Sunteți pe pagina 1din 1

Quality Systems Process-Turtle Diagram Process Type No.

: C4
Process Design Procedure Date of examination:
File: Turtle Diagram Turtle Diagram Trial Version Page 1/1

Who
Approaches
(Responsibility/skill matrix/qualification training/special training)
(Material/equipment/facility/necessary spare parts, etc.) 1. GM: grant authorization to the team leader of a new product development project;
1.Computer, design and management software 2. Team leader: set up the team, define qualifications of team members, responsibilities, and
2.Network training programs
3. Team leader: in charge of the complete design procedure, and examine the project progress
3.Other devices that receive and send information regularly
4.Printer, paper, etc. 4. Team leader: report directly to GM about project progress and supports from departments
5. HR: implement the training plan and organize training programs
6. GM Office: monitor monthly performance.
Inputs
(External & internal customer opinions)
1. Minutes of the kick-off conference/project team Outputs
2. Customer requests, blueprint, standards, (Procedures & major points internal & external customers
expectations, products and production requests. expect)
Process Design Procedure
3. Previous experience, documents of similar 1. Project node plan and sub-plan, workflow chart,
domestic or foreign products PFMEA, control plan, operation guidance
2. Manufacutring drawing, technique standards,
4. Development target (quality, progress, cost)
facilities & equipment, materials/testing
5. Risk analysis, cost estimation
tools/staff/special features/list of suppliers
6. Change to customer design 3. Test and experiment guidance, including control
methods for special features
4. People trained to be qualified for the position

How?
Measurement
(Approach/special environment requirement/procedure/work specification/list/format)
1.YGB-KPSNC-QM001-2004 Quality Manual (Performance of process target)
2.YGB-KPSNC-QP6301-2004 Procedure for Effective Control of Facilities, Equipment and Process 1. % of major nodes completed in a project
Design 2. Quality targets that have been completed, PPM
3.YGB-KPSNC-QP7301-2004 Process Design Control Procedure
3. Cost targets that have been completed
4.YGZ-KPSNC-QT002 FMEA Analysis Guidance
5.YGZ-KPSNC-QT004 Standards for Composition of Control Plans
6.YGZ-KPSNC-QT004 Standards for Analysis of Process Capabilities