Velocity String Installation &

Performance Review

VERMILION ENERGY
S.W. TUMMERS
VOGN Overview

 Entered the Netherlands in 2004 by acquiring TOTAL’s


onshore assets;
 Acquisition included ~2 million Nm3/day of mature natural
gas properties;
 40 production locations, 60 producing wells, 5 water
injection wells;
 Direct focus on production optimization:
– Install smaller diameter production tubing to improve well
flow;
– Shut-off water encroachment zones;

2
Velocity String Details

 Currently Vermilion has installed 39 velocity strings (33


onshore, 6 on Zuidwal Platform);
 The sizes are: 1 ½” 1 ¾” 2” 2 3/8” 2 7/8”
 Material: mostly (used) coiled tubing (carbon steel);
 Hang off depth: just below DHSV
until top perfs (also found in literature: best
performance is reached between top perfs
and 1/3 of top perfs);
 Typical assembly: usage of a packer and pump out subs;
 Typical reservoir pressure: 20 bars;
 Typical WHP: 5 bar;
 Typical flow: 5.000 – 20.000 Nm3/day with 1 m3 water.
3
Data Gathering and Modeling (1)

4
Data Gathering and Modeling (2)

5
Well Diagram Example and BHA

VERMILION FIELD : LW EAST WELL : NIJEGA 9


R T /T H : 6.96 M. AN N U LU S FLU ID :
COMPLETION DATE : 4/80 INHIBITED KCL BRINE S.G. 1.02
V OLU M ES D R ILLIN G D E PT H S
TUBING : 9.52 m3 TOP CEMENT IN 7" : 2155.5 m/RKB
ANNULUS : 29.65 m3 9 5/8" SHOE : 1200 m/RKB 1
HOLE : 44.25 m3 CEMENT TOP BEHIND 7" : 900 m/RKB
Xma s T R E E 2
TUBING HEAD
TUBING HANGER
MERIP 11".5000 X 7 1/16".5000
MERIP 3 1/2" EUE TOP X 3 1/2" VAM BOTTOM. 3
14
L MASTER VALVE MERIP 3 1/8" X 5000
U MATER VALVE
SWAB VALVE
MERIP 3 1/8" X 5000
MERIP 3 1/8" X 5000 4
15
WING VALVES MERIP 3 1/8" X 5000 5
TOP CAP MOTI 6 1/2" - 4 ACME QUICK UNION.
ST R IN G 6
16
ITEM QTY DESIGNATION Depth/Th ID/in 28
29
1 1 MERIP TUBING HANGER WITH 3" CAMERON BPV PROFILE
2 1 PUP JOINT 3 1/2" VAM N80 9.2# 0,38 2,992
3
4
3
1
TUBINGS 3 1/2" VAM N80 9.2#
PUP JOINT 3 1/2" VAM N80 9.2#
27,75 2,992
29,27 2,992 17
5 1 3" CAMCO B6 N IP PLE 30,05 2,813 30

6 1 PUP JOINT 3 1/2" VAM N80 9.2# 31,51 2,992


7 221 TUBINGS 3 1/2" VAM N80 9.2# 2,992
8 1 PUP JOINT 3 1/2" VAM N80 9.2# 2054,06 2,992
18
9 1 2.75" BAKER F N IP P LE 2054,42 2,750 7

10 1 PUP JOINT 3 1/2" VAM N80 9.2# & ONE IDEM TBG JOINT 2064,94 2,992 19
11 1 PUP JOINT 3 1/2" VAM N80 9.2# 2066,45 2,992
12 1 XTRA LG TBG SEAL RECEPTACLE EBA-1 SIZE 43-20 2074,09 4,299
20
13 1 S LICK JOIN T W IT H 2.75" R BAKE R P R OFILE. 2074,47 2,750

14
15
1
1
PUP JOINT 3 1/2" VAM N80 9.2#
PUP JOINT 3 1/2" VAM N80 9.2#
2075,00
2075,52
2,992
2,992
21
16
17
18
1
1
1
ANCHOR SEAL NIPPLE K22 SIZE 80-40
BAKER PACKER 84 SAB 40 X 32
MILLOUT EXTENSION 5" VAM
2075,95
2077,39
2079,01
3,248
3,248
4,402
8
9
10
22
19 1 XOVER 5" VAM X 3 1/2" VAM 2079,20 2,992 11
20 2 PUP JOINT 3 1/2" VAM N80 9.2# 2082,20 2,992
12
23
21 1 2.31" BAKER F N IPP LE 2082,55 2,312
13
22 1 PUP JOINT 3 1/2" VAM N80 9.2# 2083,57 2,992 14
23 1 TUBING 3 1/2" VAM N80 9.2# 2092,67 2,992 15
24 1 PUP JOINT 3 1/2" VAM N80 9.2# 2094,19 2,992 16
24
25 1 2.25" BAKER F N IPP LE 2094,55 2,250 17

26 1 PUP JOINT 3 1/2" VAM N80 9.2# 2096,58 2,992 18


25
27 1 WIRELINE ENTRY GUIDE 2096,89 2,992 19

VE LOCIT Y ST R IN G m/T h
20
21
26
22
28
29
1
1
Packer-1.05 m Model C- 2.69 Nominal - Top sub is 3'' GS
External Coil connector-0.14 m (2.188'' OD, 1.25'' ID)
35,00 1,250
36,19 1,250
23
27
30 1 1.5" Tapered Coiled tubing Wall Thick. = 0.145'' bottom, 0.175'' top 2121,60 1,340 24
31 1 External Coil connector-0.14 m (2.188'' OD, 1.25'' ID) 2121,74 1,250 25
32 1 Dual pump out sub- 0.26m (2.188'' OD 1.25'' ID) 2122,00 1,250 26
27

31 31
32

32
P ER FOR AT ION S D EP T H / R T N OR M CLAS S IF IE D : N O
FROM T O
21 43 21 37 BARKONE 2 2 1/8" 4 SHTS/FT. D EV IAT ION : 29dg.
21 37 21 31
21 31 21 29

6
Example 1

7
Example 2

8
Example 3

9
Performance Summary

 Of the total of 39 velocity strings, 5 did not perform


properly;
 This makes a success rate of 87,2%;
 Reasons for failures:
– Attempt as last resort (with the knowledge of low probability
of success);
– Data is insufficient or wrongly interpreted;
– Last minute changes in design.

10
DHSV Restriction

VERMILION FIELD : LW EAST WELL : OP 1


R T / T H : 5.00 m.
COMPLETION DATE : 1/76
VOLU MES
AN N U LU S FLU ID :
1.03 SG MGCL2 BRINE
D R ILLIN G D E PT H S
1 31
TUBING : 4 1/2" : 16 m3 7" SHOE @ 1969 m.
ANNULUS : 4.5 X 7 : 17.9m3 TOP CEMENT IN 7" @ 1940.70 m. 1 31
HOLE : 39.3 m3 9 5/8" SHOE @ 1205 m.

TUBING HEAD
TUBING HANGER
Xma s T R EE
CAMERON TYPE F 11 "-10000
CAMERON 11"-10000 X 4.5 EUE TOP X 4.5 VAM BOT.
2
32

33
32
L MASTER VALVE
U MATER VALVE
CAMERON GATE VALVE 4 1/16"-10000 F TYPE
CAMERON GATE VALVE 4 1/16"-10000 F TYPE WITH ACTUATOR
3
4 34 2
SWAB VALVE CAMERON GATE VALVE 4 1/16"-10000 F TYPE
WING VALVES
TOP CAP
CAMERON GATE VALVE 4 1/16"-10000 F TYPE
4 1/16"-10000 X 4 1/2" EUE BOX
5
33
ST R IN G 23
ITEM QTY
1
DESIGNATION
1 TUBING HANGER WITH 4" CAMERON BPV PROFILE
Depth/Th ID/in.
0,26 4,000
24
25
3
2 3 TUBING 4 1/2" VAM 11.60 # N80 32,50 3,875

4
3 1 PUP JOINT 4 1/2" VAM 11.60 # N80

1 BAKE R 3.81" B SCS SSV N IP PLE


35,43 3,875

35,94 3,812
4 34
5 1 PUP JOINT 4 1/2" VAM 11.60 # N80 38,74 3,875 6
6 155 TUBING 4 1/2" VAM 11.60 # N80 1860,18 3,875
7 1 PUP JOINT 4 1/2" VAM 11.60 # N80 1863,06 3,875
8
9a
1
1
XOVER 4 1/2" VAM B X 4 1/2" TDS P
XTRA LONG TBG SEAL RECPTACLE EBA1 46-30
1863,60 3,875 5
9b 1 S LICK JOIN T W IT H 3.688 BAKER F PR OFILE 1875,90 3,688

10 1 XOVER 4 1/2" TDS B X 4 1/2" VAM P 1875,88 3,875 26


11
12
1
1
BAKER K22 ANCHOR SEAL
BAKER F1 PACKER SIZE 86-40
1876,13
1876,94
3,125
4,000
23
13 1 MILLOUT EXTENSION 5" VAM 1878,61
14
15
1
1
XOVER 5" VAM X 3 1/2" VAM
PUP JOINT 3 1/2" VAM N80 9.2#
1878,82
1879,81
2,876
2,876
24
16 1 BAKE R 2.75" F N IP PLE 1880,15 2,750 7
8
25
17 1 PUP JOINT 3 1/2" VAM N80 9.2# 1880,86 2,876 9a
18 1 TUBING 3 1/2" VAM N80 9.2# 1890,36 2,876 27
19 1 PUP JOINT 3 1/2" VAM N80 9.2# 1891,88 2,876 9b
10
20 1 BAKE R 2.75" R N IP PLE 1882,22 2,697 11

21 1 PUP JOINT 3 1/2" VAM N80 9.2# 1894,67 2,876 12


22 1 WIRELINE ENTRY GUIDE 1894,85 2,876 13
14
15
CON CEN T R IC ST R IN G IN ST ALLED APR IL '90 : 16
17
23
24
25
1
1
1
OT IS "J" S LOT SLICK JOIN T W IT H X 1.875 PR OFILE
OTIS GO PACKER
XOVER 2 3/8" EU X CS HYDRILL
18

19
28 31 1 BPV PROFILE WITH SEAL SLEAVE, 0.8 M 0,26 1,900
1 4" RECEPTICAL 1,50 2,600
26 TUBING STRING 2 3/8" CS HYD. N80 4.7# 20 29
27
28
29
1
1
1
XOVER 2 3/8" X 1.9 CS HYD. , NOGO TO LAND IN 3.68" F PROFILE
TUBING STRING 1.9" CS HYDRILL N80 2.9#
OT IS 1.5" X P R OFILE
21
22 32
30

31
1

1
XOVER 1.9 CS HYD. X 1.25"NPT

BPV PROFILE WITH SEAL SLEAVE, 0.8 M 0,26 1,900


30
33 3 2.3/8" TUBING 35,25 1,900
32 1 4" RECEPTICAL 1,50 2,600
33
34
3
1
2.3/8" TUBING
SEAL STINGER FOR WR-SCSSSV
35,25
35,50
1,900
1,900 34 1 SEAL STINGER FOR WR-SCSSSV 35,50 1,900
PE R FOR AT ION S

1906-1909 2 1/8" UNIJET


1910-1913 2" SCALLOP N OR M CLASSIFIED : N O
1912-1916.5 2 1/8" UNIJET
D EV IAT ION :
VER T ICAL
REVISION: 20-11-2008

11
Future Developments and Challenges

Challenges:
 Pulling velocity strings (corrosion);
 Barriers.

Future Developments:
 Exemption for DHSV for mature onshore gas wells?
 DHSV system installed in the velocity string so they can
be run to surface? Expensive?
 …?

12
Conclusion

Velocity strings in mature onshore gas wells, despite the


challenges, offer a cost effective way of deliquifying those
(small) wells.

13