Documente Academic
Documente Profesional
Documente Cultură
G.Total
TOTAL EXECUTIVES
TOTALNONEXECUTIVES
R ASSESSMENT FORMAT
ND ROD MILL
Manpower
Requirement per
Catg. shift REMARKS
Shifts G Shift
ITI
Dip 1
Exe
ITI
Dip 1
Exe
Dip 1
Exe 1
ITI
Dip 5 Three non-executives for leave reserve and weekly off
relieving . Two non-executives for all other general
Exe 1 1 shift jobs.
ITI
Dip
Exe
ITI
Dip 9 5
Exe 4 1
5
14
DETAIL MANPOWER ASSESSMENT FORMA
ITI
6 Dip
Exe
ITI
G.Total Dip
Exe
TOTAL EXECUTIVES 4
TOTAL NONEXECUTIVES 22
SSESSMENT FORMAT
1
2
1 1
1
2
6 2
12 2
3 1
DETAIL MANPOWER ASSESSMENT FORMA
G.Total
Sheet 1
ANPOWER ASSESSMENT FORMAT
ITI 1
Dip /
2 8 Executive (3 G shift) +
B.Sc.
15% off/leave reserve (1)= 4,
Partly Non Executive
Sample preparation job ( 2x3shift + 9 G shift) + 15% off/leave
is already outsourced reserve(2) = 17 PRW
Exe 3 (2x3 shift + 2 G shift) + 15% weekly off
reserve (1) = 9.
ITI 0 1 ( 16 + 3 ) = 19 PRW
Dip 5 10 ( 25+3 ) = 28 Non executives
Exe 1 6 ( 9 + 2 ) = 11 executive
DETAIL MANPOWER ASSESS
Work Station
S. No. (Section/ Main Jobs
Equpt. / Area)
G.Total
DETAIL MANPOWER ASSESSMENT FORMAT
Total Manpower
Whether Section / Job can be out sourced (Yes/No/Partly) Requirement
Catg.
Give brief Details
Shifts G Shift
ITI 20 14
Dip/BSc/
14 17
MSc
ITI 4
Dip/BSc/
4 0
MSc
ITI 24 14
Dip/BSc/
al 18 17
MSc
Exe 4 0
TOTAL EXECUTIVES 4
TOTAL NONEXECUTIVES 73
Sheet 1
REMARKS
Whether
Section /
Job can
be out
Work Station sourced
S. No. (Section/ Main Jobs (Yes/No/
Equpt. / Area) Partly)
Give
brief
Details
Sample preparation of raw materials in cluding Sinter, Hot
1 BF-8 Laboratory metal & Slag and their chemical analysis. BF top gas analysis. No
G.Total
Mett Asst.
TOTAL EXECUTIVES 11
TOTAL NONEXECUTIVES 77
NPOWER ASSESSMENT FORMAT
Manpower
Requirement per
shift
Catg. REMARKS
Shifts G Shift
Exec 0 1
1 Executive for managing the working of BF-8 Lab. 7 analysts for
Analyst 2 1 chemical analysis of RM, HM, BF slag & top gas analysis.
Sampler 2 1
Exec 0 0
Mett 4 Mett Asst for conducting the sampling activities, calculaltion and
1 1 reporting job.7 samplers for collection of samples and their testing.
Asst.
Sampler 2 1
Exec 1 1
Mett 4 Executives and 4 Mett Asst. for conducting verification activities at the
1 1 shop floor and their reporting for necessary corrective action.
Asst.
Sampler 0 0
Exec 0 1
1 Executive for managing the working of BF-8 Lab. 7 analysts and 7
Analyst 2 1 samplers for chemical analysis of RM, HM, BF slag & top gas analysis.
Sampler 2 1
Analyst 1 0
3 Analyst for conducting top gas analysis 4 Mett Asst for conducting the
Mett sampling activities, calculation and reporting job.10 samplers for
1 1
Asst. collection of samples and their testing.
Sampler 3 1
Exec 1 1
4 Executives and 4 Mett Asst. for conducting verification activities at the
Mett shop floor and their reporting for necessary corrective action.
2 1
Asst.
Work
be out Manpower
Station
sourced Requirement per
S. No. Main Jobs (Yes/No/ Catg. shift
(Section/
Partly) Shifts G Shift
Equpt. / artting,
Area) Turning ITI 6
&, Dip 1
Grinding,
MTL-1 Maintaina
1 Machine nce of No
Shop Machine Exe
(Mechani
cal) &
Maintaina
nce of ITI 1
Sample Dip 3 ITI - 3
Receiving Dip - 4
, Exe-2
MTL Handing
Testing over,Mec
2 Shop & hanical
No
Certificat Testing,
ion Data Exe 1
Group Feeding
and
Certificati
on
ITI 7 3
G.Total Dip 4 4
Exe 1 2
REMARKS
reserve =46
DETAIL MANPOWER ASSESSMENT FORMAT
Work
be out Manpower
Station
sourced Requirement per
S. No. Main Jobs (Yes/No/ Catg. shift
(Section/
Partly) Shifts G Shift
Equpt. /
Area) ITI 9
Dip 0
MTL-2 Sample Marking, Parting,
1 Machine Turning, Grinding,Milling, Gas No
Shop cutting Exe
ITI 1 ITI-3
Dip 3 DIP-5
EXE-3
MTL
Testing
Sample Receiving, Handing
2 Shop &
over,Mechanical Testing, Data No
Certificat
Feeding and Certification Exe 1
ion
Group
ITI 10 3
G.Total Dip 3 5
Exe 1 3
REMARKS
DETAIL MANPOWER ASSESSMEN
G.Total
Whether
Section / Manpower
Job can Requirement per
be out shift
sourced
Main Jobs (Yes/No/ Catg.
Partly) Shifts G Shift
Give
brief
Details ITI 10
Dip 3
ITI-04
Sample Receiving, Handing ITI 7 DIP-5
over,Mechanical Testing, Data No Dip 2 EXE-2
Feeding and Certification Exe 1
Sample Receiving, Handing ITI 5
over,Mechanical Testing, Data No Dip 2
Feeding and Certification Exe
Sample Receiving, Handing ITI 5
over,Mechanical Testing, Data No Dip 2
Feeding and Certification Exe
ITI 27 4
Dip 9 5
Exe 2 2
REMARKS
DETAIL MANPOWER ASSESSMENT FORMAT OF METALLO
be out
sourced
S. No. Work Station (Section/ Equpt. / Area) Main Jobs (Yes/No/
Partly)
Macro-etching and
Sulphur Printing of Rail
Samples, Inclusion
Rating of Rail
Samples, Metallurgical
1 Rolling Mill Lboratory Investigation of Drop No
Test Failure Samples,
Failure Analysis of
products received at
different stages, MIS
Data Entry
Macro-etching and
2 Sulphur Printing of
SMS III Lboratory YES
Cast products from
SMS III,
Samples, Failure
Analysis of products
received at different
stages, MIS Data
3 EntryMacro-etching
Existing Metallography Section No
and Sulphur Printing of
Cast products from
SMS III, Roll failure
Analysis, Customer
complaint analysis,
G.Total
TOTAL NON-EXECUTIVES 28
TOTAL EXECUTIVES 5
ENT FORMAT OF METALLOGRAPHY SECTION
Manpower
Requirement per
Catg. shift REMARKS
Shifts G Shift
ITI 8
Dip 2
ITI 4
Dip
Exe 1
Whether
Section /
Job can
be out
sourced
Work Station (Section/ Equpt. /
S. No. Main Jobs (Yes/No/
Area)
Partly)
Give
brief
Details
G.Total
Manpower
Requirement per
shift
Catg.
Shifts G Shift
Exe
Exe 1 ---
ITI 3 ---
Dip 16 ---
Exe 2
ITI 1 ---
Dip 6
Exe 1
ITI ---
Dip 3
Exe 3
ITI 4 ---
Dip 31 3
Exe 5 3
T FORMAT
REMARKS
01 inspector each for rail & Striuctural blooms and corresponding data feeding in
HHMS/MES
To cope up with rail testing of both the areas and that of structurals and semis 02
inspectors with 01 executive.
To cope up with rail testing of both the areas and that of structurals and semis 02
inspectors with 01 executive.
SMS-III Lab. Chemical Section Circular The Laboratory will be functioning round the clock
Sanders (3 Nos.),OES (3 Nos.) for analysis of samples received from different
H2 Determinator (1No.) sections of SMS-III , which will be received
N2-O2 Analyser (1No.) through pneumatic depatch systems (19 nos.). All
XRF (1No.) the samples shall have to be analysed and
LECO C-S Analyser (1No.) reported on real time basis as part of heat making
Swing Mills (2 Nos.) process.
Briquette Press (2 Nos.)
Swivel Surface Grinders (3 Nos.)
Sample Drilling Machine (1No.)
Pin Cutting Machine (2No.)
1 Vertical Cutting M/c (3No.)
SMS-III Lab. Process Monitoring BOF Round the clock monitoring of various process
(3Nos.) activities at different workstations of SMS-III
LRF (3 Nos.)
ARU (1 No.)
RH-OB (1 No.)
Casters (3 Nos.)
2
G.Total
Exe 1
No ITI 0 0
Dip 14 2
Exe 7 2
B.Sc. 3 2
ITI 14 2
Dip 31 6
Exe 7 3
53
10
w project
REMARKS
4 persons per shift for sample preparation. 4 persons per shift for sample
analysis.Sample preparation job may be outsourced which involves 14
persons
TOTAL EXECUTIVES 7
TOTAL NON EXECUTIVES 41
FOR RCL SMS-II AREA
0 0 0 3 3 9 2
0 0 0 0 3 9 2
0 0 0 2 2 6 0
0 0 0 0 3 9 0
0 0 0 0 0 0 4
5 11 33 8
DETAIL MANPOWER ASSESSMENT FORMAT
Job can
Work Manpower
be out
Station Requirement per
sourced
shift
S. No. Main Jobs (Yes/No/ Catg.
(Section/
Partly) Shifts G Shift
Equpt. /
Area)
Sampling of different raw materials and Give
ITI 3
sinter ,Testing (screening) of raw
1 SP-II No Dip 1 1
material and their sample preparation
for chemical analysis. Exe 1
ITI
Monitoring ,ensuring for the above
2 SP-II Dip
activities.
Exe 0
ITI
ITI 9
G.Total Dip 3 1
Exe 0 1
Total man power rquirement fo SP2 ,RCL --- 4 per shift X3 =12 + 15% leave reserve+1 =15Nonex +1 Exe.
ENT FORMAT
REMARKS
=15Nonex +1 Exe.
DETAIL MANPOWER ASSES
Work
Station
S. No. Main Jobs
(Section/
Equpt. /
Area)
1 Physical testing of refractory materials received from Inspection, Shops, RED, RMP-1,
RTL
RMP-1 lab, Blast Furnace, Chemical testing of refractory materials
G.Total
TOTAL EXECUTIVES
TOTAL NON-EXECUTIVES
MANPOWER ASSESSMENT FORMAT OF RTL
be out Manpower
sourced Requirement per
(Yes/No/ Catg. shift
Partly) Shifts G Shift
ITI 3*
No Dip 3**
Exe 1
ITI 0 3
Dip 0 3*3
Exe 0 1+1
2
9
T OF RTL
REMARKS
* - 1 Non-Executive having ITI, rest are having qualifications Higher secondary & Primary,
**-NE are having qualification of MA, Mtech & BSc with LLB
9 Non executives
1 having additioal responsibilities
DETAIL MANPOWER ASSESSMENT FOR
Extension
Whether
Section /
Job can
Work
be out
Station
sourced
S. No. Main Jobs (Yes/No/ Catg.
(Section/
Partly)
Equpt. /
Area)
Give
brief
Details
ITI
Sampling of different raw materials & sinter ,Testing Dip
1 SP-III No
(screening) of raw material and their sample preparation for
new m/c
chemical analysis. Exe
ITI
2 SP-III determination of RI & RDI of sinter No Dip
new m/c
Exe
ITI
ITI
G.Total Dip
Exe
Total man power rquirement foSp-III new m/c ,RCL --- 3 per shift X3 +2 + 15% leave reserve =13Nonex .
Manpower
Requirement per
shift
REMARKS
Shifts G Shift
6
3
3per shift
6
5 11
reserve =13Nonex .
Work Station (Section/
S. No.
Equpt. / Area)
1 SP-III
G.Total
Total man power rquirement for SP3 existing --- 4 per shift X3 =12 + 15% leave reserve+1 =15Nonex +1 Exe.
DETAIL MANPOWER ASSESSMENT FORMAT Whether
Section /
Job can
Existing man power requirement for Sp-III be out
sourced Manpower
Main Jobs (Yes/No/ Catg. Requirement per
Partly) shift
Monitoring ,ensuring for the above activities. ITI
Give
brief Dip 1
Details Exe
ITI 6+3(PRW)
Dip 3
Exe 0
r SP3 existing --- 4 per shift X3 =12 + 15% leave reserve+1 =15Nonex +1 Exe.
1
1
0
1
1
DETAIL MANPOWER ASSESSMENT FORMAT
Work Station
S. No. (Section/ Main Jobs
Equpt. / Area)
G.Total
Total man power rquirement fo OHP ,RCL --- 4 per shift X3 =12 + 15% leave reserve+3 =17Nonex +1 Exe.
Whether Section /
Job can be out Manpower
sourced Catg. Requirement per
(Yes/No/Partly) shift
Give brief Details
Shifts G Shift
No ITI 4 1
ITI 2(PRW)
ITI
Dip
Exe
ITI
Dip
Exe
ITI 12 1+2(PRW)
Dip
Exe 1
3per shift
1+2(PRW)
13
1
DETAIL M
G.Total
Total man power rquirement fo OHP-2 ,RCL --- 4 per shift X3 =12 + 15% leave reserve =14Nonex +1 Exe.
DETAIL MANPOWER ASSESSMENT FORMAT
Main Jobs
Sampling of different raw materials ,Testing (screening) of raw material and their
sample preparation for chemical analysis.
G.Total
Manpower
Whether Section / Job can be out sourced Requirement per
Catg. shift
(Yes/No/Partly) Give brief Details
Shifts G Shift
ITI 9
No Dip 3
Exe
ITI
Dip
Exe 1
ITI
ITI
ITI
Dip 4x3
Exe 1
REMARKS
4per shift
12
1
DISCIPLINE -WISE MANPOWER ASSESSMENT DETAILS after new projects including existing area
TOTAL EXECUTIVES
TOTAL NONEXECUTIVES
ts including existing area
0 0 2 0 0 0 0
0 0 2 0 0 0 0 12 12 36
0 0 1 0 0 0 0 7 7 21
0 0 1 0 0 0 0 5 5 15
2
NEXECUTIVES 40
FOR RCL NDT AREA
G SHIFT
NDT QUALIFICATION
UT LEVEL II- 9
UT LEVEL II- 6, L I- 3
UT LEVEL II- 3
UT LEVEL II- 6
UT LEVEL I- 4, L II 4, L III 1
4
UT II, RT II,MT II,PT II- 1 each
4 S4-S6=19, S7-S8=14, >S9= 6
4 S4-S6=11, S7-S8=7, >S9= 6
0 S4-S6=08, S7-S8=7,
DETAIL MANPOWER ASSESSMENT FORMAT
TOTAL NONEXECUTIVES 65
TOTAL EXECUTIVES 12
ESSMENT FORMAT
Manpower
Requirement per
shift
REMARKS
G Shift
1
6 Sampling + Sieve -6
2 Sample Preparation-2
1 I/c-1
6 Sampling + Sieve -6
2 Sample Preparation-2
1 I/c-1
1 PC-1, Lab-1
1 Sand-2, OP & T&D-1
1
1 I/c -1
1 Fce -3, Lab-3, I/c-1 in Shift
1 Report-1,
1 MY, SY-1 Exe
3 Sec I/c-1
4 Dolo Samp-1
1 RMP=II samp-1
1
1 Sieve-2, Ana-2
19
7
4
8