User Requirement Specification
► What is a URS?
A URS is a detailed document used to specify the
requirements of the user for individual aspects of the facility,
equipment , utility and system in terms of function,
operation, document and applicable qualifications need.
PQ Test
URS PQ
Plan
OQ Test
FDS OQ
Plan
Design
(incl. FAT)
Development
DDS
IQ Test IQ
Plan SAT
Impact assessment
Implementation
Confidential
AW/2014-01-13
Design Phase of the New Project
Commissioning PQ
URS
Plan
Implementation
Confidential
AW/2014-01-13
Hot Storage and Distribution system
Confidential
AW/2014-01-13
Cold Storage and Distribution System
Confidential
AW/2014-01-13
User Requirement Specification
Confidential
AW/2014-01-13
Regulatory Requirement
► Guidelines Regulation
Current United State Pharmacopeia (USP)
Current ASME BPE
ISPE Good Practice Guidelines
WHO Drinking Water Guidelines
European Pharmacopeia
Etc
Confidential
AW/2014-01-13
Regulatory Requirement
Confidential
AW/2014-01-13
Material Requirement for Storage and Distribution
System
Confidential
AW/2014-01-13
Storage Vessel Requirement
Confidential
AW/2014-01-13
Requirement for water distribution pipe work
► Temperature Control and Heat Exchanger
Cold system
Hot System
► Circulation Pump
Circulation pump as a sanitary design with appropriate seal that
prevent contamination of the system
► Bio-contamination control technique
Maintenance of continues turbulent flow
Dead-legs in the pipe work installation L/D =2 (ASME BPE 2009)
Membrane Pressure gauge
Diaphragm valve should be used
Pipe work slope or drain ability (1-2 % ASME BPE 2009)
The growth of microorganisms can be inhibited by
Ultraviolet radiation in pipe work
Maintaining the system heated ( 70 -80 deg C)
Sanitizing the system periodically ( > 70 deg C Hot)
Sanitizing the system periodically ( Ozone or Chemical Cold Process)
Confidential
AW/2014-01-13
Sanitation and Bioburden Control
► Hot Sanitation
System that operate and maintained at elevated
temperature in the range of 70 – 80 deg C
Confidential
AW/2014-01-13
Instrument and Control
Confidential
AW/2014-01-13
Function Design Specification
Confidential
AW/2014-01-13
Sample Point of Use Consumption
Confidential
AW/2014-01-13
Detail Design Specification
► Material used
► Size of pipe, pump, heat exchanger, storage tank,
critical instrument and other field device
specification
► Correct or incorrect installation of the equipment
► Automation configuration
► Electrical drawing
► Documentation requirements
Confidential
AW/2014-01-13
Impact Assessment
Confidential
AW/2014-01-13
Design Qualification
A documented review of the design at an appropriate stage in a
project for conformance to operation and regulatory expectations
Confidential
AW/2014-01-13
Study Case
Confidential
AW/2014-01-13
Study Case 1
Confidential
AW/2014-01-13
Hot Water Distribution
Confidential
AW/2014-01-13
Study Case 2
Confidential
AW/2014-01-13
Cold Water Distribution
Confidential
AW/2014-01-13