C1 C1

SB4 SB1 SB4 SB1


C1
5'-4" 13'-2" 6'-4" 7'-4"

S1
SB5

7'-8"
8'-8"

SB2
S3
C1
SB1
SBR SBR

2'-11"
C1 13'-8"

SB4

19'-2"
8'-3" S2
C1

24'-7"
S1

SB3
10'-6"
SB4
16'-3"

S2
SB1

14'-1"

SB4
5'-4" 13'-2"

SB4

5'-5"
5'-5"

C2 S1
SBR3 SB3
C2
S1
2'-2"

2'-2"
S1
SBR3
SBR1

SB5 SB5
SBR4

TERRACE

C2
C2
C1 C1

C3 C3

SECOND FLOOR ROOF


BEAM AND SLAB PLAN
NOTES- 6.STRIPPING TIME FOR SHUTTERING / FORMWORK 7. CURING FOR R.C.C. MEMBER MINIMUM 7 DAYS STRUCTURAL DESIGNER- PROJECT NAME AND ADDRESS-
1. USE M-20 GRADE OF CONC.AS/ IS 456-2000 UNDER NORMAL CONDITION. CONTINOUSELY PREFERABLE - 28 DAYS.
2. USE - FE 500 GRADE OF REINF. AS/ IS-1786 8. START EARLY CURING TO AVOID SRINKAGE
3. PROVIDE CLEAR COVER TO MAIN REINF. TYPE OF WORK MINIMUM PERIOD CRACKS, WHEN CONCRETE APPEARS TO HARDEN. MAGENDRA CONSTRUCTION & CONSULTANTS
FOUNDATION- 50MM BEFORE STRIKING 9) PROVIDE FOLLOWING SLUMP IN CONCRETE GEN-
COLUMN - 40MM FORM WORK -ERALLY. Er.TARUN MAGENDRA
BEAM - 25MM a) VERTICAL FORMWORK TO a) SHALLOW SECTIONS, PAVMENTS, B.E.(civil) M.TECH(struct)
SLAB - 15MM OR DIA OF BAR, WHICHEVER IS MORE, COLUMN, WALLS, BEAM 16-24 HOUR MASS CONC. LIGTH REINFORCEMENT
R.C.C. WALL - 25MM b) SOFFITS FORMWORK TO SECTION IN SLAB, BEAM, WALL, COLUMN 25-75 ENGINEERS : ARCHITECTS : VALUER
4.TIES SHOULD BE BEND INSIDE WITH 10# LENGTH IN SLABS ( PROPS TO BE REFIXED- b) HEAVILY REINFORCEMENT SECTION IN :SURVEYOR :URBAN PLANNER
BEAM & COLUMN - IMMEDIATELY AFTER REMOVAL SLAB 50-100 : PROJECT MANAGEMENT
OF FORMWORK) 3 DAYS c) HEAVILY REINFORCEMENT SECTION IN & STRUCTURAL DESIGN CONSULTANTS DRAWING- DRAWN BY-
c) SOFFIT FORMWORK TO BEAMS BEAMS, WALLS, COLUMNS SLIPFORM, OR MAGENDRA

PUMPED CONC. 75-100


GROUP
VASUDEV SAHU
( PROPS TO BE REFIXED IMMEDIATELY
AFTER REMOVAL OF FORMWORK ) 7DAYS d) TRENCH FILL, PILLING, PUMPED CONC.
SECOND FLOOR CHECKED BY-
10 100-150
Mail Us At - ROOF BEAM &
# d) PROPS TO SLABS:
T.MAGENDRA
1) SPANNING UP TO 4.5M 7DAYS 10) PROVIDE LAP/ DEVELOPEMENT LENGTH SLAB PLAN
2) SPANNING OVER 4.5M 14 DAYS IN REINFORCEMENT BARS GRADE OF CONC. Office- 511/512 ,5th Floor ,Golden Trade Center ,New Rajendra DATE -
e) PROPS TO BEAMS & ARCHES: M20- 47Ø Nagar , Raipur (C.G)492001 DRAWING NO.- 21-10-2019
1) SPANNING UP TO 6M 14DAYS M25-41Ø
5.FOLLOW - IS-456-2000 FOR R.C.C. WORK 2) SPANNING OVER 6M 21DAYS M30-38Ø SAVE EARTH/SAVE WATER/SAVE ENERGY SCALE -
11) REFER RELEVANT DRG. WITH THIS DRG.