Documente Academic
Documente Profesional
Documente Cultură
SO L A N
LOCATION PLAN :
NORTH 1
AD
MEH
LI
AD
RO
SHIM SHO
GI
LA
RO
VAK SOL
4 8 M ) NAG
HAT AN
A ( 5 . 4K 5 M )
IM L 4K ( 20.5
SITE
CON UNDER
KAN
DAG
HAT
K
SIDE
4K (5.48
(5
BDRY
H
RAT
5
ION
1
BDRY JPI
S RY
.48
BDRY T UN
IVER
SITY
M )
BDRY
)
D BDRY
8
B
.1
5 4 3 2 1
M
9
BDRY
M) 1
GARBAGE
(
1 METALS
COMPOSTING
SEGREGATION 2 E WASTE
MACHINE
+ MANURE ROOM + OWC 3 LAMPS
BIO
14K
FLUSHING TANK DOMESTIC TANK FIRE TANK BDRY STORAGE 4 BATTERIES
5 OTHER DRY
GARBAGE
RY
Washbasin
CURING YARDS
PUMP ROOM
BD BDRY
8BDRY
LEGENDS :
W1
BDRY
WATER TANK BDRY
(5.4
BD RY
8.00
[26'-3"]
BDRY PLOT BOUNDARY
M)
8.0
]
'-3"
BDRY
[26
PROPOSED WORK
4K
EXISTING WORK
BDRY
BUILD-UP AREA
ROAD
ROAD CENTER LINE
BDRY
GREEN AREA
PLOT OPEN PARKING
BDRY
ARKIN
G
SPACE FOR
GARBAGE
DUSTBIN
DUST BIN
O P E N P )
0 SQM
(430.0
BDRY
STREET LIGHT
GARBAGE COLLECTION
BDRY
COMMERCIAL / PUBLIC AREA
33K (45.
BDRY
SPECIFIC NOTES :
BDRY
1. ALL TILE DROPS ARE 12MM UNLESS OTHERWISE
BDRY
SPECIFIED.
5.00
[16'-5"]
2. ALL THE EXTERNAL AND INTERNAL WALLS ARE
21 M)
CK
BDRY
230MM AND 115MM RESPECTIVELY UNLESS
B L O
MAIN
OTHERWISE SPECIFIED.
5.00 [16'-5"]
3. FINISH PLINTH LEVEL OF BUILDING IS ASSUMED
BDRY
G) R KIN
AS ±000 MM, MASTER LEVEL TO BE OBTAINED
(4 + PA 4.
FROM OVERALL SITE PLAN.
ALL JUNCTIONS BETWEEN CONCRETE AND ANY
TE)
BDRY
CU TI VE SUI OTHER MATERIAL TO BE PLASTERED ONLY
(14 EXE
AFTER FIXING CHICKEN MESH.
BDRY
LT SIDE
SPACE FOR TRANSFORMER REV. NO. DATE DESCRIPTION NO. OF
COPIES
BDRY
DG. SET
PSS
ESS HT SIDE
BDRY
2K (2.74
5.02
[16'-6"]
DRAWING RELEASED FOR :
BDRY
E C SUBMISSION TCP APPROVAL
BDRY
WATER STORAGE TANK TENDER
CLIENT :
CONSTRUCTION
BDRY
B L O C K
SUITE WAKNA HOSPITALITIES PVT. LTD.
BDRY
M)
K ING )
PA R
(4 + E)
TI VE SUIT PROJECT NAME :
RY
(28 E XECU
BD
BDRY
RY
BD
SPACE FOR S T P
BDRY
LAND DETAIL:
KHASARA NO .2926/2528/2329/2 ,2926/2528/2329/3,
RY
BD
5.0 2926/2528/2329/4, 2926/2528/2329/5,2926/2528/2329/6
[16
'-5
"]
0 MEASURING 4 BIGHA 17 BISWA AT MAUJA
2
BDRY
RY
9
BD
K
DISTRICT SOLAN
PARK
SITE PLAN
PROJECT CONSULTANT :
OPEN
(
M) SQ
(250.00
3
ACE EARTH MANAGEMENT
RY
9
SOLUTIONS PVT. LTD.
BD
.
TWIN TOWER, SEVEN OAK , BY-PASS ROAD SANJAULI
7
SHIMLA-171006, (H.P.), INDIA.
BD
3
RY CONTACT NO - +91-98165-08000, +91-92183-00003
www.team-ace.com
RY
MAIL- I.D :- response.ecc@gmail.com
M
BD
BD STRUCTURAL CONSULTANT :
0
RY
)
associates
5.0
]
'-5"
[16
) ERC BUILDTECH
RY
M
2 BD HOUSE # 2003, SECOND FLOOR, SECTOR 15 C
. 2 BD
RY
STP ENGINEER RANDEEP CHAUHAN
CHANDIGARH - 160015, (CHANDIGARH UT), INDIA.
CONTACT NO - +91-92180-00003, +91-80910-00003
(8 www.team-ace.com
MAIL- I.D :- response.ecc@gmail.com
RY
6K ARCHITECT :
BD
BD
RY randeep chauhan design
associates
AGGARWAL BUILDING, 2ND FLOOR, OPPOSITE GURUDWARA
SANJAULI CHOWK, SANJAULI, SHIMLA-171006, (H.P.), INDIA.
CONTACT NO - +91-92180-00003, +91-80910-00003
www.team-ace.com
MAIL- I.D :- response.ecc@gmail.com
DRAWING FOR :
HOTEL AREA DETAIL SUITE BLOCK LAND & FAR DETAIL E C SUBMISSION
TITLE OF DRAWING :
GROUND FLOOR 526.94 SQM TOTAL PLOT AREA 3561.6 Sq. m. PRELIMINARY SITE PLAN
MAIN BLOCK SUB-TILE OF DRAWING :
FIRST FLOOR 526.94 TOTAL PLOT AREA IN BIGHAS 4.8 BIGHA
PLACEMENT OF BLOCKS AND ROADS
FLOOR NAME AREA UNIT SECOND FLOOR 526.94 SQM OVERALL PERMISSIBLE FAR @ 1.75 6232.80 Sq. m. DRAWN BY : CHECKED BY : DATE :
FIRST FLOOR 581.87 SQM TOTAL AREA 2107.76 SQM 1:300 METER
PARKING DETAIL SUITE DETAIL CLIENT SIGNATURE : ARCHITECT SIGNATURE :
UH
R A ND
4435.24 SQM
AN
BUILD UP AREA NORMS AREA REQUIRED PARKING PARKING PARKING
D:\CHD PC\ACE Earth Management Solution (P) Ltd\PROJECT\Apartments\Govind Enclave\PHASE -III\DOCUMENTS\rc.jpg
TOTAL AREA 2327.48 SQM TOTAL PROJECT 18 SQM PER SUITE BLOCK 28
581.87 SQM 4435.24 798.34 430.00 581.87 1011.87
TOTAL PARKING 581.87 SQM BUILD UP PARKING 100 SQM TOTAL SUITES 42