Technical Bulletin

Using QA/QC Inspection Quarter 2 QA/QC Results

Data Analytics for


Trend Analysis
A certain percentage of projects seeking incentives from BGE’s
energy efficiency programs are subject to field inspections for
quality assurance and quality control (QA/QC). Among small
or simple projects, inspections are typically less frequent and Total Pass 63%

chosen at random. Large-scale projects with higher incentives Total Pass


with Correction 24%
and projects facing ongoing issues are inspected at higher rates.
Total Fail 13%
Depending on complexity and incentive amounts involved,
certain projects are selected for pre-inspection, post-inspection Correction/Failure Reasons
or both. The QA/QC data collected by field inspectors is
used to verify energy savings, identify potential problems or
discrepancies, recommend administrative revisions and guide
training opportunities for service providers.

The following charts summarize project pass/fail rates as


determined by analysis of data collected during field inspections.

Quarter 2: 2016 Project Report Summary

Total Pass 132 Equipment


Specification 16%
Total Pass with Correction 51
Equipment Location 0%
Total Fail 27 Equipment Hours 15%
No Inspection (Safety Issues) 0 Equipment Quantity 15%
Other 54%

For more information, or to speak with a program representative, “Other” reasons for correction/failure include
contact Business@BGESmartEnergy.com or call 410.290.1202. but are not limited to location not ready for
inspection, equipment missing or not installed
and equipment not functional.