01 312/= 312-00 312-00
06:00 hrs back to Hq 15:30 hrs Transformer T-4 and its allied Equipments, also performed its C&DF test
16-07-2019 K.P.Sadat, Alipur 16-07-2019 To attend the shutdown on Power Transformer T-1 for Tap Changer Over hauling.
M/Garh and then back to Hq By DGB 733 ---- 220 --- ---- 01 312/= 312-00 312-00
05:30 hrs 19:00 hrs To Perform the C&DF Test of Power Transformers T-1 & 2.
M/Garh
18-07-2019 Mahra Khas and 18-07-2019
By DGB 733 ---- 100 --- ---- 01 312/= 312-00 312-00 To Perform the C&DF Test of Power Transformers T-1 & 2.
06:00 hrs then back to Hq. 15:00 hrs
19-07-2019 Fazilpur and then 19-07-2019 To attend the fault on Power Transformer T-2 due to damage of 132 kV lightening
M/Garh back to Hq By DGB 733 ---- 300 --- ---- 01 312/= 312-00 312-00
17:30 hrs 11:45hrs Arrestor and differential relay operated
20-07-2019 Dammar Wala and 20-07-2019
By DGB 733 ---- 130 --- ---- 01 312/= 312-00 312-00
To check and test 11 kV Capacitor Panel.
M/Garh 09:00hrs then back to Hq 18:00hrs
23-07-2019 D.G.Khan 2 and 23-07-2019 To attend Six Monthly shutdown for testing Protection System of Power
M/Garh then back to Hq By DGB 733 ---- 130 --- ---- 01 312/= 312-00 312-00
07:00 hrs 16:30hrs Transformer T-1 and its allied Equipments.
25-07-2019 Dajal and then 25-07-2019 To attend Six Monthly shutdown for testing Protection System of Power
M/Garh back to Hq By DGB 733 ---- 260 --- ---- 01 312/= 312-00 312-00
05:00hrs 16:30 hrs Transformer T-1 & 2 and their allied Equipments.
26-07-2019 Fazilpur and then 26-07-2019 To attend Six Monthly shutdown for testing Protection System of Power
M/Garh By DGB 733 ---- 300 --- ---- 01 312/= 312-00 312-00
06:00 hrs back to Hq. 17:30 hrs Transformer T-2 and its allied Equipments.
30-07-2019 Gujrat and then 30-07-2019 To check the metering circuit of 11 kV Incoming 03 due to abnormal percentage
M/Garh By DGB 733 ---- 80 01 312/= 312-00 312-00
09:30 hrs back to Hq. 18:00 hrs Loss.
31-07-2019 Jattoi and then back 31-07-2019 to check the relay and tripping circuit of Hamza Wali 11kV Outgoing feeder.
M/Garh By DGB 733 ---- 180 --- ---- 01 312/= 312-00 312-00
10:00 hrs to Hq. 18:30 hrs
TOTAL
4680-00
Certified That:-
1) The journey was performed in the interest of authority’s work.
2) The date & time is correct in the best of my knowledge.
3) No TA /DA advance has been given to me.
4) I have not avails any c/leaves during this tour.
5) The date & time/ KM are according to the log book.

Passed for Rs …………… Received Rs …………… Deduct T.A. Advance


Net claim

Signature Controlling Officer, Accountant Signature of Payee


WAPDA

S-ar putea să vă placă și