Documente Academic
Documente Profesional
Documente Cultură
“Beneficiary”: - (coverage)
(a) Those who have completed 18 yrs of age but less than 60 yrs. Engaged in
construction work for not less than 90 days during the preceding 12
months.
Welfare board: -
The TN building and other construction workers board is responsible for
the welfare measures of the construction workmen. The board consists of 15
members with a chairman appointed by the Central government. And equal
representation from employers and workers. At least one of the workers
representatives should be a woman.
Working hours: -
(1) Government to fix the working hours.
(2) One day rest for every 7 days with payment at a rate not less than the
overtime rate
(3) The government may attempt from the above provisional in case of
urgent or emergency work preparatory or complementary work to be
done.
(4) Where there is a technical need to complete the work before the day or
when engaged in work incase of natural calamities.
(5) Overtime to be paid twice the normal wages.
(6) Provision of drinking water
(7) Provision of latrines and urinals
(8) Provision for first aid facilities
(9) Provision for a canteen (if more than 200 workmen are there)
(10) Crèches (if more than 50 female workers are there)
Accommodation to be provided with in or near the site with separate cooking
places, bathing, washing and lavatory facilities.
If more than 500 workmen, appointment of safety officer/safety
committee is a must.