01.01.01.0CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 M UND 1.00 S/. 644.90 S/. 644.90 1.00
01.01.01.0CASETA PARA OFICINA,ALMACEN Y GUARDIANIA M2 30.00 S/. 75.93 S/. 2,277.90 30.00
01.01.01.0SUMINISTRO E INSTALACION DE SERVICIOS HIGIENICOS Y VESTUA UND 1 S/. 1,236.96 S/. 1,236.96 1
CERCO PROVISIONAL DE OBRA C/MANTAS DE POLIPROPILENO M 114.20 S/. 8.38 S/. 957.00
01.01.01.0 114.20
INSTALACIONES PROVISIONALES
01.01.02
INSTALACION PROVISIONAL DE AGUA GLB 1 S/. 1,438.55 S/. 1,438.55
01.01.02.01 1.00
INSTALACION PROVISIONAL DE DESAGUE GLB 1 S/. 748.25 S/. 748.25
01.01.02.02 1
INSTALACION PROVISIONAL DE ENERGIA ELECTRICA GLB 1.00
01.01.03 S/. 1,000.00 S/. 1,000.00 1.00
01.01.03.01AGUA PARA LA OBRA MES 6 S/. 400.00 S/. 2,400.00 1
ENERGIA ELECTRICA PARA LA OBRA MES 6 S/. 500.00 S/. 3,000.00
01.01.03.02 1.00
INSTALACIONES DE SERVICIOS
01.01.04
GLB 1.00
01.01.04.01CONEXION A LA RED PÚBLICA DE AGUA Y DESAGUE S/. 1,500.00 S/. 1,500.00 1.00
GLB 1.00
01.01.04.02SUMINISTRO E INSTALACION DE MEDIDOR DE ENERGIA Y MURETE S/. 1,600.00 S/. 1,600.00 1
01.01.05 DESMONTAJE Y DEMOLICIONES
UND 8.00
01.01.05.01DESMONTAJE DE PUERTAS Y VENTANAS S/. 9.45 S/. 75.60 8
UND 1.00
01.01.05.02DESMONTAJE DE ACCESORIOS ELECTRICOS S/. 5.25 S/. 5.25 1
Página 2 de 451945503.xlsx
UND 1.00
01.01.05.03DESMONTAJE DE APARATOS SANITARIOS S/. 10.50 S/. 10.50 1
M2 1.00
01.01.05.04DESMONTAJE DE ESTRUCTURAS PRE-FABRICADAS S/. 4.56 S/. 4.56 1
m2 270.00
01.01.05.05DEMOLICION DE VEREDAS Y FALSOS PISOS S/. 18.78 S/. 5,070.60 270
UND 45.00
01.01.05.06DEMOLICION DE COLUMNAS DE CONCRETO ARMADO S/. 48.18 S/. 2,168.10 45.00
M2 80.00
01.01.05.07DEMOLICION DE ESTRUCTURAS DE ALBAÑILERIA CONFINADA S/. 11.47 S/. 917.60 80.00
M3 395.00
01.01.05.08ELIMINACION DE DEMOLICIONES S/. 6.77 S/. 2,674.15 395.00
1.02 TRABAJOS PRELIMINARES
02.04.01 ZAPATAS
M3 159.52
02.04.01.01CONCRETO EN ZAPATAS F´C=210KG/CM2 S/. 344.54 S/. 54,961.02
KG 4637.38
02.04.01.02ACERO GRADO 60 EN ZAPATAS S/. 3.90 S/. 18,085.78 3709.904
02.04.02 VIGA DE CIMENTACION
02.04.02.01CONCRETO f´c = 210 kg/cm2 EN VIGAS DE CIMENTACION M3 41.84 S/. 354.06 S/. 14,813.87
02.04.02.02ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION M2 334.68 S/. 23.29 S/. 7,794.70
02.04.02.03ACERO GRADO 60 EN VIGAS DE CIMENTACION KG 3904.82 S/. 3.85 S/. 15,033.56
02.04.03 SOBRECIMIENTO REFORZADO
02.04.03.01CONCRETO EN SOBRECIMIENTO REFORZADO f'c=175 kg/cm2 M3 13.2 S/. 345.85 S/. 4,565.22
02.04.03.02ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO REFORZADO M2 71.82 S/. 28.85 S/. 2,072.01
02.04.03.03ACERO GRADO 60 EN SOBRECIMIENTO REFORZADO KG 886.55 S/. 4.15 S/. 3,679.18
Página 4 de 451945503.xlsx
02.04.04 COLUMNAS
02.04.04.01COLUMNAS PRINCIPALES
02.04.05.01VIGAS ESTRUCTURALES
02.04.05.02CONCRETO EN VIGAS SECUNDARIAS F´C=175 KG/CM2 M3 12.19 S/. 384.71 S/. 4,689.61
02.04.05.02ENCOFRADO Y DESENCOFRADO DE VIGAS SECUNDARIAS M2 184.42 S/. 29.08 S/. 5,362.93
02.04.05.02ACERO GRADO 60 EN VIGAS SECUNDARIAS KG 1542.83 S/. 4.39 S/. 6,773.02
02.04.06 LOSAS ALIGERADAS
02.04.06.01CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 m3 72.85 S/. 393.98 S/. 28,701.44
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS
02.04.06.02ALIGERADAS m2 779.02 S/. 25.69 S/. 20,013.02
02.04.06.03ACERO GRADO 60 EN LOSAS ALIGERADAS kg 3577.37 S/. 3.91 S/. 13,987.52
02.04.06.04LADRILLO ARCILLA 0.15X0.30 P/TECHO ALIGERADO und 1332.75 S/. 3.73 S/. 4,971.16
02.04.07 LOSAS MACIZAS E=0.17
Página 5 de 451945503.xlsx
02.04.07.01CONCRETO EN LOSA MACIZA f'c=210 kg/cm2 m3 10.4 S/. 391.12 S/. 4,067.65
02.04.07.02ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS m2 61.18 S/. 30.34 S/. 1,856.20
02.04.07.03ACERO GRADO 60 EN LOSAS MACIZAS kg 1197.87 S/. 3.91 S/. 4,683.67
02.04.08 GRADERIAS
02.05.01 TEJA ANDINA 1.15X0.72 und 1537.76 S/. 35.40 S/. 54,436.70
02.05.02 CORREA DE MADERA TORNILLO 2"X3"X10´ p2 1491 S/. 9.06 S/. 13,508.46
2.06 BARANDA METÁLICA EN ESCALERAS
Página 6 de 451945503.xlsx
3.01 TABIQUES
03.01.01 MUROS DE ALBAÑILERIA CONFINADA, AMARRE SOGA m2 1324.42 S/. 47.31 S/. 62,658.31
3.02 ENLUCIDO
03.06.01 ZOCALO CON CERAMICO H-10 M 23.12 S/. 9.87 S/. 228.19
3.07 PINTURA EN INTERIORES
04.05.01 CAJA DE PASE CUADRADA DE FºGº 150X150X50 MM UND 8 S/. 25.86 S/. 206.88
04.05.02 CAJA DE PASE OCTOGONAL DE FºGº 100X40MM und 10 S/. 25.86 S/. 258.60
4.06 TABLEROS ELECTRICOS
Página 9 de 451945503.xlsx
04.07.01 ARTEF. ADOSAR REJILLA ALUMINIO RAS-A 1X4/TL36(2X36W) TIPO A pza 76 S/. 174.39 S/. 13,253.64
04.07.02 ARTEFACTO DE ALUMBRADO LED DE 40 w und 74 S/. 37.20 S/. 2,752.80
04.07.03 ARTEF. P´FAROLA E-35 VS-36W AF DE JOSFEL pza 4 S/. 293.51 S/. 1,174.04
04.07.04 ARTEF. LUZ DE EMERGENCIA 2X20W pza 30 S/. 243.07 S/. 7,292.10
04.07.05 REFLECTOR ASIMETRICO C/LAMP HM DE 250W SIM RL 40 DE JOSEF pza 3 S/. 192.02 S/. 576.06
4.08 INTERRUPTORES TERMOMAGNETICOS
04.11.01 SALIDA PARA DETECTOR DE HUMO INC.EQUIPO pto 17 S/. 101.70 S/. 1,728.90
SALIDA PARA ESTACION MANUAL DE ACI CON PULSADOR
04.11.02 pto 17 S/. 628.84 S/. 10,690.28
04.11.03 SALIDA PARA SIRENA DE ACI pto 17 S/. 107.00 S/. 1,819.00
04.11.04 CAJA DE FºGº 200X200X100MM UND 10 S/. 178.60 S/. 1,786.00
4.12 SISTEMAS DE PUESTA A TIERRA
05.01.01 EXCAVACION DE ZANJAS PARA RED DE AGUA M3 51.36 S/. 26.37 S/. 1,354.36
05.01.02 RELLENO CON MATERIAL PROPIO M3 51.77 S/. 45.56 S/. 2,358.64
5.02 APARATOS SANITARIOS Y ACCESORIOS
05.02.01.01OVALIN SONNET BLANCOINC.GRIFO TIPO A-1 PZA 26 S/. 217.08 S/. 5,644.08
05.02.01.02INODORO DE LOSA VITRIFICADA C/FLUX PZA 26 S/. 314.00 S/. 8,164.00
05.02.01.03URINARIO COLOR BLANCO C/FLUXOMETRO PZA 6 S/. 713.00 S/. 4,278.00
05.02.01.04DUCHA TIPO F-1 UND 12 S/. 174.00 S/. 2,088.00
05.02.02 INSTALACION Y SUMINISTRO DE ACCESORIOS
Página 11 de 451945503.xlsx
05.02.03.03CODO PVC SAP P/AGUA C-10 DE 1/2"X90° PZA 340 S/. 2.13 S/. 724.20
05.02.03.03CODO PVC SAP P/AGUA C-10 DE 3/4"X90° PZA 14 S/. 1.23 S/. 17.22
05.02.03.03TEE CON REDUCCION PVC SAP P/AGUA C-10 DE 3/4" A 1/2" PZA 20 S/. 3.53 S/. 70.60
05.02.03.04VALVULAS Y UNION UNIVERSAL
05.02.04.01SALIDAS DE DESAGUE
05.02.04.01MONTANTE DE TUBERIA PVC SAL 4" M 20.8 S/. 20.37 S/. 423.70
05.02.04.03REDES
05.03.01 CODO PVC SAL P/DESAGUE C-10 DE 4"X90° PZA 5 S/. 8.70 S/. 43.50
05.03.02 CODO PVC SAL P/DESAGUE C-10 DE 2"X90° PZA 27 S/. 5.70 S/. 153.90
05.03.03 CODO PVC SAL P/DESAGUE C-10 DE 2"X45° PZA 5 S/. 5.70 S/. 28.50
05.03.04 CODO PVC SAL P/DESAGUE C-10 DE 4"X45° PZA 10 S/. 9.70 S/. 97.00
05.03.05 YEE PVC SAL P/DESAGUE 4" PZA 7 S/. 14.30 S/. 100.10
05.03.06 YEE PVC SAL P/DESAGUE 2" PZA 11 S/. 10.80 S/. 118.80
05.03.07 YEE PVC SAL P/DESAGUE C/REDUCCION 4" A 2" PZA 11 S/. 10.70 S/. 117.70
05.03.08 TEE PVC P/DESAGUE 4" PZA 12 S/. 10.70 S/. 128.40
5.04 CAJAS DE REGISTRO
Página 13 de 451945503.xlsx
07.01.0 MONTANTES
MONTANTE DE DRENAJE PLUVIAL C/TUB.PVC SAL3" INC.ACC. UND 36 S/. 289.51 S/. 10,422.36
07.01.01
07.02.00 REDES
07.04.01 CODO PVC SAL P/DESAGUE C-10 DE 3"X90° PZA 10 S/. 8.70 S/. 87.00
07.04.02 CODO PVC SAL P/DESAGUE C-10 DE 3"X45° PZA 1 S/. 9.70 S/. 9.70
7.05 CANALETAS PLUVIALES
07.06.01 MITIGACION DEL IMPACTO AMBIENTAL GLB 1 S/. 12,000.00 S/. 12,000.00 1.00
Página 14 de 451945503.xlsx
CRONOGRAMA VALORIZADO
956.996 100.00%
10.4
61.18
1197.87
69.6
2
735.123
231.375
84.385
219.49
35.005
105.3
569.515
20.8
852.71
538.06
108.66
284.22
Página 22 de 451945503.xlsx
48
Página 23 de 451945503.xlsx
0.5
3
1
10
6.5
9.5
Página 24 de 451945503.xlsx
20.8
36
###
###
###
###
###
###
###
###
S/. 400.00 16.67% 1 S/. 400.00 16.67% 1 S/. 400.00 16.67%
S/. 500.00 16.67% 1.00 S/. 500.00 16.67% 1.00 S/. 500.00 16.67%
###
###
###
###
###
Página 30 de 451945503.xlsx
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
S/. 2,000.00 16.67% 0.17 S/. 2,000.00 100.00% 0.17 S/. 2,000.00 16.67%
###
###
###
S/. 2,016.00 16.67% 30 S/. 2,016.00 16.67% 30 S/. 2,016.00 16.67%
###
###
###
Página 31 de 451945503.xlsx
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Página 32 de 451945503.xlsx
###
###
###
###
###
###
S/. 9,151.64 80.00% 4.61 S/. 1,715.93 15.00% ###
S/. 12,557.98 85.00% 46.89 S/. 1,477.50 10.00% ###
S/. 3,211.80 85.00% 88.908 S/. 377.86 10.00% ###
###
###
S/. 21,636.50 85.00% 6.651 S/. 2,545.47 10.00% ###
S/. 17,493.76 85.00% 65.274 S/. 2,058.09 10.00% ###
S/. 38,868.68 85.00% 1129.083 S/. 4,572.79 10.00% ###
###
S/. 3,986.17 85.00% 1.219 S/. 468.96 10.00% ###
S/. 4,558.49 85.00% 18.442 S/. 536.29 10.00% ###
S/. 5,757.07 85.00% 154.283 S/. 677.30 10.00% ###
###
S/. 14,350.72 50.00% ###
S/. 10,006.51 50.00% ###
S/. 6,993.76 50.00% ###
S/. 2,485.58 50.00% ###
###
Página 33 de 451945503.xlsx
###
###
###
###
###
###
###
###
###
###
###
###
S/. 13,508.46 100.00% ###
###
Página 34 de 451945503.xlsx
###
###
###
###
16 S/. 280.64 100.00%
8 S/. 140.32 100.00%
###
17 S/. 1,728.90 100.00%
###
###
###
###
12 S/. 113.88 100.00%
52 S/. 1,003.60 100.00%
82 S/. 885.60 100.00%
16 S/. 212.80 100.00%
11 S/. 682.00 100.00%
12 S/. 373.80 100.00%
###
S/. 423.70 100.00% ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Página 41 de 451945503.xlsx
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Página 42 de 451945503.xlsx