CEBU TECHNOLOGICAL UNIVERSITY OJT FORM 6

October 2012
Revision: 0

DAILY PERFORMANCE REPORT

Name of Student Trainee: JOHN TONTON B. GUANZON


Course, Year & Major: BSCE-E IV-6
Cooperating Industry: PL JUAN CONSTUCTION Inclusive Date: From: JUNE 24, 2019
Department Assigned: FIELD To: JUNE 24, 2019
Summary of Activities: Learning / Insights:
 Estimating the fire sprinkler and its pipes for the  Estimating the number of fire
Eight Storey Proposed Building sprinklers (QRS and Upright Sprinkler)
 Observing the work at the site of Eight Storey and required length of the pipe using
Proposed Building. the blueprint for the Eight-Storey
Proposed Building.
 Plan interpretation of the symbols and
abbreviation.

Prepared By:

JOHN TONTON B. GUANZON


Student Signature Over Printed Name
CA Remarks:

ENGR. SHELDON JOHN I. DORIA


Signature Over Printed Name.

OJT Chairman / Supervisor Remarks:

DR. LAWRENCE T. ORJALLESA M.Eng, Ph.D


Signature Over Printed Name .
CEBU TECHNOLOGICAL UNIVERSITY OJT FORM 6
October 2012
Revision: 0

DAILY PERFORMANCE REPORT

Name of Student Trainee: JOHN TONTON B. GUANZON


Course, Year & Major: BSCE-E IV-6
Cooperating Industry: PLJUAN CONSTUCTION Inclusive Date: From: JUNE 25, 2019
Department Assigned: FIELD To: JUNE 25, 2019
Summary of Activities: Learning / Insights:
 Continuation of the bar cutting lists estimation  Additional knowledge for calculating the
of the three storey building inside the VSMMC. steel bars for the Three Storey Proposed
 Site inspection of the partial concreted slabs and building inside the VSMMC.
pedestals of the ground floor of the Eight Storey  Sights some current problems of the
Proposed Building. pedestal and anchored bolts and the
action of the Operation Manager to it.

Prepared By:

JOHN TONTON B. GUANZON


Student Signature Over Printed Name
CA Remarks:

ENGR. SHELDON JOHN I. DORIA


Signature Over Printed Name.

OJT Chairman / Supervisor Remarks:

DR. LAWRENCE T. ORJALLESA M.Eng, Ph.D


Signature Over Printed Name .
CEBU TECHNOLOGICAL UNIVERSITY OJT FORM 6
October 2012
Revision: 0

DAILY PERFORMANCE REPORT

Name of Student Trainee: JOHN TONTON B. GUANZON


Course, Year & Major: BSCE-E IV-6
Cooperating Industry: PL JUAN CONSTUCTION Inclusive Date: From: JUNE 26, 2019
Department Assigned: FIELD To: JUNE 26, 2019
Summary of Activities: Learning / Insights:
 Observation inside the Eight Storey Proposed  Some pedestals have not equally
Building proportional in terms of it concrete
 Continuation of the site inspection of the ground cover but the Project Engineer have its
floor of the Eight Storey Proposed Building in way to solve this problem.
preparation of the Steel Column installations.  Observation of the work and the
situation inside the Eight Storey
Proposed Building.

Prepared By:

JOHN TONTON B. GUANZON


Student Signature Over Printed Name
CA Remarks:

ENGR. SHELDON JOHN I. DORIA


Signature Over Printed Name.

OJT Chairman / Supervisor Remarks:

DR. LAWRENCE T. ORJALLESA M.Eng, Ph.D


Signature Over Printed Name .
CEBU TECHNOLOGICAL UNIVERSITY OJT FORM 6
October 2012
Revision: 0

DAILY PERFORMANCE REPORT

Name of Student Trainee: JOHN TONTON B. GUANZON


Course, Year & Major: BSCE-E IV-6
Cooperating Industry: PL JUAN CONSTUCTION Inclusive Date: From: JUNE 27, 2019
Department Assigned: FIELD To: JUNE 27, 2019
Summary of Activities: Learning / Insights:
 Estimation of the steel bars needed for the beams  Plan interpretation of the proposed
and girders of the three-storey building inside the plan of the three-storey building.
VSMMC.  Bar cutting lists needed for the lower
 Observed the works inside the eight-storey ground floor up to the roof deck
proposed building. portion of the three-storey building.
 Preparation of the Project Logbook discussed by  Project Logbook for the Eight Storey
Sir Ivan, one of the project-in-charges. Proposed Building, everything happens
inside the site, the weather, the
material delivered that day or the
number of manpower need to state in
the logbook.

Prepared By:

JOHN TONTON B. GUANZON


Student Signature Over Printed Name
CA Remarks:

ENGR. SHELDON JOHN I. DORIA


Signature Over Printed Name.

OJT Chairman / Supervisor Remarks:

DR. LAWRENCE T. ORJALLESA M.Eng, Ph.D


Signature Over Printed Name .
CEBU TECHNOLOGICAL UNIVERSITY OJT FORM 6
October 2012
Revision: 0

DAILY PERFORMANCE REPORT

Name of Student Trainee: JOHN TONTON B. GUANZON


Course, Year & Major: BSCE-E IV-6
Cooperating Industry: PL JUAN CONSTUCTION Inclusive Date: From: JUNE 27, 2019
Department Assigned: FIELD To: JUNE 27, 2019
Summary of Activities: Learning / Insights:
 Concrete pouring and slump test initiated by Sir  Things need to consider before and
Richard, the Project Engineer. during the concrete pouring.
 Finalizing the bar cutting list for the three storey  Recall the slump test process and
building. purposed.
 Observed the situation inside the eight storey  Observing how the equipment (Pump
building during the night time. Crete and Concrete Mixer Truck)
operate and its function.
 The manpower during the Night Time
was less. Maybe the area to be filled of
the concrete mix was small that’s why
the workers are less rather than the
Day time works.

Prepared By:

JOHN TONTON B. GUANZON


Student Signature Over Printed Name
CA Remarks:

ENGR. SHELDON JOHN I. DORIA


Signature Over Printed Name.

OJT Chairman / Supervisor Remarks:

DR. LAWRENCE T. ORJALLESA M.Eng, Ph.D


Signature Over Printed Name .
CEBU TECHNOLOGICAL UNIVERSITY OJT FORM 6
October 2012
Revision: 0

WEEKLY PERFORMANCE REPORT

Name of Student Trainee: JOHN TONTON B. GUANZON


Course, Year & Major: BSCE-E IV-6
Cooperating Industry: PL JUAN CONSTUCTION Inclusive Date: From: JUNE 24, 2019
Department Assigned: FIELD To: JUNE 27, 2019
Summary of Activities: Learning / Insights:
 Estimating the fire sprinkler and its pipes for  Estimating the number of fire sprinklers
the Eight Storey Proposed Building (QRS and Upright Sprinkler) and required
 Observing the work at the site of Eight Storey length of the pipe using the blueprint for
Proposed Building. the Eight-Storey Proposed Building.
 Continuation of the bar cutting lists estimation  Plan interpretation of the symbols and
of the three storey building inside the abbreviation.
VSMMC.  Additional knowledge for calculating the
 Site inspection of the partial concreted slabs steel bars for the Three Storey Proposed
and pedestals of the ground floor of the Eight building inside the VSMMC.
Storey Proposed Building.  Sights some current problems of the
 Observation inside the Eight Storey Proposed pedestal and anchored bolts and the action
Building of the Operation Manager to it.
 Continuation of the site inspection of the  Some pedestals have not equally
ground floor of the Eight Storey Proposed proportional in terms of it concrete cover
Building in preparation of the Steel Column but the Project Engineer have its way to
installations. solve this problem.
 Estimation of the steel bars needed for the  Observation of the work and the situation
beams and girders of the three-storey building inside the Eight Storey Proposed Building.
inside the VSMMC.  Plan interpretation of the proposed plan of
 Observed the works inside the eight-storey the three-storey building.
proposed building.  Bar cutting lists needed for the lower
 Preparation of the Project Logbook discussed ground floor up to the roof deck portion of
by Sir Ivan, one of the project-in-charges. the three-storey building.
 Concrete pouring and slump test initiated by  Project Logbook for the Eight Storey
Sir Richard, the Project Engineer. Proposed Building, everything happens
 Finalizing the bar cutting list for the three inside the site, the weather, the material
storey building. delivered that day or the number of
 Observed the situation inside the eight storey manpower need to state in the logbook.
building during the night time.  Things need to consider before and during
the concrete pouring.
 Recall the slump test process and
purposed.
 Observing how the equipment (Pump Crete
and Concrete Mixer Truck) operate and its
function.
 The manpower during the Night Time was
less. Maybe the area to be filled of the
concrete mix was small that’s why the
workers are less rather than the Day time
works.
Prepared By:

JOHN TONTON B. GUANZON


Student Signature Over Printed Name
CA Remarks:

ENGR. SHELDON JOHN I. DORIA


Signature Over Printed Name.
OJT Chairman / Supervisor Remarks:

ENGR. PHILIP JOHN S. BORROMEO


Signature Over Printed Name .