Documente Academic
Documente Profesional
Documente Cultură
Project: Page: 1
12.6.0H
Location: Date: 29-11-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: modul 3 Config.: Normal
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 16 7.900 6.354 8.381 -4.818 0.000 0.000 0.000 0.000
3.000 1.658
ETAP
Project: Page: 4
12.6.0H
Location: Date: 29-11-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: modul 3 Config.: Normal
Line/Cable Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
T3 3-Phase 5.000 13.800 0.400 7.15 8.50 0 0 0 -2.500 0 7.1500 Dyn 0.000
T10 3-Phase 9.375 150.000 20.000 8.35 13.00 0 0 0 0 0 8.3500 Dyn 0.000
T11 3-Phase 12.500 150.000 13.800 8.35 13.00 0 0 0 0 0 8.3500 Dyn 0.000
T13 3-Phase 7.000 13.800 2.400 8.35 13.00 0 0 0 -2.500 0 8.3500 Dyn 0.000
T14 3-Phase 12.500 150.000 13.800 8.35 13.00 0 0 0 0 0 8.3500 Dyn 0.000
ETAP
Project: Page: 6
12.6.0H
Location: Date: 29-11-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: modul 3 Config.: Normal
Branch Connections
* Bus3 13.800 100.000 0.0 5.034 1.584 0 0 Bus4 2.723 1.997 141.3 80.6
Bus5 0.400 96.091 -2.0 0 0 2.614 1.782 Bus4 -2.614 -1.782 4752.4 82.6
Bus8 2.400 95.116 -6.2 0 0 2.376 0.977 Bus21 -2.376 -0.977 649.7 92.5
Bus11 2.400 96.253 -8.6 0 0 6.485 -0.185 Bus19 -0.075 0.168 45.9 -41.0
* Bus17 13.800 100.000 0.0 8.267 -1.035 0 0 Bus18 4.506 -0.445 189.5 -99.5
Bus18 13.800 96.092 -2.3 0 0 0.000 -1.385 Bus17 -4.309 0.604 189.5 -99.0
Bus19 2.400 97.349 -5.4 0 0 4.206 0.711 Bus11 0.086 -0.165 45.9 -46.1
Bus20 13.800 101.773 -0.6 3.000 1.658 0 0 Bus1 3.000 1.658 140.9 87.5
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 92.0% of the Continuous Ampere rating).
ETAP
Project: Page: 9
12.6.0H
Location: Date: 29-11-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: modul 3 Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Line1 1.604 0.456 -1.597 -1.265 7.1 -809.5 100.6 100.2 0.36
Line2 1.390 1.126 -1.381 -1.936 9.1 -809.6 100.6 100.2 0.32
T14 -2.994 -1.582 3.000 1.658 5.8 75.5 100.6 101.8 1.22
Cable2 2.723 1.997 -2.632 -1.936 90.8 61.1 100.0 96.8 3.24
Cable3 2.430 1.108 -2.388 -1.080 41.5 27.9 98.9 97.1 1.83
Cable5 6.565 0.505 -6.438 -0.351 126.9 153.3 98.9 96.8 2.05
T10 -5.115 -1.003 5.134 1.250 19.0 246.8 98.9 100.2 1.36
Cable11 -0.075 0.168 0.086 -0.165 10.3 2.7 96.3 97.3 1.10
T11 -3.753 0.686 3.761 -0.590 7.4 96.5 100.2 100.0 0.23
Cable10 4.506 -0.445 -4.309 0.604 197.2 159.2 100.0 96.1 3.91
T13 4.309 0.781 -4.291 -0.546 18.1 234.8 96.1 97.3 1.26
620.3 307.6
ETAP
Project: Page: 11
12.6.0H
Location: Date: 29-11-2019
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: modul 3 Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 92.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Critical Report
MW Mvar MVA % PF
Number of Iterations: 2