INSTALLATION OF MONOPILES

Analyses models

Liv Hamre
25 April 2016

Ungraded

1 DNV GL © 2016 25 April 2016 SAFER, SMARTER, GREENER


INSTALLATION OF MONOPILES

 DNV GL – This is us
 Geotechnical Design Basis
 Soil resistance to driving
 Fatigue from driving
 Vibro installation

Ungraded

2 DNV GL © 2016 25 April 2016


OFFSHORE WIND - COMBINING DNV GL COMPETENCES

Ungraded

3 DNV GL © 2016 25 April 2016


OUR GEOGRAPHICAL REACH IN RENEWABLES

More than 1,000 renewables staff in 50 locations across 27 countries

Groningen
Kaiser-Wilhelm-
Koog
Oslo
Glasgow
Hinnerup
London
Vancouver Copenhagen
Oldenburg Beijing
Seattle Bristol Hamburg
Cork Warsaw Seoul
Portland Arnhem
Paris Imola
Ottawa Tokyo
Boston
Lisbon Izmir Shanghai
Berkeley
Barcelona Cairo Mumbai
San Ramon
Dubai
Zaragoza
San Diego Bangkok
Madrid
Montreal
Bangalore

Austin Singapore

Querétaro Newcastle

Santiago Wellington
Cape Town
Melbourne
Porto Alegre

Ungraded

4 DNV GL © 2016 25 April 2016


FOUNDATIONS

Stefan Baars
Sébastien David Jens Dhruba Jan Knut
Head of Section
Jana Gehrmann-Vorbau
Senior Engineer

Erik Robert Siamak Jørn Kristian Liv


Michael Hauschildt Michael Wagner
PhD students Other sections in marine structures Sr. Principal Engineer Senior Engineer

Zhou Jon Knut Erik Xavi


Per Madsen
Henning Höffmann
Senior Engineer
Senior Engineer

Ungraded

5 DNV GL © 2016 25 April 2016


WIND FARM CERTIFICATION

According to DNV GL-SE-0073


Site Conditions

Design Basis
Assessement
Type Certificate

Design Basis Evaluation

Integrated Load Analysis

Design
Wind Turbine / RNA Support Structure Design Other Installations Design
Design Evaluation Evaluation Evaluation

Manufac-
turing
Wind Turbine / RNA Support Structure Manuf. Other Installations Manuf.
Manuf. Surveillance Surveillance Surveillance

Instal-
lation
Transportation & Install.
Surveillance

Commis-
sioning
Commissioning
Surveillance

Project Characteristics
Measurements

Project Certificate
Final Evaluation

Project Certificate

service
Operations & Maintenance

In-
Surveillance

Ungraded

6 DNV GL © 2016 25 April 2016


GEOTECHNICAL DESIGN BASIS

 The Geotechnical Design Basis usually consists of:


– Geological Studies
– Bathymetric Investigations
– Geophysical Investigations
– Geotechnical Investigations

 A cautious estimate of the characteristic


strength would be a high value for the
driveability calculations
 The calculation models should preferably
only be used for pile dimensions and soil
conditions that they are based on

Ungraded

7 DNV GL © 2016 25 April 2016

2014-09-09
PILE INSTALLATION

 Soil Resistance to Driving, SRD, is


calculated predict the installation
challenges
 High soil strength must be
considered
 Relevant soil models must be
applied in the assessment of soil
resistance to driving
 Fatigue from driving shall be
included in the pile fatigue
evaluation
 Noise assessments and mitigation
measures may be required

Ungraded

DNV GL © 2016 25 April 2016

8
SOIL RESISTANCE TO DRIVING

Relevant published models:


1977 - Toolan & Fox
1981 - Semple & Gemeinhardt
1982 - Stevens et al
2001 - Alm & Hamre

Ungraded

9 DNV GL © 2016 25 April 2016


SOIL RESISTANCE TO DRIVING

1977 - Toolan & Fox


 Based on CPT
 Minimum of plugged and unplugged
resistance
 Remoulded shear strength

Ungraded

10 DNV GL © 2016 25 April 2016


SOIL RESISTANCE TO DRIVING

1981 - Semple & Gemeinhardt


 Based on static pile capacity
calculations including a “pile
capacity factor”
 Suggest that the unit friction at a
given penetration decreases with
the length of pile driven past this
depth
 OCR is an important parameter

Ungraded

11 DNV GL © 2016 25 April 2016


SOIL RESISTANCE TO DRIVING

1982 – Stevens et al
 Based on static soil capacity
applying a pile capacity factor
established from back-analyses
 Using both plugging and coring
 Include recommendation for
driving in rock

Ungraded

12 DNV GL © 2016 25 April 2016


SOIL RESISTANCE TO DRIVING

2001 – Alm & Hamre


 Based the friction fatigue concept
recommended by Jardine et al for
axial pile capacity assessment
 Assuming coring pile
 Based on back-analyses from
several North Sea sites
 Pile diameters in the database is
30” to 108 “

Ungraded

13 DNV GL © 2016 25 April 2016


FATIGUE FROM DRIVING

 According to DNV OS J101,


– DFF = 3 for WTGs and
– DFF = 10 for substations
 Normally, the characteristic shear
strength is applied
 Planned interruptions in the
driving operations must be
included in the predictions

Ungraded

14 DNV GL © 2016 25 April 2016


VIBRO INSTALLATIONS

 Noise from driving can be harmful to the


environment and several countries are
introducing limitation on noise emission
 Vibro-driving is potentially a cost-effective
and low-noise alternative to impact driving

 Limited available information on prediction


of resistance to installation
Quad Kong, 12 m diameter
 Research is ongoing with respect to lateral pile in China (apevibro.com)
pile capacity for vibro installed monopiles
compared to impact driven and drilled piles
 Less impact on fatigue than impact driving

Ungraded