Version : 1.0
Released on : 23-Jan-2007
Author : Rashmi Mishra
Last Revised By : Ansuman Banergee
Security Classification
This is a controlled document. Unauthorized access, copying and replication are prohibited.
This document must not be copied in whole or part by any means, without the written
authorization of Head of Quality Assurance Group, ElixirCT
Procedure ID PR_QA_013
Amendment History
TABLE OF CONTENTS
1. Introduction..............................................................................................................................................5
2. Entry Criteria............................................................................................................................................5
3. Inputs........................................................................................................................................................5
4. Roles and Responsibility..........................................................................................................................5
5. Tasks.........................................................................................................................................................5
5.1 Process Audit (Internal Audit)Plan for the organization..................................................................5
5.2 SQA planning (for projects).............................................................................................................5
5.3 For SQA Review at Project Level....................................................................................................6
5.4 Corrective and Preventive Actions...................................................................................................7
5.5 Management review meeting...........................................................................................................7
6. Outputs.....................................................................................................................................................7
7. Exit Criteria..............................................................................................................................................7
8. Formats & Guidelines...............................................................................................................................7
9. References................................................................................................................................................7
10. Glossary of Terms.......................................................................................................................................7
1. Introduction
The Project Quality Assurance process covers the process and product audits at the
project level.
Audits of compliance to the Elixir CT processes are a critical component of software
quality. The objectives of the Process audit (Internal Audit) is to:
Establish compliance to the defined processes
Determine ways to improve effectiveness of the deployed processes
2. Entry Criteria
According to the Quality Plan for the project
According to organization level QA Plan
3. Inputs
Quality Policy Manual
Quality Plan for the project
Organization level QA plan
5. Tasks
5.1 Process Audit (Internal Audit)Plan for the organization
Process Audit(Internal Audit) plan for the organization is a part of QA plan for the
organization which is prepared by the Head SEPG according to the process
development and improvement process.
Gather Data
Process Audit data is obtained through observation, interviews and study of
documents. All the data gathered should be documented.
Determine Compliance
The audit team to interview representatives from Project Teams and Support
Groups and review quality records.
Determine compliance to baselined processes and procedures and make
observations on non-conformities.
Solicits feedbacks from the team and identifies opportunities for improvement.
Audit Reporting
SQA group shall prepare a report to accurately reflect findings of compliance
audits and product audits and submit the same to Project Manager and Head
SEPG.
Follow-up audit
If the audit report warrants large number of corrective actions, a follow-up audit
needs to be scheduled after the corrective actions are completed.
6. Outputs
NCs or Observations
7. Exit Criteria
Submitting the audit report
9. References
N/A