1/007
QUALITY WORK INSTRUCTION Date of Preparation 10/06/2017
Maintenance For Re-Heating Furnace Revision No. & Date 00
Page No. 01
PREPARED BY: APPROVED BY: ISSUED BY:
Subhrajit Mohapatra HOD : T K Chakraborty HOD (ISO & TPM) Vinit Kumar
In reheating furnace hydraulic cylinders are installed at Kick off device (4 cylinders), Walking
beam (3 cylinders).
1. Check the tightness of Hydraulic line pipe clamps and hose fittings.
Check the tightness of clamp bolts and hose fittings by using proper ring or DE spanners
as per site requirement.
Tightening to be done in clock wise rotational direction.
Do not use any extension to the spanners in order to avoid over tightness or slip of thread.
While tightening the hose fittings if there is any leakage observed then note in defect
register. Appropriate action to be taken in the next possible shut down.
2. Clean the hydraulic cylinders for observing the minute leakages
Clean the hydraulic cylinder with cloth, observe any seepage leakage. If found note it in
defect register. Appropriate action to be taken in the next possible shut down.
3. Check tightness of hydraulic cylinder fasteners and cylinder mounting fasteners
Tighten the hydraulic cylinder body fasteners and mounting fasteners by using Allen key,
spanners etc.
4. Grease the hydraulic cylinders tunion bearings.
Grease the hydraulic cylinder tunion bearings with the help of grease pump. EP-2 grease
should be used.
5. Check for any hydraulic leakage from the hyd. Cylinder cushioning adjusting point.
Cushioning point should be carefully observed for any hydraulic leakage. If case of any
leakage try to arrest the leakage by tightening the check nut. In case leakage still exist
then note it in defect register. Appropriate action to be taken in the next possible shut
down.
In reheating furnace centralized greasing is done to the plummer block of charging roller table,
discharging roller table, kick off device wheel, walking beam wheel and sliding mechanism of buffer.
1. Check the tightness of grease line pipe clamps and end fittings.
Check the tightness of clamp bolts and grease fittings by using proper ring or DE
spanners as per site requirement.
Tightening to be done in clock wise rotational direction.
Do not use any extension to the spanners in order to avoid over tightness or slip of thread.
While tightening the grease line fittings if there is any leakage observed then arrest the
leakage by changing the ferrule. Before opening the joint see the grease pump restart
time, or wait for the pause delay time. (Pause delay time is 1 Hr.)
2. Check proper quantity of grease is reaching to the end points(required greasing point)
This operation to be carried out in short shut down. Grease point before plummer block
to be opened and observe grease is coming out or not. In case of no grease change the
grease distributer. The defect grease distributer to be overhauled offline and kept in store
for next time use.
In Reheating furnace cooling water system is supplied to walking beam, kick off device mechanism,
charging roller table, discharging roller table, Buffer, Doors.
1. Check the hoses and pipe line condition of cooled equipment for any joint leakages
Check the water leakage from the pipe line, hose fitting, rotary union. For hose fitting
leakage tighten the hose swivel nut. For other leakage note it in defect register.
Appropriate action to be taken in the next possible shut down.
In Reheating furnace there are 3 nos. of doors. Charging, discharging and inspection door.
1. Door mechanism should be checked so that the doors opens and closes properly without
excessive force or noise.
1. Inspect that bolts are tighten and there is no excessive vibration or noise.
Check the bolt tightness by using proper DE and Ring spanner.
Tightening to be done in clock wise rotational direction.