CHAPTER VI
Preamble:
The IT complex, comprises of high & medium rise towers. The engineering utilities are planned to
be stand-alone for each of the towers. In order to have close control and efficient monitoring of the
utilities, each of the towers is equipped with stand-alone Building Management System – BMS,
which encompasses generally the engineering utilities. This chapter overs the details of such
utilities covered by the BMS for the block A2 being proposed now,
BMS Architecture:
The BMS being proposed, as per the guidelines established in earlier blocks, generally
encompasses the engineering utilities. That too for the core and shell part of the development only
and for the interiors, the tenant / occupant shall be providing the BMS as per their choice. Also, for
specific blocks occupied by Tenants, as per their practice, the entire BMS is provided by them and
NOT by the promoters. However, for the needs of energy billing, instruments and devices along
with software and PC are installed by the Owners.
Utilities:
The BMS’s scope is limited to the engineering utilities and in most of the cases only monitoring
them is the prime scope. Only in cases control activity is initiated. The following are the utilities
being considered in the BMS.
HVAC system.
AHU system,
I/O Schedule:
Representative detail of the I/Os for various systems are detailed hereunder:
I/O Schedule for 1 No. HRW , 1 No. TEF , 1 No. SPF (when ventilation fans are near HRW)
Block – A2
AI
AI (0-
Sl.no Description (Ni100 AO DI DO Input/Output Device
10V)
0)
Heat Recovery Wheel
1 Supply Fan on/off Command 1 Potential free Contact
2 Supply Fan Run status 1 MCC supplier
3 Supply Fan A/M Status 1 Potential free Contact
3A Supply Fan Trip Status 1 Potential free Contact
4 Exhaust Fan on/off Command 1 Potential free Contact
5 Exhaust Fan Run status 1 MCC supplier
6 Exhaust Fan A/M Status 1 Potential free Contact
6A Exhaust Fan Trip Status 1 Potential free Contact
7 Diff. Pressure across SA Fan 1 DP Switch
8 Diff. Pressure across EA Fan 1 DP Switch
9 Diff. Pressure across SA Filter 1 DP Switch
10 Velocity Sensor at Supply air duct. 1 Velocity Sensor.
11 SA Enthalpy Sensor 1 Enthalpy Sensor
12 RA Enthalpy Sensor 1 Enthalpy Sensor
13 Heat Recovery Wheel on/off Command 1 Potential free Contact
14 Heat Recovery Wheel run Status 1 MCC supplier
15 Heat Recovery A/M Status 1 Potential free Contact
Toilet Exhaust Fan
16 FAN on/off Command 1 Potential free Contact
17 FAN Run status 1 MCC supplier
18 FAN A/M Status 1 Potential free Contact
18A FAN Trip Status 1 Potential free Contact
19 Diff. Pressure across SA Filter 1 DP Switch
Stairwell Pressurization
20 FAN on/off Command 1 Potential free Contact
21 FAN Run status 1 MCC supplier
22 FAN A/M Status 1 Potential free Contact
22A FAN Trip Status 1 Potential free Contact
Terrace Fire Tank
23 Fire Water Tank Level - Low 1 Level Switch
24 Spare 2 3 2 5 2
I/O's Required 2 6 2 24 7
DDC Location Terrace - Outdoor
Note: For Control Logic, refer technical
specifications.
HRW - Heat Recovery Wheel
SPF - Stair Well Pressurization Fan
TEF - Toilet Exhaust Fan
Block – A2
AI AI Input / Output
Sl.no Description AO DI DO
(Ni1000) (0-10V) Device
20 Spare 4 2