Documente Academic
Documente Profesional
Documente Cultură
SYSTEM
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY
FOR P.C. SAXENA AUDITORIUM INSIDE I.I.T.B CAMPUS
SUMMARY
SR. NO. ITEM DESCRIPTION AMOUNT
IV POST-FUNCTION AREA 0
V CONVOCATION HALL 0
VI VIDEO STREAMING 0
TOTAL OF (I+II+III+IV+V+VI) 0
ITEMWISE SUMMARY
IV POST-FUNCTION AREA
V CONVOCATION HALL
VI VIDEO STREAMING
Supply, Installation, Testing And Commissioning of A.V. System for P.C. Saxena Auditorium insid
Powai Mumbai 400 076
1 In addition to Clause 3.5.2 of Special Conditions of Contract Rate quoted for the items shall also be in
a) Security Regulations & rules of I.I.T, and its constituent units shall be strictly followed while movem
work forces and Cost arising due to security regulations.
b) Safety of Labours working at site shall be as per safety code enclosed in the specifications and to
safety engineer.
2 The approach road should be kept clean & free from obstructions for smooth functioning of existing tr
be made good without any extra cost to the IITB.
3 Tenderer's are advised to acquaint themselves with access to site, location of work, local labour prob
to availability and carriage of construction materials.
Signature of tend
2.1 Very High Power Cinema Surround Speaker for Digital Applications each 14.00
2.2 Bracket for the above speaker each 14.00
2.3 Dual Channel Digital Power Amplifier, 1600 W@ 2 ohm, each 3.00
1200W @ 4 ohm, 650 W @ 8 ohm per channel
2.4 Sourround sound preamplifier each 1.00
2.5 2 core 4 sq mm speaker cable Rmt. 100.00
TOTAL OF HARMAN AUDIO SYSTEM
5.1 32 Inch LED display for Green room including wall mounting arrangement each 2.00
5.2 32 Inch LED display with Floor mount cart for stage foldback display each 1.00
TOTAL OF DISPLAY SYSTEM FOR AUDITORIUM
V CONVOCATION HALL
A DISPLAY SYSTEM FOR CONVOCATION HALL
13 Supply, Installation, testing & commisioning of the following equipments and
accessories as per the design & drawings and as instructed by EIC.
13.1 14000 Lumens Full HD projector with standard Zoom lens(ILS 1.25-1.6SX+/1.16- each 1.00
1.49HD)
13.2 Projector mount Kit above projector each 1.00
13.3 360" Fabric projection screen each 1.00
13.4 Customised MS frame to install the fabric screen each 1.00
TOTAL OF DISPLAY SYSTEM FOR CONVOCATION HALL
Rate Amount
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rate Amount
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rate Amount
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rate Amount
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rate Amount
0
0
0
0
Rate Amount
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Rate Amount
0
0
0
0
0
0
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
A B C D E F G H=FXG I=EXH
C.P. & Sanitary Fittings & Accessories
17.2.1 W.C. pan with ISI marked white solid plastic seat and lid each 11.00 2152.50 1.39 2991.98 32,911.73
20
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
Construction of Security Cabins and
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Allied Infrastructure Works
at Entrance area
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
17.70 Providing and fixing PTMT Bottle Trap for Wash basin and sink.
21
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
Construction of Security Cabins and
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Allied Infrastructure Works
at Entrance area
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Internal work
Providing & fixing G. I pipes complete with G. I. fitting and
18.11 clamps i/c making good the walls etc. concealed pipe including
6 painting with anticorrosive bitumastic paint, cutting chases and
making good the wall
18.11.1 15 mm dia nominal bore metre 100.00 144.75 1.39 201.20 20,120.25
External work
Providing & fixing G. I pipes complete with G. I. fittings
18.12
7 including trenching and refilling etc.
18.12.3 25 mm dia. Nominal bore metre 30.00 156.85 1.39 218.02 6,540.65
18.15 Provding & fixing brass bib cock of approved quality
8
18.15.1 15 mm nominal bore each 11.00 1.39 0.00 -
22
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
Construction of Security Cabins and
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Allied Infrastructure Works
at Entrance area
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Providing and fixing C.P. brass angle valve for basin mixer and
18.53 geyser points of approved quality conforming to IS:8931 a)
10 15 mmnominal bore
18.53.1 15mm nominal bore each 347.65 each 11.00 347.65 1.39 483.23 5,315.57
18.74.2 15 mm nominal bore with 45 cm length. each 11.00 52.90 1.39 73.53 808.84
Total of Water Supply 47,380.30
Internal Drainage
17.35 Providing and fixing soil, waste and vent pipes :
17.35.1 100 mm dia
17.35.1.2 Centrifugally cast (spun) iron socketed pipe as per IS: 3989 metre 26.00 730.00 1.39 1014.70 26,382.20
12
17.35.2 75 mm diameter
17.35.2.2 Centrifugally cast (spun) iron socketed pipe as per IS: 3989 metre 79.00 629.85 1.39 875.49 69,163.83
23
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
Construction of Security Cabins and
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Allied Infrastructure Works
at Entrance area
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
24
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
Construction of Security Cabins and
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Allied Infrastructure Works
at Entrance area
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
19.7.1.1 With F.P.S. bricks with class designation 75 each 4.00 5383.70 1.39 7483.34 29,933.37
Total of External Sewage 109,914.39
25
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
Construction of Security Cabins and
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Allied Infrastructure Works
at Entrance area
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Civil Work
8.10.1 White Agaria Marble Stone sqm 4.00 2274.45 1.39 3161.49 12,645.94
26
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
Construction of Security Cabins and
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Allied Infrastructure Works
at Entrance area
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Total of Civil Work 46,882.89
27
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
Construction of Security Cabins and
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Allied Infrastructure Works
at Entrance area
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Rain Water
28
TENDER DOCUMENT - VOLUME 2 OF 2. BILL OF QUANTITIES SEAL OF TENDERER
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY DATE : 25.04.2011
MAIN ENTRANCE
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
A B C D E F G H=FXG I=EXH
Road work
15.2.1 1:3:6 or richer mix cum 5.00 368.45 1.39 512.15 2,560.73
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
2.8.1 All kinds of soil cum 1510.00 103.40 1.39 143.73 217,026.26
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Extra for compaction of earth work in embankment under
8 16.2 optimum moisture conditions to give at least 95% of the cum 369.00 4.50 1.39 6.26 2,308.10
maximum dry density(proctor density).
16.3 Supplying and stacking at site.
16.3.1 90 mm to 45 mm size stone aggregate cum 248.00 742.30 1.39 1031.80 255,885.66
9
16.3.2 63 mm to 45 mm size stone aggregate cum 331.00 768.45 1.39 1068.15 353,556.16
16.3.10 Moorum. cum 369.00 421.85 1.39 586.37 216,371.08
16.30.1 On W.B.M. @ 0.75 Kg / sqm. sqm 1229.00 23.90 1.39 33.22 40,828.61
16.30.2 On bituminous surface @ 0.50 Kg / sqm sqm 2612.00 17.15 1.39 23.84 62,266.16
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
16.48.1 New work (Two or more coats). sqm 431.00 58.10 1.39 80.76 34,807.13
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Scarifying the existing bituminous road surface to a depth of
19 16.77 50mm anddisposal of scarified material within all lifts and lead sqm 2612.00 2.60 1.39 3.61 9,439.77
upto 1000 metre (bymechanical means).
Total of Road work 4,169,407.96
Storm water Drain work
2.8.1 All kinds of soil cum 480.00 103.40 1.39 143.73 68,988.48
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Coursed rubble masonry (second sort) with hard stone in
23 7.7.1 foundation and plinth with : cum 152.00 1913.1 1.39 2659.21 404,199.77
cement mortar 1:6 (1 cement : 6 coarse sand)
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Compound wall
2.8.1 All kinds of soil cum 967.00 103.40 1.39 143.73 138,983.04
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Providing and laying 230 mm. thick dry rubble soling in line and
level, hand packed and vertically set, including filling interstices
33 NON DSR with quarry spoils, stone chips, grit etc. finally spreading either Sq m 405.00 264.50 107,122.50
grit or shingle above it as directed, compaction by wooden/
metallic rammers, watering etc. complete.
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Total of Compound wall 1,379,435.44
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
A B C D E F G H=FXG I=EXH
Soft Landscape
3 Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
2.33.2 Beyond 60 cm girth upto and including 120 cm girth each 5.00 359.80 1.39 500.12 2,500.61
2.33.3 Beyond 120 cm girth upto and including 240 cm girth each 10.00 1658.85 1.39 2305.80 23,058.02
Supplying and stacking of good earth at site including royalty
4 23.2 and carriage up to 1 km ( earth measured in stacks will be cum 204.00 144.05 1.39 200.23 40,846.82
reduced by 20% for payment).
23.4.3 Screened through sieve of I. S. designation 4.75mm cum 56.00 97.05 1.39 134.90 7,554.37
6 23.7 Fine dressing the ground 100 sqm 6.00 80.20 1.39 111.48 668.87
Spreading of sludge, dump manure or/and good earth in
7 23.8 required thickness (cost of sludge, dump manure or/ and good cum 204.00 11.60 1.39 16.12 3,289.30
earth to be paid separately)
Mixing earth and sludge or manure in proportion specified or
8 23.9 cum 260.00 7.85 1.39 10.91 2,836.99
directed.
23.10.3 In rows 5 cm apart in either direction. 100 sqm 6.00 384.85 1.39 534.94 3,209.65
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
A B C D E F G H=FXG I=EXH
Miscellaneous Items
Operative
SR.NO. DSR 2007 Description Unit Qty Rate Cost Index Amount
Rate
2mm thick corrugated (2.5" or 4.2" or 6") or step-down (2" or3"
12.47.1 sqm 33.00 785.35 1.39 1091.64 36,024.00
or 6" ) as specified.
S. DSR OPERATIVE
ITEM DESCRIPTION QTY UNIT RATE COST INDEX
NO. 2007 RATE
A B C D E F G H=FXG
Supply & fixing modular base & cover plate: Supply &
10 1.28 fixing following modular base nd cover plate for modular
switches in recess etc as required.
AMOUNT IN RS.
I=DXH
30,545.25
8,089.80
66,428.10
3,010.00
25,645.50
13,066.00
3,580.64
1,490.08
2,246.24
423.95
2,746.64
444.80
8,195.44
2,513.12
4,749.63
1,579.04
1,558.19
2,271.26
1,984.92
291.90
291.90
985.51
1,036.94
1,912.64
2,638.22
7,561.60
9,618.80
7,089.00
861.80
95.91
95.91
213,048.73
M.S.
S. OPERATIVE
PWD ITEM DESCRIPTION QTY UNIT RATE COST INDEX
NO. RATE
DSR NO
A B C D E F G H=FXG
Telephone wiring
Supplying & errecting telephone cable 1 pair with 0.5mm
1 1.10.1 dia laid in provided pvc casing / conduit as per 75.00 Metre 9.00 1.39 12.51
specification no. WG-TW
Supplying , errecting & commissioing junction box
2 1.11.12 1.00 Each 553.00 1.39 768.67
suitable for 10 pairs as per specification no. WG-TW
Supplying , errecting & commissioing crone module of 10
3 1.11.20 1.00 Each 339.00 1.39 471.21
pairs as per specification no. WG-TW
LAN cabling
AMOUNT IN RS.
I=DXH
938.25
768.67
471.21
3,440.25
166.80
4,345.14
9,798.11
17,167.89
33,682.48
4,481.36
12,776.88
1,451.16
7,005.60
7,005.60
17,743.35
15,595.80
136,838.55
S. COST OPERATIVE
CODE ITEM DESCRIPTION QTY UNIT RATE
NO. INDEX RATE
A B C D E F G H=FXG
DSR
COPPER WIRING IN PVC CONDUITS
2007
Point wiring in PVC conduit,with MODULAR type
switch :Wiring for light point/fan point/exhaust fan
point/call bell point with 1.5 sq.mm FR PVC insulated
copper conductor single core cables in surface/recessed
1.10
1 PVC conduit,with modular switch ,modular
plate,,suitable size G.I box and earthing the point with
1.5 sq.mm FR PVC insulated copper conductor single
core cables etc. as required.
AMOUNT IN RS.
I=DXH
30,545.25
8,089.80
66,428.10
3,010.00
25,645.50
13,066.00
3,580.64
1,490.08
2,246.24
423.95
2,746.64
444.80
8,195.44
2,513.12
4,749.63
1,579.04
1,558.19
2,271.26
1,984.92
291.90
291.90
985.51
1,036.94
1,912.64
2,638.22
7,561.60
9,618.80
7,089.00
861.80
95.91
95.91
213,048.73
AMOUNT IN RS.
I=DXH
938.25
768.67
471.21
3,440.25
166.80
4,345.14
9,798.11
17,167.89
33,682.48
4,481.36
12,776.88
1,451.16
7,005.60
7,005.60
17,743.35
15,595.80
136,838.55
S. COST OPERATIVE
CODE ITEM DESCRIPTION QTY UNIT RATE
NO. INDEX RATE
A B C D E F G H=FXG
DSR 2007 ITEM AS PER DSR 2007
Prewired MCB DB
S/F prewired MCB DB: Supplying and installation &
testing & commissioing of 4 way (4+4) , TPN , vertical
1791
1 type , prewired MCB DB with extended loose wire box ,
double door
2.43.5 4 way vertical double door 1.00 Each 5,830.00 1.39 8,103.70
MCB, RCCB, MCB DB's
2 1722 63 Amps rating , 4 pole RCCB 100mA / 300mA 1.00 Each 1,218.00 1.39 1,693.02
6 Amp to 32 Amp rating TP MCB 'C' series 10KA
3 1709 4.00 Each 1,218.00 1.39 1,693.02
breaking capacity
Steel tubular pole & strut
AMOUNT IN RS.
I=DXH
8,103.70
1,693.02
6,772.08
34,166.20
50735.00
AMOUNT IN RS.
I=DXH
12,176.40
86,736.00
57,546.00
627,473.80
16,652.20
12,982.60
83,122.00
15,957.20
7,089.00
8,701.40
928,436.60
5,610,000.00
5,610,000.00