Sunteți pe pagina 1din 171

Name: John Fredrick T.

Abrigo Project Title: Two Storey Residential Building


Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
DESIGN CRITERIA

1 Design Code and Reference


a. National Structural Code of the Philippines
b. National Building Code of the Philippines
c. American Concrete Institute
d. International Building Code

2 Design Loads
a. Dead Load
i. Concrete 23.50 kN/m3
ii. Ceiling 0.15 kN/m2
iii Concrete Hollow Blocks (4") 2.46 kN/m2
iv. Tiles 1.10 kN/m2
v. Railing 0.75 kN/m2

3 Live Loads
i. Residential 1.90 kN/m2
ii. Hallway / Stairs 4.80 kN/m2
iii Comfort Rooms 2.40 kN/m2
iv. Storage 1.90 kN/m2

4 Earthquake Loads
i. Zone 0.4 - Zone 4
ii. Important Factors 1 - Standard
iii Rw in x direction 8.5 - MRFS
iv. Rw in y direction 8.5 - MRFS
v. Soil Profile Type 2 - Rock
vi. Near Source Factor (Nv) 1 - > 15km
vii. Near Source Factor (Na) 1 - > 15km
viii. CT Value 0.0731 - Concrete

5 Design Stress
a. Concrete: Concrete Cylinder Strength after 28 days of hardening. (tc)
i. Footing, Beams on Grade 21 MPa
ii. Slab, Column and Beam 21 MPa
b. Rebars: Minimum Specified Yield Strength for Reinforcing Steel (ty)
i. Rebars ≤ 12mm 225 MPa
ii. Rebars ≥ 12mm 275 MPa
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ "A"

I BEAM 0.0011
I COLUMN 0.0007
11 21 31 41
1 4.00 m 2.00 m 1 4.00 m 1
1.88
Roof 8.35 kN/m kN/m 8.35 kN/m
Deck M N O P
4.10 m

6.60
Second 9.82 kN/m kN/m 19.90 kN/m
Floor I J K L
3.40 m
1.88
Ground 10.24 kN/m kN/m 10.24 kN/m
1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ "1"
I BEAM 0.0011
I COLUMN 0.0007

D C B A
5.00 m 5.00 m 5.00 m

Roof 9.51 kN/m 9.51 kN/m 9.51 kN/m


Deck M N O P
4.10 m 59.25 kN 49.43 kN
4.07 4.07 5.85
5.04 kN/m kN/m kN/m kN/m
Second 11.97 kN/m 11.97 kN/m 11.97 kN/m
Floor I J K L
3.40 m 21.97 kN

Ground 10.24 kN/m 10.24 kN/m 10.24 kN/m


1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
Ground Floor Framing Plan

B1-(1-4,A-D)
b= 0.20 m h= 0.40 m
A = 0.08 sqm w= 1.88 kN/m

A B C D
A B C D
5.00 m 5.00 m 5.00 m

8.36 kN/m 8.36 kN/m 8.36 kN/m


B1-1 B1-1 B1-1 1
8.36 kN/m
8.36 kN/m B1-A S-1 B1-B 8.36 kN/m B1-C 8.36 kN/m B1-D 4.00 m
8.36
8.36 kN/m kN/m 8.36 kN/m
2
B1-2 B1-2 B1-2 8.36 kN/m
8.36 kN/m B1-A B1-B 8.36 kN/m B1-C 8.36 kN/m B1-D 2.00 m
B1-3 B1-3 B1-3
3
8.36 kN/m 8.36 kN/m 8.36 kN/m
8.36 kN/m
8.36 kN/m B1-A S-1 B1-B 8.36 kN/m B1-C 8.36 kN/m B1-D 4.00 m

B1-4 B1-4 B1-4


4
8.36 kN/m 8.36 kN/m 8.36 kN/m
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ "B"

11 21 31 41
1 4.00 m 2.00 m 1 4.00 m 1
1.88
Roof 14.81 kN/m kN/m 14.81 kN/m
Deck M N O P
4.10 m

5.85
Second 8.19 kN/m kN/m 27.83 kN/m
Floor I J K L
3.40 m
1.88
Ground 1.88 kN/m kN/m 10.24 kN/m
1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ "2"
D C B A
5.00 m 5.00 m 5.00 m
2.50 m 2.00 m
Roof 14.36 kN/m 14.36 kN/m 14.36 kN/m
Deck M N O P
4.10 m 79.15 kN 69.33 kN
8.13 8.13
10.08 kN/m kN/m kN/m 10.89 kN/m
Second 1.88 kN/m 8.58 kN/m 1.88 kN/m
Floor I J K L
3.40 m 8.36 7.97 kN 8.36
kN/m kN/m
Ground 1.88 kN/m 1.88 kN/m 1.88 kN/m
1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
Second Floor Framing Plan

B2-(1-4,A-D)
b= 0.20 m h= 0.40 m
A = 0.08 sqm w= 1.88 kN/m

A B C D
A B C D
5.00 m 5.00 m 5.00 m
2.95 m 2.05 m 2.05 m 2.95 m

10.09 kN/m 10.09 kN/m 10.09 kN/m


1
5.85 kN/m B2-1 B2-1 5.56 5.04 kN/m
B2-A B2-B B2-C kN/m S-4
7.19 kN/m S-3 S-5 OPEN S-5 4.00 m
0.75 kN/m 7.19 kN/m 4.07 3.97 kN/m 10.09 kN/m
5.85 kN/m B2-2 kN/m S - 4
2
B2-A 5.04 kN/m 5.95 kN/m 3.97
0.75 kN/m S-4 S-6 S-2 S-6 S-4 2.00 m
5.04 kN/m 5.95 kN/m 4.06 10.09 kN/m
3
9.36 kN/m 9.36 kN/m 9.36 kN/m
B2-A w= 5.95 kPa S-1 S-1 B2-D
7.93 kN/m S-1 7.93 kN/m 7.93 kN/m 4.00 m
10.09 kN/m 7.93 kN/m 7.93 kN/m 7.93 kN/m 10.09 kN/m
9.36 kN/m 9.36 kN/m 9.36 kN/m
4
10.09 kN/m 10.09 kN/m 10.09 kN/m
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ "C"

11 21 31 41
1 4.00 m 2.00 m 1 4.00 m 1
1.88
Roof 14.81 kN/m kN/m 14.81 kN/m
Deck M N O P
4.10 m
22.42 kN
5.85
Second 8.19 kN/m kN/m 27.83 kN/m
Floor I J K L
3.40 m
1.88
Ground 10.24 kN/m kN/m 10.24 kN/m
1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ "3"
D C B A
5.00 m 5.00 m 5.00 m

Roof 14.36 kN/m 14.36 kN/m 14.36 kN/m


Deck M N O P
4.10 m 19.90 kN 19.90 kN
4.06 4.06 5.04
5.04 kN/m kN/m kN/m kN/m
Second 21.33 kN/m 27.28 kN/m 21.33 kN/m
Floor I J K L
3.40 m

Ground 1.88 kN/m 1.88 kN/m 10.24 kN/m


1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
Roof Deck Framing Plan

B3-(1-4,A-D)
b = 0.20 m h= 0.40 m
A = 0.08 sqm w= 1.88 kN/m

A B C D
A B C D
5.00 m 5.00 m 5.00 m

B3-1 B3-1 B3-1


7.63 kN/m 7.63 kN/m 7.63 kN/m 1
6.47 kN/m S-1 S-1 S-1
B3-A w= 4.85 kPa 6.47 kN/m 6.47 kN/m 4.00 m
6.47 kN/m 6.47 kN/m 6.47 kN/m
7.63 kN/m 7.63 kN/m 7.63 kN/m
2
4.85 kN/m 4.85 kN/m 4.85 kN/m
B3-A S-2 S-2 S-2 2.00 m
4.85 kN/m 4.85 kN/m 4.85 kN/m
3
7.63 kN/m 7.63 kN/m 7.63 kN/m
S-1 S-1 S-1
B3-A 6.47 kN/m 6.47 kN/m 6.47 kN/m 4.00 m
6.47 kN/m 6.47 kN/m 6.47 kN/m
7.63 kN/m 7.63 kN/m 7.63 kN/m
4
B3-4 B3-4 B3-4
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ "D"

11 21 31 41
1 4.00 m 2.00 m 1 4.00 m 1
1.88
Roof 8.35 kN/m kN/m 8.35 kN/m
Deck M N O P
4.10 m 32.51 kN
3.97 3.97
kN/m kN/m 15.93
Second 11.97 kN/m kN/m 19.90 kN/m
Floor I J K L
3.40 m
10.24
Ground 10.24 kN/m kN/m 10.24 kN/m
1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ "4"
D C B A
5.00 m 5.00 m 5.00 m

Roof 9.51 kN/m 9.51 kN/m 9.51 kN/m


Deck M N O P
4.10 m

Second 21.33 kN/m 21.33 kN/m 21.33 kN/m


Floor I J K L
3.40 m

Ground 10.24 kN/m 10.24 kN/m 10.24 kN/m


1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
Ground Floor / Second Floor / Roof Deck Framing Plan

A B C D
A B C D
5.00 m 5.00 m 5.00 m

OPEN 4.00 m

2
2.00 m

4.00 m

4
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
Load Computation for Dead Loads

I.Ground Floor
i.Concrete Hollow Blocks (4") height = 3.40 m 8.36 kN/m
ii.Stairs up to SF thickness = 0.20 m
volume = 1.91 cu.m
w= 9.73 kN/m
II.Second Floor
i.Concrete Hollow Blocks (4") height = 4.10 m 10.09 kN/m
ii.Railings height = 1.00 m 0.75 kN/m
iii.Slab
Concrete thickness = 0.20 m 4.70 kPa
Ceiling 0.15 kPa
Tiles 1.10 kPa
w= 5.95 kPa
III.Roof Deck
i.Slab
Concrete thickness = 0.20 m 4.70 kPa
Ceiling 0.15 kPa
w= 4.85 kPa

Second Floor Load Transfer


S-1
s= 4.00 m m= 0.80 wl = 9.36 kN/m
l= 5.00 m Therefore Two Way Slab ws= 7.93 kN/m
S-2
s= 2.00 m m= 0.40
l= 5.00 m Therefore One Way Slab wl = 5.95 kN/m
S-3
s= 2.95 m m= 0.74 wl = 7.19 kN/m
l= 4.00 m Therefore Two Way Slab ws= 5.85 kN/m
S-4
s= 2.00 m m= 0.68 wl = 5.04 kN/m
l= 2.95 m Therefore Two Way Slab ws= 3.97 kN/m
S-5
s= 2.05 m m= 0.51 wl = 5.56 kN/m
l= 4.00 m Therefore Two Way Slab ws= 4.07 kN/m
S-6
s= 2.00 m m= 0.98 wl = 4.06 kN/m
l= 2.05 m Therefore Two Way Slab ws= 3.97 kN/m
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
Load Computation for Dead Loads

Roof Deck Load Transfer


S-1
s= 4.00 m m= 0.80 wl = 7.63 kN/m
l= 5.00 m Therefore Two Way Slab ws= 6.47 kN/m

S-2
s= 2.00 m m= 0.40 wl = 4.85 kN/m
l= 5.00 m Therefore One Way Slab

Selfweight
B1-(1,A) B2-(1,A) B3-(1,A)
b= 0.20 m b= 0.20 m b= 0.20 m
h= 0.40 m h= 0.40 m h= 0.40 m
A= 0.08 sqm A= 0.08 sqm A= 0.08 sqm
w= 1.88 kN/m w= 1.88 kN/m w= 1.88 kN/m

B1-(2,B) B2-(2,B) B3-(2,B)


b= 0.20 m b= 0.20 m b= 0.20 m
h= 0.40 m h= 0.40 m h= 0.40 m
A= 0.08 sqm A= 0.08 sqm A= 0.08 sqm
w= 1.88 kN/m w= 1.88 kN/m w= 1.88 kN/m

B1-(3,C) B2-(3,C) B3-(3,C)


b= 0.20 m b= 0.20 m b= 0.20 m
h= 0.40 m h= 0.40 m h= 0.40 m
A= 0.08 sqm A= 0.08 sqm A= 0.08 sqm
w= 1.88 kN/m w= 1.88 kN/m w= 1.88 kN/m

B1-(4,D) B2-(4,D) B3-(4,D)


b= 0.20 m b= 0.20 m b= 0.20 m
h= 0.40 m h= 0.40 m h= 0.40 m
A= 0.08 sqm A= 0.08 sqm A= 0.08 sqm
w= 1.88 kN/m w= 1.88 kN/m w= 1.88 kN/m
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ "A"

11 21 31 41
1 4.00 m 2.00 m 1 4.00 m 1
0.00
Roof 2.53 kN/m kN/m 2.53 kN/m
Deck M N O P
4.10 m

1.27
Second 2.29 kN/m kN/m 2.53 kN/m
Floor I J K L
3.40 m
0.00
Ground 0.00 kN/m kN/m 0.00 kN/m
1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ "1"
D C B A
5.00 m 5.00 m 5.00 m

Roof 2.99 kN/m 2.99 kN/m 2.99 kN/m


Deck M N O P
4.10 m
15.18 kN 13.56 kN
3.28 3.28
Second 2.03 kN/m kN/m 0.00 kN/m kN/m 1.87 kN/m
Floor I J K L
3.40 m 10.24 kN

Ground 0.00 kN/m 0.00 kN/m 0.00 kN/m


1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
Ground Floor Framing Plan

A B C D
5.00 m 5.00 m 5.00 m
B1-1 B1-1 B1-1 1

B1-A S-1 B1-B S-1 B1-C S-1 B1-D 4.00 m

2
B1-2 B1-2 B1-2
B1-A S-2 B1-B S-2 B1-C S-2 B1-D 2.00 m
B1-3 B1-3 B1-3
3

B1-A S-1 B1-B S-1 B1-C S-1 B1-D 4.00 m

B1-4 B1-4 B1-4


4
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ "B"

11 21 31 41
1 4.00 m 2.00 m 1 4.00 m 1
0.00
Roof 5.07 kN/m kN/m 5.07 kN/m
Deck M N O P
4.10 m

3.20
Second 4.49 kN/m kN/m 5.07 kN/m
Floor I J K L
3.40 m
0.00
Ground 0.00 kN/m kN/m 0.00 kN/m
1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ "2"
D C B A
5.00 m 5.00 m 5.00 m

Roof 4.89 kN/m 4.89 kN/m 4.89 kN/m


Deck M N O P
4.10 m
19.98 kN 18.03 kN
6.56 6.56
Second 4.06 kN/m kN/m 4.80 kN/m kN/m 3.48 kN/m
Floor I J K L
3.40 m 2.36 kN

Ground 0.00 kN/m 0.00 kN/m 0.00 kN/m


1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
Second Floor Framing Plan

A B C D
5.00 m 5.00 m 5.00 m
2.95 m 2.05 m 2.05 m 2.95 m
1.87 kN/m B2-1 B2-1 4.49 2.03 kN/m 1
B2-A B2-B B2-C kN/m S-4 1.60 kN/m
2.29 kN/m S-3 S-5 OPEN S-5 4.00 m
2.29 kN/m S-4
1.87 kN/m B2-2 3.28 kN/m
2
B2-A 1.61 kN/m 4.80 kN/m 3.28
1.27 kN/m S-4 S-6 S-2 S-6 S-4 2.00 m
1.61 kN/m 4.80 kN/m 3.20
3
2.99 kN/m 2.99 kN/m 2.99 kN/m
B2-A S-1 S-1 B2-D
2.53 kN/m S-1 2.53 kN/m 2.53 kN/m 4.00 m
2.53 kN/m 2.53 kN/m 2.53 kN/m
2.99 kN/m 2.99 kN/m 2.99 kN/m
4
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T.
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ "C"

11 21 31 41
1 4.00 m 2.00 m 1 4.00 m 1
0.00
Roof 5.07 kN/m kN/m 5.07 kN/m
Deck M N O P
4.10 m
12.60 kN
3.20
Second 4.49 kN/m kN/m 5.07 kN/m
Floor I J K L
3.40 m
0.00
Ground 0.00 kN/m kN/m 0.00 kN/m
1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T.
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ "3"
D C B A
5.00 m 5.00 m 5.00 m

Roof 4.89 kN/m 4.89 kN/m 4.89 kN/m


Deck M N O P
4.10 m 4.80 kN 4.47 kN
3.28 3.28
2.03 kN/m kN/m kN/m 1.61 kN/m
Second 2.99 kN/m 7.79 kN/m 2.99 kN/m
Floor I J K L
3.40 m

Ground 0.00 kN/m 0.00 kN/m 0.00 kN/m


1.00 m Floor E F G H

A B C D

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
Roof Deck Framing Plan

A B C D
5.00 m 5.00 m 5.00 m
B3-1 B3-1 B3-1
2.99 kN/m 2.99 kN/m 2.99 kN/m 1
2.53 kN/m S-1 S-1 S-1
B3-A 2.53 kN/m 2.53 kN/m 4.00 m
2.53 kN/m 2.53 kN/m 2.53 kN/m
2.99 kN/m 2.99 kN/m 2.99 kN/m
2
1.90 kN/m 1.90 kN/m 1.90 kN/m
B3-A S-2 S-2 S-2 2.00 m
1.90 kN/m 1.90 kN/m 1.90 kN/m
3
2.99 kN/m 2.99 kN/m 2.99 kN/m
S-1 S-1 S-1
B3-A 2.53 kN/m 2.53 kN/m 2.53 kN/m 4.00 m
2.53 kN/m 2.53 kN/m 2.53 kN/m
2.99 kN/m 2.99 kN/m 2.99 kN/m
4
B3-4 B3-4 B3-4
me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ "D"

11 21 31 41
1 4.00 m 2.00 m 1 4.00 m 1
0.00
Roof 2.53 kN/m kN/m 2.53 kN/m
Deck M N O P
4.10 m
5.99 kN
1.60
Second 1.60 kN/m kN/m 2.53 kN/m
Floor I J K L
3.40 m
0.00
Ground 0.00 kN/m kN/m 0.00 kN/m
1.00 m Floor E F G H

A B C D

me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ "4"
D C B A
5.00 m 5.00 m 5.00 m

Roof 2.99 kN/m 2.99 kN/m 2.99 kN/m


Deck M N O P
4.10 m

Second 2.99 kN/m 2.99 kN/m 2.99 kN/m


Floor I J K L
3.40 m

Ground 0.00 kN/m 0.00 kN/m 0.00 kN/m


1.00 m Floor E F G H

A B C D
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
Load Computation for Live Loads

I.Ground Floor
i.Hallway / Stairs w= 4.80 kPa
II.Second Floor
i.Residential w= 1.90 kPa
ii.Hallway / Stairs w= 4.80 kPa
iii.Comfort Rooms w= 2.40 kPa
iv.Storage w= 1.90 kPa
III.Roof Deck
i.Residential w= 1.90 kPa

Second Floor Load Transfer


S-1
s= 4.00 m m= 0.80 wl = 2.99 kN/m
l= 5.00 m Therefore Two Way Slab ws= 2.53 kN/m
S-2
s= 2.00 m m= 0.40
l= 5.00 m Therefore One Way Slab wl = 4.80 kN/m
S-3
s= 2.95 m m= 0.74 wl = 2.29 kN/m
l= 4.00 m Therefore Two Way Slab ws= 1.87 kN/m
S-4
s= 2.00 m m= 0.68 wl = 1.61 kN/m
l= 2.95 m Therefore Two Way Slab ws= 1.27 kN/m
S-4
s= 2.00 m m= 0.68 wl = 2.03 kN/m
l= 2.95 m Therefore Two Way Slab ws= 1.60 kN/m
S-5
s= 2.05 m m= 0.51 wl = 4.49 kN/m
l= 4.00 m Therefore Two Way Slab ws= 3.28 kN/m
S-6
s= 2.00 m m= 0.98 wl = 3.28 kN/m
l= 2.05 m Therefore Two Way Slab ws= 3.20 kN/m

Roof Deck Load Transfer


S-1
s= 4.00 m m= 0.80 wl = 2.99 kN/m
l= 5.00 m Therefore Two Way Slab ws= 2.53 kN/m
S-2
s= 2.00 m m= 0.40 wl = 1.90 kN/m
l= 5.00 m Therefore One Way Slab
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
STRUCTURAL ANALYSIS OF DEAD LOADS @ "A"

At Joint E At Joint K
KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00027 DFEF= 0.23 FEMEF= 13.66 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -2.20
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 26.53
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 13.09 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= -0.63
KGH= 0.00027 DFGH= 0.16 FEMGH= 13.66
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 11.13 KPO= 0.00027 DFPO= 0.62 FEMPO= -11.13
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -11.13 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 0.63 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -26.53
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -13.09 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 2.20 KHG= 0.00027 DFHG= 0.23 FEMHG= -13.66
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= -13.66
KFG= 0.00053 DFFG= 0.32 FEMFG= 0.63
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O
KON= 0.00053 DFON= 0.55 FEMON= -0.63
KOP= 0.00027 DFOP= 0.28 FEMOP= 11.13
KOK= 0.00016 DFOK= 0.17 FEMOK= 0

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
STRUCTURAL ANALYSIS OF DEAD LOADS @ "1"

At Joint E At Joint K
KEA= 0.00068 DFEA= 0.62 FEMEA= 0 KKO= 0.00016 DFKO= 0.21 FEMKO= 0
KEF= 0.00021 DFEF= 0.20 FEMEF= 21.34 KKJ= 0.00021 DFKJ= 0.27 FEMKJ= -24.93
KEI= 0.00020 DFEI= 0.18 FEMEI= 0 KKL= 0.00021 DFKL= 0.27 FEMKL= 70.37
KKG= 0.00020 DFKG= 0.25 FEMKG= 0
At Joint I
KIE= 0.00020 DFIE= 0.34 FEMIE= 0 At Joint G
KIJ= 0.00021 DFIJ= 0.37 FEMIJ= 67.3967 KGK= 0.00020 DFGK= 0.15 FEMGK= 0
KIM= 0.00016 DFIM= 0.29 FEMIM= 0 KGF= 0.00021 DFGF= 0.16 FEMGF= -37.49
KGH= 0.00021 DFGH= 0.16 FEMGH= 21.34
KGC= 0.00068 DFGC= 0.52 FEMGC= 0
At Joint M
KMI= 0.00016 DFMI= 0.44 FEMMI= 0 At Joint P
KMN= 0.00021 DFMN= 0.56 FEMMN= 19.81 KPO= 0.00021 DFPO= 0.56 FEMPO= -19.81
KPL= 0.00016 DFPL= 0.44 FEMPL= 0
At Joint N
KNM= 0.00021 DFNM= 0.36 FEMNM= -19.81 At Joint L
KNO= 0.00021 DFNO= 0.36 FEMNO= 19.81 KLP= 0.00016 DFLP= 0.29 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.28 FEMNJ= 0 KLK= 0.00021 DFLK= 0.37 FEMLK= -60.92
KLH= 0.00020 DFLH= 0.34 FEMLH= 0
At Joint J
KJN= 0.00016 DFJN= 0.21 FEMJN= 0 At Joint H
KJI= 0.00021 DFJI= 0.27 FEMJI= -76.61 KHL= 0.00020 DFHL= 0.18 FEMHL= 0
KJK= 0.00021 DFJK= 0.27 FEMJK= 24.93 KHG= 0.00021 DFHG= 0.20 FEMHG= -21.34
KJF= 0.00020 DFJF= 0.25 FEMJF= 0 KHD= 0.00068 DFHD= 0.62 FEMHD= 0

At Joint F
KFJ= 0.00020 DFFJ= 0.15 FEMFJ= 0
KFE= 0.00021 DFFE= 0.16 FEMFE= -21.34
KFG= 0.00021 DFFG= 0.16 FEMFG= 28.26
KFB= 0.00068 DFFB= 0.52 FEMFB= 0

At Joint O
KON= 0.00021 DFON= 0.36 FEMON= -19.81
KOP= 0.00021 DFOP= 0.36 FEMOP= 19.81
KOK= 0.00016 DFOK= 0.28 FEMOK= 0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
STRUCTURAL ANALYSIS OF DEAD LOADS @ "B"

At Joint E At Joint K At Joint E


KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00027 DFEF= 0.23 FEMEF= 2.51 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -1.95
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 37.11
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 10.93 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= -0.63
KGH= 0.00027 DFGH= 0.16 FEMGH= 13.66
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 19.75 KPO= 0.00027 DFPO= 0.62 FEMPO= -19.75
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -19.75 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 0.63 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -37.11
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -10.93 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 1.95 KHG= 0.00027 DFHG= 0.23 FEMHG= -13.66
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= -2.51
KFG= 0.00053 DFFG= 0.32 FEMFG= 0.63
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O At Joint O
KON= 0.00053 DFON= 0.55 FEMON= -0.63
KOP= 0.00027 DFOP= 0.28 FEMOP= 19.75
KOK= 0.00016 DFOK= 0.17 FEMOK= 0

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
STRUCTURAL ANALYSIS OF DEAD LOADS @ "2"

At Joint E At Joint K At Joint E


KEA= 0.00068 DFEA= 0.62 FEMEA= 0 KKO= 0.00016 DFKO= 0.21 FEMKO= 0
KEF= 0.00021 DFEF= 0.20 FEMEF= 9.36 KKJ= 0.00021 DFKJ= 0.27 FEMKJ= -17.88
KEI= 0.00020 DFEI= 0.18 FEMEI= 0 KKL= 0.00021 DFKL= 0.27 FEMKL= 72.96
KKG= 0.00020 DFKG= 0.25 FEMKG= 0
At Joint I At Joint I
KIE= 0.00020 DFIE= 0.34 FEMIE= 0 At Joint G
KIJ= 0.00021 DFIJ= 0.37 FEMIJ= 63.39 KGK= 0.00020 DFGK= 0.15 FEMGK= 0
KIM= 0.00016 DFIM= 0.29 FEMIM= 0 KGF= 0.00021 DFGF= 0.16 FEMGF= -9.78
KGH= 0.00021 DFGH= 0.16 FEMGH= 7.04
KGC= 0.00068 DFGC= 0.52 FEMGC= 0
At Joint M At Joint M
KMI= 0.00016 DFMI= 0.44 FEMMI= 0 At Joint P
KMN= 0.00021 DFMN= 0.56 FEMMN= 29.92 KPO= 0.00021 DFPO= 0.56 FEMPO= -29.92
KPL= 0.00016 DFPL= 0.44 FEMPL= 0
At Joint N At Joint N
KNM= 0.00021 DFNM= 0.36 FEMNM= -29.92 At Joint L
KNO= 0.00021 DFNO= 0.36 FEMNO= 29.92 KLP= 0.00016 DFLP= 0.29 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.28 FEMNJ= 0 KLK= 0.00021 DFLK= 0.37 FEMLK= -53.88
KLH= 0.00020 DFLH= 0.34 FEMLH= 0
At Joint J At Joint J
KJN= 0.00016 DFJN= 0.21 FEMJN= 0 At Joint H
KJI= 0.00021 DFJI= 0.27 FEMJI= -79.19 KHL= 0.00020 DFHL= 0.18 FEMHL= 0
KJK= 0.00021 DFJK= 0.27 FEMJK= 17.88 KHG= 0.00021 DFHG= 0.20 FEMHG= -13.06
KJF= 0.00020 DFJF= 0.25 FEMJF= 0 KHD= 0.00068 DFHD= 0.62 FEMHD= 0

At Joint F At Joint F
KFJ= 0.00020 DFFJ= 0.15 FEMFJ= 0
KFE= 0.00021 DFFE= 0.16 FEMFE= -15.89
KFG= 0.00021 DFFG= 0.16 FEMFG= 6.43
KFB= 0.00068 DFFB= 0.52 FEMFB= 0

At Joint O At Joint O
KON= 0.00021 DFON= 0.36 FEMON= -29.92
KOP= 0.00021 DFOP= 0.36 FEMOP= 29.92
KOK= 0.00016 DFOK= 0.28 FEMOK= 0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T.
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
STRUCTURAL ANALYSIS OF DEAD LOADS @ "C"

At Joint E At Joint K At Joint E


KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0 KEA=
KEF= 0.00027 DFEF= 0.23 FEMEF= 13.66 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -1.95 KEF=
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 37.11 KEI=
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G KIE=
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 22.03 KGK= 0.00020 DFGK= 0.12 FEMGK= 0 KIJ=
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= -0.63 KIM=
KGH= 0.00027 DFGH= 0.16 FEMGH= 13.66
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P KMI=
KMN= 0.00027 DFMN= 0.62 FEMMN= 19.75 KPO= 0.00027 DFPO= 0.62 FEMPO= -19.75 KMN=
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -19.75 At Joint L KNM=
KNO= 0.00053 DFNO= 0.55 FEMNO= 0.63 KLP= 0.00016 DFLP= 0.26 FEMLP= 0 KNO=
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -37.11 KNJ=
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H KJN=
KJI= 0.00027 DFJI= 0.23 FEMJI= -13.49 KHL= 0.00020 DFHL= 0.17 FEMHL= 0 KJI=
KJK= 0.00053 DFJK= 0.46 FEMJK= 1.95 KHG= 0.00027 DFHG= 0.23 FEMHG= -13.66 KJK=
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0 KJF=

At Joint F At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0 KFJ=
KFE= 0.00027 DFFE= 0.16 FEMFE= -13.66 KFE=
KFG= 0.00053 DFFG= 0.32 FEMFG= 0.63 KFG=
KFB= 0.00068 DFFB= 0.40 FEMFB= 0 KFB=

At Joint O At Joint O
KON= 0.00053 DFON= 0.55 FEMON= -0.63 KON=
KOP= 0.00027 DFOP= 0.28 FEMOP= 19.75 KOP=
KOK= 0.00016 DFOK= 0.17 FEMOK= 0 KOK=

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T.
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
STRUCTURAL ANALYSIS OF DEAD LOADS @ "3"

At Joint E At Joint K At Joint E


KEA= 0.00068 DFEA= 0.62 FEMEA= 0 KKO= 0.00016 DFKO= 0.21 FEMKO= 0 KEA=
KEF= 0.00021 DFEF= 0.20 FEMEF= 3.92 KKJ= 0.00021 DFKJ= 0.27 FEMKJ= -56.83 KEF=
KEI= 0.00020 DFEI= 0.18 FEMEI= 0 KKL= 0.00021 DFKL= 0.27 FEMKL= 68.01 KEI=
KKG= 0.00020 DFKG= 0.25 FEMKG= 0
At Joint I At Joint I
KIE= 0.00020 DFIE= 0.34 FEMIE= 0 At Joint G KIE=
KIJ= 0.00021 DFIJ= 0.37 FEMIJ= 64.40 KGK= 0.00020 DFGK= 0.15 FEMGK= 0 KIJ=
KIM= 0.00016 DFIM= 0.29 FEMIM= 0 KGF= 0.00021 DFGF= 0.16 FEMGF= -3.92 KIM=
KGH= 0.00021 DFGH= 0.16 FEMGH= 21.34
KGC= 0.00068 DFGC= 0.52 FEMGC= 0
At Joint M At Joint M
KMI= 0.00016 DFMI= 0.44 FEMMI= 0 At Joint P KMI=
KMN= 0.00021 DFMN= 0.56 FEMMN= 29.92 KPO= 0.00021 DFPO= 0.56 FEMPO= -29.92 KMN=
KPL= 0.00016 DFPL= 0.44 FEMPL= 0
At Joint N At Joint N
KNM= 0.00021 DFNM= 0.36 FEMNM= -29.92 At Joint L KNM=
KNO= 0.00021 DFNO= 0.36 FEMNO= 29.92 KLP= 0.00016 DFLP= 0.29 FEMLP= 0 KNO=
KNJ= 0.00016 DFNJ= 0.28 FEMNJ= 0 KLK= 0.00021 DFLK= 0.37 FEMLK= -64.40 KNJ=
KLH= 0.00020 DFLH= 0.34 FEMLH= 0
At Joint J At Joint J
KJN= 0.00016 DFJN= 0.21 FEMJN= 0 At Joint H KJN=
KJI= 0.00021 DFJI= 0.27 FEMJI= -68.01 KHL= 0.00020 DFHL= 0.18 FEMHL= 0 KJI=
KJK= 0.00021 DFJK= 0.27 FEMJK= 56.83 KHG= 0.00021 DFHG= 0.20 FEMHG= -21.34 KJK=
KJF= 0.00020 DFJF= 0.25 FEMJF= 0 KHD= 0.00068 DFHD= 0.62 FEMHD= 0 KJF=

At Joint F At Joint F
KFJ= 0.00020 DFFJ= 0.15 FEMFJ= 0 KFJ=
KFE= 0.00021 DFFE= 0.16 FEMFE= -3.92 KFE=
KFG= 0.00021 DFFG= 0.16 FEMFG= 3.92 KFG=
KFB= 0.00068 DFFB= 0.52 FEMFB= 0 KFB=

At Joint O At Joint O
KON= 0.00021 DFON= 0.36 FEMON= -29.92 KON=
KOP= 0.00021 DFOP= 0.36 FEMOP= 29.92 KOP=
KOK= 0.00016 DFOK= 0.28 FEMOK= 0 KOK=
me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF DEAD LOADS @ "D"

At Joint E At Joint K
KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00027 DFEF= 0.23 FEMEF= 13.66 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -5.31
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 26.53
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 37.5001 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= -3.41
KGH= 0.00027 DFGH= 0.16 FEMGH= 13.66
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 11.13 KPO= 0.00027 DFPO= 0.62 FEMPO= -11.13
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -11.13 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 0.63 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -26.53
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -37.50 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 5.31 KHG= 0.00027 DFHG= 0.23 FEMHG= -13.66
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= -13.66
KFG= 0.00053 DFFG= 0.32 FEMFG= 3.41
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O
KON= 0.00053 DFON= 0.55 FEMON= -0.63
KOP= 0.00027 DFOP= 0.28 FEMOP= 11.13
KOK= 0.00016 DFOK= 0.17 FEMOK= 0

me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF DEAD LOADS @ "4"

At Joint E At Joint K
KEA= 0.00068 DFEA= 0.62 FEMEA= 0 KKO= 0.00016 DFKO= 0.21 FEMKO= 0
KEF= 0.00021 DFEF= 0.20 FEMEF= 21.34 KKJ= 0.00021 DFKJ= 0.27 FEMKJ= -44.43
KEI= 0.00020 DFEI= 0.18 FEMEI= 0 KKL= 0.00021 DFKL= 0.27 FEMKL= 44.43
KKG= 0.00020 DFKG= 0.25 FEMKG= 0
At Joint I
KIE= 0.00020 DFIE= 0.34 FEMIE= 0 At Joint G
KIJ= 0.00021 DFIJ= 0.37 FEMIJ= 44.43 KGK= 0.00020 DFGK= 0.15 FEMGK= 0
KIM= 0.00016 DFIM= 0.29 FEMIM= 0 KGF= 0.00021 DFGF= 0.16 FEMGF= -21.34
KGH= 0.00021 DFGH= 0.16 FEMGH= 21.34
KGC= 0.00068 DFGC= 0.52 FEMGC= 0
At Joint M
KMI= 0.00016 DFMI= 0.44 FEMMI= 0 At Joint P
KMN= 0.00021 DFMN= 0.56 FEMMN= 19.81 KPO= 0.00021 DFPO= 0.56 FEMPO= -19.81
KPL= 0.00016 DFPL= 0.44 FEMPL= 0
At Joint N
KNM= 0.00021 DFNM= 0.36 FEMNM= -19.81 At Joint L
KNO= 0.00021 DFNO= 0.36 FEMNO= 19.81 KLP= 0.00016 DFLP= 0.29 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.28 FEMNJ= 0 KLK= 0.00021 DFLK= 0.37 FEMLK= -44.43
KLH= 0.00020 DFLH= 0.34 FEMLH= 0
At Joint J
KJN= 0.00016 DFJN= 0.21 FEMJN= 0 At Joint H
KJI= 0.00021 DFJI= 0.27 FEMJI= -44.43 KHL= 0.00020 DFHL= 0.18 FEMHL= 0
KJK= 0.00021 DFJK= 0.27 FEMJK= 44.43 KHG= 0.00021 DFHG= 0.20 FEMHG= -21.34
KJF= 0.00020 DFJF= 0.25 FEMJF= 0 KHD= 0.00068 DFHD= 0.62 FEMHD= 0

At Joint F
KFJ= 0.00020 DFFJ= 0.15 FEMFJ= 0
KFE= 0.00021 DFFE= 0.16 FEMFE= -21.34
KFG= 0.00021 DFFG= 0.16 FEMFG= 21.34
KFB= 0.00068 DFFB= 0.52 FEMFB= 0

At Joint O
KON= 0.00021 DFON= 0.36 FEMON= -19.81
KOP= 0.00021 DFOP= 0.36 FEMOP= 19.81
KOK= 0.00016 DFOK= 0.28 FEMOK= 0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
STRUCTURAL ANALYSIS OF DEAD LOADS @ "A"

JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00027 0.00020 0.00020 0.00027 0.00016 0.00016 0.00027 0.00027 0.00053 0.00016 0.00016 0.00027 0.00053 0.00020
DF 0.00 0.59 0.23 0.17 0.32 0.42 0.26 0.38 0.62 0.28 0.55 0.17 0.14 0.23 0.46 0.17
FEM 0.00 0.00 13.66 0.00 0.00 13.09 0.00 0.00 11.13 -11.13 0.63 0.00 0.00 -13.09 2.20 0.00
BJ'S 0.00 -8.09 -3.19 -2.38 -4.13 -5.54 -3.42 -4.25 -6.88 2.90 5.81 1.79 1.54 2.50 4.99 1.86
COM -4.04 0.00 1.04 -2.06 -1.19 1.25 -2.12 -1.71 1.45 -3.44 -2.90 0.77 0.90 -2.77 -5.58 0.77
BJ'S 0.00 0.61 0.24 0.18 0.65 0.87 0.54 0.10 0.16 1.54 3.08 0.95 0.95 1.53 3.06 1.14
COM 0.30 0.00 0.22 0.33 0.09 0.77 0.05 0.27 0.77 0.08 -1.28 0.47 0.48 0.44 -1.48 0.16
BJ'S 0.00 -0.32 -0.13 -0.09 -0.29 -0.38 -0.24 -0.40 -0.64 0.20 0.40 0.12 0.06 0.09 0.18 0.07
FM -3.74 -7.80 11.83 -4.03 -4.86 10.05 -5.19 -5.99 5.99 -9.84 5.73 4.11 3.92 -11.30 3.38 4.00

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00027 0.00053 0.00068 0.00000 0.00053 0.00027 0.00016 0.00016 0.00053 0.00027 0.00020 0.00020 0.00053 0.00027 0.00068
DF 0.12 0.16 0.32 0.40 0.00 0.55 0.28 0.17 0.14 0.46 0.23 0.17 0.12 0.32 0.16 0.40
FEM 0.00 -13.66 0.63 0.00 0.00 -0.63 11.13 0.00 0.00 -2.20 26.53 0.00 0.00 -0.63 13.66 0.00
BJ'S 1.55 2.08 4.15 5.26 0.00 -5.81 -2.90 -1.79 -3.44 -11.16 -5.58 -4.15 -1.55 -4.15 -2.08 -5.26
COM 0.93 -1.60 -2.08 0.00 2.63 2.90 3.44 -1.72 -0.90 2.50 5.62 -0.77 -2.08 2.08 1.60 0.00
BJ'S 0.33 0.44 0.87 1.11 0.00 -2.56 -1.28 -0.79 -0.91 -2.95 -1.48 -1.10 -0.19 -0.51 -0.25 -0.64
COM 0.57 0.12 -0.25 0.00 0.55 1.54 -0.62 -0.46 -0.39 1.53 -0.11 -0.09 -0.55 0.44 -0.37 0.00
BJ'S -0.05 -0.07 -0.14 -0.18 0.00 -0.26 -0.13 -0.08 -0.13 -0.43 -0.21 -0.16 0.06 0.15 0.08 0.19
FM 3.32 -12.69 3.18 6.19 3.18 -4.80 9.64 -4.84 -5.78 -12.71 24.77 -6.28 -4.31 -2.62 12.63 -5.71

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF DEAD LOADS @ "B"
JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00027 0.00020 0.00020 0.00027 0.00016 0.00016 0.00027 0.00027 0.00053 0.00016 0.00016 0.00027 0.00053 0.00020
DF 0.00 0.59 0.23 0.17 0.32 0.42 0.26 0.38 0.62 0.28 0.55 0.17 0.14 0.23 0.46 0.17
FEM 0.00 0.00 2.51 0.00 0.00 10.93 0.00 0.00 19.75 -19.75 0.63 0.00 0.00 -10.93 1.95 0.00
BJ'S 0.00 -1.48 -0.59 -0.44 -3.44 -4.63 -2.86 -7.54 -12.21 5.29 10.57 3.26 1.27 2.06 4.12 1.53
COM -0.74 0.00 0.15 -1.72 -0.22 1.03 -3.77 -1.43 2.64 -6.11 -5.29 0.64 1.63 -2.31 -8.06 0.11
BJ'S 0.00 0.93 0.37 0.27 0.93 1.25 0.77 -0.46 -0.75 2.97 5.95 1.84 1.22 1.98 3.96 1.47
COM 0.47 0.00 0.13 0.47 0.14 0.99 -0.23 0.39 1.49 -0.38 -2.46 0.61 0.92 0.63 -1.72 0.10
BJ'S 0.00 -0.35 -0.14 -0.10 -0.28 -0.38 -0.23 -0.72 -1.16 0.62 1.23 0.38 0.01 0.02 0.04 0.01
FM -0.28 -0.90 2.43 -1.52 -2.87 9.19 -6.32 -9.76 9.76 -17.36 10.63 6.73 5.05 -8.56 0.28 3.23

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00027 0.00053 0.00068 0.00000 0.00053 0.00027 0.00016 0.00016 0.00053 0.00027 0.00020 0.00020 0.00053 0.00027 0.00068
DF 0.12 0.16 0.32 0.40 0.00 0.55 0.28 0.17 0.14 0.46 0.23 0.17 0.12 0.32 0.16 0.40
FEM 0.00 -2.51 0.63 0.00 0.00 -0.63 19.75 0.00 0.00 -1.95 37.11 0.00 0.00 -0.63 13.66 0.00
BJ'S 0.22 0.30 0.60 0.76 0.00 -10.57 -5.29 -3.26 -4.98 -16.12 -8.06 -6.00 -1.55 -4.15 -2.08 -5.26
COM 0.77 -0.29 -2.08 0.00 0.38 5.29 6.11 -2.49 -1.63 2.06 7.86 -0.77 -3.00 0.30 1.60 0.00
BJ'S 0.19 0.26 0.51 0.65 0.00 -4.92 -2.46 -1.52 -1.06 -3.44 -1.72 -1.28 0.13 0.35 0.18 0.45
COM 0.74 0.18 0.18 0.00 0.32 2.97 -0.68 -0.53 -0.76 1.98 -0.20 0.07 -0.64 0.26 -0.56 0.00
BJ'S -0.13 -0.17 -0.35 -0.44 0.00 -0.97 -0.49 -0.30 -0.15 -0.50 -0.25 -0.19 0.11 0.30 0.15 0.38
FM 1.79 -2.24 -0.51 0.96 0.70 -8.84 16.94 -8.10 -8.59 -17.98 34.74 -8.18 -4.94 -3.57 12.94 -4.43

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
STRUCTURAL ANALYSIS OF DEAD LOADS @ "C"

JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00027 0.00020 0.00020 0.00027 0.00016 0.00016 0.00027 0.00027 0.00053 0.00016 0.00016 0.00027 0.00053 0.00020
DF 0.00 0.59 0.23 0.17 0.32 0.42 0.26 0.38 0.62 0.28 0.55 0.17 0.14 0.23 0.46 0.17
FEM 0.00 0.00 13.66 0.00 0.00 22.03 0.00 0.00 19.75 -19.75 0.63 0.00 0.00 -13.49 1.95 0.00
BJ'S 0.00 -8.09 -3.19 -2.38 -6.94 -9.33 -5.76 -7.54 -12.21 5.29 10.57 3.26 1.63 2.65 5.29 1.97
COM -4.04 0.00 1.04 -3.47 -1.19 1.32 -3.77 -2.88 2.64 -6.11 -5.29 0.82 1.63 -4.66 -8.06 0.77
BJ'S 0.00 1.44 0.57 0.42 1.15 1.54 0.95 0.09 0.15 2.92 5.85 1.81 1.46 2.37 4.73 1.76
COM 0.72 0.00 0.21 0.57 0.21 1.18 0.04 0.48 1.46 0.07 -0.41 0.73 0.90 0.77 0.41 0.16
BJ'S 0.00 -0.47 -0.18 -0.14 -0.45 -0.61 -0.38 -0.74 -1.20 -0.11 -0.22 -0.07 -0.32 -0.51 -1.03 -0.38
FM -3.32 -7.11 12.10 -4.99 -7.23 16.14 -8.91 -10.59 10.59 -17.68 11.13 6.55 5.31 -12.88 3.29 4.28

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00027 0.00053 0.00068 0.00000 0.00053 0.00027 0.00016 0.00016 0.00053 0.00027 0.00020 0.00020 0.00053 0.00027 0.00068
DF 0.12 0.16 0.32 0.40 0.00 0.55 0.28 0.17 0.14 0.46 0.23 0.17 0.12 0.32 0.16 0.40
FEM 0.00 -13.66 0.63 0.00 0.00 -0.63 19.75 0.00 0.00 -1.95 37.11 0.00 0.00 -0.63 13.66 0.00
BJ'S 1.55 2.08 4.15 5.26 0.00 -10.57 -5.29 -3.26 -4.98 -16.12 -8.06 -6.00 -1.55 -4.15 -2.08 -5.26
COM 0.98 -1.60 -2.08 0.00 2.63 5.29 -1.32 -2.49 -1.63 2.65 -2.02 -0.77 -3.00 2.08 -0.52 -1.31
BJ'S 0.32 0.43 0.86 1.08 0.00 -0.82 -0.41 -0.25 0.25 0.81 0.41 0.30 0.33 0.88 0.44 1.11
COM 0.88 0.28 0.44 0.00 0.54 2.92 -0.10 0.13 -0.13 2.37 0.10 0.16 0.15 0.43 0.11 0.28
BJ'S -0.19 -0.26 -0.51 -0.65 0.00 -1.63 -0.81 -0.50 -0.35 -1.15 -0.57 -0.43 -0.11 -0.31 -0.15 -0.39
FM 3.54 -12.72 3.49 5.69 3.17 -5.44 11.82 -6.38 -6.84 -13.39 26.97 -6.74 -4.18 -1.70 11.46 -5.57

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF DEAD LOADS @ "D"

JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00027 0.00020 0.00020 0.00027 0.00016 0.00016 0.00027 0.00027 0.00053 0.00016 0.00016 0.00027 0.00053 0.00020
DF 0.00 0.59 0.23 0.17 0.32 0.42 0.26 0.38 0.62 0.28 0.55 0.17 0.14 0.23 0.46 0.17
FEM 0.00 0.00 13.66 0.00 0.00 37.50 0.00 0.00 11.13 -11.13 0.63 0.00 0.00 -37.50 5.31 0.00
BJ'S 0.00 -8.09 -3.19 -2.38 -11.82 -15.88 -9.80 -4.25 -6.88 2.90 5.81 1.79 4.56 7.38 14.76 5.49
COM -4.04 0.00 0.82 -5.91 -1.19 3.69 -2.12 -4.90 1.45 -3.44 -2.90 2.28 0.90 -7.94 -4.87 0.61
BJ'S 0.00 3.02 1.19 0.89 -0.12 -0.16 -0.10 1.32 2.13 1.12 2.25 0.69 1.60 2.59 5.18 1.93
COM 1.51 0.00 0.04 -0.06 0.44 1.30 0.66 -0.05 0.56 1.07 -1.34 0.80 0.35 -0.08 -2.63 0.03
BJ'S 0.00 0.01 0.00 0.00 -0.76 -1.01 -0.63 -0.20 -0.32 -0.15 -0.29 -0.09 0.33 0.54 1.07 0.40
FM -2.54 -5.06 12.52 -7.46 -13.44 25.43 -11.99 -8.08 8.08 -9.62 4.15 5.47 7.73 -35.01 18.82 8.46

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00027 0.00053 0.00068 0.00000 0.00053 0.00027 0.00016 0.00016 0.00053 0.00027 0.00020 0.00020 0.00053 0.00027 0.00068
DF 0.12 0.16 0.32 0.40 0.00 0.55 0.28 0.17 0.14 0.46 0.23 0.17 0.12 0.32 0.16 0.40
FEM 0.00 -13.66 3.41 0.00 0.00 -0.63 11.13 0.00 0.00 -5.31 26.53 0.00 0.00 -3.41 13.66 0.00
BJ'S 1.22 1.63 3.26 4.13 0.00 -5.81 -2.90 -1.79 -3.00 -9.73 -4.87 -3.62 -1.22 -3.26 -1.63 -4.13
COM 2.75 -1.60 -1.63 0.00 2.07 2.90 3.44 -1.50 -0.90 7.38 5.62 -0.61 -1.81 1.63 1.60 0.00
BJ'S 0.06 0.08 0.15 0.19 0.00 -2.68 -1.34 -0.83 -1.63 -5.27 -2.63 -1.96 -0.17 -0.45 -0.23 -0.57
COM 0.96 0.60 -0.23 0.00 0.10 1.12 -0.62 -0.81 -0.41 2.59 -0.19 -0.08 -0.98 0.08 -0.39 0.00
BJ'S -0.16 -0.21 -0.43 -0.54 0.00 0.17 0.09 0.05 -0.27 -0.87 -0.44 -0.33 0.15 0.41 0.21 0.52
FM 4.83 -13.16 4.55 3.79 2.16 -4.91 9.79 -4.88 -6.21 -11.22 24.03 -6.60 -4.02 -5.01 13.21 -4.18
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
STRUCTURAL ANALYSIS OF DEAD LOADS

JOINTS C P L H D JOINTS
MEMBER CG PO PL LP LK LH HL HG HD DH MEMBER
K 0.00000 0.00027 0.00016 0.00016 0.00027 0.00020 0.00020 0.00027 0.00068 0.00000 K
DF 0.00 0.62 0.38 0.26 0.42 0.32 0.17 0.23 0.59 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS DF
FEM 0.00 -11.13 0.00 0.00 -26.53 0.00 0.00 -13.66 0.00 0.00 OF DEAD LOADS @"A" FEM
BJ'S 0.00 6.88 4.25 6.94 11.23 8.36 2.38 3.19 8.09 0.00 BJ'S
COM -2.63 -1.45 3.47 2.12 -2.79 1.19 4.18 -1.04 0.00 4.04 COM
BJ'S 0.00 -1.25 -0.77 -0.14 -0.22 -0.17 -0.55 -0.74 -1.86 0.00 BJ'S
COM -0.32 -0.64 -0.07 -0.38 -0.74 -0.27 -0.08 -0.13 0.00 -0.93 COM
BJ'S 0.00 0.44 0.27 0.37 0.59 0.44 0.04 0.05 0.12 0.00 BJ'S
FM -2.95 -7.15 7.15 8.90 -18.46 9.55 5.97 -12.32 6.35 3.11 FM

JOINTS
JOINTS C P L H D MEMBER
MEMBER CG PO PL LP LK LH HL HG HD DH K
K 0.00000 0.00027 0.00016 0.00016 0.00027 0.00020 0.00020 0.00027 0.00068 0.00000 DF
DF 0.00 0.62 0.38 0.26 0.42 0.32 0.17 0.23 0.59 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS FEM
FEM 0.00 -19.75 0.00 0.00 -37.11 0.00 0.00 -13.66 0.00 0.00 OF DEAD LOADS @"B" BJ'S
BJ'S 0.00 12.21 7.54 9.70 15.71 11.70 2.38 3.19 8.09 0.00 COM
COM -2.63 -2.64 4.85 3.77 -4.03 1.19 5.85 -1.04 0.00 4.04 BJ'S
BJ'S 0.00 -1.36 -0.84 -0.24 -0.39 -0.29 -0.84 -1.13 -2.85 0.00 COM
COM 0.22 -1.23 -0.12 -0.42 -0.86 -0.42 -0.15 0.09 0.00 -1.42 BJ'S
BJ'S 0.00 0.84 0.52 0.44 0.72 0.54 0.01 0.01 0.03 0.00 FM
FM -2.41 -11.94 11.94 13.25 -25.96 12.71 7.25 -12.53 5.27 2.62

Name: John Fredr


Course & Section:
JOINTS
MEMBER
K
DF
FEM
BJ'S
COM
BJ'S
COM
BJ'S
FM

JOINTS
MEMBER
K
DF
FEM
BJ'S
COM
BJ'S
COM
BJ'S
FM

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
STRUCTURAL ANALYSIS OF DEAD LOADS

JOINTS C P L H D JOINTS
MEMBER CG PO PL LP LK LH HL HG HD DH MEMBER
K 0.00000 0.00027 0.00016 0.00016 0.00027 0.00020 0.00020 0.00027 0.00068 0.00000 K
DF 0.00 0.62 0.38 0.26 0.42 0.32 0.17 0.23 0.59 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS DF
FEM 0.00 -19.75 0.00 0.00 -37.11 0.00 0.00 -13.66 0.00 0.00 OF DEAD LOADS @"C" FEM
BJ'S 0.00 12.21 7.54 9.70 15.71 11.70 2.38 3.19 8.09 0.00 BJ'S
COM -2.63 -2.64 4.85 3.77 -4.03 1.19 5.85 -1.04 0.00 4.04 COM
BJ'S 0.00 -1.36 -0.84 -0.24 -0.39 -0.29 -0.84 -1.13 -2.85 0.00 BJ'S
COM 0.56 -0.20 -0.12 -0.42 0.20 -0.42 -0.15 0.22 0.00 -1.42 COM
BJ'S 0.00 0.20 0.12 0.17 0.27 0.20 -0.01 -0.02 -0.04 0.00 BJ'S
FM -2.07 -11.55 11.55 12.97 -25.35 12.38 7.23 -12.43 5.19 2.62 FM

JOINTS
JOINTS C P L H D MEMBER
MEMBER CG PO PL LP LK LH HL HG HD DH K
K 0.00000 0.00027 0.00016 0.00016 0.00027 0.00020 0.00020 0.00027 0.00068 0.00000 DF
DF 0.00 0.62 0.38 0.26 0.42 0.32 0.17 0.23 0.59 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS FEM
FEM 0.00 -11.13 0.00 0.00 -26.53 0.00 0.00 -13.66 0.00 0.00 OF DEAD LOADS @"D" BJ'S
BJ'S 0.00 6.88 4.25 6.94 11.23 8.36 2.38 3.19 8.09 0.00 COM
COM -2.07 -1.45 3.47 2.12 -2.43 1.19 4.18 -0.82 0.00 4.04 BJ'S
BJ'S 0.00 -1.25 -0.77 -0.23 -0.37 -0.28 -0.59 -0.79 -1.99 0.00 COM
COM -0.29 -0.67 -0.12 -0.38 -1.32 -0.29 -0.14 -0.11 0.00 -1.00 BJ'S
BJ'S 0.00 0.48 0.30 0.52 0.84 0.63 0.04 0.06 0.15 0.00 FM
FM -2.35 -7.13 7.13 8.97 -18.58 9.61 5.88 -12.12 6.24 3.05

Name: John Fredr


Course & Section:

JOINTS
MEMBER
K
DF
FEM
BJ'S
COM
BJ'S
COM
BJ'S
FM

JOINTS
MEMBER
K
DF
FEM
BJ'S
COM
BJ'S
COM
BJ'S
FM
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
STRUCTURAL ANALYSIS OF DEAD LOADS @ "1"

JOINTS A E I M N J JOINTS
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF MEMBER
K 0.00000 0.00068 0.00021 0.00020 0.00020 0.00021 0.00016 0.00016 0.00021 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 K
DF 0.00 0.62 0.20 0.18 0.34 0.37 0.29 0.44 0.56 0.36 0.36 0.28 0.21 0.27 0.27 0.25 DF
FEM 0.00 0.00 21.34 0.00 0.00 67.40 0.00 0.00 19.81 -19.81 19.81 0.00 0.00 -76.61 24.93 0.00 FEM
BJ'S 0.00 -13.25 -4.19 -3.90 -23.21 -24.94 -19.25 -8.63 -11.18 0.00 0.00 0.00 10.77 13.96 13.96 12.99 BJ'S
COM -6.63 0.00 -0.57 -11.60 -1.95 6.98 -4.32 -9.62 0.00 -5.59 0.00 5.39 0.00 -12.47 -6.14 -0.53 COM
BJ'S 0.00 7.56 2.39 2.22 -0.25 -0.26 -0.20 4.19 5.43 0.07 0.07 0.06 3.99 5.17 5.17 4.81 BJ'S
COM 3.78 0.00 -0.47 -0.12 1.11 2.58 2.10 -0.10 0.04 2.72 -0.15 1.99 0.03 -0.13 -2.63 -0.44 COM
BJ'S 0.00 0.37 0.12 0.11 -1.99 -2.14 -1.65 0.03 0.04 -1.64 -1.64 -1.27 0.66 0.86 0.86 0.80 BJ'S
FM -2.85 -5.33 18.62 -13.29 -26.29 49.61 -23.32 -14.14 14.14 -24.26 18.09 6.17 15.45 -69.23 36.15 17.63 FM

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC JOINTS
K 0.00020 0.00021 0.00021 0.00068 0.00000 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 0.00020 0.00021 0.00021 0.00068 MEMBER
DF 0.15 0.16 0.16 0.52 0.00 0.36 0.36 0.28 0.21 0.27 0.27 0.25 0.15 0.16 0.16 0.52 K
FEM 0.00 -21.34 28.26 0.00 0.00 -19.81 19.81 0.00 0.00 -24.93 70.37 0.00 0.00 -37.49 21.34 0.00 DF
BJ'S -1.06 -1.14 -1.14 -3.59 0.00 0.00 0.00 0.00 -9.47 -12.27 -12.27 -11.42 2.47 2.65 2.65 8.38 FEM
COM 6.50 -2.09 1.32 0.00 -1.80 0.00 5.59 -4.74 0.00 6.98 11.27 1.23 -5.71 -0.57 2.09 0.00 BJ'S
BJ'S -0.87 -0.94 -0.94 -2.97 0.00 -0.31 -0.31 -0.24 -4.06 -5.26 -5.26 -4.90 0.64 0.69 0.69 2.17 COM
COM 2.40 1.19 0.34 0.00 -1.49 0.04 -2.45 -2.03 -0.12 2.58 -0.02 0.32 -2.45 -0.47 -1.16 0.00 BJ'S
BJ'S -0.60 -0.65 -0.65 -2.05 0.00 1.60 1.60 1.24 -0.58 -0.75 -0.75 -0.69 0.62 0.67 0.67 2.12 COM
FM 6.37 -24.96 27.21 -8.61 -3.28 -18.48 24.25 -5.77 -14.23 -33.65 63.34 -15.46 -4.43 -34.52 26.28 12.67 BJ'S
FM

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF DEAD LOADS @ "2"
JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00021 0.00020 0.00020 0.00021 0.00016 0.00016 0.00021 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020
DF 0.00 0.62 0.20 0.18 0.34 0.37 0.29 0.44 0.56 0.36 0.36 0.28 0.21 0.27 0.27 0.25
FEM 0.00 0.00 9.36 0.00 0.00 63.39 0.00 0.00 29.92 -29.92 29.92 0.00 0.00 -79.19 17.88 0.00
BJ'S 0.00 -5.81 -1.84 -1.71 -21.83 -23.46 -18.10 -13.03 -16.89 0.00 0.00 0.00 12.78 16.56 16.56 15.41
COM -2.91 0.00 0.78 -10.91 -0.85 8.28 -6.52 -9.05 0.00 -8.44 0.00 6.39 0.00 -11.73 -7.44 0.72
BJ'S 0.00 6.30 1.99 1.85 -0.31 -0.34 -0.26 3.94 5.11 0.74 0.74 0.57 3.84 4.98 4.98 4.64
COM 3.15 0.00 -0.58 -0.16 0.93 2.49 1.97 -0.13 0.37 2.55 -0.49 1.92 0.29 -0.17 -2.49 -0.54
BJ'S 0.00 0.45 0.14 0.13 -1.86 -1.99 -1.54 -0.10 -0.14 -1.44 -1.44 -1.11 0.61 0.79 0.79 0.73
FM 0.24 0.94 9.85 -10.79 -23.93 48.37 -24.44 -18.37 18.37 -36.51 28.73 7.77 17.52 -68.75 30.27 20.97

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00021 0.00021 0.00068 0.00000 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 0.00020 0.00021 0.00021 0.00068
DF 0.15 0.16 0.16 0.52 0.00 0.36 0.36 0.28 0.21 0.27 0.27 0.25 0.15 0.16 0.16 0.52
FEM 0.00 -15.89 6.43 0.00 0.00 -29.92 29.92 0.00 0.00 -17.88 72.96 0.00 0.00 -9.78 7.04 0.00
BJ'S 1.44 1.55 1.55 4.91 0.00 0.00 0.00 0.00 -11.48 -14.88 -14.88 -13.85 0.42 0.45 0.45 1.42
COM 7.71 -0.92 0.22 0.00 2.46 0.00 8.44 -5.74 0.00 8.28 9.97 0.21 -6.92 0.78 1.28 0.00
BJ'S -1.07 -1.15 -1.15 -3.64 0.00 -0.98 -0.98 -0.75 -3.85 -4.99 -4.99 -4.64 0.74 0.80 0.80 2.53
COM 2.32 0.99 0.40 0.00 -1.82 0.37 -2.17 -1.92 -0.38 2.49 -0.05 0.37 -2.32 -0.58 -0.93 0.00
BJ'S -0.57 -0.61 -0.61 -1.93 0.00 1.34 1.34 1.04 -0.51 -0.66 -0.66 -0.61 0.58 0.63 0.63 1.99
FM 9.83 -16.02 6.84 -0.66 0.64 -29.18 36.56 -7.38 -16.21 -27.63 62.36 -18.52 -7.50 -7.70 9.26 5.94

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
STRUCTURAL ANALYSIS OF DEAD LOADS @ "3"

JOINTS A E I M N J JOINTS
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF MEMBER
K 0.00000 0.00068 0.00021 0.00020 0.00020 0.00021 0.00016 0.00016 0.00021 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 K
DF 0.00 0.62 0.20 0.18 0.34 0.37 0.29 0.44 0.56 0.36 0.36 0.28 0.21 0.27 0.27 0.25 DF
FEM 0.00 0.00 3.92 0.00 0.00 64.40 0.00 0.00 29.92 -29.92 29.92 0.00 0.00 -68.01 56.83 0.00 FEM
BJ'S 0.00 -2.43 -0.77 -0.72 -22.18 -23.83 -18.39 -13.03 -16.89 0.00 0.00 0.00 2.33 3.02 3.02 2.81 BJ'S
COM -1.22 0.00 0.00 -11.09 -0.36 1.51 -6.52 -9.20 0.00 -8.44 0.00 1.17 0.00 -11.92 -1.51 0.00 COM
BJ'S 0.00 6.89 2.18 2.03 1.85 1.98 1.53 4.01 5.19 2.63 2.63 2.03 2.80 3.63 3.63 3.37 BJ'S
COM 3.44 0.00 0.03 0.92 1.01 1.81 2.00 0.77 1.31 2.60 0.21 1.40 1.01 0.99 0.08 0.03 COM
BJ'S 0.00 -0.59 -0.19 -0.17 -1.66 -1.79 -1.38 -0.91 -1.17 -1.52 -1.52 -1.17 -0.44 -0.57 -0.57 -0.53 BJ'S
FM 2.23 3.86 5.17 -9.03 -21.34 44.09 -22.75 -18.36 18.36 -34.66 31.24 3.42 5.70 -72.86 61.47 5.69 FM

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC JOINTS
K 0.00020 0.00021 0.00021 0.00068 0.00000 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 0.00020 0.00021 0.00021 0.00068 MEMBER
DF 0.15 0.16 0.16 0.52 0.00 0.36 0.36 0.28 0.21 0.27 0.27 0.25 0.15 0.16 0.16 0.52 K
FEM 0.00 -3.92 3.92 0.00 0.00 -29.92 29.92 0.00 0.00 -56.83 68.01 0.00 0.00 -3.92 21.34 0.00 DF
BJ'S 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -2.33 -3.02 -3.02 -2.81 -2.66 -2.86 -2.86 -9.05 FEM
COM 1.41 -0.38 -1.43 0.00 0.00 0.00 0.00 -1.17 0.00 1.51 -0.76 -1.33 -1.41 0.00 -0.71 -2.26 BJ'S
BJ'S 0.06 0.07 0.07 0.21 0.00 0.42 0.42 0.32 0.12 0.16 0.16 0.14 0.67 0.72 0.72 2.27 COM
COM 1.69 1.09 0.36 0.00 0.11 1.31 0.11 0.06 0.16 1.81 0.04 0.33 0.07 0.03 0.18 0.57 BJ'S
BJ'S -0.48 -0.51 -0.51 -1.63 0.00 -0.53 -0.53 -0.41 -0.49 -0.63 -0.63 -0.59 -0.13 -0.14 -0.14 -0.44 COM
FM 2.68 -3.66 2.40 -1.42 0.11 -28.72 29.91 -1.19 -2.54 -57.00 63.80 -4.25 -3.46 -6.16 18.53 -8.91 BJ'S
FM

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF DEAD LOADS @ "4"

JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00021 0.00020 0.00020 0.00021 0.00016 0.00016 0.00021 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020
DF 0.00 0.62 0.20 0.18 0.34 0.37 0.29 0.44 0.56 0.36 0.36 0.28 0.21 0.27 0.27 0.25
FEM 0.00 0.00 21.34 0.00 0.00 44.43 0.00 0.00 19.81 -19.81 19.81 0.00 0.00 -44.43 44.43 0.00
BJ'S 0.00 -13.25 -4.19 -3.90 -15.30 -16.44 -12.69 -8.63 -11.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COM -6.63 0.00 0.00 -7.65 -1.95 0.00 -4.32 -6.34 0.00 -5.59 0.00 0.00 0.00 -8.22 0.00 0.00
BJ'S 0.00 4.75 1.50 1.40 2.16 2.32 1.79 2.76 3.58 2.02 2.02 1.56 1.71 2.22 2.22 2.07
COM 2.38 0.00 0.17 1.08 0.70 1.11 1.38 0.89 1.01 1.79 -1.01 0.86 0.78 1.16 -1.11 0.16
BJ'S 0.00 -0.78 -0.25 -0.23 -1.10 -1.18 -0.91 -0.83 -1.07 -0.59 -0.59 -0.46 -0.21 -0.27 -0.27 -0.25
FM -4.25 -9.28 18.58 -9.30 -15.49 30.24 -14.74 -12.15 12.15 -22.19 20.23 1.96 2.29 -49.54 45.28 1.98

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00021 0.00021 0.00068 0.00000 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 0.00020 0.00021 0.00021 0.00068
DF 0.15 0.16 0.16 0.52 0.00 0.36 0.36 0.28 0.21 0.27 0.27 0.25 0.15 0.16 0.16 0.52
FEM 0.00 -21.34 21.34 0.00 0.00 -19.81 19.81 0.00 0.00 -44.43 44.43 0.00 0.00 -21.34 21.34 0.00
BJ'S 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COM 0.00 -2.09 0.00 0.00 0.00 0.00 5.59 0.00 0.00 0.00 8.22 0.00 0.00 0.00 2.09 0.00
BJ'S 0.32 0.34 0.34 1.09 0.00 -2.02 -2.02 -1.56 -1.71 -2.22 -2.22 -2.07 -0.32 -0.34 -0.34 -1.09
COM 1.03 0.75 -0.17 0.00 0.54 1.01 -1.79 -0.86 -0.78 1.11 -1.16 -0.16 -1.03 0.17 -0.75 0.00
BJ'S -0.25 -0.26 -0.26 -0.84 0.00 0.59 0.59 0.46 0.21 0.27 0.27 0.25 0.25 0.26 0.26 0.84
FM 1.11 -22.61 21.25 0.25 0.54 -20.23 22.19 -1.96 -2.29 -45.28 49.54 -1.98 -1.11 -21.25 22.61 -0.25
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF DEAD LOADS

JOINTS C P L H D
MEMBER CG PO PL LP LK LH HL HG HD DH
K 0.00000 0.00021 0.00016 0.00016 0.00021 0.00020 0.00020 0.00021 0.00068 0.00000
DF 0.00 0.56 0.44 0.29 0.37 0.34 0.18 0.20 0.62 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS
FEM 0.00 -19.81 0.00 0.00 -60.92 0.00 0.00 -21.34 0.00 0.00 OF DEAD LOADS @"1"
BJ'S 0.00 11.18 8.63 17.40 22.54 20.98 3.90 4.19 13.25 0.00
COM 4.19 0.00 8.70 4.32 -6.14 1.95 10.49 1.32 0.00 6.63
BJ'S 0.00 -4.91 -3.79 -0.04 -0.05 -0.04 -2.16 -2.32 -7.34 0.00
COM 1.09 -0.15 -0.02 -1.89 -2.63 -1.08 -0.02 0.34 0.00 -3.67
BJ'S 0.00 0.10 0.08 1.60 2.07 1.93 -0.06 -0.06 -0.20 0.00
FM 5.28 -13.60 13.60 21.38 -45.12 23.74 12.15 -17.87 5.72 2.96

JOINTS C P L H D
MEMBER CG PO PL LP LK LH HL HG HD DH
K 0.00000 0.00021 0.00016 0.00016 0.00021 0.00020 0.00020 0.00021 0.00068 0.00000
DF 0.00 0.56 0.44 0.29 0.37 0.34 0.18 0.20 0.62 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS
FEM 0.00 -29.92 0.00 0.00 -53.88 0.00 0.00 -13.06 0.00 0.00 OF DEAD LOADS @"2"
BJ'S 0.00 16.89 13.03 15.39 19.94 18.56 2.38 2.56 8.11 0.00
COM 0.71 0.00 7.69 6.52 -7.44 1.19 9.28 0.22 0.00 4.05
BJ'S 0.00 -4.34 -3.35 -0.08 -0.10 -0.09 -1.74 -1.87 -5.90 0.00
COM 1.26 -0.49 -0.04 -1.68 -2.49 -0.87 -0.05 0.40 0.00 -2.95
BJ'S 0.00 0.30 0.23 1.44 1.86 1.73 -0.06 -0.07 -0.22 0.00
FM 1.97 -17.56 17.56 21.59 -42.11 20.52 9.82 -11.80 1.99 1.10
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF DEAD LOADS

JOINTS C P L H D
MEMBER CG PO PL LP LK LH HL HG HD DH
K 0.00000 0.00021 0.00016 0.00016 0.00021 0.00020 0.00020 0.00021 0.00068 0.00000
DF 0.00 0.56 0.44 0.29 0.37 0.34 0.18 0.20 0.62 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS
FEM 0.00 -29.92 0.00 0.00 -64.40 0.00 0.00 -21.34 0.00 0.00 OF DEAD LOADS @"3"
BJ'S 0.00 16.89 13.03 18.39 23.83 22.18 3.90 4.19 13.25 0.00
COM -4.52 0.00 9.20 6.52 -1.51 1.95 11.09 -1.43 0.00 6.63
BJ'S 0.00 -5.19 -4.01 -1.99 -2.57 -2.39 -1.76 -1.90 -6.00 0.00
COM 1.14 0.21 -0.99 -2.00 0.08 -0.88 -1.20 0.36 0.00 -3.00
BJ'S 0.00 0.44 0.34 0.80 1.04 0.97 0.15 0.16 0.52 0.00
FM -3.39 -17.57 17.57 21.72 -43.54 21.82 12.18 -19.95 7.78 3.63

JOINTS C P L H D
MEMBER CG PO PL LP LK LH HL HG HD DH
K 0.00000 0.00021 0.00016 0.00016 0.00021 0.00020 0.00020 0.00021 0.00068 0.00000
DF 0.00 0.56 0.44 0.29 0.37 0.34 0.18 0.20 0.62 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS
FEM 0.00 -19.81 0.00 0.00 -44.43 0.00 0.00 -21.34 0.00 0.00 OF DEAD LOADS @"4"
BJ'S 0.00 11.18 8.63 12.69 16.44 15.30 3.90 4.19 13.25 0.00
COM 0.00 0.00 6.34 4.32 0.00 1.95 7.65 0.00 0.00 6.63
BJ'S 0.00 -3.58 -2.76 -1.79 -2.32 -2.16 -1.40 -1.50 -4.75 0.00
COM -0.54 -1.01 -0.89 -1.38 -1.11 -0.70 -1.08 -0.17 0.00 -2.38
BJ'S 0.00 1.07 0.83 0.91 1.18 1.10 0.23 0.25 0.78 0.00
FM -0.54 -12.15 12.15 14.74 -30.24 15.49 9.30 -18.58 9.28 4.25
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
SEISMIC ANALYSIS

DESIGN CONSIDERATIONS

Seismic Zone Factor (Z) = 0.4 (Zone 4)


Near-Source Factor (Na) = 1.00 (Seismic Source Type A, ≥ 10 km)
Near-Source Factor (Nv) = 1.20 (Seismic Source Type A, = 10 km)
Importance Factor (I) = 1.00 (Table 208 - 1)
Seismic Coefficient (Ca) = 0.44Na (Table 208 - 7)
Seismic Coefficient (Cv) = 0.64Nv (Table 208 - 8)
(R) = 3.50 (Table 208 - 11,-OMRF - Concrete)

BASE SHEAR:

Cv l W ≤ 2.5 Ca l
V= W
RT R

> 0.11 Ca l W

> 0.8 Z Nv l
W
R

STRUCTURE PERIOD:

T= Ct (hn)^(3/4)
Ct= 0.0731 for RCMRF
hn= height of the building = 7.50
h2= height of 2nd floor = 4.10
h1= height of 1st floor = 3.40

VERTICAL DISTRIBUTION:

n
V= Ft + ∑ Fi
i=1

Ft= 0.07TV
Fx= (V - Ft) Wx hx
∑Wi hi

Name: John F
Course & Sec
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
SEISMIC ANALYSIS
Framing @ A (DEAD LOAD) Framing @ B

Weight per level: Weight per lev


W2 = (8.35)(4)+(1.88)(2)+(8.35)(4)
= 70.56 kN
W1 = (9.82)(4)+(6.60)(2)+(19.90)(4)
= 132.08 kN
Wt = 69.56 + 132.08
= 202.64 kN
BASE SHEAR: BASE SHEAR
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(201.64)
V =
(3.5)(.33129)
V = 134.22 kN
2.5(0.44)(1.0)(1.0)(201.64)

3.50
≤ 63.69 kN = 0
> 0.11(0.44)(1.0)(1.0)(201.64)
> 9.81 kN = 1
(0.8)(0.4)(1.20)(1.0)(201.64)
>
3.50
> 22.23 kN = 1

Therefore, use V = 63.69 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx =
∑Wi hi Ft= 0.07(.33129)(63.37)
(63.37-1.46965)(70.56)(4.10) Ft= 1.47693
F2 =
(70.56)(4.10)+(132.08)(3.4)
= 24.3741 kN
(63.37-1.46965)(132.08)(3.4)
F1 =
(70.56)(4.10)+(117.60)(3.4)
= 37.8358 kN

To Check:
V = 24.37 + 37.84 + 1.47693
= 63.69 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
SEISMIC ANALYSIS
Framing @ 1 (DEAD LOAD) Framing @ 2

Weight per level: Weight per lev


W2 = (9.51)(5)(3)
= 142.65 kN
W1 = (11.97)(5)(3) + 59.25 + 5.04(2.95) + 4.07(2.05) + 4.07(2.05) + 5.85(2.95) + 49.43
= 337.04 kN
Wt = 142.65 + 337.041
= 479.69 kN
BASE SHEAR: BASE SHEAR
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(479.69)
V =
(3.5)(.33129)
V = 317.72 kN
2.5(0.44)(1.0)(1.0)(479.69)

3.50
≤ 150.76 kN = 0
> 0.11(0.44)(1.0)(1.0)(479.69)
> 23.22 kN = 1
(0.8)(0.4)(1.20)(1.0)(479.69)
>
3.50
> 52.63 kN = 1

Therefore, use V = 150.76 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx =
∑Wi hi Ft= 0.07(.33129)(87.38)
(150.76-2.94935)(142.65)(4.10) Ft= 3.49621
F2 =
(142.65)(4.10)+(337.041)(3.4)
= 49.7627 kN
(127.18-2.18975)(337.041)(3.4)
F1 =
(142.65)(4.10)+(337.041)(3.4)
= 97.5011 kN

To Check:
V = 49.76 + 97.5 + 3.49621
= 150.76 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
SEISMIC ANALYSIS
Framing @ B (DEAD LOAD) Framing @ C (DE

Weight per level: Weight per level:


W2 = (14.81)(4)+(1.88)(2)+(14.81)(4)
= 122.24 kN
W1 = (8.19)(4)+(5.85)(2)+(27.83)(4)
= 155.78 kN
Wt = 122.24 + 155.78
= 278.02 kN
BASE SHEAR: BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(278.02)
V =
(3.5)(.33129)
V = 184.14 kN
2.5(0.44)(1.0)(1.0)(278.02)

3.50
≤ 87.38 kN = 0
> 0.11(0.44)(1.0)(1.0)(278.02)
> 13.46 kN = 1
(0.8)(0.4)(1.20)(1.0)(278.02)
>
3.50
> 30.50 kN = 1

Therefore, use V = 87.38 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx =
∑Wi hi Ft= 0.07(.33129)(87.38)
(87.38-2.02634)(122.24)(4.10) Ft= 2.02634
F2 =
(122.24)(4.10)+(155.78)(3.4)
= 41.4971 kN
(87.38-2.02634)(155.78)(3.4)
F1 =
(122.24)(4.10)+(155.78)(3.4)
= 43.8542 kN

To Check:
V = 41.5 + 43.85 + 2.02634
= 87.38 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
SEISMIC ANALYSIS
Framing @ 2 (DEAD LOAD) Framing @ 3 (DEA

Weight per level: Weight per level:


W2 = (14.36)(5)(3)
= 215.40 kN
W1 = (1.88)(5)(2) + 8.58(5) + 10.08(2.95) + 8.13(2.05)(2) + 79.15 +10.89(2.95) + 69.33
= 305.37 kN
Wt = 215.40 + 305.37
= 520.77 kN
BASE SHEAR: BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(520.77)
V =
(3.5)(.33129)
V = 344.93 kN
2.5(0.44)(1.0)(1.0)(520.77)

3.50
≤ 163.67 kN = 0
> 0.11(0.44)(1.0)(1.0)(520.77)
> 25.21 kN = 1
(0.8)(0.4)(1.20)(1.0)(520.77)
>
3.50
> 57.14 kN = 1

Therefore, use V = 163.67 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx =
∑Wi hi Ft= 0.07(.33129)(87.38)
(163.67-3.79561)(215.40)(4.10) Ft= 3.79561
F2 =
(215.40)(4.10)+(305.37)(3.4)
= 73.484 kN
(163.67-3.79561)(305.37)(3.4)
F1 =
(215.40)(4.10)+(305.37)(3.4)
= 86.391 kN

To Check:
V = 73.48 + 86.39 + 3.79561
= 163.67 kN
me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T. Abr
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSCE-5
SEISMIC ANALYSIS
Framing @ C (DEAD LOAD) Framing @ D (DEAD L

Weight per level: Weight per level:


W2 = (14.81)(4)+(1.88)(2)+(14.81)(4)
= 122.24 kN
W1 = (8.19)(4)+22.42+(5.85)(2)+(27.83)(4)
= 178.20 kN
Wt = 122.24 + 178.20
= 300.44 kN
BASE SHEAR: BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W V
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(300.44)
V = V
(3.5)(.33129)
V = 198.99 kN V
2.5(0.44)(1.0)(1.0)(300.44)

3.50
≤ 94.42 kN = 0
> 0.11(0.44)(1.0)(1.0)(300.44)
> 14.54 kN = 1
(0.8)(0.4)(1.20)(1.0)(300.44)
>
3.50
> 32.96 kN = 1

Therefore, use V = 94.42 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx = Fx
∑Wi hi Ft= 0.07(.33129)(87.38)
(94.42-2.18975)(122.24)(4.10) Ft= 2.18975
F2 = F2
(122.24)(4.10)+(178.20)(3.4)
= 41.7558 kN
(94.42-2.18975)(178.20)(3.4)
F1 = F1
(122.24)(4.10)+(178.20)(3.4)
= 50.4785 kN

To Check: To Check:
V = 41.76 + 50.48 + 2.18975
= 94.42 kN

me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T. Abr
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSCE-5
SEISMIC ANALYSIS
Framing @ 3 (DEAD LOAD) Framing @ 4 (DEAD L

Weight per level: Weight per level:


W2 = (14.36)(5)(3)
= 215.40 kN
W1 = (21.33)(5)(2) + 27.28(5) + 5.04(2.95)(2) + 4.06(2.05)(2) + 19.90(2)
= 435.88 kN
Wt = 215.40 + 435.88
= 651.28 kN
BASE SHEAR: BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W V
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(651.28)
V = V
(3.5)(.33129)
V = 431.37 kN V
2.5(0.44)(1.0)(1.0)(651.28)

3.50
≤ 204.69 kN = 0
> 0.11(0.44)(1.0)(1.0)(651.28)
> 31.52 kN = 1
(0.8)(0.4)(1.20)(1.0)(651.28)
>
3.50
> 71.45 kN = 1

Therefore, use V = 204.69 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx = Fx
∑Wi hi Ft= 0.07(.33129)(87.38)
(204.69-4.74685)(215.40)(4.10) Ft= 4.74685
F2 = F2
(215.40)(4.10)+(435.88)(3.4)
= 74.658 kN
(204.69-4.74685)(435.88)(3.4)
F1 = F1
(215.40)(4.10)+(435.88)(3.4)
= 125.284 kN

To Check: To Check:
V = 74.66 + 125.3 + 4.74685
= 204.69 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
SEISMIC ANALYSIS
Framing @ D (DEAD LOAD)

Weight per level:


W2 = (8.35)(4)+(1.88)(2)+(8.35)(4)
= 70.56 kN
W1 = (11.97)(4)+32.51+3.97(4)+(15.93)(2)+(19.90)(4)
= 207.73 kN
Wt = 70.56+ 207.73
= 278.29 kN
BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
= W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(278.29)
=
(3.5)(.33129)
= 184.32 kN
2.5(0.44)(1.0)(1.0)(278.29)

3.50
≤ 87.46 kN = 0
> 0.11(0.44)(1.0)(1.0)(278.29)
> 13.47 kN = 1
(0.8)(0.4)(1.20)(1.0)(278.29)
>
3.50
> 30.53 kN = 1

Therefore, use V = 87.46 kN

(V - Ft) Wx hx Ft= 0.07TV


=
∑Wi hi Ft= 0.07(.33129)(87.38)
(87.46-2.02831)(70.56)(4.10) Ft= 2.02831
=
(70.56)(4.10)+(207.73)(3.4)
= 24.8256 kN
(94.42-2.18975)(207.73)(3.4)
=
(70.56)(4.10)+(207.73)(3.4)
= 60.6087 kN

To Check:
V = 24.83 + 60.61 + 2.02831
= 87.46 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
SEISMIC ANALYSIS
Framing @ 4 (DEAD LOAD)

Weight per level:


W2 = (9.51)(5)(3)
= 142.65 kN
W1 = (21.33)(5)(3)
= 319.95 kN
Wt = 142.65 + 319.95
= 462.60 kN
BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
= W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(462.60)
=
(3.5)(.33129)
= 306.40 kN
2.5(0.44)(1.0)(1.0)(462.60)

3.50
≤ 145.39 kN = 0
> 0.11(0.44)(1.0)(1.0)(462.60)
> 22.39 kN = 1
(0.8)(0.4)(1.20)(1.0)(462.60)
>
3.50
> 50.75 kN = 1

Therefore, use V = 145.39 kN

(V - Ft) Wx hx Ft= 0.07TV


=
∑Wi hi Ft= 0.07(.33129)(87.38)
(145.39-3.37164)(142.65)(4.10) Ft= 3.37164
=
(142.65)(4.10)+(319.95)(3.4)
= 49.6568 kN
(145.39-3.37164)(319.95)(3.4)
=
(142.65)(4.10)+(319.95)(3.4)
= 92.3601 kN

To Check:
V = 49.66 + 92.36 + 3.37164
= 145.39 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ A
Height of upper level = 4.10 m
Height of lower level = 4.40 m

24.37 kN
I J K L
2.05 m

a a
2.05 m
37.84 kN
E F G H

2.20 m
b b
2.20 m
A B C D

4.00 m 2.00 m 4.00 m


At section a-a
24.37 kN
I J K L
2.05 m

a a

2m

5m 5m

EI
FJ

GK
HL
F = Mc I = 2(1 + 5 )
2 2
M = 24.37 x 2.05
I I = 52.00 m2 M = 49.9585 kN-m

For E-I and H-L For F-Jand G-K


F= 4.80370192 kN F= 0.96074038 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ A

At section b-b
24.37 kN
24.37 kN
I J K L
2.05 m

a a
2.05 m
37.84 kN
E F G H
2.20 m
b b

2m

5m 5m

AE

BF

CG

DH

F = Mc I = 2(12 + 52) M = (24.37 x 6.30) + (37.84 x 2.20)


I I = 52.00 m2 M = 236.779 kN-m

For A-E and D-H For B-F and C-G

F= 22.7672115 kN F= 4.55344231 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ B
Height of upper level = 4.10 m
Height of lower level = 4.40 m

41.50 kN
I J K L
2.05 m

a a
2.05 m
43.85 kN
E F G H

2.20 m
b b
2.20 m
A B C D

4.00 m 2.00 m 4.00 m


At section a-a
41.50 kN
I J K L
2.05 m

a a

2m

5m 5m

EI
FJ

GK
HL
F = Mc I = 2(1 + 5 )
2 2
M = 41.5 x 2.05
I I = 52.00 m2 M = 85.075 kN-m

For E-I and H-L For F-Jand G-K


F= 8.18028846 kN F= 1.63605769 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ B

At section b-b
41.5 kN
41.5 kN
I J K L
2.05 m

a a
2.05 m
43.85 kN
E F G H
2.20 m
b b

2m

5m 5m

AE

BF

CG

DH

F = Mc I = 2(12 + 52) M = (41.50 x 6.30) + (43.85 x 2.20)


I I = 52.00 m2 M = 357.92 kN-m

For A-E and D-H For B-F and C-G

F= 34.4153846 kN F= 6.88307692 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ C
Height of upper level = 4.10 m Height of upp
Height of lower level = 4.40 m Height of lowe

41.76 kN
I J K L
2.05 m

a a
2.05 m
50.48 kN
E F G H

2.20 m
b b
2.20 m
A B C D

4.00 m 2.00 m 4.00 m


At section a-a
41.76 kN
I J K L
2.05 m

a a

2m

5m 5m

EI
FJ

GK
HL
F = Mc I = 2(1 + 5 )
2 2
M = 41.76 x 2.05
I I = 52.00 m2 M = 85.608 kN-m

For E-I and H-L For F-Jand G-K


F= 8.23153846 kN F= 1.64630769 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ C

At section b-b
41.76 kN
41.76 kN
I J K L
2.05 m

a a
2.05 m
50.48 kN
E F G H
2.20 m
b b

2m

5m 5m

AE

BF

CG

DH

F = Mc I = 2(12 + 52) M = (41.76 x 6.30) + (50.48 x 2.20)


I I = 52.00 m2 M = 374.144 kN-m

For A-E and D-H For B-F and C-G

F= 35.9753846 kN F= 7.19507692 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ D
Height of upper level = 4.10 m
Height of lower level = 4.40 m

24.83 kN
I J K L
2.05 m

a a
2.05 m
60.61 kN
E F G H

2.20 m
b b
2.20 m
A B C D

4.00 m 2.00 m 4.00 m


At section a-a
24.83 kN
I J K L
2.05 m

a a

2m

5m 5m

EI
FJ

GK
HL
F = Mc I = 2(1 + 5 )
2 2
M = 24.80 x 2.05
I I = 52.00 m2 M = 50.9015 kN-m

For E-I and H-L For F-Jand G-K


F= 4.894375 kN F= 0.978875 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ D

At section b-b
24.83 kN
24.83 kN
I J K L
2.05 m

a a
2.05 m
60.61 kN
E F G H
2.20 m
b b

2m

5m 5m

AE

BF

CG

DH

F = Mc I = 2(12 + 52) M = (24.80 x 6.30) + (60.61 x 2.20)


I I = 52.00 m2 M = 289.771 kN-m

For A-E and D-H For B-F and C-G

F= 27.8625962 kN F= 5.57251923 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ A

` `
24.37 19.68 12.19 4.69

4.10
4.80 0.96 0.96 4.80

37.84 30.56 18.92 7.28

22.77 4.55 4.55 22.77 4.40

4.00 2.00 4.00

24.37 4.80 5.76 4.80

4.1
4.69 7.50 7.50 4.69

37.84 17.96 21.56 17.96

11.96 19.14 19.14 11.96 4.4

4.0 2.0 4.0

9.61 5.76 9.61


18.22 M N O P

4.1
9.61 15.37 15.37 9.61

35.93 21.56 35.93


36.24 I J K L

26.32 42.11 42.11 26.32 4.4

A B C D
4.0 2.0 4.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ B

`
41.50 33.52 20.75 7.98

4.10
8.18 1.64 1.64 8.18

43.85 35.42 21.93 8.43

34.42 6.88 6.88 34.42 4.40

4.00 2.00 4.00

41.50 8.18 9.82 8.18

4.1
7.98 12.77 12.77 7.98

43.85 26.24 31.48 26.24

16.41 26.26 26.26 16.41 4.4

4.0 2.0 4.0

41.50 16.36 9.82 16.36


M N O P

4.1
16.36 26.18 26.18 16.36

43.85 52.47 31.48 52.47


I J K L

36.11 57.78 57.78 36.11 4.4

A B C D
4.0 2.0 4.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T.
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ C

`
41.76 33.73 20.88 8.03

4.10
8.23 1.65 1.65 8.23

50.48 40.77 25.24 9.71

35.98 7.20 7.20 35.98 4.40

4.00 2.00 4.00

41.76 8.23 9.88 8.23

4.1
8.03 12.85 12.85 8.03

50.48 27.74 33.29 27.74

17.74 28.38 28.38 17.74 4.4

4.0 2.0 4.0

41.76 16.46 9.88 16.46


M N O P

4.1
16.46 26.34 26.34 16.46

50.48 55.49 33.29 55.49


I J K L

39.02 62.44 62.44 39.02 4.4

A B C D
4.0 2.0 4.0
me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ D

24.83 20.06 12.42 4.78

4.10
4.89 0.98 0.98 4.89

60.61 48.95 30.31 11.66

27.86 5.57 5.57 27.86 4.40

4.00 2.00 4.00

24.83 4.89 5.87 4.89

4.1
4.78 7.64 7.64 4.78

60.61 22.97 27.56 22.97

16.43 26.29 26.29 16.43 4.4

4.0 2.0 4.0

24.83 9.79 5.87 9.79


M N O P

4.1
9.79 15.66 15.66 9.79

60.61 45.94 27.56 45.94


I J K L

36.15 57.84 57.84 36.15 4.4

A B C D
4.0 2.0 4.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ 1
Height of upper level = 4.10 m
Height of lower level = 4.40 m

49.7627 kN
I J K L
2.05 m

a a
2.05 m
97.50 kN
E F G H
2.20 m

b b
2.20 m
A B C D

5.00 m 5.00 m 5.00 m


At section a-a
I J K L
49.7627 kN
2.05 m

a a

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL
F = Mc I = 2(2.5 + 7.5 )
2 2
M = 49.76 x 2.05
I I = 125.00 m2 M = 102.013 kN-m

For E-I and H-L For F-J and G-K


F= 6.12080875 kN F= 2.04026958 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ 1

At section b-b
49.7627 kN
49.7627 kN
I J K L
2.05 m

a a
2.05 m
97.50 kN
E F G H
2.20 m

b b

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL

F = Mc I = 2(2.52 + 7.52) M = (49.763*6.30)+(97.50 x 2.20)


I I = 125.00 m2 M = 528.007 kN-m

For E-I and H-L For F-J and G-K


F= 31.6804415 kN F= 10.5601472 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ 2
Height of upper level = 4.10 m
Height of lower level = 4.40 m

73.484 kN 74.658
I J K L
2.05 m

a a
2.05 m
86.39 kN 125.28
E F G H
2.20 m

b b
2.20 m
A B C D

5.00 m 5.00 m 5.00 m


At section a-a At section a-a
I J K L
73.484 kN 74.658
2.05 m

a a

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL
F = Mc I = 2(2.5 + 7.5 )
2 2
M = 73.48 x 2.05
I I = 125.00 m2 M = 150.642 kN-m

For E-I and H-L For F-J and G-K


F= 9.03852943 kN F= 3.01284314 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ 2

At section b-b At section b-b


73.484 kN 74.658
73.484 kN 74.658
I J K L
2.05 m

a a
2.05 m
86.39 kN 125.28
E F G H
2.20 m

b b

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL

F = Mc I = 2(2.52 + 7.52) M = (73.48*6.30)+(86.39 x 2.20)


I I = 125.00 m2 M = 653.009 kN-m

For E-I and H-L For F-J and G-K


F= 39.1805533 kN F= 13.0601844 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ 3
Height of upper level = 4.10 m Height of upp
Height of lower level = 4.40 m Height of lowe

74.658 kN 49.6568
I J K L
2.05 m

a a
2.05 m
125.28 kN 92.36
E F G H
2.20 m

b b
2.20 m
A B C D

5.00 m 5.00 m 5.00 m


At section a-a At section a-a
I J K L
74.658 kN 49.6568
2.05 m

a a

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL
F = Mc I = 2(2.5 + 7.5 )
2 2
M = 74.658 x 2.05
I I = 125.00 m2 M = 153.049 kN-m

For E-I and H-L For F-J and G-K


F= 9.1829368 kN F= 3.06097893 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ 3

At section b-b At section b-b


74.658 kN 49.6568
74.658 kN 49.6568
I J K L
2.05 m

a a
2.05 m
125.28 kN 92.36
E F G H
2.20 m

b b

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL

F = Mc I = 2(2.52 + 7.52) M = (74.658*6.30)+(125.28 x 2.20)


I I = 125.00 m2 M = 745.97 kN-m

For E-I and H-L For F-J and G-K


F= 44.758189 kN F= 14.9193963 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ 4
Height of upper level = 4.10 m
Height of lower level = 4.40 m

kN
I J K L
2.05 m

a a
2.05 m
kN
E F G H
2.20 m

b b
2.20 m
A B C D

5.00 m 5.00 m 5.00 m


At section a-a
I J K L
kN
2.05 m

a a

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL
F = Mc I = 2(2.5 + 7.5 )
2 2
M = 49.657 x 2.05
I I = 125.00 m2 M = 101.797 kN-m

For E-I and H-L For F-J and G-K


F= 6.10779004 kN F= 2.03593001 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ 4

At section b-b
kN
kN
I J K L
2.05 m

a a
2.05 m
kN
E F G H
2.20 m

b b

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL

F = Mc I = 2(2.52 + 7.52) M = (49.657*6.30)+(92.36 x 2.20)


I I = 125.00 m2 M = 516.03 kN-m

For E-I and H-L For F-J and G-K


F= 30.9618146 kN F= 10.3206049 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ 1

`
49.76 42.30 24.88 7.46

4.1
6.12 2.04 2.04 6.12

97.50 82.88 48.75 14.63

31.68 10.56 10.56 31.68 4.4

5.0 5.0 5.0

49.76 6.12 8.16 6.12

4.1
7.46 17.42 17.42 7.46

97.50 25.56 34.08 25.56

22.09 51.54 51.54 22.09 4.4

5.0 5.0 5.0

15.30 20.40 15.30


49.76 M N O P

4.1
15.30 35.70 35.70 15.30

63.90 85.20 63.90


97.50 I J K L

48.60 113.39 113.39 48.60 4.4

A B C D
5.0 5.0 5.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ 2

` `
73.48 62.46 36.74 11.02

4.1
9.04 3.01 3.01 9.04

86.39 73.43 43.20 12.96

39.18 13.06 13.06 39.18 4.4

5.0 5.0 5.0

73.48 9.04 12.05 9.04

4.1
11.02 25.72 25.72 11.02

86.39 30.14 40.19 30.14

23.98 55.96 55.96 23.98 4.4

5.0 5.0 5.0

22.60 30.13 22.60


73.48 M N O P

4.1
22.60 52.72 52.72 22.60

75.36 100.47 75.36


86.39 I J K L

52.76 123.10 123.10 52.76 4.4

A B C D
5.0 5.0 5.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ 3

`
74.66 63.46 37.33 11.20

4.1
9.18 3.06 3.06 9.18

125.28 106.49 62.64 18.79

44.76 14.92 14.92 44.76 4.4

5.0 5.0 5.0

74.66 9.18 12.24 9.18

4.1
11.20 26.13 26.13 11.20

125.28 35.58 47.43 35.58

29.99 69.98 69.98 29.99 4.4

5.0 5.0 5.0

22.96 30.61 22.96


74.66 M N O P

4.1
22.96 53.57 53.57 22.96

88.94 118.58 88.94


125.28 I J K L

65.98 153.96 153.96 65.98 4.4

A B C D
5.0 5.0 5.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ 4

49.66 42.21 24.83 7.45

4.1
6.11 2.04 2.04 6.11

92.36 78.51 46.18 13.85

30.96 10.32 10.32 30.96 4.4

5.0 5.0 5.0

49.66 6.11 8.14 6.11

4.1
7.45 17.38 17.38 7.45

92.36 24.85 33.14 24.85

21.30 49.71 49.71 21.30 4.4

5.0 5.0 5.0

15.27 20.36 15.27


49.66 M N O P

4.1
15.27 35.63 35.63 15.27

62.14 82.85 62.14


92.36 I J K L

46.87 109.35 109.35 46.87 4.4

A B C D
5.0 5.0 5.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
STRUCTURAL ANALYSIS OF LIVE LOADS @ "A"

At Joint E At Joint K
KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00027 DFEF= 0.23 FEMEF= 0 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -0.42
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 3.38
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 3.06 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= 0
KGH= 0.00027 DFGH= 0.16 FEMGH= 0
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 3.38 KPO= 0.00027 DFPO= 0.62 FEMPO= -3.38
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -3.38 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 0 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -3.38
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -3.06 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 0.42 KHG= 0.00027 DFHG= 0.23 FEMHG= 0
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= 0
KFG= 0.00053 DFFG= 0.32 FEMFG= 0
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O
KON= 0.00053 DFON= 0.55 FEMON= 0
KOP= 0.00027 DFOP= 0.28 FEMOP= 3.38
KOK= 0.00016 DFOK= 0.17 FEMOK= 0

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
STRUCTURAL ANALYSIS OF LIVE LOADS @ "1"

At Joint E At Joint K
KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00027 DFEF= 0.23 FEMEF= 0 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= 0
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 15.11
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 12.24 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= 7.52
KGH= 0.00027 DFGH= 0.16 FEMGH= 0
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 6.23 KPO= 0.00027 DFPO= 0.62 FEMPO= -6.23
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -6.23 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 6.23 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -11.16
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -16.46 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 0 KHG= 0.00027 DFHG= 0.23 FEMHG= 0
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= 0
KFG= 0.00053 DFFG= 0.32 FEMFG= 3.22
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O
KON= 0.00053 DFON= 0.55 FEMON= -6.23
KOP= 0.00027 DFOP= 0.28 FEMOP= 6.23
KOK= 0.00016 DFOK= 0.17 FEMOK= 0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
STRUCTURAL ANALYSIS OF LIVE LOADS @ "B"

At Joint E At Joint K At Joint E


KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00027 DFEF= 0.23 FEMEF= 0 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -1.07
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 6.76
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 5.99 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= 0
KGH= 0.00027 DFGH= 0.16 FEMGH= 0
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 6.76 KPO= 0.00027 DFPO= 0.62 FEMPO= -6.76
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -6.76 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 0 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -6.76
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -5.99 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 1.07 KHG= 0.00027 DFHG= 0.23 FEMHG= 0
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= 0
KFG= 0.00053 DFFG= 0.32 FEMFG= 0
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O At Joint O
KON= 0.00053 DFON= 0.55 FEMON= 0
KOP= 0.00027 DFOP= 0.28 FEMOP= 6.76
KOK= 0.00016 DFOK= 0.17 FEMOK= 0

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
STRUCTURAL ANALYSIS OF LIVE LOADS @ "2"

At Joint E At Joint K At Joint E


KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00027 DFEF= 0.23 FEMEF= 0 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -10.00
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 22.86
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 19.34 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= 1.73
KGH= 0.00027 DFGH= 0.16 FEMGH= 0
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 10.19 KPO= 0.00027 DFPO= 0.62 FEMPO= -10.19
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -10.19 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 10.19 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -17.40
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -25.52 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 10.00 KHG= 0.00027 DFHG= 0.23 FEMHG= 0
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= 0
KFG= 0.00053 DFFG= 0.32 FEMFG= 0.74
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O At Joint O
KON= 0.00053 DFON= 0.55 FEMON= -10.19
KOP= 0.00027 DFOP= 0.28 FEMOP= 10.19
KOK= 0.00016 DFOK= 0.17 FEMOK= 0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T.
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
STRUCTURAL ANALYSIS OF LIVE LOADS @ "C"

At Joint E At Joint K At Joint E


KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0 KEA=
KEF= 0.00027 DFEF= 0.23 FEMEF= 0 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -1.07 KEF=
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 6.76 KEI=
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G KIE=
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 14.98 KGK= 0.00020 DFGK= 0.12 FEMGK= 0 KIJ=
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= 0 KIM=
KGH= 0.00027 DFGH= 0.16 FEMGH= 0
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P KMI=
KMN= 0.00027 DFMN= 0.62 FEMMN= 6.76 KPO= 0.00027 DFPO= 0.62 FEMPO= -6.76 KMN=
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -6.76 At Joint L KNM=
KNO= 0.00053 DFNO= 0.55 FEMNO= 0 KLP= 0.00016 DFLP= 0.26 FEMLP= 0 KNO=
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -6.76 KNJ=
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H KJN=
KJI= 0.00027 DFJI= 0.23 FEMJI= -12.23 KHL= 0.00020 DFHL= 0.17 FEMHL= 0 KJI=
KJK= 0.00053 DFJK= 0.46 FEMJK= 1.07 KHG= 0.00027 DFHG= 0.23 FEMHG= 0 KJK=
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0 KJF=

At Joint F At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0 KFJ=
KFE= 0.00027 DFFE= 0.16 FEMFE= 0 KFE=
KFG= 0.00053 DFFG= 0.32 FEMFG= 0 KFG=
KFB= 0.00068 DFFB= 0.40 FEMFB= 0 KFB=

At Joint O At Joint O
KON= 0.00053 DFON= 0.55 FEMON= 0 KON=
KOP= 0.00027 DFOP= 0.28 FEMOP= 6.76 KOP=
KOK= 0.00016 DFOK= 0.17 FEMOK= 0 KOK=

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T.
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
STRUCTURAL ANALYSIS OF LIVE LOADS @ "3"

At Joint E At Joint K At Joint E


KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0 KEA=
KEF= 0.00027 DFEF= 0.23 FEMEF= 0 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -16.23 KEF=
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 14.64 KEI=
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G KIE=
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 13.33 KGK= 0.00020 DFGK= 0.12 FEMGK= 0 KIJ=
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= 0 KIM=
KGH= 0.00027 DFGH= 0.16 FEMGH= 0
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P KMI=
KMN= 0.00027 DFMN= 0.62 FEMMN= 10.19 KPO= 0.00027 DFPO= 0.62 FEMPO= -10.19 KMN=
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -10.19 At Joint L KNM=
KNO= 0.00053 DFNO= 0.55 FEMNO= 10.19 KLP= 0.00016 DFLP= 0.26 FEMLP= 0 KNO=
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -12.45 KNJ=
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H KJN=
KJI= 0.00027 DFJI= 0.23 FEMJI= -15.28 KHL= 0.00020 DFHL= 0.17 FEMHL= 0 KJI=
KJK= 0.00053 DFJK= 0.46 FEMJK= 16.23 KHG= 0.00027 DFHG= 0.23 FEMHG= 0 KJK=
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0 KJF=

At Joint F At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0 KFJ=
KFE= 0.00027 DFFE= 0.16 FEMFE= 0 KFE=
KFG= 0.00053 DFFG= 0.32 FEMFG= 0 KFG=
KFB= 0.00068 DFFB= 0.40 FEMFB= 0 KFB=

At Joint O At Joint O
KON= 0.00053 DFON= 0.55 FEMON= -10.19 KON=
KOP= 0.00027 DFOP= 0.28 FEMOP= 10.19 KOP=
KOK= 0.00016 DFOK= 0.17 FEMOK= 0 KOK=
me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF LIVE LOADS @ "D"

At Joint E At Joint K
KEA= 0.00068 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00027 DFEF= 0.23 FEMEF= 0 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -0.53
KEI= 0.00020 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 3.38
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 5.12 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= 0
KGH= 0.00027 DFGH= 0.16 FEMGH= 0
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 3.38 KPO= 0.00027 DFPO= 0.62 FEMPO= -3.38
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -3.38 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 0 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -3.38
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -5.12 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 0.53 KHG= 0.00027 DFHG= 0.23 FEMHG= 0
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= 0
KFG= 0.00053 DFFG= 0.32 FEMFG= 0
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O
KON= 0.00053 DFON= 0.55 FEMON= 0
KOP= 0.00027 DFOP= 0.28 FEMOP= 3.38
KOK= 0.00016 DFOK= 0.17 FEMOK= 0

me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF LIVE LOADS @ "4"

At Joint E At Joint K
KEA= 0.00000 DFEA= 0.59 FEMEA= 0 KKO= 0.00016 DFKO= 0.14 FEMKO= 0
KEF= 0.00000 DFEF= 0.23 FEMEF= 0 KKJ= 0.00053 DFKJ= 0.46 FEMKJ= -6.23
KEI= 0.00000 DFEI= 0.17 FEMEI= 0 KKL= 0.00027 DFKL= 0.23 FEMKL= 6.23
KKG= 0.00020 DFKG= 0.17 FEMKG= 0
At Joint I
KIE= 0.00020 DFIE= 0.32 FEMIE= 0 At Joint G
KIJ= 0.00027 DFIJ= 0.42 FEMIJ= 6.23 KGK= 0.00020 DFGK= 0.12 FEMGK= 0
KIM= 0.00016 DFIM= 0.26 FEMIM= 0 KGF= 0.00053 DFGF= 0.32 FEMGF= 0
KGH= 0.00027 DFGH= 0.16 FEMGH= 0
KGC= 0.00068 DFGC= 0.40 FEMGC= 0
At Joint M
KMI= 0.00016 DFMI= 0.38 FEMMI= 0 At Joint P
KMN= 0.00027 DFMN= 0.62 FEMMN= 6.23 KPO= 0.00027 DFPO= 0.62 FEMPO= -6.23
KPL= 0.00016 DFPL= 0.38 FEMPL= 0
At Joint N
KNM= 0.00027 DFNM= 0.28 FEMNM= -6.23 At Joint L
KNO= 0.00053 DFNO= 0.55 FEMNO= 6.23 KLP= 0.00016 DFLP= 0.26 FEMLP= 0
KNJ= 0.00016 DFNJ= 0.17 FEMNJ= 0 KLK= 0.00027 DFLK= 0.42 FEMLK= -6.23
KLH= 0.00020 DFLH= 0.32 FEMLH= 0
At Joint J
KJN= 0.00016 DFJN= 0.14 FEMJN= 0 At Joint H
KJI= 0.00027 DFJI= 0.23 FEMJI= -6.23 KHL= 0.00020 DFHL= 0.17 FEMHL= 0
KJK= 0.00053 DFJK= 0.46 FEMJK= 6.23 KHG= 0.00027 DFHG= 0.23 FEMHG= 0
KJF= 0.00020 DFJF= 0.17 FEMJF= 0 KHD= 0.00068 DFHD= 0.59 FEMHD= 0

At Joint F
KFJ= 0.00020 DFFJ= 0.12 FEMFJ= 0
KFE= 0.00027 DFFE= 0.16 FEMFE= 0
KFG= 0.00053 DFFG= 0.32 FEMFG= 0
KFB= 0.00068 DFFB= 0.40 FEMFB= 0

At Joint O
KON= 0.00053 DFON= 0.55 FEMON= -6.23
KOP= 0.00027 DFOP= 0.28 FEMOP= 6.23
KOK= 0.00016 DFOK= 0.17 FEMOK= 0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
STRUCTURAL ANALYSIS OF LIVE LOADS @ "A"

JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00027 0.00020 0.00020 0.00027 0.00016 0.00016 0.00027 0.00027 0.00053 0.00016 0.00016 0.00027 0.00053 0.00020
DF 0.00 0.59 0.23 0.17 0.32 0.42 0.26 0.38 0.62 0.28 0.55 0.17 0.14 0.23 0.46 0.17
FEM 0.00 0.00 0.00 0.00 0.00 3.06 0.00 0.00 3.38 -3.38 0.00 0.00 0.00 -3.06 0.42 0.00
BJ'S 0.00 0.00 0.00 0.00 -0.96 -1.30 -0.80 -1.29 -2.09 0.93 1.87 0.58 0.37 0.60 1.21 0.45
COM 0.00 0.00 0.00 -0.48 0.00 0.30 -0.64 -0.40 0.47 -1.04 -0.93 0.19 0.29 -0.65 -0.68 0.00
BJ'S 0.00 0.29 0.11 0.08 0.11 0.14 0.09 -0.03 -0.04 0.50 0.99 0.31 0.15 0.24 0.48 0.18
COM 0.14 0.00 -0.02 0.05 0.04 0.12 -0.01 0.04 0.25 -0.02 -0.49 0.07 0.15 0.07 -0.24 -0.01
BJ'S 0.00 -0.02 -0.01 -0.01 -0.05 -0.06 -0.04 -0.11 -0.18 0.12 0.24 0.07 0.00 0.01 0.01 0.00
FM 0.14 0.26 0.09 -0.35 -0.86 2.27 -1.41 -1.78 1.78 -2.89 1.68 1.22 0.96 -2.79 1.20 0.62

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00027 0.00053 0.00068 0.00000 0.00053 0.00027 0.00016 0.00016 0.00053 0.00027 0.00020 0.00020 0.00053 0.00027 0.00068
DF 0.12 0.16 0.32 0.40 0.00 0.55 0.28 0.17 0.14 0.46 0.23 0.17 0.12 0.32 0.16 0.40
FEM 0.00 0.00 0.00 0.00 0.00 0.00 3.38 0.00 0.00 -0.42 3.38 0.00 0.00 0.00 0.00 0.00
BJ'S 0.00 0.00 0.00 0.00 0.00 -1.87 -0.93 -0.58 -0.42 -1.36 -0.68 -0.50 0.00 0.00 0.00 0.00
COM 0.23 0.00 0.00 0.00 0.00 0.93 1.04 -0.21 -0.29 0.60 0.72 0.00 -0.25 0.00 0.00 0.00
BJ'S -0.03 -0.04 -0.07 -0.09 -0.98 -0.49 -0.30 -0.15 -0.47 -0.24 -0.18 0.03 0.08 0.04 0.10
COM 0.09 0.06 0.04 0.00 -0.05 0.50 0.01 -0.07 -0.15 0.24 -0.06 0.01 -0.09 -0.04 -0.06 0.00
BJ'S -0.02 -0.03 -0.06 -0.07 -0.24 -0.12 -0.07 -0.01 -0.02 -0.01 -0.01 0.02 0.06 0.03 0.08
FM 0.26 -0.01 -0.09 -0.17 -0.05 -1.65 2.89 -1.23 -1.01 -1.42 3.11 -0.67 -0.29 0.10 0.01 0.18

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF LIVE LOADS @ "B"
JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00027 0.00020 0.00020 0.00027 0.00016 0.00016 0.00027 0.00027 0.00053 0.00016 0.00016 0.00027 0.00053 0.00020
DF 0.00 0.59 0.23 0.17 0.32 0.42 0.26 0.38 0.62 0.28 0.55 0.17 0.14 0.23 0.46 0.17
FEM 0.00 0.00 0.00 0.00 0.00 5.99 0.00 0.00 6.76 -6.76 0.00 0.00 0.00 -5.99 1.07 0.00
BJ'S 0.00 0.00 0.00 0.00 -1.89 -2.53 -1.56 -2.58 -4.18 1.87 3.74 1.15 0.70 1.13 2.26 0.84
COM 0.00 0.00 0.00 -0.94 0.00 0.56 -1.29 -0.78 0.93 -2.09 -1.87 0.35 0.58 -1.27 -1.30 0.00
BJ'S 0.00 0.56 0.22 0.16 0.23 0.31 0.19 -0.06 -0.09 1.00 1.99 0.62 0.28 0.46 0.91 0.34
COM 0.28 0.00 -0.03 0.11 0.08 0.23 -0.03 0.09 0.50 -0.05 -0.98 0.14 0.31 0.15 -0.45 -0.02
BJ'S 0.00 -0.05 -0.02 -0.01 -0.09 -0.12 -0.07 -0.23 -0.37 0.25 0.49 0.15 0.00 0.00 0.01 0.00
FM 0.28 0.51 0.17 -0.68 -1.66 4.43 -2.77 -3.55 3.55 -5.78 3.37 2.41 1.87 -5.51 2.49 1.16

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00027 0.00053 0.00068 0.00000 0.00053 0.00027 0.00016 0.00016 0.00053 0.00027 0.00020 0.00020 0.00053 0.00027 0.00068
DF 0.12 0.16 0.32 0.40 0.00 0.55 0.28 0.17 0.14 0.46 0.23 0.17 0.12 0.32 0.16 0.40
FEM 0.00 0.00 0.00 0.00 0.00 0.00 6.76 0.00 0.00 -1.07 6.76 0.00 0.00 0.00 0.00 0.00
BJ'S 0.00 0.00 0.00 0.00 0.00 -3.74 -1.87 -1.15 -0.81 -2.61 -1.30 -0.97 0.00 0.00 0.00 0.00
COM 0.42 0.00 0.00 0.00 0.00 1.87 2.09 -0.40 -0.58 1.13 1.43 0.00 -0.49 0.00 0.00 0.00
BJ'S -0.05 -0.07 -0.13 -0.17 0.00 -1.96 -0.98 -0.61 -0.28 -0.91 -0.45 -0.34 0.06 0.15 0.08 0.20
COM 0.17 0.11 0.08 0.00 -0.08 1.00 0.02 -0.14 -0.30 0.46 -0.13 0.03 -0.17 -0.07 -0.12 0.00
BJ'S -0.04 -0.06 -0.11 -0.14 0.00 -0.48 -0.24 -0.15 -0.01 -0.02 -0.01 -0.01 0.04 0.11 0.06 0.15
FM 0.50 -0.01 -0.17 -0.31 -0.08 -3.32 5.77 -2.45 -1.97 -3.02 6.28 -1.29 -0.55 0.20 0.01 0.34

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
STRUCTURAL ANALYSIS OF LIVE LOADS @ "C"

JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00027 0.00020 0.00020 0.00027 0.00016 0.00016 0.00027 0.00027 0.00053 0.00016 0.00016 0.00027 0.00053 0.00020
DF 0.00 0.59 0.23 0.17 0.32 0.42 0.26 0.38 0.62 0.28 0.55 0.17 0.14 0.23 0.46 0.17
FEM 0.00 0.00 0.00 0.00 0.00 14.98 0.00 0.00 6.76 -6.76 0.00 0.00 0.00 -12.23 1.07 0.00
BJ'S 0.00 0.00 0.00 0.00 -4.72 -6.34 -3.91 -2.58 -4.18 1.87 3.74 1.15 1.58 2.56 5.12 1.90
COM 0.00 0.00 0.00 -2.36 0.00 1.28 -1.29 -1.96 0.93 -2.09 -1.87 0.79 0.58 -3.17 -1.30 0.00
BJ'S 0.00 1.40 0.55 0.41 0.00 0.00 0.00 0.39 0.63 0.88 1.75 0.54 0.55 0.89 1.79 0.67
COM 0.70 0.00 -0.08 0.00 0.21 0.45 0.20 0.00 0.44 0.32 -0.28 0.28 0.27 0.00 -0.38 -0.06
BJ'S 0.00 0.04 0.02 0.01 -0.27 -0.36 -0.22 -0.17 -0.27 -0.09 -0.17 -0.05 0.02 0.04 0.08 0.03
FM 0.70 1.44 0.49 -1.93 -4.78 10.01 -5.23 -4.31 4.31 -5.87 3.17 2.70 3.00 -11.90 6.36 2.54

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00027 0.00053 0.00068 0.00000 0.00053 0.00027 0.00016 0.00016 0.00053 0.00027 0.00020 0.00020 0.00053 0.00027 0.00068
DF 0.12 0.16 0.32 0.40 0.00 0.55 0.28 0.17 0.14 0.46 0.23 0.17 0.12 0.32 0.16 0.40
FEM 0.00 0.00 0.00 0.00 0.00 0.00 6.76 0.00 0.00 -1.07 6.76 0.00 0.00 0.00 0.00 0.00
BJ'S 0.00 0.00 0.00 0.00 0.00 -3.74 -1.87 -1.15 -0.81 -2.61 -1.30 -0.97 0.00 0.00 0.00 0.00
COM 0.95 0.00 0.00 0.00 0.00 1.87 -0.47 -0.40 -0.58 2.56 -0.33 0.00 -0.49 0.00 0.00 0.00
BJ'S -0.11 -0.15 -0.30 -0.38 0.00 -0.55 -0.28 -0.17 -0.23 -0.76 -0.38 -0.28 0.06 0.15 0.08 0.20
COM 0.33 0.28 0.08 0.00 -0.19 0.88 -0.07 -0.12 -0.09 0.89 -0.09 0.03 -0.14 -0.15 0.02 0.05
BJ'S -0.08 -0.11 -0.22 -0.28 0.00 -0.38 -0.19 -0.12 -0.11 -0.34 -0.17 -0.13 0.03 0.07 0.04 0.09
FM 1.09 0.01 -0.44 -0.66 -0.19 -1.93 3.89 -1.96 -1.81 -1.32 4.48 -1.35 -0.54 0.07 0.13 0.34

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF LIVE LOADS @ "D"

JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00027 0.00020 0.00020 0.00027 0.00016 0.00016 0.00027 0.00027 0.00053 0.00016 0.00016 0.00027 0.00053 0.00020
DF 0.00 0.59 0.23 0.17 0.32 0.42 0.26 0.38 0.62 0.28 0.55 0.17 0.14 0.23 0.46 0.17
FEM 0.00 0.00 0.00 0.00 0.00 5.12 0.00 0.00 3.38 -3.38 0.00 0.00 0.00 -5.12 0.53 0.00
BJ'S 0.00 0.00 0.00 0.00 -1.61 -2.17 -1.34 -1.29 -2.09 0.93 1.87 0.58 0.65 1.05 2.10 0.78
COM 0.00 0.00 0.00 -0.81 0.00 0.53 -0.64 -0.67 0.47 -1.04 -0.93 0.32 0.29 -1.08 -0.65 0.00
BJ'S 0.00 0.48 0.19 0.14 0.04 0.05 0.03 0.08 0.13 0.46 0.91 0.28 0.21 0.33 0.66 0.25
COM 0.24 0.00 -0.03 0.02 0.07 0.17 0.04 0.02 0.23 0.06 -0.49 0.10 0.14 0.03 -0.34 -0.02
BJ'S 0.00 0.01 0.00 0.00 -0.09 -0.12 -0.07 -0.09 -0.15 0.09 0.18 0.06 0.03 0.04 0.09 0.03
FM 0.24 0.49 0.16 -0.65 -1.59 3.58 -1.99 -1.96 1.96 -2.88 1.54 1.34 1.31 -4.75 2.40 1.04

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00027 0.00053 0.00068 0.00000 0.00053 0.00027 0.00016 0.00016 0.00053 0.00027 0.00020 0.00020 0.00053 0.00027 0.00068
DF 0.12 0.16 0.32 0.40 0.00 0.55 0.28 0.17 0.14 0.46 0.23 0.17 0.12 0.32 0.16 0.40
FEM 0.00 0.00 0.00 0.00 0.00 0.00 3.38 0.00 0.00 -0.53 3.38 0.00 0.00 0.00 0.00 0.00
BJ'S 0.00 0.00 0.00 0.00 0.00 -1.87 -0.93 -0.58 -0.40 -1.30 -0.65 -0.49 0.00 0.00 0.00 0.00
COM 0.39 0.00 0.00 0.00 0.00 0.93 1.04 -0.20 -0.29 1.05 0.72 0.00 -0.24 0.00 0.00 0.00
BJ'S -0.05 -0.06 -0.12 -0.16 0.00 -0.98 -0.49 -0.30 -0.21 -0.68 -0.34 -0.25 0.03 0.08 0.04 0.10
COM 0.12 0.09 0.04 0.00 -0.08 0.46 0.01 -0.10 -0.15 0.33 -0.07 0.01 -0.13 -0.06 -0.06 0.00
BJ'S -0.03 -0.04 -0.08 -0.10 0.00 -0.20 -0.10 -0.06 -0.02 -0.06 -0.03 -0.02 0.03 0.08 0.04 0.10
FM 0.44 -0.01 -0.17 -0.26 -0.08 -1.66 2.91 -1.25 -1.07 -1.19 3.00 -0.75 -0.31 0.09 0.02 0.20
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
STRUCTURAL ANALYSIS OF LIVE LOADS

JOINTS C P L H D JOINTS
MEMBER CG PO PL LP LK LH HL HG HD DH MEMBER
K 0.00000 0.00027 0.00016 0.00016 0.00027 0.00020 0.00020 0.00027 0.00068 0.00000 K
DF 0.00 0.62 0.38 0.26 0.42 0.32 0.17 0.23 0.59 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS DF
FEM 0.00 -3.38 0.00 0.00 -3.38 0.00 0.00 0.00 0.00 0.00 OF LIVE LOADS @"A" FEM
BJ'S 0.00 2.09 1.29 0.88 1.43 1.06 0.00 0.00 0.00 0.00 BJ'S
COM 0.00 -0.47 0.44 0.64 -0.34 0.00 0.53 0.00 0.00 0.00 COM
BJ'S 0.00 0.02 0.01 -0.08 -0.13 -0.10 -0.09 -0.12 -0.32 0.00 BJ'S
COM 0.05 -0.24 -0.04 0.00 -0.12 -0.05 -0.05 0.02 0.00 -0.16 COM
BJ'S 0.00 0.18 0.11 0.04 0.07 0.05 0.00 0.01 0.02 0.00 BJ'S
FM 0.05 -1.81 1.81 1.49 -2.47 0.97 0.40 -0.10 -0.30 -0.16 FM

JOINTS
JOINTS C P L H D MEMBER
MEMBER CG PO PL LP LK LH HL HG HD DH K
K 0.00000 0.00027 0.00016 0.00016 0.00027 0.00020 0.00020 0.00027 0.00068 0.00000 DF
DF 0.00 0.62 0.38 0.26 0.42 0.32 0.17 0.23 0.59 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS FEM
FEM 0.00 -6.76 0.00 0.00 -6.76 0.00 0.00 0.00 0.00 0.00 OF LIVE LOADS @"B" BJ'S
BJ'S 0.00 4.18 2.58 1.77 2.86 2.13 0.00 0.00 0.00 0.00 COM
COM 0.00 -0.93 0.88 1.29 -0.65 0.00 1.06 0.00 0.00 0.00 BJ'S
BJ'S 0.00 0.03 0.02 -0.17 -0.27 -0.20 -0.19 -0.25 -0.63 0.00 COM
COM 0.10 -0.49 -0.08 0.01 -0.23 -0.09 -0.10 0.04 0.00 -0.32 BJ'S
BJ'S 0.00 0.36 0.22 0.08 0.13 0.10 0.01 0.01 0.04 0.00 FM
FM 0.10 -3.62 3.62 2.98 -4.91 1.93 0.79 -0.20 -0.59 -0.32

Name: John Fredr


Course & Section:
JOINTS
MEMBER
K
DF
FEM
BJ'S
COM
BJ'S
COM
BJ'S
FM

JOINTS
MEMBER
K
DF
FEM
BJ'S
COM
BJ'S
COM
BJ'S
FM

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
STRUCTURAL ANALYSIS OF LIVE LOADS

JOINTS C P L H D JOINTS
MEMBER CG PO PL LP LK LH HL HG HD DH MEMBER
K 0.00000 0.00027 0.00016 0.00016 0.00027 0.00020 0.00020 0.00027 0.00068 0.00000 K
DF 0.00 0.62 0.38 0.26 0.42 0.32 0.17 0.23 0.59 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS DF
FEM 0.00 -6.76 0.00 0.00 -6.76 0.00 0.00 0.00 0.00 0.00 OF LIVE LOADS @"C" FEM
BJ'S 0.00 4.18 2.58 1.77 2.86 2.13 0.00 0.00 0.00 0.00 BJ'S
COM 0.00 -0.93 0.88 1.29 -0.65 0.00 1.06 0.00 0.00 0.00 COM
BJ'S 0.00 0.03 0.02 -0.17 -0.27 -0.20 -0.19 -0.25 -0.63 0.00 BJ'S
COM 0.10 -0.14 -0.08 0.01 -0.19 -0.09 -0.10 0.04 0.00 -0.32 COM
BJ'S 0.00 0.14 0.08 0.07 0.12 0.09 0.01 0.01 0.04 0.00 BJ'S
FM 0.10 -3.48 3.48 2.97 -4.89 1.92 0.79 -0.20 -0.59 -0.32 FM

JOINTS
JOINTS C P L H D MEMBER
MEMBER CG PO PL LP LK LH HL HG HD DH K
K 0.00000 0.00027 0.00016 0.00016 0.00027 0.00020 0.00020 0.00027 0.00068 0.00000 DF
DF 0.00 0.62 0.38 0.26 0.42 0.32 0.17 0.23 0.59 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS FEM
FEM 0.00 -3.38 0.00 0.00 -3.38 0.00 0.00 0.00 0.00 0.00 OF LIVE LOADS @"D" BJ'S
BJ'S 0.00 2.09 1.29 0.88 1.43 1.06 0.00 0.00 0.00 0.00 COM
COM 0.00 -0.47 0.44 0.64 -0.33 0.00 0.53 0.00 0.00 0.00 BJ'S
BJ'S 0.00 0.02 0.01 -0.08 -0.13 -0.10 -0.09 -0.12 -0.32 0.00 COM
COM 0.05 -0.25 -0.04 0.00 -0.17 -0.05 -0.05 0.02 0.00 -0.16 BJ'S
BJ'S 0.00 0.18 0.11 0.06 0.09 0.07 0.01 0.01 0.02 0.00 FM
FM 0.05 -1.81 1.81 1.50 -2.49 0.98 0.39 -0.10 -0.30 -0.16

Name: John Fredr


Course & Section:

JOINTS
MEMBER
K
DF
FEM
BJ'S
COM
BJ'S
COM
BJ'S
FM

JOINTS
MEMBER
K
DF
FEM
BJ'S
COM
BJ'S
COM
BJ'S
FM
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
STRUCTURAL ANALYSIS OF LIVE LOADS @ "1"

JOINTS A E I M N J JOINTS
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF MEMBER
K 0.00000 0.00068 0.00021 0.00020 0.00020 0.00021 0.00016 0.00016 0.00021 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 K
DF 0.00 0.62 0.20 0.18 0.34 0.37 0.29 0.44 0.56 0.36 0.36 0.28 0.21 0.27 0.27 0.25 DF
FEM 0.00 0.00 0.00 0.00 0.00 12.24 0.00 0.00 6.23 -6.23 6.23 0.00 0.00 -16.46 0.00 0.00 FEM
BJ'S 0.00 0.00 0.00 0.00 -4.22 -4.53 -3.50 -2.71 -3.52 0.00 0.00 0.00 3.43 4.45 4.45 4.14 BJ'S
COM 0.00 0.00 -0.26 -2.11 0.00 2.22 -1.36 -1.75 0.00 -1.76 0.00 1.72 0.00 -2.26 -2.04 -0.25 COM
BJ'S 0.00 1.47 0.47 0.43 -0.30 -0.32 -0.25 0.76 0.99 0.02 0.02 0.01 0.95 1.23 1.23 1.14 BJ'S
COM 0.74 0.00 -0.12 -0.15 0.22 0.61 0.38 -0.12 0.01 0.49 -0.03 0.47 0.01 -0.16 -0.50 -0.11 COM
BJ'S 0.00 0.17 0.05 0.05 -0.42 -0.45 -0.35 0.05 0.07 -0.34 -0.34 -0.26 0.16 0.21 0.21 0.19 BJ'S
FM 0.74 1.64 0.13 -1.77 -4.71 9.78 -5.06 -3.77 3.77 -7.81 5.87 1.94 4.55 -13.00 3.34 5.12 FM

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC JOINTS
K 0.00020 0.00021 0.00021 0.00068 0.00000 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 0.00020 0.00021 0.00021 0.00068 MEMBER
DF 0.15 0.16 0.16 0.52 0.00 0.36 0.36 0.28 0.21 0.27 0.27 0.25 0.15 0.16 0.16 0.52 K
FEM 0.00 0.00 3.22 0.00 0.00 -6.23 6.23 0.00 0.00 0.00 15.11 0.00 0.00 7.52 0.00 0.00 DF
BJ'S -0.49 -0.53 -0.53 -1.67 0.00 0.00 0.00 0.00 -3.15 -4.08 -4.08 -3.80 -1.15 -1.23 -1.23 -3.90 FEM
COM 2.07 0.00 -0.62 0.00 -0.84 0.00 1.76 -1.57 0.00 2.22 2.06 -0.57 -1.90 -0.26 0.00 0.00 BJ'S
BJ'S -0.22 -0.24 -0.24 -0.75 0.00 -0.07 -0.07 -0.05 -0.77 -1.00 -1.00 -0.93 0.33 0.35 0.35 1.12 COM
COM 0.57 0.23 0.18 0.00 -0.38 0.01 -0.45 -0.39 -0.03 0.61 0.13 0.17 -0.47 -0.12 -0.13 0.00 BJ'S
BJ'S -0.15 -0.16 -0.16 -0.51 0.00 0.30 0.30 0.23 -0.18 -0.24 -0.24 -0.22 0.11 0.12 0.12 0.37 COM
FM 1.78 -0.69 1.85 -2.94 -1.21 -5.99 7.77 -1.78 -4.13 -2.48 11.98 -5.36 -3.07 6.37 -0.89 -2.41 BJ'S
FM

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF LIVE LOADS @ "2"
JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00021 0.00020 0.00020 0.00021 0.00016 0.00016 0.00021 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020
DF 0.00 0.62 0.20 0.18 0.34 0.37 0.29 0.44 0.56 0.36 0.36 0.28 0.21 0.27 0.27 0.25
FEM 0.00 0.00 0.00 0.00 0.00 19.34 0.00 0.00 10.19 -10.19 10.19 0.00 0.00 -25.52 10.00 0.00
BJ'S 0.00 0.00 0.00 0.00 -6.66 -7.16 -5.52 -4.44 -5.75 0.00 0.00 0.00 3.24 4.19 4.19 3.90
COM 0.00 0.00 -0.06 -3.33 0.00 2.10 -2.22 -2.76 0.00 -2.87 0.00 1.62 0.00 -3.58 -1.74 -0.06
BJ'S 0.00 2.11 0.67 0.62 0.04 0.05 0.03 1.20 1.56 0.45 0.45 0.35 1.12 1.45 1.45 1.35
COM 1.05 0.00 -0.15 0.02 0.31 0.73 0.60 0.02 0.23 0.78 -0.28 0.56 0.18 0.02 -0.70 -0.14
BJ'S 0.00 0.08 0.02 0.02 -0.56 -0.61 -0.47 -0.11 -0.14 -0.38 -0.38 -0.30 0.13 0.17 0.17 0.16
FM 1.05 2.18 0.48 -2.67 -6.87 14.44 -7.57 -6.08 6.08 -12.21 9.98 2.23 4.66 -23.26 13.38 5.22

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00021 0.00021 0.00068 0.00000 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 0.00020 0.00021 0.00021 0.00068
DF 0.15 0.16 0.16 0.52 0.00 0.36 0.36 0.28 0.21 0.27 0.27 0.25 0.15 0.16 0.16 0.52
FEM 0.00 0.00 0.74 0.00 0.00 -10.19 10.19 0.00 0.00 -10.00 22.86 0.00 0.00 1.73 0.00 0.00
BJ'S -0.11 -0.12 -0.12 -0.38 0.00 0.00 0.00 0.00 -2.68 -3.47 -3.47 -3.23 -0.26 -0.28 -0.28 -0.90
COM 1.95 0.00 -0.14 0.00 -0.19 0.00 2.87 -1.34 0.00 2.10 3.22 -0.13 -1.62 -0.06 0.00 0.00
BJ'S -0.28 -0.30 -0.30 -0.94 0.00 -0.55 -0.55 -0.43 -1.08 -1.40 -1.40 -1.30 0.26 0.28 0.28 0.87
COM 0.68 0.33 0.14 0.00 -0.47 0.23 -0.70 -0.54 -0.21 0.73 -0.09 0.13 -0.65 -0.15 -0.28 0.00
BJ'S -0.17 -0.19 -0.19 -0.59 0.00 0.37 0.37 0.28 -0.11 -0.15 -0.15 -0.14 0.16 0.18 0.18 0.56
FM 2.06 -0.27 0.13 -1.92 -0.66 -10.15 12.17 -2.03 -4.09 -12.20 20.97 -4.68 -2.11 1.69 -0.11 0.53

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
STRUCTURAL ANALYSIS OF LIVE LOADS @ "3"

JOINTS A E I M N J JOINTS
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF MEMBER
K 0.00000 0.00068 0.00021 0.00020 0.00020 0.00021 0.00016 0.00016 0.00021 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 K
DF 0.00 0.62 0.20 0.18 0.34 0.37 0.29 0.44 0.56 0.36 0.36 0.28 0.21 0.27 0.27 0.25 DF
FEM 0.00 0.00 0.00 0.00 0.00 13.33 0.00 0.00 10.19 -10.19 10.19 0.00 0.00 -15.28 16.23 0.00 FEM
BJ'S 0.00 0.00 0.00 0.00 -4.59 -4.93 -3.81 -4.44 -5.75 0.00 0.00 0.00 -0.20 -0.26 -0.26 -0.24 BJ'S
COM 0.00 0.00 0.00 -2.29 0.00 -0.13 -2.22 -1.90 0.00 -2.87 0.00 -0.10 0.00 -2.47 0.21 0.00 COM
BJ'S 0.00 1.43 0.45 0.42 0.81 0.87 0.67 0.83 1.07 1.07 1.07 0.83 0.47 0.61 0.61 0.57 BJ'S
COM 0.71 0.00 0.01 0.40 0.21 0.30 0.41 0.34 0.54 0.54 -0.03 0.23 0.41 0.43 0.00 0.01 COM
BJ'S 0.00 -0.26 -0.08 -0.08 -0.32 -0.34 -0.27 -0.38 -0.49 -0.27 -0.27 -0.21 -0.18 -0.23 -0.23 -0.22 BJ'S
FM 0.71 1.17 0.38 -1.55 -3.89 9.10 -5.20 -5.56 5.56 -11.72 10.96 0.76 0.51 -17.19 16.56 0.12 FM

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC JOINTS
K 0.00020 0.00021 0.00021 0.00068 0.00000 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 0.00020 0.00021 0.00021 0.00068 MEMBER
DF 0.15 0.16 0.16 0.52 0.00 0.36 0.36 0.28 0.21 0.27 0.27 0.25 0.15 0.16 0.16 0.52 K
FEM 0.00 0.00 0.00 0.00 0.00 -10.19 10.19 0.00 0.00 -16.23 14.64 0.00 0.00 0.00 0.00 0.00 DF
BJ'S 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.33 0.43 0.43 0.40 0.00 0.00 0.00 0.00 FEM
COM -0.12 0.00 0.00 0.00 0.00 0.00 0.00 0.17 0.00 -0.13 0.11 0.00 0.20 0.00 0.00 0.00 BJ'S
BJ'S 0.02 0.02 0.02 0.06 0.00 -0.06 -0.06 -0.05 0.00 0.01 0.01 0.01 -0.03 -0.03 -0.03 -0.10 COM
COM 0.28 0.23 -0.02 0.00 0.03 0.54 -0.01 0.00 -0.02 0.30 0.00 -0.02 0.00 0.01 -0.01 -0.03 BJ'S
BJ'S -0.08 -0.08 -0.08 -0.26 0.00 -0.19 -0.19 -0.15 -0.06 -0.07 -0.07 -0.07 0.00 0.00 0.00 0.01 COM
FM 0.11 0.16 -0.08 -0.19 0.03 -9.90 9.92 -0.02 0.26 -15.69 15.11 0.32 0.18 -0.02 -0.04 -0.12 BJ'S
FM

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF LIVE LOADS @ "4"

JOINTS A E I M N J
MEMBER AE EA EF EI IE IJ IM MI MN NM NO NJ JN JI JK JF
K 0.00000 0.00068 0.00021 0.00020 0.00020 0.00021 0.00016 0.00016 0.00021 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020
DF 0.00 0.62 0.20 0.18 0.34 0.37 0.29 0.44 0.56 0.36 0.36 0.28 0.21 0.27 0.27 0.25
FEM 0.00 0.00 0.00 0.00 0.00 6.23 0.00 0.00 6.23 -6.23 6.23 0.00 0.00 -6.23 6.23 0.00
BJ'S 0.00 0.00 0.00 0.00 -2.14 -2.30 -1.78 -2.71 -3.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COM 0.00 0.00 0.00 -1.07 0.00 0.00 -1.36 -0.89 0.00 -1.76 0.00 0.00 0.00 -1.15 0.00 0.00
BJ'S 0.00 0.67 0.21 0.20 0.47 0.50 0.39 0.39 0.50 0.63 0.63 0.49 0.24 0.31 0.31 0.29
COM 0.33 0.00 0.00 0.23 0.10 0.16 0.19 0.19 0.32 0.25 -0.32 0.12 0.24 0.25 -0.16 0.00
BJ'S 0.00 -0.15 -0.05 -0.04 -0.15 -0.17 -0.13 -0.22 -0.29 -0.02 -0.02 -0.02 -0.07 -0.09 -0.09 -0.09
FM 0.33 0.52 0.16 -0.69 -1.73 4.42 -2.68 -3.24 3.24 -7.12 6.53 0.59 0.41 -6.91 6.29 0.20

JOINTS F B O K G
MEMBER FJ FE FG FB BF ON OP OK KO KJ KL KG GK GF GH GC
K 0.00020 0.00021 0.00021 0.00068 0.00000 0.00021 0.00021 0.00016 0.00016 0.00021 0.00021 0.00020 0.00020 0.00021 0.00021 0.00068
DF 0.15 0.16 0.16 0.52 0.00 0.36 0.36 0.28 0.21 0.27 0.27 0.25 0.15 0.16 0.16 0.52
FEM 0.00 0.00 0.00 0.00 0.00 -6.23 6.23 0.00 0.00 -6.23 6.23 0.00 0.00 0.00 0.00 0.00
BJ'S 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COM 0.00 0.00 0.00 0.00 0.00 0.00 1.76 0.00 0.00 0.00 1.15 0.00 0.00 0.00 0.00 0.00
BJ'S 0.00 0.00 0.00 0.00 0.00 -0.63 -0.63 -0.49 -0.24 -0.31 -0.31 -0.29 0.00 0.00 0.00 0.00
COM 0.14 0.11 0.00 0.00 0.00 0.32 -0.25 -0.12 -0.24 0.16 -0.25 0.00 -0.14 0.00 -0.11 0.00
BJ'S -0.04 -0.04 -0.04 -0.13 0.00 0.02 0.02 0.02 0.07 0.09 0.09 0.09 0.04 0.04 0.04 0.13
FM 0.11 0.06 -0.04 -0.13 0.00 -6.53 7.12 -0.59 -0.41 -6.29 6.91 -0.20 -0.11 0.04 -0.06 0.13
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF LIVE LOADS

JOINTS C P L H D
MEMBER CG PO PL LP LK LH HL HG HD DH
K 0.00000 0.00021 0.00016 0.00016 0.00021 0.00020 0.00020 0.00021 0.00068 0.00000
DF 0.00 0.56 0.44 0.29 0.37 0.34 0.18 0.20 0.62 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS
FEM 0.00 -6.23 0.00 0.00 -11.16 0.00 0.00 0.00 0.00 0.00 OF LIVE LOADS @"1"
BJ'S 0.00 3.52 2.71 3.19 4.13 3.84 0.00 0.00 0.00 0.00
COM -1.95 0.00 1.59 1.36 -2.04 0.00 1.92 -0.62 0.00 0.00
BJ'S 0.00 -0.90 -0.69 0.20 0.25 0.24 -0.24 -0.26 -0.81 0.00
COM 0.56 -0.03 0.10 -0.35 -0.50 -0.12 0.12 0.18 0.00 -0.41
BJ'S 0.00 -0.04 -0.03 0.28 0.36 0.33 -0.05 -0.06 -0.18 0.00
FM -1.39 -3.68 3.68 4.67 -8.96 4.29 1.75 -0.75 -0.99 -0.41

JOINTS C P L H D
MEMBER CG PO PL LP LK LH HL HG HD DH
K 0.00000 0.00021 0.00016 0.00016 0.00021 0.00020 0.00020 0.00021 0.00068 0.00000
DF 0.00 0.56 0.44 0.29 0.37 0.34 0.18 0.20 0.62 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS
FEM 0.00 -10.19 0.00 0.00 -17.40 0.00 0.00 0.00 0.00 0.00 OF LIVE LOADS @"2"
BJ'S 0.00 5.75 4.44 4.97 6.44 5.99 0.00 0.00 0.00 0.00
COM -0.45 0.00 2.48 2.22 -1.74 0.00 3.00 -0.14 0.00 0.00
BJ'S 0.00 -1.40 -1.08 -0.14 -0.18 -0.17 -0.52 -0.56 -1.77 0.00
COM 0.44 -0.28 -0.07 -0.54 -0.70 -0.26 -0.08 0.14 0.00 -0.89
BJ'S 0.00 0.20 0.15 0.43 0.56 0.52 -0.01 -0.01 -0.03 0.00
FM -0.01 -5.92 5.92 6.94 -13.02 6.08 2.38 -0.58 -1.81 -0.89
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
STRUCTURAL ANALYSIS OF LIVE LOADS

JOINTS C P L H D
MEMBER CG PO PL LP LK LH HL HG HD DH
K 0.00000 0.00021 0.00016 0.00016 0.00021 0.00020 0.00020 0.00021 0.00068 0.00000
DF 0.00 0.56 0.44 0.29 0.37 0.34 0.18 0.20 0.62 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS
FEM 0.00 -10.19 0.00 0.00 -12.45 0.00 0.00 0.00 0.00 0.00 OF LIVE LOADS @"3"
BJ'S 0.00 5.75 4.44 3.55 4.61 4.29 0.00 0.00 0.00 0.00
COM 0.00 0.00 1.78 2.22 0.21 0.00 2.14 0.00 0.00 0.00
BJ'S 0.00 -1.00 -0.77 -0.69 -0.90 -0.84 -0.39 -0.42 -1.33 0.00
COM -0.05 -0.03 -0.35 -0.39 0.00 -0.20 -0.42 -0.02 0.00 -0.67
BJ'S 0.00 0.21 0.16 0.17 0.21 0.20 0.08 0.09 0.27 0.00
FM -0.05 -5.26 5.26 4.86 -8.31 3.45 1.41 -0.35 -1.06 -0.67

JOINTS C P L H D
MEMBER CG PO PL LP LK LH HL HG HD DH
K 0.00000 0.00021 0.00016 0.00016 0.00021 0.00020 0.00020 0.00021 0.00068 0.00000
DF 0.00 0.56 0.44 0.29 0.37 0.34 0.18 0.20 0.62 0.00 CONTINUATION FOR STRUCTURAL ANALYSIS
FEM 0.00 -6.23 0.00 0.00 -6.23 0.00 0.00 0.00 0.00 0.00 OF LIVE LOADS @"4"
BJ'S 0.00 3.52 2.71 1.78 2.30 2.14 0.00 0.00 0.00 0.00
COM 0.00 0.00 0.89 1.36 0.00 0.00 1.07 0.00 0.00 0.00
BJ'S 0.00 -0.50 -0.39 -0.39 -0.50 -0.47 -0.20 -0.21 -0.67 0.00
COM 0.00 -0.32 -0.19 -0.19 -0.16 -0.10 -0.23 0.00 0.00 -0.33
BJ'S 0.00 0.29 0.22 0.13 0.17 0.15 0.04 0.05 0.15 0.00
FM 0.00 -3.24 3.24 2.68 -4.42 1.73 0.69 -0.16 -0.52 -0.33
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
SEISMIC ANALYSIS

DESIGN CONSIDERATIONS

Seismic Zone Factor (Z) = 0.4 (Zone 4)


Near-Source Factor (Na) = 1.00 (Seismic Source Type A, ≥ 10 km)
Near-Source Factor (Nv) = 1.20 (Seismic Source Type A, = 10 km)
Importance Factor (I) = 1.00 (Table 208 - 1)
Seismic Coefficient (Ca) = 0.44Na (Table 208 - 7)
Seismic Coefficient (Cv) = 0.64Nv (Table 208 - 8)
(R) = 3.50 (Table 208 - 11,-OMRF - Concrete)

BASE SHEAR:

Cv l W ≤ 2.5 Ca l
V= W
RT R

> 0.11 Ca l W

> 0.8 Z Nv l
W
R

STRUCTURE PERIOD:

T= Ct (hn)^(3/4)
Ct= 0.0731 for RCMRF
hn= height of the building = 7.50
h2= height of 2nd floor = 4.10
h1= height of 1st floor = 3.40

VERTICAL DISTRIBUTION:

n
V= Ft + ∑ Fi
i=1

Ft= 0.07TV
Fx= (V - Ft) Wx hx
∑Wi hi

Name: John F
Course & Sec
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
SEISMIC ANALYSIS
Framing @ A ( LIVE LOAD) Framing @ B

Weight per level: Weight per lev


W2 = (2.53)(4)(2)
= 20.24 kN
W1 = (2.29)(4)+(1.27)(2)+(2.53)(4)
= 21.82 kN
Wt = 20.24 + 21.82
= 42.06 kN
BASE SHEAR: BASE SHEAR
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(42.06)
V =
(3.5)(.33129)
V = 27.86 kN
2.5(0.44)(1.0)(1.0)(42.06)

3.50
≤ 13.22 kN = 0
> 0.11(0.44)(1.0)(1.0)(42.06)
> 2.04 kN = 1
(0.8)(0.4)(1.20)(1.0)(42.06)
>
3.50
> 4.61 kN = 1

Therefore, use V = 13.22 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx =
∑Wi hi Ft= 0.07(.33129)(63.37)
(13.22-0.30655)(20.24)(4.10) Ft= 0.30655
F2 =
(20.24)(4.10)+(21.82)(3.4)
= 6.81747 kN
(13.22-0.30655)(21.82)(3.4)
F1 =
(20.24)(4.10)+(21.82)(3.4)
= 6.09484 kN

To Check:
V = 6.8175 + 6.0948 + 0.30655
= 13.22 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
SEISMIC ANALYSIS
Framing @ 1 ( LIVE LOAD) Framing @ 2

Weight per level: Weight per lev


W2 = (2.99)(5)(3)
= 44.85 kN
W1 = 15.18+13.56+(2.03)(2.95)+(3.28)(2.05)+(3.28)(2.05)+(1.87)(2.95)
= 53.69 kN
Wt = 44.85 + 53.69
= 98.54 kN
BASE SHEAR: BASE SHEAR
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(98.54)
V =
(3.5)(.33129)
V = 27.86 kN
2.5(0.44)(1.0)(1.0)(98.54)

3.50
≤ 30.97 kN = 0
> 0.11(0.44)(1.0)(1.0)(98.54)
> 4.77 kN = 1
(0.8)(0.4)(1.20)(1.0)(98.54)
>
3.50
> 10.81 kN = 1

Therefore, use V = 30.97 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx =
∑Wi hi Ft= 0.07(.33129)(63.37)
(30.97-0.71821)(44.85)(4.10) Ft= 0.71821
F2 =
(44.85)(4.10)+(53.69)(3.4)
= 15.181 kN
(30.97-0.71821)(53.69)(3.4)
F1 =
(44.85)(4.10)+(53.69)(3.4)
= 15.0705 kN

To Check:
V = 15.181 + 15.07 + 0.71821
= 30.97 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
SEISMIC ANALYSIS
Framing @ B ( LIVE LOAD) Framing @ C ( LIV

Weight per level: Weight per level:


W2 = (5.07)(4)(2)
= 40.56 kN
W1 = (4.49)(4)+(3.20)(2)+(5.07)(4)
= 44.64 kN
Wt = 40.56 + 44.64
= 85.20 kN
BASE SHEAR: BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(85.20)
V =
(3.5)(.33129)
V = 27.86 kN
2.5(0.44)(1.0)(1.0)(85.20)

3.50
≤ 26.78 kN = 0
> 0.11(0.44)(1.0)(1.0)(85.20)
> 4.12 kN = 1
(0.8)(0.4)(1.20)(1.0)(85.20)
>
3.50
> 9.35 kN = 1

Therefore, use V = 26.78 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx =
∑Wi hi Ft= 0.07(.33129)(63.37)
(26.78-0.62098)(40.56)(4.10) Ft= 0.62098
F2 =
(40.56)(4.10)+(44.64)(3.4)
= 13.6751 kN
(26.78-0.62098)(44.64)(3.4)
F1 =
(40.56)(4.10)+(44.64)(3.4)
= 12.4811 kN

To Check:
V = 13.675 + 12.481 + 0.62098
= 26.78 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
SEISMIC ANALYSIS
Framing @ 2 ( LIVE LOAD) Framing @ 3 ( LIV

Weight per level: Weight per level:


W2 = (4.89)(5)(3)
= 73.35 kN
W1 = (4.06)(2.95)+(6.56)(2.05)+19.98+(4.80)(5)+(6.56)(2.05)+(3.48)(2.95)+18.03
= 111.15 kN
Wt = 73.35 + 111.15
= 184.50 kN
BASE SHEAR: BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(184.50)
V =
(3.5)(.33129)
V = 27.86 kN
2.5(0.44)(1.0)(1.0)(184.50)

3.50
≤ 57.99 kN = 0
> 0.11(0.44)(1.0)(1.0)(184.50)
> 8.93 kN = 1
(0.8)(0.4)(1.20)(1.0)(184.50)
>
3.50
> 20.24 kN = 1

Therefore, use V = 57.99 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx =
∑Wi hi Ft= 0.07(.33129)(63.37)
(57.99-1.34471)(73.35)(4.10) Ft= 1.34472
F2 =
(73.35)(4.10)+(111.15)(3.4)
= 25.0999 kN
(57.99-1.34471)(111.15)(3.4)
F1 =
(73.35)(4.10)+(111.15)(3.4)
= 31.5411 kN

To Check:
V = 25.1 + 31.541 + 1.34472
= 57.99 kN
me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T. Abr
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSCE-5
SEISMIC ANALYSIS
Framing @ C ( LIVE LOAD) Framing @ D ( LIVE LO

Weight per level: Weight per level:


W2 = (5.07)(4)(2)
= 40.56 kN
W1 = (4.49)(4)+(3.20)(2)+(5.07)(4)+12.60
= 57.24 kN
Wt = 40.56 + 57.24
= 97.80 kN
BASE SHEAR: BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W V
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(97.80)
V = V
(3.5)(.33129)
V = 27.86 kN V
2.5(0.44)(1.0)(1.0)(97.80)

3.50
≤ 30.74 kN = 0
> 0.11(0.44)(1.0)(1.0)(97.80)
> 4.73 kN = 1
(0.8)(0.4)(1.20)(1.0)(97.80)
>
3.50
> 10.73 kN = 1

Therefore, use V = 30.74 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx = Fx
∑Wi hi Ft= 0.07(.33129)(63.37)
(30.74-0.71281)(40.56)(4.10) Ft= 0.71281
F2 = F2
(40.56)(4.10)+(57.24)(3.4)
= 13.8342 kN
(30.74-0.71281)(57.24)(3.4)
F1 = F1
(40.56)(4.10)+(57.24)(3.4)
= 16.1901 kN

To Check: To Check:
V = 13.834 + 16.19 + 0.71281
= 30.74 kN

me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T. Abr
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSCE-5
SEISMIC ANALYSIS
Framing @ 3 ( LIVE LOAD) Framing @ 4 ( LIVE LO

Weight per level: Weight per level:


W2 = (4.89)(5)(3)
= 73.35 kN
W1 = 4.80+4.47+(2.03)(2.95)+(3.28)(2.05)+(2.99)(5)+(7.79)(5)+(3.28)(2.05)+(1.61)(2.95)+(2.99)(5)
= 102.31 kN
Wt = 73.35 + 102.306
= 175.66 kN
BASE SHEAR: BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
V = W V
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(175.66)
V = V
(3.5)(.33129)
V = 27.86 kN V
2.5(0.44)(1.0)(1.0)(175.66)

3.50
≤ 55.21 kN = 0
> 0.11(0.44)(1.0)(1.0)(175.66)
> 8.50 kN = 1
(0.8)(0.4)(1.20)(1.0)(175.66)
>
3.50
> 19.27 kN = 1

Therefore, use V = 55.21 kN

(V - Ft) Wx hx Ft= 0.07TV


Fx = Fx
∑Wi hi Ft= 0.07(.33129)(63.37)
(55.21-1.28026)(73.35)(4.10) Ft= 1.28026
F2 = F2
(73.35)(4.10)+(102.31)(3.4)
= 25.0047 kN
(55.21-1.28026)(102.31)(3.4)
F1 = F1
(73.35)(4.10)+(102.31)(3.4)
= 28.9212 kN

To Check: To Check:
V = 25.005 + 28.921 + 1.28026
= 55.21 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
SEISMIC ANALYSIS
Framing @ D ( LIVE LOAD)

Weight per level:


W2 = (2.53)(4)(2)
= 20.24 kN
W1 = (1.60)(4)+(1.60)(2)+(2.53)(4)+5.99
= 25.71 kN
Wt = 20.24 + 25.71
= 45.95 kN
BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
= W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(45.95)
=
(3.5)(.33129)
= 27.86 kN
2.5(0.44)(1.0)(1.0)(45.95)

3.50
≤ 14.44 kN = 0
> 0.11(0.44)(1.0)(1.0)(45.95)
> 2.22 kN = 1
(0.8)(0.4)(1.20)(1.0)(45.95)
>
3.50
> 5.04 kN = 1

Therefore, use V = 14.44 kN

(V - Ft) Wx hx Ft= 0.07TV


=
∑Wi hi Ft= 0.07(.33129)(63.37)
(14.44-0.33490)(20.24)(4.10) Ft= 0.33490
=
(20.24)(4.10)+(25.71)(3.4)
= 6.86989 kN
(14.44-0.33490)(25.71)(3.4)
=
(20.24)(4.10)+(25.71)(3.4)
= 7.23663 kN

To Check:
V = 6.8699 + 7.2366 + 0.33490
= 14.44 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
SEISMIC ANALYSIS
Framing @ 4 ( LIVE LOAD)

Weight per level:


W2 = (2.99)(5)(3)
= 44.85 kN
W1 = (2.99)(5)(3)
= 44.85 kN
Wt = 44.85 + 44.85
= 89.70 kN
BASE SHEAR:
Cv l W ≤ 2.5 Ca l T= Ct (hn)^(3/4)
= W
RT R T= 0.0731 (7.5)^(3/4)
> 0.11 Ca l W T= 0.33129 < 0.70
> 0.8 Z Nv l
W
R
0.64(1.20)(1.00)(89.70)
=
(3.5)(.33129)
= 27.86 kN
2.5(0.44)(1.0)(1.0)(89.70)

3.50
≤ 28.19 kN = 0
> 0.11(0.44)(1.0)(1.0)(89.70)
> 4.34 kN = 1
(0.8)(0.4)(1.20)(1.0)(175.66)
>
3.50
> 9.84 kN = 1

Therefore, use V = 28.19 kN

(V - Ft) Wx hx Ft= 0.07TV


=
∑Wi hi Ft= 0.07(.33129)(63.37)
(28.19-0.65378)(44.85)(4.10) Ft= 0.65378
=
(44.85)(4.10)+(44.85)(3.4)
= 15.0539 kN
(28.19-0.65378)(44.85)(3.4)
=
(44.85)(4.10)+(44.85)(3.4)
= 12.4837 kN

To Check:
V = 15.054 + 12.484 + 0.65378
= 28.19 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ A
Height of upper level = 4.10 m
Height of lower level = 4.40 m

6.82 kN
I J K L
2.05 m

a a
2.05 m
6.09484 kN
E F G H

2.20 m
b b
2.20 m
A B C D

4.00 m 2.00 m 4.00 m


At section a-a
6.82 kN
I J K L
2.05 m

a a

2m

5m 5m

EI
FJ

GK
HL
F = Mc I = 2(1 + 5 )
2 2
M = 6.82 x 2.05
I I = 52.00 m2 M = 13.9758 kN-m

For E-I and H-L For F-Jand G-K


F= 1.34382731 kN F= 0.26876546 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ A

At section b-b
6.81747 kN
6.81747 kN
I J K L
2.05 m

a a
2.05 m
6.09484 kN
E F G H
2.20 m
b b

2m

5m 5m

AE

BF

CG

DH

F = Mc I = 2(12 + 52) M = (6.82 x 6.30) + (6.095 x 2.20)


I I = 52.00 m2 M = 56.3587 kN-m

For A-E and D-H For B-F and C-G

F= 5.41910361 kN F= 1.08382072 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ B
Height of upper level = 4.10 m
Height of lower level = 4.40 m

13.68 kN
I J K L
2.05 m

a a
2.05 m
12.4811 kN
E F G H

2.20 m
b b
2.20 m
A B C D

4.00 m 2.00 m 4.00 m


At section a-a
13.68 kN
I J K L
2.05 m

a a

2m

5m 5m

EI
FJ

GK
HL
F = Mc I = 2(1 + 5 )
2 2
M = 13.68 x 2.05
I I = 52.00 m2 M = 28.034 kN-m

For E-I and H-L For F-Jand G-K


F= 2.69557218 kN F= 0.53911444 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ B

At section b-b
13.6751 kN
13.6751 kN
I J K L
2.05 m

a a
2.05 m
12.4811 kN
E F G H
2.20 m
b b

2m

5m 5m

AE

BF

CG

DH

F = Mc I = 2(12 + 52) M = (13.68 x 6.30) + (12.48 x 2.20)


I I = 52.00 m2 M = 113.611 kN-m

For A-E and D-H For B-F and C-G

F= 10.9241794 kN F= 2.18483588 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ C
Height of upper level = 4.10 m Height of upp
Height of lower level = 4.40 m Height of lowe

13.83 kN
I J K L
2.05 m

a a
2.05 m
16.1901 kN
E F G H

2.20 m
b b
2.20 m
A B C D

4.00 m 2.00 m 4.00 m


At section a-a
13.83 kN
I J K L
2.05 m

a a

2m

5m 5m

EI
FJ

GK
HL
F = Mc I = 2(1 + 5 )
2 2
M = 13.83 x 2.05
I I = 52.00 m2 M = 28.3601 kN-m

For E-I and H-L For F-Jand G-K


F= 2.72693222 kN F= 0.54538644 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ C

At section b-b
13.8342 kN
13.8342 kN
I J K L
2.05 m

a a
2.05 m
16.1901 kN
E F G H
2.20 m
b b

2m

5m 5m

AE

BF

CG

DH

F = Mc I = 2(12 + 52) M = (13.83 x 6.30) + (16.19 x 2.20)


I I = 52.00 m2 M = 122.774 kN-m

For A-E and D-H For B-F and C-G

F= 11.8051652 kN F= 2.36103305 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ D
Height of upper level = 4.10 m
Height of lower level = 4.40 m

6.87 kN
I J K L
2.05 m

a a
2.05 m
7.23663 kN
E F G H

2.20 m
b b
2.20 m
A B C D

4.00 m 2.00 m 4.00 m


At section a-a
6.87 kN
I J K L
2.05 m

a a

2m

5m 5m

EI
FJ

GK
HL
F = Mc I = 2(1 + 5 )
2 2
M = 6.87 x 2.05
I I = 52.00 m2 M = 14.0833 kN-m

For E-I and H-L For F-Jand G-K


F= 1.35416129 kN F= 0.27083226 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ D

At section b-b
6.86989 kN
6.86989 kN
I J K L
2.05 m

a a
2.05 m
7.23663 kN
E F G H
2.20 m
b b

2m

5m 5m

AE

BF

CG

DH

F = Mc I = 2(12 + 52) M = (6.87 x 6.30) + (7.237 x 2.20)


I I = 52.00 m2 M = 59.2009 kN-m

For A-E and D-H For B-F and C-G

F= 5.69239489 kN F= 1.13847898 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ A

` `
6.82 5.51 3.41 1.31

4.1
1.34 0.27 0.27 1.34

6.09 4.92 3.05 1.17

5.42 1.08 1.08 5.42 4.4

4.0 2.0 4.0

6.82 1.34 1.61 1.34

4.1
1.31 2.10 2.10 1.31

6.09 4.08 4.89 4.08

2.48 3.97 3.97 2.48 4.4

4.0 2.0 4.0

2.69 1.61 2.69


6.82

4.1
2.69 4.30 4.30 2.69

8.15 4.89 8.15


6.09

5.46 8.74 8.74 5.46 4.4

4.0 2.0 4.0


Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredri
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ B

`
13.68 11.05 6.84 2.63

4.1
2.70 0.54 0.54 2.70

12.48 10.08 6.24 2.40

10.92 2.18 2.18 10.92 4.4

4.0 2.0 4.0

13.68 2.70 3.23 2.70

4.1
2.63 4.21 4.21 2.63

12.48 8.23 9.87 8.23

5.03 8.05 8.05 5.03 4.4

4.0 2.0 4.0

5.39 3.23 5.39


13.68

4.1
5.39 8.63 8.63 5.39

16.46 9.87 16.46


12.48

11.07 17.71 17.71 11.07 4.4

4.0 2.0 4.0


Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T.
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ C

`
13.83 11.17 6.92 2.66

4.1
2.73 0.55 0.55 2.73

16.19 13.08 8.10 3.11

11.81 2.36 2.36 11.81 4.4

4.0 2.0 4.0

13.83 2.73 3.27 2.73

4.1
2.66 4.26 4.26 2.66

16.19 9.08 10.89 9.08

5.77 9.24 9.24 5.77 4.4

4.0 2.0 4.0

5.45 3.27 5.45


13.83

4.1
5.45 8.73 8.73 5.45

18.16 10.89 18.16


16.19

12.70 20.32 20.32 12.70 4.4

4.0 2.0 4.0


me: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
rse & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ D

6.87 5.55 3.43 1.32

4.1
1.35 0.27 0.27 1.35

7.24 5.84 3.62 1.39

5.69 1.14 1.14 5.69 4.4

4.0 2.0 4.0

6.87 1.35 1.62 1.35

4.1
1.32 2.11 2.11 1.32

7.24 4.34 5.21 4.34

2.71 4.34 4.34 2.71 4.4

4.0 2.0 4.0

2.71 1.62 2.71


6.87

4.1
2.71 4.33 4.33 2.71

8.68 5.21 8.68


7.24

5.97 9.55 9.55 5.97 4.4

4.0 2.0 4.0


Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ 1
Height of upper level = 4.10 m
Height of lower level = 4.40 m

15.181 kN
I J K L
2.05 m

a a
2.05 m
15.07 kN
E F G H
2.20 m

b b
2.20 m
A B C D

5.00 m 5.00 m 5.00 m


At section a-a
I J K L
15.181 kN
2.05 m

a a

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL
F = Mc I = 2(2.5 + 7.5 )
2 2
M = 15.181 x 2.05
I I = 125.00 m2 M = 31.1211 kN-m

For E-I and H-L For F-J and G-K


F= 1.86726627 kN F= 0.62242209 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ 1

At section b-b
15.181 kN
15.181 kN
I J K L
2.05 m

a a
2.05 m
15.07 kN
E F G H
2.20 m

b b

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL

F = Mc I = 2(2.52 + 7.52) M = (15.181*6.30)+(15.07 x 2.20)


I I = 125.00 m2 M = 128.796 kN-m

For E-I and H-L For F-J and G-K


F= 7.72773173 kN F= 2.57591058 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ 2
Height of upper level = 4.10 m
Height of lower level = 4.40 m

25.0999 kN 25.0047
I J K L
2.05 m

a a
2.05 m
31.54 kN 28.92
E F G H
2.20 m

b b
2.20 m
A B C D

5.00 m 5.00 m 5.00 m


At section a-a At section a-a
I J K L
25.0999 kN 25.0047
2.05 m

a a

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL
F = Mc I = 2(2.5 + 7.5 )
2 2
M = 25.1 x 2.05
I I = 125.00 m2 M = 51.4548 kN-m

For E-I and H-L For F-J and G-K


F= 3.08728902 kN F= 1.02909634 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ 2

At section b-b At section b-b


25.0999 kN 25.0047
25.0999 kN 25.0047
I J K L
2.05 m

a a
2.05 m
31.54 kN 28.92
E F G H
2.20 m

b b

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL

F = Mc I = 2(2.52 + 7.52) M = (25.1*6.30)+(31.54 x 2.20)


I I = 125.00 m2 M = 227.52 kN-m

For E-I and H-L For F-J and G-K


F= 13.6511891 kN F= 4.55039636 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ 3
Height of upper level = 4.10 m Height of upp
Height of lower level = 4.40 m Height of lowe

25.0047 kN 15.0539
I J K L
2.05 m

a a
2.05 m
28.92 kN 12.48
E F G H
2.20 m

b b
2.20 m
A B C D

5.00 m 5.00 m 5.00 m


At section a-a At section a-a
I J K L
25.0047 kN 15.0539
2.05 m

a a

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL
F = Mc I = 2(2.5 + 7.5 )
2 2
M = 25.005 x 2.05
I I = 125.00 m2 M = 51.2596 kN-m

For E-I and H-L For F-J and G-K


F= 3.07557335 kN F= 1.02519112 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredrick T
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section: BSC
RIGID FRAMING @ 3

At section b-b At section b-b


25.0047 kN 15.0539
25.0047 kN 15.0539
I J K L
2.05 m

a a
2.05 m
28.92 kN 12.48
E F G H
2.20 m

b b

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL

F = Mc I = 2(2.52 + 7.52) M = (25.005*6.30)+(28.92 x 2.20)


I I = 125.00 m2 M = 221.156 kN-m

For E-I and H-L For F-J and G-K


F= 13.2693667 kN F= 4.42312223 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ 4
Height of upper level = 4.10 m
Height of lower level = 4.40 m

kN
I J K L
2.05 m

a a
2.05 m
kN
E F G H
2.20 m

b b
2.20 m
A B C D

5.00 m 5.00 m 5.00 m


At section a-a
I J K L
kN
2.05 m

a a

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL
F = Mc I = 2(2.5 + 7.5 )
2 2
M = 15.054 x 2.05
I I = 125.00 m2 M = 30.8605 kN-m

For E-I and H-L For F-J and G-K


F= 1.85163181 kN F= 0.6172106 kN

Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ 4

At section b-b
kN
kN
I J K L
2.05 m

a a
2.05 m
kN
E F G H
2.20 m

b b

5.00 m

7.50 m 7.50 m

EI
FJ

GK
HL

F = Mc I = 2(2.52 + 7.52) M = (15.054*6.30)+(12.48 x 2.20)


I I = 125.00 m2 M = 122.304 kN-m

For E-I and H-L For F-J and G-K


F= 7.33823387 kN F= 2.44607796 kN
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ 1

`
15.18 12.90 7.59 2.28

4.1
1.87 0.62 0.62 1.87

15.07 12.81 7.54 2.26

7.73 2.58 2.58 7.73 4.4

5.0 5.0 5.0

15.18 1.87 2.49 1.87

4.1
2.28 5.31 5.31 2.28

15.07 5.86 7.81 5.86

4.54 10.59 10.59 4.54 4.4

5.0 5.0 5.0

4.67 6.22 4.67


15.18 M N O P

4.1
4.67 10.89 10.89 4.67

14.65 19.53 14.65


15.07 I J K L

9.98 23.29 23.29 9.98 4.4

A B C D
5.0 5.0 5.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John F
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Sec
RIGID FRAMING @ 2

` `
25.10 21.33 12.55 3.76

4.1
3.09 1.03 1.03 3.09

31.54 26.81 15.77 4.73

13.65 4.55 4.55 13.65 4.4

5.0 5.0 5.0

25.10 3.09 4.12 3.09

4.1
3.76 8.78 8.78 3.76

31.54 10.56 14.09 10.56

8.50 19.82 19.82 8.50 4.4

5.0 5.0 5.0

7.72 10.29 7.72


25.10 M N O P

4.1
7.72 18.01 18.01 7.72

26.41 35.21 26.41


31.54 I J K L

18.69 43.61 43.61 18.69 4.4

A B C D
5.0 5.0 5.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building Name: John Fredr
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales Course & Section:
RIGID FRAMING @ 3

`
25.00 21.25 12.50 3.75

4.1
3.08 1.03 1.03 3.08

28.92 24.58 14.46 4.34

13.27 4.42 4.42 13.27 4.4

5.0 5.0 5.0

25.00 3.08 4.10 3.08

4.1
3.75 8.75 8.75 3.75

28.92 10.19 13.59 10.19

8.09 18.87 18.87 8.09 4.4

5.0 5.0 5.0

7.69 10.25 7.69


25.00 M N O P

4.1
7.69 17.94 17.94 7.69

25.48 33.98 25.48


28.92 I J K L

17.80 41.52 41.52 17.80 4.4

A B C D
5.0 5.0 5.0
Name: John Fredrick T. Abrigo Project Title: Two Storey Residential Building
Course & Section: BSCE-5A Location: Amungan, Iba, Zambales
RIGID FRAMING @ 4

15.05 12.80 7.53 2.26

4.1
1.85 0.62 0.62 1.85

12.48 10.61 6.24 1.87

7.34 2.45 2.45 7.34 4.4

5.0 5.0 5.0

15.05 1.85 2.47 1.85

4.1
2.26 5.27 5.27 2.26

12.48 5.49 7.32 5.49

4.13 9.64 9.64 4.13 4.4

5.0 5.0 5.0

4.63 6.17 4.63


15.05 M N O P

4.1
4.63 10.80 10.80 4.63

13.72 18.29 13.72


12.48 I J K L

9.09 21.20 21.20 9.09 4.4

A B C D
5.0 5.0 5.0
TRANSVERSE FRAME
FRAME A 
FACTORED MOMENTS (kN­m)

1. Mu = 0.75(1.4DL + 1.7LL + 1.87E)
2. Mu = 0.90DL + 1.43E
3. Mu = 1.4DL +1.7LL

Maximum moment Factored moment Design moments


Member
DL LL E 1 2 3 Maximum Minimum
A­E 3.74 0.14 0.00 4.11 3.37 5.48 5.48 3.37
E­A 7.80 0.26 0.00 8.53 7.02 11.37 11.37 7.02
E­F 11.83 0.09 0.00 12.54 10.65 16.71 16.71 10.65
E­I 4.03 0.35 26.32 41.59 41.27 6.24 41.59 6.24
I­E 4.86 0.86 26.32 43.11 42.01 8.27 43.11 8.27
I­J 10.05 2.27 35.93 63.83 60.42 17.93 63.83 17.93
I­M 5.19 1.41 9.61 20.72 18.41 9.66 20.72 9.66
M­I 5.99 1.78 9.61 22.03 19.13 11.41 22.03 11.41
M­N 5.99 1.78 9.61 22.03 19.13 11.41 22.03 11.41
N­M 9.84 2.89 9.61 27.50 22.60 18.70 27.50 18.70
N­O 5.73 1.68 5.76 16.24 13.40 10.88 16.24 10.88
N­J 4.11 1.22 15.37 27.43 25.68 7.82 27.43 7.82
J­N 3.92 0.96 15.37 26.90 25.51 7.12 26.90 7.12
J­I 11.30 2.79 35.93 65.81 61.55 20.56 65.81 20.56
J­K 3.38 1.20 21.56 35.32 33.87 6.78 35.32 6.78
J­F 4.00 0.62 42.11 64.05 63.82 6.65 64.05 6.65
F­J 3.32 0.26 42.11 62.88 63.21 5.10 63.21 5.10
F­E 12.69 0.01 0.00 13.34 11.42 17.78 17.78 11.42
F­G 3.18 0.09 0.00 3.46 2.87 4.61 4.61 2.87
F­B 6.19 0.17 0.00 6.71 5.57 8.94 8.94 5.57
B­F 3.18 0.05 0.00 3.40 2.86 4.53 4.53 2.86
O­N 4.80 1.65 5.76 15.23 12.56 9.53 15.23 9.53
O­P 9.64 2.89 9.61 27.28 22.41 18.40 27.28 18.40
O­K 4.84 1.23 15.37 28.21 26.34 8.87 28.21 8.87
K­O 5.78 1.01 15.37 28.91 27.18 9.80 28.91 9.80
K­J 12.71 1.42 21.56 45.40 42.26 20.22 45.40 20.22
K­L 24.77 3.11 35.93 80.35 73.67 39.96 80.35 39.96
K­G 6.28 0.67 42.11 66.51 65.87 9.93 66.51 9.93
G­K 4.31 0.29 42.11 63.95 64.09 6.52 64.09 6.52
G­F 2.62 0.10 0.00 2.89 2.36 3.85 3.85 2.36
G­H 12.63 0.01 0.00 13.28 11.37 17.70 17.70 11.37
G­C 5.71 0.18 0.00 6.22 5.14 8.29 8.29 5.14
C­G 2.95 0.05 0.00 3.16 2.66 4.22 4.22 2.66
P­O 7.15 1.81 9.61 23.29 20.17 13.08 23.29 13.08
P­L 7.15 1.81 9.61 23.29 20.17 13.08 23.29 13.08
L­P 8.90 1.49 9.61 24.73 21.75 15.00 24.73 15.00
L­K 18.46 2.47 35.93 72.91 67.99 30.03 72.91 30.03
L­H 9.55 0.97 26.32 48.18 46.24 15.03 48.18 15.03
H­L 5.97 0.40 26.32 43.68 43.01 9.03 43.68 9.03
H­G 12.32 0.10 0.00 13.06 11.08 17.41 17.41 11.08
H­D 6.35 0.30 0.00 7.05 5.71 9.40 9.40 5.71
D­H 3.11 0.16 0.00 3.47 2.80 4.63 4.63 2.80
FRAME B 
FACTORED MOMENTS (kN­m)

1. Mu = 0.75(1.4DL + 1.7LL + 1.87E)
2. Mu = 0.90DL + 1.43E
3. Mu = 1.4DL +1.7LL

Maximum moment Factored moment Design moments


Member
DL LL E 1 2 3 Maximum Minimum
A­E 0.28 0.28 0.00 0.65 0.25 0.86 0.86 0.25
E­A 0.90 0.51 0.00 1.60 0.81 2.13 2.13 0.81
E­F 2.43 0.17 0.00 2.76 2.18 3.68 3.68 2.18
E­I 1.52 0.68 36.11 53.11 53.01 3.28 53.11 3.28
I­E 2.87 1.66 36.11 55.78 54.22 6.85 55.78 6.85
I­J 9.19 4.43 52.47 88.89 83.31 20.40 88.89 20.40
I­M 6.32 2.77 16.36 33.11 29.08 13.55 33.11 13.55
M­I 9.76 3.55 16.36 37.72 32.18 19.70 37.72 19.70
M­N 9.76 3.55 16.36 37.72 32.18 19.70 37.72 19.70
N­M 17.36 5.78 16.36 48.54 39.02 34.13 48.54 34.13
N­O 10.63 3.37 9.82 29.23 23.60 20.61 29.23 20.61
N­J 6.73 2.41 26.18 46.85 43.49 13.51 46.85 13.51
J­N 5.05 1.87 26.18 44.40 41.98 10.25 44.40 10.25
J­I 8.56 5.51 52.47 89.60 82.73 21.35 89.60 21.35
J­K 0.28 2.49 31.48 47.62 45.27 4.62 47.62 4.62
J­F 3.23 1.16 57.78 85.89 85.52 6.49 85.89 6.49
F­J 1.79 0.50 57.78 83.54 84.23 3.35 84.23 3.35
F­E 2.24 0.01 0.00 2.36 2.01 3.15 3.15 2.01
F­G 0.51 0.17 0.00 0.76 0.46 1.01 1.01 0.46
F­B 0.96 0.31 0.00 1.41 0.87 1.88 1.88 0.87
B­F 0.70 0.31 0.00 1.14 0.63 1.52 1.52 0.63
O­N 8.84 3.32 9.82 27.27 21.99 18.01 27.27 18.01
O­P 16.94 5.77 16.36 48.09 38.64 33.52 48.09 33.52
O­K 8.10 2.45 26.18 48.35 44.73 15.51 48.35 15.51
K­O 8.59 1.97 26.18 48.24 45.16 15.37 48.24 15.37
K­J 17.98 3.02 31.48 66.88 61.20 30.30 66.88 30.30
K­L 34.74 6.28 52.47 118.07 106.30 59.31 118.07 59.31
K­G 8.18 1.29 57.78 91.26 89.98 13.64 91.26 13.64
G­K 4.94 0.55 57.78 86.93 87.07 7.86 87.07 7.86
G­F 3.57 0.20 0.00 4.01 3.21 5.34 5.34 3.21
G­H 12.94 0.01 0.00 13.60 11.65 18.14 18.14 11.65
G­C 4.43 0.34 0.00 5.09 3.99 6.78 6.78 3.99
C­G 2.41 0.10 0.00 2.65 2.16 3.53 3.53 2.16
P­O 11.94 3.62 16.36 40.10 34.14 22.87 40.10 22.87
P­L 11.94 3.62 16.36 40.10 34.14 22.87 40.10 22.87
L­P 13.25 2.98 16.36 40.66 35.32 23.62 40.66 23.62
L­K 25.96 4.91 52.47 107.11 98.40 44.70 107.11 44.70
L­H 12.71 1.93 36.11 66.46 63.08 21.08 66.46 21.08
H­L 7.25 0.79 36.11 59.27 58.16 11.50 59.27 11.50
H­G 12.53 0.20 0.00 13.40 11.27 17.87 17.87 11.27
H­D 5.27 0.59 0.00 6.29 4.75 8.39 8.39 4.75
D­H 2.62 0.32 0.00 3.15 2.36 4.20 4.20 2.36
FRAME C

FACTORED MOMENTS (kN­m)

1. Mu = 0.75(1.4DL + 1.7LL + 1.87E)
2. Mu = 0.90DL + 1.43E
3. Mu = 1.4DL +1.7LL

Maximum moment Factored moment Design moments


Member
DL LL E 1 2 3 Maximum Minimum
A­E 3.32 0.70 0.00 4.38 2.99 5.84 5.84 2.99
E­A 7.11 1.44 0.00 9.30 6.40 12.41 12.41 6.40
E­F 12.10 0.49 0.00 13.34 10.89 17.78 17.78 10.89
E­I 4.99 1.93 39.02 62.44 60.30 10.28 62.44 10.28
I­E 7.23 4.78 39.02 68.41 62.31 18.24 68.41 18.24
I­J 16.14 10.01 55.49 107.52 93.87 39.60 107.52 39.60
I­M 8.91 5.23 16.46 39.11 31.56 21.36 39.11 21.36
M­I 10.59 4.31 16.46 39.71 33.08 22.16 39.71 22.16
M­N 10.59 4.31 16.46 39.71 33.08 22.16 39.71 22.16
N­M 17.68 5.87 16.46 49.14 39.46 34.74 49.14 34.74
N­O 11.13 3.17 9.88 29.58 24.15 20.97 29.58 20.97
N­J 6.55 2.70 26.34 47.27 43.56 13.77 47.27 13.77
J­N 5.31 3.00 26.34 46.35 42.45 12.54 46.35 12.54
J­I 12.88 11.90 55.49 106.53 90.94 38.27 106.53 38.27
J­K 3.29 6.36 33.29 58.26 50.57 15.42 58.26 15.42
J­F 4.28 2.54 62.44 95.31 93.14 10.31 95.31 10.31
F­J 3.54 1.09 62.44 92.68 92.47 6.81 92.68 6.81
F­E 12.72 0.01 0.00 13.38 11.45 17.84 17.84 11.45
F­G 3.49 0.44 0.00 4.23 3.14 5.64 5.64 3.14
F­B 5.69 0.66 0.00 6.82 5.12 9.09 9.09 5.12
B­F 3.17 0.19 0.00 3.57 2.85 4.77 4.77 2.85
O­N 5.44 1.93 9.88 22.02 19.02 10.88 22.02 10.88
O­P 11.82 3.89 16.46 40.45 34.18 23.15 40.45 23.15
O­K 6.38 1.96 26.34 46.14 43.41 12.27 46.14 12.27
K­O 6.84 1.81 26.34 46.43 43.82 12.64 46.43 12.64
K­J 13.39 1.32 33.29 62.44 59.66 21.00 62.44 21.00
K­L 26.97 4.48 55.49 111.85 103.62 45.37 111.85 45.37
K­G 6.74 1.35 62.44 96.37 95.35 11.73 96.37 11.73
G­K 4.18 0.54 62.44 92.66 93.05 6.78 93.05 6.78
G­F 1.70 0.07 0.00 1.88 1.53 2.51 2.51 1.53
G­H 11.46 0.13 0.00 12.20 10.31 16.27 16.27 10.31
G­C 5.57 0.34 0.00 6.28 5.01 8.37 8.37 5.01
C­G 2.07 0.10 0.00 2.30 1.86 3.07 3.07 1.86
P­O 11.55 3.48 16.46 39.66 33.94 22.09 39.66 22.09
P­L 11.55 3.48 16.46 39.66 33.94 22.09 39.66 22.09
L­P 12.97 2.97 16.46 40.50 35.22 23.21 40.50 23.21
L­K 25.35 4.89 55.49 110.67 102.16 43.80 110.67 43.80
L­H 12.38 1.92 39.02 70.18 66.94 20.59 70.18 20.59
H­L 7.23 0.79 39.02 63.33 62.31 11.46 63.33 11.46
H­G 12.43 0.20 0.00 13.30 11.18 17.73 17.73 11.18
H­D 5.19 0.59 0.00 6.21 4.68 8.28 8.28 4.68
D­H 2.62 0.32 0.00 3.15 2.36 4.20 4.20 2.36
FRAME D

FACTORED MOMENTS (kN­m)

1. Mu = 0.75(1.4DL + 1.7LL + 1.87E)
2. Mu = 0.90DL + 1.43E
3. Mu = 1.4DL +1.7LL

Maximum moment Factored moment Design moments


Member
DL LL E 1 2 3 Maximum Minimum
A­E 2.54 0.24 0.00 2.97 2.28 3.96 3.96 2.28
E­A 5.06 0.49 0.00 5.93 4.55 7.91 7.91 4.55
E­F 12.52 0.16 0.00 13.35 11.26 17.79 17.79 11.26
E­I 7.46 0.65 36.15 59.35 58.40 11.54 59.35 11.54
I­E 13.44 1.59 36.15 66.84 63.79 21.53 66.84 21.53
I­J 25.43 3.58 45.94 95.70 88.58 41.69 95.70 41.69
I­M 11.99 1.99 9.79 28.85 24.79 20.17 28.85 20.17
M­I 8.08 1.96 9.79 24.71 21.27 14.64 24.71 14.64
M­N 8.08 1.96 9.79 24.71 21.27 14.64 24.71 14.64
N­M 9.62 2.88 9.79 27.50 22.66 18.36 27.50 18.36
N­O 4.15 1.54 5.87 14.55 12.13 8.42 14.55 8.42
N­J 5.47 1.34 15.66 29.42 27.32 9.94 29.42 9.94
J­N 7.73 1.31 15.66 31.75 29.35 13.05 31.75 13.05
J­I 35.01 4.75 45.94 107.25 97.20 57.10 107.25 57.10
J­K 18.82 2.40 27.56 61.48 56.36 30.43 61.48 30.43
J­F 8.46 1.04 57.84 91.32 90.32 13.61 91.32 13.61
F­J 4.83 0.44 57.84 86.74 87.05 7.50 87.05 7.50
F­E 13.16 0.01 0.00 13.83 11.85 18.44 18.44 11.85
F­G 4.55 0.17 0.00 4.99 4.09 6.65 6.65 4.09
F­B 3.79 0.26 0.00 4.31 3.41 5.75 5.75 3.41
B­F 2.16 0.08 0.00 2.37 1.95 3.16 3.16 1.95
O­N 4.91 1.66 5.87 15.51 12.82 9.69 15.51 9.69
O­P 9.79 2.91 9.79 27.71 22.81 18.65 27.71 18.65
O­K 4.88 1.25 15.66 28.68 26.79 8.95 28.68 8.95
K­O 6.21 1.07 15.66 29.85 27.99 10.51 29.85 10.51
K­J 11.22 1.19 27.56 51.95 49.51 17.72 51.95 17.72
K­L 24.03 3.00 45.94 93.48 87.31 38.74 93.48 38.74
K­G 6.60 0.75 57.84 89.00 88.65 10.51 89.00 10.51
G­K 4.02 0.31 57.84 85.73 86.33 6.16 86.33 6.16
G­F 5.01 0.09 0.00 5.38 4.51 7.17 7.17 4.51
G­H 13.21 0.02 0.00 13.89 11.89 18.52 18.52 11.89
G­C 4.18 0.20 0.00 4.64 3.76 6.19 6.19 3.76
C­G 2.35 0.05 0.00 2.53 2.12 3.38 3.38 2.12
P­O 7.13 1.81 9.79 23.52 20.42 13.06 23.52 13.06
P­L 7.13 1.81 9.79 23.52 20.42 13.06 23.52 13.06
L­P 8.97 1.50 9.79 25.06 22.07 15.11 25.06 15.11
L­K 18.58 2.49 45.94 87.10 82.41 30.24 87.10 30.24
L­H 9.61 0.98 36.15 62.04 60.34 15.13 62.04 15.13
H­L 5.88 0.39 36.15 57.37 56.98 8.90 57.37 8.90
H­G 12.12 0.10 0.00 12.85 10.91 17.14 17.14 10.91
H­D 6.24 0.30 0.00 6.93 5.62 9.24 9.24 5.62
D­H 3.05 0.16 0.00 3.40 2.74 4.53 4.53 2.74
FACTORED LOADINGS

1. Wu1 = 1.4DL + 1.7LL (Concentrated load)
2. Wu2 = 1.4DL + 1.7LL (Uniformly distributed load)

FRAME A 
Member DL  (kN) LL (kN) DL  (kN/m) LL (kN/m) Wu1 (kN) Wu2 (kN/m)
M­N 0.00 0.00 8.35 2.53 0.00 15.99
N­O 0.00 0.00 1.88 0.00 0.00 2.63
O­P 0.00 0.00 8.35 2.53 0.00 15.99
I­J 0.00 0.00 9.82 2.29 0.00 17.64
J­K 0.00 0.00 6.60 1.27 0.00 11.39
K­L 0.00 0.00 19.90 2.53 0.00 32.17
E­F 0.00 0.00 10.24 0.00 0.00 14.34
F­G 0.00 0.00 1.88 0.00 0.00 2.63
G­H 0.00 0.00 10.24 0.00 0.00 14.34

FRAME B
Member DL  (kN) LL (kN) DL  (kN/m) LL (kN/m) Wu1 (kN) Wu2 (kN/m)
M­N 0.00 0.00 14.81 5.07 0.00 29.35
N­O 0.00 0.00 1.88 0.00 0.00 2.63
O­P 0.00 0.00 14.81 5.07 0.00 29.35
I­J 0.00 0.00 8.19 4.49 0.00 19.10
J­K 0.00 0.00 5.85 3.20 0.00 13.63
K­L 0.00 0.00 27.83 5.07 0.00 47.58
E­F 0.00 0.00 1.88 0.00 0.00 2.63
F­G 0.00 0.00 1.88 0.00 0.00 2.63
G­H 0.00 0.00 10.24 0.00 0.00 14.34

FRAME C
Member DL  (kN) LL (kN) DL  (kN/m) LL (kN/m) Wu1 (kN) Wu2 (kN/m)
M­N 0.00 0.00 14.81 5.07 0.00 29.35
N­O 0.00 0.00 1.88 0.00 0.00 2.63
O­P 0.00 0.00 14.81 5.07 0.00 29.35
I­J 22.42 12.60 8.19 4.49 52.81 19.10
J­K 0.00 0.00 5.85 3.20 0.00 13.63
K­L 0.00 0.00 27.83 5.07 0.00 47.58
E­F 0.00 0.00 10.24 0.00 0.00 14.34
F­G 0.00 0.00 1.88 0.00 0.00 2.63
G­H 0.00 0.00 10.24 0.00 0.00 14.34

FRAME D
Member DL  (kN) LL (kN) DL  (kN/m) LL (kN/m) Wu1 (kN) Wu2 (kN/m)
M­N 0.00 0.00 8.35 2.53 0.00 15.99
N­O 0.00 0.00 1.88 0.00 0.00 2.63
O­P 0.00 0.00 8.35 2.53 0.00 15.99
I­J 32.51 5.99 15.93 1.60 55.70 25.03
J­K 0.00 0.00 15.93 1.60 0.00 25.03
K­L 0.00 0.00 19.90 2.53 0.00 32.17
E­F 0.00 0.00 10.24 0.00 0.00 14.34
F­G 0.00 0.00 10.24 0.00 0.00 14.34
G­H 0.00 0.00 10.24 0.00 0.00 14.34
TRANSVERSE FRAME
FRAME 1
FACTORED MOMENTS (kN­m)

1. Mu = 0.75(1.4DL + 1.7LL + 1.87E)
2. Mu = 0.90DL + 1.43E
3. Mu = 1.4DL +1.7LL

Maximum moment Factored moment Design moments


Member
DL LL E 1 2 3 Maximum Minimum
A­E 2.85 0.74 0.00 3.93 2.56 5.24 5.24 2.56
E­A 5.33 1.64 0.00 7.68 4.79 10.24 10.24 4.79
E­F 18.62 0.13 0.00 19.72 16.76 26.30 26.30 16.76
E­I 13.29 1.77 48.60 84.38 81.46 21.63 84.38 21.63
I­E 26.29 4.71 48.60 101.77 93.15 44.82 101.77 44.82
I­J 26.29 9.78 63.90 129.69 115.03 53.43 129.69 53.43
I­M 23.32 5.06 15.30 52.41 42.87 41.26 52.41 41.26
M­I 14.14 3.77 15.30 41.11 34.60 26.20 41.11 26.20
M­N 14.14 3.77 15.30 41.11 34.60 26.20 41.11 26.20
N­M 24.26 7.81 15.30 56.90 43.72 47.25 56.90 43.72
N­O 18.09 5.87 20.40 55.10 45.46 35.31 55.10 35.31
N­J 6.17 1.94 35.70 59.03 56.61 11.94 59.03 11.94
J­N 15.45 4.55 35.70 72.09 64.96 29.36 72.09 29.36
J­I 69.23 13.00 63.90 178.89 153.68 119.03 178.89 119.03
J­K 36.15 3.34 85.20 161.70 154.37 56.28 161.70 56.28
J­F 17.63 5.12 113.39 184.07 178.02 33.38 184.07 33.38
F­J 6.37 1.78 113.39 167.99 167.88 11.94 167.99 11.94
F­E 24.96 0.69 0.00 27.10 22.47 36.13 36.13 22.47
F­G 27.21 1.85 0.00 30.93 24.49 41.24 41.24 24.49
F­B 8.61 2.94 0.00 12.79 7.75 17.05 17.05 7.75
B­F 3.28 1.21 0.00 4.99 2.95 6.66 6.66 2.95
O­N 18.48 5.99 20.40 55.65 45.81 36.05 55.65 36.05
O­P 24.25 7.77 15.30 56.83 43.70 47.15 56.83 43.70
O­K 5.77 1.78 35.70 58.40 56.25 11.10 58.40 11.10
K­O 14.23 1.78 35.70 67.29 63.86 22.95 67.29 22.95
K­J 33.65 2.48 85.20 157.99 152.12 51.33 157.99 51.33
K­L 63.34 11.98 63.90 171.39 148.38 109.03 171.39 109.03
K­G 15.46 5.36 113.39 182.10 176.07 30.76 182.10 30.76
G­K 4.43 3.07 113.39 167.61 166.14 11.43 167.61 11.43
G­F 34.52 6.37 0.00 44.38 31.07 59.17 59.17 31.07
G­H 26.28 0.89 0.00 28.73 23.65 38.31 38.31 23.65
G­C 12.67 2.41 0.00 16.38 11.41 21.84 21.84 11.41
C­G 5.28 1.39 0.00 7.31 4.75 9.75 9.75 4.75
P­O 13.60 3.68 15.30 40.43 34.12 25.29 40.43 25.29
P­L 13.60 3.68 15.30 40.43 34.12 25.29 40.43 25.29
L­P 21.38 4.67 15.30 49.86 41.13 37.87 49.86 37.87
L­K 45.12 8.96 63.90 148.42 131.98 78.40 148.42 78.40
L­H 23.74 4.29 48.60 98.55 90.86 40.53 98.55 40.53
H­L 12.15 1.75 48.60 83.14 80.43 19.98 83.14 19.98
H­G 17.87 0.75 0.00 19.72 16.08 26.29 26.29 16.08
H­D 5.72 0.99 0.00 7.27 5.15 9.69 9.69 5.15
D­H 2.96 0.41 0.00 3.62 2.66 4.83 4.83 2.66
FRAME 2
FACTORED MOMENTS (kN­m)

1. Mu = 0.75(1.4DL + 1.7LL + 1.87E)
2. Mu = 0.90DL + 1.43E
3. Mu = 1.4DL +1.7LL

Maximum moment Factored moment Design moments


Member
DL LL E 1 2 3 Maximum Minimum
A­E 0.24 1.05 0.00 1.60 0.22 2.13 2.13 0.22
E­A 0.94 2.18 0.00 3.77 0.85 5.03 5.03 0.85
E­F 9.85 0.48 0.00 10.96 8.87 14.61 14.61 8.87
E­I 10.79 2.67 52.76 88.73 85.16 19.65 88.73 19.65
I­E 23.93 6.87 52.76 107.88 96.98 45.18 107.88 45.18
I­J 48.37 14.44 75.36 174.89 151.29 92.27 174.89 92.27
I­M 24.44 7.57 22.60 67.01 54.31 47.10 67.01 47.10
M­I 18.37 6.08 22.60 58.74 48.85 36.07 58.74 36.07
M­N 18.37 6.08 22.60 58.74 48.85 36.07 58.74 36.07
N­M 36.51 12.21 22.60 85.59 65.17 71.87 85.59 65.17
N­O 28.73 9.98 30.13 85.15 68.94 57.19 85.15 57.19
N­J 7.77 2.23 52.72 84.95 82.39 14.68 84.95 14.68
J­N 17.52 4.66 52.72 98.29 91.16 32.45 98.29 32.45
J­I 68.75 23.26 75.36 207.53 169.64 135.80 207.53 135.80
J­K 30.27 13.38 100.47 189.76 170.92 65.12 189.76 65.12
J­F 20.97 5.22 123.10 201.32 194.91 38.22 201.32 38.22
F­J 9.83 2.06 123.10 185.60 184.89 17.27 185.60 17.27
F­E 16.02 0.27 0.00 17.17 14.42 22.89 22.89 14.42
F­G 6.84 0.13 0.00 7.35 6.16 9.80 9.80 6.16
F­B 0.66 1.92 0.00 3.13 0.59 4.18 4.18 0.59
B­F 0.64 0.66 0.00 1.51 0.57 2.01 2.01 0.57
O­N 29.18 10.15 30.13 85.83 69.34 58.10 85.83 58.10
O­P 36.56 12.17 22.60 85.60 65.22 71.87 85.60 65.22
O­K 7.38 2.03 52.72 84.28 82.04 13.77 84.28 13.77
K­O 16.21 4.09 52.72 96.18 89.99 29.65 96.18 29.65
K­J 27.63 12.20 100.47 185.48 168.54 59.42 185.48 59.42
K­L 62.36 20.97 75.36 197.89 163.88 122.94 197.89 122.94
K­G 18.52 4.68 123.10 198.06 192.70 33.88 198.06 33.88
G­K 7.50 2.11 123.10 183.22 182.79 14.08 183.22 14.08
G­F 7.70 1.69 0.00 10.24 6.93 13.65 13.65 6.93
G­H 9.26 0.11 0.00 9.87 8.34 13.16 13.16 8.34
G­C 5.94 0.53 0.00 6.91 5.34 9.22 9.22 5.34
C­G 1.97 0.01 0.00 2.09 1.78 2.79 2.79 1.78
P­O 17.56 5.92 22.60 57.68 48.12 34.66 57.68 34.66
P­L 17.56 5.92 22.60 57.68 48.12 34.66 57.68 34.66
L­P 21.59 6.94 22.60 63.21 51.74 42.02 63.21 42.02
L­K 42.11 13.02 75.36 166.50 145.66 81.09 166.50 81.09
L­H 20.52 6.08 52.76 103.30 93.91 39.07 103.30 39.07
H­L 9.82 2.38 52.76 87.34 84.28 17.79 87.34 17.79
H­G 11.80 0.58 0.00 13.13 10.62 17.50 17.50 10.62
H­D 1.99 1.81 0.00 4.39 1.79 5.85 5.85 1.79
D­H 1.10 0.89 0.00 2.29 0.99 3.05 3.05 0.99
FRAME 3

FACTORED MOMENTS (kN­m)

1. Mu = 0.75(1.4DL + 1.7LL + 1.87E)
2. Mu = 0.90DL + 1.43E
3. Mu = 1.4DL +1.7LL

Maximum moment Factored moment Design moments


Member
DL LL E 1 2 3 Maximum Minimum
A­E 2.23 0.71 0.00 3.25 2.00 4.33 4.33 2.00
E­A 3.86 1.17 0.00 5.54 3.47 7.39 7.39 3.47
E­F 5.17 0.38 0.00 5.91 4.65 7.88 7.88 4.65
E­I 9.03 1.55 65.98 103.99 102.48 15.27 103.99 15.27
I­E 21.34 3.89 65.98 119.91 113.56 36.49 119.91 36.49
I­J 44.09 9.10 88.94 182.63 166.86 77.19 182.63 77.19
I­M 22.75 5.20 22.96 62.72 53.31 40.70 62.72 40.70
M­I 18.36 5.56 22.96 58.56 49.35 35.15 58.56 35.15
M­N 18.36 5.56 22.96 58.56 49.35 35.15 58.56 35.15
N­M 34.66 11.72 22.96 83.53 64.02 68.44 83.53 64.02
N­O 31.24 10.96 30.61 89.70 71.89 62.37 89.70 62.37
N­J 3.42 0.76 53.57 79.68 79.68 6.08 79.68 6.08
J­N 5.70 0.51 53.57 81.76 81.73 8.84 81.76 8.84
J­I 72.86 17.19 88.94 223.16 192.75 131.23 223.16 131.23
J­K 61.47 16.56 118.58 251.98 224.90 114.22 251.98 114.22
J­F 5.69 0.12 153.96 222.05 225.27 8.16 225.27 8.16
F­J 2.68 0.11 153.96 218.87 222.56 3.93 222.56 3.93
F­E 3.66 0.16 0.00 4.05 3.29 5.40 5.40 3.29
F­G 2.40 0.08 0.00 2.62 2.16 3.49 3.49 2.16
F­B 1.42 0.19 0.00 1.73 1.27 2.31 2.31 1.27
B­F 0.11 0.03 0.00 0.15 0.10 0.20 0.20 0.10
O­N 28.72 9.90 30.61 85.70 69.62 57.03 85.70 57.03
O­P 29.91 9.92 22.96 76.25 59.75 58.74 76.25 58.74
O­K 1.19 0.02 53.57 76.41 77.67 1.71 77.67 1.71
K­O 2.54 0.26 53.57 78.12 78.89 3.99 78.89 3.99
K­J 57.00 15.69 118.58 246.17 220.88 106.48 246.17 106.48
K­L 63.80 15.11 88.94 210.99 184.60 115.00 210.99 115.00
K­G 4.25 0.32 153.96 220.80 223.98 6.50 223.98 6.50
G­K 3.46 0.18 153.96 219.77 223.27 5.14 223.27 5.14
G­F 6.16 0.02 0.00 6.50 5.55 8.66 8.66 5.55
G­H 18.53 0.04 0.00 19.50 16.67 26.00 26.00 16.67
G­C 8.91 0.12 0.00 9.50 8.02 12.67 12.67 8.02
C­G ­3.39 0.05 0.00 ­3.49 ­3.05 ­4.65 ­3.05 ­4.65
P­O 17.57 5.26 22.96 57.35 48.64 33.53 57.35 33.53
P­L 17.57 5.26 22.96 57.35 48.64 33.53 57.35 33.53
L­P 21.72 4.86 22.96 61.20 52.38 38.66 61.20 38.66
L­K 43.54 8.31 88.94 181.04 166.36 75.08 181.04 75.08
L­H 21.82 3.45 65.98 119.85 113.99 36.41 119.85 36.41
H­L 12.18 1.41 65.98 107.13 105.31 19.45 107.13 19.45
H­G 19.95 0.35 0.00 21.40 17.96 28.53 28.53 17.96
H­D 7.78 1.06 0.00 9.52 7.00 12.69 12.69 7.00
D­H 3.63 0.67 0.00 4.66 3.26 6.21 6.21 3.26
FRAME 4

FACTORED MOMENTS (kN­m)

1. Mu = 0.75(1.4DL + 1.7LL + 1.87E)
2. Mu = 0.90DL + 1.43E
3. Mu = 1.4DL +1.7LL

Maximum moment Factored moment Design moments


Member
DL LL E 1 2 3 Maximum Minimum
A­E 4.25 0.33 0.00 4.89 3.83 6.52 6.52 3.83
E­A 9.28 0.52 0.00 10.41 8.35 13.88 13.88 8.35
E­F 18.58 0.16 0.00 19.72 16.72 26.29 26.29 16.72
E­I 9.30 0.69 46.87 76.37 75.39 14.19 76.37 14.19
I­E 15.49 1.73 46.87 84.21 80.96 24.64 84.21 24.64
I­J 30.24 4.42 62.14 124.52 116.07 49.84 124.52 49.84
I­M 14.74 2.68 15.27 40.32 35.11 25.20 40.32 25.20
M­I 12.15 3.24 15.27 38.30 32.77 22.52 38.30 22.52
M­N 12.15 3.24 15.27 38.30 32.77 22.52 38.30 22.52
N­M 22.19 7.12 15.27 53.79 41.81 43.17 53.79 41.81
N­O 20.23 6.53 20.36 58.12 47.32 39.42 58.12 39.42
N­J 1.96 0.59 35.63 52.78 52.71 3.75 52.78 3.75
J­N 2.29 0.41 35.63 52.90 53.01 3.90 53.01 3.90
J­I 49.54 6.91 62.14 147.97 133.44 81.10 147.97 81.10
J­K 45.28 6.29 82.85 171.75 159.22 74.08 171.75 74.08
J­F 1.98 0.20 109.35 155.71 158.16 3.12 158.16 3.12
F­J 1.11 0.11 109.35 154.67 157.37 1.73 157.37 1.73
F­E 22.61 0.06 0.00 23.82 20.35 31.76 31.76 20.35
F­G 21.25 0.04 0.00 22.36 19.12 29.82 29.82 19.12
F­B 0.25 0.13 0.00 0.43 0.23 0.57 0.57 0.23
B­F 0.54 0.00 0.00 0.57 0.49 0.76 0.76 0.49
O­N 20.23 6.53 20.36 58.12 47.32 39.42 58.12 39.42
O­P 22.19 7.12 15.27 53.79 41.81 43.17 53.79 41.81
O­K 1.96 0.59 35.63 52.78 52.71 3.75 52.78 3.75
K­O 2.29 0.41 35.63 52.90 53.01 3.90 53.01 3.90
K­J 45.28 6.29 82.85 171.75 159.22 74.08 171.75 74.08
K­L 49.54 6.91 62.14 147.97 133.44 81.10 147.97 81.10
K­G 1.98 ­0.20 109.35 155.18 158.16 2.42 158.16 2.42
G­K 1.11 0.11 109.35 154.67 157.37 1.73 157.37 1.73
G­F 21.25 0.04 0.00 22.36 19.12 29.82 29.82 19.12
G­H 22.61 0.06 0.00 23.82 20.35 31.76 31.76 20.35
G­C 0.25 0.13 0.00 0.43 0.23 0.57 0.57 0.23
C­G 0.54 0.00 0.00 0.57 0.49 0.76 0.76 0.49
P­O 12.15 3.24 15.27 38.30 32.77 22.52 38.30 22.52
P­L 12.15 3.24 15.27 38.30 32.77 22.52 38.30 22.52
L­P 14.74 2.68 15.27 40.32 35.11 25.20 40.32 25.20
L­K 30.24 4.42 62.14 124.52 116.07 49.84 124.52 49.84
L­H 15.49 1.73 46.87 84.21 80.96 24.64 84.21 24.64
H­L 9.30 0.69 46.87 76.37 75.39 14.19 76.37 14.19
H­G 18.58 0.16 0.00 19.72 16.72 26.29 26.29 16.72
H­D 9.28 0.52 0.00 10.41 8.35 13.88 13.88 8.35
D­H 4.25 0.33 0.00 4.89 3.83 6.52 6.52 3.83
FACTORED LOADINGS

1. Wu1 = 1.4DL + 1.7LL (Concentrated load)
2. Wu2 = 1.4DL + 1.7LL (Uniformly distributed load)

FRAME 1
Member DL  (kN) LL (kN) DL  (kN/m) LL (kN/m) Wu1 (kN) Wu2 (kN/m)
M­N 0.00 0.00 9.51 2.99 0.00 18.40
N­O 0.00 0.00 9.51 2.99 0.00 18.40
O­P 0.00 0.00 9.51 2.99 0.00 18.40
I­J 59.25 15.18 21.07 5.31 108.76 38.53
J­K 0.00 0.00 11.97 0.00 0.00 16.75
K­L 49.43 13.56 21.88 5.15 92.26 39.39
E­F 0.00 0.00 10.24 0.00 0.00 14.34
F­G 21.97 10.24 10.24 0.00 48.17 14.34
G­H 0.00 0.00 10.24 0.00 0.00 14.34

FRAME 2
Member DL  (kN) LL (kN) DL  (kN/m) LL (kN/m) Wu1 (kN) Wu2 (kN/m)
M­N 0.00 0.00 14.81 4.89 0.00 29.05
N­O 0.00 0.00 14.36 4.89 0.00 28.42
O­P 0.00 0.00 14.81 4.89 0.00 29.05
I­J 79.15 19.98 20.08 10.62 144.78 46.18
J­K 0.00 0.00 8.58 4.80 0.00 20.17
K­L 69.33 18.03 20.90 10.04 127.71 46.32
E­F 0.00 0.00 10.24 0.00 0.00 14.34
F­G 7.97 2.36 1.88 0.00 15.17 2.63
G­H 0.00 0.00 10.24 0.00 0.00 14.34

FRAME 3
Member DL  (kN) LL (kN) DL  (kN/m) LL (kN/m) Wu1 (kN) Wu2 (kN/m)
M­N 0.00 0.00 14.36 4.89 0.00 28.42
N­O 0.00 0.00 14.36 4.89 0.00 28.42
O­P 0.00 0.00 14.36 4.89 0.00 28.42
I­J 19.90 4.80 30.43 8.30 36.02 56.71
J­K 0.00 0.00 27.28 7.79 0.00 51.43
K­L 19.90 4.47 30.43 7.88 35.46 55.99
E­F 0.00 0.00 1.88 0.00 0.00 2.63
F­G 0.00 0.00 1.88 0.00 0.00 2.63
G­H 0.00 0.00 10.24 0.00 0.00 14.34

FRAME 4
Member DL  (kN) LL (kN) DL  (kN/m) LL (kN/m) Wu1 (kN) Wu2 (kN/m)
M­N 0.00 0.00 9.51 2.99 0.00 18.40
N­O 0.00 0.00 9.51 2.99 0.00 18.40
O­P 0.00 0.00 9.51 2.99 0.00 18.40
I­J 0.00 0.00 21.33 2.99 0.00 34.94
J­K 0.00 0.00 21.33 2.99 0.00 34.94
K­L 0.00 0.00 21.33 2.99 0.00 34.94
E­F 0.00 0.00 10.24 0.00 0.00 14.34
F­G 0.00 0.00 10.24 0.00 0.00 14.34