Sunteți pe pagina 1din 3

Flats, UK Egmond aan Zee, the Netherlands

Kentish
Anholt, Denmark
2, UK
Walney
Arklow ium
Lincs, UK
Bank, Ir
eland Alph elgiu
m
Belg
a Ve ind, B nk
, Sheringh
Barrow, UK ntus Belw Ba am Soal,
UK
ton
y

, Ge
an

rma orn
m

North Hoyle, UK ny Th
er

BAR Samsø UK Gun


ray,
,G

, Denm fleet
DO n Ar Burbo Bank, UK
c1

ffsh ark do Sand


Lon ium s, UK
lti

ore ank, Belg


B
Ba

1, G
erm Thornton , Sweden
any Utgrunden Greater Gabbard, UK
Hor
UK eden ns R Hook siel, Germ any sing, UK
ts, w ev 2 ow
l Fla d, S er D
Rhy
Thanet, UK run , De
& Inn Q7, th
Steng Robin Rigg, UK
nm
ark L yn n e Neth
e erland
Horns Rev 1, Denmark Yttr s

Ducorit® references
- grouted connections in offshore foundations
References

More than 1500 grouted



1 2012: Anholt, Denmark
111 monopiles

connections in offshore foundations



2 2011: Lincs, UK
75 monopiles
3 2011: London Array, UK
Ever since the start of erecting wind farms offshore, ITW Densit’s 177 monopiles
4 2011: Walney 2, UK
ultra high performance cementitious material, Ducorit® has been
51 monopiles
a crucial structural component of foundations for offshore wind 5 2010/2011: Sheringham Shoal, UK
turbines. 90 monopiles
6 2010/2012: BARD Offshore 1, Germany
80 tripiles
Ducorit® is successfully applied as a strong 7 2010: Baltic 1, Germany
and cost-effective connection between 18
21 monopiles
piles and transition pieces in more than 23 16
1 8 2010: Walney 1, UK
8 30 51 monopiles
1500 monopile, tripile, tripod, jacket and 4
28
29 9 2009/2010: Belwind, Belgium
wave/tidal foundations. 21 27 56 monopiles
17 26 10 2009/2010: Greater Gabbard, UK
25 140 monopiles
Over time ITW Densit has worked with 19
6
7 11 2009: Thanet, UK
most foundation contractors and the 2 5 12 100 monopiles
14
experience we have gathered has made 12 2008/2009: Alpha Ventus, Germany
10
6 tripods
us the market leading supplier of grouting 12 13 2008: Gunfleet Sands, UK
services to offshore wind farms. 13 22 48 monopiles
20 14 2008: Hooksiel, Germany
24 1 tripile
9
15 2008: Thornton Bank, Belgium
15
3 6 undercasting of towers
16 2008: Horns Rev 2, Denmark
92 monopiles
17 2008: Rhyl Flats, UK
25 monopiles
18 2007: Robin Rigg, UK
60 monopiles
19 2007: Lynn & Inner Dowsing, UK
54 monopiles
20 2006: Princess Amalia, the Netherlands
60 monopiles
21 2006: Burbo Bank, UK
25 monopiles
22 2006: Egmond aan Zee, the Netherlands
36 monopiles
23 2005: Barrow, UK
30 monopiles
24 2004: Kentish Flats, UK
30 monopiles
2 London Array, UK (phase 1) 6 Baltic 1, Germany 4 Sheringham Shoal, UK 5 BARD Offshore 1, Germany 11 Alpha Ventus, Germany 25 2003: Arklow Bank, Ireland
Year of installation: 2011/2012 Year of installation: 2010 Year of installation: 2010/2011 Year of installation: 2010/2012 Year of installation: 2008-2009 7 monopiles
Location: Outer Thames Estuary, Location: Northeast Germany, Baltic Sea Location: East Coast of North Norfolk, UK Location: North Sea Location: North Sea 26 2003: North Hoyle, UK
North Sea Foundations: 21 monopiles Foundations: 90 monopiles Foundations: 80 tripiles Foundations: 6 tripods 30 monopiles
Foundations: 177 monopiles Grouted connections: Between piles Grouted connections: Between piles Grouted connections: Between Grouted connections: Between 27 2002: Samsø, Denmark
Grouted connections: Between piles and TPs and TPs piles and tripile TPs piles and tripod TPs 10 monopiles
and TPs Foundation contractor: Ballast Needam Foundation contractor: SHL/MTH Foundation contractor: BARD Foundation contractor: Areva 28 2002: Horns Rev 1, Denmark
Foundation contractor: ABJV Operator: EnBW Operator: Statoil, Statkraft Operator: BARD Operator: EWE AG, E.ON and 80 monopiles
Operator: DONG Energy, E.ON, and Vattenfall 29 2001: Yttre Stengrund, Sweden
Masdar 5 monopiles
30 2000: Utgrunden, Sweden
7 monopiles
ITW Densit - your experienced partner
for connecting offshore structures around the world
ITW DENSIT - part of ITW WindGroup ITW DENSIT ApS Quality assurance
ITW Densit ApS is part of Illinois Tool Since 1983, ITW Densit has been specia- ITW Densit is certified to ISO 9001, ISO
Works (ITW) a global industrial company lizing in the development, manufacture 14001 and OHSAS 18001. The manu-
that operates over 800 businesses and supply of high-performance soluti- facturing and quality management of
located in 52 countries worldwide. ons based on its Ultra High Performance Ducorit® products hold a Shop Approval
Cementitious (UHPC) Densit® materials. Certificate issued by Germanischer Lloyds
ITW focuses on developing value-added In addition to connecting offshore struc- Industrial Service.
products and innovative customer solu- tures in the wind industry, UHPC Densit®
tions to serve diverse end markets and materials are applied worldwide in other
customer segments. One area of such demanding areas such as the reinforce-
focus is the Wind Industry market where ment of oil and gas platforms and secu-
the company services global customers rity barriers and as wear and abrasion
through its ITW WindGroup business. resistant solutions.

ITW Densit ApS brings its unique global


platform of Ducorit® grout solutions for
offshore and onshore foundation instal-
lations through the ITW WindGroup into
this market. As part of the ITW WindGroup
ITW Densit ApS leverage global econo-
mies of scale, established distribution
network and pricing to help its customers
remain competitive in the marketplace.

©2012 ITW Densit ApS 10.04.2012

46, Gasvaerksvej · DK-9000 Aalborg


Tel. +45 9816 7011
mail@densit.com

www.itwwindgroup.com www.densit.com

S-ar putea să vă placă și