Documente Academic
Documente Profesional
Documente Cultură
Maintain enrolment in
mandated programs in
Agriculture and Fishery,
Engineering and IT and its
related fields
Strengthen Office of
External Affairs and
Linkages and Office of
Student Affairs
A.2 Number of
Foreign
Students
Enrolled
Full-
Time
on Campus
Participate in international
conferences/fora
A.3 Percentage
of Students
Involved
in Inter-
Country
Mobility
Programs
Develop a comprehensive
data bank on foreign
exchanges to promote
professional and
interpersonal growth
A.4
Institutionalized
Monitoring and
Evaluation
B.1.1Library
Services
B.1.1.1
Percentage of
students who have
used the library
and its facilities
Provide/restore internet
connections and e-library
facilities
Upgrade of laboratory
facilities and equipment
B.1.1.3 Number of
library services
offered
B.1.2.2
Percentage
of students
who availed of
medical and
dental
services
Continuing education
of medical and dental
personnel
B.1.3. Sports and
Cultural
Services
B.1.3.1
Percentage of
Athletics
and cultural
events
conducted
(school-
based)
B.1.3.2
Percentage
of Athletics
and Cultural
events
participated
in higher
meet
(Reg’l/National
SCUAA)
B.1.3.3 Number of
students
sent to
higher
meet
B.1.4.Guidance
and Counselling
B.1.4.1 Number of
Guidance
and
Counselling
programs
conducted
Organize a grievance
committee
B.1.4.2
Percentage
of students
who availed
of the
Guidance
and
Counselling
Services
Require faculty to
recommend for counselling
students with guidance and
counselling needs
Student monitoring by the
faculty and adviser
B.1.4.3 Number of
designated /
appointed
licensed
guidance
counsellor
B.1.5.
Scholarship
/Financial
Assistance/
Loans
B.1.5.2 Number of
external
scholarships
recognized
by the
university
B.1.5.4 Number of
sustainable
student loan
program
B.1.6.1
Percentage
of students
staying in
the dormitory
B. 1.7.1 Number of
student
publications
with ISSN
Regular issue/release of
school publication
B.2. Student
Organizations
B.2.1 Number of
Accredited /
recognized
student
organizations
B.2.2 No. of
student
organization-
initiated
activities
Number of
Student
Portfolio
Established
B.4 Timeliness of
Education
Delivery/
Supervision
Percentage
of students
who rated
timeliness
of education
delivery/
supervision
as good or
better
60% of the Survey of students’ Formulate and submit
students rated satisfaction level on proposal on Survey of
timeliness of timeliness of students’ satisfaction level
education delivery/ education delivery on timeliness of education
supervision as delivery
good or better
Conduct survey/ monitoring
and analyse results and
make recommendations to
improve the delivery of
services
B. 5
Institutionalized
Monitoring and
Evaluation
C.1 Faculty
Scholarships
Percentage of
Faculty who
finished their
doctoral program
from CHED
recognized
educational
institutions (with at
least Level III
accreditation) in
their field of
specialization
(other than home
SUC)
C.2.1 Relevant
Training
Hours
Attended
C.2.1.1
International
C.4
Institutionalized
Monitoring and
Evaluation
100% of the
curricular offerings
are dynamic and
responsive
a. Conduct a comprehensive
Business/Industry review of existing curricular
Needs programs and assess its
relevancy to business/
b. ASEAN industry needs, ASEAN
Economic Economic Integration
Integration (internationalization),
(internationalizatio K-12 Enhanced Basic
n) Education Curriculum and
DRR/CCA
c. K -12 Enhanced
Basic Education Establish a standardized
Curriculum and uniform format/template
of curricular programs to
d. Disaster Risk include course syllabi
Reduction
Management and Establish a standardized
Climatic Change test questions in preparation
Adaptation for and in harmony with
(DRR/CCA) Board Examinations (for
Board courses)
Inclusion of DRR/CCA in
curricula/syllabi
D.2
Institutionalized
Monitoring and
Evaluation
E. BOARD Objective:
PERFORMANCE
/LICENSURE Improved performance on Licensure/Board Person
EXAMINATION Examination Time Frame Respons Budget
ible
E.1 Passing
Percentage
of Graduates
in the
Licensure
/Board
Examination
E.2
Institutionalized
Monitoring and
Evaluation
F.1 Number of
Accredited
Programs
CapSU has been Prepare and apply Submit all curricular VP AA 750,00
Institutionally for programs to accreditation Director 0
Accredited by the Institutional with AACUP -
end of 2016 Accreditation Accredi
tation
CA,
a. Baccalaureate Deans
Programs
b. Master’s
Degree
Programs
c. Doctoral
Degree
Programs
Budget Allocation for VP AF
accreditation as one of the CA,
priorities in budget planning Budget
Officer
Orientation seminar on VP AA
Document Preparation CA
Director
for
Accredi
tation
IAB Visit/Evaluation, VP AA
Monitoring and Feed CA
backing Director
for
Accredi
tation
Deans
c. Doctoral
Degree
Programs
F.3. Percentage
(cumulative)
of programs
accredited to
total number
of programs
All programs are Subject all programs Prepare and submit all
100% accredited to accreditation curricular programs for
a. Higher AACUP accreditation
Education
b. Advance
Education
F.4 ISO Certified
University
Attend seminar/training
workshop on ISO document
preparation
Standardize format/template
of all forms, reports,
communications and all
other documents used in
the University system
G.1. Total
number
of graduates
in
b. Advanced
Education
G.2 Percentage
of total
graduates
within the
mandated and
priority
programs
(Higher
Education)
G.3 Percentage
of graduates
within the
required time
frame
80% of the class Provide the students Make the following student
graduated within with an enabling development programs
the required time environment available and accessible:
frame conducive to learning a. Library Services
b. Medical and Dental
Services
c. Sports and Cultural
d. Guidance and
Counselling
e. Scholarships/
Financial/
Loans
f. Housing and
Dormitory
g. School Publication
h. Student
Organizations
G.4.2.
Advanced Deans/Program Chairs to
Education conduct regular monitoring
and appraisal of students
performance/records to
ensure graduation within
timeframe
G.5 Percentage
of Colleges
who have
conducted
tracer studies
50% of the
graduates
have improved
their employment
status
G.8
Institutionalized
Monitoring and
Evaluation
H.1. Percentage
of faculty
producing
quality and
approved
instructional
materials(IMs)
H.3
Institutionalized
Monitoring and
Evaluation
Q1 Q2 Q3 Q4 Amount Source
PROGRAMS/ of
SUCCESS Strategies PROJECTS/ Fund
INDICATOS(S) ACTIVITIES
A.1 Percentage
of research
studies
projects
completed in
the last 3years
Establish research Assess capability needs of
80% of faculty and development faculty members related to
members agenda based on research activities
occupying National and
professorial Regional priorities
positions have
completed
research outputs
A.2 Percentage
of research
studies/
projects
completed
within the
original time
frame
Monitor submission of
research outputs by the
Research Chairmen
Research
Studies
Presented to
a. International
C.1 Research
Studies
Published in
International/
National
Refereed
Journals
10% of research Update University Review RDE manual and VP RDE 50,000
outputs published research policy research provisions in the Research
in international and University Code Director/
Chair
national refereed CA
Secure approval for
journals Deans
revisions and
PDMIS
implementation
Strengthen linkages Create a directory of VP RDE
with international available international and Research
and national national refereed journals. Director/
Organizations/ Chair
Institutions that CA
publish refereed Deans
Establish network Research
journals
Chair
PDMIS
C.2 Research
Studies Published
in Institutional
Refereed Journal
C.4 Research
output cited by
other
researchers
in refereed
journals
C.5 Research
outputs cited by
book authors
D.1 Number of
Books
submitted for
copyright
D.2 Number of
Books
Copyrighted
Produce quality Continuous book writing
One (1) copyrighted
book per year books for publication capability building
and copyright
Provide monetary and non-
monetary incentives for
faculty-authors
Strengthen linkages with
publishing houses (i.e.
Mutya Publishing House,
etc.)
E.1 Number of
Inventions
submitted for
Patenting
Conduct orientation
workshop on documentation
and packaging of inventions
inventions and package for
patenting
E.2 Inventions
Patented,
Utilized
and
Commercialized
Forge MOA/MOU with
One (1) invention Establish linkages business/ VP RDE
with Business/ Research
patented, utilized manufacturing/
Manufacturing/ Commercial establishments Director
and commercialized Director
per year Commercial
for
establishments Market patented inventions
External
Provide monetary and non- Affairs/
Linkages
monetary incentives for
faculty and student-
inventors
F. RESEARCH OUTPUTS WITH AWARDS Time Frame Person/ Budget
s
Q1 Q2 Q3 Q4 Respons
PROGRAMS/ ible Source
Performance Strategies PROJECTS/ Amount of
Indicator/s ACTIVITIES
Fund
Research outputs
with awards
G.1 External
Research
Fund Source
80% of budget for Tap LGUs, private Update directory of funding VP RDE
research is sourced institutions and other institutions CA
from external agencies for Research
agencies / donors research funding Director
PDMIS
Faculty
H.1 Frequency of
conduct of
institutional
symposia/
fora/meetings
Institutionalized
Monitoring and
Evaluation
Regular monitoring VP RDE 100,00
Monitor and Research
and evaluation of Formulate monitoring and 0
evaluate program Director
research -related evaluation tools CA
every semester (as Research
necessary) activities
Chair
PDMIS
HRMO
Conduct regular monitoring
and evaluation
EXTENSION Objective:
Responsive and
RELATIONSHIP WITH AND SERVICES sustainable extension Time Frame Person Budget
TO THE COMMUNITY services /s
Respon
sible
A. COMMUNITY
PROGRAMS
SUCCESS PROGRAMS/ Q1 Q2 Q3 Q4 Amount Source
INDICATOR(S) STRATEGIES PROJECTS/ of
J F M A M J J A S O N D Fund
ACTIVITIES
A.1. Number of
recognized and
implemented
community
programs (with
minimum of 8
contact hours)
with BOR
approval, MOA
and approved
Budget
Properly document
extension activities
A.2. Number of
beneficiaries
served
- Technical
- Consultancy
- Training
A.3. Community
programs
monitored and
evaluated
A.3.1 Percentage
of beneficiaries
who rated the
program good or
better
A.4. Number of
Adopters
engaged in
profitable
enterprise
Feed backing
Five (5) sustainable Establish strong Conduct and analyse President 100,00
linkages/ partnership monitoring and evaluation VP 0
partners by the end results RDE
Extension
of 2016
Feed backing Director
Extension
Chair
CA
Deans
Update plans to further PDMIS
improve viable External
demonstration projects Affairs/L
inkages
Director
B. LINKAGES
Number of active
linkages
/partnership with
other
organizations /
universities
(covered by MOA,
MOU and BOR
approved budget)
Feed backing
C. AWARDS
Number of awards
given by reputable
organizations
D.PUBLICATION
Number of
developed,
published and
utilized IEC/
Techno Guide
materials
Conduct training/seminars
on IEC/Techno Guide
materials Preparation
Institutionalized
Monitoring and
Evaluation
Recommend project
implementation
Business Plan
implementation
Strengthen Conduct capability building VP AF 50,000
capability of (training workshop) on CA
fishpond project in- A.Project planning, PDMIS
charge and development and UBAO
caretakers/pond management Extension /
tenders a. Fishpond operation Linkages
Director
and management Project
b. Basic production in-charge
records keeping Production
c. Basic financial Mngr
records keeping
Business Plan
implementation
Business Plan
implementation
Strengthen Conduct capability VP AF
capability of hometel building (training workshop) CA
in-charge/personnel on PDMIS
and caretakers a. Project planning, UBAO
development and Extension /
management Linkages
b. Hometel operation Director
and management Project
c. Basic production in-
records keeping charge
Production
d. Basic financial
records keeping Chair
B. AGRI-ECO-TOURISM PROJECTS
Execute plans
Establish records
documentation system
Regular submission of
reports
Establish linkages Forge an undertaking in the President
with public and/or form of MOA/MOU VP AF
private agencies for UBAO
technical assistance Submit proposals to funding PDMIS 20,000
and funding agencies related to agri-eco CA
purposes tourism business venture for Product
evaluation and funding ion
purposes Chair
Project
in-
charge
Establish records
documentation system
Regular submission of
reports
Execute plans
Establish records
documentation system
Regular submission of
reports
a. Bamboo Plantation
b. Rattan Plantation
c. Darag native chicken
production
d. Mt. Tag-aw forest and
mountain resort
Execute plans
Establish records
documentation system
Regular submission of
reports
Product marketing Establishment of VP AF Per
bamboo/rattan based UBAO project
product packaging and CA propos
branding PDMIS al
Technical
Establishment of Working
bamboo/rattan based Group
product outlets Product
ion
Establishment of chair
bamboo/rattan eco-tourism Project
services outlets/front office in-
charge
Advertisement and
promotion of products and
services
Execute plans
Establish records
documentation system
Regular submission of
reports
Establishment of agro-
forestry eco-tourism product
packaging
Execute plans
Establish records
documentation system
Regular submission of
reports
Number of Other
Income
Generating
Projects (IGPs)
established
Recommend project 5M
implementation
Execute plans
Establish records
documentation system
Regular submission of
reports
Product Marketing Establishment of processed
fish products packaging and
branding
Establishment of fish
processed products outlets
Advertisement and
promotion of products
Provide proper
remuneration to faculty
reviewers
Establish records
documentation system
Regular submission of
reports
Number of
research outputs
implemented and
commercialized
Number of
IEC/techno guide
produced and
commercialized
Institutionalized
Monitoring and
Evaluation
A. MANAGEMENT OF RESOURCES
A.1.1
Harmonized
Plans and
Programs of
the University
Present consolidated
Strategic Plan to the
Administrative Council
Submit updated
Strategic HR Plan to CSC
for validation
Submit validated Strategic
HR Plan to BOR for
approval
Implement updated
provisions of Strategic HR
Plan
Submit updated
SPMS to CSC for validation
Implement updated
provisions of SP
Formulate Master
Development Plan by
campus
Present Master
Development Plan by
campus to the
Administrative Council for
critiquing
Submit Master
Development Plan to BOR
for approval
Implement updated
manuals
Strengthen Organizational
Structure of the University
following the Strategic HR
Plan specifically:
1. Human Resource
Department with the
following sections:
a. Recruitment,
Selection&
Promotion Section
b. HR Development &
Performance Mgt.
Section
c. Personnel Relations
Section
2. Planning, Dev’t & MIS
(PDMIS)
3. Project Management
Office (PMO)
4. University Business
Affairs Office (UBAO)
5. External Affairs and
Linkages (EAL)
6. University Legal Office
7. Intellectual Property
Office
8. Supply/Procurement
Office (including BAC)
9. Records Office
10. Motorpool
11. Janitorial Services
12. Security
A.1.2 Productive
Resource
Management
Secure/prepare necessary
documents needed for titling
Successful
implementation of
proactive initiatives
towards:
Update curriculum
Allocate funds
Standardize format/template
of all forms, reports,
communications and all
other documents used in
the University system
b. K-12 Enhanced Review and upgrade Complete faculty mapping President 50,000
VP AF
Basic Education curriculum and accreditation in VP AA
Curriculum responsive to K-12 conformity with areas of VP RDE
Enhanced Basic specialization PDMIS
CA
Education Curriculum
Curriculum Director
c. Sustained Review and upgrade Institutionalize activities on President 10M
Disaster curriculum to be Disaster Risk Reduction VP AF
VP AA
Risk Reduction responsive to Management/ Climatic VP RDE
Management/ Disaster Risk Change Adaptation PDMIS
Climatic Change Reduction CA
Adaptation Management/ Prepare DRR/CCA Manual Deans
(DRR/CCA) Climatic Change and seek BOR approval External
Affairs/
Adaptation Linkages
Conduct orientation/briefing Director
on DRR/CCA manual Curriculum
Director
Implement provisions on
DRR/CCA Manual
Conduct ofregular
Tree Planting activities
Implement Waste
Management practices
A.1.4 Strong
Public-
Private
Partnership (PPP)
Execute Deed of
Undertaking/MOA/MOU
A.1.5 Good
Governance
Indicators
Transparency of Programs
and Projects thru
submission of regular
reports of programs,
projects and activities (PPA)
to COA
A.1.5
Institutionalized
Quality Control
Circles (QCC) in
the University
S5: Sustain
1. Create 5S audit form
or radar chart for
summarizing results
2. Establish periodic
schedule for
conducting audits
3. Establish checklist
for visitors to review
4. Celebrate
accomplishments
and continue
improving
A.1.7
Standardized
format/template of
all forms, reports,
and communications
Develop uniform
format/templates of all
forms, reports,
communications and all
other documents
Implement approved
templates and stylebook
A.1.8
Institutionalize
Monitoring and
Evaluation (M & E)
System (all plans,
programs,
performance
reports, etc.)
A.2.1 Enhanced
Human
Resource
Development
and
Management
Update Organizational
Structure of the University
following the Strategic HR
Plan specifically:
1.Human Resource
Department with the
following sections:
a. Recruitment,
Selection &
Promotion
Section
b. HR
Development &
Performance
Mgt. Section
c. Personnel
Relations
Section
2. Planning, Dev’t & MIS
(PDMIS):
a. Planning &
Development
Section
b. MIS Section
3. Project Management
Office (PMO)
4. University Business
Affairs Office (UBAO)
7. Intellectual Property
Office
8. Supply/Procurement
Office (including BAC)
9. Records Office
10. Motorpool
11. General/Janitorial
Services
12. Security
Institutionalized Establish an Link with training President
Exemplary and Exemplary institutions/ associates on VP AF
External
Ethical Servant Leadership Culture Exemplary Leadership Affairs/
Leadership Values capability building Linkages
at the end of 2016 Director
a. Model the Way Allocate funding for HRMO 200,000
Clarify values by Exemplary Leadership PDMIS
finding your voice training VP AF
and affirming Budget
shared ideal; Set the Officer
example by aligning CA
actions with shared
values
A.2.2 Recruitment
of right
people for
the right job
Conduct interview of
qualified applicants by the
Promotion and
Selection Board (PSB)
Process appointment
papers for approval of
the President and
attestation by the CSC
A.2.4 Retention of
High
Performing
Personnel
Zero incidence of
Creation of enabling Provision of HR systems for
personnel turn-over environment increased employee
conducive to higher productivity such as
morale and Strategic Performance
increased Management System
productivity (SPMS), Merit System,
Career Pathing and
Succession Planning
Program, Faculty and Staff
Development Program,
Employee Welfare Program,
Health and Wellness
Program, PRAISE,
Grievance Machinery,
Gender and Development
(GAD) Plan
90% of personnel
attended
institutional
trainings/
Seminars
All key Attendance to the Academy of the Philippines
officials/personnel Executive Course (DAP), CHED and PASUC
attended the on Educational
Executive Course Management and
on Educational Leadership,
Management and Flagship Course on
Leadership, Administrative
Flagship Course on Service Excellence
Administrative and Academic
Service Excellence Excellence, Flagship
and Academic Course on the
Excellence, Management of
Flagship Course on Research in SUCs
the Management of under the EDPS by
Research in SUCs the DAP, CHED
and PASUC
A.2.5 Faculty
finished
their
doctoral
program
from CHED
recognized
educational
institutions
Implement approved
PRAISE
A.2.7 Personnel
Relations Stable
A.2.8 Retirement
with Satisfaction
Availability of
Supplies, Materials
and Equipment
when needed
Monitor issuance of
supplies, materials and
equipment
Proper issuance of
memorandum receipts
(MRs)
Automation of Inventory
System
Systematic records
keeping and safe
storage for easy
retrieval
Functional
vehicles,
machineries and
equipment
Streamline Motorpool
Organizational Structure
A.6SECURITY SERVICES
Protection of
personnel and
students and
safeguard
property of the
University
Strict implementation of
rules and regulations
relative to entry of
visitors/guests, students,
personnel and campus
residents
Streamline Security
Organizational Structure
Continuous/periodic
capability building of
security personnel
Update renewal of firearms
license
The 5S
Sustain (Self-Discipline) –
Make a habit of maintaining
established procedures
Identify possible
donors(alumni,
LGUs, NGOs, Foundations)
Number of
medical
and dental
services
offered
Allocation of funds
Effective Budget
Preparation and
Utilization
a. Internally
generated
income
Properly acknowledge
donations/grants thru BOR
approval and resolutions
Conduct feedbacking
through meeting of those 100,000
involved for corrective
measures