Phase – 3. (__________)
- Hypermarket.
Note- Phase – 1.
1) EXTERNAL.
1.1) Building.
- Plastering. (Defects)
- Painting. (Defects)
- Windows. (Defects) (Testing) if any?
1.2) Infra.
- Parameter Drainage cover. (Outstanding)
- Road curves. (If any) to check drawings.
- Drainage. (If any) to check drawings.
- Road works. (Outstanding)
- Street lighting. (If any). To check drawings.
- Feeder Piller. (If any)
3.2) M&E.
- Electrical. (Outstanding, Defects and testing).
- Fire Fighting. (Outstanding, Defects and testing)
- CCTV. (Outstanding, defect and testing).
- Air-conditioning. (Outstanding, defects and testing).
4.1) Architecture.
5.1) Architecture.
5.2) M&E.
2.2) M&E.
- Electrical.
- Fire Fighting.
- CCTV.
- Air-conditioning.
- 3) Roof Top.
3.1) Architecture.
- Wall plastering.
- Wall Painting.
- Floor screeding.
- Floor tiling.
- Windows.
- Ceiling.
- Painting.
- Door.
- Ironmongery.
- Toilet fittings.
- Cleaning.
3.2) M&E.
- Electrical.
- Fire Fighting.
- CCTV.
- Air-conditioning.