Sunteți pe pagina 1din 1

 

1. DATA BANGUNAN 
Luas (m2)
Lantai
Kantor Retal SP/ME Fasilitas Parkir Void R. Terbuka Proyeksi Total
B2 370,74 370,74
B1 1713 3161,01 1346,22 9756,81 15977,04
1 6632,49 896,68 1968,09 91,19 4918,3 14506,75
2 9351,15 1304,37 1836,54 1215,58 119,3 13826,94
ROOF 621,64 1113,52 3751,88 8278,22 13765,26
TOTAL 621,64 17696,64 6846,32 5150,85 9756,81 5058,65 8397,52 4918,3 58446,73
 
2. PLUMBING MATERIAL 
No Deskripsi Material
1 Cold Water & Recycle Water Supply
- Transfer & distribution from pump GIP Medium Class
- Suction, discharge & header GIP Medium Class
- Supply PPR PN-10
- Water tank drain & overflow uPVC / PVC AW
2 Kitchen Waste Water
- Down pipe Polypropylene / PVC Accoustic
3 Sewage Waste Water
- Down pipe uPVC / PVC AW
- SWP discharge Ductile Iron Pipe / PVC AW
- Underground Ductile Iron Pipe / PVC AW
4 Rain Water
- Down pipe uPVC / PVC AW
- Suction, discharge & header GIP Medium Class
5 Vent PVC D
6 Floor Drainage PVC AW
7 Bulk LPG
- Mainline from storage tank (undergound) Ductile Iron Pipe
- Riser API 5L Sch 40 Grade B
- Distribution Line API 5L Sch 40 Grade B
8 Pool
9 STP
10 Hot water
11 Deepwell
12 Fire Fighting
- Hydrant & sprinkler installation Black steel API Sch 40
- Air vent Copper BS 1387
- Drain pipework GIP Medium Class
 

S-ar putea să vă placă și